if any comment
Unit Price
Ref. Item Description Q'ty UOM Amount Remarks
(PKR)
Engg. Fill Compacted in 12” layer SFT 35
PCC 4” thick (1:4:8) SFT 5
RCC in Footing As per drawing CFT 15
10% increase for
RCC in Columns Upto 8’ height CFT 25 each successive
Step
Shuttering in
As per drawing SFT 21
Footings
10% increase for
Shuttering in each successive
As per drawing SFT 24
Columns Step
Subtotal
Tax
Total
Terms & Conditions
Applies
The above rates are exclusive of any type of tax(s) applicable.
All tools & Plants, Shuttering, Scaffolding, Machines, consumables and auxiliaries are to be provided by the
employer
Labor Residence, Water Supply & Electricity are to be provided by the Employer
Regards,
for IEC International