PROJECT:
CHECKLIST FOR:
MECHANICAL – REFRIGERANT COPPER PIPES
Installation Basis :
1. Post Award :
c. Delivery:
Delivery Order
(Specify Delivery
Handling / Storage Findings
Equipment/Material Date
Delivered)
Copper Pipes
1/6
Mech- REFRIGERANT COPPER PIPES
3. Installation:
4. Post Installation:
5. General:
Inspected By:
2/6
Mech- REFRIGERANT COPPER PIPES
3/6