Documente Academic
Documente Profesional
Documente Cultură
8 Tn/m2
s/c 300 Kg/m2
NPT= 0.15 m
NFZ= -1.30 m
K30= 6000 Tn/m3 (Arenas)
f'c= 210 Kg/cm2
fy= 4200 Kg/cm2
Lo= 4.80 m
R= 96.00 Tn
Lc= 5.25 m
xR= 3.31 m
L= 6.628125 m
L= 6.65 m
Gn= 12.60 Tn/m2
Az= 7.62 m2 L= 6.65 m
B= 1.15 m B= 1.40 m
e= -0.0109375 m
R= 124.00 Tn
Lc= 5.25 m
xR= 3.41 m
Gn= 17.34 Tn/m2
e= 0.09 m L= 6.65 m
B= 1.40 m
R= 68.00 Tn
Lc= 5.25 m
xR= 3.13 m
Gn= 17.34 Tn/m2
e= -0.19 m L= 6.65 m
B= 1.40 m
R= 116.00 Tn
Lc= 5.25 m
xR= 3.28 m
Gn= 17.34 Tn/m2
e= -0.04 m L= 6.65 m
B= 1.60 m
Verificación de Esfuerzos en el Suelo.-
G1= 16.36 Tn/m2
G2= 17.17 Tn/m2
G3= 4.63 Tn/m2
G4= 5.44 Tn/m2
R= 76.00 Tn
Lc= 5.25 m
xR= 3.36 m
Gn= 17.34 Tn/m2
e= 0.03 m L= 6.65 m
B= 1.60 m
R= 149.00 Tn
Lc= 5.25 m
xR= 3.20 m
e= -0.12 m L= 6.65 m
B= 1.60 m
Primer Apoyo.-
usar 5/8" @ 0.14m
usar 3/4" @ 0.21m
Segundo Apoyo.-
Mu= 26.38 Tn-m
b= 160 cm
d= 66.73 cm
a= 1.56 (asumido)
As= 10.58 cm2
a= 1.56 cm
As,min= 21.60 cm2
As= 21.60 cm2
Claro
Mu= 112.8 Tn-m
b= 160 cm
d= 68.73 cm
a= 6.71 (asumido)
As= 45.65 cm2
a= 6.71 cm
As,min= 21.60 cm2
As= 45.65 cm2
barras 5/8" 1.98 cm2 s= 6.94032128 cm
barras 3/4" 2.85 cm2 s= 9.98985638 cm