Documente Academic
Documente Profesional
Documente Cultură
Project Serial No
1- Polarity Check
Test equipment
Make
Calibration validity
2. a. Primary to Ground
Resistance in MΩ
Test equipment
Make
Calibration validity
4- Verification of Ratios
Test equipment
Make
Calibration validity
Core No 1 2 Remarks
Meas. Sec. Voltage
% error
Apply 3 phase AC supply low voltage and verify secondary voltage with AVO meter throughout the circuit.
Core#:1
Voltage(V)
Voltage(V)
Voltage(V)
Core#:2
Voltage(V)
Voltage(V)
Voltage(V)
Yellow CHG
Blue CHG
Test equipment
Make
Calibration date
7- Burden Test
Core 2
Core 3
Core 4
Core 5
C.B Closed Position Applied Voltage (kV) Measured Leakage Current (µΩ)
B
Test Instrument Type
Make
Model
Calibration date
9- Visual Inspection