Customer ID Date 24 Apr 2019

Project PELL PRIVATE LIMITED Quotation # IEC1006


Address TAMEER CONSTRUCTION PVT LTD LHR IEC Ref IEC-P-061
Attention MANAGER

Subject Quotation for Earth Filling

if any comment

Unit Price
Ref. Item Description Q'ty UOM Amount Remarks
(PKR)
Engg. Fill Compacted in 12” layer SFT 35
PCC 4” thick (1:4:8) SFT 5
RCC in Footing As per drawing CFT 15
10% increase for
RCC in Columns Upto 8’ height CFT 25 each successive
Step
Shuttering in
As per drawing SFT 21
Footings
10% increase for
Shuttering in each successive
As per drawing SFT 24
Columns Step

10% increase for


Concrete in each successive
Upto 13’ Height CFT 35
Bracing Beams Beam

10% increase for


Shuttering in
Upto 13’ Height SFT 35 each successive
Bracing Beam Beam
Brickwork in 10% increase for
Upto 13’ Height SFT 33
Super Structure successive floor
Plaster in 10% increase for
Upto 13’ Height SFT 16
Superstructure successive floor
10% increase for
Steel Fixing Upto 13’ Height TON 4300 each successive
Step

Subtotal
Tax
Total
Terms & Conditions
Applies
 The above rates are exclusive of any type of tax(s) applicable.
 All tools & Plants, Shuttering, Scaffolding, Machines, consumables and auxiliaries are to be provided by the
employer
 Labor Residence, Water Supply & Electricity are to be provided by the Employer

THANK YOU FOR YOUR BUSINESS