AIS CCVT/VT Test Protocol

Customer Make & Type

Project Serial No

Grid Station Bay

Name Plate Details shall be added at site:

1- Polarity Check

Phase Core-1 Core2 Results


R
Y
B

2- Verification of Insulation Resistance

Test equipment
Make
Calibration validity

2. a. Primary to Ground

Test voltage: _______________ Test duration: _______________

Pri-Ground Red Yellow Blue

Resistance in MΩ

Sub-Contractor Main-Contractor Client

Sign: Sign: Sign:

Name: Nabi Ahmad Jajja Name: Name:

Desg:Testing Engineer Desg: Desg:

Date: Date: Date:


AIS CCVT/VT Test Protocol

2. b. Secondary to Ground and Between Secondary Windings

Test voltage: _______________ Test duration: _______________

Red Phase MΩ Yellow Phase MΩ Blue Phase MΩ

Core1-Grnd Core1-Grnd Core1-Grnd

Core2-Grnd Core2-Grnd Core2-Grnd

Core1-Core2 Core1-Core2 Core1-Core2

2. c. Primary to Secondary Windings

Test Test voltage: _______________ Test duration: _______________

Red Phase MΩ Yellow Phase MΩ Blue Phase MΩ

Core1-Pri Core1-Pri Core1-Pri

Core2-Pri Core2-Pri Core2-Pri

3- Measurement of Winding Resistance of Secondary Windings

Test equipment
Make
Calibration validity

Test Current: _________________

Red Phase Ω Yellow Phase Ω Blue Phase Ω

Ia-In Ia-In Ia-In

Ib-In Ib-In Ib-In

Sub-Contractor Main-Contractor Client

Sign: Sign: Sign:

Name: Nabi Ahmad Jajja Name: Name:

Desg:Testing Engineer Desg: Desg:

Date: Date: Date:


AIS CCVT/VT Test Protocol

4- Verification of Ratios

Test equipment
Make
Calibration validity

Test voltage: _______________ Selection Ratio: _______________

Core No 1 2 Remarks
Meas. Sec. Voltage
% error

5- Verification of VT circuit with three phase injection

Apply 3 phase AC supply low voltage and verify secondary voltage with AVO meter throughout the circuit.

Core#:1

Panel#: TB#: TB#: TB#: TB#: TB#: TB#:


R-N Y-N B-N R-Y Y-B B-R

Voltage(V)

Panel#: Relay display

R-N Y-N B-N R-Y Y-B B-R

Voltage(V)

Panel#: Meter Display

R-N Y-N B-N R-Y Y-B B-R

Voltage(V)

Sub-Contractor Main-Contractor Client

Sign: Sign: Sign:

Name: Nabi Ahmad Jajja Name: Name:

Desg:Testing Engineer Desg: Desg:

Date: Date: Date:


AIS CCVT/VT Test Protocol

Core#:2

Panel#: TB#: TB#: TB#: TB#: TB#: TB#:


R-N Y-N B-N R-Y Y-B B-R

Voltage(V)

Panel#: Relay display

R-N Y-N B-N R-Y Y-B B-R

Voltage(V)

Panel#: Meter display

R-N Y-N B-N R-Y Y-B B-R

Voltage(V)

6- Capacitance and Dissipation Factor: at 10kV

Capacitance Measured D.F Measured Leakage


Phase Mode Measured Power (if
PF % Current (if
Applicable)
Applicable)
Red CHG

Yellow CHG

Blue CHG

Test equipment

Make

Calibration date

Sub-Contractor Main-Contractor Client

Sign: Sign: Sign:

Name: Nabi Ahmad Jajja Name: Name:

Desg:Testing Engineer Desg: Desg:

Date: Date: Date:


AIS CCVT/VT Test Protocol

7- Burden Test

Injected Current (Secondary Rated): ___________________

Core Red Yellow Blue Burden


(Voltage) (Voltage) (Voltage) (VA)
Core 1

Core 2

Core 3

Core 4

Core 5

Test Instrument Type


Make
Model
Calibration date

8- DC Hi-Pot (During Hi-Pot of Complete Switch Yard):

C.B Closed Position Applied Voltage (kV) Measured Leakage Current (µΩ)

B
Test Instrument Type
Make
Model
Calibration date

Sub-Contractor Main-Contractor Client

Sign: Sign: Sign:

Name: Nabi Ahmad Jajja Name: Name:

Desg:Testing Engineer Desg: Desg:

Date: Date: Date:


AIS CCVT/VT Test Protocol

9- Visual Inspection

Check List Remarks

Tightness of secondary connections

Porcelain insulator is undamaged and clean

Base structure is firmly earthed

No secondary winding is shorted

Secondary box cover is closed tightly

Earthing properly made

Check of clearance between device and other


structures

Checking of identification signs and name plate

Tightness of base frame and structure

Sub-Contractor Main-Contractor Client

Sign: Sign: Sign:

Name: Nabi Ahmad Jajja Name: Name:

Desg:Testing Engineer Desg: Desg:

Date: Date: Date: