REBAR WEIGHT

Rebars ø Unit weight


mm kg/m
6 0.222
8 0.3946
10 0.6165
12 0.8878
16 1.5783
20 2.4662
25 3.8534
28 4.8337
32 6.3133
36 7.9903

GENERAL NOTES
Lap Splice Hooks (45deg.) Hooks (90deg.)
Beams 65d 6d 12d
Slabs 65d 6d 12d
Columns 40d 6d 12d

Clear Cover for the reinforcement including links

Cover
Member Designation
m
Slabs ( General ) 0.02
Slabs ( Exposed to weather ) 0.02
Beams 0.04
Columns 0.04
R.C. Shear Walls 0.04
Retaining Walls / Raft ( Earth Side Face ) 0.07
Retaining Walls / Raft ( Internal Face ) 0.07
Footing 0.075

LAP LENGTH FOR REINFORCEMENT ( LINTEL BEAMS & STAIRS )

Tension Bars Compression Bars


Bar Size Top Bars Other Bars Reg. Laps Col. w/ Ties
8 0.41 0.41 0.3 0.3
10 0.45 0.41 0.37 0.3
12 0.54 0.41 0.44 0.36
16 0.71 0.55 0.58 0.48
20 0.88 0.68 0.73 0.6
25 1.12 0.88 0.91 0.75
28 1.84 1.42 1.16 0.96
32 1.84 1.42 1.16 0.96
40 3.12 2.41 1.45 1.2
PARAMETERS
Material psi Mpa ACI 318-05
f'c 3000 21 Dev't & Splice Length
fy 40000 276 12mm & higher
fyh 33000 227 10mm & lower
tie ø 10 stirrup ø 10
fyt 40000 fyt 40000
Anchorage
Bar ø length Ldh Standard Hook (mm) Beam Comp. Tension Lap Splice (m
(mm) (mm) (mm) 90 o
180 o
135 90 Splice (mm)Lap Class
o- o
Beam
Top Bar
10 0.6 0.15 0.16 0.11 0.12 0.3 A 0.31
B 0.4
12 0.71 0.18 0.2 0.12 0.13 0.3 A 0.45
B 0.59
16 0.95 0.23 0.26 0.13 0.16 0.31 A 0.61
B 0.79
20 1.18 0.29 0.32 0.16 0.2 0.39 A 0.76
B 0.99
25 1.9 0.37 0.4 0.2 0.25 0.48 A 1.18
B 1.53
28 2.19 0.41 0.48 0.26 0.54 A 1.33
B 1.73
32 2.59 0.47 0.55 0.29 0.62 A 1.51
B 1.96
36 2.99 0.53 0.65 0.36 0.7 A 1.7
B 2.21

PARAMETERS
Material psi Mpa ACI 318-05
f'c 4000 27.6 Dev't & Splice Length
fy 60000 414 12mm & higher
fyh 40000 276 10mm & lower
tie ø 10 stirrup ø 10
fyt 40000 fyt 40000
Anchorage
Bar ø length Ldh Standard Hook (mm) Beam Comp. Tension Lap Splice (m
(mm) (mm) (mm) 90 o
180 o
135 90 Splice (mm)Lap Class
o- o
Beam
Top Bar
10 0.6 0.15 0.16 0.11 0.12 0.3 A 0.33
B 0.43
12 0.62 0.23 0.2 0.12 0.13 0.35 A 0.59
B 0.77
16 0.82 0.3 0.26 0.13 0.16 0.46 A 0.79
B 1.03
20 1.03 0.38 0.32 0.16 0.2 0.58 A 0.98
B 1.27
25 1.64 0.48 0.4 0.2 0.25 0.72 A 1.54
B 2
28 1.9 0.53 0.48 0.26 0.81 A 1.72
B 2.24
32 2.24 0.61 0.55 0.29 0.93 A 1.97
B 2.56
36 2.59 0.69 0.65 0.36 1.04 A 2.21
B 2.87

PARAMETERS
Material psi Mpa ACI 318-05
f'c 5000 34.5 Dev't & Splice Length
fy 60000 414 12mm & higher
fyh 40000 276 10mm & lower
tie ø 10 stirrup ø 10
fyt 40000 fyt 40000
Anchorage
Bar ø length Ldh Standard Hook (mm) Beam Comp. Tension Lap Splice (m
(mm) (mm) (mm) 90o 180o 135o - 90o Splice (mm)Lap Class Beam
Top Bar
10 0.6 0.15 0.16 0.11 0.12 0.3 A 0.3
B 0.39
12 0.6 0.2 0.2 0.12 0.13 0.35 A 0.53
B 0.69
16 0.74 0.27 0.26 0.13 0.16 0.46 A 0.7
B 0.91
20 0.92 0.34 0.32 0.16 0.2 0.58 A 0.88
B 1.14
25 1.15 0.43 0.4 0.2 0.25 0.72 A 1.37
B 1.78
28 1.3 0.48 0.48 0.26 0.81 A 1.54
B 2
32 1.7 0.54 0.55 0.29 0.93 A 1.76
B 2.29
36 2.15 0.61 0.65 0.36 1.04 A 1.98
B 2.57

PARAMETERS
Material psi Mpa ACI 318-05
f'c 7000 48.3 Dev't & Splice Length
fy 60000 414 12mm & higher
fyh 40000 276 10mm & lower
tie ø 10 stirrup ø 10
fyt 40000 fyt 40000
Anchorage
Bar ø length Ldh Standard Hook (mm) Beam Comp. Tension Lap Splice (m
(mm) (mm) (mm) 90 o
180 o
135 90 Splice (mm)Lap Class
o- o
Beam
Top Bar
10 0.6 0.15 0.16 0.11 0.12 0.3 A 0.3
B 0.39
12 0.6 0.17 0.2 0.12 0.13 0.35 A 0.45
B 0.59
16 0.62 0.23 0.26 0.13 0.16 0.46 A 0.59
B 0.77
20 0.78 0.29 0.32 0.16 0.2 0.58 A 0.74
B 0.96
25 1.24 0.36 0.4 0.2 0.25 0.72 A 1.16
B 1.51
28 1.44 0.4 0.48 0.26 0.81 A 1.3
B 1.69
32 1.7 0.46 0.55 0.29 0.93 A 1.49
B 1.94
36 1.96 0.52 0.65 0.36 1.04 A 1.67
B 2.17
Tension Lap Splice (mm)
Beam Column Unit Wt.
Bottom Bar Tied Spiral kg/m
0.3 0.3 0.3 0.616
0.39
0.35 0.35 0.35 0.888
0.46
0.47 0.47 0.47 1.579
0.61
0.58 0.58 0.58 2.466
0.75
0.91 0.91 0.91 3.854
1.18
1.02 1.02 1.02 4.833
1.33
1.17 1.17 1.17 6.313
1.52
1.31 1.31 1.31 7.991
1.7

Tension Lap Splice (mm)


Beam Column Unit Wt.
Bottom Bar Tied Spiral kg/m
0.3 0.3 0.3 0.616
0.39
0.45 0.45 0.45 0.888
0.59
0.61 0.61 0.61 1.579
0.79
0.76 0.76 0.76 2.466
0.99
1.18 1.18 1.18 3.854
1.53
1.32 1.32 1.32 4.833
1.72
1.51 1.51 1.51 6.313
1.96
1.7 1.7 1.7 7.991
2.21

Tension Lap Splice (mm)


Beam Column Unit Wt.
Bottom Bar Tied Spiral kg/m
0.3 0.3 0.3 0.616
0.39
0.41 0.41 0.41 0.888
0.53
0.54 0.54 0.54 1.579
0.7
0.68 0.68 0.68 2.466
0.88
1.06 1.06 1.06 3.854
1.38
1.18 1.18 1.18 4.833
1.53
1.35 1.35 1.35 6.313
1.76
1.52 1.52 1.52 7.991
1.98

Tension Lap Splice (mm)


Beam Column Unit Wt.
Bottom Bar Tied Spiral kg/m
0.3 0.3 0.3 0.616
0.39
0.34 0.34 0.34 0.888
0.44
0.46 0.46 0.46 1.579
0.6
0.57 0.57 0.57 2.466
0.74
0.89 0.89 0.89 3.854
1.16
1 1 1 4.833
1.3
1.14 1.14 1.14 6.313
1.48
1.29 1.29 1.29 7.991
1.68
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

B1S-4A B 2 0.6 0.6 4.879 3.367 0.125 16.43 32.86


GL 1 - 2 2 0.6 0.6 4.879 3.367 0.125 Short Span
2 0.6 0.6 4.879 3.367 0.125
2 0.6 0.6 4.879 3.367 0.125
2 0.6 0.6 4.879 3.367 0.125
2 0.6 0.6 4.879 3.367 0.125
2 0.6 0.6 4.879 3.367 0.125 Long Span
2 0.6 0.6 4.879 3.367 0.125
2 0.6 0.6 4.879 3.367 0.125
2 0.6 0.6 4.879 3.367 0.125
2 0.6 0.6 4.879 3.367 0.125

B1S-4A B 1 0.4 0.6 4.879 3.467 0.125 16.91 16.91


GL 1 - 2 1 0.4 0.6 4.879 3.467 0.125 Short Span
1 0.4 0.6 4.879 3.467 0.125
1 0.4 0.6 4.879 3.467 0.125
1 0.4 0.6 4.879 3.467 0.125
1 0.4 0.6 4.879 3.467 0.125
1 0.4 0.6 4.879 3.467 0.125 Long Span
1 0.4 0.6 4.879 3.467 0.125
1 0.4 0.6 4.879 3.467 0.125
1 0.4 0.6 4.879 3.467 0.125
1 0.4 0.6 4.879 3.467 0.125

B1S-4A B 2 0.6 0.7 4.879 2.600 0.125 12.69 25.38


GL 2 - 3 2 0.6 0.7 4.879 2.600 0.125 Short Span

I. A. Campbell Associates, Inc. Page 8 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.6 0.7 4.879 2.600 0.125
2 0.6 0.7 4.879 2.600 0.125
2 0.6 0.7 4.879 2.600 0.125
2 0.6 0.7 4.879 2.600 0.125
2 0.6 0.7 4.879 2.600 0.125 Long Span
2 0.6 0.7 4.879 2.600 0.125
2 0.6 0.7 4.879 2.600 0.125
2 0.6 0.7 4.879 2.600 0.125
2 0.6 0.7 4.879 2.600 0.125

B1S-4A B 1 0.6 0.6 4.879 2.700 0.125 13.17 13.17


GL 2 - 3 1 0.6 0.6 4.879 2.700 0.125 Short Span
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125 Long Span
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125

B1S-4 B 4 0.6 0.7 4.829 2.600 0.125 12.56 50.24


GL 3 - 4 4 0.6 0.7 4.829 2.600 0.125 Short Span
GL 4 - 5 4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125

I. A. Campbell Associates, Inc. Page 9 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125 Long Span
4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125

B1S-4 B 2 0.6 0.7 4.829 2.700 0.125 13.04 26.08


GL 3 - 4 2 0.6 0.7 4.829 2.700 0.125 Short Span
GL 4 - 5 2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125 Long Span
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125

B1S-5 B 4 0.6 0.7 4.829 2.600 0.125 12.56 50.24


GL 5 - 6 4 0.6 0.7 4.829 2.600 0.125 Short Span
GL 6 - 7 4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125 Long Span
4 0.6 0.7 4.829 2.600 0.125

I. A. Campbell Associates, Inc. Page 10 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125
4 0.6 0.7 4.829 2.600 0.125

B1S-5 B 2 0.6 0.7 4.829 2.700 0.125 13.04 26.08


GL 5 - 6 2 0.6 0.7 4.829 2.700 0.125 Short Span
GL 6 - 7 2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125 Long Span
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125
2 0.6 0.7 4.829 2.700 0.125

B1S-5 B 2 0.6 0.6 4.879 2.600 0.125 12.69 25.38


GL 7 - 8 2 0.6 0.6 4.879 2.600 0.125 Short Span
2 0.6 0.6 4.879 2.600 0.125
2 0.6 0.6 4.879 2.600 0.125
2 0.6 0.6 4.879 2.600 0.125
2 0.6 0.6 4.879 2.600 0.125
2 0.6 0.6 4.879 2.600 0.125 Long Span
2 0.6 0.6 4.879 2.600 0.125
2 0.6 0.6 4.879 2.600 0.125
2 0.6 0.6 4.879 2.600 0.125
2 0.6 0.6 4.879 2.600 0.125

I. A. Campbell Associates, Inc. Page 11 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

B1S-5 B 1 0.6 0.6 4.879 2.700 0.125 13.17 13.17


GL 7 - 8 1 0.6 0.6 4.879 2.700 0.125 Short Span
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125 Long Span
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125
1 0.6 0.6 4.879 2.700 0.125

B1S-6 B 1 0.6 0.6 4.879 3.000 0.125 14.64 14.64


GL 9 - 10 1 0.6 0.6 4.879 3.000 0.125 Short Span
1 0.6 0.6 4.879 3.000 0.125
1 0.6 0.6 4.879 3.000 0.125
1 0.6 0.6 4.879 3.000 0.125
1 0.6 0.6 4.879 3.000 0.125
1 0.6 0.6 4.879 3.000 0.125 Long Span
1 0.6 0.6 4.879 3.000 0.125
1 0.6 0.6 4.879 3.000 0.125
1 0.6 0.6 4.879 3.000 0.125
1 0.6 0.6 4.879 3.000 0.125

B1S-6 B 1 0.6 0.6 4.879 3.600 0.125 17.56 17.56


GL 9 - 10 1 0.6 0.6 4.879 3.600 0.125 Short Span

I. A. Campbell Associates, Inc. Page 12 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.6 4.879 3.600 0.125
1 0.6 0.6 4.879 3.600 0.125
1 0.6 0.6 4.879 3.600 0.125
1 0.6 0.6 4.879 3.600 0.125
1 0.6 0.6 4.879 3.600 0.125 Long Span
1 0.6 0.6 4.879 3.600 0.125
1 0.6 0.6 4.879 3.600 0.125
1 0.6 0.6 4.879 3.600 0.125
1 0.6 0.6 4.879 3.600 0.125

B1S-11 A 1 0.6 0.6 6.75 2.7 0.125 18.23 18.23


GL 6 -7 1 0.6 0.6 6.75 2.7 0.125 Short Span
1 0.6 0.6 6.75 2.7 0.125
1 0.6 0.6 6.75 2.7 0.125
1 0.6 0.6 6.75 2.7 0.125
1 0.6 0.6 6.75 2.7 0.125 Long Span
1 0.6 0.6 6.75 2.7 0.125
1 0.6 0.6 6.75 2.7 0.125
1 0.6 0.6 6.75 2.7 0.125

B1S-1 A 2 0.4 0.6 6.75 2.7 0.125 18.23 36.46


GL 6 - 8 2 0.4 0.6 6.75 2.7 0.125 Short Span
2 0.4 0.6 6.75 2.7 0.125
2 0.4 0.6 6.75 2.7 0.125
2 0.4 0.6 6.75 2.7 0.125
2 0.4 0.6 6.75 2.7 0.125 Long Span
2 0.4 0.6 6.75 2.7 0.125

I. A. Campbell Associates, Inc. Page 13 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.4 0.6 6.75 2.7 0.125
2 0.4 0.6 6.75 2.7 0.125

B1S-1 A 3 0.6 0.6 6.75 2.7 0.125 18.23 54.69


GL 6 - 8 3 0.6 0.6 6.75 2.7 0.125 Short Span
3 0.6 0.6 6.75 2.7 0.125
3 0.6 0.6 6.75 2.7 0.125
3 0.6 0.6 6.75 2.7 0.125
3 0.6 0.6 6.75 2.7 0.125 Long Span
3 0.6 0.6 6.75 2.7 0.125
3 0.6 0.6 6.75 2.7 0.125
3 0.6 0.6 6.75 2.7 0.125

B1S-7A A 1 0.6 0.6 6.75 3.000 0.15 20.25 20.25


1 0.6 0.6 6.75 3.000 0.15 Short Span
1 0.6 0.6 6.75 3.000 0.15
1 0.6 0.6 6.75 3.000 0.15
1 0.6 0.6 6.75 3.000 0.15
1 0.6 0.6 6.75 3.000 0.15 Long Span
1 0.6 0.6 6.75 3.000 0.15
1 0.6 0.6 6.75 3.000 0.15
1 0.6 0.6 6.75 3.000 0.15

B1S-12 A 1 0.5 0.6 6.75 3.600 0.125 24.3 24.30


1 0.5 0.6 6.75 3.600 0.125 Short Span
1 0.5 0.6 6.75 3.600 0.125
1 0.5 0.6 6.75 3.600 0.125

I. A. Campbell Associates, Inc. Page 14 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.5 0.6 6.75 3.600 0.125
1 0.5 0.6 6.75 3.600 0.125 Long Span
1 0.5 0.6 6.75 3.600 0.125
1 0.5 0.6 6.75 3.600 0.125
1 0.5 0.6 6.75 3.600 0.125

B1S-3A B 1 0.6 0.6 9.95 3.367 0.125 33.5 33.50


GL 1 - 2 1 0.6 0.6 9.95 3.367 0.125 Short Span
1 0.6 0.6 9.95 3.367 0.125
1 0.6 0.6 9.95 3.367 0.125
1 0.6 0.6 9.95 3.367 0.125
1 0.6 0.6 9.95 3.367 0.125
1 0.6 0.6 9.95 3.367 0.125 Long Span
1 0.6 0.6 9.95 3.367 0.125
1 0.6 0.6 9.95 3.367 0.125
1 0.6 0.6 9.95 3.367 0.125
1 0.6 0.6 9.95 3.367 0.125

B1S-2A A 2 0.4 0.6 9.95 3.467 0.15 34.49 68.98


GL 1 - 2 2 0.4 0.6 9.95 3.467 0.15 Short Span
2 0.4 0.6 9.95 3.467 0.15
2 0.4 0.6 9.95 3.467 0.15
2 0.4 0.6 9.95 3.467 0.15
2 0.4 0.6 9.95 3.467 0.15 Long Span
2 0.4 0.6 9.95 3.467 0.15
2 0.4 0.6 9.95 3.467 0.15
2 0.4 0.6 9.95 3.467 0.15

I. A. Campbell Associates, Inc. Page 15 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

B1S-2A A 3 0.6 0.6 9.95 3.367 0.15 33.5 100.50


GL 1 - 2 3 0.6 0.6 9.95 3.367 0.15 Short Span
3 0.6 0.6 9.95 3.367 0.15
3 0.6 0.6 9.95 3.367 0.15
3 0.6 0.6 9.95 3.367 0.15
3 0.6 0.6 9.95 3.367 0.15 Long Span
3 0.6 0.6 9.95 3.367 0.15
3 0.6 0.6 9.95 3.367 0.15
3 0.6 0.6 9.95 3.367 0.15

B1S-1A A 6 0.6 0.6 10 2.600 0.125 26 156.00


GL 2 - 3 6 0.6 0.6 10 2.600 0.125 Short Span
6 0.6 0.6 10 2.600 0.125
6 0.6 0.6 10 2.600 0.125
6 0.6 0.6 10 2.600 0.125
6 0.6 0.6 10 2.600 0.125 Long Span
6 0.6 0.6 10 2.600 0.125
6 0.6 0.6 10 2.600 0.125
6 0.6 0.6 10 2.600 0.125

B1S-1A A 3 0.4 0.6 10 2.700 0.125 27 81.00


GL 2 - 3 3 0.4 0.6 10 2.700 0.125 Short Span
3 0.4 0.6 10 2.700 0.125
3 0.4 0.6 10 2.700 0.125
3 0.4 0.6 10 2.700 0.125
3 0.4 0.6 10 2.700 0.125 Long Span

I. A. Campbell Associates, Inc. Page 16 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3 0.4 0.6 10 2.700 0.125
3 0.4 0.6 10 2.700 0.125
3 0.4 0.6 10 2.700 0.125

B1S-1 A 57 0.6 0.6 10 2.600 0.125 26 1,482.00


57 0.6 0.6 10 2.600 0.125 Short Span
57 0.6 0.6 10 2.600 0.125
57 0.6 0.6 10 2.600 0.125
57 0.6 0.6 10 2.600 0.125
57 0.6 0.6 10 2.600 0.125 Long Span
57 0.6 0.6 10 2.600 0.125
57 0.6 0.6 10 2.600 0.125
57 0.6 0.6 10 2.600 0.125

B1S-1 A 28 0.4 0.6 10 2.700 0.125 27 756.00


28 0.4 0.6 10 2.700 0.125 Short Span
28 0.4 0.6 10 2.700 0.125
28 0.4 0.6 10 2.700 0.125
28 0.4 0.6 10 2.700 0.125
28 0.4 0.6 10 2.700 0.125 Long Span
28 0.4 0.6 10 2.700 0.125
28 0.4 0.6 10 2.700 0.125
28 0.4 0.6 10 2.700 0.125

B1S-1 A 1 0.6 0.6 5.625 2.600 0.125 14.63 14.63


1 0.6 0.6 5.625 2.600 0.125 Short Span
1 0.6 0.6 5.625 2.600 0.125

I. A. Campbell Associates, Inc. Page 17 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.6 5.625 2.600 0.125
1 0.6 0.6 5.625 2.600 0.125
1 0.6 0.6 5.625 2.600 0.125 Long Span
1 0.6 0.6 5.625 2.600 0.125
1 0.6 0.6 5.625 2.600 0.125
1 0.6 0.6 5.625 2.600 0.125

B1S-1 A 3 0.6 0.6 9.28 2.600 0.125 24.13 72.39


3 0.6 0.6 9.28 2.600 0.125 Short Span
3 0.6 0.6 9.28 2.600 0.125
3 0.6 0.6 9.28 2.600 0.125
3 0.6 0.6 9.28 2.600 0.125
3 0.6 0.6 9.28 2.600 0.125 Long Span
3 0.6 0.6 9.28 2.600 0.125
3 0.6 0.6 9.28 2.600 0.125
3 0.6 0.6 9.28 2.600 0.125

B1S-1 A 2 0.4 0.6 9.28 2.700 0.125 25.06 50.12


2 0.4 0.6 9.28 2.700 0.125 Short Span
2 0.4 0.6 9.28 2.700 0.125
2 0.4 0.6 9.28 2.700 0.125
2 0.4 0.6 9.28 2.700 0.125
2 0.4 0.6 9.28 2.700 0.125 Long Span
2 0.4 0.6 9.28 2.700 0.125
2 0.4 0.6 9.28 2.700 0.125
2 0.4 0.6 9.28 2.700 0.125

I. A. Campbell Associates, Inc. Page 18 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
B1S-2 A 4 0.4 0.6 10 3.467 0.125 34.67 138.68
4 0.4 0.6 10 3.467 0.125 Short Span
4 0.4 0.6 10 3.467 0.125
4 0.4 0.6 10 3.467 0.125
4 0.4 0.6 10 3.467 0.125
4 0.4 0.6 10 3.467 0.125 Long Span
4 0.4 0.6 10 3.467 0.125
4 0.4 0.6 10 3.467 0.125
4 0.4 0.6 10 3.467 0.125

B1S-2 A 4 0.6 0.6 10 3.367 0.125 33.67 134.68


4 0.6 0.6 10 3.367 0.125 Short Span
4 0.6 0.6 10 3.367 0.125
4 0.6 0.6 10 3.367 0.125
4 0.6 0.6 10 3.367 0.125
4 0.6 0.6 10 3.367 0.125 Long Span
4 0.6 0.6 10 3.367 0.125
4 0.6 0.6 10 3.367 0.125
4 0.6 0.6 10 3.367 0.125

B1S-2 A 1 0.4 0.6 9.28 3.467 0.125 32.17 32.17


1 0.4 0.6 9.28 3.467 0.125 Short Span
1 0.4 0.6 9.28 3.467 0.125
1 0.4 0.6 9.28 3.467 0.125
1 0.4 0.6 9.28 3.467 0.125
1 0.4 0.6 9.28 3.467 0.125 Long Span
1 0.4 0.6 9.28 3.467 0.125

I. A. Campbell Associates, Inc. Page 19 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.4 0.6 9.28 3.467 0.125
1 0.4 0.6 9.28 3.467 0.125

B1S-2 A 1 0.6 0.6 9.28 3.367 0.125 31.24 31.24


1 0.6 0.6 9.28 3.367 0.125 Short Span
1 0.6 0.6 9.28 3.367 0.125
1 0.6 0.6 9.28 3.367 0.125
1 0.6 0.6 9.28 3.367 0.125
1 0.6 0.6 9.28 3.367 0.125 Long Span
1 0.6 0.6 9.28 3.367 0.125
1 0.6 0.6 9.28 3.367 0.125
1 0.6 0.6 9.28 3.367 0.125

B1S-3 A 1 0.4 0.6 6.9 3.450 0.15 23.81 23.81


1 0.4 0.6 6.9 3.450 0.15 Short Span
1 0.4 0.6 6.9 3.450 0.15
1 0.4 0.6 6.9 3.450 0.15
1 0.4 0.6 6.9 3.450 0.15
1 0.4 0.6 6.9 3.450 0.15 Long Span
1 0.4 0.6 6.9 3.450 0.15
1 0.4 0.6 6.9 3.450 0.15
1 0.4 0.6 6.9 3.450 0.15

B1S-3 A 1 0.4 0.6 9.28 3.450 0.15 32.02 32.02


1 0.4 0.6 9.28 3.450 0.15 Short Span
1 0.4 0.6 9.28 3.450 0.15
1 0.4 0.6 9.28 3.450 0.15

I. A. Campbell Associates, Inc. Page 20 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.4 0.6 9.28 3.450 0.15
1 0.4 0.6 9.28 3.450 0.15 Long Span
1 0.4 0.6 9.28 3.450 0.15
1 0.4 0.6 9.28 3.450 0.15
1 0.4 0.6 9.28 3.450 0.15

B1S-3 A 1 0.4 0.6 10 3.825 0.15 38.25 38.25


1 0.4 0.6 10 3.825 0.15 Short Span
1 0.4 0.6 10 3.825 0.15
1 0.4 0.6 10 3.825 0.15
1 0.4 0.6 10 3.825 0.15
1 0.4 0.6 10 3.825 0.15 Long Span
1 0.4 0.6 10 3.825 0.15
1 0.4 0.6 10 3.825 0.15
1 0.4 0.6 10 3.825 0.15

B1S-3 A 1 0.4 0.6 10 4.125 0.15 41.25 41.25


1 0.4 0.6 10 4.125 0.15 Short Span
1 0.4 0.6 10 4.125 0.15
1 0.4 0.6 10 4.125 0.15
1 0.4 0.6 10 4.125 0.15
1 0.4 0.6 10 4.125 0.15 Long Span
1 0.4 0.6 10 4.125 0.15
1 0.4 0.6 10 4.125 0.15
1 0.4 0.6 10 4.125 0.15

B1S-17 B 1 0.6 0.4 4.275 1.800 0.125 7.7 7.70

I. A. Campbell Associates, Inc. Page 21 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 4.275 1.800 0.125 Short Span
1 0.6 0.4 4.275 1.800 0.125
1 0.6 0.4 4.275 1.800 0.125
1 0.6 0.4 4.275 1.800 0.125
1 0.6 0.4 4.275 1.800 0.125
1 0.6 0.4 4.275 1.800 0.125 Long Span
1 0.6 0.4 4.275 1.800 0.125
1 0.6 0.4 4.275 1.800 0.125
1 0.6 0.4 4.275 1.800 0.125
1 0.6 0.4 4.275 1.800 0.125

B1S-17 B 2 0.6 0.4 3.6 1.800 0.125 6.48 12.96


2 0.6 0.4 3.6 1.800 0.125 Short Span
2 0.6 0.4 3.6 1.800 0.125
2 0.6 0.4 3.6 1.800 0.125
2 0.6 0.4 3.6 1.800 0.125
2 0.6 0.4 3.6 1.800 0.125
2 0.6 0.4 3.6 1.800 0.125 Long Span
2 0.6 0.4 3.6 1.800 0.125
2 0.6 0.4 3.6 1.800 0.125
2 0.6 0.4 3.6 1.800 0.125
2 0.6 0.4 3.6 1.800 0.125

B1S-17 B 1 0.6 0.4 2.85 1.800 0.125 5.13 5.13


1 0.6 0.4 2.85 1.800 0.125 Short Span
1 0.6 0.4 2.85 1.800 0.125
1 0.6 0.4 2.85 1.800 0.125

I. A. Campbell Associates, Inc. Page 22 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 2.85 1.800 0.125
1 0.6 0.4 2.85 1.800 0.125
1 0.6 0.4 2.85 1.800 0.125 Long Span
1 0.6 0.4 2.85 1.800 0.125
1 0.6 0.4 2.85 1.800 0.125
1 0.6 0.4 2.85 1.800 0.125
1 0.6 0.4 2.85 1.800 0.125

B1S-21 B 1 0.4 0.6 2.325 1.875 0.125 4.36 4.36


1 0.4 0.6 2.325 1.875 0.125 Short Span
1 0.4 0.6 2.325 1.875 0.125
1 0.4 0.6 2.325 1.875 0.125
1 0.4 0.6 2.325 1.875 0.125
1 0.4 0.6 2.325 1.875 0.125
1 0.4 0.6 2.325 1.875 0.125 Long Span
1 0.4 0.6 2.325 1.875 0.125
1 0.4 0.6 2.325 1.875 0.125
1 0.4 0.6 2.325 1.875 0.125
1 0.4 0.6 2.325 1.875 0.125

B1S-20 B 1 0.6 0.4 2.775 2.025 0.125 5.62 5.62


1 0.6 0.4 2.775 2.025 0.125 Short Span
1 0.6 0.4 2.775 2.025 0.125
1 0.6 0.4 2.775 2.025 0.125
1 0.6 0.4 2.775 2.025 0.125
1 0.6 0.4 2.775 2.025 0.125
1 0.6 0.4 2.775 2.025 0.125 Long Span

I. A. Campbell Associates, Inc. Page 23 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 2.775 2.025 0.125
1 0.6 0.4 2.775 2.025 0.125
1 0.6 0.4 2.775 2.025 0.125
1 0.6 0.4 2.775 2.025 0.125

B1S-13 A 1 0.6 0.6 9.28 2.600 0.125 24.13 24.13


1 0.6 0.6 9.28 2.600 0.125 Short Span
1 0.6 0.6 9.28 2.600 0.125
1 0.6 0.6 9.28 2.600 0.125
1 0.6 0.6 9.28 2.600 0.125
1 0.6 0.6 9.28 2.600 0.125 Long Span
1 0.6 0.6 9.28 2.600 0.125
1 0.6 0.6 9.28 2.600 0.125
1 0.6 0.6 9.28 2.600 0.125

B1S-22 B 1 0.6 0.6 4.275 2.775 0.125 11.86 11.86


1 0.6 0.6 4.275 2.775 0.125 Short Span
1 0.6 0.6 4.275 2.775 0.125
1 0.6 0.6 4.275 2.775 0.125
1 0.6 0.6 4.275 2.775 0.125
1 0.6 0.6 4.275 2.775 0.125
1 0.6 0.6 4.275 2.775 0.125 Long Span
1 0.6 0.6 4.275 2.775 0.125
1 0.6 0.6 4.275 2.775 0.125
1 0.6 0.6 4.275 2.775 0.125
1 0.6 0.6 4.275 2.775 0.125

I. A. Campbell Associates, Inc. Page 24 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
B1S-22 B 1 0.6 0.6 4.275 3.375 0.125 14.43 14.43
1 0.6 0.6 4.275 3.375 0.125 Short Span
1 0.6 0.6 4.275 3.375 0.125
1 0.6 0.6 4.275 3.375 0.125
1 0.6 0.6 4.275 3.375 0.125
1 0.6 0.6 4.275 3.375 0.125
1 0.6 0.6 4.275 3.375 0.125 Long Span
1 0.6 0.6 4.275 3.375 0.125
1 0.6 0.6 4.275 3.375 0.125
1 0.6 0.6 4.275 3.375 0.125
1 0.6 0.6 4.275 3.375 0.125

B1CS-1 A 1 0.6 0.6 8.7 1.200 0.125 10.44 10.44


1 0.6 0.6 8.7 1.200 0.125 Short Span
1 0.6 0.6 8.7 1.200 0.125
1 0.6 0.6 8.7 1.200 0.125
1 0.6 0.6 8.7 1.200 0.125
1 0.6 0.6 8.7 1.200 0.125 Long Span
1 0.6 0.6 8.7 1.200 0.125
1 0.6 0.6 8.7 1.200 0.125
1 0.6 0.6 8.7 1.200 0.125

B1CS-1 A 1 0.6 0.6 8.7 5.100 0.125 44.37 44.37


1 0.6 0.6 8.7 5.100 0.125 Short Span
1 0.6 0.6 8.7 5.100 0.125
1 0.6 0.6 8.7 5.100 0.125
1 0.6 0.6 8.7 5.100 0.125

I. A. Campbell Associates, Inc. Page 25 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.6 8.7 5.100 0.125 Long Span
1 0.6 0.6 8.7 5.100 0.125
1 0.6 0.6 8.7 5.100 0.125
1 0.6 0.6 8.7 5.100 0.125

B1S-24 A 1 0.6 0.6 6.75 0.450 0.125 3.04 3.04


1 0.6 0.6 6.75 0.450 0.125 Short Span
1 0.6 0.6 6.75 0.450 0.125
1 0.6 0.6 6.75 0.450 0.125
1 0.6 0.6 6.75 0.450 0.125
1 0.6 0.6 6.75 0.450 0.125 Long Span
1 0.6 0.6 6.75 0.450 0.125
1 0.6 0.6 6.75 0.450 0.125
1 0.6 0.6 6.75 0.450 0.125

B1S-24 A 2 0.6 0.6 9 0.450 0.125 4.05 8.10


2 0.6 0.6 9 0.450 0.125 Short Span
2 0.6 0.6 9 0.450 0.125
2 0.6 0.6 9 0.450 0.125
2 0.6 0.6 9 0.450 0.125
2 0.6 0.6 9 0.450 0.125 Long Span
2 0.6 0.6 9 0.450 0.125
2 0.6 0.6 9 0.450 0.125
2 0.6 0.6 9 0.450 0.125

B1S-24 A 1 0.6 0.6 5.55 0.450 0.125 2.5 2.50


1 0.6 0.6 5.55 0.450 0.125 Short Span

I. A. Campbell Associates, Inc. Page 26 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.6 5.55 0.450 0.125
1 0.6 0.6 5.55 0.450 0.125
1 0.6 0.6 5.55 0.450 0.125
1 0.6 0.6 5.55 0.450 0.125 Long Span
1 0.6 0.6 5.55 0.450 0.125
1 0.6 0.6 5.55 0.450 0.125
1 0.6 0.6 5.55 0.450 0.125

B1S-24 A 1 0.6 0.6 6.75 0.450 0.125 3.04 3.04


1 0.6 0.6 6.75 0.450 0.125 Short Span
1 0.6 0.6 6.75 0.450 0.125
1 0.6 0.6 6.75 0.450 0.125
1 0.6 0.6 6.75 0.450 0.125
1 0.6 0.6 6.75 0.450 0.125 Long Span
1 0.6 0.6 6.75 0.450 0.125
1 0.6 0.6 6.75 0.450 0.125
1 0.6 0.6 6.75 0.450 0.125

B1S-24 A 1 0.6 0.6 6.45 0.450 0.125 2.9 2.90


1 0.6 0.6 6.45 0.450 0.125 Short Span
1 0.6 0.6 6.45 0.450 0.125
1 0.6 0.6 6.45 0.450 0.125
1 0.6 0.6 6.45 0.450 0.125
1 0.6 0.6 6.45 0.450 0.125 Long Span
1 0.6 0.6 6.45 0.450 0.125
1 0.6 0.6 6.45 0.450 0.125
1 0.6 0.6 6.45 0.450 0.125

I. A. Campbell Associates, Inc. Page 27 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

B1S-24 A 1 0.6 0.6 5.25 0.450 0.125 2.36 2.36


1 0.6 0.6 5.25 0.450 0.125 Short Span
1 0.6 0.6 5.25 0.450 0.125
1 0.6 0.6 5.25 0.450 0.125
1 0.6 0.6 5.25 0.450 0.125
1 0.6 0.6 5.25 0.450 0.125 Long Span
1 0.6 0.6 5.25 0.450 0.125
1 0.6 0.6 5.25 0.450 0.125
1 0.6 0.6 5.25 0.450 0.125

B1S-1 A 1 0.4 0.6 6.9 2.700 0.125 18.63 18.63


1 0.4 0.6 6.9 2.700 0.125 Short Span
1 0.4 0.6 6.9 2.700 0.125
1 0.4 0.6 6.9 2.700 0.125
1 0.4 0.6 6.9 2.700 0.125
1 0.4 0.6 6.9 2.700 0.125 Long Span
1 0.4 0.6 6.9 2.700 0.125
1 0.4 0.6 6.9 2.700 0.125
1 0.4 0.6 6.9 2.700 0.125

B1S-1 A 2 0.6 0.6 6.9 2.600 0.125 17.94 35.88


2 0.6 0.6 6.9 2.600 0.125 Short Span
2 0.6 0.6 6.9 2.600 0.125
2 0.6 0.6 6.9 2.600 0.125
2 0.6 0.6 6.9 2.600 0.125
2 0.6 0.6 6.9 2.600 0.125 Long Span

I. A. Campbell Associates, Inc. Page 28 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.6 0.6 6.9 2.600 0.125
2 0.6 0.6 6.9 2.600 0.125
2 0.6 0.6 6.9 2.600 0.125

B1S-14 B 2 0.6 0.4 3.45 2.100 0.125 7.25 14.50


2 0.6 0.4 3.45 2.100 0.125 Short Span
2 0.6 0.4 3.45 2.100 0.125
2 0.6 0.4 3.45 2.100 0.125
2 0.6 0.4 3.45 2.100 0.125
2 0.6 0.4 3.45 2.100 0.125
2 0.6 0.4 3.45 2.100 0.125 Long Span
2 0.6 0.4 3.45 2.100 0.125
2 0.6 0.4 3.45 2.100 0.125
2 0.6 0.4 3.45 2.100 0.125
2 0.6 0.4 3.45 2.100 0.125

B1S-13 A 2 0.6 0.6 9.28 2.600 0.125 24.13 48.26


2 0.6 0.6 9.28 2.600 0.125 Short Span
2 0.6 0.6 9.28 2.600 0.125
2 0.6 0.6 9.28 2.600 0.125
2 0.6 0.6 9.28 2.600 0.125
2 0.6 0.6 9.28 2.600 0.125 Long Span
2 0.6 0.6 9.28 2.600 0.125
2 0.6 0.6 9.28 2.600 0.125
2 0.6 0.6 9.28 2.600 0.125

B1S-13 A 1 0.4 0.6 9.28 2.600 0.125 24.13 24.13

I. A. Campbell Associates, Inc. Page 29 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.4 0.6 9.28 2.600 0.125 Short Span
1 0.4 0.6 9.28 2.600 0.125
1 0.4 0.6 9.28 2.600 0.125
1 0.4 0.6 9.28 2.600 0.125
1 0.4 0.6 9.28 2.600 0.125 Long Span
1 0.4 0.6 9.28 2.600 0.125
1 0.4 0.6 9.28 2.600 0.125
1 0.4 0.6 9.28 2.600 0.125

B1S-7 A 8 0.6 0.6 10 3.096 0.125 30.96 247.68


8 0.6 0.6 10 3.096 0.125 Short Span
8 0.6 0.6 10 3.096 0.125
8 0.6 0.6 10 3.096 0.125
8 0.6 0.6 10 3.096 0.125
8 0.6 0.6 10 3.096 0.125 Long Span
8 0.6 0.6 10 3.096 0.125
8 0.6 0.6 10 3.096 0.125
8 0.6 0.6 10 3.096 0.125

B1S-7 A 7 0.6 0.6 10 2.896 0.125 28.96 202.72


7 0.6 0.6 10 2.896 0.125 Short Span
7 0.6 0.6 10 2.896 0.125
7 0.6 0.6 10 2.896 0.125
7 0.6 0.6 10 2.896 0.125
7 0.6 0.6 10 2.896 0.125 Long Span
7 0.6 0.6 10 2.896 0.125
7 0.6 0.6 10 2.896 0.125

I. A. Campbell Associates, Inc. Page 30 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
7 0.6 0.6 10 2.896 0.125

B1S-7 A 2 0.6 0.6 9.28 3.096 0.125 28.73 57.46


2 0.6 0.6 9.28 3.096 0.125 Short Span
2 0.6 0.6 9.28 3.096 0.125
2 0.6 0.6 9.28 3.096 0.125
2 0.6 0.6 9.28 3.096 0.125
2 0.6 0.6 9.28 3.096 0.125 Long Span
2 0.6 0.6 9.28 3.096 0.125
2 0.6 0.6 9.28 3.096 0.125
2 0.6 0.6 9.28 3.096 0.125

B1S-7 A 2 0.6 0.6 9.28 2.896 0.125 26.87 53.74


2 0.6 0.6 9.28 2.896 0.125 Short Span
2 0.6 0.6 9.28 2.896 0.125
2 0.6 0.6 9.28 2.896 0.125
2 0.6 0.6 9.28 2.896 0.125
2 0.6 0.6 9.28 2.896 0.125 Long Span
2 0.6 0.6 9.28 2.896 0.125
2 0.6 0.6 9.28 2.896 0.125
2 0.6 0.6 9.28 2.896 0.125

B1S-7A A 1 0.6 0.6 10 2.896 0.15 28.96 28.96


1 0.6 0.6 10 2.896 0.15 Short Span
1 0.6 0.6 10 2.896 0.15
1 0.6 0.6 10 2.896 0.15
1 0.6 0.6 10 2.896 0.15

I. A. Campbell Associates, Inc. Page 31 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.6 10 2.896 0.15 Long Span
1 0.6 0.6 10 2.896 0.15
1 0.6 0.6 10 2.896 0.15
1 0.6 0.6 10 2.896 0.15

B1S-7A A 2 0.6 0.6 4.95 3.096 0.15 15.32 30.64


2 0.6 0.6 4.95 3.096 0.15 Short Span
2 0.6 0.6 4.95 3.096 0.15
2 0.6 0.6 4.95 3.096 0.15
2 0.6 0.6 4.95 3.096 0.15
2 0.6 0.6 4.95 3.096 0.15 Long Span
2 0.6 0.6 4.95 3.096 0.15
2 0.6 0.6 4.95 3.096 0.15
2 0.6 0.6 4.95 3.096 0.15

B1S-19 B 1 0.4 0.6 10 3.600 0.125 36 36.00


1 0.4 0.6 10 3.600 0.125 Short Span
1 0.4 0.6 10 3.600 0.125
1 0.4 0.6 10 3.600 0.125
1 0.4 0.6 10 3.600 0.125
1 0.4 0.6 10 3.600 0.125
1 0.4 0.6 10 3.600 0.125 Long Span
1 0.4 0.6 10 3.600 0.125
1 0.4 0.6 10 3.600 0.125
1 0.4 0.6 10 3.600 0.125
1 0.4 0.6 10 3.600 0.125

I. A. Campbell Associates, Inc. Page 32 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
B1S-19 B 1 0.4 0.6 10 2.896 0.125 28.96 28.96
1 0.4 0.6 10 2.896 0.125 Short Span
1 0.4 0.6 10 2.896 0.125
1 0.4 0.6 10 2.896 0.125
1 0.4 0.6 10 2.896 0.125
1 0.4 0.6 10 2.896 0.125
1 0.4 0.6 10 2.896 0.125 Long Span
1 0.4 0.6 10 2.896 0.125
1 0.4 0.6 10 2.896 0.125
1 0.4 0.6 10 2.896 0.125
1 0.4 0.6 10 2.896 0.125

B1S-18 B 1 0.6 0.35 3 1.500 0.125 4.5 4.50


1 0.6 0.35 3 1.500 0.125 Short Span
1 0.6 0.35 3 1.500 0.125
1 0.6 0.35 3 1.500 0.125
1 0.6 0.35 3 1.500 0.125
1 0.6 0.35 3 1.500 0.125
1 0.6 0.35 3 1.500 0.125 Long Span
1 0.6 0.35 3 1.500 0.125
1 0.6 0.35 3 1.500 0.125
1 0.6 0.35 3 1.500 0.125
1 0.6 0.35 3 1.500 0.125

B1S-8 A 6 0.6 0.6 10 2.473 0.125 24.73 148.38


6 0.6 0.6 10 2.473 0.125 Short Span
6 0.6 0.6 10 2.473 0.125

I. A. Campbell Associates, Inc. Page 33 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
6 0.6 0.6 10 2.473 0.125
6 0.6 0.6 10 2.473 0.125
6 0.6 0.6 10 2.473 0.125 Long Span
6 0.6 0.6 10 2.473 0.125
6 0.6 0.6 10 2.473 0.125
6 0.6 0.6 10 2.473 0.125

B1S-15 A 2 0.6 0.4 8.25 2.473 0.125 20.4 40.80


2 0.6 0.4 8.25 2.473 0.125 Short Span
2 0.6 0.4 8.25 2.473 0.125
2 0.6 0.4 8.25 2.473 0.125
2 0.6 0.4 8.25 2.473 0.125
2 0.6 0.4 8.25 2.473 0.125 Long Span
2 0.6 0.4 8.25 2.473 0.125
2 0.6 0.4 8.25 2.473 0.125
2 0.6 0.4 8.25 2.473 0.125

B1S-9A A 2 0.6 0.6 10 2.323 0.125 23.23 46.46


2 0.6 0.6 10 2.323 0.125 Short Span
2 0.6 0.6 10 2.323 0.125
2 0.6 0.6 10 2.323 0.125
2 0.6 0.6 10 2.323 0.125
2 0.6 0.6 10 2.323 0.125 Long Span
2 0.6 0.6 10 2.323 0.125
2 0.6 0.6 10 2.323 0.125
2 0.6 0.6 10 2.323 0.125

I. A. Campbell Associates, Inc. Page 34 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
B1S-9 A 1 0.6 0.6 8.1 2.323 0.125 18.82 18.82
1 0.6 0.6 8.1 2.323 0.125 Short Span
1 0.6 0.6 8.1 2.323 0.125
1 0.6 0.6 8.1 2.323 0.125
1 0.6 0.6 8.1 2.323 0.125
1 0.6 0.6 8.1 2.323 0.125 Long Span
1 0.6 0.6 8.1 2.323 0.125
1 0.6 0.6 8.1 2.323 0.125
1 0.6 0.6 8.1 2.323 0.125

B1S-10 A 1 0.4 0.6 8.1 2.448 0.125 19.83 19.83


1 0.4 0.6 8.1 2.448 0.125 Short Span
1 0.4 0.6 8.1 2.448 0.125
1 0.4 0.6 8.1 2.448 0.125
1 0.4 0.6 8.1 2.448 0.125
1 0.4 0.6 8.1 2.448 0.125 Long Span
1 0.4 0.6 8.1 2.448 0.125
1 0.4 0.6 8.1 2.448 0.125
1 0.4 0.6 8.1 2.448 0.125

B1S-10A A 1 0.4 0.6 10 2.323 0.125 23.23 23.23


1 0.4 0.6 10 2.323 0.125 Short Span
1 0.4 0.6 10 2.323 0.125
1 0.4 0.6 10 2.323 0.125
1 0.4 0.6 10 2.323 0.125
1 0.4 0.6 10 2.323 0.125 Long Span
1 0.4 0.6 10 2.323 0.125

I. A. Campbell Associates, Inc. Page 35 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.4 0.6 10 2.323 0.125
1 0.4 0.6 10 2.323 0.125

B1S-10A A 1 0.4 0.6 4.575 2.323 0.125 10.63 10.63


1 0.4 0.6 4.575 2.323 0.125 Short Span
1 0.4 0.6 4.575 2.323 0.125
1 0.4 0.6 4.575 2.323 0.125
1 0.4 0.6 4.575 2.323 0.125
1 0.4 0.6 4.575 2.323 0.125 Long Span
1 0.4 0.6 4.575 2.323 0.125
1 0.4 0.6 4.575 2.323 0.125
1 0.4 0.6 4.575 2.323 0.125

B1S-16 B 1 0.35 0.6 2.625 2.475 0.125 6.5 6.50


1 0.35 0.6 2.625 2.475 0.125 Short Span
1 0.35 0.6 2.625 2.475 0.125
1 0.35 0.6 2.625 2.475 0.125
1 0.35 0.6 2.625 2.475 0.125
1 0.35 0.6 2.625 2.475 0.125
1 0.35 0.6 2.625 2.475 0.125 Long Span
1 0.35 0.6 2.625 2.475 0.125
1 0.35 0.6 2.625 2.475 0.125
1 0.35 0.6 2.625 2.475 0.125
1 0.35 0.6 2.625 2.475 0.125

Sub total 5,062.51

I. A. Campbell Associates, Inc. Page 36 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

GS-6 B 1 0.4 0.7 4.829 3.667 0.125 17.71 17.71


1 0.4 0.7 4.829 3.667 0.125 Short Span
1 0.4 0.7 4.829 3.667 0.125
1 0.4 0.7 4.829 3.667 0.125
1 0.4 0.7 4.829 3.667 0.125
1 0.4 0.7 4.829 3.667 0.125
1 0.4 0.7 4.829 3.667 0.125 Long Span
1 0.4 0.7 4.829 3.667 0.125
1 0.4 0.7 4.829 3.667 0.125
1 0.4 0.7 4.829 3.667 0.125

GS-7 B 1 0.5 0.7 4.829 3.417 0.125 16.5 16.50


1 0.5 0.7 4.829 3.417 0.125 Short Span
1 0.5 0.7 4.829 3.417 0.125
1 0.5 0.7 4.829 3.417 0.125
1 0.5 0.7 4.829 3.417 0.125
1 0.5 0.7 4.829 3.417 0.125
1 0.5 0.7 4.829 3.417 0.125 Long Span
1 0.5 0.7 4.829 3.417 0.125
1 0.5 0.7 4.829 3.417 0.125
1 0.5 0.7 4.829 3.417 0.125

GS-7 B 1 0.6 0.7 4.829 3.367 0.125 16.26 16.26


1 0.6 0.7 4.829 3.367 0.125 Short Span
1 0.6 0.7 4.829 3.367 0.125
1 0.6 0.7 4.829 3.367 0.125

I. A. Campbell Associates, Inc. Page 37 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.7 4.829 3.367 0.125
1 0.6 0.7 4.829 3.367 0.125
1 0.6 0.7 4.829 3.367 0.125 Long Span
1 0.6 0.7 4.829 3.367 0.125
1 0.6 0.7 4.829 3.367 0.125
1 0.6 0.7 4.829 3.367 0.125

GS-8A B 6 0.6 0.6 4.879 2.600 0.125 12.69 76.14


6 0.6 0.6 4.879 2.600 0.125 Short Span
6 0.6 0.6 4.879 2.600 0.125
6 0.6 0.6 4.879 2.600 0.125
6 0.6 0.6 4.879 2.600 0.125
6 0.6 0.6 4.879 2.600 0.125
6 0.6 0.6 4.879 2.600 0.125 Long Span
6 0.6 0.6 4.879 2.600 0.125
6 0.6 0.6 4.879 2.600 0.125
6 0.6 0.6 4.879 2.600 0.125

GS-8A B 3 0.4 0.6 4.879 2.700 0.125 13.17 39.51


3 0.4 0.6 4.879 2.700 0.125 Short Span
3 0.4 0.6 4.879 2.700 0.125
3 0.4 0.6 4.879 2.700 0.125
3 0.4 0.6 4.879 2.700 0.125
3 0.4 0.6 4.879 2.700 0.125
3 0.4 0.6 4.879 2.700 0.125 Long Span
3 0.4 0.6 4.879 2.700 0.125
3 0.4 0.6 4.879 2.700 0.125

I. A. Campbell Associates, Inc. Page 38 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3 0.4 0.6 4.879 2.700 0.125

GS-9 A 1 0.6 0.7 9.95 2.600 0.125 25.87 25.87


1 0.6 0.7 9.95 2.600 0.125 Short Span
1 0.6 0.7 9.95 2.600 0.125
1 0.6 0.7 9.95 2.600 0.125
1 0.6 0.7 9.95 2.600 0.125
1 0.6 0.7 9.95 2.600 0.125 Long Span
1 0.6 0.7 9.95 2.600 0.125
1 0.6 0.7 9.95 2.600 0.125
1 0.6 0.7 9.95 2.600 0.125

GS-9 A 7 0.6 0.6 10 2.600 0.125 26 182.00


7 0.6 0.6 10 2.600 0.125 Short Span
7 0.6 0.6 10 2.600 0.125
7 0.6 0.6 10 2.600 0.125
7 0.6 0.6 10 2.600 0.125
7 0.6 0.6 10 2.600 0.125 Long Span
7 0.6 0.6 10 2.600 0.125
7 0.6 0.6 10 2.600 0.125
7 0.6 0.6 10 2.600 0.125

GS-9 A 3 0.5 0.6 10 2.650 0.125 26.5 79.50


3 0.5 0.6 10 2.650 0.125 Short Span
3 0.5 0.6 10 2.650 0.125
3 0.5 0.6 10 2.650 0.125
3 0.5 0.6 10 2.650 0.125

I. A. Campbell Associates, Inc. Page 39 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3 0.5 0.6 10 2.650 0.125 Long Span
3 0.5 0.6 10 2.650 0.125
3 0.5 0.6 10 2.650 0.125
3 0.5 0.6 10 2.650 0.125

GS-9 A 5 0.4 0.6 10 2.700 0.125 27 135.00


5 0.4 0.6 10 2.700 0.125 Short Span
5 0.4 0.6 10 2.700 0.125
5 0.4 0.6 10 2.700 0.125
5 0.4 0.6 10 2.700 0.125
5 0.4 0.6 10 2.700 0.125 Long Span
5 0.4 0.6 10 2.700 0.125
5 0.4 0.6 10 2.700 0.125
5 0.4 0.6 10 2.700 0.125

GS-9 A 1 0.6 0.75 9.875 2.600 0.125 25.68 25.68


1 0.6 0.75 9.875 2.600 0.125 Short Span
1 0.6 0.75 9.875 2.600 0.125
1 0.6 0.75 9.875 2.600 0.125
1 0.6 0.75 9.875 2.600 0.125
1 0.6 0.75 9.875 2.600 0.125 Long Span
1 0.6 0.75 9.875 2.600 0.125
1 0.6 0.75 9.875 2.600 0.125
1 0.6 0.75 9.875 2.600 0.125

GS-9 A 4 0.6 0.7 9.95 2.600 0.125 25.87 103.48


4 0.6 0.7 9.95 2.600 0.125 Short Span

I. A. Campbell Associates, Inc. Page 40 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
4 0.6 0.7 9.95 2.600 0.125
4 0.6 0.7 9.95 2.600 0.125
4 0.6 0.7 9.95 2.600 0.125
4 0.6 0.7 9.95 2.600 0.125 Long Span
4 0.6 0.7 9.95 2.600 0.125
4 0.6 0.7 9.95 2.600 0.125
4 0.6 0.7 9.95 2.600 0.125

GS-9 A 3 0.6 0.75 9.925 2.600 0.125 25.81 77.43


3 0.6 0.75 9.925 2.600 0.125 Short Span
3 0.6 0.75 9.925 2.600 0.125
3 0.6 0.75 9.925 2.600 0.125
3 0.6 0.75 9.925 2.600 0.125
3 0.6 0.75 9.925 2.600 0.125 Long Span
3 0.6 0.75 9.925 2.600 0.125
3 0.6 0.75 9.925 2.600 0.125
3 0.6 0.75 9.925 2.600 0.125

GS-9 A 2 0.4 0.7 9.95 2.700 0.125 26.87 53.74


2 0.4 0.7 9.95 2.700 0.125 Short Span
2 0.4 0.7 9.95 2.700 0.125
2 0.4 0.7 9.95 2.700 0.125
2 0.4 0.7 9.95 2.700 0.125
2 0.4 0.7 9.95 2.700 0.125 Long Span
2 0.4 0.7 9.95 2.700 0.125
2 0.4 0.7 9.95 2.700 0.125
2 0.4 0.7 9.95 2.700 0.125

I. A. Campbell Associates, Inc. Page 41 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

GS-9 A 2 0.4 0.75 9.925 2.700 0.125 26.8 53.60


2 0.4 0.75 9.925 2.700 0.125 Short Span
2 0.4 0.75 9.925 2.700 0.125
2 0.4 0.75 9.925 2.700 0.125
2 0.4 0.75 9.925 2.700 0.125
2 0.4 0.75 9.925 2.700 0.125 Long Span
2 0.4 0.75 9.925 2.700 0.125
2 0.4 0.75 9.925 2.700 0.125
2 0.4 0.75 9.925 2.700 0.125

GS-9 A 1 0.5 0.75 9.925 2.650 0.125 26.3 26.30


1 0.5 0.75 9.925 2.650 0.125 Short Span
1 0.5 0.75 9.925 2.650 0.125
1 0.5 0.75 9.925 2.650 0.125
1 0.5 0.75 9.925 2.650 0.125
1 0.5 0.75 9.925 2.650 0.125 Long Span
1 0.5 0.75 9.925 2.650 0.125
1 0.5 0.75 9.925 2.650 0.125
1 0.5 0.75 9.925 2.650 0.125

GS-9 A 2 0.5 0.6 10.025 2.650 0.125 26.57 53.14


2 0.5 0.6 10.025 2.650 0.125 Short Span
2 0.5 0.6 10.025 2.650 0.125
2 0.5 0.6 10.025 2.650 0.125
2 0.5 0.6 10.025 2.650 0.125
2 0.5 0.6 10.025 2.650 0.125 Long Span

I. A. Campbell Associates, Inc. Page 42 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.5 0.6 10.025 2.650 0.125
2 0.5 0.6 10.025 2.650 0.125
2 0.5 0.6 10.025 2.650 0.125

GS-9 A 1 0.5 0.6 10.025 2.700 0.125 27.07 27.07


1 0.5 0.6 10.025 2.700 0.125 Short Span
1 0.5 0.6 10.025 2.700 0.125
1 0.5 0.6 10.025 2.700 0.125
1 0.5 0.6 10.025 2.700 0.125
1 0.5 0.6 10.025 2.700 0.125 Long Span
1 0.5 0.6 10.025 2.700 0.125
1 0.5 0.6 10.025 2.700 0.125
1 0.5 0.6 10.025 2.700 0.125

GS-9 A 1 0.6 0.75 9.875 2.600 0.125 25.68 25.68


1 0.6 0.75 9.875 2.600 0.125 Short Span
1 0.6 0.75 9.875 2.600 0.125
1 0.6 0.75 9.875 2.600 0.125
1 0.6 0.75 9.875 2.600 0.125
1 0.6 0.75 9.875 2.600 0.125 Long Span
1 0.6 0.75 9.875 2.600 0.125
1 0.6 0.75 9.875 2.600 0.125
1 0.6 0.75 9.875 2.600 0.125

GS-9 A 4 0.6 0.7 9.9 2.600 0.125 25.74 102.96


4 0.6 0.7 9.9 2.600 0.125 Short Span
4 0.6 0.7 9.9 2.600 0.125

I. A. Campbell Associates, Inc. Page 43 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
4 0.6 0.7 9.9 2.600 0.125
4 0.6 0.7 9.9 2.600 0.125
4 0.6 0.7 9.9 2.600 0.125 Long Span
4 0.6 0.7 9.9 2.600 0.125
4 0.6 0.7 9.9 2.600 0.125
4 0.6 0.7 9.9 2.600 0.125

GS-9 A 2 0.4 0.7 9.9 2.700 0.125 26.73 53.46


2 0.4 0.7 9.9 2.700 0.125 Short Span
2 0.4 0.7 9.9 2.700 0.125
2 0.4 0.7 9.9 2.700 0.125
2 0.4 0.7 9.9 2.700 0.125
2 0.4 0.7 9.9 2.700 0.125 Long Span
2 0.4 0.7 9.9 2.700 0.125
2 0.4 0.7 9.9 2.700 0.125
2 0.4 0.7 9.9 2.700 0.125

GS-9 A 1 0.6 0.75 9.85 2.600 0.125 25.61 25.61


1 0.6 0.75 9.85 2.600 0.125 Short Span
1 0.6 0.75 9.85 2.600 0.125
1 0.6 0.75 9.85 2.600 0.125
1 0.6 0.75 9.85 2.600 0.125
1 0.6 0.75 9.85 2.600 0.125 Long Span
1 0.6 0.75 9.85 2.600 0.125
1 0.6 0.75 9.85 2.600 0.125
1 0.6 0.75 9.85 2.600 0.125

I. A. Campbell Associates, Inc. Page 44 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
GS-9 A 2 0.6 0.75 10.8 1.950 0.125 21.06 42.12
2 0.6 0.75 10.8 1.950 0.125 Short Span
2 0.6 0.75 10.8 1.950 0.125
2 0.6 0.75 10.8 1.950 0.125
2 0.6 0.75 10.8 1.950 0.125
2 0.6 0.75 10.8 1.950 0.125 Long Span
2 0.6 0.75 10.8 1.950 0.125
2 0.6 0.75 10.8 1.950 0.125
2 0.6 0.75 10.8 1.950 0.125

GS-9 A 1 0.5 0.75 10.8 1.575 0.125 17.01 17.01


1 0.5 0.75 10.8 1.575 0.125 Short Span
1 0.5 0.75 10.8 1.575 0.125
1 0.5 0.75 10.8 1.575 0.125
1 0.5 0.75 10.8 1.575 0.125
1 0.5 0.75 10.8 1.575 0.125 Long Span
1 0.5 0.75 10.8 1.575 0.125
1 0.5 0.75 10.8 1.575 0.125
1 0.5 0.75 10.8 1.575 0.125

GS-9 A 1 0.5 0.75 10.8 2.350 0.125 25.38 25.38


1 0.5 0.75 10.8 2.350 0.125 Short Span
1 0.5 0.75 10.8 2.350 0.125
1 0.5 0.75 10.8 2.350 0.125
1 0.5 0.75 10.8 2.350 0.125
1 0.5 0.75 10.8 2.350 0.125 Long Span
1 0.5 0.75 10.8 2.350 0.125

I. A. Campbell Associates, Inc. Page 45 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.5 0.75 10.8 2.350 0.125
1 0.5 0.75 10.8 2.350 0.125

GS-9 A 2 0.5 0.6 10.025 2.550 0.125 25.56 51.12


2 0.5 0.6 10.025 2.550 0.125 Short Span
2 0.5 0.6 10.025 2.550 0.125
2 0.5 0.6 10.025 2.550 0.125
2 0.5 0.6 10.025 2.550 0.125
2 0.5 0.6 10.025 2.550 0.125 Long Span
2 0.5 0.6 10.025 2.550 0.125
2 0.5 0.6 10.025 2.550 0.125
2 0.5 0.6 10.025 2.550 0.125

GS-9 A 1 0.6 0.6 10.025 2.500 0.125 25.06 25.06


1 0.6 0.6 10.025 2.500 0.125 Short Span
1 0.6 0.6 10.025 2.500 0.125
1 0.6 0.6 10.025 2.500 0.125
1 0.6 0.6 10.025 2.500 0.125
1 0.6 0.6 10.025 2.500 0.125 Long Span
1 0.6 0.6 10.025 2.500 0.125
1 0.6 0.6 10.025 2.500 0.125
1 0.6 0.6 10.025 2.500 0.125

GS-9 A 1 0.6 0.85 9.825 2.600 0.125 25.55 25.55


1 0.6 0.85 9.825 2.600 0.125 Short Span
1 0.6 0.85 9.825 2.600 0.125
1 0.6 0.85 9.825 2.600 0.125

I. A. Campbell Associates, Inc. Page 46 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.85 9.825 2.600 0.125
1 0.6 0.85 9.825 2.600 0.125 Long Span
1 0.6 0.85 9.825 2.600 0.125
1 0.6 0.85 9.825 2.600 0.125
1 0.6 0.85 9.825 2.600 0.125

GS-9 A 4 0.6 0.7 9.975 2.600 0.125 25.94 103.76


4 0.6 0.7 9.975 2.600 0.125 Short Span
4 0.6 0.7 9.975 2.600 0.125
4 0.6 0.7 9.975 2.600 0.125
4 0.6 0.7 9.975 2.600 0.125
4 0.6 0.7 9.975 2.600 0.125 Long Span
4 0.6 0.7 9.975 2.600 0.125
4 0.6 0.7 9.975 2.600 0.125
4 0.6 0.7 9.975 2.600 0.125

GS-9 A 1 0.4 0.7 9.975 2.700 0.125 26.93 26.93


1 0.4 0.7 9.975 2.700 0.125 Short Span
1 0.4 0.7 9.975 2.700 0.125
1 0.4 0.7 9.975 2.700 0.125
1 0.4 0.7 9.975 2.700 0.125
1 0.4 0.7 9.975 2.700 0.125 Long Span
1 0.4 0.7 9.975 2.700 0.125
1 0.4 0.7 9.975 2.700 0.125
1 0.4 0.7 9.975 2.700 0.125

GS-9 A 1 0.5 0.7 9.975 2.650 0.125 26.43 26.43

I. A. Campbell Associates, Inc. Page 47 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.5 0.7 9.975 2.650 0.125 Short Span
1 0.5 0.7 9.975 2.650 0.125
1 0.5 0.7 9.975 2.650 0.125
1 0.5 0.7 9.975 2.650 0.125
1 0.5 0.7 9.975 2.650 0.125 Long Span
1 0.5 0.7 9.975 2.650 0.125
1 0.5 0.7 9.975 2.650 0.125
1 0.5 0.7 9.975 2.650 0.125

GS-9 A 2 0.6 0.75 9.45 2.450 0.125 23.15 46.30


2 0.6 0.75 9.45 2.450 0.125 Short Span
2 0.6 0.75 9.45 2.450 0.125
2 0.6 0.75 9.45 2.450 0.125
2 0.6 0.75 9.45 2.450 0.125
2 0.6 0.75 9.45 2.450 0.125 Long Span
2 0.6 0.75 9.45 2.450 0.125
2 0.6 0.75 9.45 2.450 0.125
2 0.6 0.75 9.45 2.450 0.125

GS-9 A 1 0.5 0.75 9.45 2.650 0.125 25.04 25.04


1 0.5 0.75 9.45 2.650 0.125 Short Span
1 0.5 0.75 9.45 2.650 0.125
1 0.5 0.75 9.45 2.650 0.125
1 0.5 0.75 9.45 2.650 0.125
1 0.5 0.75 9.45 2.650 0.125 Long Span
1 0.5 0.75 9.45 2.650 0.125
1 0.5 0.75 9.45 2.650 0.125

I. A. Campbell Associates, Inc. Page 48 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.5 0.75 9.45 2.650 0.125

GS-9 A 1 0.6 0.75 9.45 2.450 0.125 23.15 23.15


1 0.6 0.75 9.45 2.450 0.125 Short Span
1 0.6 0.75 9.45 2.450 0.125
1 0.6 0.75 9.45 2.450 0.125
1 0.6 0.75 9.45 2.450 0.125
1 0.6 0.75 9.45 2.450 0.125 Long Span
1 0.6 0.75 9.45 2.450 0.125
1 0.6 0.75 9.45 2.450 0.125
1 0.6 0.75 9.45 2.450 0.125

GS-9 A 1 0.4 0.75 9.45 2.700 0.125 25.52 25.52


1 0.4 0.75 9.45 2.700 0.125 Short Span
1 0.4 0.75 9.45 2.700 0.125
1 0.4 0.75 9.45 2.700 0.125
1 0.4 0.75 9.45 2.700 0.125
1 0.4 0.75 9.45 2.700 0.125 Long Span
1 0.4 0.75 9.45 2.700 0.125
1 0.4 0.75 9.45 2.700 0.125
1 0.4 0.75 9.45 2.700 0.125

GS-9 A 1 0.5 0.75 9.45 2.650 0.125 25.04 25.04


1 0.5 0.75 9.45 2.650 0.125 Short Span
1 0.5 0.75 9.45 2.650 0.125
1 0.5 0.75 9.45 2.650 0.125
1 0.5 0.75 9.45 2.650 0.125

I. A. Campbell Associates, Inc. Page 49 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.5 0.75 9.45 2.650 0.125 Long Span
1 0.5 0.75 9.45 2.650 0.125
1 0.5 0.75 9.45 2.650 0.125
1 0.5 0.75 9.45 2.650 0.125

GS-9 A 2 0.5 0.6 10.025 2.650 0.125 26.57 53.14


2 0.5 0.6 10.025 2.650 0.125 Short Span
2 0.5 0.6 10.025 2.650 0.125
2 0.5 0.6 10.025 2.650 0.125
2 0.5 0.6 10.025 2.650 0.125
2 0.5 0.6 10.025 2.650 0.125 Long Span
2 0.5 0.6 10.025 2.650 0.125
2 0.5 0.6 10.025 2.650 0.125
2 0.5 0.6 10.025 2.650 0.125

GS-9 A 1 0.6 0.6 10.025 2.650 0.125 26.57 26.57


1 0.6 0.6 10.025 2.650 0.125 Short Span
1 0.6 0.6 10.025 2.650 0.125
1 0.6 0.6 10.025 2.650 0.125
1 0.6 0.6 10.025 2.650 0.125
1 0.6 0.6 10.025 2.650 0.125 Long Span
1 0.6 0.6 10.025 2.650 0.125
1 0.6 0.6 10.025 2.650 0.125
1 0.6 0.6 10.025 2.650 0.125

GS-9 A 1 0.6 0.85 9.875 2.600 0.125 25.68 25.68


1 0.6 0.85 9.875 2.600 0.125 Short Span

I. A. Campbell Associates, Inc. Page 50 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.85 9.875 2.600 0.125
1 0.6 0.85 9.875 2.600 0.125
1 0.6 0.85 9.875 2.600 0.125
1 0.6 0.85 9.875 2.600 0.125 Long Span
1 0.6 0.85 9.875 2.600 0.125
1 0.6 0.85 9.875 2.600 0.125
1 0.6 0.85 9.875 2.600 0.125

GS-9 A 4 0.6 0.6 10.025 2.600 0.125 26.07 104.28


4 0.6 0.6 10.025 2.600 0.125 Short Span
4 0.6 0.6 10.025 2.600 0.125
4 0.6 0.6 10.025 2.600 0.125
4 0.6 0.6 10.025 2.600 0.125
4 0.6 0.6 10.025 2.600 0.125 Long Span
4 0.6 0.6 10.025 2.600 0.125
4 0.6 0.6 10.025 2.600 0.125
4 0.6 0.6 10.025 2.600 0.125

GS-9 A 2 0.6 0.6 10.025 2.700 0.125 27.07 54.14


2 0.6 0.6 10.025 2.700 0.125 Short Span
2 0.6 0.6 10.025 2.700 0.125
2 0.6 0.6 10.025 2.700 0.125
2 0.6 0.6 10.025 2.700 0.125
2 0.6 0.6 10.025 2.700 0.125 Long Span
2 0.6 0.6 10.025 2.700 0.125
2 0.6 0.6 10.025 2.700 0.125
2 0.6 0.6 10.025 2.700 0.125

I. A. Campbell Associates, Inc. Page 51 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

GS-9 A 3 0.6 0.6 10.025 2.600 0.125 26.07 78.21


3 0.6 0.6 10.025 2.600 0.125 Short Span
3 0.6 0.6 10.025 2.600 0.125
3 0.6 0.6 10.025 2.600 0.125
3 0.6 0.6 10.025 2.600 0.125
3 0.6 0.6 10.025 2.600 0.125 Long Span
3 0.6 0.6 10.025 2.600 0.125
3 0.6 0.6 10.025 2.600 0.125
3 0.6 0.6 10.025 2.600 0.125

GS-9 A 1 0.5 0.6 10.025 2.650 0.125 26.57 26.57


1 0.5 0.6 10.025 2.650 0.125 Short Span
1 0.5 0.6 10.025 2.650 0.125
1 0.5 0.6 10.025 2.650 0.125
1 0.5 0.6 10.025 2.650 0.125
1 0.5 0.6 10.025 2.650 0.125 Long Span
1 0.5 0.6 10.025 2.650 0.125
1 0.5 0.6 10.025 2.650 0.125
1 0.5 0.6 10.025 2.650 0.125

GS-9 A 2 0.6 0.6 10.025 2.550 0.125 25.56 51.12


2 0.6 0.6 10.025 2.550 0.125 Short Span
2 0.6 0.6 10.025 2.550 0.125
2 0.6 0.6 10.025 2.550 0.125
2 0.6 0.6 10.025 2.550 0.125
2 0.6 0.6 10.025 2.550 0.125 Long Span

I. A. Campbell Associates, Inc. Page 52 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.6 0.6 10.025 2.550 0.125
2 0.6 0.6 10.025 2.550 0.125
2 0.6 0.6 10.025 2.550 0.125

GS-9 A 1 0.5 0.6 10.025 2.550 0.125 25.56 25.56


1 0.5 0.6 10.025 2.550 0.125 Short Span
1 0.5 0.6 10.025 2.550 0.125
1 0.5 0.6 10.025 2.550 0.125
1 0.5 0.6 10.025 2.550 0.125
1 0.5 0.6 10.025 2.550 0.125 Long Span
1 0.5 0.6 10.025 2.550 0.125
1 0.5 0.6 10.025 2.550 0.125
1 0.5 0.6 10.025 2.550 0.125

GS-9 A 1 0.6 0.6 10.025 2.500 0.125 25.06 25.06


1 0.6 0.6 10.025 2.500 0.125 Short Span
1 0.6 0.6 10.025 2.500 0.125
1 0.6 0.6 10.025 2.500 0.125
1 0.6 0.6 10.025 2.500 0.125
1 0.6 0.6 10.025 2.500 0.125 Long Span
1 0.6 0.6 10.025 2.500 0.125
1 0.6 0.6 10.025 2.500 0.125
1 0.6 0.6 10.025 2.500 0.125

GS-9 A 1 0.5 0.6 10.025 2.550 0.125 25.56 25.56


1 0.5 0.6 10.025 2.550 0.125 Short Span
1 0.5 0.6 10.025 2.550 0.125

I. A. Campbell Associates, Inc. Page 53 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.5 0.6 10.025 2.550 0.125
1 0.5 0.6 10.025 2.550 0.125
1 0.5 0.6 10.025 2.550 0.125 Long Span
1 0.5 0.6 10.025 2.550 0.125
1 0.5 0.6 10.025 2.550 0.125
1 0.5 0.6 10.025 2.550 0.125

GS-9 A 1 0.7 0.6 9.305 2.550 0.125 23.73 23.73


1 0.7 0.6 9.305 2.550 0.125 Short Span
1 0.7 0.6 9.305 2.550 0.125
1 0.7 0.6 9.305 2.550 0.125
1 0.7 0.6 9.305 2.550 0.125
1 0.7 0.6 9.305 2.550 0.125 Long Span
1 0.7 0.6 9.305 2.550 0.125
1 0.7 0.6 9.305 2.550 0.125
1 0.7 0.6 9.305 2.550 0.125

GS-9 A 1 0.4 0.6 9.305 2.700 0.125 25.12 25.12


1 0.4 0.6 9.305 2.700 0.125 Short Span
1 0.4 0.6 9.305 2.700 0.125
1 0.4 0.6 9.305 2.700 0.125
1 0.4 0.6 9.305 2.700 0.125
1 0.4 0.6 9.305 2.700 0.125 Long Span
1 0.4 0.6 9.305 2.700 0.125
1 0.4 0.6 9.305 2.700 0.125
1 0.4 0.6 9.305 2.700 0.125

I. A. Campbell Associates, Inc. Page 54 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
GS-9 A 1 0.6 0.6 9.305 2.600 0.125 24.19 24.19
1 0.6 0.6 9.305 2.600 0.125 Short Span
1 0.6 0.6 9.305 2.600 0.125
1 0.6 0.6 9.305 2.600 0.125
1 0.6 0.6 9.305 2.600 0.125
1 0.6 0.6 9.305 2.600 0.125 Long Span
1 0.6 0.6 9.305 2.600 0.125
1 0.6 0.6 9.305 2.600 0.125
1 0.6 0.6 9.305 2.600 0.125

GS-9 A 1 0.6 0.6 9.305 2.525 0.125 23.5 23.50


1 0.6 0.6 9.305 2.525 0.125 Short Span
1 0.6 0.6 9.305 2.525 0.125
1 0.6 0.6 9.305 2.525 0.125
1 0.6 0.6 9.305 2.525 0.125
1 0.6 0.6 9.305 2.525 0.125 Long Span
1 0.6 0.6 9.305 2.525 0.125
1 0.6 0.6 9.305 2.525 0.125
1 0.6 0.6 9.305 2.525 0.125

GS-9 A 1 0.4 0.6 9.305 2.700 0.125 25.12 25.12


1 0.4 0.6 9.305 2.700 0.125 Short Span
1 0.4 0.6 9.305 2.700 0.125
1 0.4 0.6 9.305 2.700 0.125
1 0.4 0.6 9.305 2.700 0.125
1 0.4 0.6 9.305 2.700 0.125 Long Span
1 0.4 0.6 9.305 2.700 0.125

I. A. Campbell Associates, Inc. Page 55 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.4 0.6 9.305 2.700 0.125
1 0.4 0.6 9.305 2.700 0.125

GS-9 A 1 0.4 0.6 5.25 2.600 0.125 13.65 13.65


1 0.4 0.6 5.25 2.600 0.125 Short Span
1 0.4 0.6 5.25 2.600 0.125
1 0.4 0.6 5.25 2.600 0.125
1 0.4 0.6 5.25 2.600 0.125
1 0.4 0.6 5.25 2.600 0.125 Long Span
1 0.4 0.6 5.25 2.600 0.125
1 0.4 0.6 5.25 2.600 0.125
1 0.4 0.6 5.25 2.600 0.125

GS-9 A 1 0.6 0.6 6.9 2.600 0.125 17.94 17.94


1 0.6 0.6 6.9 2.600 0.125 Short Span
1 0.6 0.6 6.9 2.600 0.125
1 0.6 0.6 6.9 2.600 0.125
1 0.6 0.6 6.9 2.600 0.125
1 0.6 0.6 6.9 2.600 0.125 Long Span
1 0.6 0.6 6.9 2.600 0.125
1 0.6 0.6 6.9 2.600 0.125
1 0.6 0.6 6.9 2.600 0.125

GS-9 A 1 0.4 0.6 6.9 2.700 0.125 18.63 18.63


1 0.4 0.6 6.9 2.700 0.125 Short Span
1 0.4 0.6 6.9 2.700 0.125
1 0.4 0.6 6.9 2.700 0.125

I. A. Campbell Associates, Inc. Page 56 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.4 0.6 6.9 2.700 0.125
1 0.4 0.6 6.9 2.700 0.125 Long Span
1 0.4 0.6 6.9 2.700 0.125
1 0.4 0.6 6.9 2.700 0.125
1 0.4 0.6 6.9 2.700 0.125

GS-9 A 1 0.4 0.6 6.9 2.650 0.125 18.29 18.29


1 0.4 0.6 6.9 2.650 0.125 Short Span
1 0.4 0.6 6.9 2.650 0.125
1 0.4 0.6 6.9 2.650 0.125
1 0.4 0.6 6.9 2.650 0.125
1 0.4 0.6 6.9 2.650 0.125 Long Span
1 0.4 0.6 6.9 2.650 0.125
1 0.4 0.6 6.9 2.650 0.125
1 0.4 0.6 6.9 2.650 0.125

GS-9 A 1 0.6 0.6 9.28 2.500 0.125 23.2 23.20


1 0.6 0.6 9.28 2.500 0.125 Short Span
1 0.6 0.6 9.28 2.500 0.125
1 0.6 0.6 9.28 2.500 0.125
1 0.6 0.6 9.28 2.500 0.125
1 0.6 0.6 9.28 2.500 0.125 Long Span
1 0.6 0.6 9.28 2.500 0.125
1 0.6 0.6 9.28 2.500 0.125
1 0.6 0.6 9.28 2.500 0.125

GS-9 A 1 0.6 0.6 9.28 2.550 0.125 23.66 23.66

I. A. Campbell Associates, Inc. Page 57 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.6 9.28 2.550 0.125 Short Span
1 0.6 0.6 9.28 2.550 0.125
1 0.6 0.6 9.28 2.550 0.125
1 0.6 0.6 9.28 2.550 0.125
1 0.6 0.6 9.28 2.550 0.125 Long Span
1 0.6 0.6 9.28 2.550 0.125
1 0.6 0.6 9.28 2.550 0.125
1 0.6 0.6 9.28 2.550 0.125

GS-9 A 1 0.6 0.6 9.28 2.550 0.125 23.66 23.66


1 0.6 0.6 9.28 2.550 0.125 Short Span
1 0.6 0.6 9.28 2.550 0.125
1 0.6 0.6 9.28 2.550 0.125
1 0.6 0.6 9.28 2.550 0.125
1 0.6 0.6 9.28 2.550 0.125 Long Span
1 0.6 0.6 9.28 2.550 0.125
1 0.6 0.6 9.28 2.550 0.125
1 0.6 0.6 9.28 2.550 0.125

GS-6 B 1 0.7 0.5 4.7 3.27 0.125 15.37 15.37


1 0.7 0.5 4.7 3.27 0.125 Short Span
1 0.7 0.5 4.7 3.27 0.125
1 0.7 0.5 4.7 3.27 0.125
1 0.7 0.5 4.7 3.27 0.125
1 0.7 0.5 4.7 3.27 0.125
1 0.7 0.5 4.7 3.27 0.125 Long Span
1 0.7 0.5 4.7 3.27 0.125

I. A. Campbell Associates, Inc. Page 58 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 4.7 3.27 0.125
1 0.7 0.5 4.7 3.27 0.125

GS-7 B 2 0.7 0.5 4.7 3.27 0.125 15.37 30.74


2 0.7 0.5 4.7 3.27 0.125 Short Span
2 0.7 0.5 4.7 3.27 0.125
2 0.7 0.5 4.7 3.27 0.125
2 0.7 0.5 4.7 3.27 0.125
2 0.7 0.5 4.7 3.27 0.125
2 0.7 0.5 4.7 3.27 0.125 Long Span
2 0.7 0.5 4.7 3.27 0.125
2 0.7 0.5 4.7 3.27 0.125
2 0.7 0.5 4.7 3.27 0.125

GS-1 A 1 0.7 0.5 9.9 3.27 0.175 32.37 32.37


1 0.7 0.5 9.9 3.27 0.175 Short Span
1 0.7 0.5 9.9 3.27 0.175
1 0.7 0.5 9.9 3.27 0.175
1 0.7 0.5 9.9 3.27 0.175
1 0.7 0.5 9.9 3.27 0.175 Long Span
1 0.7 0.5 9.9 3.27 0.175
1 0.7 0.5 9.9 3.27 0.175
1 0.7 0.5 9.9 3.27 0.175

GS-1 A 1 0.7 0.5 6.6 3.27 0.175 21.58 21.58


1 0.7 0.5 6.6 3.27 0.175 Short Span
1 0.7 0.5 6.6 3.27 0.175

I. A. Campbell Associates, Inc. Page 59 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 6.6 3.27 0.175
1 0.7 0.5 6.6 3.27 0.175
1 0.7 0.5 6.6 3.27 0.175 Long Span
1 0.7 0.5 6.6 3.27 0.175
1 0.7 0.5 6.6 3.27 0.175
1 0.7 0.5 6.6 3.27 0.175

GS-1 A 1 0.7 0.5 9 3.27 0.175 29.43 29.43


1 0.7 0.5 9 3.27 0.175 Short Span
1 0.7 0.5 9 3.27 0.175
1 0.7 0.5 9 3.27 0.175
1 0.7 0.5 9 3.27 0.175
1 0.7 0.5 9 3.27 0.175 Long Span
1 0.7 0.5 9 3.27 0.175
1 0.7 0.5 9 3.27 0.175
1 0.7 0.5 9 3.27 0.175

GS-1 A 1 0.7 0.5 9.9 3.37 0.175 33.36 33.36


1 0.7 0.5 9.9 3.37 0.175 Short Span
1 0.7 0.5 9.9 3.37 0.175
1 0.7 0.5 9.9 3.37 0.175
1 0.7 0.5 9.9 3.37 0.175
1 0.7 0.5 9.9 3.37 0.175 Long Span
1 0.7 0.5 9.9 3.37 0.175
1 0.7 0.5 9.9 3.37 0.175
1 0.7 0.5 9.9 3.37 0.175

I. A. Campbell Associates, Inc. Page 60 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
GS-1 A 1 0.7 0.5 9.9 3.57 0.175 35.34 35.34
1 0.7 0.5 9.9 3.57 0.175 Short Span
1 0.7 0.5 9.9 3.57 0.175
1 0.7 0.5 9.9 3.57 0.175
1 0.7 0.5 9.9 3.57 0.175
1 0.7 0.5 9.9 3.57 0.175 Long Span
1 0.7 0.5 9.9 3.57 0.175
1 0.7 0.5 9.9 3.57 0.175
1 0.7 0.5 9.9 3.57 0.175

GS-2 A 14 0.7 0.5 9.9 3.27 0.15 32.37 453.18


14 0.7 0.5 9.9 3.27 0.15 Short Span
14 0.7 0.5 9.9 3.27 0.15
14 0.7 0.5 9.9 3.27 0.15
14 0.7 0.5 9.9 3.27 0.15
14 0.7 0.5 9.9 3.27 0.15 Long Span
14 0.7 0.5 9.9 3.27 0.15
14 0.7 0.5 9.9 3.27 0.15
14 0.7 0.5 9.9 3.27 0.15

GS-2 A 2 0.7 0.5 9 3.27 0.15 29.43 58.86


2 0.7 0.5 9 3.27 0.15 Short Span
2 0.7 0.5 9 3.27 0.15
2 0.7 0.5 9 3.27 0.15
2 0.7 0.5 9 3.27 0.15
2 0.7 0.5 9 3.27 0.15 Long Span
2 0.7 0.5 9 3.27 0.15

I. A. Campbell Associates, Inc. Page 61 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.7 0.5 9 3.27 0.15
2 0.7 0.5 9 3.27 0.15

GS-2 A 2 0.7 0.5 9 3.27 0.15 29.43 58.86


2 0.7 0.5 9 3.27 0.15 Short Span
2 0.7 0.5 9 3.27 0.15
2 0.7 0.5 9 3.27 0.15
2 0.7 0.5 9 3.27 0.15
2 0.7 0.5 9 3.27 0.15 Long Span
2 0.7 0.5 9 3.27 0.15
2 0.7 0.5 9 3.27 0.15
2 0.7 0.5 9 3.27 0.15

GS-4A B 1 0.7 0.5 5.3 3.57 0.125 18.92 18.92


1 0.7 0.5 5.3 3.57 0.125 Short Span
1 0.7 0.5 5.3 3.57 0.125
1 0.7 0.5 5.3 3.57 0.125
1 0.7 0.5 5.3 3.57 0.125
1 0.7 0.5 5.3 3.57 0.125
1 0.7 0.5 5.3 3.57 0.125 Long Span
1 0.7 0.5 5.3 3.57 0.125
1 0.7 0.5 5.3 3.57 0.125
1 0.7 0.5 5.3 3.57 0.125

GS-4B B 2 0.7 0.5 5.3 3.27 0.125 17.33 34.66


2 0.7 0.5 5.3 3.27 0.125 Short Span
2 0.7 0.5 5.3 3.27 0.125

I. A. Campbell Associates, Inc. Page 62 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.7 0.5 5.3 3.27 0.125
2 0.7 0.5 5.3 3.27 0.125
2 0.7 0.5 5.3 3.27 0.125
2 0.7 0.5 5.3 3.27 0.125 Long Span
2 0.7 0.5 5.3 3.27 0.125
2 0.7 0.5 5.3 3.27 0.125
2 0.7 0.5 5.3 3.27 0.125

GS-4C B 1 0.7 0.5 5.3 2.4 0.125 12.72 12.72


1 0.7 0.5 5.3 2.4 0.125 Short Span
1 0.7 0.5 5.3 2.4 0.125
1 0.7 0.5 5.3 2.4 0.125
1 0.7 0.5 5.3 2.4 0.125
1 0.7 0.5 5.3 2.4 0.125
1 0.7 0.5 5.3 2.4 0.125 Long Span
1 0.7 0.5 5.3 2.4 0.125
1 0.7 0.5 5.3 2.4 0.125
1 0.7 0.5 5.3 2.4 0.125

GS-8A B 3 0.6 0.6 4.7 2.4 0.125 11.28 33.84


3 0.6 0.6 4.7 2.4 0.125 Short Span
3 0.6 0.6 4.7 2.4 0.125
3 0.6 0.6 4.7 2.4 0.125
3 0.6 0.6 4.7 2.4 0.125
3 0.6 0.6 4.7 2.4 0.125
3 0.6 0.6 4.7 2.4 0.125 Long Span
3 0.6 0.6 4.7 2.4 0.125

I. A. Campbell Associates, Inc. Page 63 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3 0.6 0.6 4.7 2.4 0.125
3 0.6 0.6 4.7 2.4 0.125

GS-3 A 13 0.7 0.5 9.9 2.4 0.125 23.76 308.88


13 0.7 0.5 9.9 2.4 0.125 Short Span
13 0.7 0.5 9.9 2.4 0.125
13 0.7 0.5 9.9 2.4 0.125
13 0.7 0.5 9.9 2.4 0.125
13 0.7 0.5 9.9 2.4 0.125 Long Span
13 0.7 0.5 9.9 2.4 0.125
13 0.7 0.5 9.9 2.4 0.125
13 0.7 0.5 9.9 2.4 0.125

GS-3 A 1 0.7 0.5 9 2.4 0.125 21.6 21.60


1 0.7 0.5 9 2.4 0.125 Short Span
1 0.7 0.5 9 2.4 0.125
1 0.7 0.5 9 2.4 0.125
1 0.7 0.5 9 2.4 0.125
1 0.7 0.5 9 2.4 0.125 Long Span
1 0.7 0.5 9 2.4 0.125
1 0.7 0.5 9 2.4 0.125
1 0.7 0.5 9 2.4 0.125

GS-9 A 5 0.7 0.5 9 2.4 0.125 21.6 108.00


5 0.7 0.5 9 2.4 0.125 Short Span
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125

I. A. Campbell Associates, Inc. Page 64 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125 Long Span
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125

GS-9 A 5 0.7 0.5 9 2.4 0.125 21.6 108.00


5 0.7 0.5 9 2.4 0.125 Short Span
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125 Long Span
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125

GS-3 A 1 0.7 0.5 8 2.4 0.125 19.2 19.20


1 0.7 0.5 8 2.4 0.125 Short Span
1 0.7 0.5 8 2.4 0.125
1 0.7 0.5 8 2.4 0.125
1 0.7 0.5 8 2.4 0.125
1 0.7 0.5 8 2.4 0.125 Long Span
1 0.7 0.5 8 2.4 0.125
1 0.7 0.5 8 2.4 0.125
1 0.7 0.5 8 2.4 0.125

GS-5 B 1 0.6 0.6 4.95 2.4 0.125 11.88 11.88

I. A. Campbell Associates, Inc. Page 65 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.6 4.95 2.4 0.125 Short Span
1 0.6 0.6 4.95 2.4 0.125
1 0.6 0.6 4.95 2.4 0.125
1 0.6 0.6 4.95 2.4 0.125
1 0.6 0.6 4.95 2.4 0.125
1 0.6 0.6 4.95 2.4 0.125 Long Span
1 0.6 0.6 4.95 2.4 0.125
1 0.6 0.6 4.95 2.4 0.125
1 0.6 0.6 4.95 2.4 0.125

GS-8A B 6 0.6 0.6 4.7 2.4 0.125 11.28 67.68


6 0.6 0.6 4.7 2.4 0.125 Short Span
6 0.6 0.6 4.7 2.4 0.125
6 0.6 0.6 4.7 2.4 0.125
6 0.6 0.6 4.7 2.4 0.125
6 0.6 0.6 4.7 2.4 0.125
6 0.6 0.6 4.7 2.4 0.125 Long Span
6 0.6 0.6 4.7 2.4 0.125
6 0.6 0.6 4.7 2.4 0.125
6 0.6 0.6 4.7 2.4 0.125

GS-9 A 30 0.7 0.5 9.9 2.4 0.125 23.76 712.80


30 0.7 0.5 9.9 2.4 0.125 Short Span
30 0.7 0.5 9.9 2.4 0.125
30 0.7 0.5 9.9 2.4 0.125
30 0.7 0.5 9.9 2.4 0.125
30 0.7 0.5 9.9 2.4 0.125 Long Span

I. A. Campbell Associates, Inc. Page 66 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
30 0.7 0.5 9.9 2.4 0.125
30 0.7 0.5 9.9 2.4 0.125
30 0.7 0.5 9.9 2.4 0.125

GS-9 A 6 0.7 0.5 9 2.4 0.125 21.6 129.60


6 0.7 0.5 9 2.4 0.125 Short Span
6 0.7 0.5 9 2.4 0.125
6 0.7 0.5 9 2.4 0.125
6 0.7 0.5 9 2.4 0.125
6 0.7 0.5 9 2.4 0.125 Long Span
6 0.7 0.5 9 2.4 0.125
6 0.7 0.5 9 2.4 0.125
6 0.7 0.5 9 2.4 0.125

GS-9 A 1 0.7 0.5 3.5 2.4 0.125 8.4 8.40


1 0.7 0.5 3.5 2.4 0.125 Short Span
1 0.7 0.5 3.5 2.4 0.125
1 0.7 0.5 3.5 2.4 0.125
1 0.7 0.5 3.5 2.4 0.125
1 0.7 0.5 3.5 2.4 0.125 Long Span
1 0.7 0.5 3.5 2.4 0.125
1 0.7 0.5 3.5 2.4 0.125
1 0.7 0.5 3.5 2.4 0.125

GS-9 A 1 0.7 0.5 3.5 2.4 0.125 8.4 8.40


1 0.7 0.5 3.5 2.4 0.125 Short Span
1 0.7 0.5 3.5 2.4 0.125

I. A. Campbell Associates, Inc. Page 67 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 3.5 2.4 0.125
1 0.7 0.5 3.5 2.4 0.125
1 0.7 0.5 3.5 2.4 0.125 Long Span
1 0.7 0.5 3.5 2.4 0.125
1 0.7 0.5 3.5 2.4 0.125
1 0.7 0.5 3.5 2.4 0.125

GS-21 A 1 0.7 0.5 3.4 2.4 0.125 8.16 8.16


1 0.7 0.5 3.4 2.4 0.125 Short Span
1 0.7 0.5 3.4 2.4 0.125
1 0.7 0.5 3.4 2.4 0.125
1 0.7 0.5 3.4 2.4 0.125
1 0.7 0.5 3.4 2.4 0.125 Long Span
1 0.7 0.5 3.4 2.4 0.125
1 0.7 0.5 3.4 2.4 0.125
1 0.7 0.5 3.4 2.4 0.125

GS-24 A 4 0.7 0.5 7.2 2.65 0.125 19.08 76.32


4 0.7 0.5 7.2 2.65 0.125 Short Span
4 0.7 0.5 7.2 2.65 0.125
4 0.7 0.5 7.2 2.65 0.125
4 0.7 0.5 7.2 2.65 0.125
4 0.7 0.5 7.2 2.65 0.125 Long Span
4 0.7 0.5 7.2 2.65 0.125
4 0.7 0.5 7.2 2.65 0.125
4 0.7 0.5 7.2 2.65 0.125

I. A. Campbell Associates, Inc. Page 68 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
GS-24 A 1 0.7 0.5 5.7 2.65 0.125 15.11 15.11
1 0.7 0.5 5.7 2.65 0.125 Short Span
1 0.7 0.5 5.7 2.65 0.125
1 0.7 0.5 5.7 2.65 0.125
1 0.7 0.5 5.7 2.65 0.125
1 0.7 0.5 5.7 2.65 0.125 Long Span
1 0.7 0.5 5.7 2.65 0.125
1 0.7 0.5 5.7 2.65 0.125
1 0.7 0.5 5.7 2.65 0.125

GS-24 A 1 0.7 0.5 5.4 2.65 0.125 14.31 14.31


1 0.7 0.5 5.4 2.65 0.125 Short Span
1 0.7 0.5 5.4 2.65 0.125
1 0.7 0.5 5.4 2.65 0.125
1 0.7 0.5 5.4 2.65 0.125
1 0.7 0.5 5.4 2.65 0.125 Long Span
1 0.7 0.5 5.4 2.65 0.125
1 0.7 0.5 5.4 2.65 0.125
1 0.7 0.5 5.4 2.65 0.125

GS-24 A 1 0.7 0.5 4.5 2.65 0.125 11.93 11.93


1 0.7 0.5 4.5 2.65 0.125 Short Span
1 0.7 0.5 4.5 2.65 0.125
1 0.7 0.5 4.5 2.65 0.125
1 0.7 0.5 4.5 2.65 0.125
1 0.7 0.5 4.5 2.65 0.125 Long Span
1 0.7 0.5 4.5 2.65 0.125

I. A. Campbell Associates, Inc. Page 69 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 4.5 2.65 0.125
1 0.7 0.5 4.5 2.65 0.125

GS-8B B 3 0.6 0.6 4.7 2.4 0.125 11.28 33.84


3 0.6 0.6 4.7 2.4 0.125 Short Span
3 0.6 0.6 4.7 2.4 0.125
3 0.6 0.6 4.7 2.4 0.125
3 0.6 0.6 4.7 2.4 0.125
3 0.6 0.6 4.7 2.4 0.125
3 0.6 0.6 4.7 2.4 0.125 Long Span
3 0.6 0.6 4.7 2.4 0.125
3 0.6 0.6 4.7 2.4 0.125
3 0.6 0.6 4.7 2.4 0.125

GS-9 A 41 0.7 0.5 9.9 2.4 0.125 23.76 974.16


41 0.7 0.5 9.9 2.4 0.125 Short Span
41 0.7 0.5 9.9 2.4 0.125
41 0.7 0.5 9.9 2.4 0.125
41 0.7 0.5 9.9 2.4 0.125
41 0.7 0.5 9.9 2.4 0.125 Long Span
41 0.7 0.5 9.9 2.4 0.125
41 0.7 0.5 9.9 2.4 0.125
41 0.7 0.5 9.9 2.4 0.125

GS-9 A 3 0.7 0.5 8.9 2.4 0.125 21.36 64.08


3 0.7 0.5 8.9 2.4 0.125 Short Span
3 0.7 0.5 8.9 2.4 0.125

I. A. Campbell Associates, Inc. Page 70 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3 0.7 0.5 8.9 2.4 0.125
3 0.7 0.5 8.9 2.4 0.125
3 0.7 0.5 8.9 2.4 0.125 Long Span
3 0.7 0.5 8.9 2.4 0.125
3 0.7 0.5 8.9 2.4 0.125
3 0.7 0.5 8.9 2.4 0.125

GS-9 A 5 0.7 0.5 9 2.4 0.125 21.6 108.00


5 0.7 0.5 9 2.4 0.125 Short Span
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125 Long Span
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125
5 0.7 0.5 9 2.4 0.125

GS-22 A 1 0.7 0.5 9 2.4 0.125 21.6 21.60


1 0.7 0.5 9 2.4 0.125 Short Span
1 0.7 0.5 9 2.4 0.125
1 0.7 0.5 9 2.4 0.125
1 0.7 0.5 9 2.4 0.125
1 0.7 0.5 9 2.4 0.125 Long Span
1 0.7 0.5 9 2.4 0.125
1 0.7 0.5 9 2.4 0.125
1 0.7 0.5 9 2.4 0.125

I. A. Campbell Associates, Inc. Page 71 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
GS-23 B 1 0.6 0.6 3.2 3.1 0.125 9.92 9.92
1 0.6 0.6 3.2 3.1 0.125 Short Span
1 0.6 0.6 3.2 3.1 0.125
1 0.6 0.6 3.2 3.1 0.125
1 0.6 0.6 3.2 3.1 0.125
1 0.6 0.6 3.2 3.1 0.125
1 0.6 0.6 3.2 3.1 0.125 Long Span
1 0.6 0.6 3.2 3.1 0.125
1 0.6 0.6 3.2 3.1 0.125
1 0.6 0.6 3.2 3.1 0.125

GS-9 A 5 0.7 0.5 5.9 2.4 0.125 14.16 70.80


5 0.7 0.5 5.9 2.4 0.125 Short Span
5 0.7 0.5 5.9 2.4 0.125
5 0.7 0.5 5.9 2.4 0.125
5 0.7 0.5 5.9 2.4 0.125
5 0.7 0.5 5.9 2.4 0.125 Long Span
5 0.7 0.5 5.9 2.4 0.125
5 0.7 0.5 5.9 2.4 0.125
5 0.7 0.5 5.9 2.4 0.125

GS-19 A 1 0.7 0.5 9.3 2.2 0.175 20.46 20.46


1 0.7 0.5 9.3 2.2 0.175 Short Span
1 0.7 0.5 9.3 2.2 0.175
1 0.7 0.5 9.3 2.2 0.175
1 0.7 0.5 9.3 2.2 0.175
1 0.7 0.5 9.3 2.2 0.175 Long Span

I. A. Campbell Associates, Inc. Page 72 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 9.3 2.2 0.175
1 0.7 0.5 9.3 2.2 0.175
1 0.7 0.5 9.3 2.2 0.175

GS-8B B 1 0.6 0.6 2.35 2.4 0.125 5.64 5.64


1 0.6 0.6 2.35 2.4 0.125 Short Span
1 0.6 0.6 2.35 2.4 0.125
1 0.6 0.6 2.35 2.4 0.125
1 0.6 0.6 2.35 2.4 0.125
1 0.6 0.6 2.35 2.4 0.125
1 0.6 0.6 2.35 2.4 0.125 Long Span
1 0.6 0.6 2.35 2.4 0.125
1 0.6 0.6 2.35 2.4 0.125
1 0.6 0.6 2.35 2.4 0.125

GS-8B B 5 0.6 0.6 4.7 2.4 0.125 11.28 56.40


5 0.6 0.6 4.7 2.4 0.125 Short Span
5 0.6 0.6 4.7 2.4 0.125
5 0.6 0.6 4.7 2.4 0.125
5 0.6 0.6 4.7 2.4 0.125
5 0.6 0.6 4.7 2.4 0.125
5 0.6 0.6 4.7 2.4 0.125 Long Span
5 0.6 0.6 4.7 2.4 0.125
5 0.6 0.6 4.7 2.4 0.125
5 0.6 0.6 4.7 2.4 0.125

GS-16 B 2 0.6 0.6 5.3 2.8 0.125 14.84 29.68

I. A. Campbell Associates, Inc. Page 73 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.6 0.6 5.3 2.8 0.125 Short Span
2 0.6 0.6 5.3 2.8 0.125
2 0.6 0.6 5.3 2.8 0.125
2 0.6 0.6 5.3 2.8 0.125
2 0.6 0.6 5.3 2.8 0.125
2 0.6 0.6 5.3 2.8 0.125 Long Span
2 0.6 0.6 5.3 2.8 0.125
2 0.6 0.6 5.3 2.8 0.125
2 0.6 0.6 5.3 2.8 0.125

GS-10A A 8 0.7 0.5 9.9 2.9 0.125 28.71 229.68


8 0.7 0.5 9.9 2.9 0.125 Short Span
8 0.7 0.5 9.9 2.9 0.125
8 0.7 0.5 9.9 2.9 0.125
8 0.7 0.5 9.9 2.9 0.125
8 0.7 0.5 9.9 2.9 0.125 Long Span
8 0.7 0.5 9.9 2.9 0.125
8 0.7 0.5 9.9 2.9 0.125
8 0.7 0.5 9.9 2.9 0.125

GS-10A A 2 0.7 0.5 9 2.9 0.125 26.1 52.20


2 0.7 0.5 9 2.9 0.125 Short Span
2 0.7 0.5 9 2.9 0.125
2 0.7 0.5 9 2.9 0.125
2 0.7 0.5 9 2.9 0.125
2 0.7 0.5 9 2.9 0.125 Long Span
2 0.7 0.5 9 2.9 0.125

I. A. Campbell Associates, Inc. Page 74 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.7 0.5 9 2.9 0.125
2 0.7 0.5 9 2.9 0.125

GS-10B A 8 0.7 0.5 9.9 2.9 0.125 28.71 229.68


8 0.7 0.5 9.9 2.9 0.125 Short Span
8 0.7 0.5 9.9 2.9 0.125
8 0.7 0.5 9.9 2.9 0.125
8 0.7 0.5 9.9 2.9 0.125
8 0.7 0.5 9.9 2.9 0.125 Long Span
8 0.7 0.5 9.9 2.9 0.125
8 0.7 0.5 9.9 2.9 0.125
8 0.7 0.5 9.9 2.9 0.125

GS-10B A 2 0.7 0.5 9 2.9 0.125 26.1 52.20


2 0.7 0.5 9 2.9 0.125 Short Span
2 0.7 0.5 9 2.9 0.125
2 0.7 0.5 9 2.9 0.125
2 0.7 0.5 9 2.9 0.125
2 0.7 0.5 9 2.9 0.125 Long Span
2 0.7 0.5 9 2.9 0.125
2 0.7 0.5 9 2.9 0.125
2 0.7 0.5 9 2.9 0.125

GS-10B A 1 0.7 0.5 5.9 2.9 0.125 17.11 17.11


1 0.7 0.5 5.9 2.9 0.125 Short Span
1 0.7 0.5 5.9 2.9 0.125
1 0.7 0.5 5.9 2.9 0.125

I. A. Campbell Associates, Inc. Page 75 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 5.9 2.9 0.125
1 0.7 0.5 5.9 2.9 0.125 Long Span
1 0.7 0.5 5.9 2.9 0.125
1 0.7 0.5 5.9 2.9 0.125
1 0.7 0.5 5.9 2.9 0.125

GS-14 A 1 0.7 0.5 5.9 2.7 0.15 15.93 15.93


1 0.7 0.5 5.9 2.7 0.15 Short Span
1 0.7 0.5 5.9 2.7 0.15
1 0.7 0.5 5.9 2.7 0.15
1 0.7 0.5 5.9 2.7 0.15
1 0.7 0.5 5.9 2.7 0.15 Long Span
1 0.7 0.5 5.9 2.7 0.15
1 0.7 0.5 5.9 2.7 0.15
1 0.7 0.5 5.9 2.7 0.15

GS-14 A 2 0.7 0.5 9.9 2.7 0.15 26.73 53.46


2 0.7 0.5 9.9 2.7 0.15 Short Span
2 0.7 0.5 9.9 2.7 0.15
2 0.7 0.5 9.9 2.7 0.15
2 0.7 0.5 9.9 2.7 0.15
2 0.7 0.5 9.9 2.7 0.15 Long Span
2 0.7 0.5 9.9 2.7 0.15
2 0.7 0.5 9.9 2.7 0.15
2 0.7 0.5 9.9 2.7 0.15

GS-15 B 2 0.6 0.6 4.7 2.8 0.125 13.16 26.32

I. A. Campbell Associates, Inc. Page 76 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.6 0.6 4.7 2.8 0.125 Short Span
2 0.6 0.6 4.7 2.8 0.125
2 0.6 0.6 4.7 2.8 0.125
2 0.6 0.6 4.7 2.8 0.125
2 0.6 0.6 4.7 2.8 0.125
2 0.6 0.6 4.7 2.8 0.125 Long Span
2 0.6 0.6 4.7 2.8 0.125
2 0.6 0.6 4.7 2.8 0.125
2 0.6 0.6 4.7 2.8 0.125

GS-11 A 6 0.7 0.5 9.9 2.9 0.125 28.71 172.26


6 0.7 0.5 9.9 2.9 0.125 Short Span
6 0.7 0.5 9.9 2.9 0.125
6 0.7 0.5 9.9 2.9 0.125
6 0.7 0.5 9.9 2.9 0.125
6 0.7 0.5 9.9 2.9 0.125 Long Span
6 0.7 0.5 9.9 2.9 0.125
6 0.7 0.5 9.9 2.9 0.125
6 0.7 0.5 9.9 2.9 0.125

GS-12 A 2 0.7 0.5 9.9 2.1 0.125 20.79 41.58


2 0.7 0.5 9.9 2.1 0.125 Short Span
2 0.7 0.5 9.9 2.1 0.125
2 0.7 0.5 9.9 2.1 0.125
2 0.7 0.5 9.9 2.1 0.125
2 0.7 0.5 9.9 2.1 0.125 Long Span
2 0.7 0.5 9.9 2.1 0.125

I. A. Campbell Associates, Inc. Page 77 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.7 0.5 9.9 2.1 0.125
2 0.7 0.5 9.9 2.1 0.125

GS-13 A 2 0.7 0.5 9.9 2.7 0.125 26.73 53.46


2 0.7 0.5 9.9 2.7 0.125 Short Span
2 0.7 0.5 9.9 2.7 0.125
2 0.7 0.5 9.9 2.7 0.125
2 0.7 0.5 9.9 2.7 0.125
2 0.7 0.5 9.9 2.7 0.125 Long Span
2 0.7 0.5 9.9 2.7 0.125
2 0.7 0.5 9.9 2.7 0.125
2 0.7 0.5 9.9 2.7 0.125

GS-18 B 1 0.6 0.6 4.85 3.6 0.125 17.46 17.46


1 0.6 0.6 4.85 3.6 0.125 Short Span
1 0.6 0.6 4.85 3.6 0.125
1 0.6 0.6 4.85 3.6 0.125
1 0.6 0.6 4.85 3.6 0.125
1 0.6 0.6 4.85 3.6 0.125
1 0.6 0.6 4.85 3.6 0.125 Long Span
1 0.6 0.6 4.85 3.6 0.125
1 0.6 0.6 4.85 3.6 0.125
1 0.6 0.6 4.85 3.6 0.125

GS-13 A 1 0.7 0.5 4.9 2.65 0.125 12.99 12.99


1 0.7 0.5 4.9 2.65 0.125 Short Span
1 0.7 0.5 4.9 2.65 0.125

I. A. Campbell Associates, Inc. Page 78 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 4.9 2.65 0.125
1 0.7 0.5 4.9 2.65 0.125
1 0.7 0.5 4.9 2.65 0.125 Long Span
1 0.7 0.5 4.9 2.65 0.125
1 0.7 0.5 4.9 2.65 0.125
1 0.7 0.5 4.9 2.65 0.125

GS-25 B 1 0.6 0.6 9.9 3.6 0.125 35.64 35.64


1 0.6 0.6 9.9 3.6 0.125 Short Span
1 0.6 0.6 9.9 3.6 0.125
1 0.6 0.6 9.9 3.6 0.125
1 0.6 0.6 9.9 3.6 0.125
1 0.6 0.6 9.9 3.6 0.125
1 0.6 0.6 9.9 3.6 0.125 Long Span
1 0.6 0.6 9.9 3.6 0.125
1 0.6 0.6 9.9 3.6 0.125
1 0.6 0.6 9.9 3.6 0.125

GS-21 A 1 0.7 0.5 3.5 3.9 0.125 13.65 13.65


1 0.7 0.5 3.5 3.9 0.125 Short Span
1 0.7 0.5 3.5 3.9 0.125
1 0.7 0.5 3.5 3.9 0.125
1 0.7 0.5 3.5 3.9 0.125
1 0.7 0.5 3.5 3.9 0.125 Long Span
1 0.7 0.5 3.5 3.9 0.125
1 0.7 0.5 3.5 3.9 0.125
1 0.7 0.5 3.5 3.9 0.125

I. A. Campbell Associates, Inc. Page 79 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

GS-3A A 1 0.7 0.5 5.3 3.27 0.125 17.33 17.33


1 0.7 0.5 5.3 3.27 0.125 Short Span
1 0.7 0.5 5.3 3.27 0.125
1 0.7 0.5 5.3 3.27 0.125
1 0.7 0.5 5.3 3.27 0.125
1 0.7 0.5 5.3 3.27 0.125 Long Span
1 0.7 0.5 5.3 3.27 0.125
1 0.7 0.5 5.3 3.27 0.125
1 0.7 0.5 5.3 3.27 0.125

Sub total 7,396.66

2S-4 B 3 0.6 0.4 4.7 3.46 0.125 16.26 48.78


3 0.6 0.4 4.7 3.46 0.125 Short Span
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125 Long Span
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125

2S-3 A 2 0.6 0.4 10 3.46 0.175 34.6 69.20


2 0.6 0.4 10 3.46 0.175 Short Span

I. A. Campbell Associates, Inc. Page 80 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.6 0.4 10 3.46 0.175
2 0.6 0.4 10 3.46 0.175
2 0.6 0.4 10 3.46 0.175
2 0.6 0.4 10 3.46 0.175 Long Span
2 0.6 0.4 10 3.46 0.175
2 0.6 0.4 10 3.46 0.175
2 0.6 0.4 10 3.46 0.175

2S-3 A 1 0.6 0.4 9.1 3.46 0.175 31.49 31.49


1 0.6 0.4 9.1 3.46 0.175 Short Span
1 0.6 0.4 9.1 3.46 0.175
1 0.6 0.4 9.1 3.46 0.175
1 0.6 0.4 9.1 3.46 0.175
1 0.6 0.4 9.1 3.46 0.175 Long Span
1 0.6 0.4 9.1 3.46 0.175
1 0.6 0.4 9.1 3.46 0.175
1 0.6 0.4 9.1 3.46 0.175

2S-3 A 1 0.6 0.4 5 3.46 0.175 17.3 17.30


1 0.6 0.4 5 3.46 0.175 Short Span
1 0.6 0.4 5 3.46 0.175
1 0.6 0.4 5 3.46 0.175
1 0.6 0.4 5 3.46 0.175
1 0.6 0.4 5 3.46 0.175 Long Span
1 0.6 0.4 5 3.46 0.175
1 0.6 0.4 5 3.46 0.175

I. A. Campbell Associates, Inc. Page 81 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 5 3.46 0.175

2S-2 A 12 0.6 0.4 10 3.46 0.15 34.6 415.20


12 0.6 0.4 10 3.46 0.15 Short Span
12 0.6 0.4 10 3.46 0.15
12 0.6 0.4 10 3.46 0.15
12 0.6 0.4 10 3.46 0.15
12 0.6 0.4 10 3.46 0.15 Long Span
12 0.6 0.4 10 3.46 0.15
12 0.6 0.4 10 3.46 0.15
12 0.6 0.4 10 3.46 0.15

2S-2 A 2 0.6 0.4 9.1 3.46 0.15 31.49 62.98


2 0.6 0.4 9.1 3.46 0.15 Short Span
2 0.6 0.4 9.1 3.46 0.15
2 0.6 0.4 9.1 3.46 0.15
2 0.6 0.4 9.1 3.46 0.15
2 0.6 0.4 9.1 3.46 0.15 Long Span
2 0.6 0.4 9.1 3.46 0.15
2 0.6 0.4 9.1 3.46 0.15
2 0.6 0.4 9.1 3.46 0.15

2S-4 B 9 0.6 0.4 4.7 2.7 0.125 12.69 114.21


9 0.6 0.4 4.7 2.7 0.125 Short Span
9 0.6 0.4 4.7 2.7 0.125
9 0.6 0.4 4.7 2.7 0.125

I. A. Campbell Associates, Inc. Page 82 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
9 0.6 0.4 4.7 2.7 0.125
9 0.6 0.4 4.7 2.7 0.125
9 0.6 0.4 4.7 2.7 0.125 Long Span
9 0.6 0.4 4.7 2.7 0.125
9 0.6 0.4 4.7 2.7 0.125
9 0.6 0.4 4.7 2.7 0.125

2S-1 A 48 0.6 0.4 10 2.7 0.125 27 1,296.00


48 0.6 0.4 10 2.7 0.125 Short Span
48 0.6 0.4 10 2.7 0.125
48 0.6 0.4 10 2.7 0.125
48 0.6 0.4 10 2.7 0.125
48 0.6 0.4 10 2.7 0.125 Long Span
48 0.6 0.4 10 2.7 0.125
48 0.6 0.4 10 2.7 0.125
48 0.6 0.4 10 2.7 0.125

2S-1 A 8 0.6 0.4 9.1 2.7 0.125 24.57 196.56


8 0.6 0.4 9.1 2.7 0.125 Short Span
8 0.6 0.4 9.1 2.7 0.125
8 0.6 0.4 9.1 2.7 0.125
8 0.6 0.4 9.1 2.7 0.125
8 0.6 0.4 9.1 2.7 0.125 Long Span
8 0.6 0.4 9.1 2.7 0.125
8 0.6 0.4 9.1 2.7 0.125
8 0.6 0.4 9.1 2.7 0.125

I. A. Campbell Associates, Inc. Page 83 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

2S-1 A 1 0.6 0.4 7 2.7 0.125 18.9 18.90


1 0.6 0.4 7 2.7 0.125 Short Span
1 0.6 0.4 7 2.7 0.125
1 0.6 0.4 7 2.7 0.125
1 0.6 0.4 7 2.7 0.125
1 0.6 0.4 7 2.7 0.125 Long Span
1 0.6 0.4 7 2.7 0.125
1 0.6 0.4 7 2.7 0.125
1 0.6 0.4 7 2.7 0.125

2S-1 A 1 0.6 0.4 5 2.7 0.125 13.5 13.50


1 0.6 0.4 5 2.7 0.125 Short Span
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125 Long Span
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125

2S-5 B 9 0.6 0.4 4.7 2.7 0.125 12.69 114.21


9 0.6 0.4 4.7 2.7 0.125 Short Span
9 0.6 0.4 4.7 2.7 0.125
9 0.6 0.4 4.7 2.7 0.125
9 0.6 0.4 4.7 2.7 0.125

I. A. Campbell Associates, Inc. Page 84 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
9 0.6 0.4 4.7 2.7 0.125
9 0.6 0.4 4.7 2.7 0.125 Long Span
9 0.6 0.4 4.7 2.7 0.125
9 0.6 0.4 4.7 2.7 0.125
9 0.6 0.4 4.7 2.7 0.125

2S-1 A 42 0.6 0.4 10 2.7 0.125 27 1,134.00


42 0.6 0.4 10 2.7 0.125 Short Span
42 0.6 0.4 10 2.7 0.125
42 0.6 0.4 10 2.7 0.125
42 0.6 0.4 10 2.7 0.125
42 0.6 0.4 10 2.7 0.125 Long Span
42 0.6 0.4 10 2.7 0.125
42 0.6 0.4 10 2.7 0.125
42 0.6 0.4 10 2.7 0.125

2S-1 A 3 0.6 0.4 6 2.7 0.125 16.2 48.60


3 0.6 0.4 6 2.7 0.125 Short Span
3 0.6 0.4 6 2.7 0.125
3 0.6 0.4 6 2.7 0.125
3 0.6 0.4 6 2.7 0.125
3 0.6 0.4 6 2.7 0.125 Long Span
3 0.6 0.4 6 2.7 0.125
3 0.6 0.4 6 2.7 0.125
3 0.6 0.4 6 2.7 0.125

I. A. Campbell Associates, Inc. Page 85 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2S-1 A 1 0.6 0.4 5 2.7 0.125 13.5 13.50
1 0.6 0.4 5 2.7 0.125 Short Span
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125 Long Span
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125

2S-14 B 3 0.6 0.4 4.55 2.7 0.125 12.29 36.87


3 0.6 0.4 4.55 2.7 0.125 Short Span
3 0.6 0.4 4.55 2.7 0.125
3 0.6 0.4 4.55 2.7 0.125
3 0.6 0.4 4.55 2.7 0.125
3 0.6 0.4 4.55 2.7 0.125
3 0.6 0.4 4.55 2.7 0.125 Long Span
3 0.6 0.4 4.55 2.7 0.125
3 0.6 0.4 4.55 2.7 0.125
3 0.6 0.4 4.55 2.7 0.125

2S-18 B 1 0.6 0.4 6 2.7 0.125 16.2 16.20


1 0.6 0.4 6 2.7 0.125 Short Span
1 0.6 0.4 6 2.7 0.125
1 0.6 0.4 6 2.7 0.125
1 0.6 0.4 6 2.7 0.125

I. A. Campbell Associates, Inc. Page 86 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 6 2.7 0.125
1 0.6 0.4 6 2.7 0.125 Long Span
1 0.6 0.4 6 2.7 0.125
1 0.6 0.4 6 2.7 0.125
1 0.6 0.4 6 2.7 0.125

2S-19 A 2 0.6 0.4 10 2.7 0.15 27 54.00


2 0.6 0.4 10 2.7 0.15 Short Span
2 0.6 0.4 10 2.7 0.15
2 0.6 0.4 10 2.7 0.15
2 0.6 0.4 10 2.7 0.15
2 0.6 0.4 10 2.7 0.15 Long Span
2 0.6 0.4 10 2.7 0.15
2 0.6 0.4 10 2.7 0.15
2 0.6 0.4 10 2.7 0.15

2S-13 A 1 0.6 0.4 6.7 2.7 0.15 18.09 18.09


1 0.6 0.4 6.7 2.7 0.15 Short Span
1 0.6 0.4 6.7 2.7 0.15
1 0.6 0.4 6.7 2.7 0.15
1 0.6 0.4 6.7 2.7 0.15
1 0.6 0.4 6.7 2.7 0.15 Long Span
1 0.6 0.4 6.7 2.7 0.15
1 0.6 0.4 6.7 2.7 0.15
1 0.6 0.4 6.7 2.7 0.15

I. A. Campbell Associates, Inc. Page 87 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2S-1 A 5 0.6 0.4 6.7 2.7 0.125 18.09 90.45
5 0.6 0.4 6.7 2.7 0.125 Short Span
5 0.6 0.4 6.7 2.7 0.125
5 0.6 0.4 6.7 2.7 0.125
5 0.6 0.4 6.7 2.7 0.125
5 0.6 0.4 6.7 2.7 0.125 Long Span
5 0.6 0.4 6.7 2.7 0.125
5 0.6 0.4 6.7 2.7 0.125
5 0.6 0.4 6.7 2.7 0.125

2S-12 A 2 0.6 0.4 6.7 3.25 0.15 21.78 43.56


2 0.6 0.4 6.7 3.25 0.15 Short Span
2 0.6 0.4 6.7 3.25 0.15
2 0.6 0.4 6.7 3.25 0.15
2 0.6 0.4 6.7 3.25 0.15
2 0.6 0.4 6.7 3.25 0.15 Long Span
2 0.6 0.4 6.7 3.25 0.15
2 0.6 0.4 6.7 3.25 0.15
2 0.6 0.4 6.7 3.25 0.15

2S-6 B 2 0.6 0.4 4.7 3.25 0.125 15.28 30.56


2 0.6 0.4 4.7 3.25 0.125 Short Span
2 0.6 0.4 4.7 3.25 0.125
2 0.6 0.4 4.7 3.25 0.125
2 0.6 0.4 4.7 3.25 0.125
2 0.6 0.4 4.7 3.25 0.125

I. A. Campbell Associates, Inc. Page 88 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.6 0.4 4.7 3.25 0.125 Long Span
2 0.6 0.4 4.7 3.25 0.125
2 0.6 0.4 4.7 3.25 0.125
2 0.6 0.4 4.7 3.25 0.125

2S-7 A 18 0.6 0.4 10 3.25 0.125 32.5 585.00


18 0.6 0.4 10 3.25 0.125 Short Span
18 0.6 0.4 10 3.25 0.125
18 0.6 0.4 10 3.25 0.125
18 0.6 0.4 10 3.25 0.125
18 0.6 0.4 10 3.25 0.125 Long Span
18 0.6 0.4 10 3.25 0.125
18 0.6 0.4 10 3.25 0.125
18 0.6 0.4 10 3.25 0.125

2S-7 A 4 0.6 0.4 9.1 3.25 0.125 29.58 118.32


4 0.6 0.4 9.1 3.25 0.125 Short Span
4 0.6 0.4 9.1 3.25 0.125
4 0.6 0.4 9.1 3.25 0.125
4 0.6 0.4 9.1 3.25 0.125
4 0.6 0.4 9.1 3.25 0.125 Long Span
4 0.6 0.4 9.1 3.25 0.125
4 0.6 0.4 9.1 3.25 0.125
4 0.6 0.4 9.1 3.25 0.125

2S-7 A 1 0.6 0.4 6.7 3.25 0.125 21.78 21.78

I. A. Campbell Associates, Inc. Page 89 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 6.7 3.25 0.125 Short Span
1 0.6 0.4 6.7 3.25 0.125
1 0.6 0.4 6.7 3.25 0.125
1 0.6 0.4 6.7 3.25 0.125
1 0.6 0.4 6.7 3.25 0.125 Long Span
1 0.6 0.4 6.7 3.25 0.125
1 0.6 0.4 6.7 3.25 0.125
1 0.6 0.4 6.7 3.25 0.125

2S-6 B 2 0.6 0.4 4.7 3.1 0.125 14.57 29.14


2 0.6 0.4 4.7 3.1 0.125 Short Span
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125 Long Span
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125

2S-6 B 2 0.6 0.4 4.7 3.1 0.125 14.57 29.14


2 0.6 0.4 4.7 3.1 0.125 Short Span
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125

I. A. Campbell Associates, Inc. Page 90 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.6 0.4 4.7 3.1 0.125 Long Span
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125

2S-13 A 1 0.6 0.4 6.7 3.1 0.15 20.77 20.77


1 0.6 0.4 6.7 3.1 0.15 Short Span
1 0.6 0.4 6.7 3.1 0.15
1 0.6 0.4 6.7 3.1 0.15
1 0.6 0.4 6.7 3.1 0.15
1 0.6 0.4 6.7 3.1 0.15 Long Span
1 0.6 0.4 6.7 3.1 0.15
1 0.6 0.4 6.7 3.1 0.15
1 0.6 0.4 6.7 3.1 0.15

2S-19 A 2 0.6 0.4 10 3.1 0.15 31 62.00


2 0.6 0.4 10 3.1 0.15 Short Span
2 0.6 0.4 10 3.1 0.15
2 0.6 0.4 10 3.1 0.15
2 0.6 0.4 10 3.1 0.15
2 0.6 0.4 10 3.1 0.15 Long Span
2 0.6 0.4 10 3.1 0.15
2 0.6 0.4 10 3.1 0.15
2 0.6 0.4 10 3.1 0.15

2S-8 A 6 0.6 0.4 10 3.1 0.125 31 186.00

I. A. Campbell Associates, Inc. Page 91 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
6 0.6 0.4 10 3.1 0.125 Short Span
6 0.6 0.4 10 3.1 0.125
6 0.6 0.4 10 3.1 0.125
6 0.6 0.4 10 3.1 0.125
6 0.6 0.4 10 3.1 0.125 Long Span
6 0.6 0.4 10 3.1 0.125
6 0.6 0.4 10 3.1 0.125
6 0.6 0.4 10 3.1 0.125

2S-15 B 1 0.6 0.4 9.1 2.65 0.125 24.12 24.12


1 0.6 0.4 9.1 2.65 0.125 Short Span
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125 Long Span
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125

2S-16 B 1 0.6 0.4 6.8 2.65 0.125 18.02 18.02


1 0.6 0.4 6.8 2.65 0.125 Short Span
1 0.6 0.4 6.8 2.65 0.125
1 0.6 0.4 6.8 2.65 0.125
1 0.6 0.4 6.8 2.65 0.125
1 0.6 0.4 6.8 2.65 0.125

I. A. Campbell Associates, Inc. Page 92 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 6.8 2.65 0.125 Long Span
1 0.6 0.4 6.8 2.65 0.125
1 0.6 0.4 6.8 2.65 0.125
1 0.6 0.4 6.8 2.65 0.125

2S-9 A 1 0.6 0.4 10 2.5 0.125 25 25.00


1 0.6 0.4 10 2.5 0.125 Short Span
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125 Long Span
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125

2S-9 A 1 0.6 0.4 7.5 2.5 0.125 18.75 18.75


1 0.6 0.4 7.5 2.5 0.125 Short Span
1 0.6 0.4 7.5 2.5 0.125
1 0.6 0.4 7.5 2.5 0.125
1 0.6 0.4 7.5 2.5 0.125
1 0.6 0.4 7.5 2.5 0.125 Long Span
1 0.6 0.4 7.5 2.5 0.125
1 0.6 0.4 7.5 2.5 0.125
1 0.6 0.4 7.5 2.5 0.125

2S-9 A 1 0.6 0.4 6.6 2.5 0.125 16.5 16.50

I. A. Campbell Associates, Inc. Page 93 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 6.6 2.5 0.125 Short Span
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125 Long Span
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125

2S-13 A 1 0.6 0.4 10 2.5 0.15 25 25.00


1 0.6 0.4 10 2.5 0.15 Short Span
1 0.6 0.4 10 2.5 0.15
1 0.6 0.4 10 2.5 0.15
1 0.6 0.4 10 2.5 0.15
1 0.6 0.4 10 2.5 0.15 Long Span
1 0.6 0.4 10 2.5 0.15
1 0.6 0.4 10 2.5 0.15
1 0.6 0.4 10 2.5 0.15

2S-13 A 1 0.6 0.4 7.5 2.5 0.15 18.75 18.75


1 0.6 0.4 7.5 2.5 0.15 Short Span
1 0.6 0.4 7.5 2.5 0.15
1 0.6 0.4 7.5 2.5 0.15
1 0.6 0.4 7.5 2.5 0.15
1 0.6 0.4 7.5 2.5 0.15 Long Span
1 0.6 0.4 7.5 2.5 0.15

I. A. Campbell Associates, Inc. Page 94 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 7.5 2.5 0.15
1 0.6 0.4 7.5 2.5 0.15

2S-13 A 1 0.6 0.4 6.6 2.5 0.15 16.5 16.50


1 0.6 0.4 6.6 2.5 0.15 Short Span
1 0.6 0.4 6.6 2.5 0.15
1 0.6 0.4 6.6 2.5 0.15
1 0.6 0.4 6.6 2.5 0.15
1 0.6 0.4 6.6 2.5 0.15 Long Span
1 0.6 0.4 6.6 2.5 0.15
1 0.6 0.4 6.6 2.5 0.15
1 0.6 0.4 6.6 2.5 0.15

Sub total 5,098.95

3S-4 B 3 0.6 0.4 4.7 3.46 0.125 16.26 48.78


3 0.6 0.4 4.7 3.46 0.125 Short Span
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125 Long Span
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125
3 0.6 0.4 4.7 3.46 0.125

I. A. Campbell Associates, Inc. Page 95 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3S-3 A 2 0.6 0.4 10 3.46 0.175 34.6 69.20
2 0.6 0.4 10 3.46 0.175 Short Span
2 0.6 0.4 10 3.46 0.175
2 0.6 0.4 10 3.46 0.175
2 0.6 0.4 10 3.46 0.175
2 0.6 0.4 10 3.46 0.175 Long Span
2 0.6 0.4 10 3.46 0.175
2 0.6 0.4 10 3.46 0.175
2 0.6 0.4 10 3.46 0.175

3S-3 A 1 0.6 0.4 5 3.46 0.175 17.3 17.30


1 0.6 0.4 5 3.46 0.175 Short Span
1 0.6 0.4 5 3.46 0.175
1 0.6 0.4 5 3.46 0.175
1 0.6 0.4 5 3.46 0.175
1 0.6 0.4 5 3.46 0.175 Long Span
1 0.6 0.4 5 3.46 0.175
1 0.6 0.4 5 3.46 0.175
1 0.6 0.4 5 3.46 0.175

3S-3 A 1 0.6 0.4 9.1 3.46 0.175 31.49 31.49


1 0.6 0.4 9.1 3.46 0.175 Short Span
1 0.6 0.4 9.1 3.46 0.175
1 0.6 0.4 9.1 3.46 0.175
1 0.6 0.4 9.1 3.46 0.175
1 0.6 0.4 9.1 3.46 0.175 Long Span

I. A. Campbell Associates, Inc. Page 96 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 9.1 3.46 0.175
1 0.6 0.4 9.1 3.46 0.175
1 0.6 0.4 9.1 3.46 0.175

3S-2 A 10 0.6 0.4 10 3.46 0.15 34.6 346.00


10 0.6 0.4 10 3.46 0.15 Short Span
10 0.6 0.4 10 3.46 0.15
10 0.6 0.4 10 3.46 0.15
10 0.6 0.4 10 3.46 0.15
10 0.6 0.4 10 3.46 0.15 Long Span
10 0.6 0.4 10 3.46 0.15
10 0.6 0.4 10 3.46 0.15
10 0.6 0.4 10 3.46 0.15

3S-1 A 3 0.6 0.4 10 3.46 0.125 34.6 103.80


3 0.6 0.4 10 3.46 0.125 Short Span
3 0.6 0.4 10 3.46 0.125
3 0.6 0.4 10 3.46 0.125
3 0.6 0.4 10 3.46 0.125
3 0.6 0.4 10 3.46 0.125 Long Span
3 0.6 0.4 10 3.46 0.125
3 0.6 0.4 10 3.46 0.125
3 0.6 0.4 10 3.46 0.125

3S-4 B 11 0.6 0.4 4.7 2.7 0.125 12.69 139.59


11 0.6 0.4 4.7 2.7 0.125 Short Span

I. A. Campbell Associates, Inc. Page 97 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
11 0.6 0.4 4.7 2.7 0.125
11 0.6 0.4 4.7 2.7 0.125
11 0.6 0.4 4.7 2.7 0.125
11 0.6 0.4 4.7 2.7 0.125
11 0.6 0.4 4.7 2.7 0.125 Long Span
11 0.6 0.4 4.7 2.7 0.125
11 0.6 0.4 4.7 2.7 0.125
11 0.6 0.4 4.7 2.7 0.125

3S-1 A 18 0.6 0.4 10 2.7 0.125 27 486.00


18 0.6 0.4 10 2.7 0.125 Short Span
18 0.6 0.4 10 2.7 0.125
18 0.6 0.4 10 2.7 0.125
18 0.6 0.4 10 2.7 0.125
18 0.6 0.4 10 2.7 0.125 Long Span
18 0.6 0.4 10 2.7 0.125
18 0.6 0.4 10 2.7 0.125
18 0.6 0.4 10 2.7 0.125

3S-1 A 3 0.6 0.4 9.1 2.7 0.125 24.57 73.71


3 0.6 0.4 9.1 2.7 0.125 Short Span
3 0.6 0.4 9.1 2.7 0.125
3 0.6 0.4 9.1 2.7 0.125
3 0.6 0.4 9.1 2.7 0.125
3 0.6 0.4 9.1 2.7 0.125 Long Span
3 0.6 0.4 9.1 2.7 0.125

I. A. Campbell Associates, Inc. Page 98 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3 0.6 0.4 9.1 2.7 0.125
3 0.6 0.4 9.1 2.7 0.125

3S-1 A 30 0.6 0.4 10 2.7 0.125 27 810.00


30 0.6 0.4 10 2.7 0.125 Short Span
30 0.6 0.4 10 2.7 0.125
30 0.6 0.4 10 2.7 0.125
30 0.6 0.4 10 2.7 0.125
30 0.6 0.4 10 2.7 0.125 Long Span
30 0.6 0.4 10 2.7 0.125
30 0.6 0.4 10 2.7 0.125
30 0.6 0.4 10 2.7 0.125

3S-1 A 5 0.6 0.4 9.1 2.7 0.125 24.57 122.85


5 0.6 0.4 9.1 2.7 0.125 Short Span
5 0.6 0.4 9.1 2.7 0.125
5 0.6 0.4 9.1 2.7 0.125
5 0.6 0.4 9.1 2.7 0.125
5 0.6 0.4 9.1 2.7 0.125 Long Span
5 0.6 0.4 9.1 2.7 0.125
5 0.6 0.4 9.1 2.7 0.125
5 0.6 0.4 9.1 2.7 0.125

3S-1 A 1 0.6 0.4 4.55 2.7 0.125 12.29 12.29


1 0.6 0.4 4.55 2.7 0.125 Short Span
1 0.6 0.4 4.55 2.7 0.125

I. A. Campbell Associates, Inc. Page 99 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 4.55 2.7 0.125
1 0.6 0.4 4.55 2.7 0.125
1 0.6 0.4 4.55 2.7 0.125 Long Span
1 0.6 0.4 4.55 2.7 0.125
1 0.6 0.4 4.55 2.7 0.125
1 0.6 0.4 4.55 2.7 0.125

3S-1 A 1 0.6 0.4 5.3 2.7 0.125 14.31 14.31


1 0.6 0.4 5.3 2.7 0.125 Short Span
1 0.6 0.4 5.3 2.7 0.125
1 0.6 0.4 5.3 2.7 0.125
1 0.6 0.4 5.3 2.7 0.125
1 0.6 0.4 5.3 2.7 0.125 Long Span
1 0.6 0.4 5.3 2.7 0.125
1 0.6 0.4 5.3 2.7 0.125
1 0.6 0.4 5.3 2.7 0.125

3S-17 B 1 0.6 0.4 5 2.7 0.125 13.5 13.50


1 0.6 0.4 5 2.7 0.125 Short Span
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125 Long Span
1 0.6 0.4 5 2.7 0.125
1 0.6 0.4 5 2.7 0.125

I. A. Campbell Associates, Inc. Page 100 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 5 2.7 0.125

3S-5 B 1 0.6 0.4 4.7 2.7 0.125 12.69 12.69


1 0.6 0.4 4.7 2.7 0.125 Short Span
1 0.6 0.4 4.7 2.7 0.125
1 0.6 0.4 4.7 2.7 0.125
1 0.6 0.4 4.7 2.7 0.125
1 0.6 0.4 4.7 2.7 0.125
1 0.6 0.4 4.7 2.7 0.125 Long Span
1 0.6 0.4 4.7 2.7 0.125
1 0.6 0.4 4.7 2.7 0.125
1 0.6 0.4 4.7 2.7 0.125

3S-11 A 1 0.6 0.4 8.7 3 0.15 26.1 26.10


1 0.6 0.4 8.7 3 0.15 Short Span
1 0.6 0.4 8.7 3 0.15
1 0.6 0.4 8.7 3 0.15
1 0.6 0.4 8.7 3 0.15
1 0.6 0.4 8.7 3 0.15 Long Span
1 0.6 0.4 8.7 3 0.15
1 0.6 0.4 8.7 3 0.15
1 0.6 0.4 8.7 3 0.15

3S-1 A 39 0.6 0.4 10 2.7 0.125 27 1,053.00


39 0.6 0.4 10 2.7 0.125 Short Span
39 0.6 0.4 10 2.7 0.125

I. A. Campbell Associates, Inc. Page 101 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
39 0.6 0.4 10 2.7 0.125
39 0.6 0.4 10 2.7 0.125
39 0.6 0.4 10 2.7 0.125 Long Span
39 0.6 0.4 10 2.7 0.125
39 0.6 0.4 10 2.7 0.125
39 0.6 0.4 10 2.7 0.125

3S-1 A 3 0.6 0.4 9.1 2.7 0.125 24.57 73.71


3 0.6 0.4 9.1 2.7 0.125 Short Span
3 0.6 0.4 9.1 2.7 0.125
3 0.6 0.4 9.1 2.7 0.125
3 0.6 0.4 9.1 2.7 0.125
3 0.6 0.4 9.1 2.7 0.125 Long Span
3 0.6 0.4 9.1 2.7 0.125
3 0.6 0.4 9.1 2.7 0.125
3 0.6 0.4 9.1 2.7 0.125

3S-1 A 3 0.6 0.4 6 2.7 0.125 16.2 48.60


3 0.6 0.4 6 2.7 0.125 Short Span
3 0.6 0.4 6 2.7 0.125
3 0.6 0.4 6 2.7 0.125
3 0.6 0.4 6 2.7 0.125
3 0.6 0.4 6 2.7 0.125 Long Span
3 0.6 0.4 6 2.7 0.125
3 0.6 0.4 6 2.7 0.125
3 0.6 0.4 6 2.7 0.125

I. A. Campbell Associates, Inc. Page 102 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

3S-14 B 3 0.6 0.4 4.5 2.7 0.125 12.15 36.45


3 0.6 0.4 4.5 2.7 0.125 Short Span
3 0.6 0.4 4.5 2.7 0.125
3 0.6 0.4 4.5 2.7 0.125
3 0.6 0.4 4.5 2.7 0.125
3 0.6 0.4 4.5 2.7 0.125
3 0.6 0.4 4.5 2.7 0.125 Long Span
3 0.6 0.4 4.5 2.7 0.125
3 0.6 0.4 4.5 2.7 0.125
3 0.6 0.4 4.5 2.7 0.125

3S-19 A 2 0.6 0.4 10 2.7 0.15 27 54.00


2 0.6 0.4 10 2.7 0.15 Short Span
2 0.6 0.4 10 2.7 0.15
2 0.6 0.4 10 2.7 0.15
2 0.6 0.4 10 2.7 0.15
2 0.6 0.4 10 2.7 0.15 Long Span
2 0.6 0.4 10 2.7 0.15
2 0.6 0.4 10 2.7 0.15
2 0.6 0.4 10 2.7 0.15

3S-18 B 1 0.6 0.4 3.5 4.5 0.125 15.75 15.75


1 0.6 0.4 3.5 4.5 0.125 Short Span
1 0.6 0.4 3.5 4.5 0.125
1 0.6 0.4 3.5 4.5 0.125

I. A. Campbell Associates, Inc. Page 103 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 3.5 4.5 0.125
1 0.6 0.4 3.5 4.5 0.125
1 0.6 0.4 3.5 4.5 0.125 Long Span
1 0.6 0.4 3.5 4.5 0.125
1 0.6 0.4 3.5 4.5 0.125
1 0.6 0.4 3.5 4.5 0.125

3S-1 A 5 0.6 0.4 6.7 2.7 0.125 18.09 90.45


5 0.6 0.4 6.7 2.7 0.125 Short Span
5 0.6 0.4 6.7 2.7 0.125
5 0.6 0.4 6.7 2.7 0.125
5 0.6 0.4 6.7 2.7 0.125
5 0.6 0.4 6.7 2.7 0.125 Long Span
5 0.6 0.4 6.7 2.7 0.125
5 0.6 0.4 6.7 2.7 0.125
5 0.6 0.4 6.7 2.7 0.125

3S-5 B 5 0.6 0.4 4.7 2.7 0.125 12.69 63.45


5 0.6 0.4 4.7 2.7 0.125 Short Span
5 0.6 0.4 4.7 2.7 0.125
5 0.6 0.4 4.7 2.7 0.125
5 0.6 0.4 4.7 2.7 0.125
5 0.6 0.4 4.7 2.7 0.125
5 0.6 0.4 4.7 2.7 0.125 Long Span
5 0.6 0.4 4.7 2.7 0.125
5 0.6 0.4 4.7 2.7 0.125

I. A. Campbell Associates, Inc. Page 104 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
5 0.6 0.4 4.7 2.7 0.125

3S-12 A 2 0.6 0.4 6.7 3.25 0.15 21.78 43.56


2 0.6 0.4 6.7 3.25 0.15 Short Span
2 0.6 0.4 6.7 3.25 0.15
2 0.6 0.4 6.7 3.25 0.15
2 0.6 0.4 6.7 3.25 0.15
2 0.6 0.4 6.7 3.25 0.15 Long Span
2 0.6 0.4 6.7 3.25 0.15
2 0.6 0.4 6.7 3.25 0.15
2 0.6 0.4 6.7 3.25 0.15

3S-6 B 2 0.6 0.4 4.7 3.25 0.125 15.28 30.56


2 0.6 0.4 4.7 3.25 0.125 Short Span
2 0.6 0.4 4.7 3.25 0.125
2 0.6 0.4 4.7 3.25 0.125
2 0.6 0.4 4.7 3.25 0.125
2 0.6 0.4 4.7 3.25 0.125
2 0.6 0.4 4.7 3.25 0.125 Long Span
2 0.6 0.4 4.7 3.25 0.125
2 0.6 0.4 4.7 3.25 0.125
2 0.6 0.4 4.7 3.25 0.125

3S-7 A 10 0.6 0.4 10 3.25 0.125 32.5 325.00


10 0.6 0.4 10 3.25 0.125 Short Span
10 0.6 0.4 10 3.25 0.125

I. A. Campbell Associates, Inc. Page 105 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
10 0.6 0.4 10 3.25 0.125
10 0.6 0.4 10 3.25 0.125
10 0.6 0.4 10 3.25 0.125 Long Span
10 0.6 0.4 10 3.25 0.125
10 0.6 0.4 10 3.25 0.125
10 0.6 0.4 10 3.25 0.125

3S-7 A 2 0.6 0.4 9.1 3.25 0.125 29.58 59.16


2 0.6 0.4 9.1 3.25 0.125 Short Span
2 0.6 0.4 9.1 3.25 0.125
2 0.6 0.4 9.1 3.25 0.125
2 0.6 0.4 9.1 3.25 0.125
2 0.6 0.4 9.1 3.25 0.125 Long Span
2 0.6 0.4 9.1 3.25 0.125
2 0.6 0.4 9.1 3.25 0.125
2 0.6 0.4 9.1 3.25 0.125

3S-7 A 1 0.6 0.4 6.7 3.1 0.125 20.77 20.77


1 0.6 0.4 6.7 3.1 0.125 Short Span
1 0.6 0.4 6.7 3.1 0.125
1 0.6 0.4 6.7 3.1 0.125
1 0.6 0.4 6.7 3.1 0.125
1 0.6 0.4 6.7 3.1 0.125 Long Span
1 0.6 0.4 6.7 3.1 0.125
1 0.6 0.4 6.7 3.1 0.125
1 0.6 0.4 6.7 3.1 0.125

I. A. Campbell Associates, Inc. Page 106 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

3S-13 A 1 0.6 0.4 6.7 3.1 0.15 20.77 20.77


1 0.6 0.4 6.7 3.1 0.15 Short Span
1 0.6 0.4 6.7 3.1 0.15
1 0.6 0.4 6.7 3.1 0.15
1 0.6 0.4 6.7 3.1 0.15
1 0.6 0.4 6.7 3.1 0.15 Long Span
1 0.6 0.4 6.7 3.1 0.15
1 0.6 0.4 6.7 3.1 0.15
1 0.6 0.4 6.7 3.1 0.15

3S-6 B 2 0.6 0.4 4.7 3.1 0.125 14.57 29.14


2 0.6 0.4 4.7 3.1 0.125 Short Span
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125 Long Span
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125
2 0.6 0.4 4.7 3.1 0.125

3S-7 A 8 0.6 0.4 10 3.1 0.125 31 248.00


8 0.6 0.4 10 3.1 0.125 Short Span
8 0.6 0.4 10 3.1 0.125
8 0.6 0.4 10 3.1 0.125

I. A. Campbell Associates, Inc. Page 107 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
8 0.6 0.4 10 3.1 0.125
8 0.6 0.4 10 3.1 0.125 Long Span
8 0.6 0.4 10 3.1 0.125
8 0.6 0.4 10 3.1 0.125
8 0.6 0.4 10 3.1 0.125

3S-7 A 2 0.6 0.4 9.1 3.1 0.125 28.21 56.42


2 0.6 0.4 9.1 3.1 0.125 Short Span
2 0.6 0.4 9.1 3.1 0.125
2 0.6 0.4 9.1 3.1 0.125
2 0.6 0.4 9.1 3.1 0.125
2 0.6 0.4 9.1 3.1 0.125 Long Span
2 0.6 0.4 9.1 3.1 0.125
2 0.6 0.4 9.1 3.1 0.125
2 0.6 0.4 9.1 3.1 0.125

3S-19 A 2 0.6 0.4 10 3.1 0.15 31 62.00


2 0.6 0.4 10 3.1 0.15 Short Span
2 0.6 0.4 10 3.1 0.15
2 0.6 0.4 10 3.1 0.15
2 0.6 0.4 10 3.1 0.15
2 0.6 0.4 10 3.1 0.15 Long Span
2 0.6 0.4 10 3.1 0.15
2 0.6 0.4 10 3.1 0.15
2 0.6 0.4 10 3.1 0.15

I. A. Campbell Associates, Inc. Page 108 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3S-8 A 6 0.6 0.4 10 2.65 0.125 26.5 159.00
6 0.6 0.4 10 2.65 0.125 Short Span
6 0.6 0.4 10 2.65 0.125
6 0.6 0.4 10 2.65 0.125
6 0.6 0.4 10 2.65 0.125
6 0.6 0.4 10 2.65 0.125 Long Span
6 0.6 0.4 10 2.65 0.125
6 0.6 0.4 10 2.65 0.125
6 0.6 0.4 10 2.65 0.125

3S-15 B 1 0.6 0.4 9.1 2.65 0.125 24.12 24.12


1 0.6 0.4 9.1 2.65 0.125 Short Span
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125 Long Span
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125
1 0.6 0.4 9.1 2.65 0.125

3S-15 B 1 0.6 0.4 8.1 2.65 0.125 21.47 21.47


1 0.6 0.4 8.1 2.65 0.125 Short Span
1 0.6 0.4 8.1 2.65 0.125
1 0.6 0.4 8.1 2.65 0.125
1 0.6 0.4 8.1 2.65 0.125

I. A. Campbell Associates, Inc. Page 109 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 8.1 2.65 0.125
1 0.6 0.4 8.1 2.65 0.125 Long Span
1 0.6 0.4 8.1 2.65 0.125
1 0.6 0.4 8.1 2.65 0.125
1 0.6 0.4 8.1 2.65 0.125

3S-9 A 1 0.6 0.4 10 2.5 0.125 25 25.00


1 0.6 0.4 10 2.5 0.125 Short Span
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125 Long Span
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125

3S-9 A 1 0.6 0.4 6.6 2.5 0.125 16.5 16.50


1 0.6 0.4 6.6 2.5 0.125 Short Span
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125 Long Span
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125

I. A. Campbell Associates, Inc. Page 110 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3S-9 A 1 0.6 0.4 2.2 2.5 0.125 5.5 5.50
1 0.6 0.4 2.2 2.5 0.125 Short Span
1 0.6 0.4 2.2 2.5 0.125
1 0.6 0.4 2.2 2.5 0.125
1 0.6 0.4 2.2 2.5 0.125
1 0.6 0.4 2.2 2.5 0.125 Long Span
1 0.6 0.4 2.2 2.5 0.125
1 0.6 0.4 2.2 2.5 0.125
1 0.6 0.4 2.2 2.5 0.125

3S-10 A 1 0.6 0.4 10 2.5 0.125 25 25.00


1 0.6 0.4 10 2.5 0.125 Short Span
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125 Long Span
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125
1 0.6 0.4 10 2.5 0.125

3S-10 A 1 0.6 0.4 6.6 2.5 0.125 16.5 16.50


1 0.6 0.4 6.6 2.5 0.125 Short Span
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125 Long Span

I. A. Campbell Associates, Inc. Page 111 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125
1 0.6 0.4 6.6 2.5 0.125

3S-10 A 1 0.6 0.4 3.3 2.5 0.125 8.25 8.25


1 0.6 0.4 3.3 2.5 0.125 Short Span
1 0.6 0.4 3.3 2.5 0.125
1 0.6 0.4 3.3 2.5 0.125
1 0.6 0.4 3.3 2.5 0.125
1 0.6 0.4 3.3 2.5 0.125 Long Span
1 0.6 0.4 3.3 2.5 0.125
1 0.6 0.4 3.3 2.5 0.125
1 0.6 0.4 3.3 2.5 0.125

Sub total 4,959.74

4S-4 B 3 0.7 0.5 4.6 3.36 0.125 15.46 46.38


3 0.7 0.5 4.6 3.36 0.125 Short Span
3 0.7 0.5 4.6 3.36 0.125
3 0.7 0.5 4.6 3.36 0.125
3 0.7 0.5 4.6 3.36 0.125
3 0.7 0.5 4.6 3.36 0.125
3 0.7 0.5 4.6 3.36 0.125 Long Span
3 0.7 0.5 4.6 3.36 0.125
3 0.7 0.5 4.6 3.36 0.125
3 0.7 0.5 4.6 3.36 0.125

I. A. Campbell Associates, Inc. Page 112 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

4S-3 A 3 0.7 0.5 10 3.36 0.125 33.6 100.80


3 0.7 0.5 10 3.36 0.125 Short Span
3 0.7 0.5 10 3.36 0.125
3 0.7 0.5 10 3.36 0.125
3 0.7 0.5 10 3.36 0.125
3 0.7 0.5 10 3.36 0.125 Long Span
3 0.7 0.5 10 3.36 0.125
3 0.7 0.5 10 3.36 0.125
3 0.7 0.5 10 3.36 0.125

4S-3 A 1 0.7 0.5 9.1 3.36 0.125 30.58 30.58


1 0.7 0.5 9.1 3.36 0.125 Short Span
1 0.7 0.5 9.1 3.36 0.125
1 0.7 0.5 9.1 3.36 0.125
1 0.7 0.5 9.1 3.36 0.125
1 0.7 0.5 9.1 3.36 0.125 Long Span
1 0.7 0.5 9.1 3.36 0.125
1 0.7 0.5 9.1 3.36 0.125
1 0.7 0.5 9.1 3.36 0.125

4S-3 A 1 0.7 0.5 5 3.36 0.125 16.8 16.80


1 0.7 0.5 5 3.36 0.125 Short Span
1 0.7 0.5 5 3.36 0.125
1 0.7 0.5 5 3.36 0.125
1 0.7 0.5 5 3.36 0.125

I. A. Campbell Associates, Inc. Page 113 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 5 3.36 0.125 Long Span
1 0.7 0.5 5 3.36 0.125
1 0.7 0.5 5 3.36 0.125
1 0.7 0.5 5 3.36 0.125

4S-2 A 12 0.7 0.5 10 3.36 0.125 33.6 403.20


12 0.7 0.5 10 3.36 0.125 Short Span
12 0.7 0.5 10 3.36 0.125
12 0.7 0.5 10 3.36 0.125
12 0.7 0.5 10 3.36 0.125
12 0.7 0.5 10 3.36 0.125 Long Span
12 0.7 0.5 10 3.36 0.125
12 0.7 0.5 10 3.36 0.125
12 0.7 0.5 10 3.36 0.125

4S-2 A 2 0.7 0.5 9.1 3.36 0.125 30.58 61.16


2 0.7 0.5 9.1 3.36 0.125 Short Span
2 0.7 0.5 9.1 3.36 0.125
2 0.7 0.5 9.1 3.36 0.125
2 0.7 0.5 9.1 3.36 0.125
2 0.7 0.5 9.1 3.36 0.125 Long Span
2 0.7 0.5 9.1 3.36 0.125
2 0.7 0.5 9.1 3.36 0.125
2 0.7 0.5 9.1 3.36 0.125

4S-4 B 12 0.7 0.5 4.6 2.6 0.125 11.96 143.52

I. A. Campbell Associates, Inc. Page 114 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
12 0.7 0.5 4.6 2.6 0.125 Short Span
12 0.7 0.5 4.6 2.6 0.125
12 0.7 0.5 4.6 2.6 0.125
12 0.7 0.5 4.6 2.6 0.125
12 0.7 0.5 4.6 2.6 0.125
12 0.7 0.5 4.6 2.6 0.125 Long Span
12 0.7 0.5 4.6 2.6 0.125
12 0.7 0.5 4.6 2.6 0.125
12 0.7 0.5 4.6 2.6 0.125

4S-1 A 18 0.7 0.5 10 2.6 0.125 26 468.00


18 0.7 0.5 10 2.6 0.125 Short Span
18 0.7 0.5 10 2.6 0.125
18 0.7 0.5 10 2.6 0.125
18 0.7 0.5 10 2.6 0.125
18 0.7 0.5 10 2.6 0.125 Long Span
18 0.7 0.5 10 2.6 0.125
18 0.7 0.5 10 2.6 0.125
18 0.7 0.5 10 2.6 0.125

4S-1 A 3 0.7 0.5 9.1 2.6 0.125 23.66 70.98


3 0.7 0.5 9.1 2.6 0.125 Short Span
3 0.7 0.5 9.1 2.6 0.125
3 0.7 0.5 9.1 2.6 0.125
3 0.7 0.5 9.1 2.6 0.125
3 0.7 0.5 9.1 2.6 0.125 Long Span

I. A. Campbell Associates, Inc. Page 115 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3 0.7 0.5 9.1 2.6 0.125
3 0.7 0.5 9.1 2.6 0.125
3 0.7 0.5 9.1 2.6 0.125

4S-1 A 1 0.7 0.5 7.5 2.6 0.125 19.5 19.50


1 0.7 0.5 7.5 2.6 0.125 Short Span
1 0.7 0.5 7.5 2.6 0.125
1 0.7 0.5 7.5 2.6 0.125
1 0.7 0.5 7.5 2.6 0.125
1 0.7 0.5 7.5 2.6 0.125 Long Span
1 0.7 0.5 7.5 2.6 0.125
1 0.7 0.5 7.5 2.6 0.125
1 0.7 0.5 7.5 2.6 0.125

4S-1 A 1 0.7 0.5 5 2.6 0.125 13 13.00


1 0.7 0.5 5 2.6 0.125 Short Span
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125 Long Span
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125

4S-1 A 69 0.7 0.5 10 2.6 0.125 26 1,794.00


69 0.7 0.5 10 2.6 0.125 Short Span

I. A. Campbell Associates, Inc. Page 116 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
69 0.7 0.5 10 2.6 0.125
69 0.7 0.5 10 2.6 0.125
69 0.7 0.5 10 2.6 0.125
69 0.7 0.5 10 2.6 0.125 Long Span
69 0.7 0.5 10 2.6 0.125
69 0.7 0.5 10 2.6 0.125
69 0.7 0.5 10 2.6 0.125

4S-1 A 8 0.7 0.5 9.1 2.6 0.125 23.66 189.28


8 0.7 0.5 9.1 2.6 0.125 Short Span
8 0.7 0.5 9.1 2.6 0.125
8 0.7 0.5 9.1 2.6 0.125
8 0.7 0.5 9.1 2.6 0.125
8 0.7 0.5 9.1 2.6 0.125 Long Span
8 0.7 0.5 9.1 2.6 0.125
8 0.7 0.5 9.1 2.6 0.125
8 0.7 0.5 9.1 2.6 0.125

4S-1 A 11 0.7 0.5 9.1 2.6 0.125 23.66 260.26


11 0.7 0.5 9.1 2.6 0.125 Short Span
11 0.7 0.5 9.1 2.6 0.125
11 0.7 0.5 9.1 2.6 0.125
11 0.7 0.5 9.1 2.6 0.125
11 0.7 0.5 9.1 2.6 0.125 Long Span
11 0.7 0.5 9.1 2.6 0.125
11 0.7 0.5 9.1 2.6 0.125

I. A. Campbell Associates, Inc. Page 117 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
11 0.7 0.5 9.1 2.6 0.125

4S-1 A 3 0.7 0.5 6 2.6 0.125 15.6 46.80


3 0.7 0.5 6 2.6 0.125 Short Span
3 0.7 0.5 6 2.6 0.125
3 0.7 0.5 6 2.6 0.125
3 0.7 0.5 6 2.6 0.125
3 0.7 0.5 6 2.6 0.125 Long Span
3 0.7 0.5 6 2.6 0.125
3 0.7 0.5 6 2.6 0.125
3 0.7 0.5 6 2.6 0.125

4S-1 A 1 0.7 0.5 4.55 2.6 0.125 11.83 11.83


1 0.7 0.5 4.55 2.6 0.125 Short Span
1 0.7 0.5 4.55 2.6 0.125
1 0.7 0.5 4.55 2.6 0.125
1 0.7 0.5 4.55 2.6 0.125
1 0.7 0.5 4.55 2.6 0.125 Long Span
1 0.7 0.5 4.55 2.6 0.125
1 0.7 0.5 4.55 2.6 0.125
1 0.7 0.5 4.55 2.6 0.125

4S-4 B 3 0.7 0.5 4.55 2.6 0.125 11.83 35.49


3 0.7 0.5 4.55 2.6 0.125 Short Span
3 0.7 0.5 4.55 2.6 0.125
3 0.7 0.5 4.55 2.6 0.125

I. A. Campbell Associates, Inc. Page 118 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3 0.7 0.5 4.55 2.6 0.125
3 0.7 0.5 4.55 2.6 0.125
3 0.7 0.5 4.55 2.6 0.125 Long Span
3 0.7 0.5 4.55 2.6 0.125
3 0.7 0.5 4.55 2.6 0.125
3 0.7 0.5 4.55 2.6 0.125

4S-18 B 1 0.7 0.5 3 2.5 0.125 7.5 7.50


1 0.7 0.5 3 2.5 0.125 Short Span
1 0.7 0.5 3 2.5 0.125
1 0.7 0.5 3 2.5 0.125
1 0.7 0.5 3 2.5 0.125
1 0.7 0.5 3 2.5 0.125
1 0.7 0.5 3 2.5 0.125 Long Span
1 0.7 0.5 3 2.5 0.125
1 0.7 0.5 3 2.5 0.125
1 0.7 0.5 3 2.5 0.125

4S-19 A 2 0.7 0.5 10 2.6 0.15 26 52.00


2 0.7 0.5 10 2.6 0.15 Short Span
2 0.7 0.5 10 2.6 0.15
2 0.7 0.5 10 2.6 0.15
2 0.7 0.5 10 2.6 0.15
2 0.7 0.5 10 2.6 0.15 Long Span
2 0.7 0.5 10 2.6 0.15
2 0.7 0.5 10 2.6 0.15

I. A. Campbell Associates, Inc. Page 119 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.7 0.5 10 2.6 0.15

4S-5 B 5 0.7 0.5 4.6 2.6 0.125 11.96 59.80


5 0.7 0.5 4.6 2.6 0.125 Short Span
5 0.7 0.5 4.6 2.6 0.125
5 0.7 0.5 4.6 2.6 0.125
5 0.7 0.5 4.6 2.6 0.125
5 0.7 0.5 4.6 2.6 0.125
5 0.7 0.5 4.6 2.6 0.125 Long Span
5 0.7 0.5 4.6 2.6 0.125
5 0.7 0.5 4.6 2.6 0.125
5 0.7 0.5 4.6 2.6 0.125

4S-5 B 1 0.7 0.5 2.6 2.3 0.125 5.98 5.98


1 0.7 0.5 2.6 2.3 0.125 Short Span
1 0.7 0.5 2.6 2.3 0.125
1 0.7 0.5 2.6 2.3 0.125
1 0.7 0.5 2.6 2.3 0.125
1 0.7 0.5 2.6 2.3 0.125
1 0.7 0.5 2.6 2.3 0.125 Long Span
1 0.7 0.5 2.6 2.3 0.125
1 0.7 0.5 2.6 2.3 0.125
1 0.7 0.5 2.6 2.3 0.125

4S-12 B 5 0.7 0.5 6.6 2.6 0.125 17.16 85.80


5 0.7 0.5 6.6 2.6 0.125 Short Span

I. A. Campbell Associates, Inc. Page 120 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
5 0.7 0.5 6.6 2.6 0.125
5 0.7 0.5 6.6 2.6 0.125
5 0.7 0.5 6.6 2.6 0.125
5 0.7 0.5 6.6 2.6 0.125
5 0.7 0.5 6.6 2.6 0.125 Long Span
5 0.7 0.5 6.6 2.6 0.125
5 0.7 0.5 6.6 2.6 0.125
5 0.7 0.5 6.6 2.6 0.125

4S-12 B 2 0.7 0.5 6.6 3.2 0.125 21.12 42.24


2 0.7 0.5 6.6 3.2 0.125 Short Span
2 0.7 0.5 6.6 3.2 0.125
2 0.7 0.5 6.6 3.2 0.125
2 0.7 0.5 6.6 3.2 0.125
2 0.7 0.5 6.6 3.2 0.125
2 0.7 0.5 6.6 3.2 0.125 Long Span
2 0.7 0.5 6.6 3.2 0.125
2 0.7 0.5 6.6 3.2 0.125
2 0.7 0.5 6.6 3.2 0.125

4S-12 B 1 0.7 0.5 6.6 3 0.125 19.8 19.80


1 0.7 0.5 6.6 3 0.125 Short Span
1 0.7 0.5 6.6 3 0.125
1 0.7 0.5 6.6 3 0.125
1 0.7 0.5 6.6 3 0.125
1 0.7 0.5 6.6 3 0.125

I. A. Campbell Associates, Inc. Page 121 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 6.6 3 0.125 Long Span
1 0.7 0.5 6.6 3 0.125
1 0.7 0.5 6.6 3 0.125
1 0.7 0.5 6.6 3 0.125

4S-6 B 2 0.7 0.5 4.6 3.2 0.125 14.72 29.44


2 0.7 0.5 4.6 3.2 0.125 Short Span
2 0.7 0.5 4.6 3.2 0.125
2 0.7 0.5 4.6 3.2 0.125
2 0.7 0.5 4.6 3.2 0.125
2 0.7 0.5 4.6 3.2 0.125
2 0.7 0.5 4.6 3.2 0.125 Long Span
2 0.7 0.5 4.6 3.2 0.125
2 0.7 0.5 4.6 3.2 0.125
2 0.7 0.5 4.6 3.2 0.125

4S-6 B 2 0.7 0.5 4.6 3 0.125 13.8 27.60


2 0.7 0.5 4.6 3 0.125 Short Span
2 0.7 0.5 4.6 3 0.125
2 0.7 0.5 4.6 3 0.125
2 0.7 0.5 4.6 3 0.125
2 0.7 0.5 4.6 3 0.125
2 0.7 0.5 4.6 3 0.125 Long Span
2 0.7 0.5 4.6 3 0.125
2 0.7 0.5 4.6 3 0.125
2 0.7 0.5 4.6 3 0.125

I. A. Campbell Associates, Inc. Page 122 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

4S-7 A 10 0.7 0.5 10 3.2 0.15 32 320.00


10 0.7 0.5 10 3.2 0.15 Short Span
10 0.7 0.5 10 3.2 0.15
10 0.7 0.5 10 3.2 0.15
10 0.7 0.5 10 3.2 0.15
10 0.7 0.5 10 3.2 0.15 Long Span
10 0.7 0.5 10 3.2 0.15
10 0.7 0.5 10 3.2 0.15
10 0.7 0.5 10 3.2 0.15

4S-7 A 2 0.7 0.5 9.1 3.2 0.15 29.12 58.24


2 0.7 0.5 9.1 3.2 0.15 Short Span
2 0.7 0.5 9.1 3.2 0.15
2 0.7 0.5 9.1 3.2 0.15
2 0.7 0.5 9.1 3.2 0.15
2 0.7 0.5 9.1 3.2 0.15 Long Span
2 0.7 0.5 9.1 3.2 0.15
2 0.7 0.5 9.1 3.2 0.15
2 0.7 0.5 9.1 3.2 0.15

4S-7 A 5 0.7 0.5 10 3.2 0.15 32 160.00


5 0.7 0.5 10 3.2 0.15 Short Span
5 0.7 0.5 10 3.2 0.15
5 0.7 0.5 10 3.2 0.15
5 0.7 0.5 10 3.2 0.15

I. A. Campbell Associates, Inc. Page 123 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
5 0.7 0.5 10 3.2 0.15 Long Span
5 0.7 0.5 10 3.2 0.15
5 0.7 0.5 10 3.2 0.15
5 0.7 0.5 10 3.2 0.15

4S-7 A 2 0.7 0.5 9.1 3 0.15 27.3 54.60


2 0.7 0.5 9.1 3 0.15 Short Span
2 0.7 0.5 9.1 3 0.15
2 0.7 0.5 9.1 3 0.15
2 0.7 0.5 9.1 3 0.15
2 0.7 0.5 9.1 3 0.15 Long Span
2 0.7 0.5 9.1 3 0.15
2 0.7 0.5 9.1 3 0.15
2 0.7 0.5 9.1 3 0.15

4S-13 A 1 0.7 0.5 6.6 3 0.15 19.8 19.80


1 0.7 0.5 6.6 3 0.15 Short Span
1 0.7 0.5 6.6 3 0.15
1 0.7 0.5 6.6 3 0.15
1 0.7 0.5 6.6 3 0.15
1 0.7 0.5 6.6 3 0.15 Long Span
1 0.7 0.5 6.6 3 0.15
1 0.7 0.5 6.6 3 0.15
1 0.7 0.5 6.6 3 0.15

4S-19 A 2 0.7 0.5 10 3 0.15 30 60.00

I. A. Campbell Associates, Inc. Page 124 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.7 0.5 10 3 0.15 Short Span
2 0.7 0.5 10 3 0.15
2 0.7 0.5 10 3 0.15
2 0.7 0.5 10 3 0.15
2 0.7 0.5 10 3 0.15 Long Span
2 0.7 0.5 10 3 0.15
2 0.7 0.5 10 3 0.15
2 0.7 0.5 10 3 0.15

4S-8 A 3 0.7 0.5 10 3 0.125 30 90.00


3 0.7 0.5 10 3 0.125 Short Span
3 0.7 0.5 10 3 0.125
3 0.7 0.5 10 3 0.125
3 0.7 0.5 10 3 0.125
3 0.7 0.5 10 3 0.125 Long Span
3 0.7 0.5 10 3 0.125
3 0.7 0.5 10 3 0.125
3 0.7 0.5 10 3 0.125

4S-8 A 3 0.7 0.5 10 2.6 0.125 26 78.00


3 0.7 0.5 10 2.6 0.125 Short Span
3 0.7 0.5 10 2.6 0.125
3 0.7 0.5 10 2.6 0.125
3 0.7 0.5 10 2.6 0.125
3 0.7 0.5 10 2.6 0.125 Long Span
3 0.7 0.5 10 2.6 0.125

I. A. Campbell Associates, Inc. Page 125 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3 0.7 0.5 10 2.6 0.125
3 0.7 0.5 10 2.6 0.125

4S-8 A 6 0.7 0.5 10 2.6 0.125 26 156.00


6 0.7 0.5 10 2.6 0.125 Short Span
6 0.7 0.5 10 2.6 0.125
6 0.7 0.5 10 2.6 0.125
6 0.7 0.5 10 2.6 0.125
6 0.7 0.5 10 2.6 0.125 Long Span
6 0.7 0.5 10 2.6 0.125
6 0.7 0.5 10 2.6 0.125
6 0.7 0.5 10 2.6 0.125

4S-9 A 1 0.7 0.5 10 2.6 0.125 26 26.00


1 0.7 0.5 10 2.6 0.125 Short Span
1 0.7 0.5 10 2.6 0.125
1 0.7 0.5 10 2.6 0.125
1 0.7 0.5 10 2.6 0.125
1 0.7 0.5 10 2.6 0.125 Long Span
1 0.7 0.5 10 2.6 0.125
1 0.7 0.5 10 2.6 0.125
1 0.7 0.5 10 2.6 0.125

4S-9 A 1 0.7 0.5 6.6 2.6 0.125 17.16 17.16


1 0.7 0.5 6.6 2.6 0.125 Short Span
1 0.7 0.5 6.6 2.6 0.125

I. A. Campbell Associates, Inc. Page 126 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 6.6 2.6 0.125
1 0.7 0.5 6.6 2.6 0.125
1 0.7 0.5 6.6 2.6 0.125 Long Span
1 0.7 0.5 6.6 2.6 0.125
1 0.7 0.5 6.6 2.6 0.125
1 0.7 0.5 6.6 2.6 0.125

4S-9 A 1 0.7 0.5 5 2.6 0.125 13 13.00


1 0.7 0.5 5 2.6 0.125 Short Span
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125 Long Span
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125

4S-10 A 1 0.7 0.5 10 2.6 0.125 26 26.00


1 0.7 0.5 10 2.6 0.125 Short Span
1 0.7 0.5 10 2.6 0.125
1 0.7 0.5 10 2.6 0.125
1 0.7 0.5 10 2.6 0.125
1 0.7 0.5 10 2.6 0.125 Long Span
1 0.7 0.5 10 2.6 0.125
1 0.7 0.5 10 2.6 0.125
1 0.7 0.5 10 2.6 0.125

I. A. Campbell Associates, Inc. Page 127 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

4S-10 A 1 0.7 0.5 6.6 2.6 0.125 17.16 17.16


1 0.7 0.5 6.6 2.6 0.125 Short Span
1 0.7 0.5 6.6 2.6 0.125
1 0.7 0.5 6.6 2.6 0.125
1 0.7 0.5 6.6 2.6 0.125
1 0.7 0.5 6.6 2.6 0.125 Long Span
1 0.7 0.5 6.6 2.6 0.125
1 0.7 0.5 6.6 2.6 0.125
1 0.7 0.5 6.6 2.6 0.125

4S-10 A 1 0.7 0.5 5 2.6 0.125 13 13.00


1 0.7 0.5 5 2.6 0.125 Short Span
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125 Long Span
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125
1 0.7 0.5 5 2.6 0.125

Sub total 5,150.70

RDS-3 A 4 0.7 0.5 10 3.36 0.175 33.6 134.40


4 0.7 0.5 10 3.36 0.175 Short Span
4 0.7 0.5 10 3.36 0.175

I. A. Campbell Associates, Inc. Page 128 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
4 0.7 0.5 10 3.36 0.175
4 0.7 0.5 10 3.36 0.175
4 0.7 0.5 10 3.36 0.175 Long Span
4 0.7 0.5 10 3.36 0.175
4 0.7 0.5 10 3.36 0.175
4 0.7 0.5 10 3.36 0.175

RDS-2 A 5 0.7 0.5 10 3.36 0.15 33.6 168.00


5 0.7 0.5 10 3.36 0.175 Short Span
5 0.7 0.5 10 3.36 0.175
5 0.7 0.5 10 3.36 0.175
5 0.7 0.5 10 3.36 0.175
5 0.7 0.5 10 3.36 0.175 Long Span
5 0.7 0.5 10 3.36 0.175
5 0.7 0.5 10 3.36 0.175
5 0.7 0.5 10 3.36 0.175

RDS-1 A 2 0.7 0.5 3.36 2.05 0.15 6.89 13.78


2 0.7 0.5 3.36 2.05 0.15 Short Span
2 0.7 0.5 3.36 2.05 0.15
2 0.7 0.5 3.36 2.05 0.15
2 0.7 0.5 3.36 2.05 0.15
2 0.7 0.5 3.36 2.05 0.15 Long Span
2 0.7 0.5 3.36 2.05 0.15
2 0.7 0.5 3.36 2.05 0.15
2 0.7 0.5 3.36 2.05 0.15

I. A. Campbell Associates, Inc. Page 129 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

RDS-4 B 6 0.7 0.5 4.6 2.6 0.125 11.96 71.76


6 0.7 0.5 4.6 2.6 0.125 Short Span
6 0.7 0.5 4.6 2.6 0.125
6 0.7 0.5 4.6 2.6 0.125
6 0.7 0.5 4.6 2.6 0.125
6 0.7 0.5 4.6 2.6 0.125
6 0.7 0.5 4.6 2.6 0.125 Long Span
6 0.7 0.5 4.6 2.6 0.125
6 0.7 0.5 4.6 2.6 0.125
6 0.7 0.5 4.6 2.6 0.125

RDS-1A A 1 0.7 0.5 10 2.6 0.15 26 26.00


1 0.7 0.5 10 2.6 0.175 Short Span
1 0.7 0.5 10 2.6 0.175
1 0.7 0.5 10 2.6 0.175
1 0.7 0.5 10 2.6 0.175
1 0.7 0.5 10 2.6 0.175 Long Span
1 0.7 0.5 10 2.6 0.175
1 0.7 0.5 10 2.6 0.175
1 0.7 0.5 10 2.6 0.175

RDS-1A A 2 0.7 0.5 9.1 2.6 0.15 23.66 47.32


2 0.7 0.5 9.1 2.6 0.15 Short Span
2 0.7 0.5 9.1 2.6 0.15
2 0.7 0.5 9.1 2.6 0.15

I. A. Campbell Associates, Inc. Page 130 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.7 0.5 9.1 2.6 0.15
2 0.7 0.5 9.1 2.6 0.15 Long Span
2 0.7 0.5 9.1 2.6 0.15
2 0.7 0.5 9.1 2.6 0.15
2 0.7 0.5 9.1 2.6 0.15

RDS-1 A 20 0.7 0.5 10 2.6 0.125 26 520.00


20 0.7 0.5 10 2.6 0.125 Short Span
20 0.7 0.5 10 2.6 0.125
20 0.7 0.5 10 2.6 0.125
20 0.7 0.5 10 2.6 0.125
20 0.7 0.5 10 2.6 0.125 Long Span
20 0.7 0.5 10 2.6 0.125
20 0.7 0.5 10 2.6 0.125
20 0.7 0.5 10 2.6 0.125

RDS-5 B 3 0.7 0.5 4.6 2.6 0.125 11.96 35.88


3 0.7 0.5 4.6 2.6 0.125 Short Span
3 0.7 0.5 4.6 2.6 0.125
3 0.7 0.5 4.6 2.6 0.125
3 0.7 0.5 4.6 2.6 0.125
3 0.7 0.5 4.6 2.6 0.125
3 0.7 0.5 4.6 2.6 0.125 Long Span
3 0.7 0.5 4.6 2.6 0.125
3 0.7 0.5 4.6 2.6 0.125
3 0.7 0.5 4.6 2.6 0.125

I. A. Campbell Associates, Inc. Page 131 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2

RDS-1 A 2 0.7 0.5 4.6 2.6 0.15 11.96 23.92


2 0.7 0.5 4.6 2.6 0.15 Short Span
2 0.7 0.5 4.6 2.6 0.15
2 0.7 0.5 4.6 2.6 0.15
2 0.7 0.5 4.6 2.6 0.15
2 0.7 0.5 4.6 2.6 0.15 Long Span
2 0.7 0.5 4.6 2.6 0.15
2 0.7 0.5 4.6 2.6 0.15
2 0.7 0.5 4.6 2.6 0.15

RDS-1 A 3 0.7 0.5 6.6 2.6 0.15 17.16 51.48


3 0.7 0.5 6.6 2.6 0.15 Short Span
3 0.7 0.5 6.6 2.6 0.15
3 0.7 0.5 6.6 2.6 0.15
3 0.7 0.5 6.6 2.6 0.15
3 0.7 0.5 6.6 2.6 0.15 Long Span
3 0.7 0.5 6.6 2.6 0.15
3 0.7 0.5 6.6 2.6 0.15
3 0.7 0.5 6.6 2.6 0.15

RDS-13 A 1 0.7 0.5 6.6 2.6 0.15 17.16 17.16


1 0.7 0.5 6.6 2.6 0.15 Short Span
1 0.7 0.5 6.6 2.6 0.15
1 0.7 0.5 6.6 2.6 0.15
1 0.7 0.5 6.6 2.6 0.15

I. A. Campbell Associates, Inc. Page 132 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 6.6 2.6 0.15 Long Span
1 0.7 0.5 6.6 2.6 0.15
1 0.7 0.5 6.6 2.6 0.15
1 0.7 0.5 6.6 2.6 0.15

RDS-12 A 2 0.7 0.5 6.6 2.3 0.15 15.18 30.36


2 0.7 0.5 6.6 2.3 0.15 Short Span
2 0.7 0.5 6.6 2.3 0.15
2 0.7 0.5 6.6 2.3 0.15
2 0.7 0.5 6.6 2.3 0.15
2 0.7 0.5 6.6 2.3 0.15 Long Span
2 0.7 0.5 6.6 2.3 0.15
2 0.7 0.5 6.6 2.3 0.15
2 0.7 0.5 6.6 2.3 0.15

RDS-6 B 1 0.7 0.5 4.6 2.6 0.125 11.96 11.96


1 0.7 0.5 4.6 2.6 0.125 Short Span
1 0.7 0.5 4.6 2.6 0.125
1 0.7 0.5 4.6 2.6 0.125
1 0.7 0.5 4.6 2.6 0.125
1 0.7 0.5 4.6 2.6 0.125
1 0.7 0.5 4.6 2.6 0.125 Long Span
1 0.7 0.5 4.6 2.6 0.125
1 0.7 0.5 4.6 2.6 0.125
1 0.7 0.5 4.6 2.6 0.125

RDS-6 B 2 0.7 0.5 4.6 3.05 0.125 14.03 28.06

I. A. Campbell Associates, Inc. Page 133 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.7 0.5 4.6 3.05 0.125 Short Span
2 0.7 0.5 4.6 3.05 0.125
2 0.7 0.5 4.6 3.05 0.125
2 0.7 0.5 4.6 3.05 0.125
2 0.7 0.5 4.6 3.05 0.125
2 0.7 0.5 4.6 3.05 0.125 Long Span
2 0.7 0.5 4.6 3.05 0.125
2 0.7 0.5 4.6 3.05 0.125
2 0.7 0.5 4.6 3.05 0.125

RDS-6 B 2 0.7 0.5 4.6 2.9 0.125 13.34 26.68


2 0.7 0.5 4.6 2.9 0.125 Short Span
2 0.7 0.5 4.6 2.9 0.125
2 0.7 0.5 4.6 2.9 0.125
2 0.7 0.5 4.6 2.9 0.125
2 0.7 0.5 4.6 2.9 0.125
2 0.7 0.5 4.6 2.9 0.125 Long Span
2 0.7 0.5 4.6 2.9 0.125
2 0.7 0.5 4.6 2.9 0.125
2 0.7 0.5 4.6 2.9 0.125

RDS-12 A 2 0.7 0.5 6.6 3.05 0.15 20.13 40.26


2 0.7 0.5 6.6 3.05 0.15 Short Span
2 0.7 0.5 6.6 3.05 0.15
2 0.7 0.5 6.6 3.05 0.15
2 0.7 0.5 6.6 3.05 0.15
2 0.7 0.5 6.6 3.05 0.15 Long Span

I. A. Campbell Associates, Inc. Page 134 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.7 0.5 6.6 3.05 0.15
2 0.7 0.5 6.6 3.05 0.15
2 0.7 0.5 6.6 3.05 0.15

RDS-12 A 1 0.7 0.5 6.6 2.9 0.15 19.14 19.14


1 0.7 0.5 6.6 2.9 0.15 Short Span
1 0.7 0.5 6.6 2.9 0.15
1 0.7 0.5 6.6 2.9 0.15
1 0.7 0.5 6.6 2.9 0.15
1 0.7 0.5 6.6 2.9 0.15 Long Span
1 0.7 0.5 6.6 2.9 0.15
1 0.7 0.5 6.6 2.9 0.15
1 0.7 0.5 6.6 2.9 0.15

RDS-13 A 1 0.7 0.5 6.6 2.9 0.15 19.14 19.14


1 0.7 0.5 6.6 2.9 0.15 Short Span
1 0.7 0.5 6.6 2.9 0.15
1 0.7 0.5 6.6 2.9 0.15
1 0.7 0.5 6.6 2.9 0.15
1 0.7 0.5 6.6 2.9 0.15 Long Span
1 0.7 0.5 6.6 2.9 0.15
1 0.7 0.5 6.6 2.9 0.15
1 0.7 0.5 6.6 2.9 0.15

RDS-7 A 4 0.7 0.5 10 3.05 0.15 30.5 122.00


4 0.7 0.5 10 3.05 0.15 Short Span
4 0.7 0.5 10 3.05 0.15

I. A. Campbell Associates, Inc. Page 135 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
4 0.7 0.5 10 3.05 0.15
4 0.7 0.5 10 3.05 0.15
4 0.7 0.5 10 3.05 0.15 Long Span
4 0.7 0.5 10 3.05 0.15
4 0.7 0.5 10 3.05 0.15
4 0.7 0.5 10 3.05 0.15

RDS-7 A 2 0.7 0.5 9.1 3.05 0.15 27.76 55.52


2 0.7 0.5 9.1 3.05 0.15 Short Span
2 0.7 0.5 9.1 3.05 0.15
2 0.7 0.5 9.1 3.05 0.15
2 0.7 0.5 9.1 3.05 0.15
2 0.7 0.5 9.1 3.05 0.15 Long Span
2 0.7 0.5 9.1 3.05 0.15
2 0.7 0.5 9.1 3.05 0.15
2 0.7 0.5 9.1 3.05 0.15

RDS-7 A 8 0.7 0.5 10 2.9 0.15 29 232.00


8 0.7 0.5 10 2.9 0.15 Short Span
8 0.7 0.5 10 2.9 0.15
8 0.7 0.5 10 2.9 0.15
8 0.7 0.5 10 2.9 0.15
8 0.7 0.5 10 2.9 0.15 Long Span
8 0.7 0.5 10 2.9 0.15
8 0.7 0.5 10 2.9 0.15
8 0.7 0.5 10 2.9 0.15

I. A. Campbell Associates, Inc. Page 136 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
RDS-7 A 2 0.7 0.5 9.1 2.9 0.15 26.39 52.78
2 0.7 0.5 9.1 2.9 0.15 Short Span
2 0.7 0.5 9.1 2.9 0.15
2 0.7 0.5 9.1 2.9 0.15
2 0.7 0.5 9.1 2.9 0.15
2 0.7 0.5 9.1 2.9 0.15 Long Span
2 0.7 0.5 9.1 2.9 0.15
2 0.7 0.5 9.1 2.9 0.15
2 0.7 0.5 9.1 2.9 0.15

RDS-10 A 2 0.7 0.5 10 2.9 0.15 29 58.00


2 0.7 0.5 10 2.9 0.15 Short Span
2 0.7 0.5 10 2.9 0.15
2 0.7 0.5 10 2.9 0.15
2 0.7 0.5 10 2.9 0.15
2 0.7 0.5 10 2.9 0.15 Long Span
2 0.7 0.5 10 2.9 0.15
2 0.7 0.5 10 2.9 0.15
2 0.7 0.5 10 2.9 0.15

RDS-8 A 3 0.7 0.5 10 2.65 0.125 26.5 79.50


3 0.7 0.5 10 2.65 0.125 Short Span
3 0.7 0.5 10 2.65 0.125
3 0.7 0.5 10 2.65 0.125
3 0.7 0.5 10 2.65 0.125
3 0.7 0.5 10 2.65 0.125 Long Span
3 0.7 0.5 10 2.65 0.125

I. A. Campbell Associates, Inc. Page 137 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
3 0.7 0.5 10 2.65 0.125
3 0.7 0.5 10 2.65 0.125

RDS-8 A 1 0.7 0.5 6.6 2.65 0.125 17.49 17.49


1 0.7 0.5 6.6 2.65 0.125 Short Span
1 0.7 0.5 6.6 2.65 0.125
1 0.7 0.5 6.6 2.65 0.125
1 0.7 0.5 6.6 2.65 0.125
1 0.7 0.5 6.6 2.65 0.125 Long Span
1 0.7 0.5 6.6 2.65 0.125
1 0.7 0.5 6.6 2.65 0.125
1 0.7 0.5 6.6 2.65 0.125

RDS-1 A 4 0.7 0.5 9.1 2.6 0.15 23.66 94.64


4 0.7 0.5 9.1 2.6 0.15 Short Span
4 0.7 0.5 9.1 2.6 0.15
4 0.7 0.5 9.1 2.6 0.15
4 0.7 0.5 9.1 2.6 0.15
4 0.7 0.5 9.1 2.6 0.15 Long Span
4 0.7 0.5 9.1 2.6 0.15
4 0.7 0.5 9.1 2.6 0.15
4 0.7 0.5 9.1 2.6 0.15

RDS-1 A 2 0.7 0.5 6.06 2.6 0.15 15.76 31.52


2 0.7 0.5 6.06 2.6 0.15 Short Span
2 0.7 0.5 6.06 2.6 0.15
2 0.7 0.5 6.06 2.6 0.15

I. A. Campbell Associates, Inc. Page 138 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
2 0.7 0.5 6.06 2.6 0.15
2 0.7 0.5 6.06 2.6 0.15 Long Span
2 0.7 0.5 6.06 2.6 0.15
2 0.7 0.5 6.06 2.6 0.15
2 0.7 0.5 6.06 2.6 0.15

RDS-1 A 1 0.7 0.5 4.55 2.6 0.15 11.83 11.83


1 0.7 0.5 4.55 2.6 0.15 Short Span
1 0.7 0.5 4.55 2.6 0.15
1 0.7 0.5 4.55 2.6 0.15
1 0.7 0.5 4.55 2.6 0.15
1 0.7 0.5 4.55 2.6 0.15 Long Span
1 0.7 0.5 4.55 2.6 0.15
1 0.7 0.5 4.55 2.6 0.15
1 0.7 0.5 4.55 2.6 0.15

RDS-1 A 2 0.7 0.5 9.1 2.6 0.15 23.66 47.32


2 0.7 0.5 9.1 2.6 0.15 Short Span
2 0.7 0.5 9.1 2.6 0.15
2 0.7 0.5 9.1 2.6 0.15
2 0.7 0.5 9.1 2.6 0.15
2 0.7 0.5 9.1 2.6 0.15 Long Span
2 0.7 0.5 9.1 2.6 0.15
2 0.7 0.5 9.1 2.6 0.15
2 0.7 0.5 9.1 2.6 0.15

RDS-15 B 1 0.7 0.5 5 2.65 0.125 13.25 13.25

I. A. Campbell Associates, Inc. Page 139 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 5 2.65 0.125 Short Span
1 0.7 0.5 5 2.65 0.125
1 0.7 0.5 5 2.65 0.125
1 0.7 0.5 5 2.65 0.125
1 0.7 0.5 5 2.65 0.125
1 0.7 0.5 5 2.65 0.125 Long Span
1 0.7 0.5 5 2.65 0.125
1 0.7 0.5 5 2.65 0.125
1 0.7 0.5 5 2.65 0.125

RDS-9A A 2 0.7 0.5 10 2.5 0.125 25 50.00


2 0.7 0.5 10 2.5 0.125 Short Span
2 0.7 0.5 10 2.5 0.125
2 0.7 0.5 10 2.5 0.125
2 0.7 0.5 10 2.5 0.125
2 0.7 0.5 10 2.5 0.125 Long Span
2 0.7 0.5 10 2.5 0.125
2 0.7 0.5 10 2.5 0.125
2 0.7 0.5 10 2.5 0.125

RDS-9A A 1 0.7 0.5 8 2.5 0.125 20 20.00


1 0.7 0.5 8 2.5 0.125 Short Span
1 0.7 0.5 8 2.5 0.125
1 0.7 0.5 8 2.5 0.125
1 0.7 0.5 8 2.5 0.125
1 0.7 0.5 8 2.5 0.125 Long Span
1 0.7 0.5 8 2.5 0.125

I. A. Campbell Associates, Inc. Page 140 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Rebars
Date : February 16, 2011

SLAB

Slab Type Width Beam Width Beam Lnet Wnet


Sets Slab Depth Area Area Total
A-One way slab B- (Along Long Span) (Along Short Span) (F to F) (F to F)
Designation Rebars
Two way slab C-
Cantilever slab nos m m m m m m2 m2
1 0.7 0.5 8 2.5 0.125
1 0.7 0.5 8 2.5 0.125

RDS-9 A 2 0.7 0.5 10 2.5 0.125 25 50.00


2 0.7 0.5 10 2.5 0.125 Short Span
2 0.7 0.5 10 2.5 0.125
2 0.7 0.5 10 2.5 0.125
2 0.7 0.5 10 2.5 0.125
2 0.7 0.5 10 2.5 0.125 Long Span
2 0.7 0.5 10 2.5 0.125
2 0.7 0.5 10 2.5 0.125
2 0.7 0.5 10 2.5 0.125

RDS-9 A 1 0.7 0.5 5 2.5 0.125 12.5 12.50


1 0.7 0.5 5 2.5 0.125 Short Span
1 0.7 0.5 5 2.5 0.125
1 0.7 0.5 5 2.5 0.125
1 0.7 0.5 5 2.5 0.125
1 0.7 0.5 5 2.5 0.125 Long Span
1 0.7 0.5 5 2.5 0.125
1 0.7 0.5 5 2.5 0.125
1 0.7 0.5 5 2.5 0.125

Sub total 2,233.65

Grand Total 29,902.21

I. A. Campbell Associates, Inc. Page 141 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.25 1.55166667 - -


Bottom - S 12 0.25 8 1.68333333 11.96 23.92
Bottom - L 12 0.25 13 3.96666667 45.78 91.56
Top Cont. 12 0.225 46 1.14166667 46.62 93.24
Tie Bars 10 2 4.879 6.02 12.04
Top Discont. 12 0.25 15 1.55166667 20.66 41.32
Bottom - S 12 0.25 6 2.4395 12.99 25.98
Bottom - L 12 0.25 9 5.479 43.78 87.56
Top Cont. 12 0.25 15 1.14166667 15.20 30.40
Tie Bars 10 2 3.36666667 4.15 8.30

Top Discont. 12 0.25 1.37666667 - -


Bottom - S 12 0.25 8 1.73333333 12.31 12.31
Bottom - L 12 0.25 13 3.86666667 44.63 44.63
Top Cont. 12 0.225 46 1.06666667 43.56 43.56
Tie Bars 10 2 4.879 6.02 6.02
Top Discont. 12 0.25 15 1.57666667 21.00 21.00
Bottom - S 12 0.25 6 2.4395 12.99 12.99
Bottom - L 12 0.25 9 5.479 43.78 43.78
Top Cont. 12 0.25 15 1.16666667 15.54 15.54
Tie Bars 10 2 3.46666667 4.27 4.27

Top Discont. 12 0.25 1.36 - -

I. A. Campbell Associates, Inc. Page 142 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom - S 12 0.25 8 1.3 9.23 18.46
Bottom - L 12 0.25 13 3.2 36.93 73.86
Top Cont. 12 0.225 46 0.95 38.80 77.60
Tie Bars 10 2 4.879 6.02 12.04
Top Discont. 12 0.25 12 1.46 15.55 31.10
Bottom - S 12 0.25 5 2.4395 10.83 21.66
Bottom - L 12 0.25 7 5.579 34.67 69.34
Top Cont. 12 0.25 12 1 10.65 21.30
Tie Bars 10 2 2.6 3.21 6.42

Top Discont. 12 0.25 1.385 - -


Bottom - S 12 0.25 8 1.35 9.59 9.59
Bottom - L 12 0.25 13 3.3 38.09 38.09
Top Cont. 12 0.225 46 0.975 39.82 39.82
Tie Bars 10 2 4.879 6.02 6.02
Top Discont. 12 0.25 12 1.385 14.76 14.76
Bottom - S 12 0.25 5 2.4395 10.83 10.83
Bottom - L 12 0.25 7 5.479 34.05 34.05
Top Cont. 12 0.25 12 0.975 10.39 10.39
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.25 21 1.36 25.36 101.44


Bottom - S 12 0.25 8 1.3 9.23 36.92
Bottom - L 12 0.25 13 3.2 36.93 147.72
Top Cont. 12 0.225 23 0.95 19.40 77.60

I. A. Campbell Associates, Inc. Page 143 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 4.829 5.95 23.80
Top Discont. 12 0.25 12 1.46 15.55 62.20
Bottom - S 12 0.25 5 2.4145 10.72 42.88
Bottom - L 12 0.25 7 5.529 34.36 137.44
Top Cont. 12 0.25 12 1 10.65 42.60
Tie Bars 10 2 2.6 3.21 12.84

Top Discont. 12 0.25 21 1.385 25.82 51.64


Bottom - S 12 0.25 8 1.35 9.59 19.18
Bottom - L 12 0.25 13 3.3 38.09 76.18
Top Cont. 12 0.225 23 0.975 19.91 39.82
Tie Bars 10 2 4.829 5.95 11.90
Top Discont. 12 0.25 12 1.485 15.82 31.64
Bottom - S 12 0.25 5 2.4145 10.72 21.44
Bottom - L 12 0.25 7 5.529 34.36 68.72
Top Cont. 12 0.25 12 1.025 10.92 21.84
Tie Bars 10 2 2.7 3.33 6.66

Top Discont. 12 0.25 1.36 - -


Bottom - S 12 0.25 8 1.3 9.23 36.92
Bottom - L 12 0.25 13 3.2 36.93 147.72
Top Cont. 12 0.25 42 0.95 35.42 141.68
Tie Bars 10 2 4.829 5.95 23.80
Top Discont. 12 0.25 1.46 - -
Bottom - S 12 0.25 5 2.4145 10.72 42.88

I. A. Campbell Associates, Inc. Page 144 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom - L 12 0.25 7 5.529 34.36 137.44
Top Cont. 12 0.25 24 1 21.31 85.24
Tie Bars 10 2 2.6 3.21 12.84

Top Discont. 12 0.25 1.385 - -


Bottom - S 12 0.25 8 1.35 9.59 19.18
Bottom - L 12 0.25 13 3.3 38.09 76.18
Top Cont. 12 0.25 42 0.975 36.36 72.72
Tie Bars 10 2 4.829 5.95 11.90
Top Discont. 12 0.25 1.485 - -
Bottom - S 12 0.25 5 2.4145 10.72 21.44
Bottom - L 12 0.25 7 5.529 34.36 68.72
Top Cont. 12 0.25 24 1.025 21.84 43.68
Tie Bars 10 2 2.7 3.33 6.66

Top Discont. 12 0.25 1.36 - -


Bottom - S 12 0.25 8 1.3 9.23 18.46
Bottom - L 12 0.25 13 3.2 36.93 73.86
Top Cont. 12 0.25 42 0.95 35.42 70.84
Tie Bars 10 2 4.879 6.02 12.04
Top Discont. 12 0.25 1.36 - -
Bottom - S 12 0.25 5 2.4395 10.83 21.66
Bottom - L 12 0.25 7 5.479 34.05 68.10
Top Cont. 12 0.25 24 0.95 20.24 40.48
Tie Bars 10 2 2.6 3.21 6.42

I. A. Campbell Associates, Inc. Page 145 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.25 1.385 - -


Bottom - S 12 0.25 8 1.35 9.59 9.59
Bottom - L 12 0.25 13 3.3 38.09 38.09
Top Cont. 12 0.25 42 0.975 36.36 36.36
Tie Bars 10 2 4.879 6.02 6.02
Top Discont. 12 0.25 1.385 - -
Bottom - S 12 0.25 5 2.4395 10.83 10.83
Bottom - L 12 0.25 7 5.479 34.05 34.05
Top Cont. 12 0.25 24 0.975 20.77 20.77
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.25 21 1.46 27.22 27.22


Bottom - S 12 0.25 8 1.5 10.65 10.65
Bottom - L 12 0.25 13 3.6 41.55 41.55
Top Cont. 12 0.25 21 1.05 19.58 19.58
Tie Bars 10 2 4.879 6.02 6.02
Top Discont. 12 0.25 1.46 - -
Bottom - S 12 0.25 5 2.4395 10.83 10.83
Bottom - L 12 0.25 8 5.479 38.91 38.91
Top Cont. 12 0.25 26 1.05 24.24 24.24
Tie Bars 10 2 3 3.70 3.70

Top Discont. 12 0.25 21 1.61 30.02 30.02

I. A. Campbell Associates, Inc. Page 146 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom - S 12 0.25 8 1.8 12.78 12.78
Bottom - L 12 0.25 13 4.2 48.47 48.47
Top Cont. 12 0.25 21 1.2 22.37 22.37
Tie Bars 10 2 4.879 6.02 6.02
Top Discont. 12 0.25 1.61 - -
Bottom - S 12 0.25 6 2.4395 12.99 12.99
Bottom - L 12 0.25 10 5.479 48.64 48.64
Top Cont. 12 0.25 32 1.2 34.09 34.09
Tie Bars 10 2 3.6 4.44 4.44

Top Discont. 12 0.3 24 2.3975 51.08 51.08


Bottom 12 0.3 24 3.3 70.31 70.31
Top Cont. 12 0.225 31 1.9875 54.70 54.70
Tie Bars 10 2 6.75 8.32 8.32
Top Discont. 10 0.3 10 1.375 8.48 8.48
Bottom 10 0.3 10 7.35 45.31 45.31
Top Cont. 10 0.3 10 0.975 6.01 6.01
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.3 2.1975 - -


Bottom 12 0.3 24 3.1 66.05 132.10
Top Cont. 12 0.25 56 1.8875 93.84 187.68
Tie Bars 10 2 6.75 8.32 16.64
Top Discont. 10 0.3 10 1.375 8.48 16.96
Bottom 10 0.3 10 7.35 45.31 90.62

I. A. Campbell Associates, Inc. Page 147 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 10 0.975 6.01 12.02
Tie Bars 10 2 2.7 3.33 6.66

Top Discont. 12 0.3 2.3975 - -


Bottom 12 0.3 24 3.3 70.31 210.93
Top Cont. 12 0.25 56 1.9875 98.81 296.43
Tie Bars 10 2 6.75 8.32 24.96
Top Discont. 10 0.3 10 1.375 8.48 25.44
Bottom 10 0.3 10 7.35 45.31 135.93
Top Cont. 10 0.3 10 0.975 6.01 18.03
Tie Bars 10 2 2.7 3.33 9.99

Top Discont. 12 0.2 2.3975 - -


Bottom 12 0.2 35 3.6 111.86 111.86
Top Cont. 12 0.125 110 1.9875 194.10 194.10
Tie Bars 10 2 6.75 8.32 8.32
Top Discont. 10 0.3 11 1.45 9.83 9.83
Bottom 10 0.3 11 7.35 49.84 49.84
Top Cont. 10 0.3 11 1.05 7.12 7.12
Tie Bars 10 2 3 3.70 3.70

Top Discont. 12 0.3 24 2.2975 48.95 48.95


Bottom 12 0.225 31 4.1 112.84 112.84
Top Cont. 12 0.25 28 1.9375 48.16 48.16

I. A. Campbell Associates, Inc. Page 148 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 6.75 8.32 8.32
Top Discont. 10 0.3 13 1.6 12.82 12.82
Bottom 10 0.3 13 7.35 58.91 58.91
Top Cont. 10 0.3 13 1.2 9.62 9.62
Tie Bars 10 2 3.6 4.44 4.44

Top Discont. 12 0.25 41 1.55166667 56.48 56.48


Bottom - S 12 0.25 14 1.68333333 20.92 20.92
Bottom - L 12 0.25 27 3.96666667 95.08 95.08
Top Cont. 12 0.125 81 1.14166667 82.10 82.10
Tie Bars 10 2 9.95 12.27 12.27
Top Discont. 12 0.25 30 1.55166667 41.33 41.33
Bottom - S 12 0.25 6 4.975 26.50 26.50
Bottom - L 12 0.25 9 10.55 84.30 84.30
Top Cont. 12 0.25 1.14166667 - -
Tie Bars 10 2 3.36666667 4.15 4.15

Top Discont. 12 0.275 2.9975 - -


Bottom 12 0.275 38 3.86666667 130.45 260.90
Top Cont. 12 0.175 116 2.6875 276.77 553.54
Tie Bars 10 2 9.95 12.27 24.54
Top Discont. 10 0.3 13 1.56666667 12.56 25.12
Bottom 10 0.3 13 10.55 84.55 169.10
Top Cont. 10 0.3 13 1.16666667 9.35 18.70
Tie Bars 10 2 3.46666667 4.27 8.54

I. A. Campbell Associates, Inc. Page 149 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.275 3.1975 - -


Bottom 12 0.275 38 3.96666667 133.82 401.46
Top Cont. 12 0.175 116 2.7875 287.07 861.21
Tie Bars 10 2 9.95 12.27 36.81
Top Discont. 10 0.3 13 1.54166667 12.36 37.08
Bottom 10 0.3 13 10.55 84.55 253.65
Top Cont. 10 0.3 13 1.14166667 9.15 27.45
Tie Bars 10 2 3.36666667 4.15 12.45

Top Discont. 12 0.3 3.21 - -


Bottom 12 0.3 35 3.2 99.43 596.58
Top Cont. 12 0.25 82 2.8 203.84 1,223.04
Tie Bars 10 2 10 12.33 73.98
Top Discont. 10 0.3 10 1.35 8.32 49.92
Bottom 10 0.3 10 10.6 65.35 392.10
Top Cont. 10 0.3 10 0.95 5.86 35.16
Tie Bars 10 2 2.6 3.21 19.26

Top Discont. 12 0.3 3.01 - -


Bottom 12 0.3 35 3.1 96.33 288.99
Top Cont. 12 0.25 82 2.7 196.56 589.68
Tie Bars 10 2 10 12.33 36.99
Top Discont. 10 0.3 10 1.375 8.48 25.44

I. A. Campbell Associates, Inc. Page 150 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 10 0.3 10 10.6 65.35 196.05
Top Cont. 10 0.3 10 0.975 6.01 18.03
Tie Bars 10 2 2.7 3.33 9.99

Top Discont. 12 0.3 3.21 - -


Bottom 12 0.3 35 3.2 99.43 5,667.51
Top Cont. 12 0.25 82 2.8 203.84 11,618.88
Tie Bars 10 2 10 12.33 702.81
Top Discont. 10 0.3 10 1.35 8.32 474.24
Bottom 10 0.3 10 10.6 65.35 3,724.95
Top Cont. 10 0.3 10 0.95 5.86 334.02
Tie Bars 10 2 2.6 3.21 182.97

Top Discont. 12 0.3 3.01 - -


Bottom 12 0.3 35 3.1 96.33 2,697.24
Top Cont. 12 0.25 82 2.7 196.56 5,503.68
Tie Bars 10 2 10 12.33 345.24
Top Discont. 10 0.3 10 1.375 8.48 237.44
Bottom 10 0.3 10 10.6 65.35 1,829.80
Top Cont. 10 0.3 10 0.975 6.01 168.28
Tie Bars 10 2 2.7 3.33 93.24

Top Discont. 12 0.3 2.11625 - -


Bottom 12 0.3 20 3.2 56.82 56.82

I. A. Campbell Associates, Inc. Page 151 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.25 48 1.70625 72.71 72.71
Tie Bars 10 2 5.625 6.94 6.94
Top Discont. 10 0.3 10 1.35 8.32 8.32
Bottom 10 0.3 10 6.225 38.38 38.38
Top Cont. 10 0.3 10 0.95 5.86 5.86
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.3 3.03 - -


Bottom 12 0.3 32 3.2 90.91 272.73
Top Cont. 12 0.25 76 2.62 176.78 530.34
Tie Bars 10 2 9.28 11.44 34.32
Top Discont. 10 0.3 10 1.35 8.32 24.96
Bottom 10 0.3 10 9.88 60.91 182.73
Top Cont. 10 0.3 10 0.95 5.86 17.58
Tie Bars 10 2 2.6 3.21 9.63

Top Discont. 12 0.3 2.83 - -


Bottom 12 0.3 32 3.1 88.07 176.14
Top Cont. 12 0.25 76 2.52 170.03 340.06
Tie Bars 10 2 9.28 11.44 22.88
Top Discont. 10 0.3 10 1.375 8.48 16.96
Bottom 10 0.3 10 9.88 60.91 121.82
Top Cont. 10 0.3 10 0.975 6.01 12.02
Tie Bars 10 2 2.7 3.33 6.66

I. A. Campbell Associates, Inc. Page 152 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.275 3.01 - -


Bottom 12 0.275 38 3.86666667 130.45 521.80
Top Cont. 12 0.175 116 2.7 278.06 1,112.24
Tie Bars 10 2 10 12.33 49.32
Top Discont. 10 0.3 13 1.56666667 12.56 50.24
Bottom 10 0.3 13 10.6 84.95 339.80
Top Cont. 10 0.3 13 1.16666667 9.35 37.40
Tie Bars 10 2 3.46666667 4.27 17.08

Top Discont. 12 0.275 3.21 - -


Bottom 12 0.275 38 3.96666667 133.82 535.28
Top Cont. 12 0.175 116 2.8 288.36 1,153.44
Tie Bars 10 2 10 12.33 49.32
Top Discont. 10 0.3 13 1.54166667 12.36 49.44
Bottom 10 0.3 13 10.6 84.95 339.80
Top Cont. 10 0.3 13 1.14166667 9.15 36.60
Tie Bars 10 2 3.36666667 4.15 16.60

Top Discont. 12 0.275 2.83 - -


Bottom 12 0.275 35 3.86666667 120.15 120.15
Top Cont. 12 0.175 108 2.52 241.62 241.62
Tie Bars 10 2 9.28 11.44 11.44
Top Discont. 10 0.3 13 1.56666667 12.56 12.56
Bottom 10 0.3 13 9.88 79.18 79.18

I. A. Campbell Associates, Inc. Page 153 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 13 1.16666667 9.35 9.35
Tie Bars 10 2 3.46666667 4.27 4.27

Top Discont. 12 0.275 3.03 - -


Bottom 12 0.275 35 3.96666667 123.26 123.26
Top Cont. 12 0.175 108 2.62 251.21 251.21
Tie Bars 10 2 9.28 11.44 11.44
Top Discont. 10 0.3 13 1.54166667 12.36 12.36
Bottom 10 0.3 13 9.88 79.18 79.18
Top Cont. 10 0.3 13 1.14166667 9.15 9.15
Tie Bars 10 2 3.36666667 4.15 4.15

Top Discont. 12 0.3 24 2.235 47.62 47.62


Bottom 12 0.3 24 3.85 82.03 82.03
Top Cont. 12 0.2 36 1.925 61.52 61.52
Tie Bars 10 2 6.9 8.51 8.51
Top Discont. 10 0.25 15 1.5625 14.45 14.45
Bottom 10 0.25 15 7.5 69.36 69.36
Top Cont. 10 0.25 15 1.1625 10.75 10.75
Tie Bars 10 2 3.45 4.25 4.25

Top Discont. 12 0.3 32 2.83 80.40 80.40


Bottom 12 0.3 32 3.85 109.38 109.38
Top Cont. 12 0.2 48 2.52 107.39 107.39

I. A. Campbell Associates, Inc. Page 154 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 9.28 11.44 11.44
Top Discont. 10 0.25 15 1.5625 14.45 14.45
Bottom 10 0.25 15 9.88 91.37 91.37
Top Cont. 10 0.25 15 1.1625 10.75 10.75
Tie Bars 10 2 3.45 4.25 4.25

Top Discont. 12 0.3 35 3.01 93.53 93.53


Bottom 12 0.3 35 4.225 131.28 131.28
Top Cont. 12 0.2 51 2.7 122.25 122.25
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.25 17 1.65625 17.36 17.36
Bottom 10 0.25 17 10.6 111.09 111.09
Top Cont. 10 0.25 17 1.25625 13.17 13.17
Tie Bars 10 2 3.825 4.72 4.72

Top Discont. 12 0.3 35 3.01 93.53 93.53


Bottom 12 0.3 35 4.525 140.61 140.61
Top Cont. 12 0.2 51 2.7 122.25 122.25
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.25 18 1.73125 19.21 19.21
Bottom 10 0.25 18 10.6 117.63 117.63
Top Cont. 10 0.25 18 1.33125 14.77 14.77
Tie Bars 10 2 4.125 5.09 5.09

I. A. Campbell Associates, Inc. Page 155 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.25 18 1.16 18.54 18.54
Bottom - S 12 0.25 7 0.9 5.59 5.59
Bottom - L 12 0.25 11 2.4 23.44 23.44
Top Cont. 12 0.25 18 0.75 11.99 11.99
Tie Bars 10 2 4.275 5.27 5.27
Top Discont. 12 0.25 9 0.96 7.67 7.67
Bottom - S 12 0.25 4 2.1375 7.59 7.59
Bottom - L 12 0.25 5 4.675 20.75 20.75
Top Cont. 12 0.25 9 0.65 5.19 5.19
Tie Bars 10 2 1.8 2.22 2.22

Top Discont. 12 0.25 16 1.16 16.48 32.96


Bottom - S 12 0.25 6 0.9 4.79 9.58
Bottom - L 12 0.25 10 2.4 21.31 42.62
Top Cont. 12 0.25 16 0.75 10.65 21.30
Tie Bars 10 2 3.6 4.44 8.88
Top Discont. 12 0.25 9 0.96 7.67 15.34
Bottom - S 12 0.25 4 1.8 6.39 12.78
Bottom - L 12 0.25 5 4 17.76 35.52
Top Cont. 12 0.25 9 0.65 5.19 10.38
Tie Bars 10 2 1.8 2.22 4.44

Top Discont. 12 0.25 13 1.16 13.39 13.39


Bottom - S 12 0.25 5 0.9 4.00 4.00
Bottom - L 12 0.25 8 2.4 17.05 17.05

I. A. Campbell Associates, Inc. Page 156 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.25 13 0.75 8.66 8.66
Tie Bars 10 2 2.85 3.51 3.51
Top Discont. 12 0.25 9 0.96 7.67 7.67
Bottom - S 12 0.25 4 1.425 5.06 5.06
Bottom - L 12 0.25 5 3.25 14.43 14.43
Top Cont. 12 0.25 9 0.65 5.19 5.19
Tie Bars 10 2 1.8 2.22 2.22

Top Discont. 12 0.25 11 0.97875 9.56 9.56


Bottom - S 12 0.25 4 0.9375 3.33 3.33
Bottom - L 12 0.25 7 2.275 14.14 14.14
Top Cont. 12 0.225 12 0.66875 7.12 7.12
Tie Bars 10 2 2.325 2.87 2.87
Top Discont. 12 0.25 9 1.17875 9.42 9.42
Bottom - S 12 0.25 4 1.1625 4.13 4.13
Bottom - L 12 0.25 5 2.925 12.98 12.98
Top Cont. 12 0.25 9 0.76875 6.14 6.14
Tie Bars 10 2 1.875 2.31 2.31

Top Discont. 12 0.25 12 1.21625 12.96 12.96


Bottom - S 12 0.25 5 1.0125 4.49 4.49
Bottom - L 12 0.25 7 2.625 16.31 16.31
Top Cont. 12 0.175 17 0.80625 12.17 12.17
Tie Bars 10 2 2.775 3.42 3.42
Top Discont. 12 0.25 9 1.01625 8.12 8.12

I. A. Campbell Associates, Inc. Page 157 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom - S 12 0.25 4 1.3875 4.93 4.93
Bottom - L 12 0.25 5 3.175 14.09 14.09
Top Cont. 12 0.25 9 0.70625 5.64 5.64
Tie Bars 10 2 2.025 2.50 2.50

Top Discont. 12 0.3 3.03 - -


Bottom 12 0.3 32 3.2 90.91 90.91
Top Cont. 12 0.25 76 2.62 176.78 176.78
Tie Bars 10 2 9.28 11.44 11.44
Top Discont. 10 0.3 10 1.35 8.32 8.32
Bottom 10 0.3 10 9.88 60.91 60.91
Top Cont. 10 0.3 10 0.95 5.86 5.86
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.25 36 1.40375 44.86 44.86


Bottom - S 12 0.25 7 1.3875 8.62 8.62
Bottom - L 12 0.25 11 3.375 32.96 32.96
Top Cont. 12 0.225 0.99375 - -
Tie Bars 10 2 4.275 5.27 5.27
Top Discont. 12 0.25 1.40375 - -
Bottom - S 12 0.25 5 2.1375 9.49 9.49
Bottom - L 12 0.25 7 4.875 30.30 30.30
Top Cont. 12 0.25 24 0.99375 21.17 21.17
Tie Bars 10 2 2.775 3.42 3.42

I. A. Campbell Associates, Inc. Page 158 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.25 36 1.55375 49.66 49.66


Bottom - S 12 0.25 7 1.6875 10.49 10.49
Bottom - L 12 0.25 11 3.975 38.82 38.82
Top Cont. 12 0.225 1.14375 - -
Tie Bars 10 2 4.275 5.27 5.27
Top Discont. 12 0.25 1.55375 - -
Bottom - S 12 0.25 6 2.1375 11.39 11.39
Bottom - L 12 0.25 9 4.875 38.95 38.95
Top Cont. 12 0.25 30 1.14375 30.46 30.46
Tie Bars 10 2 3.375 4.16 4.16

Top Discont. 12 0.3 30 2.885 76.84 76.84


Bottom 12 0.3 30 1.8 47.94 47.94
Top Cont. 12 0.3 30 2.475 65.92 65.92
Tie Bars 10 2 8.7 10.73 10.73
Top Discont. 10 0.3 5 1 3.08 3.08
Bottom 10 0.3 5 9.3 28.67 28.67
Top Cont. 10 0.3 5 0.6 1.85 1.85
Tie Bars 10 2 1.2 1.48 1.48

Top Discont. 12 0.3 30 2.885 76.84 76.84


Bottom 12 0.3 30 5.7 151.81 151.81
Top Cont. 12 0.3 30 2.475 65.92 65.92
Tie Bars 10 2 8.7 10.73 10.73

I. A. Campbell Associates, Inc. Page 159 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 10 0.3 18 1.975 21.92 21.92
Bottom 10 0.3 18 9.3 103.20 103.20
Top Cont. 10 0.3 18 1.575 17.48 17.48
Tie Bars 10 2 5.1 6.29 6.29

Top Discont. 12 0.3 24 2.3975 51.08 51.08


Bottom 12 0.3 24 1.05 22.37 22.37
Top Cont. 12 0.3 24 1.9875 42.35 42.35
Tie Bars 10 2 6.75 8.32 8.32
Top Discont. 10 0.3 3 0.8125 1.50 1.50
Bottom 10 0.3 3 7.35 13.59 13.59
Top Cont. 10 0.3 3 0.4125 0.76 0.76
Tie Bars 10 2 0.45 0.55 0.55

Top Discont. 12 0.3 31 2.96 81.46 162.92


Bottom 12 0.3 31 1.05 28.90 57.80
Top Cont. 12 0.3 31 2.55 70.18 140.36
Tie Bars 10 2 9 11.10 22.20
Top Discont. 10 0.3 3 0.8125 1.50 3.00
Bottom 10 0.3 3 9.6 17.76 35.52
Top Cont. 10 0.3 3 0.4125 0.76 1.52
Tie Bars 10 2 0.45 0.55 1.10

Top Discont. 12 0.3 20 2.0975 37.24 37.24

I. A. Campbell Associates, Inc. Page 160 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 12 0.3 20 1.05 18.64 18.64
Top Cont. 12 0.3 20 1.6875 29.96 29.96
Tie Bars 10 2 5.55 6.84 6.84
Top Discont. 10 0.3 3 0.8125 1.50 1.50
Bottom 10 0.3 3 6.15 11.37 11.37
Top Cont. 10 0.3 3 0.4125 0.76 0.76
Tie Bars 10 2 0.45 0.55 0.55

Top Discont. 12 0.3 24 2.3975 51.08 51.08


Bottom 12 0.3 24 1.05 22.37 22.37
Top Cont. 12 0.3 24 1.9875 42.35 42.35
Tie Bars 10 2 6.75 8.32 8.32
Top Discont. 10 0.3 3 0.8125 1.50 1.50
Bottom 10 0.3 3 7.35 13.59 13.59
Top Cont. 10 0.3 3 0.4125 0.76 0.76
Tie Bars 10 2 0.45 0.55 0.55

Top Discont. 12 0.3 23 2.3225 47.42 47.42


Bottom 12 0.3 23 1.05 21.44 21.44
Top Cont. 12 0.3 23 1.9125 39.05 39.05
Tie Bars 10 2 6.45 7.95 7.95
Top Discont. 10 0.3 3 0.8125 1.50 1.50
Bottom 10 0.3 3 7.05 13.04 13.04
Top Cont. 10 0.3 3 0.4125 0.76 0.76
Tie Bars 10 2 0.45 0.55 0.55

I. A. Campbell Associates, Inc. Page 161 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.3 19 2.0225 34.12 34.12


Bottom 12 0.3 19 1.05 17.71 17.71
Top Cont. 12 0.3 19 1.6125 27.20 27.20
Tie Bars 10 2 5.25 6.47 6.47
Top Discont. 10 0.3 3 0.8125 1.50 1.50
Bottom 10 0.3 3 5.85 10.82 10.82
Top Cont. 10 0.3 3 0.4125 0.76 0.76
Tie Bars 10 2 0.45 0.55 0.55

Top Discont. 12 0.3 2.235 - -


Bottom 12 0.3 24 3.1 66.05 66.05
Top Cont. 12 0.25 58 1.925 99.12 99.12
Tie Bars 10 2 6.9 8.51 8.51
Top Discont. 10 0.3 10 1.375 8.48 8.48
Bottom 10 0.3 10 7.5 46.24 46.24
Top Cont. 10 0.3 10 0.975 6.01 6.01
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.3 2.435 - -


Bottom 12 0.3 24 3.2 68.18 136.36
Top Cont. 12 0.25 58 2.025 104.27 208.54
Tie Bars 10 2 6.9 8.51 17.02
Top Discont. 10 0.3 10 1.35 8.32 16.64

I. A. Campbell Associates, Inc. Page 162 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 10 0.3 10 7.5 46.24 92.48
Top Cont. 10 0.3 10 0.95 5.86 11.72
Tie Bars 10 2 2.6 3.21 6.42

Top Discont. 10 0.25 1.225 - -


Bottom - S 10 0.25 6 1.05 3.88 7.76
Bottom - L 10 0.25 9 2.7 14.98 29.96
Top Cont. 10 0.25 30 0.825 15.26 30.52
Tie Bars 10 2 3.45 4.25 8.50
Top Discont. 12 0.25 20 1.035 18.38 36.76
Bottom - S 12 0.25 4 1.725 6.13 12.26
Bottom - L 12 0.25 6 3.85 20.51 41.02
Top Cont. 12 0.25 0.725 - -
Tie Bars 10 2 2.1 2.59 5.18

Top Discont. 12 0.3 3.03 - -


Bottom 12 0.3 32 3.2 90.91 181.82
Top Cont. 12 0.25 76 2.62 176.78 353.56
Tie Bars 10 2 9.28 11.44 22.88
Top Discont. 10 0.3 10 1.35 8.32 16.64
Bottom 10 0.3 10 9.88 60.91 121.82
Top Cont. 10 0.3 10 0.95 5.86 11.72
Tie Bars 10 2 2.6 3.21 6.42

I. A. Campbell Associates, Inc. Page 163 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.3 2.83 - -
Bottom 12 0.3 32 3 85.23 85.23
Top Cont. 12 0.25 76 2.52 170.03 170.03
Tie Bars 10 2 9.28 11.44 11.44
Top Discont. 10 0.3 10 1.35 8.32 8.32
Bottom 10 0.3 10 9.88 60.91 60.91
Top Cont. 10 0.3 10 0.95 5.86 5.86
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.3 3.21 - -


Bottom 12 0.3 35 3.6955 114.83 918.64
Top Cont. 12 0.225 92 2.8 228.70 1,829.60
Tie Bars 10 2 10 12.33 98.64
Top Discont. 10 0.3 12 1.473875 10.90 87.20
Bottom 10 0.3 12 10.6 78.42 627.36
Top Cont. 10 0.3 12 1.073875 7.94 63.52
Tie Bars 10 2 3.0955 3.82 30.56

Top Discont. 12 0.3 3.21 - -


Bottom 12 0.3 35 3.4955 108.62 760.34
Top Cont. 12 0.225 92 2.8 228.70 1,600.90
Tie Bars 10 2 10 12.33 86.31
Top Discont. 10 0.3 11 1.423875 9.66 67.62
Bottom 10 0.3 11 10.6 71.88 503.16
Top Cont. 10 0.3 11 1.023875 6.94 48.58

I. A. Campbell Associates, Inc. Page 164 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 2.8955 3.57 24.99

Top Discont. 12 0.3 3.03 - -


Bottom 12 0.3 32 3.6955 104.99 209.98
Top Cont. 12 0.225 86 2.62 200.04 400.08
Tie Bars 10 2 9.28 11.44 22.88
Top Discont. 10 0.3 12 1.473875 10.90 21.80
Bottom 10 0.3 12 9.88 73.09 146.18
Top Cont. 10 0.3 12 1.073875 7.94 15.88
Tie Bars 10 2 3.0955 3.82 7.64

Top Discont. 12 0.3 3.03 - -


Bottom 12 0.3 32 3.4955 99.31 198.62
Top Cont. 12 0.225 86 2.62 200.04 400.08
Tie Bars 10 2 9.28 11.44 22.88
Top Discont. 10 0.3 11 1.423875 9.66 19.32
Bottom 10 0.3 11 9.88 67.00 134.00
Top Cont. 10 0.3 11 1.023875 6.94 13.88
Tie Bars 10 2 2.8955 3.57 7.14

Top Discont. 12 0.2 3.21 - -


Bottom 12 0.2 51 3.4955 158.27 158.27
Top Cont. 12 0.125 162 2.8 402.71 402.71
Tie Bars 10 2 10 12.33 12.33

I. A. Campbell Associates, Inc. Page 165 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 10 0.3 11 1.423875 9.66 9.66
Bottom 10 0.3 11 10.6 71.88 71.88
Top Cont. 10 0.3 11 1.023875 6.94 6.94
Tie Bars 10 2 2.8955 3.57 3.57

Top Discont. 12 0.2 1.9475 - -


Bottom 12 0.2 26 3.69555 85.30 170.60
Top Cont. 12 0.125 82 1.5375 111.93 223.86
Tie Bars 10 2 4.95 6.10 12.20
Top Discont. 10 0.3 12 1.4738875 10.90 21.80
Bottom 10 0.3 12 5.55 41.06 82.12
Top Cont. 10 0.3 12 1.0738875 7.94 15.88
Tie Bars 10 2 3.09555 3.82 7.64

Top Discont. 12 0.25 1.41 - -


Bottom - S 12 0.225 16 1.8 25.57 25.57
Bottom - L 12 0.225 30 4 106.54 106.54
Top Cont. 12 0.15 136 1.1 132.81 132.81
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.25 16 1.6 15.78 15.78
Bottom - S 10 0.25 6 5 18.50 18.50
Bottom - L 10 0.25 10 10.6 65.35 65.35
Top Cont. 10 0.25 16 1.2 11.84 11.84
Tie Bars 10 2 3.6 4.44 4.44

I. A. Campbell Associates, Inc. Page 166 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.25 1.233875 - -


Bottom - S 12 0.225 16 1.44775 20.56 20.56
Bottom - L 12 0.225 30 3.2955 87.77 87.77
Top Cont. 12 0.15 136 0.923875 111.55 111.55
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.25 13 1.423875 11.41 11.41
Bottom - S 10 0.25 5 5 15.41 15.41
Bottom - L 10 0.25 8 10.6 52.28 52.28
Top Cont. 10 0.25 13 1.023875 8.21 8.21
Tie Bars 10 2 2.8955 3.57 3.57

Top Discont. 12 0.25 13 1.085 12.52 12.52


Bottom - S 12 0.25 5 0.75 3.33 3.33
Bottom - L 12 0.25 8 2.1 14.92 14.92
Top Cont. 12 0.25 13 0.675 7.79 7.79
Tie Bars 10 2 3 3.70 3.70
Top Discont. 12 0.25 7 0.835 5.19 5.19
Bottom - S 12 0.25 3 1.5 4.00 4.00
Bottom - L 12 0.25 4 3.35 11.90 11.90
Top Cont. 12 0.25 7 0.55 3.42 3.42
Tie Bars 10 2 1.5 1.85 1.85

Top Discont. 10 0.3 35 3.2 69.05 414.30


Bottom 10 0.3 35 3.073 66.31 397.86

I. A. Campbell Associates, Inc. Page 167 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 35 2.8 60.42 362.52
Tie Bars 10 2 10 12.33 73.98
Top Discont. 10 0.3 10 1.31825 8.13 48.78
Bottom 10 0.3 10 10.6 65.35 392.10
Top Cont. 10 0.3 10 0.91825 5.66 33.96
Tie Bars 10 2 2.473 3.05 18.30

Top Discont. 12 0.3 2.7725 - -


Bottom 12 0.3 29 3.073 79.12 158.24
Top Cont. 12 0.3 58 2.3625 121.65 243.30
Tie Bars 10 2 8.25 10.17 20.34
Top Discont. 10 0.3 10 1.11825 6.89 13.78
Bottom 10 0.3 10 8.65 53.33 106.66
Top Cont. 10 0.3 10 0.81825 5.04 10.08
Tie Bars 10 2 2.473 3.05 6.10

Top Discont. 12 0.3 3.21 - -


Bottom 12 0.3 35 2.923 90.83 181.66
Top Cont. 12 0.3 70 2.8 174.01 348.02
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.3 9 1.28075 7.11 14.22
Bottom 10 0.3 9 10.6 58.81 117.62
Top Cont. 10 0.3 9 0.88075 4.89 9.78
Tie Bars 10 2 2.323 2.86 5.72

I. A. Campbell Associates, Inc. Page 168 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 10 0.3 2.725 - -


Bottom 10 0.3 28 2.923 50.46 50.46
Top Cont. 10 0.3 56 2.325 80.27 80.27
Tie Bars 10 2 8.1 9.99 9.99
Top Discont. 10 0.3 9 1.28075 7.11 7.11
Bottom 10 0.3 9 8.7 48.27 48.27
Top Cont. 10 0.3 9 0.88075 4.89 4.89
Tie Bars 10 2 2.323 2.86 2.86

Top Discont. 10 0.3 28 2.525 43.59 43.59


Bottom 10 0.3 28 2.848 49.16 49.16
Top Cont. 10 0.3 28 2.225 38.41 38.41
Tie Bars 10 2 8.1 9.99 9.99
Top Discont. 10 0.25 11 1.312 8.90 8.90
Bottom 10 0.25 11 8.7 59.00 59.00
Top Cont. 10 0.25 11 0.912 6.18 6.18
Tie Bars 10 2 2.448 3.02 3.02

Top Discont. 12 0.3 35 3.01 93.53 93.53


Bottom 12 0.3 35 2.723 84.61 84.61
Top Cont. 12 0.3 35 2.7 83.90 83.90
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.3 9 1.28075 7.11 7.11
Bottom 10 0.3 9 10.6 58.81 58.81

I. A. Campbell Associates, Inc. Page 169 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 9 0.88075 4.89 4.89
Tie Bars 10 2 2.323 2.86 2.86

Top Discont. 12 0.3 17 1.65375 24.96 24.96


Bottom 12 0.3 17 2.723 41.10 41.10
Top Cont. 12 0.3 17 1.34375 20.28 20.28
Tie Bars 10 2 4.575 5.64 5.64
Top Discont. 10 0.3 9 1.28075 7.11 7.11
Bottom 10 0.3 9 5.175 28.71 28.71
Top Cont. 10 0.3 9 0.88075 4.89 4.89
Tie Bars 10 2 2.323 2.86 2.86

Top Discont. 12 0.25 12 1.07875 11.49 11.49


Bottom - S 12 0.25 5 1.2375 5.49 5.49
Bottom - L 12 0.25 7 2.825 17.56 17.56
Top Cont. 12 0.15 19 0.79375 13.39 13.39
Tie Bars 10 2 2.625 3.24 3.24
Top Discont. 12 0.25 11 1.32875 12.98 12.98
Bottom - S 12 0.225 5 1.3125 5.83 5.83
Bottom - L 12 0.225 7 3.225 20.04 20.04
Top Cont. 12 0.125 21 0.91875 17.13 17.13
Tie Bars 10 2 2.475 3.05 3.05

74,646.89

I. A. Campbell Associates, Inc. Page 170 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.25 21 1.42666667 26.60 26.60


Bottom - S 12 0.25 8 1.83333333 13.02 13.02
Bottom - L 12 0.25 13 4.06666667 46.94 46.94
Top Cont. 12 0.25 21 1.11666667
Tie Bars 10 2 4.829 5.95 5.95
Top Discont. 12 0.25 16 1.72666667 24.53 24.53
Bottom - S 12 0.25 6 2.4145 12.86 12.86
Bottom - L 12 0.25 10 5.529 49.09 49.09
Top Cont. 12 0.25 16 1.26666667 17.99 17.99

Top Discont. 12 0.25 1.46416667 - -


Bottom - S 12 0.25 8 1.70833333 12.13 12.13
Bottom - L 12 0.25 13 3.91666667 45.20 45.20
Top Cont. 12 0.25 42 1.10416667
Tie Bars 10 2 4.829 5.95 5.95
Top Discont. 12 0.25 15 1.66416667 22.16 22.16
Bottom - S 12 0.25 6 2.4145 12.86 12.86
Bottom - L 12 0.25 9 5.529 44.18 44.18
Top Cont. 12 0.25 15 1.20416667 16.04 16.04

Top Discont. 12 0.25 1.55166667 - -


Bottom - S 12 0.25 8 1.68333333 11.96 11.96
Bottom - L 12 0.25 13 3.96666667 45.78 45.78

I. A. Campbell Associates, Inc. Page 171 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.25 42 1.14166667
Tie Bars 10 2 4.829 5.95 5.95
Top Discont. 12 0.25 15 1.65166667 22.00 22.00
Bottom - S 12 0.25 6 2.4145 12.86 12.86
Bottom - L 12 0.25 9 5.529 44.18 44.18
Top Cont. 12 0.25 15 1.19166667 15.87 15.87

Top Discont. 12 0.25 21 1.36 25.36 152.16


Bottom - S 12 0.25 8 1.3 9.23 55.38
Bottom - L 12 0.25 13 3.2 36.93 221.58
Top Cont. 12 0.25 21 0.95
Tie Bars 10 2 4.879 6.02 36.12
Top Discont. 12 0.25 12 1.36 14.49 86.94
Bottom - S 12 0.25 5 2.4395 10.83 64.98
Bottom - L 12 0.25 7 5.479 34.05 204.30
Top Cont. 12 0.25 12 0.95 10.12 60.72

Top Discont. 12 0.25 21 1.185 22.09 66.27


Bottom - S 12 0.25 8 1.35 9.59 28.77
Bottom - L 12 0.25 13 3.1 35.78 107.34
Top Cont. 12 0.25 21 0.875
Tie Bars 10 2 4.879 6.02 18.06
Top Discont. 12 0.25 12 1.385 14.76 44.28
Bottom - S 12 0.25 5 2.4395 10.83 32.49
Bottom - L 12 0.25 7 5.479 34.05 102.15

I. A. Campbell Associates, Inc. Page 172 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.25 12 0.975 10.39 31.17

Top Discont. 12 0.3 3.1975 - -


Bottom 12 0.3 35 3.2 99.43 99.43
Top Cont. 12 0.3 70 2.7875 173.23 173.23
Tie Bars 10 2 9.95 12.27 12.27
Top Discont. 10 0.3 10 1.45 8.94 8.94
Bottom 10 0.3 10 10.65 65.66 65.66
Top Cont. 10 0.3 10 1 6.17 6.17
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.3 3.21 - -


Bottom 12 0.3 35 3.2 99.43 696.01
Top Cont. 12 0.3 70 2.8 174.01 1,218.07
Tie Bars 10 2 10 12.33 86.31
Top Discont. 10 0.3 10 1.35 8.32 58.24
Bottom 10 0.3 10 10.6 65.35 457.45
Top Cont. 10 0.3 10 0.95 5.86 41.02
Tie Bars 10 2 2.6 3.21 22.47

Top Discont. 12 0.3 3.11 - -


Bottom 12 0.3 35 3.15 97.88 293.64
Top Cont. 12 0.3 70 2.75 170.90 512.70
Tie Bars 10 2 10 12.33 36.99

I. A. Campbell Associates, Inc. Page 173 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 10 0.3 10 1.3625 8.40 25.20
Bottom 10 0.3 10 10.6 65.35 196.05
Top Cont. 10 0.3 10 0.9625 5.93 17.79
Tie Bars 10 2 2.65 3.27 9.81

Top Discont. 12 0.3 3.01 - -


Bottom 12 0.3 35 3.1 96.33 481.65
Top Cont. 12 0.3 70 2.7 167.79 838.95
Tie Bars 10 2 10 12.33 61.65
Top Discont. 10 0.3 10 1.375 8.48 42.40
Bottom 10 0.3 10 10.6 65.35 326.75
Top Cont. 10 0.3 10 0.975 6.01 30.05
Tie Bars 10 2 2.7 3.33 16.65

Top Discont. 12 0.3 3.17875 - -


Bottom 12 0.3 34 3.2 96.59 96.59
Top Cont. 12 0.3 68 2.76875 167.15 167.15
Tie Bars 10 2 9.875 12.18 12.18
Top Discont. 10 0.3 10 1.5 9.25 9.25
Bottom 10 0.3 10 10.625 65.50 65.50
Top Cont. 10 0.3 10 1.025 6.32 6.32
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.3 3.1975 - -

I. A. Campbell Associates, Inc. Page 174 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 12 0.3 35 3.2 99.43 397.72
Top Cont. 12 0.3 70 2.7875 173.23 692.92
Tie Bars 10 2 9.95 12.27 49.08
Top Discont. 10 0.3 10 1.45 8.94 35.76
Bottom 10 0.3 10 10.65 65.66 262.64
Top Cont. 10 0.3 10 1 6.17 24.68
Tie Bars 10 2 2.6 3.21 12.84

Top Discont. 12 0.3 3.19125 - -


Bottom 12 0.3 34 3.2 96.59 289.77
Top Cont. 12 0.3 68 2.78125 167.91 503.73
Tie Bars 10 2 9.925 12.24 36.72
Top Discont. 10 0.3 10 1.5 9.25 27.75
Bottom 10 0.3 10 10.675 65.81 197.43
Top Cont. 10 0.3 10 1.025 6.32 18.96
Tie Bars 10 2 2.6 3.21 9.63

Top Discont. 12 0.3 2.9975 - -


Bottom 12 0.3 35 3.1 96.33 192.66
Top Cont. 12 0.3 70 2.6875 167.02 334.04
Tie Bars 10 2 9.95 12.27 24.54
Top Discont. 10 0.3 10 1.475 9.09 18.18
Bottom 10 0.3 10 10.65 65.66 131.32
Top Cont. 10 0.3 10 1.025 6.32 12.64
Tie Bars 10 2 2.7 3.33 6.66

I. A. Campbell Associates, Inc. Page 175 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.3 2.99125 - -


Bottom 12 0.3 34 3.1 93.57 187.14
Top Cont. 12 0.3 68 2.68125 161.87 323.74
Tie Bars 10 2 9.925 12.24 24.48
Top Discont. 10 0.3 10 1.525 9.40 18.80
Bottom 10 0.3 10 10.675 65.81 131.62
Top Cont. 10 0.3 10 1.05 6.47 12.94
Tie Bars 10 2 2.7 3.33 6.66

Top Discont. 12 0.3 3.09125 - -


Bottom 12 0.3 34 3.15 95.08 95.08
Top Cont. 12 0.3 68 2.73125 164.89 164.89
Tie Bars 10 2 9.925 12.24 12.24
Top Discont. 10 0.3 10 1.5125 9.32 9.32
Bottom 10 0.3 10 10.675 65.81 65.81
Top Cont. 10 0.3 10 1.0375 6.40 6.40
Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0.3 3.11625 - -


Bottom 12 0.3 35 3.15 97.88 195.76
Top Cont. 12 0.3 70 2.75625 171.29 342.58
Tie Bars 10 2 10.025 12.36 24.72
Top Discont. 10 0.3 10 1.3625 8.40 16.80

I. A. Campbell Associates, Inc. Page 176 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 10 0.3 10 10.625 65.50 131.00
Top Cont. 10 0.3 10 0.9625 5.93 11.86
Tie Bars 10 2 2.65 3.27 6.54

Top Discont. 12 0.3 3.11625 - -


Bottom 12 0.3 35 3.2 99.43 99.43
Top Cont. 12 0.3 70 2.75625 171.29 171.29
Tie Bars 10 2 10.025 12.36 12.36
Top Discont. 10 0.3 10 1.375 8.48 8.48
Bottom 10 0.3 10 10.625 65.50 65.50
Top Cont. 10 0.3 10 0.975 6.01 6.01
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.3 3.17875 - -


Bottom 12 0.3 34 3.2 96.59 96.59
Top Cont. 12 0.3 68 2.76875 167.15 167.15
Tie Bars 10 2 9.875 12.18 12.18
Top Discont. 10 0.3 10 1.5 9.25 9.25
Bottom 10 0.3 10 10.625 65.50 65.50
Top Cont. 10 0.3 10 1.025 6.32 6.32
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.3 3.185 - -


Bottom 12 0.3 34 3.2 96.59 386.36

I. A. Campbell Associates, Inc. Page 177 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.3 68 2.775 167.53 670.12
Tie Bars 10 2 9.9 12.21 48.84
Top Discont. 10 0.3 10 1.45 8.94 35.76
Bottom 10 0.3 10 10.6 65.35 261.40
Top Cont. 10 0.3 10 1 6.17 24.68
Tie Bars 10 2 2.6 3.21 12.84

Top Discont. 12 0.3 2.985 - -


Bottom 12 0.3 34 3.1 93.57 187.14
Top Cont. 12 0.3 68 2.675 161.49 322.98
Tie Bars 10 2 9.9 12.21 24.42
Top Discont. 10 0.3 10 1.475 9.09 18.18
Bottom 10 0.3 10 10.6 65.35 130.70
Top Cont. 10 0.3 10 1.025 6.32 12.64
Tie Bars 10 2 2.7 3.33 6.66

Top Discont. 12 0.3 3.1725 - -


Bottom 12 0.3 34 3.2 96.59 96.59
Top Cont. 12 0.3 68 2.7625 166.77 166.77
Tie Bars 10 2 9.85 12.15 12.15
Top Discont. 10 0.3 10 1.5 9.25 9.25
Bottom 10 0.3 10 10.6 65.35 65.35
Top Cont. 10 0.3 10 1.025 6.32 6.32
Tie Bars 10 2 2.6 3.21 3.21

I. A. Campbell Associates, Inc. Page 178 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.3 3.41 - -


Bottom 12 0.3 37 2.55 83.76 167.52
Top Cont. 12 0.3 74 3 197.09 394.18
Tie Bars 10 2 10.8 13.32 26.64
Top Discont. 10 0.3 8 1.3375 6.60 13.20
Bottom 10 0.3 8 11.55 56.96 113.92
Top Cont. 10 0.3 8 0.8625 4.25 8.50
Tie Bars 10 2 1.95 2.40 4.80

Top Discont. 12 0.3 3.31 - -


Bottom 12 0.3 37 2.075 68.16 68.16
Top Cont. 12 0.3 74 2.95 193.81 193.81
Tie Bars 10 2 10.8 13.32 13.32
Top Discont. 10 0.3 7 1.24375 5.37 5.37
Bottom 10 0.3 7 11.55 49.84 49.84
Top Cont. 10 0.3 7 0.76875 3.32 3.32
Tie Bars 10 2 1.575 1.94 1.94

Top Discont. 12 0.3 3.31 - -


Bottom 12 0.3 37 2.85 93.62 93.62
Top Cont. 12 0.3 74 2.95 193.81 193.81
Tie Bars 10 2 10.8 13.32 13.32
Top Discont. 10 0.3 9 1.4375 7.98 7.98
Bottom 10 0.3 9 11.55 64.09 64.09

I. A. Campbell Associates, Inc. Page 179 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 9 0.9625 5.34 5.34
Tie Bars 10 2 2.35 2.90 2.90

Top Discont. 12 0.3 3.11625 - -


Bottom 12 0.3 35 3.05 94.77 189.54
Top Cont. 12 0.3 70 2.75625 171.29 342.58
Tie Bars 10 2 10.025 12.36 24.72
Top Discont. 10 0.3 10 1.3375 8.25 16.50
Bottom 10 0.3 10 10.625 65.50 131.00
Top Cont. 10 0.3 10 0.9375 5.78 11.56
Tie Bars 10 2 2.55 3.14 6.28

Top Discont. 12 0.3 3.21625 - -


Bottom 12 0.3 35 3.1 96.33 96.33
Top Cont. 12 0.3 70 2.80625 174.40 174.40
Tie Bars 10 2 10.025 12.36 12.36
Top Discont. 10 0.3 10 1.325 8.17 8.17
Bottom 10 0.3 10 10.625 65.50 65.50
Top Cont. 10 0.3 10 0.925 5.70 5.70
Tie Bars 10 2 2.5 3.08 3.08

Top Discont. 12 0.3 3.16625 - -


Bottom 12 0.3 34 3.2 96.59 96.59
Top Cont. 12 0.3 68 2.75625 166.40 166.40

I. A. Campbell Associates, Inc. Page 180 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 9.825 12.11 12.11
Top Discont. 10 0.3 10 1.6 9.86 9.86
Bottom 10 0.3 10 10.675 65.81 65.81
Top Cont. 10 0.3 10 1.075 6.63 6.63
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.3 3.20375 - -


Bottom 12 0.3 35 3.2 99.43 397.72
Top Cont. 12 0.3 70 2.79375 173.62 694.48
Tie Bars 10 2 9.975 12.30 49.20
Top Discont. 10 0.3 10 1.45 8.94 35.76
Bottom 10 0.3 10 10.675 65.81 263.24
Top Cont. 10 0.3 10 1 6.17 24.68
Tie Bars 10 2 2.6 3.21 12.84

Top Discont. 12 0.3 3.00375 - -


Bottom 12 0.3 35 3.1 96.33 96.33
Top Cont. 12 0.3 70 2.69375 167.41 167.41
Tie Bars 10 2 9.975 12.30 12.30
Top Discont. 10 0.3 10 1.475 9.09 9.09
Bottom 10 0.3 10 10.675 65.81 65.81
Top Cont. 10 0.3 10 1.025 6.32 6.32
Tie Bars 10 2 2.7 3.33 3.33

I. A. Campbell Associates, Inc. Page 181 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.3 3.10375 - -
Bottom 12 0.3 35 3.15 97.88 97.88
Top Cont. 12 0.3 70 2.74375 170.51 170.51
Tie Bars 10 2 9.975 12.30 12.30
Top Discont. 10 0.3 10 1.4625 9.02 9.02
Bottom 10 0.3 10 10.675 65.81 65.81
Top Cont. 10 0.3 10 1.0125 6.24 6.24
Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0.3 3.0725 - -


Bottom 12 0.3 33 3.05 89.36 178.72
Top Cont. 12 0.3 66 2.6625 156.01 312.02
Tie Bars 10 2 9.45 11.65 23.30
Top Discont. 10 0.3 10 1.4625 9.02 18.04
Bottom 10 0.3 10 10.2 62.88 125.76
Top Cont. 10 0.3 10 0.9875 6.09 12.18
Tie Bars 10 2 2.45 3.02 6.04

Top Discont. 12 0.3 2.9725 - -


Bottom 12 0.3 33 3.15 92.29 92.29
Top Cont. 12 0.3 66 2.6125 153.08 153.08
Tie Bars 10 2 9.45 11.65 11.65
Top Discont. 10 0.3 10 1.5125 9.32 9.32
Bottom 10 0.3 10 10.2 62.88 62.88
Top Cont. 10 0.3 10 1.0375 6.40 6.40

I. A. Campbell Associates, Inc. Page 182 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0.3 3.0725 - -


Bottom 12 0.3 33 3.05 89.36 89.36
Top Cont. 12 0.3 66 2.6625 156.01 156.01
Tie Bars 10 2 9.45 11.65 11.65
Top Discont. 10 0.3 10 1.4625 9.02 9.02
Bottom 10 0.3 10 10.2 62.88 62.88
Top Cont. 10 0.3 10 0.9875 6.09 6.09
Tie Bars 10 2 2.45 3.02 3.02

Top Discont. 12 0.3 2.8725 - -


Bottom 12 0.3 33 3.1 90.82 90.82
Top Cont. 12 0.3 66 2.5625 150.15 150.15
Tie Bars 10 2 9.45 11.65 11.65
Top Discont. 10 0.3 10 1.525 9.40 9.40
Bottom 10 0.3 10 10.2 62.88 62.88
Top Cont. 10 0.3 10 1.05 6.47 6.47
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.3 2.9725 - -


Bottom 12 0.3 33 3.15 92.29 92.29
Top Cont. 12 0.3 66 2.6125 153.08 153.08
Tie Bars 10 2 9.45 11.65 11.65

I. A. Campbell Associates, Inc. Page 183 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 10 0.3 10 1.5125 9.32 9.32
Bottom 10 0.3 10 10.2 62.88 62.88
Top Cont. 10 0.3 10 1.0375 6.40 6.40
Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0.3 3.11625 - -


Bottom 12 0.3 35 3.15 97.88 195.76
Top Cont. 12 0.3 70 2.75625 171.29 342.58
Tie Bars 10 2 10.025 12.36 24.72
Top Discont. 10 0.3 10 1.3625 8.40 16.80
Bottom 10 0.3 10 10.625 65.50 131.00
Top Cont. 10 0.3 10 0.9625 5.93 11.86
Tie Bars 10 2 2.65 3.27 6.54

Top Discont. 12 0.3 3.21625 - -


Bottom 12 0.3 35 3.25 100.99 100.99
Top Cont. 12 0.3 70 2.80625 174.40 174.40
Tie Bars 10 2 10.025 12.36 12.36
Top Discont. 10 0.3 10 1.3625 8.40 8.40
Bottom 10 0.3 10 10.625 65.50 65.50
Top Cont. 10 0.3 10 0.9625 5.93 5.93
Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0.3 3.17875 - -

I. A. Campbell Associates, Inc. Page 184 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 12 0.3 34 3.2 96.59 96.59
Top Cont. 12 0.3 68 2.76875 167.15 167.15
Tie Bars 10 2 9.875 12.18 12.18
Top Discont. 10 0.3 10 1.6 9.86 9.86
Bottom 10 0.3 10 10.725 66.12 66.12
Top Cont. 10 0.3 10 1.075 6.63 6.63
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.3 3.21625 - -


Bottom 12 0.3 35 3.2 99.43 397.72
Top Cont. 12 0.3 70 2.80625 174.40 697.60
Tie Bars 10 2 10.025 12.36 49.44
Top Discont. 10 0.3 10 1.35 8.32 33.28
Bottom 10 0.3 10 10.625 65.50 262.00
Top Cont. 10 0.3 10 0.95 5.86 23.44
Tie Bars 10 2 2.6 3.21 12.84

Top Discont. 12 0.3 3.21625 - -


Bottom 12 0.3 35 3.3 102.54 205.08
Top Cont. 12 0.3 70 2.80625 174.40 348.80
Tie Bars 10 2 10.025 12.36 24.72
Top Discont. 10 0.3 10 1.375 8.48 16.96
Bottom 10 0.3 10 10.625 65.50 131.00
Top Cont. 10 0.3 10 0.975 6.01 12.02
Tie Bars 10 2 2.7 3.33 6.66

I. A. Campbell Associates, Inc. Page 185 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.3 3.21625 - -


Bottom 12 0.3 35 3.2 99.43 298.29
Top Cont. 12 0.3 70 2.80625 174.40 523.20
Tie Bars 10 2 10.025 12.36 37.08
Top Discont. 10 0.3 10 1.35 8.32 24.96
Bottom 10 0.3 10 10.625 65.50 196.50
Top Cont. 10 0.3 10 0.95 5.86 17.58
Tie Bars 10 2 2.6 3.21 9.63

Top Discont. 12 0.3 3.11625 - -


Bottom 12 0.3 35 3.15 97.88 97.88
Top Cont. 12 0.3 70 2.75625 171.29 171.29
Tie Bars 10 2 10.025 12.36 12.36
Top Discont. 10 0.3 10 1.3625 8.40 8.40
Bottom 10 0.3 10 10.625 65.50 65.50
Top Cont. 10 0.3 10 0.9625 5.93 5.93
Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0.3 3.21625 - -


Bottom 12 0.3 35 3.15 97.88 195.76
Top Cont. 12 0.3 70 2.80625 174.40 348.80
Tie Bars 10 2 10.025 12.36 24.72
Top Discont. 10 0.3 10 1.3375 8.25 16.50

I. A. Campbell Associates, Inc. Page 186 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 10 0.3 10 10.625 65.50 131.00
Top Cont. 10 0.3 10 0.9375 5.78 11.56
Tie Bars 10 2 2.55 3.14 6.28

Top Discont. 12 0.3 3.11625 - -


Bottom 12 0.3 35 3.05 94.77 94.77
Top Cont. 12 0.3 70 2.75625 171.29 171.29
Tie Bars 10 2 10.025 12.36 12.36
Top Discont. 10 0.3 10 1.3375 8.25 8.25
Bottom 10 0.3 10 10.625 65.50 65.50
Top Cont. 10 0.3 10 0.9375 5.78 5.78
Tie Bars 10 2 2.55 3.14 3.14

Top Discont. 12 0.3 3.21625 - -


Bottom 12 0.3 35 3.1 96.33 96.33
Top Cont. 12 0.3 70 2.80625 174.40 174.40
Tie Bars 10 2 10.025 12.36 12.36
Top Discont. 10 0.3 10 1.325 8.17 8.17
Bottom 10 0.3 10 10.625 65.50 65.50
Top Cont. 10 0.3 10 0.925 5.70 5.70
Tie Bars 10 2 2.5 3.08 3.08

Top Discont. 12 0.3 3.11625 - -


Bottom 12 0.3 35 3.05 94.77 94.77

I. A. Campbell Associates, Inc. Page 187 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.3 70 2.75625 171.29 171.29
Tie Bars 10 2 10.025 12.36 12.36
Top Discont. 10 0.3 10 1.3375 8.25 8.25
Bottom 10 0.3 10 10.625 65.50 65.50
Top Cont. 10 0.3 10 0.9375 5.78 5.78
Tie Bars 10 2 2.55 3.14 3.14

Top Discont. 12 0.3 3.13625 - -


Bottom 12 0.3 32 3.25 92.33 92.33
Top Cont. 12 0.3 64 2.67625 152.06 152.06
Tie Bars 10 2 9.305 11.47 11.47
Top Discont. 10 0.3 10 1.3375 8.25 8.25
Bottom 10 0.3 10 9.905 61.06 61.06
Top Cont. 10 0.3 10 0.9375 5.78 5.78
Tie Bars 10 2 2.55 3.14 3.14

Top Discont. 12 0.3 2.83625 - -


Bottom 12 0.3 32 3.1 88.07 88.07
Top Cont. 12 0.3 64 2.52625 143.54 143.54
Tie Bars 10 2 9.305 11.47 11.47
Top Discont. 10 0.3 10 1.375 8.48 8.48
Bottom 10 0.3 10 9.905 61.06 61.06
Top Cont. 10 0.3 10 0.975 6.01 6.01
Tie Bars 10 2 2.7 3.33 3.33

I. A. Campbell Associates, Inc. Page 188 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.3 3.03625 - -


Bottom 12 0.3 32 3.2 90.91 90.91
Top Cont. 12 0.3 64 2.62625 149.22 149.22
Tie Bars 10 2 9.305 11.47 11.47
Top Discont. 10 0.3 10 1.35 8.32 8.32
Bottom 10 0.3 10 9.905 61.06 61.06
Top Cont. 10 0.3 10 0.95 5.86 5.86
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.3 3.03625 - -


Bottom 12 0.3 32 3.125 88.78 88.78
Top Cont. 12 0.3 64 2.62625 149.22 149.22
Tie Bars 10 2 9.305 11.47 11.47
Top Discont. 10 0.3 10 1.33125 8.21 8.21
Bottom 10 0.3 10 9.905 61.06 61.06
Top Cont. 10 0.3 10 0.93125 5.74 5.74
Tie Bars 10 2 2.525 3.11 3.11

Top Discont. 12 0.3 2.83625 - -


Bottom 12 0.3 32 3.1 88.07 88.07
Top Cont. 12 0.3 64 2.52625 143.54 143.54
Tie Bars 10 2 9.305 11.47 11.47
Top Discont. 10 0.3 10 1.375 8.48 8.48
Bottom 10 0.3 10 9.905 61.06 61.06

I. A. Campbell Associates, Inc. Page 189 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 10 0.975 6.01 6.01
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.3 1.8225 - -


Bottom 12 0.3 19 3 50.60 50.60
Top Cont. 12 0.3 38 1.5125 51.03 51.03
Tie Bars 10 2 5.25 6.47 6.47
Top Discont. 10 0.3 10 1.35 8.32 8.32
Bottom 10 0.3 10 5.85 36.07 36.07
Top Cont. 10 0.3 10 0.95 5.86 5.86
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.3 2.435 - -


Bottom 12 0.3 24 3.2 68.18 68.18
Top Cont. 12 0.3 48 2.025 86.29 86.29
Tie Bars 10 2 6.9 8.51 8.51
Top Discont. 10 0.3 10 1.35 8.32 8.32
Bottom 10 0.3 10 7.5 46.24 46.24
Top Cont. 10 0.3 10 0.95 5.86 5.86
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.3 2.235 - -


Bottom 12 0.3 24 3.1 66.05 66.05
Top Cont. 12 0.3 48 1.925 82.03 82.03

I. A. Campbell Associates, Inc. Page 190 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 6.9 8.51 8.51
Top Discont. 10 0.3 10 1.375 8.48 8.48
Bottom 10 0.3 10 7.5 46.24 46.24
Top Cont. 10 0.3 10 0.975 6.01 6.01
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.3 2.235 - -


Bottom 12 0.3 24 3.05 64.99 64.99
Top Cont. 12 0.3 48 1.925 82.03 82.03
Tie Bars 10 2 6.9 8.51 8.51
Top Discont. 10 0.3 10 1.3625 8.40 8.40
Bottom 10 0.3 10 7.5 46.24 46.24
Top Cont. 10 0.3 10 0.9625 5.93 5.93
Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0.3 3.03 - -


Bottom 12 0.3 32 3.1 88.07 88.07
Top Cont. 12 0.3 64 2.62 148.87 148.87
Tie Bars 10 2 9.28 11.44 11.44
Top Discont. 10 0.3 10 1.325 8.17 8.17
Bottom 10 0.3 10 9.88 60.91 60.91
Top Cont. 10 0.3 10 0.925 5.70 5.70
Tie Bars 10 2 2.5 3.08 3.08

I. A. Campbell Associates, Inc. Page 191 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.3 3.03 - -
Bottom 12 0.3 32 3.15 89.49 89.49
Top Cont. 12 0.3 64 2.62 148.87 148.87
Tie Bars 10 2 9.28 11.44 11.44
Top Discont. 10 0.3 10 1.3375 8.25 8.25
Bottom 10 0.3 10 9.88 60.91 60.91
Top Cont. 10 0.3 10 0.9375 5.78 5.78
Tie Bars 10 2 2.55 3.14 3.14

Top Discont. 12 0.225 3.03 - -


Bottom 12 0.225 43 3.15 120.25 120.25
Top Cont. 12 0.15 126 2.62 293.08 293.08
Tie Bars 10 2 9.28 11.44 11.44
Top Discont. 10 0.3 10 1.3375 8.25 8.25
Bottom 10 0.3 10 9.88 60.91 60.91
Top Cont. 10 0.3 10 0.9375 5.78 5.78
Tie Bars 10 2 2.55 3.14 3.14

Top Discont. 12 0.25 19 1.5695 26.47 26.47


Bottom - S 12 0.25 6 1.635 8.71 8.71
Bottom - L 12 0.25 13 3.97 45.82 45.82
Top Cont. 12 0.2
Tie Bars 10 2 4.7 5.80 5.80
Top Discont. 12 0.25 13 1.3695 15.81 15.81
Bottom - S 12 0.25 4 2.35 8.35 8.35

I. A. Campbell Associates, Inc. Page 192 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom - L 12 0.25 9 5.2 41.55 41.55
Top Cont. 12 0.25 13 1.0675 12.32 12.32

Top Discont. 12 0.25 19 1.5695 26.47 52.94


Bottom - S 12 0.25 6 1.635 8.71 17.42
Bottom - L 12 0.25 13 3.97 45.82 91.64
Top Cont. 12 0.175
Tie Bars 10 2 4.7 5.80 11.60
Top Discont. 12 0.25 13 1.3695 15.81 31.62
Bottom - S 12 0.25 4 2.35 8.35 16.70
Bottom - L 12 0.25 9 5.2 41.55 83.10
Top Cont. 12 0.25 13 1.0675 12.32 24.64

Top Discont. 12 0.3 33 3.227 94.54 94.54


Bottom 12 0.175 57 3.97 200.90 200.90
Top Cont. 12 0.125 158 2.825 396.27 396.27
Tie Bars 10 2 9.9 12.21 12.21
Top Discont. 10 0.225 15 1.3575 12.55 12.55
Bottom 10 0.225 15 10.4 96.17 96.17
Top Cont. 10 0.225 15 1.0675 9.87 9.87
Tie Bars 10 2 3.27 4.03 4.03

Top Discont. 12 0.3 22 2.402 46.91 46.91


Bottom 12 0.175 38 3.97 133.93 133.93

I. A. Campbell Associates, Inc. Page 193 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.125 106 2 188.21 188.21
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.225 15 1.3575 12.55 12.55
Bottom 10 0.225 15 7.1 65.66 65.66
Top Cont. 10 0.225 15 1.0675 9.87 9.87
Tie Bars 10 2 3.27 4.03 4.03

Top Discont. 12 0.3 30 3.002 79.96 79.96


Bottom 12 0.175 52 3.97 183.28 183.28
Top Cont. 12 0.125 144 2.6 332.39 332.39
Tie Bars 10 2 9 11.10 11.10
Top Discont. 10 0.225 15 1.3575 12.55 12.55
Bottom 10 0.225 15 9.5 87.85 87.85
Top Cont. 10 0.225 15 1.0675 9.87 9.87
Tie Bars 10 2 3.27 4.03 4.03

Top Discont. 12 0.3 33 3.227 94.54 94.54


Bottom 12 0.175 57 4.07 205.96 205.96
Top Cont. 12 0.125 158 2.825 396.27 396.27
Tie Bars 10 2 9.9 12.21 12.21
Top Discont. 10 0.225 15 1.3825 12.78 12.78
Bottom 10 0.225 15 10.4 96.17 96.17
Top Cont. 10 0.225 15 1.0925 10.10 10.10
Tie Bars 10 2 3.37 4.16 4.16

I. A. Campbell Associates, Inc. Page 194 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.3 33 3.227 94.54 94.54


Bottom 12 0.175 57 4.27 216.08 216.08
Top Cont. 12 0.125 158 2.825 396.27 396.27
Tie Bars 10 2 9.9 12.21 12.21
Top Discont. 10 0.225 16 1.4325 14.13 14.13
Bottom 10 0.225 16 10.4 102.59 102.59
Top Cont. 10 0.225 16 1.1425 11.27 11.27
Tie Bars 10 2 3.57 4.40 4.40

Top Discont. 12 0
Bottom 12 0.175 57 3.97 200.90 2,812.60
Top Cont. 12 0.1 198 2.825 496.59 6,952.26
Tie Bars 10 2 9.9 12.21 170.94
Top Discont. 10 0.275 12 1.3575 10.04 140.56
Bottom 10 0.275 12 10.4 76.94 1,077.16
Top Cont. 10 0.275 12 1.0675 7.90 110.60
Tie Bars 10 2 3.27 4.03 56.42

Top Discont. 12 0
Bottom 12 0.175 52 3.97 183.28 366.56
Top Cont. 12 0.1 180 2.6 415.49 830.98
Tie Bars 10 2 9 11.10 22.20
Top Discont. 10 0.275 12 1.3575 10.04 20.08
Bottom 10 0.275 12 9.5 70.28 140.56

I. A. Campbell Associates, Inc. Page 195 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.275 12 1.0675 7.90 15.80
Tie Bars 10 2 3.27 4.03 8.06

Top Discont. 12 0
Bottom 12 0.175 52 3.97 183.28 366.56
Top Cont. 12 0.1 180 2.6 415.49 830.98
Tie Bars 10 2 9 11.10 22.20
Top Discont. 10 0.275 12 1.3575 10.04 20.08
Bottom 10 0.275 12 9.5 70.28 140.56
Top Cont. 10 0.275 12 1.0675 7.90 15.80
Tie Bars 10 2 3.27 4.03 8.06

Top Discont. 12 0.25 22 1.6445 32.12 32.12


Bottom - S 12 0.25 7 1.785 11.09 11.09
Bottom - L 12 0.25 15 4.27 56.86 56.86
Top Cont. 12 0.25
Tie Bars 10 2 5.3 6.53 6.53
Top Discont. 12 0.25 15 1.4445 19.24 19.24
Bottom - S 12 0.25 5 2.65 11.76 11.76
Bottom - L 12 0.25 10 5.8 51.49 51.49
Top Cont. 12 0.25 15 1.1425 15.21 15.21

Top Discont. 12 0.25 22 1.5695 30.65 61.30


Bottom - S 12 0.25 7 1.635 10.16 20.32

I. A. Campbell Associates, Inc. Page 196 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom - L 12 0.25 15 3.97 52.87 105.74
Top Cont. 12 0.25
Tie Bars 10 2 5.3 6.53 13.06
Top Discont. 12 0.25 13 1.3695 15.81 31.62
Bottom - S 12 0.25 4 2.65 9.41 18.82
Bottom - L 12 0.25 9 5.8 46.34 92.68
Top Cont. 12 0.25 13 1.0675 12.32 24.64

Top Discont. 12 0.25 22 1.352 26.41 26.41


Bottom - S 12 0.25 7 1.2 7.46 7.46
Bottom - L 12 0.25 15 3.1 41.28 41.28
Top Cont. 12 0.25
Tie Bars 10 2 5.3 6.53 6.53
Top Discont. 12 0.25 10 1.152 10.23 10.23
Bottom - S 12 0.25 3 2.65 7.06 7.06
Bottom - L 12 0.25 7 5.8 36.04 36.04
Top Cont. 12 0.25 10 0.85 7.55 7.55

Top Discont. 12 0.25 19 1.252 21.12 63.36


Bottom - S 12 0.25 6 1.2 6.39 19.17
Bottom - L 12 0.25 13 3 34.62 103.86
Top Cont. 12 0.25
Tie Bars 10 2 4.7 5.80 17.40
Top Discont. 12 0.25 10 1.252 11.12 33.36
Bottom - S 12 0.25 3 2.35 6.26 18.78

I. A. Campbell Associates, Inc. Page 197 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom - L 12 0.25 7 5.3 32.94 98.82
Top Cont. 12 0.25 10 0.9 7.99 23.97

Top Discont. 12 0
Bottom 12 0.225 44 3.1 121.10 1,574.30
Top Cont. 12 0.15 132 2.825 331.06 4,303.78
Tie Bars 10 2 9.9 12.21 158.73
Top Discont. 10 0.3 8 1.14 5.62 73.06
Bottom 10 0.3 8 10.4 51.29 666.77
Top Cont. 10 0.3 8 0.85 4.19 54.47
Tie Bars 10 2 2.4 2.96 38.48

Top Discont. 12 0
Bottom 12 0.225 40 3.1 110.09 110.09
Top Cont. 12 0.15 120 2.6 276.99 276.99
Tie Bars 10 2 9 11.10 11.10
Top Discont. 10 0.3 8 1.14 5.62 5.62
Bottom 10 0.3 8 9.5 46.85 46.85
Top Cont. 10 0.3 8 0.85 4.19 4.19
Tie Bars 10 2 2.4 2.96 2.96

Top Discont. 12 0
Bottom 12 0.3 30 3.1 82.57 412.85
Top Cont. 12 0.25 72 2.6 166.20 831.00

I. A. Campbell Associates, Inc. Page 198 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 9 11.10 55.50
Top Discont. 10 0.3 8 1.14 5.62 28.10
Bottom 10 0.3 8 9.5 46.85 234.25
Top Cont. 10 0.3 8 0.85 4.19 20.95
Tie Bars 10 2 2.4 2.96 14.80

Top Discont. 12 0
Bottom 12 0.3 30 3.1 82.57 412.85
Top Cont. 12 0.25 72 2.6 166.20 831.00
Tie Bars 10 2 9 11.10 55.50
Top Discont. 10 0.3 8 1.14 5.62 28.10
Bottom 10 0.3 8 9.5 46.85 234.25
Top Cont. 10 0.3 8 0.85 4.19 20.95
Tie Bars 10 2 2.4 2.96 14.80

Top Discont. 12 0
Bottom 12 0.225 36 3.1 99.08 99.08
Top Cont. 12 0.15 108 2.35 225.32 225.32
Tie Bars 10 2 8 9.86 9.86
Top Discont. 10 0.3 8 1.14 5.62 5.62
Bottom 10 0.3 8 8.5 41.92 41.92
Top Cont. 10 0.3 8 0.85 4.19 4.19
Tie Bars 10 2 2.4 2.96 2.96

I. A. Campbell Associates, Inc. Page 199 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.25 20 1.252 22.23 22.23
Bottom - S 12 0.2 8 1.2 8.52 8.52
Bottom - L 12 0.2 17 3 45.28 45.28
Top Cont. 12 0.15
Tie Bars 10 2 4.95 6.10 6.10
Top Discont. 12 0.25 10 1.252 11.12 11.12
Bottom - S 12 0.25 3 2.475 6.59 6.59
Bottom - L 12 0.25 7 5.55 34.49 34.49
Top Cont. 12 0.25 10 0.9 7.99 7.99

Top Discont. 12 0.25 19 1.252 21.12 126.72


Bottom - S 12 0.25 6 1.2 6.39 38.34
Bottom - L 12 0.25 13 3 34.62 207.72
Top Cont. 12 0.25
Tie Bars 10 2 4.7 5.80 34.80
Top Discont. 12 0.25 10 1.252 11.12 66.72
Bottom - S 12 0.25 3 2.35 6.26 37.56
Bottom - L 12 0.25 7 5.3 32.94 197.64
Top Cont. 12 0.25 10 0.9 7.99 47.94

Top Discont. 12 0
Bottom 12 0.3 33 3.1 90.82 2,724.60
Top Cont. 12 0.25 80 2.825 200.64 6,019.20
Tie Bars 10 2 9.9 12.21 366.30
Top Discont. 10 0.3 8 1.14 5.62 168.60

I. A. Campbell Associates, Inc. Page 200 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 10 0.3 8 10.4 51.29 1,538.70
Top Cont. 10 0.3 8 0.85 4.19 125.70
Tie Bars 10 2 2.4 2.96 88.80

Top Discont. 12 0
Bottom 12 0.3 30 3.1 82.57 495.42
Top Cont. 12 0.25 72 2.6 166.20 997.20
Tie Bars 10 2 9 11.10 66.60
Top Discont. 10 0.3 8 1.14 5.62 33.72
Bottom 10 0.3 8 9.5 46.85 281.10
Top Cont. 10 0.3 8 0.85 4.19 25.14
Tie Bars 10 2 2.4 2.96 17.76

Top Discont. 12 0
Bottom 12 0.3 12 3.1 33.03 33.03
Top Cont. 12 0.25 28 1.225 30.45 30.45
Tie Bars 10 2 3.5 4.32 4.32
Top Discont. 10 0.3 8 1.14 5.62 5.62
Bottom 10 0.3 8 4 19.73 19.73
Top Cont. 10 0.3 8 0.85 4.19 4.19
Tie Bars 10 2 2.4 2.96 2.96

Top Discont. 12 0
Bottom 12 0.3 12 3.1 33.03 33.03

I. A. Campbell Associates, Inc. Page 201 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.25 28 1.225 30.45 30.45
Tie Bars 10 2 3.5 4.32 4.32
Top Discont. 10 0.3 8 1.14 5.62 5.62
Bottom 10 0.3 8 4 19.73 19.73
Top Cont. 10 0.3 8 0.85 4.19 4.19
Tie Bars 10 2 2.4 2.96 2.96

Top Discont. 12 0.3 12 1.602 17.07 17.07


Bottom 12 0.3 12 3.1 33.03 33.03
Top Cont. 12 0.15 46 1.2 49.01 49.01
Tie Bars 10 2 3.4 4.19 4.19
Top Discont. 10 0.3 8 1.14 5.62 5.62
Bottom 10 0.3 8 3.9 19.23 19.23
Top Cont. 10 0.3 8 0.85 4.19 4.19
Tie Bars 10 2 2.4 2.96 2.96

Top Discont. 12 0.3 24 2.552 54.38 217.52


Bottom 12 0.3 24 3.35 71.38 285.52
Top Cont. 12 0.3 48 2.15 91.62 366.48
Tie Bars 10 2 7.2 8.88 35.52
Top Discont. 10 0.3 9 1.2025 6.67 26.68
Bottom 10 0.3 9 7.7 42.72 170.88
Top Cont. 10 0.3 9 0.9125 5.06 20.24
Tie Bars 10 2 2.65 3.27 13.08

I. A. Campbell Associates, Inc. Page 202 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.3 19 2.177 36.72 36.72


Bottom 12 0.3 19 3.35 56.51 56.51
Top Cont. 12 0.3 38 1.775 59.88 59.88
Tie Bars 10 2 5.7 7.03 7.03
Top Discont. 10 0.3 9 1.2025 6.67 6.67
Bottom 10 0.3 9 6.2 34.40 34.40
Top Cont. 10 0.3 9 0.9125 5.06 5.06
Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0.3 18 2.102 33.59 33.59


Bottom 12 0.3 18 3.35 53.53 53.53
Top Cont. 12 0.3 36 1.7 54.33 54.33
Tie Bars 10 2 5.4 6.66 6.66
Top Discont. 10 0.3 9 1.2025 6.67 6.67
Bottom 10 0.3 9 5.9 32.74 32.74
Top Cont. 10 0.3 9 0.9125 5.06 5.06
Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0.3 15 1.877 25.00 25.00


Bottom 12 0.3 15 3.35 44.61 44.61
Top Cont. 12 0.3 30 1.475 39.29 39.29
Tie Bars 10 2 4.5 5.55 5.55
Top Discont. 10 0.3 9 1.2025 6.67 6.67
Bottom 10 0.3 9 5 27.74 27.74

I. A. Campbell Associates, Inc. Page 203 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 9 0.9125 5.06 5.06
Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0.25 19 1.252 21.12 63.36


Bottom - S 12 0.25 6 1.2 6.39 19.17
Bottom - L 12 0.25 13 3 34.62 103.86
Top Cont. 12 0.25
Tie Bars 10 2 4.7 5.80 17.40
Top Discont. 12 0.25 10 1.252 11.12 33.36
Bottom - S 12 0.25 3 2.35 6.26 18.78
Bottom - L 12 0.25 7 5.3 32.94 98.82
Top Cont. 12 0.25 10 0.9 7.99 23.97

Top Discont. 12 0
Bottom 12 0.3 33 3.1 90.82 3,723.62
Top Cont. 12 0.25 80 2.825 200.64 8,226.24
Tie Bars 10 2 9.9 12.21 500.61
Top Discont. 10 0.3 8 1.14 5.62 230.42
Bottom 10 0.3 8 10.4 51.29 2,102.89
Top Cont. 10 0.3 8 0.85 4.19 171.79
Tie Bars 10 2 2.4 2.96 121.36

Top Discont. 12 0
Bottom 12 0.3 30 3.1 82.57 247.71

I. A. Campbell Associates, Inc. Page 204 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.25 72 2.575 164.60 493.80
Tie Bars 10 2 8.9 10.97 32.91
Top Discont. 10 0.3 8 1.14 5.62 16.86
Bottom 10 0.3 8 9.4 46.36 139.08
Top Cont. 10 0.3 8 0.85 4.19 12.57
Tie Bars 10 2 2.4 2.96 8.88

Top Discont. 12 0
Bottom 12 0.3 30 3.1 82.57 412.85
Top Cont. 12 0.25 72 2.6 166.20 831.00
Tie Bars 10 2 9 11.10 55.50
Top Discont. 10 0.3 8 1.14 5.62 28.10
Bottom 10 0.3 8 9.5 46.85 234.25
Top Cont. 10 0.3 8 0.85 4.19 20.95
Tie Bars 10 2 2.4 2.96 14.80

Top Discont. 12 0
Bottom 12 0.225 40 3.1 110.09 110.09
Top Cont. 12 0.15 120 2.6 276.99 276.99
Tie Bars 10 2 9 11.10 11.10
Top Discont. 10 0.3 8 1.14 5.62 5.62
Bottom 10 0.3 8 9.5 46.85 46.85
Top Cont. 10 0.3 8 0.85 4.19 4.19
Tie Bars 10 2 2.4 2.96 2.96

I. A. Campbell Associates, Inc. Page 205 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.25 13 1.427 16.47 16.47


Bottom - S 12 0.25 4 1.55 5.50 5.50
Bottom - L 12 0.25 9 3.7 29.56 29.56
Top Cont. 12 0.25
Tie Bars 10 2 3.2 3.95 3.95
Top Discont. 12 0.25 13 1.427 16.47 16.47
Bottom - S 12 0.25 4 1.6 5.68 5.68
Bottom - L 12 0.25 9 3.8 30.36 30.36
Top Cont. 12 0

Top Discont. 12 0
Bottom 12 0.3 20 3.1 55.04 275.20
Top Cont. 12 0.25 48 1.825 77.77 388.85
Tie Bars 10 2 5.9 7.27 36.35
Top Discont. 10 0.3 8 1.14 5.62 28.10
Bottom 10 0.3 8 6.4 31.56 157.80
Top Cont. 10 0.3 8 0.85 4.19 20.95
Tie Bars 10 2 2.4 2.96 14.80

Top Discont. 12 0.3 31 3.077 84.68 84.68


Bottom 12 0.25 38 2.9 97.84 97.84
Top Cont. 12 0.2 94 2.675 223.24 223.24
Tie Bars 10 2 9.3 11.47 11.47
Top Discont. 10 0.225 10 1.09 6.72 6.72

I. A. Campbell Associates, Inc. Page 206 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 10 0.225 10 9.8 60.42 60.42
Top Cont. 10 0.225 10 0.8 4.93 4.93
Tie Bars 10 2 2.2 2.71 2.71

Top Discont. 12 0.25 10 1.252 11.12 11.12


Bottom - S 12 0.25 3 1.2 3.20 3.20
Bottom - L 12 0.25 7 3 18.64 18.64
Top Cont. 12 0.25
Tie Bars 10 2 2.35 2.90 2.90
Top Discont. 12 0.25 10 1.252 11.12 11.12
Bottom - S 12 0.25 3 1.175 3.13 3.13
Bottom - L 12 0.25 7 2.95 18.33 18.33
Top Cont. 12 0.25 10 0.9 7.99 7.99

Top Discont. 12 0.25 19 1.252 21.12 105.60


Bottom - S 12 0.25 6 1.2 6.39 31.95
Bottom - L 12 0.25 13 3 34.62 173.10
Top Cont. 12 0.25
Tie Bars 10 2 4.7 5.80 29.00
Top Discont. 12 0.25 10 1.252 11.12 55.60
Bottom - S 12 0.25 3 2.35 6.26 31.30
Bottom - L 12 0.25 7 5.3 32.94 164.70
Top Cont. 12 0.25 10 0.9 7.99 39.95

I. A. Campbell Associates, Inc. Page 207 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.25 22 1.352 26.41 52.82
Bottom - S 12 0.25 7 1.4 8.70 17.40
Bottom - L 12 0.25 15 3.4 45.28 90.56
Top Cont. 12 0.25
Tie Bars 10 2 5.3 6.53 13.06
Top Discont. 12 0.25 12 1.352 14.40 28.80
Bottom - S 12 0.25 4 2.65 9.41 18.82
Bottom - L 12 0.25 8 5.9 41.90 83.80
Top Cont. 12 0.25 12 1 10.65 21.30

Top Discont. 12 0
Bottom 12 0.25 40 3.6 127.84 1,022.72
Top Cont. 12 0.175 114 2.825 285.92 2,287.36
Tie Bars 10 2 9.9 12.21 97.68
Top Discont. 10 0.3 10 1.265 7.80 62.40
Bottom 10 0.3 10 10.4 64.12 512.96
Top Cont. 10 0.3 10 0.975 6.01 48.08
Tie Bars 10 2 2.9 3.58 28.64

Top Discont. 12 0
Bottom 12 0.25 36 3.6 115.06 230.12
Top Cont. 12 0.175 104 2.6 240.06 480.12
Tie Bars 10 2 9 11.10 22.20
Top Discont. 10 0.3 10 1.265 7.80 15.60
Bottom 10 0.3 10 9.5 58.57 117.14

I. A. Campbell Associates, Inc. Page 208 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 10 0.975 6.01 12.02
Tie Bars 10 2 2.9 3.58 7.16

Top Discont. 12 0
Bottom 12 0.25 40 3.6 127.84 1,022.72
Top Cont. 12 0.175 114 2.825 285.92 2,287.36
Tie Bars 10 2 9.9 12.21 97.68
Top Discont. 10 0.3 10 1.265 7.80 62.40
Bottom 10 0.3 10 10.4 64.12 512.96
Top Cont. 10 0.3 10 0.975 6.01 48.08
Tie Bars 10 2 2.9 3.58 28.64

Top Discont. 12 0
Bottom 12 0.25 36 3.6 115.06 230.12
Top Cont. 12 0.175 104 2.6 240.06 480.12
Tie Bars 10 2 9 11.10 22.20
Top Discont. 10 0.3 10 1.265 7.80 15.60
Bottom 10 0.3 10 9.5 58.57 117.14
Top Cont. 10 0.3 10 0.975 6.01 12.02
Tie Bars 10 2 2.9 3.58 7.16

Top Discont. 12 0
Bottom 12 0.25 24 3.6 76.71 76.71
Top Cont. 12 0.175 68 1.825 110.18 110.18

I. A. Campbell Associates, Inc. Page 209 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 5.9 7.27 7.27
Top Discont. 10 0.3 10 1.265 7.80 7.80
Bottom 10 0.3 10 6.4 39.46 39.46
Top Cont. 10 0.3 10 0.975 6.01 6.01
Tie Bars 10 2 2.9 3.58 3.58

Top Discont. 12 0.3 20 2.227 39.54 39.54


Bottom 12 0.3 20 3.4 60.37 60.37
Top Cont. 12 0.225 54 1.825 87.49 87.49
Tie Bars 10 2 5.9 7.27 7.27
Top Discont. 10 0.275 10 1.215 7.49 7.49
Bottom 10 0.275 10 6.4 39.46 39.46
Top Cont. 10 0.275 10 0.925 5.70 5.70
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.3 33 3.227 94.54 189.08


Bottom 12 0.3 33 3.4 99.61 199.22
Top Cont. 12 0.225 88 2.825 220.71 441.42
Tie Bars 10 2 9.9 12.21 24.42
Top Discont. 10 0.275 10 1.215 7.49 14.98
Bottom 10 0.275 10 10.4 64.12 128.24
Top Cont. 10 0.275 10 0.925 5.70 11.40
Tie Bars 10 2 2.7 3.33 6.66

I. A. Campbell Associates, Inc. Page 210 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.25 19 1.352 22.81 45.62
Bottom - S 12 0.25 6 1.4 7.46 14.92
Bottom - L 12 0.25 13 3.4 39.24 78.48
Top Cont. 12 0.225
Tie Bars 10 2 4.7 5.80 11.60
Top Discont. 12 0.25 12 1.352 14.40 28.80
Bottom - S 12 0.25 4 2.35 8.35 16.70
Bottom - L 12 0.25 8 5.3 37.64 75.28
Top Cont. 12 0.25 12 1 10.65 21.30

Top Discont. 12 0
Bottom 12 0.3 33 3.6 105.47 632.82
Top Cont. 12 0.275 72 2.825 180.58 1,083.48
Tie Bars 10 2 9.9 12.21 73.26
Top Discont. 10 0.3 10 1.265 7.80 46.80
Bottom 10 0.3 10 10.4 64.12 384.72
Top Cont. 10 0.3 10 0.975 6.01 36.06
Tie Bars 10 2 2.9 3.58 21.48

Top Discont. 12 0
Bottom 12 0.3 33 2.8 82.03 164.06
Top Cont. 12 0.3 66 2.825 165.53 331.06
Tie Bars 10 2 9.9 12.21 24.42
Top Discont. 10 0.3 7 1.065 4.60 9.20
Bottom 10 0.3 7 10.4 44.88 89.76

I. A. Campbell Associates, Inc. Page 211 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 7 0.775 3.34 6.68
Tie Bars 10 2 2.1 2.59 5.18

Top Discont. 12 0.3 33 3.227 94.54 189.08


Bottom 12 0.3 33 3.4 99.61 199.22
Top Cont. 12 0.275 72 2.825 180.58 361.16
Tie Bars 10 2 9.9 12.21 24.42
Top Discont. 10 0.3 9 1.215 6.74 13.48
Bottom 10 0.3 9 10.4 57.70 115.40
Top Cont. 10 0.3 9 0.925 5.13 10.26
Tie Bars 10 2 2.7 3.33 6.66

Top Discont. 12 0.25 20 1.552 27.56 27.56


Bottom - S 12 0.25 7 1.8 11.19 11.19
Bottom - L 12 0.25 13 4.2 48.47 48.47
Top Cont. 12 0.1
Tie Bars 10 2 4.85 5.98 5.98
Top Discont. 12 0.25 15 1.552 20.67 20.67
Bottom - S 12 0.2 6 2.425 12.92 12.92
Bottom - L 12 0.2 12 5.45 58.06 58.06
Top Cont. 12 0.1 36 1.2 38.35 38.35

Top Discont. 12 0.3 17 1.977 29.84 29.84


Bottom 12 0.3 17 3.35 50.56 50.56

I. A. Campbell Associates, Inc. Page 212 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.275 36 1.575 50.34 50.34
Tie Bars 10 2 4.9 6.04 6.04
Top Discont. 10 0.3 9 1.2025 6.67 6.67
Bottom 10 0.3 9 5.4 29.96 29.96
Top Cont. 10 0.3 9 0.9125 5.06 5.06
Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0.25 40 1.552 55.11 55.11


Bottom - S 12 0.15 22 1.8 35.16 35.16
Bottom - L 12 0.15 44 4.2 164.07 164.07
Top Cont. 12 0.1
Tie Bars 10 2 9.9 12.21 12.21
Top Discont. 12 0.25 15 1.552 20.67 20.67
Bottom - S 12 0.25 5 4.95 21.97 21.97
Bottom - L 12 0.25 10 10.5 93.22 93.22
Top Cont. 12 0.225 16 1.2 17.05 17.05

Top Discont. 12 0.3 12 1.627 17.33 17.33


Bottom 12 0.3 12 4.6 49.01 49.01
Top Cont. 12 0.15 48 1.225 52.20 52.20
Tie Bars 10 2 3.5 4.32 4.32
Top Discont. 10 0.3 13 1.515 12.14 12.14
Bottom 10 0.3 13 4 32.06 32.06
Top Cont. 10 0.3 13 1.225 9.82 9.82
Tie Bars 10 2 3.9 4.81 4.81

I. A. Campbell Associates, Inc. Page 213 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0
Bottom 12 0.225 24 3.97 84.59 84.59
Top Cont. 12 0.15 72 1.675 107.07 107.07
Tie Bars 10 2 5.3 6.53 6.53
Top Discont. 10 0.3 11 1.3575 9.21 9.21
Bottom 10 0.3 11 5.8 39.33 39.33
Top Cont. 10 0.3 11 1.0675 7.24 7.24
Tie Bars 10 2 3.27 4.03 4.03

118,070.44

Top Discont. 12 0.25 19 1.517 25.59 76.77


Bottom - S 12 0.25 6 1.73 9.22 27.66
Bottom - L 12 0.25 13 4.06 46.86 140.58
Top Cont. 12 0.175
Tie Bars 10 2 4.7 5.80 17.40
Top Discont. 12 0.25 14 1.317 16.37 49.11
Bottom - S 12 0.25 5 2.35 10.43 31.29
Bottom - L 12 0.25 9 5.1 40.75 122.25
Top Cont. 12 0.25 14 1.065 13.24 39.72

Top Discont. 12 0

I. A. Campbell Associates, Inc. Page 214 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 12 0.3 34 4.06 122.55 245.10
Top Cont. 12 0.2 100 2.8 248.58 497.16
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.225 16 1.305 12.87 25.74
Bottom 10 0.225 16 10.4 102.59 205.18
Top Cont. 10 0.225 16 1.065 10.51 21.02
Tie Bars 10 2 3.46 4.27 8.54

Top Discont. 12 0
Bottom 12 0.3 31 4.06 111.74 111.74
Top Cont. 12 0.2 92 2.575 210.32 210.32
Tie Bars 10 2 9.1 11.22 11.22
Top Discont. 10 0.225 16 1.305 12.87 12.87
Bottom 10 0.225 16 9.5 93.71 93.71
Top Cont. 10 0.225 16 1.065 10.51 10.51
Tie Bars 10 2 3.46 4.27 4.27

Top Discont. 12 0
Bottom 12 0.3 17 4.06 61.28 61.28
Top Cont. 12 0.2 50 1.55 68.80 68.80
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.225 16 1.305 12.87 12.87
Bottom 10 0.225 16 5.4 53.27 53.27
Top Cont. 10 0.225 16 1.065 10.51 10.51

I. A. Campbell Associates, Inc. Page 215 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 3.46 4.27 4.27

Top Discont. 12 0
Bottom 12 0.3 34 4.06 122.55 1,470.60
Top Cont. 12 0.2 100 2.8 248.58 2,982.96
Tie Bars 10 2 10 12.33 147.96
Top Discont. 10 0.275 13 1.305 10.46 125.52
Bottom 10 0.275 13 10.4 83.35 1,000.20
Top Cont. 10 0.275 13 1.065 8.54 102.48
Tie Bars 10 2 3.46 4.27 51.24

Top Discont. 12 0
Bottom 12 0.3 31 4.06 111.74 223.48
Top Cont. 12 0.2 92 2.575 210.32 420.64
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 13 1.305 10.46 20.92
Bottom 10 0.275 13 9.5 76.14 152.28
Top Cont. 10 0.275 13 1.065 8.54 17.08
Tie Bars 10 2 3.46 4.27 8.54

Top Discont. 12 0.25 19 1.327 22.38 201.42


Bottom - S 12 0.25 6 1.35 7.19 64.71
Bottom - L 12 0.25 13 3.3 38.09 342.81

I. A. Campbell Associates, Inc. Page 216 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.175
Tie Bars 10 2 4.7 5.80 52.20
Top Discont. 12 0.25 11 1.127 11.01 99.09
Bottom - S 12 0.25 4 2.35 8.35 75.15
Bottom - L 12 0.25 7 5.1 31.69 285.21
Top Cont. 12 0.25 11 0.875 8.55 76.95

Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 4,781.28
Top Cont. 12 0.25 80 2.8 198.87 9,545.76
Tie Bars 10 2 10 12.33 591.84
Top Discont. 10 0.3 9 1.115 6.19 297.12
Bottom 10 0.3 9 10.4 57.70 2,769.60
Top Cont. 10 0.3 9 0.875 4.85 232.80
Tie Bars 10 2 2.7 3.33 159.84

Top Discont. 12 0
Bottom 12 0.3 31 3.3 90.82 726.56
Top Cont. 12 0.25 74 2.575 169.17 1,353.36
Tie Bars 10 2 9.1 11.22 89.76
Top Discont. 10 0.3 9 1.115 6.19 49.52
Bottom 10 0.3 9 9.5 52.71 421.68
Top Cont. 10 0.3 9 0.875 4.85 38.80
Tie Bars 10 2 2.7 3.33 26.64

I. A. Campbell Associates, Inc. Page 217 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0
Bottom 12 0.3 24 3.3 70.31 70.31
Top Cont. 12 0.25 56 2.05 101.92 101.92
Tie Bars 10 2 7 8.63 8.63
Top Discont. 10 0.3 9 1.115 6.19 6.19
Bottom 10 0.3 9 7.4 41.06 41.06
Top Cont. 10 0.3 9 0.875 4.85 4.85
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0
Bottom 12 0.3 17 3.3 49.81 49.81
Top Cont. 12 0.25 40 1.55 55.04 55.04
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.3 9 1.115 6.19 6.19
Bottom 10 0.3 9 5.4 29.96 29.96
Top Cont. 10 0.3 9 0.875 4.85 4.85
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.25 19 1.327 22.38 201.42


Bottom - S 12 0.25 6 1.35 7.19 64.71
Bottom - L 12 0.25 13 3.3 38.09 342.81
Top Cont. 12 0.25

I. A. Campbell Associates, Inc. Page 218 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 4.7 5.80 52.20
Top Discont. 12 0.25 11 1.127 11.01 99.09
Bottom - S 12 0.25 4 2.35 8.35 75.15
Bottom - L 12 0.25 7 5.1 31.69 285.21
Top Cont. 12 0.25 11 0.875 8.55 76.95

Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 4,183.62
Top Cont. 12 0.25 80 2.8 198.87 8,352.54
Tie Bars 10 2 10 12.33 517.86
Top Discont. 10 0.3 9 1.115 6.19 259.98
Bottom 10 0.3 9 10.4 57.70 2,423.40
Top Cont. 10 0.3 9 0.875 4.85 203.70
Tie Bars 10 2 2.7 3.33 139.86

Top Discont. 12 0
Bottom 12 0.3 20 3.3 58.59 175.77
Top Cont. 12 0.25 48 1.8 76.71 230.13
Tie Bars 10 2 6 7.40 22.20
Top Discont. 10 0.3 9 1.115 6.19 18.57
Bottom 10 0.3 9 6.4 35.51 106.53
Top Cont. 10 0.3 9 0.875 4.85 14.55
Tie Bars 10 2 2.7 3.33 9.99

I. A. Campbell Associates, Inc. Page 219 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0
Bottom 12 0.3 17 3.3 49.81 49.81
Top Cont. 12 0.25 40 1.55 55.04 55.04
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.3 9 1.115 6.19 6.19
Bottom 10 0.3 9 5.4 29.96 29.96
Top Cont. 10 0.3 9 0.875 4.85 4.85
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.25 19 1.327 22.38 67.14


Bottom - S 12 0.25 6 1.35 7.19 21.57
Bottom - L 12 0.25 13 3.3 38.09 114.27
Top Cont. 12 0.25
Tie Bars 10 2 4.55 5.61 16.83
Top Discont. 12 0.25 11 1.127 11.01 33.03
Bottom - S 12 0.25 4 2.275 8.08 24.24
Bottom - L 12 0.25 7 4.95 30.76 92.28
Top Cont. 12 0.25 11 0.875 8.55 25.65

Top Discont. 12 0.25 24 1.327 28.27 28.27


Bottom - S 12 0.25 8 1.35 9.59 9.59
Bottom - L 12 0.25 16 3.3 46.88 46.88
Top Cont. 12 0.25

I. A. Campbell Associates, Inc. Page 220 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 6 7.40 7.40
Top Discont. 12 0.25 11 1.127 11.01 11.01
Bottom - S 12 0.25 4 3 10.65 10.65
Bottom - L 12 0.25 7 6.4 39.77 39.77
Top Cont. 12 0

Top Discont. 12 0.3 34 3.152 95.14 190.28


Bottom 12 0.3 34 3.3 99.61 199.22
Top Cont. 12 0.225 90 2.8 223.73 447.46
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.275 10 1.115 6.87 13.74
Bottom 10 0.275 10 10.4 64.12 128.24
Top Cont. 10 0.275 10 0.875 5.39 10.78
Tie Bars 10 2 2.7 3.33 6.66

Top Discont. 12 0.3 23 2.327 47.52 47.52


Bottom 12 0.3 23 3.3 67.38 67.38
Top Cont. 12 0.225 60 1.975 105.20 105.20
Tie Bars 10 2 6.7 8.26 8.26
Top Discont. 10 0.275 10 1.115 6.87 6.87
Bottom 10 0.275 10 7.1 43.77 43.77
Top Cont. 10 0.275 10 0.875 5.39 5.39
Tie Bars 10 2 2.7 3.33 3.33

I. A. Campbell Associates, Inc. Page 221 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0
Bottom 12 0.3 23 3.3 67.38 336.90
Top Cont. 12 0.25 54 1.975 94.68 473.40
Tie Bars 10 2 6.7 8.26 41.30
Top Discont. 10 0.3 9 1.115 6.19 30.95
Bottom 10 0.3 9 7.1 39.39 196.95
Top Cont. 10 0.3 9 0.875 4.85 24.25
Tie Bars 10 2 2.7 3.33 16.65

Top Discont. 12 0
Bottom 12 0.3 23 3.85 78.61 157.22
Top Cont. 12 0.225 60 1.975 105.20 210.40
Tie Bars 10 2 6.7 8.26 16.52
Top Discont. 10 0.275 12 1.2525 9.27 18.54
Bottom 10 0.275 12 7.1 52.53 105.06
Top Cont. 10 0.275 12 1.0125 7.49 14.98
Tie Bars 10 2 3.25 4.01 8.02

Top Discont. 12 0.25 19 1.4645 24.70 49.40


Bottom - S 12 0.25 6 1.625 8.66 17.32
Bottom - L 12 0.25 13 3.85 44.43 88.86
Top Cont. 12 0.225
Tie Bars 10 2 4.7 5.80 11.60

I. A. Campbell Associates, Inc. Page 222 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.25 13 1.2645 14.59 29.18
Bottom - S 12 0.25 4 2.35 8.35 16.70
Bottom - L 12 0.25 9 5.1 40.75 81.50
Top Cont. 12 0.25 13 1.0125 11.69 23.38

Top Discont. 12 0
Bottom 12 0.3 34 3.85 116.21 2,091.78
Top Cont. 12 0.225 90 2.8 223.73 4,027.14
Tie Bars 10 2 10 12.33 221.94
Top Discont. 10 0.275 12 1.2525 9.27 166.86
Bottom 10 0.275 12 10.4 76.94 1,384.92
Top Cont. 10 0.275 12 1.0125 7.49 134.82
Tie Bars 10 2 3.25 4.01 72.18

Top Discont. 12 0
Bottom 12 0.3 31 3.85 105.96 423.84
Top Cont. 12 0.225 82 2.575 187.46 749.84
Tie Bars 10 2 9.1 11.22 44.88
Top Discont. 10 0.275 12 1.2525 9.27 37.08
Bottom 10 0.275 12 9.5 70.28 281.12
Top Cont. 10 0.275 12 1.0125 7.49 29.96
Tie Bars 10 2 3.25 4.01 16.04

I. A. Campbell Associates, Inc. Page 223 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0
Bottom 12 0.3 23 3.85 78.61 78.61
Top Cont. 12 0.225 60 1.975 105.20 105.20
Tie Bars 10 2 6.7 8.26 8.26
Top Discont. 10 0.275 12 1.2525 9.27 9.27
Bottom 10 0.275 12 7.1 52.53 52.53
Top Cont. 10 0.275 12 1.0125 7.49 7.49
Tie Bars 10 2 3.25 4.01 4.01

Top Discont. 12 0.25 19 1.427 24.07 48.14


Bottom - S 12 0.25 6 1.55 8.26 16.52
Bottom - L 12 0.25 13 3.7 42.70 85.40
Top Cont. 12 0.225
Tie Bars 10 2 4.7 5.80 11.60
Top Discont. 12 0.25 13 1.227 14.16 28.32
Bottom - S 12 0.25 4 2.35 8.35 16.70
Bottom - L 12 0.25 9 5.1 40.75 81.50
Top Cont. 12 0.25 13 0.975 11.25 22.50

Top Discont. 12 0.25 19 1.427 24.07 48.14


Bottom - S 12 0.25 6 1.55 8.26 16.52
Bottom - L 12 0.25 13 3.7 42.70 85.40
Top Cont. 12 0.225
Tie Bars 10 2 4.7 5.80 11.60

I. A. Campbell Associates, Inc. Page 224 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.25 13 1.227 14.16 28.32
Bottom - S 12 0.25 4 2.35 8.35 16.70
Bottom - L 12 0.25 9 5.1 40.75 81.50
Top Cont. 12 0.25 13 0.975 11.25 22.50

Top Discont. 12 0.3 23 2.327 47.52 47.52


Bottom 12 0.3 23 3.7 75.55 75.55
Top Cont. 12 0.225 60 1.975 105.20 105.20
Tie Bars 10 2 6.7 8.26 8.26
Top Discont. 10 0.275 12 1.215 8.99 8.99
Bottom 10 0.275 12 7.1 52.53 52.53
Top Cont. 10 0.275 12 0.975 7.21 7.21
Tie Bars 10 2 3.1 3.82 3.82

Top Discont. 12 0.3 34 3.152 95.14 190.28


Bottom 12 0.3 34 3.7 111.69 223.38
Top Cont. 12 0.225 90 2.8 223.73 447.46
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.275 12 1.215 8.99 17.98
Bottom 10 0.275 12 10.4 76.94 153.88
Top Cont. 10 0.275 12 0.975 7.21 14.42
Tie Bars 10 2 3.1 3.82 7.64

I. A. Campbell Associates, Inc. Page 225 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0
Bottom 12 0.3 34 3.7 111.69 670.14
Top Cont. 12 0.275 74 2.8 183.95 1,103.70
Tie Bars 10 2 10 12.33 73.98
Top Discont. 10 0.3 11 1.215 8.24 49.44
Bottom 10 0.3 11 10.4 70.53 423.18
Top Cont. 10 0.3 11 0.975 6.61 39.66
Tie Bars 10 2 3.1 3.82 22.92

Top Discont. 12 0.25 37 1.3145 43.18 43.18


Bottom - S 12 0.25 12 1.325 14.12 14.12
Bottom - L 12 0.25 25 3.25 72.13 72.13
Top Cont. 12 0.25
Tie Bars 10 2 9.1 11.22 11.22
Top Discont. 12 0.25 11 1.1145 10.88 10.88
Bottom - S 12 0.25 4 4.55 16.16 16.16
Bottom - L 12 0.25 7 9.5 59.04 59.04
Top Cont. 12 0.25 11 0.8625 8.42 8.42

Top Discont. 12 0.25 28 1.3145 32.68 32.68


Bottom - S 12 0.25 9 1.325 10.59 10.59
Bottom - L 12 0.25 19 3.25 54.82 54.82
Top Cont. 12 0.25
Tie Bars 10 2 6.8 8.38 8.38

I. A. Campbell Associates, Inc. Page 226 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.25 11 1.1145 10.88 10.88
Bottom - S 12 0.25 4 3.4 12.07 12.07
Bottom - L 12 0.25 7 7.2 44.75 44.75
Top Cont. 12 0

Top Discont. 12 0
Bottom 12 0.3 34 3.1 93.57 93.57
Top Cont. 12 0.3 68 2.8 169.04 169.04
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 10.4 57.70 57.70
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

Top Discont. 12 0
Bottom 12 0.3 25 3.1 68.80 68.80
Top Cont. 12 0.3 50 2.175 96.55 96.55
Tie Bars 10 2 7.5 9.25 9.25
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 7.9 43.83 43.83
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

I. A. Campbell Associates, Inc. Page 227 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0
Bottom 12 0.3 22 3.1 60.55 60.55
Top Cont. 12 0.3 44 1.95 76.17 76.17
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 7 38.84 38.84
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

Top Discont. 12 0.3 34 3.152 95.14 95.14


Bottom 12 0.3 34 3.1 93.57 93.57
Top Cont. 12 0.225 90 2.8 223.73 223.73
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.275 9 1.065 5.91 5.91
Bottom 10 0.275 9 10.4 57.70 57.70
Top Cont. 10 0.275 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

Top Discont. 12 0.3 25 2.527 56.09 56.09


Bottom 12 0.3 25 3.1 68.80 68.80
Top Cont. 12 0.225 68 2.175 131.31 131.31
Tie Bars 10 2 7.5 9.25 9.25
Top Discont. 10 0.275 9 1.065 5.91 5.91
Bottom 10 0.275 9 7.9 43.83 43.83

I. A. Campbell Associates, Inc. Page 228 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.275 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

Top Discont. 12 0.3 22 2.302 44.96 44.96


Bottom 12 0.3 22 3.1 60.55 60.55
Top Cont. 12 0.225 60 1.95 103.87 103.87
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.275 9 1.065 5.91 5.91
Bottom 10 0.275 9 7 38.84 38.84
Top Cont. 10 0.275 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

70,076.63

Top Discont. 12 0.25 19 1.517 25.59 76.77


Bottom - S 12 0.25 6 1.73 9.22 27.66
Bottom - L 12 0.25 13 4.06 46.86 140.58
Top Cont. 12 0.175
Tie Bars 10 2 4.7 5.80 17.40
Top Discont. 12 0.25 14 1.317 16.37 49.11
Bottom - S 12 0.25 5 2.35 10.43 31.29
Bottom - L 12 0.25 9 5.1 40.75 122.25
Top Cont. 12 0.25 14 1.065 13.24 39.72

I. A. Campbell Associates, Inc. Page 229 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.3 34 3.152 95.14 190.28


Bottom 12 0.3 34 4.06 122.55 245.10
Top Cont. 12 0.2 100 2.8 248.58 497.16
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.225 16 1.305 12.87 25.74
Bottom 10 0.225 16 10.4 102.59 205.18
Top Cont. 10 0.225 16 1.065 10.51 21.02
Tie Bars 10 2 3.46 4.27 8.54

Top Discont. 12 0.3 17 1.902 28.71 28.71


Bottom 12 0.3 17 4.06 61.28 61.28
Top Cont. 12 0.2 50 1.55 68.80 68.80
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.225 16 1.305 12.87 12.87
Bottom 10 0.225 16 5.4 53.27 53.27
Top Cont. 10 0.225 16 1.065 10.51 10.51
Tie Bars 10 2 3.46 4.27 4.27

Top Discont. 12 0.3 31 2.927 80.56 80.56


Bottom 12 0.3 31 4.06 111.74 111.74
Top Cont. 12 0.2 92 2.575 210.32 210.32
Tie Bars 10 2 9.1 11.22 11.22
Top Discont. 10 0.225 16 1.305 12.87 12.87

I. A. Campbell Associates, Inc. Page 230 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 10 0.225 16 9.5 93.71 93.71
Top Cont. 10 0.225 16 1.065 10.51 10.51
Tie Bars 10 2 3.46 4.27 4.27

Top Discont. 12 0
Bottom 12 0.3 34 4.06 122.55 1,225.50
Top Cont. 12 0.2 100 2.8 248.58 2,485.80
Tie Bars 10 2 10 12.33 123.30
Top Discont. 10 0.275 13 1.305 10.46 104.60
Bottom 10 0.275 13 10.4 83.35 833.50
Top Cont. 10 0.275 13 1.065 8.54 85.40
Tie Bars 10 2 3.46 4.27 42.70

Top Discont. 12 0
Bottom 12 0.3 34 4.06 122.55 367.65
Top Cont. 12 0.25 80 2.8 198.87 596.61
Tie Bars 10 2 10 12.33 36.99
Top Discont. 10 0.3 12 1.305 9.65 28.95
Bottom 10 0.3 12 10.4 76.94 230.82
Top Cont. 10 0.3 12 1.065 7.88 23.64
Tie Bars 10 2 3.46 4.27 12.81

Top Discont. 12 0.25 19 1.327 22.38 246.18

I. A. Campbell Associates, Inc. Page 231 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom - S 12 0.25 6 1.35 7.19 79.09
Bottom - L 12 0.25 13 3.3 38.09 418.99
Top Cont. 12 0.175
Tie Bars 10 2 4.7 5.80 63.80
Top Discont. 12 0.25 11 1.127 11.01 121.11
Bottom - S 12 0.25 4 2.35 8.35 91.85
Bottom - L 12 0.25 7 5.1 31.69 348.59
Top Cont. 12 0.25 11 0.875 8.55 94.05

Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 1,792.98
Top Cont. 12 0.25 80 2.8 198.87 3,579.66
Tie Bars 10 2 10 12.33 221.94
Top Discont. 10 0.3 9 1.115 6.19 111.42
Bottom 10 0.3 9 10.4 57.70 1,038.60
Top Cont. 10 0.3 9 0.875 4.85 87.30
Tie Bars 10 2 2.7 3.33 59.94

Top Discont. 12 0
Bottom 12 0.3 31 3.3 90.82 272.46
Top Cont. 12 0.25 74 2.575 169.17 507.51
Tie Bars 10 2 9.1 11.22 33.66
Top Discont. 10 0.3 9 1.115 6.19 18.57
Bottom 10 0.3 9 9.5 52.71 158.13

I. A. Campbell Associates, Inc. Page 232 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 9 0.875 4.85 14.55
Tie Bars 10 2 2.7 3.33 9.99

Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 2,988.30
Top Cont. 12 0.25 80 2.8 198.87 5,966.10
Tie Bars 10 2 10 12.33 369.90
Top Discont. 10 0.3 9 1.115 6.19 185.70
Bottom 10 0.3 9 10.4 57.70 1,731.00
Top Cont. 10 0.3 9 0.875 4.85 145.50
Tie Bars 10 2 2.7 3.33 99.90

Top Discont. 12 0
Bottom 12 0.3 31 3.3 90.82 454.10
Top Cont. 12 0.25 74 2.575 169.17 845.85
Tie Bars 10 2 9.1 11.22 56.10
Top Discont. 10 0.3 9 1.115 6.19 30.95
Bottom 10 0.3 9 9.5 52.71 263.55
Top Cont. 10 0.3 9 0.875 4.85 24.25
Tie Bars 10 2 2.7 3.33 16.65

Top Discont. 12 0
Bottom 12 0.3 16 3.3 46.88 46.88

I. A. Campbell Associates, Inc. Page 233 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.25 38 1.4375 48.50 48.50
Tie Bars 10 2 4.55 5.61 5.61
Top Discont. 10 0.3 9 1.115 6.19 6.19
Bottom 10 0.3 9 4.95 27.47 27.47
Top Cont. 10 0.3 9 0.875 4.85 4.85
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0
Bottom 12 0.3 18 3.3 52.74 52.74
Top Cont. 12 0.25 44 1.625 63.48 63.48
Tie Bars 10 2 5.3 6.53 6.53
Top Discont. 10 0.3 9 1.115 6.19 6.19
Bottom 10 0.3 9 5.7 31.63 31.63
Top Cont. 10 0.3 9 0.875 4.85 4.85
Tie Bars 10 2 2.7 3.33 3.33

Top Discont. 12 0.25 20 1.327 23.56 23.56


Bottom - S 12 0.25 7 1.35 8.39 8.39
Bottom - L 12 0.25 13 3.3 38.09 38.09
Top Cont. 12 0.175
Tie Bars 10 2 5 6.17 6.17
Top Discont. 12 0.25 11 1.127 11.01 11.01
Bottom - S 12 0.25 4 2.5 8.88 8.88
Bottom - L 12 0.25 7 5.4 33.56 33.56

I. A. Campbell Associates, Inc. Page 234 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.25 11 0.875 8.55 8.55

Top Discont. 12 0.25 19 1.327 22.38 22.38


Bottom - S 12 0.25 6 1.35 7.19 7.19
Bottom - L 12 0.25 13 3.3 38.09 38.09
Top Cont. 12 0.25
Tie Bars 10 2 4.7 5.80 5.80
Top Discont. 12 0.25 11 1.127 11.01 11.01
Bottom - S 12 0.25 4 2.35 8.35 8.35
Bottom - L 12 0.25 7 5.1 31.69 31.69
Top Cont. 12 0.25 11 0.875 8.55 8.55

Top Discont. 12 0.3 29 2.827 72.78 72.78


Bottom 12 0.3 29 3.6 92.69 92.69
Top Cont. 12 0.225 78 2.475 171.39 171.39
Tie Bars 10 2 8.7 10.73 10.73
Top Discont. 10 0.275 11 1.19 8.07 8.07
Bottom 10 0.275 11 9.1 61.71 61.71
Top Cont. 10 0.275 11 0.95 6.44 6.44
Tie Bars 10 2 3 3.70 3.70

Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 3,884.79

I. A. Campbell Associates, Inc. Page 235 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.25 80 2.8 198.87 7,755.93
Tie Bars 10 2 10 12.33 480.87
Top Discont. 10 0.3 9 1.115 6.19 241.41
Bottom 10 0.3 9 10.4 57.70 2,250.30
Top Cont. 10 0.3 9 0.875 4.85 189.15
Tie Bars 10 2 2.7 3.33 129.87

Top Discont. 12 0
Bottom 12 0.3 31 3.3 90.82 272.46
Top Cont. 12 0.25 74 2.575 169.17 507.51
Tie Bars 10 2 9.1 11.22 33.66
Top Discont. 10 0.3 9 1.115 6.19 18.57
Bottom 10 0.3 9 9.5 52.71 158.13
Top Cont. 10 0.3 9 0.875 4.85 14.55
Tie Bars 10 2 2.7 3.33 9.99

Top Discont. 12 0
Bottom 12 0.3 20 3.3 58.59 175.77
Top Cont. 12 0.25 48 1.8 76.71 230.13
Tie Bars 10 2 6 7.40 22.20
Top Discont. 10 0.3 9 1.115 6.19 18.57
Bottom 10 0.3 9 6.4 35.51 106.53
Top Cont. 10 0.3 9 0.875 4.85 14.55
Tie Bars 10 2 2.7 3.33 9.99

I. A. Campbell Associates, Inc. Page 236 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.25 18 1.327 21.21 63.63


Bottom - S 12 0.25 6 1.35 7.19 21.57
Bottom - L 12 0.25 12 3.3 35.16 105.48
Top Cont. 12 0.25
Tie Bars 10 2 4.5 5.55 16.65
Top Discont. 12 0.25 11 1.127 11.01 33.03
Bottom - S 12 0.25 4 2.25 7.99 23.97
Bottom - L 12 0.25 7 4.9 30.45 91.35
Top Cont. 12 0.25 11 0.875 8.55 25.65

Top Discont. 12 0
Bottom 12 0.3 34 3.3 99.61 199.22
Top Cont. 12 0.225 90 2.8 223.73 447.46
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.275 10 1.115 6.87 13.74
Bottom 10 0.275 10 10.4 64.12 128.24
Top Cont. 10 0.275 10 0.875 5.39 10.78
Tie Bars 10 2 2.7 3.33 6.66

Top Discont. 12 0.25 14 1.777 22.09 22.09


Bottom - S 12 0.25 5 2.25 9.99 9.99
Bottom - L 12 0.25 9 5.1 40.75 40.75

I. A. Campbell Associates, Inc. Page 237 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.25
Tie Bars 10 2 3.5 4.32 4.32
Top Discont. 12 0.25 18 1.577 25.20 25.20
Bottom - S 12 0.25 6 1.75 9.32 9.32
Bottom - L 12 0.25 12 3.9 41.55 41.55
Top Cont. 12 0

Top Discont. 12 0
Bottom 12 0.3 23 3.3 67.38 336.90
Top Cont. 12 0.25 54 1.975 94.68 473.40
Tie Bars 10 2 6.7 8.26 41.30
Top Discont. 10 0.3 9 1.115 6.19 30.95
Bottom 10 0.3 9 7.1 39.39 196.95
Top Cont. 10 0.3 9 0.875 4.85 24.25
Tie Bars 10 2 2.7 3.33 16.65

Top Discont. 12 0.25 19 1.327 22.38 111.90


Bottom - S 12 0.25 6 1.35 7.19 35.95
Bottom - L 12 0.25 13 3.3 38.09 190.45
Top Cont. 12 0.25
Tie Bars 10 2 4.7 5.80 29.00
Top Discont. 12 0.25 11 1.127 11.01 55.05
Bottom - S 12 0.25 4 2.35 8.35 41.75
Bottom - L 12 0.25 7 5.1 31.69 158.45

I. A. Campbell Associates, Inc. Page 238 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.25 11 0.875 8.55 42.75

Top Discont. 12 0
Bottom 12 0.3 23 3.85 78.61 157.22
Top Cont. 12 0.25 54 1.975 94.68 189.36
Tie Bars 10 2 6.7 8.26 16.52
Top Discont. 10 0.275 12 1.2525 9.27 18.54
Bottom 10 0.275 12 7.1 52.53 105.06
Top Cont. 10 0.275 12 1.0125 7.49 14.98
Tie Bars 10 2 3.25 4.01 8.02

Top Discont. 12 0.25 19 1.4645 24.70 49.40


Bottom - S 12 0.25 6 1.625 8.66 17.32
Bottom - L 12 0.25 13 3.85 44.43 88.86
Top Cont. 12 0.225
Tie Bars 10 2 4.7 5.80 11.60
Top Discont. 12 0.25 13 1.2645 14.59 29.18
Bottom - S 12 0.25 4 2.35 8.35 16.70
Bottom - L 12 0.25 9 5.1 40.75 81.50
Top Cont. 12 0.25 13 1.0125 11.69 23.38

Top Discont. 12 0
Bottom 12 0.3 34 3.85 116.21 1,162.10

I. A. Campbell Associates, Inc. Page 239 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.225 90 2.8 223.73 2,237.30
Tie Bars 10 2 10 12.33 123.30
Top Discont. 10 0.275 12 1.2525 9.27 92.70
Bottom 10 0.275 12 10.4 76.94 769.40
Top Cont. 10 0.275 12 1.0125 7.49 74.90
Tie Bars 10 2 3.25 4.01 40.10

Top Discont. 12 0
Bottom 12 0.3 31 3.85 105.96 211.92
Top Cont. 12 0.225 82 2.575 187.46 374.92
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 12 1.2525 9.27 18.54
Bottom 10 0.275 12 9.5 70.28 140.56
Top Cont. 10 0.275 12 1.0125 7.49 14.98
Tie Bars 10 2 3.25 4.01 8.02

Top Discont. 12 0
Bottom 12 0.3 23 3.7 75.55 75.55
Top Cont. 12 0.225 60 1.975 105.20 105.20
Tie Bars 10 2 6.7 8.26 8.26
Top Discont. 10 0.275 12 1.215 8.99 8.99
Bottom 10 0.275 12 7.1 52.53 52.53
Top Cont. 10 0.275 12 0.975 7.21 7.21
Tie Bars 10 2 3.1 3.82 3.82

I. A. Campbell Associates, Inc. Page 240 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0
Bottom 12 0.3 23 3.7 75.55 75.55
Top Cont. 12 0.25 54 1.975 94.68 94.68
Tie Bars 10 2 6.7 8.26 8.26
Top Discont. 10 0.275 12 1.215 8.99 8.99
Bottom 10 0.275 12 7.1 52.53 52.53
Top Cont. 10 0.275 12 0.975 7.21 7.21
Tie Bars 10 2 3.1 3.82 3.82

Top Discont. 12 0.25 19 1.427 24.07 48.14


Bottom - S 12 0.25 6 1.55 8.26 16.52
Bottom - L 12 0.25 13 3.7 42.70 85.40
Top Cont. 12 0.225
Tie Bars 10 2 4.7 5.80 11.60
Top Discont. 12 0.25 13 1.227 14.16 28.32
Bottom - S 12 0.25 4 2.35 8.35 16.70
Bottom - L 12 0.25 9 5.1 40.75 81.50
Top Cont. 12 0.25 13 0.975 11.25 22.50

Top Discont. 12 0
Bottom 12 0.3 34 3.7 111.69 893.52
Top Cont. 12 0.225 90 2.8 223.73 1,789.84

I. A. Campbell Associates, Inc. Page 241 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 10 12.33 98.64
Top Discont. 10 0.275 12 1.215 8.99 71.92
Bottom 10 0.275 12 10.4 76.94 615.52
Top Cont. 10 0.275 12 0.975 7.21 57.68
Tie Bars 10 2 3.1 3.82 30.56

Top Discont. 12 0
Bottom 12 0.3 31 3.7 101.83 203.66
Top Cont. 12 0.225 82 2.575 187.46 374.92
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 12 1.215 8.99 17.98
Bottom 10 0.275 12 9.5 70.28 140.56
Top Cont. 10 0.275 12 0.975 7.21 14.42
Tie Bars 10 2 3.1 3.82 7.64

Top Discont. 12 0
Bottom 12 0.3 34 3.7 111.69 223.38
Top Cont. 12 0.25 80 2.8 198.87 397.74
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.275 12 1.215 8.99 17.98
Bottom 10 0.275 12 10.4 76.94 153.88
Top Cont. 10 0.275 12 0.975 7.21 14.42
Tie Bars 10 2 3.1 3.82 7.64

I. A. Campbell Associates, Inc. Page 242 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0
Bottom 12 0.3 34 3.25 98.10 588.60
Top Cont. 12 0.275 74 2.8 183.95 1,103.70
Tie Bars 10 2 10 12.33 73.98
Top Discont. 10 0.3 9 1.1025 6.12 36.72
Bottom 10 0.3 9 10.4 57.70 346.20
Top Cont. 10 0.3 9 0.8625 4.79 28.74
Tie Bars 10 2 2.65 3.27 19.62

Top Discont. 12 0.25 37 1.3145 43.18 43.18


Bottom - S 12 0.25 12 1.325 14.12 14.12
Bottom - L 12 0.25 25 3.25 72.13 72.13
Top Cont. 12 0.25
Tie Bars 10 2 9.1 11.22 11.22
Top Discont. 12 0.25 11 1.1145 10.88 10.88
Bottom - S 12 0.25 4 4.55 16.16 16.16
Bottom - L 12 0.25 7 9.5 59.04 59.04
Top Cont. 12 0.25 11 0.8625 8.42 8.42

Top Discont. 12 0.25 33 1.3145 38.51 38.51


Bottom - S 12 0.25 11 1.325 12.94 12.94
Bottom - L 12 0.25 22 3.25 63.48 63.48
Top Cont. 12 0.25

I. A. Campbell Associates, Inc. Page 243 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 8.1 9.99 9.99
Top Discont. 12 0.25 11 1.1145 10.88 10.88
Bottom - S 12 0.25 4 4.05 14.38 14.38
Bottom - L 12 0.25 7 8.5 52.82 52.82
Top Cont. 12 0

Top Discont. 12 0
Bottom 12 0.3 34 3.1 93.57 93.57
Top Cont. 12 0.3 68 2.8 169.04 169.04
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 10.4 57.70 57.70
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

Top Discont. 12 0
Bottom 12 0.3 22 3.1 60.55 60.55
Top Cont. 12 0.3 44 1.95 76.17 76.17
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 7 38.84 38.84
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

I. A. Campbell Associates, Inc. Page 244 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0
Bottom 12 0.3 8 3.1 22.02 22.02
Top Cont. 12 0.3 16 0.85 12.07 12.07
Tie Bars 10 2 2.2 2.71 2.71
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 2.6 14.43 14.43
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

Top Discont. 12 0
Bottom 12 0.3 34 3.1 93.57 93.57
Top Cont. 12 0.225 90 2.8 223.73 223.73
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 10.4 57.70 57.70
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

Top Discont. 12 0
Bottom 12 0.3 22 3.1 60.55 60.55
Top Cont. 12 0.225 60 1.95 103.87 103.87
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.3 9 1.065 5.91 5.91

I. A. Campbell Associates, Inc. Page 245 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 10 0.3 9 7 38.84 38.84
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

Top Discont. 12 0
Bottom 12 0.3 11 3.1 30.27 30.27
Top Cont. 12 0.225 30 1.125 29.96 29.96
Tie Bars 10 2 3.3 4.07 4.07
Top Discont. 10 0.3 9 1.065 5.91 5.91
Bottom 10 0.3 9 3.7 20.53 20.53
Top Cont. 10 0.3 9 0.825 4.58 4.58
Tie Bars 10 2 2.5 3.08 3.08

68,025.69

Top Discont. 16 0.25 19 1.616 48.46 145.38


Bottom - S 16 0.25 6 1.68 15.91 47.73
Bottom - L 16 0.25 13 4.06 83.30 249.90
Top Cont. 16 0.175
Tie Bars 10 2 4.6 5.67 17.01
Top Discont. 16 0.25 14 1.416 31.29 93.87
Bottom - S 16 0.25 5 2.3 18.15 54.45
Bottom - L 16 0.25 9 5.1 72.44 217.32
Top Cont. 16 0.25 14 1.09 24.08 72.24

I. A. Campbell Associates, Inc. Page 246 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.3 34 3.252 98.16 294.48


Bottom 12 0.175 57 4.06 205.45 616.35
Top Cont. 12 0.125 160 2.85 404.84 1,214.52
Tie Bars 10 2 10 12.33 36.99
Top Discont. 10 0.275 13 1.38 11.06 33.18
Bottom 10 0.275 13 10.5 84.15 252.45
Top Cont. 10 0.275 13 1.09 8.74 26.22
Tie Bars 10 2 3.36 4.14 12.42

Top Discont. 12 0.3 31 3.027 83.31 83.31


Bottom 12 0.175 52 4.06 187.43 187.43
Top Cont. 12 0.125 146 2.625 340.25 340.25
Tie Bars 10 2 9.1 11.22 11.22
Top Discont. 10 0.275 13 1.38 11.06 11.06
Bottom 10 0.275 13 9.6 76.94 76.94
Top Cont. 10 0.275 13 1.09 8.74 8.74
Tie Bars 10 2 3.36 4.14 4.14

Top Discont. 12 0.3 17 2.002 30.22 30.22


Bottom 12 0.175 29 4.06 104.53 104.53
Top Cont. 12 0.125 80 1.6 113.64 113.64
Tie Bars 10 2 5 6.17 6.17

I. A. Campbell Associates, Inc. Page 247 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 10 0.275 13 1.38 11.06 11.06
Bottom 10 0.275 13 5.5 44.08 44.08
Top Cont. 10 0.275 13 1.09 8.74 8.74
Tie Bars 10 2 3.36 4.14 4.14

Top Discont. 12 0
Bottom 12 0.2 50 4.06 180.22 2,162.64
Top Cont. 12 0.125 160 2.85 404.84 4,858.08
Tie Bars 10 2 10 12.33 147.96
Top Discont. 10 0.275 13 1.38 11.06 132.72
Bottom 10 0.275 13 10.5 84.15 1,009.80
Top Cont. 10 0.275 13 1.09 8.74 104.88
Tie Bars 10 2 3.36 4.14 49.68

Top Discont. 12 0
Bottom 12 0.2 46 4.06 165.81 331.62
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 13 1.38 11.06 22.12
Bottom 10 0.275 13 9.6 76.94 153.88
Top Cont. 10 0.275 13 1.09 8.74 17.48
Tie Bars 10 2 3.36 4.14 8.28

I. A. Campbell Associates, Inc. Page 248 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 16 0.25 19 1.426 42.76 513.12
Bottom - S 16 0.25 6 1.3 12.31 147.72
Bottom - L 16 0.25 13 3.3 67.71 812.52
Top Cont. 16 0.175
Tie Bars 10 2 4.6 5.67 68.04
Top Discont. 16 0.25 11 1.226 21.28 255.36
Bottom - S 16 0.25 4 2.3 14.52 174.24
Bottom - L 16 0.25 7 5.1 56.35 676.20
Top Cont. 16 0.25 11 0.9 15.63 187.56

Top Discont. 12 0
Bottom 12 0.225 45 3.3 131.84 2,373.12
Top Cont. 12 0.15 134 2.85 339.05 6,102.90
Tie Bars 10 2 10 12.33 221.94
Top Discont. 10 0.3 9 1.19 6.60 118.80
Bottom 10 0.3 9 10.5 58.26 1,048.68
Top Cont. 10 0.3 9 0.9 4.99 89.82
Tie Bars 10 2 2.6 3.21 57.78

Top Discont. 12 0
Bottom 12 0.225 41 3.3 120.12 360.36
Top Cont. 12 0.15 122 2.625 284.32 852.96
Tie Bars 10 2 9.1 11.22 33.66
Top Discont. 10 0.3 9 1.19 6.60 19.80

I. A. Campbell Associates, Inc. Page 249 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 10 0.3 9 9.6 53.27 159.81
Top Cont. 10 0.3 9 0.9 4.99 14.97
Tie Bars 10 2 2.6 3.21 9.63

Top Discont. 12 0
Bottom 12 0.225 34 3.3 99.61 99.61
Top Cont. 12 0.15 100 2.225 197.54 197.54
Tie Bars 10 2 7.5 9.25 9.25
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 8 44.39 44.39
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0
Bottom 12 0.225 23 3.3 67.38 67.38
Top Cont. 12 0.15 68 1.6 96.59 96.59
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 5.5 30.52 30.52
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0

I. A. Campbell Associates, Inc. Page 250 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 12 0.225 45 3.3 131.84 9,096.96
Top Cont. 12 0.15 134 2.85 339.05 23,394.45
Tie Bars 10 2 10 12.33 850.77
Top Discont. 10 0.3 9 1.19 6.60 455.40
Bottom 10 0.3 9 10.5 58.26 4,019.94
Top Cont. 10 0.3 9 0.9 4.99 344.31
Tie Bars 10 2 2.6 3.21 221.49

Top Discont. 12 0
Bottom 12 0.225 41 3.3 120.12 960.96
Top Cont. 12 0.15 122 2.625 284.32 2,274.56
Tie Bars 10 2 9.1 11.22 89.76
Top Discont. 10 0.3 9 1.19 6.60 52.80
Bottom 10 0.3 9 9.6 53.27 426.16
Top Cont. 10 0.3 9 0.9 4.99 39.92
Tie Bars 10 2 2.6 3.21 25.68

Top Discont. 12 0
Bottom 12 0.225 41 3.3 120.12 1,321.32
Top Cont. 12 0.15 122 2.625 284.32 3,127.52
Tie Bars 10 2 9.1 11.22 123.42
Top Discont. 10 0.3 9 1.19 6.60 72.60
Bottom 10 0.3 9 9.6 53.27 585.97
Top Cont. 10 0.3 9 0.9 4.99 54.89

I. A. Campbell Associates, Inc. Page 251 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 2.6 3.21 35.31

Top Discont. 12 0
Bottom 12 0.225 27 3.3 79.10 237.30
Top Cont. 12 0.15 80 1.85 131.39 394.17
Tie Bars 10 2 6 7.40 22.20
Top Discont. 10 0.3 9 1.19 6.60 19.80
Bottom 10 0.3 9 6.5 36.07 108.21
Top Cont. 10 0.3 9 0.9 4.99 14.97
Tie Bars 10 2 2.6 3.21 9.63

Top Discont. 12 0
Bottom 12 0.225 21 3.3 61.52 61.52
Top Cont. 12 0.15 62 1.4875 81.88 81.88
Tie Bars 10 2 4.55 5.61 5.61
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 5.05 28.02 28.02
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 16 0.25 19 1.426 42.76 128.28


Bottom - S 16 0.25 6 1.3 12.31 36.93
Bottom - L 16 0.25 13 3.3 67.71 203.13

I. A. Campbell Associates, Inc. Page 252 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 16 0.175
Tie Bars 10 2 4.55 5.61 16.83
Top Discont. 16 0.25 11 1.226 21.28 63.84
Bottom - S 16 0.25 4 2.275 14.36 43.08
Bottom - L 16 0.25 7 5.05 55.79 167.37
Top Cont. 16 0.25 11 0.9 15.63 46.89

Top Discont. 12 0.25 12 1.377 14.67 14.67


Bottom - S 12 0.25 4 1.25 4.44 4.44
Bottom - L 12 0.25 8 3.2 22.73 22.73
Top Cont. 12 0.15
Tie Bars 10 2 3 3.70 3.70
Top Discont. 12 0.25 10 1.177 10.45 10.45
Bottom - S 12 0.25 3 1.5 4.00 4.00
Bottom - L 12 0.25 7 3.5 21.75 21.75
Top Cont. 12 0

Top Discont. 12 0.3 34 3.252 98.16 196.32


Bottom 12 0.175 57 3.3 167.00 334.00
Top Cont. 12 0.125 160 2.85 404.84 809.68
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.3 9 1.19 6.60 13.20
Bottom 10 0.3 9 10.5 58.26 116.52
Top Cont. 10 0.3 9 0.9 4.99 9.98

I. A. Campbell Associates, Inc. Page 253 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 2.6 3.21 6.42

Top Discont. 12 0.25 19 1.402 23.65 118.25


Bottom - S 12 0.25 6 1.3 6.92 34.60
Bottom - L 12 0.25 13 3.3 38.09 190.45
Top Cont. 12 0.15
Tie Bars 10 2 4.6 5.67 28.35
Top Discont. 12 0.25 11 1.202 11.74 58.70
Bottom - S 12 0.25 4 2.3 8.17 40.85
Bottom - L 12 0.25 7 5.1 31.69 158.45
Top Cont. 12 0.25 11 0.9 8.79 43.95

Top Discont. 12 0.25 11 1.327 12.96 12.96


Bottom - S 12 0.25 4 1.15 4.08 4.08
Bottom - L 12 0.25 7 3 18.64 18.64
Top Cont. 12 0.15
Tie Bars 10 2 2.6 3.21 3.21
Top Discont. 12 0.25 10 1.127 10.01 10.01
Bottom - S 12 0.25 3 1.3 3.46 3.46
Bottom - L 12 0.25 7 3.1 19.27 19.27
Top Cont. 12 0.25 10 0.825 7.32 7.32

Top Discont. 12 0

I. A. Campbell Associates, Inc. Page 254 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom - S 12 0.2 11 1.3 12.70 63.50
Bottom - L 12 0.2 22 3.3 64.45 322.25
Top Cont. 12 0.125
Tie Bars 10 2 6.6 8.14 40.70
Top Discont. 10 0.275 10 1.19 7.34 36.70
Bottom - S 10 0.275 3 3.3 6.10 30.50
Bottom - L 10 0.275 7 7.1 30.64 153.20
Top Cont. 10 0.275 10 0.9 5.55 27.75

Top Discont. 12 0
Bottom - S 12 0.2 11 1.6 15.63 31.26
Bottom - L 12 0.2 22 3.9 76.17 152.34
Top Cont. 12 0.125
Tie Bars 10 2 6.6 8.14 16.28
Top Discont. 10 0.275 12 1.34 9.91 19.82
Bottom - S 10 0.275 4 3.3 8.14 16.28
Bottom - L 10 0.275 8 7.1 35.02 70.04
Top Cont. 10 0.275 12 1.05 7.77 15.54

Top Discont. 12 0
Bottom - S 12 0.2 11 1.5 14.65 14.65
Bottom - L 12 0.2 22 3.7 72.27 72.27
Top Cont. 12 0.125
Tie Bars 10 2 6.6 8.14 8.14

I. A. Campbell Associates, Inc. Page 255 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 10 0.275 11 1.29 8.75 8.75
Bottom - S 10 0.275 4 3.3 8.14 8.14
Bottom - L 10 0.275 7 7.1 30.64 30.64
Top Cont. 10 0.275 11 1 6.78 6.78

Top Discont. 12 0.25 19 1.552 26.18 52.36


Bottom - S 12 0.2 8 1.6 11.36 22.72
Bottom - L 12 0.2 15 3.9 51.94 103.88
Top Cont. 12 0.125
Tie Bars 10 2 4.6 5.67 11.34
Top Discont. 12 0.25 13 1.352 15.60 31.20
Bottom - S 12 0.25 4 2.3 8.17 16.34
Bottom - L 12 0.25 9 5.1 40.75 81.50
Top Cont. 12 0.25 13 1.05 12.12 24.24

Top Discont. 12 0.25 19 1.502 25.34 50.68


Bottom - S 12 0.2 8 1.5 10.65 21.30
Bottom - L 12 0.2 15 3.7 49.27 98.54
Top Cont. 12 0.125
Tie Bars 10 2 4.6 5.67 11.34
Top Discont. 12 0.25 12 1.302 13.87 27.74
Bottom - S 12 0.25 4 2.3 8.17 16.34
Bottom - L 12 0.25 8 5.1 36.22 72.44
Top Cont. 12 0.25 12 1 10.65 21.30

I. A. Campbell Associates, Inc. Page 256 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0
Bottom 12 0.2 50 3.9 173.12 1,731.20
Top Cont. 12 0.125 160 2.85 404.84 4,048.40
Tie Bars 10 2 10 12.33 123.30
Top Discont. 10 0.275 12 1.34 9.91 99.10
Bottom 10 0.275 12 10.5 77.68 776.80
Top Cont. 10 0.275 12 1.05 7.77 77.70
Tie Bars 10 2 3.2 3.95 39.50

Top Discont. 12 0
Bottom 12 0.2 46 3.9 159.27 318.54
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 12 1.34 9.91 19.82
Bottom 10 0.275 12 9.6 71.02 142.04
Top Cont. 10 0.275 12 1.05 7.77 15.54
Tie Bars 10 2 3.2 3.95 7.90

Top Discont. 12 0
Bottom 12 0.2 50 3.9 173.12 865.60
Top Cont. 12 0.125 160 2.85 404.84 2,024.20
Tie Bars 10 2 10 12.33 61.65

I. A. Campbell Associates, Inc. Page 257 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 10 0.275 12 1.34 9.91 49.55
Bottom 10 0.275 12 10.5 77.68 388.40
Top Cont. 10 0.275 12 1.05 7.77 38.85
Tie Bars 10 2 3.2 3.95 19.75

Top Discont. 12 0
Bottom 12 0.2 46 3.7 151.10 302.20
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 11 1.29 8.75 17.50
Bottom 10 0.275 11 9.6 65.10 130.20
Top Cont. 10 0.275 11 1 6.78 13.56
Tie Bars 10 2 3 3.70 7.40

Top Discont. 12 0.3 22 2.402 46.91 46.91


Bottom 12 0.175 38 3.7 124.82 124.82
Top Cont. 12 0.125 53 2 94.11 94.11
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 12 0.275 11 1.302 12.72 12.72
Bottom 12 0.275 11 7.1 69.34 69.34
Top Cont. 12 0.275 11 1 9.77 9.77
Tie Bars 10 2 3 3.70 3.70

I. A. Campbell Associates, Inc. Page 258 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.3 34 3.252 98.16 196.32
Bottom 12 0.175 57 3.7 187.24 374.48
Top Cont. 12 0.125 80 2.85 202.42 404.84
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.3 10 1.29 7.95 15.90
Bottom 10 0.3 10 10.5 64.73 129.46
Top Cont. 10 0.3 10 1 6.17 12.34
Tie Bars 10 2 3 3.70 7.40

Top Discont. 12 0
Bottom 12 0.225 45 3.7 147.82 443.46
Top Cont. 12 0.15 134 2.85 339.05 1,017.15
Tie Bars 10 2 10 12.33 36.99
Top Discont. 10 0.3 10 1.29 7.95 23.85
Bottom 10 0.3 10 10.5 64.73 194.19
Top Cont. 10 0.3 10 1 6.17 18.51
Tie Bars 10 2 3 3.70 11.10

Top Discont. 12 0
Bottom 12 0.225 45 3.3 131.84 395.52
Top Cont. 12 0.15 134 2.85 339.05 1,017.15
Tie Bars 10 2 10 12.33 36.99
Top Discont. 10 0.3 9 1.19 6.60 19.80
Bottom 10 0.3 9 10.5 58.26 174.78

I. A. Campbell Associates, Inc. Page 259 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 9 0.9 4.99 14.97
Tie Bars 10 2 2.6 3.21 9.63

Top Discont. 12 0
Bottom 12 0.225 45 3.3 131.84 791.04
Top Cont. 12 0.15 134 2.85 339.05 2,034.30
Tie Bars 10 2 10 12.33 73.98
Top Discont. 10 0.3 9 1.19 6.60 39.60
Bottom 10 0.3 9 10.5 58.26 349.56
Top Cont. 10 0.3 9 0.9 4.99 29.94
Tie Bars 10 2 2.6 3.21 19.26

Top Discont. 12 0
Bottom 12 0.275 37 3.3 108.40 108.40
Top Cont. 12 0.175 114 2.85 288.45 288.45
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 10.5 58.26 58.26
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0
Bottom 12 0.275 24 3.3 70.31 70.31

I. A. Campbell Associates, Inc. Page 260 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.175 76 2 134.95 134.95
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 7.1 39.39 39.39
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0
Bottom 12 0.275 19 3.3 55.67 55.67
Top Cont. 12 0.175 58 1.6 82.39 82.39
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 5.5 30.52 30.52
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0
Bottom 12 0.275 37 3.3 108.40 108.40
Top Cont. 12 0.175 114 2.85 288.45 288.45
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 10.5 58.26 58.26
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21

I. A. Campbell Associates, Inc. Page 261 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0
Bottom 12 0.275 24 3.3 70.31 70.31
Top Cont. 12 0.175 76 2 134.95 134.95
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 7.1 39.39 39.39
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0
Bottom 12 0.275 19 3.3 55.67 55.67
Top Cont. 12 0.175 58 1.6 82.39 82.39
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.3 9 1.19 6.60 6.60
Bottom 10 0.3 9 5.5 30.52 30.52
Top Cont. 10 0.3 9 0.9 4.99 4.99
Tie Bars 10 2 2.6 3.21 3.21

105,334.83

Top Discont. 12 0.3 34 3.252 98.16 392.64


Bottom 12 0.175 57 4.06 205.45 821.80

I. A. Campbell Associates, Inc. Page 262 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.125 160 2.85 404.84 1,619.36
Tie Bars 10 2 10 12.33 49.32
Top Discont. 10 0.225 15 1.38 12.76 51.04
Bottom 10 0.225 15 10.5 97.10 388.40
Top Cont. 10 0.225 15 1.09 10.08 40.32
Tie Bars 10 2 3.36 4.14 16.56

Top Discont. 12 0
Bottom 12 0.175 57 4.06 205.45 1,027.25
Top Cont. 12 0.125 160 2.85 404.84 2,024.20
Tie Bars 10 2 10 12.33 61.65
Top Discont. 10 0.225 15 1.38 12.76 63.80
Bottom 10 0.225 15 10.5 97.10 485.50
Top Cont. 10 0.225 15 1.09 10.08 50.40
Tie Bars 10 2 3.36 4.14 20.70

Top Discont. 12 0
Bottom 12 0.175 19 2.75 46.39 92.78
Top Cont. 12 0.125 54 1.19 57.05 114.10
Tie Bars 10 2 3.36 4.14 8.28
Top Discont. 10 0.225 9 1.0525 5.84 11.68
Bottom 10 0.225 9 3.86 21.42 42.84
Top Cont. 10 0.225 9 0.7625 4.23 8.46
Tie Bars 10 2 2.05 2.53 5.06

I. A. Campbell Associates, Inc. Page 263 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0.25 19 1.402 23.65 141.90


Bottom - S 12 0.175 9 1.3 10.39 62.34
Bottom - L 12 0.175 18 3.3 52.74 316.44
Top Cont. 12 0.1
Tie Bars 10 2 4.6 5.67 34.02
Top Discont. 12 0.25 11 1.202 11.74 70.44
Bottom - S 12 0.25 4 2.3 8.17 49.02
Bottom - L 12 0.25 7 5.1 31.69 190.14
Top Cont. 12 0.175 15 0.9 11.99 71.94

Top Discont. 12 0.3 34 3.252 98.16 98.16


Bottom 12 0.225 45 3.3 131.84 131.84
Top Cont. 12 0.15 134 2.85 339.05 339.05
Tie Bars 10 2 10 12.33 12.33
Top Discont. 10 0.275 10 1.19 7.34 7.34
Bottom 10 0.275 10 10.5 64.73 64.73
Top Cont. 10 0.275 10 0.9 5.55 5.55
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0.3 31 3.027 83.31 166.62


Bottom 12 0.225 41 3.3 120.12 240.24
Top Cont. 12 0.15 122 2.625 284.32 568.64

I. A. Campbell Associates, Inc. Page 264 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 10 1.19 7.34 14.68
Bottom 10 0.275 10 9.6 59.18 118.36
Top Cont. 10 0.275 10 0.9 5.55 11.10
Tie Bars 10 2 2.6 3.21 6.42

Top Discont. 12 0
Bottom 12 0.225 45 3.3 131.84 2,636.80
Top Cont. 12 0.15 134 2.85 339.05 6,781.00
Tie Bars 10 2 10 12.33 246.60
Top Discont. 10 0.3 9 1.19 6.60 132.00
Bottom 10 0.3 9 10.5 58.26 1,165.20
Top Cont. 10 0.3 9 0.9 4.99 99.80
Tie Bars 10 2 2.6 3.21 64.20

Top Discont. 12 0.25 19 1.402 23.65 70.95


Bottom - S 12 0.25 6 1.3 6.92 20.76
Bottom - L 12 0.25 13 3.3 38.09 114.27
Top Cont. 12 0.15
Tie Bars 10 2 4.6 5.67 17.01
Top Discont. 12 0.25 11 1.202 11.74 35.22
Bottom - S 12 0.25 4 2.3 8.17 24.51
Bottom - L 12 0.25 7 5.1 31.69 95.07
Top Cont. 12 0.25 11 0.9 8.79 26.37

I. A. Campbell Associates, Inc. Page 265 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0
Bottom 12 0.175 27 3.3 79.10 158.20
Top Cont. 12 0.125 74 1.5 98.55 197.10
Tie Bars 10 2 4.6 5.67 11.34
Top Discont. 10 0.225 12 1.19 8.80 17.60
Bottom 10 0.225 12 5.1 37.73 75.46
Top Cont. 10 0.225 12 0.9 6.66 13.32
Tie Bars 10 2 2.6 3.21 6.42

Top Discont. 12 0
Bottom 12 0.175 38 3.3 111.33 333.99
Top Cont. 12 0.125 106 2 188.21 564.63
Tie Bars 10 2 6.6 8.14 24.42
Top Discont. 10 0.225 12 1.19 8.80 26.40
Bottom 10 0.225 12 7.1 52.53 157.59
Top Cont. 10 0.225 12 0.9 6.66 19.98
Tie Bars 10 2 2.6 3.21 9.63

Top Discont. 12 0.3 22 2.402 46.91 46.91


Bottom 12 0.175 38 3.3 111.33 111.33
Top Cont. 12 0.125 106 2 188.21 188.21
Tie Bars 10 2 6.6 8.14 8.14

I. A. Campbell Associates, Inc. Page 266 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 10 0.275 10 1.19 7.34 7.34
Bottom 10 0.275 10 7.1 43.77 43.77
Top Cont. 10 0.275 10 0.9 5.55 5.55
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0
Bottom 12 0.2 33 3 87.89 175.78
Top Cont. 12 0.125 106 2 188.21 376.42
Tie Bars 10 2 6.6 8.14 16.28
Top Discont. 10 0.275 9 1.115 6.19 12.38
Bottom 10 0.275 9 7.1 39.39 78.78
Top Cont. 10 0.275 9 0.825 4.58 9.16
Tie Bars 10 2 2.3 2.84 5.68

Top Discont. 12 0.25 19 1.402 23.65 23.65


Bottom - S 12 0.2 8 1.3 9.23 9.23
Bottom - L 12 0.2 15 3.3 43.95 43.95
Top Cont. 12 0.125
Tie Bars 10 2 4.6 5.67 5.67
Top Discont. 12 0.25 11 1.202 11.74 11.74
Bottom - S 12 0.25 4 2.3 8.17 8.17
Bottom - L 12 0.25 7 5.1 31.69 31.69
Top Cont. 12 0.15 18 0.9 14.38 14.38

I. A. Campbell Associates, Inc. Page 267 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.25 19 1.5145 25.55 51.10
Bottom - S 12 0.2 8 1.525 10.83 21.66
Bottom - L 12 0.2 15 3.75 49.94 99.88
Top Cont. 12 0.125
Tie Bars 10 2 4.6 5.67 11.34
Top Discont. 12 0.25 13 1.3145 15.17 30.34
Bottom - S 12 0.25 4 2.3 8.17 16.34
Bottom - L 12 0.25 9 5.1 40.75 81.50
Top Cont. 12 0.15 21 1.0125 18.88 37.76

Top Discont. 12 0.25 19 1.477 24.91 49.82


Bottom - S 12 0.2 8 1.45 10.30 20.60
Bottom - L 12 0.2 15 3.6 47.94 95.88
Top Cont. 12 0.125
Tie Bars 10 2 4.6 5.67 11.34
Top Discont. 12 0.25 12 1.277 13.60 27.20
Bottom - S 12 0.25 4 2.3 8.17 16.34
Bottom - L 12 0.25 8 5.1 36.22 72.44
Top Cont. 12 0.15 20 0.975 17.31 34.62

Top Discont. 12 0
Bottom 12 0.2 33 3.75 109.87 219.74
Top Cont. 12 0.125 106 2 188.21 376.42
Tie Bars 10 2 6.6 8.14 16.28
Top Discont. 10 0.275 11 1.3025 8.83 17.66

I. A. Campbell Associates, Inc. Page 268 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Bottom 10 0.275 11 7.1 48.15 96.30
Top Cont. 10 0.275 11 1.0125 6.87 13.74
Tie Bars 10 2 3.05 3.76 7.52

Top Discont. 12 0
Bottom 12 0.2 33 3.6 105.47 105.47
Top Cont. 12 0.125 106 2 188.21 188.21
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.275 11 1.265 8.58 8.58
Bottom 10 0.275 11 7.1 48.15 48.15
Top Cont. 10 0.275 11 0.975 6.61 6.61
Tie Bars 10 2 2.9 3.58 3.58

Top Discont. 12 0.3 22 2.402 46.91 46.91


Bottom 12 0.175 38 3.6 121.45 121.45
Top Cont. 12 0.125 106 2 188.21 188.21
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.275 11 1.265 8.58 8.58
Bottom 10 0.275 11 7.1 48.15 48.15
Top Cont. 10 0.275 11 0.975 6.61 6.61
Tie Bars 10 2 2.9 3.58 3.58

Top Discont. 12 0
Bottom 12 0.2 50 3.75 166.46 665.84

I. A. Campbell Associates, Inc. Page 269 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 12 0.125 160 2.85 404.84 1,619.36
Tie Bars 10 2 10 12.33 49.32
Top Discont. 10 0.275 11 1.3025 8.83 35.32
Bottom 10 0.275 11 10.5 71.21 284.84
Top Cont. 10 0.275 11 1.0125 6.87 27.48
Tie Bars 10 2 3.05 3.76 15.04

Top Discont. 12 0
Bottom 12 0.2 46 3.75 153.15 306.30
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 11 1.3025 8.83 17.66
Bottom 10 0.275 11 9.6 65.10 130.20
Top Cont. 10 0.275 11 1.0125 6.87 13.74
Tie Bars 10 2 3.05 3.76 7.52

Top Discont. 12 0
Bottom 12 0.2 50 3.6 159.80 1,278.40
Top Cont. 12 0.125 160 2.85 404.84 3,238.72
Tie Bars 10 2 10 12.33 98.64
Top Discont. 10 0.275 11 1.265 8.58 68.64
Bottom 10 0.275 11 10.5 71.21 569.68
Top Cont. 10 0.275 11 0.975 6.61 52.88
Tie Bars 10 2 2.9 3.58 28.64

I. A. Campbell Associates, Inc. Page 270 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs

Top Discont. 12 0
Bottom 12 0.2 46 3.6 147.02 294.04
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.275 11 1.265 8.58 17.16
Bottom 10 0.275 11 9.6 65.10 130.20
Top Cont. 10 0.275 11 0.975 6.61 13.22
Tie Bars 10 2 2.9 3.58 7.16

Top Discont. 12 0.3 34 3.252 98.16 196.32


Bottom 12 0.175 57 3.6 182.18 364.36
Top Cont. 12 0.125 160 2.85 404.84 809.68
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.275 11 1.265 8.58 17.16
Bottom 10 0.275 11 10.5 71.21 142.42
Top Cont. 10 0.275 11 0.975 6.61 13.22
Tie Bars 10 2 2.9 3.58 7.16

Top Discont. 12 0.3 34 3.252 98.16 294.48


Bottom 12 0.2 50 3.35 148.71 446.13
Top Cont. 12 0.15 134 2.85 339.05 1,017.15
Tie Bars 10 2 10 12.33 36.99
Top Discont. 10 0.3 9 1.2025 6.67 20.01
Bottom 10 0.3 9 10.5 58.26 174.78

I. A. Campbell Associates, Inc. Page 271 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 9 0.9125 5.06 15.18
Tie Bars 10 2 2.65 3.27 9.81

Top Discont. 12 0.3 22 2.402 46.91 46.91


Bottom 12 0.2 33 3.35 98.15 98.15
Top Cont. 12 0.15 88 2 156.25 156.25
Tie Bars 10 2 6.6 8.14 8.14
Top Discont. 10 0.3 9 1.2025 6.67 6.67
Bottom 10 0.3 9 7.1 39.39 39.39
Top Cont. 10 0.3 9 0.9125 5.06 5.06
Tie Bars 10 2 2.65 3.27 3.27

Top Discont. 12 0
Bottom 12 0.175 52 3.3 152.35 609.40
Top Cont. 12 0.125 146 2.625 340.25 1,361.00
Tie Bars 10 2 9.1 11.22 44.88
Top Discont. 10 0.225 12 1.19 8.80 35.20
Bottom 10 0.225 12 9.6 71.02 284.08
Top Cont. 10 0.225 12 0.9 6.66 26.64
Tie Bars 10 2 2.6 3.21 12.84

Top Discont. 12 0
Bottom 12 0.175 35 3.3 102.54 205.08
Top Cont. 12 0.125 98 1.865 162.26 324.52

I. A. Campbell Associates, Inc. Page 272 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Tie Bars 10 2 6.06 7.47 14.94
Top Discont. 10 0.225 12 1.19 8.80 17.60
Bottom 10 0.225 12 6.56 48.53 97.06
Top Cont. 10 0.225 12 0.9 6.66 13.32
Tie Bars 10 2 2.6 3.21 6.42

Top Discont. 12 0
Bottom 12 0.175 26 3.3 76.17 76.17
Top Cont. 12 0.125 74 1.4875 97.72 97.72
Tie Bars 10 2 4.55 5.61 5.61
Top Discont. 10 0.225 12 1.19 8.80 8.80
Bottom 10 0.225 12 5.05 37.36 37.36
Top Cont. 10 0.225 12 0.9 6.66 6.66
Tie Bars 10 2 2.6 3.21 3.21

Top Discont. 12 0
Bottom 12 0.175 52 3.3 152.35 304.70
Top Cont. 12 0.125 146 2.625 340.25 680.50
Tie Bars 10 2 9.1 11.22 22.44
Top Discont. 10 0.225 12 1.19 8.80 17.60
Bottom 10 0.225 12 9.6 71.02 142.04
Top Cont. 10 0.225 12 0.9 6.66 13.32
Tie Bars 10 2 2.6 3.21 6.42

I. A. Campbell Associates, Inc. Page 273 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Discont. 12 0.25 20 1.4145 25.12 25.12
Bottom - S 12 0.275 6 1.325 7.06 7.06
Bottom - L 12 0.275 13 3.35 38.66 38.66
Top Cont. 12 0.175
Tie Bars 10 2 5 6.17 6.17
Top Discont. 12 0.25 11 1.2145 11.86 11.86
Bottom - S 12 0.25 4 2.5 8.88 8.88
Bottom - L 12 0.25 7 5.5 34.18 34.18
Top Cont. 12 0.15 18 0.9125 14.58 14.58

Top Discont. 12 0.3 34 3.252 98.16 196.32


Bottom 12 0.225 45 3.2 127.84 255.68
Top Cont. 12 0.15 134 2.85 339.05 678.10
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.3 9 1.165 6.46 12.92
Bottom 10 0.3 9 10.5 58.26 116.52
Top Cont. 10 0.3 9 0.875 4.85 9.70
Tie Bars 10 2 2.5 3.08 6.16

Top Discont. 12 0.3 27 2.752 65.97 65.97


Bottom 12 0.225 36 3.2 102.27 102.27
Top Cont. 12 0.15 108 2.35 225.32 225.32
Tie Bars 10 2 8 9.86 9.86
Top Discont. 10 0.3 9 1.165 6.46 6.46
Bottom 10 0.3 9 8.5 47.16 47.16

I. A. Campbell Associates, Inc. Page 274 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Top Cont. 10 0.3 9 0.875 4.85 4.85
Tie Bars 10 2 2.5 3.08 3.08

Top Discont. 12 0.3 34 3.252 98.16 196.32


Bottom 12 0.225 45 3.2 127.84 255.68
Top Cont. 12 0.15 134 2.85 339.05 678.10
Tie Bars 10 2 10 12.33 24.66
Top Discont. 10 0.3 9 1.165 6.46 12.92
Bottom 10 0.3 9 10.5 58.26 116.52
Top Cont. 10 0.3 9 0.875 4.85 9.70
Tie Bars 10 2 2.5 3.08 6.16

Top Discont. 12 0.3 17 2.002 30.22 30.22


Bottom 12 0.225 23 3.2 65.34 65.34
Top Cont. 12 0.15 68 1.6 96.59 96.59
Tie Bars 10 2 5 6.17 6.17
Top Discont. 10 0.3 9 1.165 6.46 6.46
Bottom 10 0.3 9 5.5 30.52 30.52
Top Cont. 10 0.3 9 0.875 4.85 4.85
Tie Bars 10 2 2.5 3.08 3.08

49,012.13

485,166.61
Gr. 40 : 90,401.73

I. A. Campbell Associates, Inc. Page 275 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Dia Spacing L Wt Wtotal
Rebars

mm m sets m kgs kgs


Gr. 60 : 365,852.03

I. A. Campbell Associates, Inc. Page 276 of 279 Slab Rebars - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Slab Concrete
Date : October 28, 2010

SLAB CONCRETE
Floor Level Area
Basement 2
150mm thk 6,650.21

Basement 1
175mm thk 16.97 41.02 30.77 37.54 51.62 51.62
150mm thk 25.70 574.31 75.08
125mm thk 94.72 401.22 689.00 3,306.41 372.28 508.53

Ground Floor
175mm thk 16.97 41.02 30.77 37.54 51.62 51.62
150mm thk 25.70 574.31 75.08 73.14
125mm thk 20.52 520.36 689.00 3,306.41 372.28 508.53

Second Floor
175mm thk - 41.02 30.77 37.54 51.62 -
150mm thk 25.70 492.34 75.08 90.93 52.81 72.08
125mm thk 94.72 401.22 689.00 3,207.21 319.47 508.53

Third Floor
175mm thk - 41.02 30.77 37.54 51.62 -
150mm thk 25.70 492.34 75.08 8.96 52.81 72.08
125mm thk 94.72 401.22 689.00 3,289.18 319.47 508.53

Fourth Floor
175mm thk - - - - - -
150mm thk 98.46 - - - - -
125mm thk 94.72 401.22 689.00 3,289.18 319.47 1,396.45

Roof Deck
175mm thk 163.66 - - - - -
150mm thk 125.58 636.00 69.84 66.84 292.56 66.84
125mm thk 113.83 271.78 361.46 73.03 204.94 375.04

Grand Total

I. A. Campbell Associates, Inc. Page 277 of 279 Slab Concrete - Dwg Dtd October 27, 2010
Total Area Volume

6,650.21 997.53

229.54 40.17
675.09 101.26
5,372.16 671.52
812.95

229.54 40.17
748.23 112.23
5,417.10 677.14
829.54

160.95 28.17
808.94 121.34
5,220.15 652.52
802.03

160.95 28.17
726.97 109.05
5,302.12 662.76
799.98

- -
98.46 14.77
6,190.04 773.76
788.52

163.66 28.64
1,257.67 188.65
1,400.09 175.01
392.30

5,422.86

I. A. Campbell Associates, Inc. Page 278 of 279 Slab Concrete - Dwg Dtd October 27, 2010
Project : Metro Gaisano Alabang
Location : Alabang Town Center, Muntinlupa City
Scope : Girder and Beams
Date :

SLAB ON GRADE - REBARS

Qty Length Lap Total Length Unit Weight Total Weight (kgs)
10mmø
6.00 32.04 5.00 34.29 0.616 126.74

9.00 36.63 6.00 39.33 0.616 218.05

24.00 81.70 13.00 87.55 0.616 1,294.34

22.00 87.50 14.00 93.80 0.616 1,271.18


15.00 (9.59) (2.00) (10.49) 0.616 (96.93)
15.00 0.22 - 0.22 0.616 2.03

56.00 93.29 15.00 100.04 0.616 3,450.98


9.00 (8.57) (2.00) (9.47) 0.616 (52.50)

12.00 39.72 6.00 42.42 0.616 313.57


12.00 41.67 6.00 44.37 0.616 327.98

31.00 21.03 3.00 22.38 0.616 427.37

16.00 15.32 2.00 16.22 0.616 159.86

13.00 28.37 4.00 30.17 0.616 241.60


13.00 4.30 - 4.30 0.616 34.43

10.00 38.93 6.00 41.63 0.616 256.44


5.00 0.22 - 0.22 0.616 0.68
9.00 0.22 - 0.22 0.616 1.22

65.00 76.11 12.00 81.51 0.616 3,263.66

18.00 65.50 10.00 70.00 0.616 776.16

27.00 68.76 11.00 73.71 0.616 1,225.94

24.00 8.35 1.00 8.80 0.616 130.07

21.00 91.51 15.00 98.26 0.616 1,271.09

9.00 13.68 2.00 14.58 0.616 80.83


9.00 12.46 2.00 13.36 0.616 74.07
9.00 43.47 7.00 46.62 0.616 258.46

Total 15,057.33