Europe
50 % incl 9% France
Flow assembly
Manufacturing to Order
100 types x 100 options.
Operation cycle : 2 days / 100 steps
1700 component references
110 suppliers
7 x 100 % control steps on electrical and
mechanical caracteristics.
Compliance checking according to drawings + wiring
diagrams + manufacturing documents
Voltage drops test
Mechanical operation test
Leakage test
Electrical operation tests
Dielectric tests
Partial discharge test 100%
Epoxy Moulding
Epoxy resin moulding of the fuse chambers and of
the bushings.
8 presses and 1 carrousel / 5 moulds - 500 t
resin/year.
Sandblasting and metallization of surfaces.
100 % measurement of the partial discharge (<10
pC
at 26,4 KV and extinction at 16,6 KV) according to
IEC
270 standard.
Commitment to Quality