Name of the work : Construction of Link Parallel Taxi Track (Phase-II) and Grading of Basic Strip at South

Side of Mangalore International Airport.

Client Airports Authority of India


Contractor PBI Construction Company

Job Mix Proportion - WMM


I.S.Sieve Stone % of Lower
40mm 33% 20mm 26% 12.5mm 21% 20% Limits Upper limit
(mm) Dust Passing Limit
53.00 100 33.0 100 26.00 100 21.00 100 20.00 100 100 100 100
45.00 100.00 33.00 100 26.00 100 21.00 100 20.00 100 95-100 100 95
22.40 36.12 11.92 74.32 19.32 100 21.00 100 20.00 72.24 60-80 80 60
11.20 0 0.00 48.85 12.70 82.25 17.27 100 20.00 49.97 40-60 60 40
4.75 0 0.0 28.96 7.53 15.77 3.31 100 20.00 30.84 25-40 40 25
2.36 0 0.0 0 0 14.63 3.07 89.72 17.94 21.02 15-30 30 15
0.60 0 0.0 0 0 9.88 2.07 46.54 9.31 11.38 8-22 22 8
0.08 0 0.0 0 0 1.82 0.38 6.62 2.32 2.70 0-5 5 0

120

100

80
% Passing

60

40

20

0
0.01 0.10 1.00 10.00 100.00
0
0.01 0.10 1.00 10.00 100.00
Sieve Size in mm
rallel Taxi Track (Phase-II) and Grading of Basic Strip at South

ob Mix Proportion - WMM


Middile
Limit
100
97.5
70
50
32.5
22.5
15
2.5

1.00 10.00 100.00


1.00 10.00 100.00
Sieve Size in mm
Name of the work : Construction of Link Parallel Taxi Track (Phase-II) and
Grading of Basic Strip at South Side of Mangalore International Airport.

Client Airports Authority Of India


Contractor PBI Construction Company

COMBINED GRADATION FOR WMM

Sample No 1
Date of Sampling
Source
Location
Date of Testing
Layer WMM
Mix proportion - 40mm- 33%, 20mm-26%,12.5mm-21%, Dust -20%. Total Weight of Sample (gms) :

Weight Retained Cumulative Retained Cumulative % Cumulative %


I.S.Sieve (mm)
(gms) (gms) Retained Passing

53.00 0 0 0 100

45.00 0 0 0 100

22.40 2755 2755 27.55 72.45

11.20 2220 4975 49.75 50.25

5.60 1660 6635 66.35 33.65

2.80 1315 7950 79.50 20.50

0.710 410 8360 83.60 16.40

0.080 1376 9736 97.36 2.64

Remarks:
on of Link Parallel Taxi Track (Phase-II) and
Side of Mangalore International Airport.

s Authority Of India

ED GRADATION FOR WMM

10000
Specfication.
Limits as per CA

100

95-100

60-80

40-60

25-40

15-30

8-22

0-8
Name of the work : Construction of Link Parallel Taxi Track (Phase-II) and Grading of
Basic Strip at South Side of Mangalore International Airport.

Client Airports Authority of India


Contractor PBI Construction Company

MDD & OMC using HEAVY COMPACTION TEST


(As per IS 2720 part 8)
Material Use for : Wet Mix Macadam Date of Sampling :
Source : Date of Testing :
Location : Plant Lab Layer : 5
Sample Description : Type of Compaction : Heavy
Volume of Mould : 2250 CC No. of Blows in each Layer : 56 Blows
Weight of Rammer : 4.9 Kg. Falling Height of Rammer : 450 mm
Moisture Moisture Moisture Moisture
Sr. No. Description Increment - Increment - Increment - Increment -
3% 4% 5% 6%
1 Weight of Mould (gm) 5700 5700 5700 5700
2 Weight of Mould + Compacted wet soil (gm) 10360 10585 10855 11029
3 Weight of compacted wet soil (gm) (2 - 1) 4660 4885 5155 5329
4 Volume of Mould (cc) 2250 2250 2250 2250
5 Wet Density (gm/cc) (3 / 4) 2.071 2.171 2.291 2.368
6 Container no. 24 25 26 27
7 Weight of Container (gm) 17.85 17.71 17.81 17.99
8 Weight of container + wet soil (gm) 121.20 112.50 101.20 103.50
9 Weight of wet soil (gm) (8 - 7) 103.35 94.79 83.39 85.51
10 Weight of container + dry soil (gm) 117.56 108.44 96.83 98.33
11 Weight of dry soil (gm) (10 - 7) 99.71 90.73 79.02 80.34
12 Water content (gm) (8 - 10) 3.64 4.06 4.37 5.17
13 Moisture Content (%) {12/(11-7)x100} 3.65 4.47 5.53 6.44
14 Dry Density (gm/cc) {5 /1+(13/100)} 1.998 2.078 2.171 2.225

Moisture Content & Dry Density GRAPH


2.250 Moisture content
Dry Density
3.65 1.998
4.47 2.078
2.200 5.53 2.171
6.44 2.225
7.37 2.152
2.150 #REF! #REF!

2.100

M
2.050 D
D
2.000

OMC
1.950 Moisture Content (%)
3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00
MDD : 2.225 gm/cc OMC : 6.44%
of Link Parallel Taxi Track (Phase-II) and Grading of
alore International Airport.

uthority of India
ruction Company

using HEAVY COMPACTION TEST


As per IS 2720 part 8)
Date of Sampling :
Date of Testing :

No. of Blows in each Layer : 56 Blows


Falling Height of Rammer : 450 mm
Moisture
Increment -
7%
5700
10899
5199
2250
2.311
28
17.36
121.50
104.14
114.35
96.99
7.15
7.37
2.152

ontent & Dry Density GRAPH

Moisture Content (%)


5.00 5.50 6.00 6.50 7.00 7.50 8.00