DOCUMENT NO.

REV

BLA-FTP-C-CC-00-012 0B

Contract No. 3510005298 SHEET 1 OF 197

CALCULATION FOR MISCELLANEOUS PIPE SUPPORT


AND PIPE SLEEPER AT ALUR RAMBONG CLUSTER AR-1A

BLOCK-A GAS DEVELOPMENT PROJECT

X Class 1 Class 2 Class 3

CONTRACTOR COMPANY
REV. DATE PURPOSE
PREP'P CHK'D APP'D APP'D

0B 29-SEP-17 RE-ISSUED FOR CONSTRUCTION RN/LG KHB/BD BHK

0A 18-JUL-17 RE-ISSUED FOR CONSTRUCTION RN/LG KHB/BD BHK

0 17-MAY-17 ISSUED FOR CONSTRUCTION RN/LG KHB/BD BHK

C 23-FEB-17 ISSUED FOR APPROVAL RN/LG KHB/BD BHK

B 14-FEB-17 RE-ISSUED FOR REVIEW RN/LG KHB/BD BHK

A 03-FEB-17 ISSUED FOR REVIEW RN/LG KHB/BD BHK


Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 2 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

RECORD OF REVISION
The revisions listed below have been incorporated in this copy of the document
REV. PAGE
SECTION DESCRIPTION OF CHANGES
NO NO.
CPY Comment: "Should be SPS-TP2-ARR-01"
0B ALL 2
CTR Response: "Complied"
CPY Comment: "20 or 22? Check dwg found ARR-FTP-C-EF-20-001
0B ALL 47 sheet 4 of 7"
CTR Response: "Drawing has been updated"
CPY Comment: "Use 8D13 as mentioned on fdn dwg ARR-FTP-C-EF-20-
0B ALL 88 001"
CTR Response: "Drawing has been updated"
CPY Comments: "not match with fdn dwg, please check"
0B ALL 116
CTR Response: "Calculation has been revised"
CPY Comment: "shown no of dia rebar, e.g= 8D13 similar with other type
pedestal"
0B ALL 127, 139
CTR Response: "Complied"
CPY Comment: "Not match with the drawing"
0B ALL 128
CTR Response: "Drawing and Calc. has been matched"
CPY Comment: "increase fdn dimension, close to limit"
0B ALL 134
CTR Response: "Since the required safety factor > allowable, no need to
increase foundation dimension"
CPY Comment: "this sleeper not found on drawing"
0B ALL 142, 153
CTR Response: "type of sleeper has been revised refer to drawing"
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 3 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

TABLE OF CONTENT

Record of Revision
Table of Content
1.0 INTRODUCTION ..................................................................................................................................... 4
2.0 PURPOSES ........................................................................................................................................... 4
3.0 DEFINITIONS ...........................................................................................................................................4
4.0 ABBREVIATION ........................................................................................................................................... 4
5.0 REFERENCES ...........................................................................................................................................4
5.1 Code and Standard ...........................................................................................................................................
4
5.2 Project Specifications ...........................................................................................................................................
4
5.3 Project References ...........................................................................................................................................
5
6.0 5
MATERIAL PROPERTIES .........................................................................................................................................
6.1 Unit ........................................................................................................................................... 5
6.2 Quality of Material ...........................................................................................................................................
5
6.3 Unit Weight ........................................................................................................................................... 5
7.0 6
STABILITY PARAMETER .........................................................................................................................................
7.1 Parameter for Steel Structure Stability .......................................................................................................................
6
7.2 Parameter for Soil Stability .........................................................................................................................................
6
8.0 LOADING ........................................................................................................................................... 6
8.1 Unfactored Load Combination ...................................................................................................................................
6
8.2 Factored Load Combination for Steel Structure ......................................................................................................... 6
9.0 SUMMARY OF ANALYSIS RESULT ........................................................................................................................ 7
9.1 Summary of Structure Analysis ..................................................................................................................................
7
9.2 Summary of Foundation Analysis ...............................................................................................................................
7

APPENDIX A LOADING ANALYSIS


APPENDIX B T-POST TYPE
APPENDIX C CONCRETE TRENCH TYPE
APPENDIX D PIPE SLEEPER TYPE
APPENDIX E STRESS DATA
APPENDIX F PIPE SUPPORT LOCATION
APPENDIX G STAAD OUTPUT
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 4 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

1.0 INTRODUCTION
PT Medco E&P Malaka, henceforth referred as COMPANY, intends to develop Block-A gas
reserves for sales gas supplying to PT Pertamina. The fields of Alur Siwah, Alur Rambong and Julu
Rayeu are to be developed in Block-A. All fields are located in East Aceh Region, Aceh Province,
Indonesia. The project plans to build Alur Siwah Central Processing Plant to monetize gases from Alur
Siwah and Alur Rambong fields. Julu Rayeu gas will be used for fuel gas supply to Alur Siwah Central
Processing Plant and produced water will be injected to produced water injection wells in Julu Rayeu.

Alur Siwah Central Processing Station (AS CPP) will be designed to produce capacity sales gas in the
amount of 63.25 BBTUD with associated condensate and produced water. Gas processing at AS CPP will
consist of sweetening (removal of CO2 and H2S), dehydration and dew point control with the associated
utilities and supporting systems.

AS CPP sales gas will be transported to PT Pertamina via Pertagas pipeline. The sales gas will be
transported using 10 km pipeline to tie-in point near Jambo Balee Metering Station where custody meter
is to be located. Tie-in point is provided by Pertagas. Condensate production from AS CPP is to be
transported to Point B by Trucking.

2.0 PURPOSES
The purpose of this document presents civil calculation for Miscellaneous Pipe Support and Pipe Sleeper
at Alur Rambong Cluster AR-1A for Flowline, Trunkline, and Pipeline Block A Gas Development Project.

3.0 DEFINITIONS
COMPANY : PT. MEDCO E&P MALAKA
CONTRACTOR : PT. KELSRI
VENDOR / SUPPLIER : Company or firm selected to supply materials, equipments, and
services detailed in this specification. This is the entity having unit
responsibility as defined in the industrial codes and standards

4.0 ABBREVIATION
ACI : American Concrete Institute
AS : Alur Siwah
ASCE : American Society of Civil Engineers
BBTUD : Billion British Thermal Unit per Day
CPP : Central Processing Plant
SNI : Standar Nasional Indonesia

5.0 REFERENCES
5.1 Code and Standard
ASCE 7-10 : Minimum Design Loads for Buildings and Other Structures
ACI 318-05 : Building Code Requirements for Reinforced Concrete
SNI 07-2052-2002 : Steel Bars for Concrete Reinforcement
AISC-ASD 9th : Steel Construction Manual Allowable Stress Design
UBC 1997 : Uniform Building Code 0B
5.2 Project Specifications
Doc. No. Status Title
BLA-FTP-C-DB-50-001 AFC Civil and Structure Design Criteria for Pipeline
BLA-FTP-C-TS-00-001 AFC Specification for Underground Design
BLA-FTP-C-TS-00-003 AFC Specification for Steel Structure Material
BLA-FTP-C-TS-00-004 AFC Specification for Concrete Material
BLA-FTP-C-TS-00-005 AFC Specification for Anchor Bolt
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 5 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

5.3 Project References


Doc. No. Status Title
BLA-FTP-C-RE-00-002 IFA FTP Soil Investigation Report
BLA-FTP-C-SD-50-006 AFC Standard Drawing Typical Pipe Supports and Sleeper
BLA-FTP-P-RE-00-003 AFC Pipe Stress Analysis Report at Alur Rambong
BLA-FTP-L-CC-50-005 Re-IFC Stress Analysis for Sales Gas Pipeline
BLA-FTP-C-CC-00-003 Re-IFC Calculation for Concrete Culvert, Duct Bank and Other
Underground Structure
ARR-FTP-P-PS-00- Re-IFC FTP Pipe Support Location Plan Alur Rambong Cluster AR-1A
001~015
ARR-FTP-C-EF-20-001 Re-IFC Foundation Location Plan Alur Rambong Cluster AR-1A
ARR-FTP-C-PS-20-001 Re-IFC Pipe Support Structure Plan Elevation & Detail Wellpad Alur
Rambong Cluster AR-1A

6.0 MATERIAL PROPERTIES

6.1 Unit
All units are in Metric System.

6.2 Quality of Material


Concrete
Concrete Grade fc' 24.8 MPa, equivalent to 28 days cylinder compressive strength
fc' = 24.8 MPa for general concrete foundation (ASTM C150 Type II Cement)
Concrete Grade fc' 13.8 MPa, equivalent to 28 days cylinder compressive strength
fc' = 13.8 MPa for lean concrete (ASTM C150 Type I Cement)

Steel Rebar
Deformed high yield steel bar, fy = 390 MPa (BJTS40)
Plain round steel bar, fy = 235 MPa (BJTP24)

Steel Structure
ASTM A36 or JIS G 3101 grade SS 400 or eq. for Wide Flange, Angle, Channel, Plate and Tee
ASTM A53 Gr. B or JIS G3444 STK 400 or equivalent for structural steel pipe

Bolt
Ordinary strength bolt shall conform to ASTM A307 Gr. A or equivalent
High strength bolt shall conform to ASTM A325M Type 1 or equivalent

6.3 Unit Weight


Unit weight of major construction materials shall be as follows :
Steel = 7850 kg/m3
Cement Mortar = 2000 kg/m3
Reinforcement Concrete = 2400 kg/m3
Plain Concrete = 2200 kg/m3
Soil saturated = 1800 kg/m3
Sand (dry) = 1600 kg/m3
Sand (saturated) = 1800 kg/m3
Ground Water = 1000 kg/m3
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 6 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

7.0 STABILITY PARAMETER


7.1 Parameter for Steel Structure Stability
Permanent Temporary
All. Bending Ratio for Steel Member 1.00 1.00
All. Lateral Displacement (∆/L) 1/300 1/200
All. Vertical Displacement (∆/L)
- Girders & Beams 1/360 1/360
- Girts & Purlins 1/200 1/200
∆ : Maximum displacement of one node
* L : Span of member/beam

7.2 Parameter for Soil Stability


Location = HB-03
Reference = BLA-FTP-C-RE-00-002
Permanent Temporary
2 8.18 8.18
All. Bearing Capacity (ton/m ), qall
All. Soil Pressure (ton/m2), σall 7.36 7.36
Friction Coeff. Between Soil & Concrete, µ 0.40 0.40
All. Safety Factor for Sliding 1.75 1.75
All. Safety Factor for Overturning 2.00 2.00

8.0 LOADING
There are two type for loading combination, Factored and Unfactored load combination. Factored load
combination shall be used for foundation reinforcement design while unfactored load combination shall be
used for foundation stability check and steel structure design. This combination are in accordance with
BLA-FTP-C-DB-50-001 Civil and Structure Design Basis for Pipeline

8.1 Unfactored Load Combination


LC 101 : Ds + Do + Tf + Af + Ff
LC 102 : 0.6 (Ds + Do + W) + Af + Tf
LC 103 : Ds + Do + Af + Tf + 0.45W
LC 104 : Ds + Do + Af + Tf + 0.6W
LC 105 : 0.6 (Ds + Do) + Af + Tf + 0.7Eo
LC 106 : Ds + Do + Af + Tf + 0.525Eo
LC 107 : Ds + Do + Af + Tf + 0.7Eo
LC 108 : Ds + De + 0.6W
LC 109 : Ds + Dt + 0.6W

8.2 Factored Load Combination for Steel Structure


LC 201 : 1.4 (Ds + Do + Tf + Af + Ff)
LC 202 : 1.2 (Ds + Do + Tf + Af + Ff)
LC 203 : 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0W
LC 204 : 1.2 (Ds + Do + Af + Tf) + 1.0W
LC 205 : 0.9 (Ds + Do) + 1.0Ee
LC 206 : 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0Eo
LC 207 : 1.2 (Ds + Do + Af + Tf) + 1.0Eo
LC 208 0.9 (Ds + De) + 1.0W
LC 209 1.2 (Ds + Dt) + W
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 7 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

9.0 SUMMARY OF ANALYSIS RESULT

9.1 Summary of Structure Analysis

This summary of analysis result presents checking of the Pipe Support and Pipe Sleeper Structure on
each type based on analysis by StaadPro. Detail of Structure Analysis of each type is presented in
Appendix B to D, as shown in following table.

No. Type of Support Remark


1 T-Post See Appendix B
2 Goal Post -
3 Concrete Trench See Appendix C
4 Pipe Sleeper See Appendix D

9.2 Summary of Foundation Analysis

This summary of analysis result presents checking of the Pipe Support and Pipe Sleeper Foundation on
each type based on analysis and loading from StaadPro. Type of pipe support foundation shown in the
table above.

Note : For CT calculation shall refer to Doc. No. BLA-FTP-C-CC-00-003 Calculation for Concrete Culvert,
Duct Bank and Other Underground Structure.

Detail of Foundation Analysis is presented in Appendix B to D.


Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 8 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

APPENDIX A

LOADING ANALYSIS
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 9 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

A.1 Dead Load of Structure Proper (Ds)


1). Steel Structure
Dead load of steel structure is calculated by computer program

2). Steel Connection and Accessories


Dead load of steel structure accessories is taken by 12% of total steel structure weight and it is
calculated by computer program

3). Grating
Grating used is 25x3 size, = 27 kg/m2

4). Handrail
Weight per meter length of handrail:
Unit
Item Length Weight
Weight
m kg/m kg
Post Rail L 60x60x6 3.63 5.40 19.60
Top Rail Pipe dia. 1.5" 1.00 4.05 4.05
Knee Rail FB 50x9 1.00 3.53 3.53
Toe Plate FB 75x6 1.00 3.53 3.53
Handrail weight per meter length 30.72

5). Ladder
Weight per meter length of ladder:
Unit
Item Length Weight
Weight
m kg/m kg
Side Rail L 65x65x7 2.00 7.70 15.40
Round bar dia.19 1.60 2.23 3.56
Handrail weight per meter length 18.96

A.2 Equipment Empty Dead Load (De)


The equipment empty dead load comes from pipe load data based on Pipe Stress Analysis. The loading
from Pipe Stress Analysis of each type of support is presented on Appendix B - Appendix C.

A.3 Equipment Operating Dead Load (Do)


The equipment operating dead load comes from pipe load data based on Pipe Stress Analysis. The
loading from Pipe Stress Analysis of each type of support is presented on Appendix B - Appendix C.

A.4 Equipment Test Dead Load (Dt)


The equipment test dead load comes from pipe load data based on Pipe Stress Analysis. The loading
from Pipe Stress Analysis of each type of support is presented on Appendix B - Appendix C.

A.5 Live Load (L)


1). Access Platform
Live load for access platform is 250 kg/m2. (BLA-FTP-C-DB-50-001 Civil Design Basis)

2). Ladder
Live load for ladder is 150 kg.
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 10 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

A.6 Handling Device / Impact Load (I)


Not applicable in this structure

A.7 Wind Load (W)


Wind load calculated based on ASCE 7-10 as follows :
Basic Wind Speed, V = 34.87 m/sec
Exposure coefficient, Kz = 0.85
Wind directionality factor, Kd = 0.95 (for tank & other structure) (Table. 6-4 ASCE 7-10)
Importance Factor, I = 1.15 (Table 6-1 ASCE 7-10)
Exposure Category = C (Section 6.5.6.3 ASCE 7-10)
Topographic Factor, Kzt = 1.00 (Section 6.5.7.2 ASCE 7-10)
Gust Effect Factor, G = 0.85
Net Force Pressure Coeff., C = 0.60

Velocity Pressure, qz = 0.613*Kz*Kzt*Kd*V2*I


= 0.613 x 0.85 x 1 x 0.95 x 34.87^2 x 1.15
= 692.16 N/m2
= 70.56 kg/m2

Wind Force, W = qz G C A

A.8 Earthquake / Seismic Load (E)


The earthquake load is reffered to UBC 1997, with the parameters below:
a. Seismic Zone Area = Zone 3
b. Seismic Zone Factor, Z = 0.30 G (Table 16-I UBC 1997)
c. Soil Profile Type = Sd (Table 16-J UBC 1997)
d. Importance Factor, I = 1.25 (Table 16-K UBC 1997)
e. Structural System, R = 4.50 (Table 16-P UBC 1997)
f. Seismic Coefficient, Ca = 0.36 (Table 16-Q UBC 1997)
Cv = 0.54 (Table 16-R UBC 1997)

g. Structure period ( T ); The value of T may be approximated from the following formula :
3/4
T = Ct (hn)
Where :
Ct = 0.0853 (for steel moment-resisting frames)
= 0.0731 (for concrete moment-resisting frames)
= 0.0488 (for all other building)

h. Base Shear Provision


Base shear from the structure may be found by using this formula :

Cv I
V = W
R T

0.54 x 1.25
V = W = 0.150 W/T
4.5 x T
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 11 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Shall not be more than :


2.5 C a I
V = W
R

2.5 x 0.36 x 1.25


V = W
4.50
= 0.250 W

And not less than :


V = 0.11 Ca I W

V = 0.11 x 0.36 x 1.25 x W


= 0.050 W

i. Mass Participation
According to UBC 1997, Ch. 1630.1.1, in the earthquake analysis Dead Load and Equipment Dead
Load shall be included as 100% portions, while Live Load at platform (floor load) could be taken 25%
portions.

A.9 Vibration Load (J)


Not applicable in this structure

A.10 Self-Straining and Thermal Forces (Tf)


The thermal forces load comes from pipe load data based on Pipe Stress Analysis. The loading from
Pipe Stress Analysis of each type of support is presented on Appendix B - Appendix C.

A.11 Surface Friction Forces (Ff)


The surface friction forces load comes from pipe load data based on Pipe Stress Analysis. The loading
from Pipe Stress Analysis of each type of support is presented on Appendix B - Appendix C.

A.12 Anchor Force (Af)


The anchor forces load comes from pipe load data based on Pipe Stress Analysis. The loading from Pipe
Stress Analysis of each type of support is presented on Appendix B - Appendix C.

A.13 Earth Pressure (Hs)


Not applicable in this structure

A.14 Water Pressure (Hw)


Not applicable in this structure

A.15 Rain Loads (R)


Not applicable in this structure

A.16 Vehicle Load (Vh)


Not applicable in this structure

A.17 Crane Load (C)


Not applicable in this structure
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 12 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

A.18 Load Combination


Detail load combination for Staad Pro presented in the following table

Load Explanation
D = Dead Load General
Ds = Dead Load of Structure Proper
De = Equipment Empty Dead Load
Do = Equipment Operating Dead Load
Dt = Equipment Test Dead Load
L = Live Load
I = Handling Device/ Impact Load
W = Wind Load
E = Earthquake/Seismic Load
J = Vibration Load
Tf = Self-Straining and Thermal Forces
Ff = Surface Friction Forces
Af = Anchor Forces
Hs = Earth Pressure
Hw = Water Pressure
R = Rain Load
Vh = Vehicle Load
C = Crane Load

Unfactored Load Combination


No Load Combination Condition
101 Ds + Do + Tf + Af + Ff Operating
102 0.6 (Ds + Do + W) + Af + Tf
103 Ds + Do + Af + Tf + 0.45W Operating + Wind
104 Ds + Do + Af + Tf + 0.6W
105 0.6 (Ds + Do) + Af + Tf + 0.7Eo
Operating +
106 Ds + Do + Af + Tf + 0.525Eo
Earthquake
107 Ds + Do + Af + Tf + 0.7Eo
108 Ds + De + 0.6W Erection + Wind
109 Ds + Dt + 0.6W Test

Factored Load Combination


No Load Combination Condition
201 1.4 (Ds + Do + Tf + Af + Ff)
Operating
202 1.2 (Ds + Do + Tf + Af + Ff)
203 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0W
Operating + Wind
204 1.2 (Ds + Do + Af + Tf) + 1.0W
205 0.9 (Ds + Do) + 1.0Ee
Operating +
206 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0Eo
Earthquake
207 1.2 (Ds + Do + Af + Tf) + 1.0Eo
208 0.9 (Ds + De) + 1.0W Erection + Wind
209 1.2 (Ds + Dt) + W Test
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 13 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

APPENDIX B

T-POST TYPE
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 14 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1. T-Post Type (SPS-TP2-ARR-01 - Civil Scope)


B1.1 Dimension and Size

B1 B2
Notes :
Bf = Width of footing,
Lf = Length of footing,
Hf = Height of footing,
H2 Df = Depth of foundation below ground,
Af = Area of foundation,
Ht Wf = Weight of footing
H1
Ws = Weight of soil
Bp = Width of pedestal,
Lp = Length of pedestal,
Gp Hp = Height of pedestal,
Dp = Depth of pedestal below ground,
Hp Gp = Height of pedestal above ground,
Dp
y Df Ap = Area of pedestal,

Hf
z
Off Z

1 Lp
Off X z
(0,0) Lf

Bp
Bf

Foundation Plan

Footing Size
Width of footing, Bf = 1.70 m
Length of footing, Lf = 1.70 m
Height of footing, Hf = 0.30 m
Depth of foundation below ground, Df = 2.00 m
Area of foundation, Af = 2.89 m2
Weight of footing Wf = 2.08 ton
Weight of soil Ws = 7.74 ton

Off Z, Off X is offset position from the center of the footing. (-) = Left or bottom from center of footing.
Unit (m, Ton)
Ft. Name Pr. Name Bp Lp Hp Dp Gp Area Weight Off Z Off X
FPS-16A 1 0.60 0.60 1.50 1.70 0.30 0.36 1.296 0 0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 15 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Structure Size
Width of beam, Bt = 0.90 m
B1 = 0.60 m
B2 = 0.60 m
Height of column, Ht = 3.70 m
H1 = 2.20 m
H2 = 1.50 m
Column Size, = H250x250x9x14
Beam Size, = H200x200x8x12

B1.2 Loading
Pipe Load
Pipe Diameter, dp = 0.152 m
Distance between support, Ls = 2.70 m
Piping support tag number, = SPS-TP2-ARR-01 / TP-F-P06-25-05
Reference = BLA-FTP-P-RE-00-003 Pipe Stress Analysis Report Alur
Rambong Cluster - AR1
Pipe loading data is taken from node 1820, 2620, and 2580 which have the largest load for this T post
Pipe Direction
Node Type Load Type Index Unit
Dia. X Y Z
Empty De N - -754 -
Operating Do N - -1573 -
6" 1820 Guide Thermal Tf N - - 8699
Anchor Af N - - -
Test T N - -1858 -
Empty De N - -754 -
Operating Do N - -2219 -
6" 2620 Guide Thermal Tf N - - 268
Anchor Af N - - -
Test T N - -1855 -
Empty De N - -754 -
Operating Do N - -2236 -
6" 2580 Guide Thermal Tf N - - 3382
Anchor Af N - - -
Test T N - -2269 -
*For detail see Appendix E

Wind Load
Velocity Pressure, qz = 0.613*Kz*Kzt*Kd*V2*I
= 70.56 kg/m2
Wind Force, W = qz G C A
Wind Force on the Pipe, W pz = 70.56 x 0.85 x 0.6 x (0.25 x 3.14 x 0.0508^2)
= 0.073 kg
W px = 70.56 x 0.85 x 0.6 x 2.7 x 0.0508
= 4.94 kg
Wind Force on the PS, W sz = 70.56 x 0.85 x 0.6 x 0.15
= 5.40 kg/m
W sx = 70.56 x 0.85 x 0.6 x 0.15
= 5.40 kg/m
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 16 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Seismic Load
Calculated automatically using STAAD.Pro using UBC 1997 with parameter shown in Appendix A.8

B1.3 STAAD.Pro Modeling

Isometric View Beam Number Node Number Member Properties

Seismic X-Dir Seismic Z-Dir Equipment Empty Equipment Operating

Equipment Test Thermal Forces Wind Load X-Dir Wind Load Z-Dir
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 17 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Support Reaction Summary - Unfactored Load (Permanent)


Horizontal Vertical Horizontal Moment
Node L/C
Fx kg Fy kg Fz kg Mx kg-m My kg-m Mz kg-m
Max Fx 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0
Min Fx 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0
Max Fy 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0
Min Fy 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0
Max Fz 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0
Min Fz 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0
Max Mx 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0
Min Mx 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0
Max My 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0
Min My 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0
Max Mz 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0
Min Mz 1 101 DS + DO + L + TF + AF + FF 0.0 999.9 -1234.9 -3964.9 0.0 0.0

Support Reaction Summary - Unfactored Load (Temporary)


Horizontal Vertical Horizontal Moment
Node L/C
Fx kg Fy kg Fz kg Mx kg-m My kg-m Mz kg-m
Max Fx 1 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X 175.0 600.0 -1287.4 -4133.8 -15.5 -487.3
Min Fx 1 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
-175.0 600.0 -1287.4 -4133.8 15.5 487.3
Max Fy 1 106 DS + DO + 0.75 L + AF + TF + 0.45-18.9
WX 999.9 -1234.9 -3964.9 0.7 40.8
Min Fy 1 102 0.6 (DS + DO + WX) + AF + TF + FF -25.2 600.0 -1234.9 -3987.6 0.9 54.4
Max Fz 1 129 DS + DE - 0.6 WZ 0.0 732.5 59.5 190.7 0.0 0.0
Min Fz 1 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z-52.5 600.0 -1409.9 -4474.9 4.6 146.2
Max Mx 1 134 DS + DT - 0.6 WZ 0.0 995.3 59.5 200.4 0.0 0.0
Min Mx 1 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z -52.5 600.0 -1409.9 -4474.9 4.6 146.2
Max My 1 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X-175.0 600.0 -1287.4 -4133.8 15.5 487.3
Min My 1 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X 175.0 600.0 -1287.4 -4133.8 -15.5 -487.3
Max Mz 1 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X-175.0 600.0 -1287.4 -4133.8 15.5 487.3
Min Mz 1 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X 175.0 600.0 -1287.4 -4133.8 -15.5 -487.3

Displacement Summary
Horizontal Vertical HorizontalResultantRotationalHorizontal
Node L/C
X mm Y mm Z mm mm rX rad rY rad
Max X 5 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
10.91 1.85 8.12 13.727 0 -0.01
Min X 5 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X
-10.91 1.85 8.12 13.727 0 0.01
Max Y 5 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z3.27 1.98 8.74 9.543 0 0
Min Y 4 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z
-1.15 -1.74 3.89 4.416 0 0
Max Z 5 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z3.27 1.98 8.74 9.543 0 0
Min Z 5 134 DS + DT - 0.6 WZ 0.00 -0.14 -0.43 0.447 0 0
Max rX 6 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z0.76 -0.01 8.74 8.773 0 0
Min rX 5 134 DS + DT - 0.6 WZ 0.00 -0.14 -0.43 0.447 0 0
Max rY 5 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X
-10.91 1.85 8.12 13.727 0 0.01
Min rY 5 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
10.91 1.85 8.12 13.727 0 -0.01
Max rZ 5 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X
-10.91 1.85 8.12 13.727 0 0.01
Min rZ 5 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
10.91 1.85 8.12 13.727 0 -0.01
Max Rst 5 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
10.91 1.85 8.12 13.727 0 -0.01
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 18 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.4 Steel Structure Design


Steel Member Size and Unity Check
Steel design were performed based on AISC-ASD. In STAADPro, maximum stress on frame member
directly selected by STAADPro software, taken from the worst loading combination. The member stress is
indicated as check ratio which should be less than 1.0, unless the member will be overstress or fail.

Ratio
Beam No. Section Clause L/C
Actual Allow
100 H250X250X9 0.385 1.00 AISC- H1-3 122
101 H250X250X9 0.111 1.00 AISC- H1-3 114
200 H200X200X8 0.017 1.00 AISC- H1-3 122
201 H200X200X8 0.017 1.00 SHEAR -Y 130
202 H200X200X8 0.022 1.00 AISC- H1-3 122

Deflection

∆y : Vertical Displacement
∆x : Lateral Displacement

Max Dis. (∆) Span (L)


Direction Node ∆/L All. ∆/L Check
mm mm
Vertical 4 1.739 600 1/345.03 1/120 OK
Lateral 5 13.727 3700 1/269.54 1/200 OK
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 19 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5 Foundation Design (FPS-16A)


Support Reaction (From output Staad pro)
Support reaction value are taken from output staad pro analysis. This reaction occur on base plate of
pedestal or pier. Maximum support reaction for permanent & temporary condition are summarized in the
following table.

B1.5.1 Summary of Load at Top of Pedestal or Pier Unit (Ton, Ton-m)


Ft. Name Pr. Name Load Case Fx Fy Fz Mx Mz
FPS-16A 1 Dead Load of Structure Proper (Ds) 0.00 -0.40 0.00 0.01 0.00
Equipment Empty Dead Load (De) 0.00 -0.34 0.00 0.03 0.00
Equipment Operating Dead Load (Do) 0.00 -0.60 0.00 0.05 0.00
Equipment Test Dead Load (Dt) 0.00 -0.60 0.00 0.04 0.00
Live Load (L) 0.00 0.00 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) 0.00 0.00 -1.23 -4.02 0.00
Anchor Force (Af) 0.00 0.00 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 0.00 0.00 0.00 0.00
Wind Load in X-Dir (Wx) -0.04 0.00 0.00 0.00 0.09
Wind Load in Z-Dir (Wz) 0.00 0.00 -0.10 -0.25 0.00
Earthquake in X-Dir (EQ-X) -0.25 0.00 0.00 0.00 0.70
Earthquake in Z-Dir (EQ-Z) 0.00 0.00 -0.25 -0.70 0.00

B1.5.2 Summary of Load at Pier bottom center Unit (Ton, Ton-m)


Ft. Name Pr. Name Load Case Fx Fy Fz Mx Mz
FPS-16A 1 Dead Load of Structure Proper (Ds) 0.00 -1.69 0.00 0.00 0.00
Equipment Empty Dead Load (De) 0.00 -1.63 0.00 0.00 0.00
Equipment Operating Dead Load (Do) 0.00 -1.90 0.00 0.00 0.00
Equipment Test Dead Load (Dt) 0.00 -1.89 0.00 0.00 0.00
Live Load (L) 0.00 -1.30 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) 0.00 -1.30 -1.23 -1.85 0.00
Anchor Force (Af) 0.00 -1.30 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 -1.30 0.00 0.00 0.00
Wind Load in X-Dir (Wx) -0.04 -1.30 0.00 0.00 0.06
Wind Load in Z-Dir (Wz) 0.00 -1.30 -0.10 -0.15 0.00
Earthquake in X-Dir (EQ-X) -0.25 -1.30 0.00 0.00 0.37
Earthquake in Z-Dir (EQ-Z) 0.00 -1.30 -0.25 -0.37 0.00

B1.5.3 Summary of Load at Footing bottom center Unit (Ton, Ton-m)


Ft. Name Pr. Name Load Case Fx Fy Fz Mx Mz
FPS-16A 1 Dead Load of Structure Proper (Ds) 0.00 -11.52 0.00 0.00 0.00
Equipment Empty Dead Load (De) 0.00 -0.34 0.00 0.00 0.00
Equipment Operating Dead Load (Do) 0.00 -0.60 0.00 0.00 0.00
Equipment Test Dead Load (Dt) 0.00 -0.60 0.00 0.00 0.00
Live Load (L) 0.00 0.00 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) 0.00 0.00 -1.23 -2.22 0.00
Anchor Force (Af) 0.00 0.00 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 0.00 0.00 0.00 0.00
Wind Load in X-Dir (Wx) -0.04 0.00 0.00 0.00 0.08
Wind Load in Z-Dir (Wz) 0.00 0.00 -0.10 -0.18 0.00
Earthquake in X-Dir (EQ-X) -0.25 0.00 0.00 0.00 0.45
Earthquake in Z-Dir (EQ-Z) 0.00 0.00 -0.25 -0.45 0.00
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 20 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5.4 Loading Combination - Unfactored Load Combination

EQ-X

EQ-Z
Wx

Wz
Do
Ds

De

Dt

Af
Tf

Ff
L
101 DS+DO+L+TF+AF+FF 1 1 1 1 1
102 0.6(DS+DO+WX)+AF+TF+FF 0.6 0.6 0.6
103 0.6(DS+DO+WZ)+AF+TF+FF 0.6 0.6 0.6
104 0.6(DS+DO-WX)+AF+TF+FF 0.6 0.6 -0.6
105 0.6(DS+DO-WZ)+AF+TF+FF 0.6 0.6 -0.6
106 DS+DO+0.75L+AF+TF+0.45WX 1 1 1 0.45
107 DS+DO+0.75L+AF+TF+0.45 WZ 1 1 1 0.45
108 DS+DO+0.75L+AF+TF-0.45 WX 1 1 1 -0.45
109 DS+DO+0.75L+AF+TF-0.45 WZ 1 1 1 -0.45
110 DS+DO+AF+TF+0.6WX 1 1 1 0.6
111 DS+DO+AF+TF+0.6 WZ 1 1 1 0.6
112 DS+DO+AF+TF-0.6 WX 1 1 1 -0.6
113 DS+DO+AF+TF-0.6 WZ 1 1 1 -0.6
114 0.6(DS+DO)+AF+TF+0.7EQ-X 0.6 0.6 0.7
115 0.6(DS+DO)+AF+TF+0.7EQ-Z 0.6 0.6 0.7
116 0.6(DS+DO)+AF+TF-0.7EQ-X 0.6 0.6 -0.7
117 0.6(DS+DO)+AF+TF-0.7EQ-Z 0.6 0.6 -0.7
118 DS+DO+AF+TF+0.75L+0.525EQ-X 1 1 0.525
119 DS+DO+AF+TF+0.75L+0.525EO-Z 1 1 0.525
120 DS+DO+AF+TF+0.75L-0.525 EQ-X 1 1 -0.525

121 DS+DO+AF+TF+0.75L-0.525 EQ-Z 1 1 -0.525

122 DS+DO+AF+TF+0.7EQ-X 1 1 1 0.7


123 DS+DO+AF+TF+0.7EQ-Z 1 1 1 0.7
124 DS+DO+AF+TF-0.7EQ-X 1 1 1 -0.7
125 DS+DO+AF+TF-0.7EQ-Z 1 1 1 -0.7
126 DS+DE+0.6 WX 1 1 0.6
127 DS+DE+0.6 WZ 1 1 0.6
128 DS+DE-0.6 WX 1 1 -0.6
129 DS+DE-0.6 WZ 1 1 -0.6
130 DS+DT+L 1 1
131 DS+DT+0.6 WX 1 1 0.6
132 DS+DT+0.6 WZ 1 1 0.6
133 DS+DT-0.6 WX 1 1 -0.6
134 DS+DT-0.6 WZ 1 1 -0.6
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 21 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5.5 Loading Combination - Factored Load Combination

EQ-X

EQ-Z
Wx

Wz
Do
Ds

De

Dt

Af
Tf

Ff
L
201 1.4(DS+DO+L+TF+AF+FF) 1.4 1.4 1.4 1.4 1.4
202 1.2(DS+DO+L+TF+AF+FF) 1.2 1.2 1.2 1.2 1.2
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.9 0.9 1
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.9 0.9 1
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.9 0.9 -1
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.9 0.9 -1
207 1.2(DS+DO+AF+TF)+1.0WX 1.2 1.2 1.2 1
208 1.2(DS+DO+AF+TF)+1.0WZ 1.2 1.2 1.2 1
209 1.2(DS+DO+AF+TF)-1.0WX 1.2 1.2 1.2 -1
210 1.2(DS+DO+AF+TF)-1.0WZ 1.2 1.2 1.2 -1
211 0.9(DS+DO)+1.0EQ-X 0.9 0.9 1
212 0.9(DS+DO)+1.0EQ-Z 0.9 0.9 1
213 0.9(DS+DO)-1.0EQ-X 0.9 0.9 -1
214 0.9(DS+DO)-1.0EQ-Z 0.9 0.9 -1
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.9 0.9 1.2 1
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.9 0.9 1.2 1
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.9 0.9 1.2 -1
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.9 0.9 1.2 -1
219 1.2(DS+DO+AF+TF)+1.0EQ-X 1.2 1.2 1
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 1.2 1.2 1
221 1.2(DS+DO+AF+TF)-1.0EQ-X 1.2 1.2 -1
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 1.2 1.2 -1
223 0.9(DS+DE)+1.0 WX 0.9 0.9 1
224 0.9(DS+DE)+1.0 WZ 0.9 0.9 1
225 0.9(DS+DE)-1.0 WX 0.9 0.9 -1
226 0.9(DS+DE)-1.0 WZ 0.9 0.9 -1
227 1.2(DS+DT)+1.0 WX 1.2 1.2 1
228 1.2(DS+DT)+1.0 WZ 1.2 1.2 1
229 1.2(DS+DT)-1.0 WX 1.2 1.2 -1
230 1.2(DS+DT)-1.0 WZ 1.2 1.2 -1
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 22 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5.6 Unfactored Loading Combination in Footing Bottom Center (With Pier & Footing Selfweight)
Unit (Ton, Ton-m)
Ft. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz
FPS-16A 101 DS+DO+L+TF+AF+FF 0.0 -12.1 -1.2 -2.2 0.0
102 0.6(DS+DO+WX)+AF+TF+FF 0.0 -7.3 0.0 0.0 0.0
103 0.6(DS+DO+WZ)+AF+TF+FF 0.0 -7.3 -0.1 -0.1 0.0
104 0.6(DS+DO-WX)+AF+TF+FF 0.0 -7.3 0.0 0.0 0.0
105 0.6(DS+DO-WZ)+AF+TF+FF 0.0 -7.3 0.1 0.1 0.0
106 DS+DO+0.75L+AF+TF+0.45WX 0.0 -12.1 0.0 0.0 0.0
107 DS+DO+0.75L+AF+TF+0.45 WZ 0.0 -12.1 0.0 -0.1 0.0
108 DS+DO+0.75L+AF+TF-0.45 WX 0.0 -12.1 0.0 0.0 0.0
109 DS+DO+0.75L+AF+TF-0.45 WZ 0.0 -12.1 0.0 0.1 0.0
110 DS+DO+AF+TF+0.6WX 0.0 -12.1 0.0 0.0 0.0
111 DS+DO+AF+TF+0.6 WZ 0.0 -12.1 -0.1 -0.1 0.0
112 DS+DO+AF+TF-0.6 WX 0.0 -12.1 0.0 0.0 0.0
113 DS+DO+AF+TF-0.6 WZ 0.0 -12.1 0.1 0.1 0.0
114 0.6(DS+DO)+AF+TF+0.7EQ-X -0.2 -7.3 0.0 0.0 0.3
115 0.6(DS+DO)+AF+TF+0.7EQ-Z 0.0 -7.3 -0.2 -0.3 0.0
116 0.6(DS+DO)+AF+TF-0.7EQ-X 0.2 -7.3 0.0 0.0 -0.3
117 0.6(DS+DO)+AF+TF-0.7EQ-Z 0.0 -7.3 0.2 0.3 0.0
118 DS+DO+AF+TF+0.75L+0.525EQ-X -0.1 -12.1 0.0 0.0 0.2
119 DS+DO+AF+TF+0.75L+0.525EO-Z 0.0 -12.1 -0.1 -0.2 0.0
120 DS+DO+AF+TF+0.75L-0.525 EQ-X 0.1 -12.1 0.0 0.0 -0.2
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z 0.0 -12.1 0.1 0.2 0.0
122 DS+DO+AF+TF+0.7EQ-X -0.2 -12.1 0.0 0.0 0.3
123 DS+DO+AF+TF+0.7EQ-Z 0.0 -12.1 -0.2 -0.3 0.0
124 DS+DO+AF+TF-0.7EQ-X 0.2 -12.1 0.0 0.0 -0.3
125 DS+DO+AF+TF-0.7EQ-Z 0.0 -12.1 0.2 0.3 0.0
126 DS+DE+0.6 WX 0.0 -11.9 0.0 0.0 0.0
127 DS+DE+0.6 WZ 0.0 -11.9 -0.1 -0.1 0.0
128 DS+DE-0.6 WX 0.0 -11.9 0.0 0.0 0.0
129 DS+DE-0.6 WZ 0.0 -11.9 0.1 0.1 0.0
130 DS+DT+L 0.0 -12.1 0.0 0.0 0.0
131 DS+DT+0.6 WX 0.0 -12.1 0.0 0.0 0.0
132 DS+DT+0.6 WZ 0.0 -12.1 -0.1 -0.1 0.0
133 DS+DT-0.6 WX 0.0 -12.1 0.0 0.0 0.0
134 DS+DT-0.6 WZ 0.0 -12.1 0.1 0.1 0.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 23 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5.7 Factored Loading Combination in Footing Bottom Center (With Pier & Footing Selfweight)
Unit (Ton, Ton-m)
Ft. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz
FPS-16A 201 1.4(DS+DO+L+TF+AF+FF) 0.0 -17.0 -1.7 -3.1 0.0
202 1.2(DS+DO+L+TF+AF+FF) 0.0 -14.5 -1.5 -2.7 0.0
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.0 -10.9 0.0 0.0 0.1
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.0 -10.9 -0.1 -0.2 0.0
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.0 -10.9 0.0 0.0 -0.1
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.0 -10.9 0.1 0.2 0.0
207 1.2(DS+DO+AF+TF)+1.0WX 0.0 -14.5 0.0 0.0 0.1
208 1.2(DS+DO+AF+TF)+1.0WZ 0.0 -14.5 -0.1 -0.2 0.0
209 1.2(DS+DO+AF+TF)-1.0WX 0.0 -14.5 0.0 0.0 -0.1
210 1.2(DS+DO+AF+TF)-1.0WZ 0.0 -14.5 0.1 0.2 0.0
211 0.9(DS+DO)+1.0EQ-X -0.2 -10.9 0.0 0.0 0.4
212 0.9(DS+DO)+1.0EQ-Z 0.0 -10.9 -0.2 -0.4 0.0
213 0.9(DS+DO)-1.0EQ-X 0.2 -10.9 0.0 0.0 -0.4
214 0.9(DS+DO)-1.0EQ-Z 0.0 -10.9 0.2 0.4 0.0
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X -0.2 -10.9 0.0 0.0 0.4
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.0 -10.9 -0.2 -0.4 0.0
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.2 -10.9 0.0 0.0 -0.4
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.0 -10.9 0.2 0.4 0.0
219 1.2(DS+DO+AF+TF)+1.0EQ-X -0.2 -14.5 0.0 0.0 0.4
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.0 -14.5 -0.2 -0.4 0.0
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.2 -14.5 0.0 0.0 -0.4
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.0 -14.5 0.2 0.4 0.0
223 0.9(DS+DE)+1.0 WX 0.0 -10.7 0.0 0.0 0.1
224 0.9(DS+DE)+1.0 WZ 0.0 -10.7 -0.1 -0.2 0.0
225 0.9(DS+DE)-1.0 WX 0.0 -10.7 0.0 0.0 -0.1
226 0.9(DS+DE)-1.0 WZ 0.0 -10.7 0.1 0.2 0.0
227 1.2(DS+DT)+1.0 WX 0.0 -14.5 0.0 0.0 0.1
228 1.2(DS+DT)+1.0 WZ 0.0 -14.5 -0.1 -0.2 0.0
229 1.2(DS+DT)-1.0 WX 0.0 -14.5 0.0 0.0 -0.1
230 1.2(DS+DT)-1.0 WZ 0.0 -14.5 0.1 0.2 0.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 24 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5.8 Factored Loading Combination in Pier Bottom Center (With Pier Selfweight)
Unit (Ton, Ton-m)
Pr. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz
1 201 1.4(DS+DO+L+TF+AF+FF) 0.0 -10.5 -1.7 -2.6 0.0
202 1.2(DS+DO+L+TF+AF+FF) 0.0 -9.0 -1.5 -2.2 0.0
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.0 -4.5 0.0 0.0 0.1
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.0 -4.5 -0.1 -0.1 0.0
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.0 -1.9 0.0 0.0 -0.1
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.0 -1.9 0.1 0.1 0.0
207 1.2(DS+DO+AF+TF)+1.0WX 0.0 -7.2 0.0 0.0 0.1
208 1.2(DS+DO+AF+TF)+1.0WZ 0.0 -7.2 -0.1 -0.1 0.0
209 1.2(DS+DO+AF+TF)-1.0WX 0.0 -4.6 0.0 0.0 -0.1
210 1.2(DS+DO+AF+TF)-1.0WZ 0.0 -4.6 0.1 0.1 0.0
211 0.9(DS+DO)+1.0EQ-X -0.2 -4.5 0.0 0.0 0.4
212 0.9(DS+DO)+1.0EQ-Z 0.0 -4.5 -0.2 -0.4 0.0
213 0.9(DS+DO)-1.0EQ-X 0.2 -1.9 0.0 0.0 -0.4
214 0.9(DS+DO)-1.0EQ-Z 0.0 -1.9 0.2 0.4 0.0
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X -0.2 -6.1 0.0 0.0 0.4
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.0 -6.1 -0.2 -0.4 0.0
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.2 -3.5 0.0 0.0 -0.4
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.0 -3.5 0.2 0.4 0.0
219 1.2(DS+DO+AF+TF)+1.0EQ-X -0.2 -5.6 0.0 0.0 0.4
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.0 -5.6 -0.2 -0.4 0.0
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.2 -3.0 0.0 0.0 -0.4
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.0 -3.0 0.2 0.4 0.0
223 0.9(DS+DE)+1.0 WX 0.0 -4.3 0.0 0.0 0.1
224 0.9(DS+DE)+1.0 WZ 0.0 -4.3 -0.1 -0.1 0.0
225 0.9(DS+DE)-1.0 WX 0.0 -1.7 0.0 0.0 -0.1
226 0.9(DS+DE)-1.0 WZ 0.0 -1.7 0.1 0.1 0.0
227 1.2(DS+DT)+1.0 WX 0.0 -5.6 0.0 0.0 0.1
228 1.2(DS+DT)+1.0 WZ 0.0 -5.6 -0.1 -0.1 0.0
229 1.2(DS+DT)-1.0 WX 0.0 -3.0 0.0 0.0 -0.1
230 1.2(DS+DT)-1.0 WZ 0.0 -3.0 0.1 0.1 0.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 25 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5.9 Check of Stability

B1.5.9.1 Check Soil Pressure


Formula : ΣFy/Af ± ΣMz/Wz or ΣFy/Af ± ΣMx/Wx > Allow. Bearing Capacity (Q all.)

Input Data :
Ft. Name Af (m2) Bf (m) Lf (m) Wz (m3) Wx (m3)
FPS-16A 2.890 1.700 1.700 0.819 0.819

Z - Direction Unit (Ton, Ton-m, Ton/m2)


L. Comb Σ Fy Σ Mx Q max Q min Q all. Check
101 DS+DO+L+TF+AF+FF -12.1 -2.2 6.9 1.5 7.4 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -7.3 0.0 2.5 2.5 7.4 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -7.3 -0.1 2.6 2.4 7.4 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -7.3 0.0 2.5 2.5 7.4 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -7.3 0.1 2.6 2.4 7.4 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -12.1 0.0 4.2 4.2 7.4 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -12.1 -0.1 4.3 4.1 7.4 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -12.1 0.0 4.2 4.2 7.4 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -12.1 0.1 4.3 4.1 7.4 OK!
110 DS+DO+AF+TF+0.6WX -12.1 0.0 4.2 4.2 7.4 OK!
111 DS+DO+AF+TF+0.6 WZ -12.1 -0.1 4.3 4.1 7.4 OK!
112 DS+DO+AF+TF-0.6 WX -12.1 0.0 4.2 4.2 7.4 OK!
113 DS+DO+AF+TF-0.6 WZ -12.1 0.1 4.3 4.1 7.4 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -7.3 0.0 2.5 2.5 7.4 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -7.3 -0.3 2.9 2.1 7.4 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -7.3 0.0 2.5 2.5 7.4 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -7.3 0.3 2.9 2.1 7.4 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -12.1 0.0 4.2 4.2 7.4 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -12.1 -0.2 4.5 3.9 7.4 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -12.1 0.0 4.2 4.2 7.4 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -12.1 0.2 4.5 3.9 7.4 OK!
122 DS+DO+AF+TF+0.7EQ-X -12.1 0.0 4.2 4.2 7.4 OK!
123 DS+DO+AF+TF+0.7EQ-Z -12.1 -0.3 4.6 3.8 7.4 OK!
124 DS+DO+AF+TF-0.7EQ-X -12.1 0.0 4.2 4.2 7.4 OK!
125 DS+DO+AF+TF-0.7EQ-Z -12.1 0.3 4.6 3.8 7.4 OK!
126 DS+DE+0.6 WX -11.9 0.0 4.1 4.1 7.4 OK!
127 DS+DE+0.6 WZ -11.9 -0.1 4.2 4.0 7.4 OK!
128 DS+DE-0.6 WX -11.9 0.0 4.1 4.1 7.4 OK!
129 DS+DE-0.6 WZ -11.9 0.1 4.2 4.0 7.4 OK!
130 DS+DT+L -12.1 0.0 4.2 4.2 7.4 OK!
131 DS+DT+0.6 WX -12.1 0.0 4.2 4.2 7.4 OK!
132 DS+DT+0.6 WZ -12.1 -0.1 4.3 4.1 7.4 OK!
133 DS+DT-0.6 WX -12.1 0.0 4.2 4.2 7.4 OK!
134 DS+DT-0.6 WZ -12.1 0.1 4.3 4.1 7.4 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 26 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (Ton, Ton-m, Ton/m2)


L. Comb Σ Fy Σ Mz Q max Q min Q all. Check
101 DS+DO+L+TF+AF+FF -12.1 0.0 4.2 4.2 7.4 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -7.3 0.0 2.6 2.5 7.4 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -7.3 0.0 2.5 2.5 7.4 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -7.3 0.0 2.6 2.5 7.4 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -7.3 0.0 2.5 2.5 7.4 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -12.1 0.0 4.2 4.2 7.4 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -12.1 0.0 4.2 4.2 7.4 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -12.1 0.0 4.2 4.2 7.4 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -12.1 0.0 4.2 4.2 7.4 OK!
110 DS+DO+AF+TF+0.6WX -12.1 0.0 4.2 4.1 7.4 OK!
111 DS+DO+AF+TF+0.6 WZ -12.1 0.0 4.2 4.2 7.4 OK!
112 DS+DO+AF+TF-0.6 WX -12.1 0.0 4.2 4.1 7.4 OK!
113 DS+DO+AF+TF-0.6 WZ -12.1 0.0 4.2 4.2 7.4 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -7.3 0.3 2.9 2.1 7.4 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -7.3 0.0 2.5 2.5 7.4 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -7.3 -0.3 2.9 2.1 7.4 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -7.3 0.0 2.5 2.5 7.4 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -12.1 0.2 4.5 3.9 7.4 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -12.1 0.0 4.2 4.2 7.4 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -12.1 -0.2 4.5 3.9 7.4 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -12.1 0.0 4.2 4.2 7.4 OK!
122 DS+DO+AF+TF+0.7EQ-X -12.1 0.3 4.6 3.8 7.4 OK!
123 DS+DO+AF+TF+0.7EQ-Z -12.1 0.0 4.2 4.2 7.4 OK!
124 DS+DO+AF+TF-0.7EQ-X -12.1 -0.3 4.6 3.8 7.4 OK!
125 DS+DO+AF+TF-0.7EQ-Z -12.1 0.0 4.2 4.2 7.4 OK!
126 DS+DE+0.6 WX -11.9 0.0 4.2 4.0 7.4 OK!
127 DS+DE+0.6 WZ -11.9 0.0 4.1 4.1 7.4 OK!
128 DS+DE-0.6 WX -11.9 0.0 4.2 4.0 7.4 OK!
129 DS+DE-0.6 WZ -11.9 0.0 4.1 4.1 7.4 OK!
130 DS+DT+L -12.1 0.0 4.2 4.2 7.4 OK!
131 DS+DT+0.6 WX -12.1 0.0 4.2 4.1 7.4 OK!
132 DS+DT+0.6 WZ -12.1 0.0 4.2 4.2 7.4 OK!
133 DS+DT-0.6 WX -12.1 0.0 4.2 4.1 7.4 OK!
134 DS+DT-0.6 WZ -12.1 0.0 4.2 4.2 7.4 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 27 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5.9.2 Check Sliding


Formula : (µΣFy/ΣFz or µΣFy/ΣFx) > Allow. Safety Factor ---> OK!

Z - Direction Unit (Ton)


L. Comb Σ Fy Σ Fz µΣFy/Σ
µΣ Σ Fz Allow. Check
101 DS+DO+L+TF+AF+FF -12.1 -1.2 3.9 1.75 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -7.3 0.0 N.A 1.75 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -7.3 -0.1 48.9 1.75 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -7.3 0.0 N.A 1.75 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -7.3 0.1 48.9 1.75 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -12.1 0.0 N.A 1.75 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -12.1 0.0 108.6 1.75 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -12.1 0.0 N.A 1.75 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -12.1 0.0 108.6 1.75 OK!
110 DS+DO+AF+TF+0.6WX -12.1 0.0 N.A 1.75 OK!
111 DS+DO+AF+TF+0.6 WZ -12.1 -0.1 81.5 1.75 OK!
112 DS+DO+AF+TF-0.6 WX -12.1 0.0 N.A 1.75 OK!
113 DS+DO+AF+TF-0.6 WZ -12.1 0.1 81.5 1.75 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -7.3 0.0 N.A 1.75 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -7.3 -0.2 16.6 1.75 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -7.3 0.0 N.A 1.75 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -7.3 0.2 16.6 1.75 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -12.1 0.0 N.A 1.75 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -12.1 -0.1 36.9 1.75 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -12.1 0.0 N.A 1.75 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -12.1 0.1 36.9 1.75 OK!
122 DS+DO+AF+TF+0.7EQ-X -12.1 0.0 N.A 1.75 OK!
123 DS+DO+AF+TF+0.7EQ-Z -12.1 -0.2 27.7 1.75 OK!
124 DS+DO+AF+TF-0.7EQ-X -12.1 0.0 N.A 1.75 OK!
125 DS+DO+AF+TF-0.7EQ-Z -12.1 0.2 27.7 1.75 OK!
126 DS+DE+0.6 WX -11.9 0.0 N.A 1.75 OK!
127 DS+DE+0.6 WZ -11.9 -0.1 79.7 1.75 OK!
128 DS+DE-0.6 WX -11.9 0.0 N.A 1.75 OK!
129 DS+DE-0.6 WZ -11.9 0.1 79.7 1.75 OK!
130 DS+DT+L -12.1 0.0 N.A 1.75 OK!
131 DS+DT+0.6 WX -12.1 0.0 N.A 1.75 OK!
132 DS+DT+0.6 WZ -12.1 -0.1 81.4 1.75 OK!
133 DS+DT-0.6 WX -12.1 0.0 N.A 1.75 OK!
134 DS+DT-0.6 WZ -12.1 0.1 81.4 1.75 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 28 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (Ton)


L. Comb Σ Fy Σ Fx µΣFy/Σ
µΣ Σ Fx Allow. Check
101 DS+DO+L+TF+AF+FF -12.1 0.0 N.A 1.75 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -7.3 0.0 115.4 1.75 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -7.3 0.0 N.A 1.75 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -7.3 0.0 115.4 1.75 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -7.3 0.0 N.A 1.75 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -12.1 0.0 256.5 1.75 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -12.1 0.0 N.A 1.75 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -12.1 0.0 256.5 1.75 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -12.1 0.0 N.A 1.75 OK!
110 DS+DO+AF+TF+0.6WX -12.1 0.0 192.4 1.75 OK!
111 DS+DO+AF+TF+0.6 WZ -12.1 0.0 N.A 1.75 OK!
112 DS+DO+AF+TF-0.6 WX -12.1 0.0 192.4 1.75 OK!
113 DS+DO+AF+TF-0.6 WZ -12.1 0.0 N.A 1.75 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -7.3 -0.2 16.6 1.75 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -7.3 0.0 N.A 1.75 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -7.3 0.2 16.6 1.75 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -7.3 0.0 N.A 1.75 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -12.1 -0.1 36.9 1.75 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -12.1 0.0 N.A 1.75 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -12.1 0.1 36.9 1.75 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -12.1 0.0 N.A 1.75 OK!
122 DS+DO+AF+TF+0.7EQ-X -12.1 -0.2 27.7 1.75 OK!
123 DS+DO+AF+TF+0.7EQ-Z -12.1 0.0 N.A 1.75 OK!
124 DS+DO+AF+TF-0.7EQ-X -12.1 0.2 27.7 1.75 OK!
125 DS+DO+AF+TF-0.7EQ-Z -12.1 0.0 N.A 1.75 OK!
126 DS+DE+0.6 WX -11.9 0.0 188.2 1.75 OK!
127 DS+DE+0.6 WZ -11.9 0.0 N.A 1.75 OK!
128 DS+DE-0.6 WX -11.9 0.0 188.2 1.75 OK!
129 DS+DE-0.6 WZ -11.9 0.0 N.A 1.75 OK!
130 DS+DT+L -12.1 0.0 N.A 1.75 OK!
131 DS+DT+0.6 WX -12.1 0.0 192.3 1.75 OK!
132 DS+DT+0.6 WZ -12.1 0.0 N.A 1.75 OK!
133 DS+DT-0.6 WX -12.1 0.0 192.3 1.75 OK!
134 DS+DT-0.6 WZ -12.1 0.0 N.A 1.75 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 29 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5.9.3 Check Overturning


Formula : ΣFy*Lf/(2ΣMz) or ΣFy*Bf/(2ΣMx) > Allow. Safety Factor ---> OK!

Z - Direction Unit (Ton, Ton-m)


L. Comb Σ Fy Σ Mx Σ Fy*Bf/(2ΣΣ Mx) Allow. Check
101 DS+DO+L+TF+AF+FF -12.1 -2.2 4.6 2.00 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -7.3 0.0 N.A 2.00 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -7.3 -0.1 57.7 2.00 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -7.3 0.0 N.A 2.00 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -7.3 0.1 57.7 2.00 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -12.1 0.0 N.A 2.00 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -12.1 -0.1 128.2 2.00 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -12.1 0.0 N.A 2.00 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -12.1 0.1 128.2 2.00 OK!
110 DS+DO+AF+TF+0.6WX -12.1 0.0 N.A 2.00 OK!
111 DS+DO+AF+TF+0.6 WZ -12.1 -0.1 96.2 2.00 OK!
112 DS+DO+AF+TF-0.6 WX -12.1 0.0 N.A 2.00 OK!
113 DS+DO+AF+TF-0.6 WZ -12.1 0.1 96.2 2.00 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -7.3 0.0 N.A 2.00 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -7.3 -0.3 19.6 2.00 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -7.3 0.0 N.A 2.00 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -7.3 0.3 19.6 2.00 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -12.1 0.0 N.A 2.00 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -12.1 -0.2 43.6 2.00 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -12.1 0.0 N.A 2.00 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -12.1 0.2 43.6 2.00 OK!
122 DS+DO+AF+TF+0.7EQ-X -12.1 0.0 N.A 2.00 OK!
123 DS+DO+AF+TF+0.7EQ-Z -12.1 -0.3 32.7 2.00 OK!
124 DS+DO+AF+TF-0.7EQ-X -12.1 0.0 N.A 2.00 OK!
125 DS+DO+AF+TF-0.7EQ-Z -12.1 0.3 32.7 2.00 OK!
126 DS+DE+0.6 WX -11.9 0.0 N.A 2.00 OK!
127 DS+DE+0.6 WZ -11.9 -0.1 94.0 2.00 OK!
128 DS+DE-0.6 WX -11.9 0.0 N.A 2.00 OK!
129 DS+DE-0.6 WZ -11.9 0.1 94.0 2.00 OK!
130 DS+DT+L -12.1 0.0 N.A 2.00 OK!
131 DS+DT+0.6 WX -12.1 0.0 N.A 2.00 OK!
132 DS+DT+0.6 WZ -12.1 -0.1 96.1 2.00 OK!
133 DS+DT-0.6 WX -12.1 0.0 N.A 2.00 OK!
134 DS+DT-0.6 WZ -12.1 0.1 96.1 2.00 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 30 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (Ton, Ton-m)


L. Comb Σ Fy Σ Mz Σ Fy*Lf/(2Σ
Σ Mz) Allow. Check
101 DS+DO+L+TF+AF+FF -12.1 0.0 N.A 2.00 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -7.3 0.0 136.3 2.00 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -7.3 0.0 N.A 2.00 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -7.3 0.0 136.3 2.00 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -7.3 0.0 N.A 2.00 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -12.1 0.0 302.9 2.00 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -12.1 0.0 N.A 2.00 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -12.1 0.0 302.9 2.00 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -12.1 0.0 N.A 2.00 OK!
110 DS+DO+AF+TF+0.6WX -12.1 0.0 227.1 2.00 OK!
111 DS+DO+AF+TF+0.6 WZ -12.1 0.0 N.A 2.00 OK!
112 DS+DO+AF+TF-0.6 WX -12.1 0.0 227.1 2.00 OK!
113 DS+DO+AF+TF-0.6 WZ -12.1 0.0 N.A 2.00 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -7.3 0.3 19.6 2.00 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -7.3 0.0 N.A 2.00 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -7.3 -0.3 19.6 2.00 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -7.3 0.0 N.A 2.00 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -12.1 0.2 43.6 2.00 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -12.1 0.0 N.A 2.00 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -12.1 -0.2 43.6 2.00 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -12.1 0.0 N.A 2.00 OK!
122 DS+DO+AF+TF+0.7EQ-X -12.1 0.3 32.7 2.00 OK!
123 DS+DO+AF+TF+0.7EQ-Z -12.1 0.0 N.A 2.00 OK!
124 DS+DO+AF+TF-0.7EQ-X -12.1 -0.3 32.7 2.00 OK!
125 DS+DO+AF+TF-0.7EQ-Z -12.1 0.0 N.A 2.00 OK!
126 DS+DE+0.6 WX -11.9 0.0 222.1 2.00 OK!
127 DS+DE+0.6 WZ -11.9 0.0 N.A 2.00 OK!
128 DS+DE-0.6 WX -11.9 0.0 222.1 2.00 OK!
129 DS+DE-0.6 WZ -11.9 0.0 N.A 2.00 OK!
130 DS+DT+L -12.1 0.0 N.A 2.00 OK!
131 DS+DT+0.6 WX -12.1 0.0 227.1 2.00 OK!
132 DS+DT+0.6 WZ -12.1 0.0 N.A 2.00 OK!
133 DS+DT-0.6 WX -12.1 0.0 227.1 2.00 OK!
134 DS+DT-0.6 WZ -12.1 0.0 N.A 2.00 OK!

B1.5.10 Footing Reinforcement


ACI 318-05 Chapter 10.5.4 :
For structural slabs and footings of uniform thickness, As min in the direction of the span shall be same as that
required by :
Area of shrinkage and temperature reinforcement shall provide at least the following ratios of
reinforcement area to gross concrete area, but not less than 0.0014:
(a) Slabs where grade 280 or 350 deformed bars are used …..0.0020
(b) Slabs where grade 420 deformed bars or welded wire reinforcement are used ….. 0.0018
(c) Slabs where reinforcement with yield stress exceeding 420 MPa measured at a yield strain of 0.35
percent is used ….. 0.0018*420/fy

As req' = Max(As1, As2) As 1 = ρreq*b*d As 2 = ρmin*b*h


Rn = Mu/(φ∗b*d^2) ρreq = 0.85*fc'/fy*(1-(1-(2*Rn/(0.85*fc')))^0.5)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 31 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Design Parameters
Unit (MPa, mm)
φ (Bending) fc' fy cl_b cl_t
0.8 24.8 390 75 50

φ = Reduction factor for bending


fc' = Concrete strength of footing
fy = Yield strength of rebar
cl_b = Clear concrete cover for bottom rebar
cl_t = Clear concrete cover for top rebar

Using Bar = D 13 - 200 (Z - direction) Max. Spacing OK!


D 13 - 200 (X - direction) Max. Spacing OK!
Z - Direction
Unit (Ton/m2, mm, Ton-m)
L. Comb Qu max Qu min Qu eq. Pos. d Mux
201 1.4(DS+DO+L+TF+AF+FF) 9.7 2.07 5.87 top 243.5 0.00
202 1.2(DS+DO+L+TF+AF+FF) 8.3 1.77 5.03 top 243.5 0.00
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.8 3.77 3.77 top 243.5 0.00
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 4.0 3.56 3.77 top 243.5 0.00
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.8 3.77 3.77 top 243.5 0.00
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 4.0 3.56 3.77 top 243.5 0.00
207 1.2(DS+DO+AF+TF)+1.0WX 5.0 5.03 5.03 top 243.5 0.00
208 1.2(DS+DO+AF+TF)+1.0WZ 5.2 4.81 5.03 top 243.5 0.00
209 1.2(DS+DO+AF+TF)-1.0WX 5.0 5.03 5.03 top 243.5 0.00
210 1.2(DS+DO+AF+TF)-1.0WZ 5.2 4.81 5.03 top 243.5 0.00
211 0.9(DS+DO)+1.0EQ-X 3.8 3.77 3.77 top 243.5 0.00
212 0.9(DS+DO)+1.0EQ-Z 4.3 3.22 3.77 top 243.5 0.00
213 0.9(DS+DO)-1.0EQ-X 3.8 3.77 3.77 top 243.5 0.00
214 0.9(DS+DO)-1.0EQ-Z 4.3 3.22 3.77 top 243.5 0.00
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 3.8 3.77 3.77 top 243.5 0.00
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 4.3 3.22 3.77 top 243.5 0.00
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 3.8 3.77 3.77 top 243.5 0.00
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 4.3 3.22 3.77 top 243.5 0.00
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.0 5.03 5.03 top 243.5 0.00
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 5.6 4.48 5.03 top 243.5 0.00
221 1.2(DS+DO+AF+TF)-1.0EQ-X 5.0 5.03 5.03 top 243.5 0.00
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 5.6 4.48 5.03 top 243.5 0.00
223 0.9(DS+DE)+1.0 WX 3.7 3.69 3.69 top 243.5 0.00
224 0.9(DS+DE)+1.0 WZ 3.9 3.47 3.69 top 243.5 0.00
225 0.9(DS+DE)-1.0 WX 3.7 3.69 3.69 top 243.5 0.00
226 0.9(DS+DE)-1.0 WZ 3.9 3.47 3.69 top 243.5 0.00
227 1.2(DS+DT)+1.0 WX 5.0 5.03 5.03 top 243.5 0.00
228 1.2(DS+DT)+1.0 WZ 5.2 4.81 5.03 top 243.5 0.00
229 1.2(DS+DT)-1.0 WX 5.0 5.03 5.03 top 243.5 0.00
230 1.2(DS+DT)-1.0 WZ 5.2 4.81 5.03 top 243.5 0.00
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 32 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 1,261 651 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 1,261 651 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.000 0.000 0.002 1,261 651 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.000 0.000 0.002 1,261 651 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.000 0.000 0.002 1,261 651 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.000 0.000 0.002 1,261 651 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.000 0.000 0.002 1,261 651 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.000 0.000 0.002 1,261 651 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.000 0.000 0.002 1,261 651 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.000 0.000 0.002 1,261 651 OK!
211 0.9(DS+DO)+1.0EQ-X 0.000 0.000 0.002 1,261 651 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.000 0.000 0.002 1,261 651 OK!
213 0.9(DS+DO)-1.0EQ-X 0.000 0.000 0.002 1,261 651 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.000 0.000 0.002 1,261 651 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.000 0.000 0.002 1,261 651 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.000 0.000 0.002 1,261 651 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.000 0.000 0.002 1,261 651 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.000 0.000 0.002 1,261 651 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.000 0.000 0.002 1,261 651 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.000 0.000 0.002 1,261 651 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.000 0.000 0.002 1,261 651 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.000 0.000 0.002 1,261 651 OK!
223 0.9(DS+DE)+1.0 WX 0.000 0.000 0.002 1,261 651 OK!
224 0.9(DS+DE)+1.0 WZ 0.000 0.000 0.002 1,261 651 OK!
225 0.9(DS+DE)-1.0 WX 0.000 0.000 0.002 1,261 651 OK!
226 0.9(DS+DE)-1.0 WZ 0.000 0.000 0.002 1,261 651 OK!
227 1.2(DS+DT)+1.0 WX 0.000 0.000 0.002 1,261 651 OK!
228 1.2(DS+DT)+1.0 WZ 0.000 0.000 0.002 1,261 651 OK!
229 1.2(DS+DT)-1.0 WX 0.000 0.000 0.002 1,261 651 OK!
230 1.2(DS+DT)-1.0 WZ 0.000 0.000 0.002 1,261 651 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 33 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (Ton/m2, mm, Ton-m)


L. Comb Qu max Qu min Qu eq. Pos. d Mux
201 1.4(DS+DO+L+TF+AF+FF) 9.7 2.07 5.87 bottom 218.5 6.60
202 1.2(DS+DO+L+TF+AF+FF) 8.3 1.77 5.03 bottom 218.5 5.66
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.8 3.77 3.77 bottom 218.5 4.24
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 4.0 3.56 3.77 bottom 218.5 4.24
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.8 3.77 3.77 bottom 218.5 4.24
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 4.0 3.56 3.77 bottom 218.5 4.24
207 1.2(DS+DO+AF+TF)+1.0WX 5.0 5.03 5.03 bottom 218.5 5.66
208 1.2(DS+DO+AF+TF)+1.0WZ 5.2 4.81 5.03 bottom 218.5 5.66
209 1.2(DS+DO+AF+TF)-1.0WX 5.0 5.03 5.03 bottom 218.5 5.66
210 1.2(DS+DO+AF+TF)-1.0WZ 5.2 4.81 5.03 bottom 218.5 5.66
211 0.9(DS+DO)+1.0EQ-X 3.8 3.77 3.77 bottom 218.5 4.24
212 0.9(DS+DO)+1.0EQ-Z 4.3 3.22 3.77 bottom 218.5 4.24
213 0.9(DS+DO)-1.0EQ-X 3.8 3.77 3.77 bottom 218.5 4.24
214 0.9(DS+DO)-1.0EQ-Z 4.3 3.22 3.77 bottom 218.5 4.24
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 3.8 3.77 3.77 bottom 218.5 4.24
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 4.3 3.22 3.77 bottom 218.5 4.24
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 3.8 3.77 3.77 bottom 218.5 4.24
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 4.3 3.22 3.77 bottom 218.5 4.24
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.0 5.03 5.03 bottom 218.5 5.66
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 5.6 4.48 5.03 bottom 218.5 5.66
221 1.2(DS+DO+AF+TF)-1.0EQ-X 5.0 5.03 5.03 bottom 218.5 5.66
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 5.6 4.48 5.03 bottom 218.5 5.66
223 0.9(DS+DE)+1.0 WX 3.7 3.69 3.69 bottom 218.5 4.15
224 0.9(DS+DE)+1.0 WZ 3.9 3.47 3.69 bottom 218.5 4.15
225 0.9(DS+DE)-1.0 WX 3.7 3.69 3.69 bottom 218.5 4.15
226 0.9(DS+DE)-1.0 WZ 3.9 3.47 3.69 bottom 218.5 4.15
227 1.2(DS+DT)+1.0 WX 5.0 5.03 5.03 bottom 218.5 5.65
228 1.2(DS+DT)+1.0 WZ 5.2 4.81 5.03 bottom 218.5 5.65
229 1.2(DS+DT)-1.0 WX 5.0 5.03 5.03 bottom 218.5 5.65
230 1.2(DS+DT)-1.0 WZ 5.2 4.81 5.03 bottom 218.5 5.65
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 34 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 0.997 0.003 0.002 1,261 973 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.855 0.002 0.002 1,261 831 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.641 0.002 0.002 1,261 620 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.641 0.002 0.002 1,261 620 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.641 0.002 0.002 1,261 620 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.641 0.002 0.002 1,261 620 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.855 0.002 0.002 1,261 831 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.855 0.002 0.002 1,261 831 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.855 0.002 0.002 1,261 831 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.855 0.002 0.002 1,261 831 OK!
211 0.9(DS+DO)+1.0EQ-X 0.641 0.002 0.002 1,261 620 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.641 0.002 0.002 1,261 620 OK!
213 0.9(DS+DO)-1.0EQ-X 0.641 0.002 0.002 1,261 620 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.641 0.002 0.002 1,261 620 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.641 0.002 0.002 1,261 620 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.641 0.002 0.002 1,261 620 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.641 0.002 0.002 1,261 620 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.641 0.002 0.002 1,261 620 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.855 0.002 0.002 1,261 831 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.855 0.002 0.002 1,261 831 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.855 0.002 0.002 1,261 831 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.855 0.002 0.002 1,261 831 OK!
223 0.9(DS+DE)+1.0 WX 0.627 0.002 0.002 1,261 606 OK!
224 0.9(DS+DE)+1.0 WZ 0.627 0.002 0.002 1,261 606 OK!
225 0.9(DS+DE)-1.0 WX 0.627 0.002 0.002 1,261 606 OK!
226 0.9(DS+DE)-1.0 WZ 0.627 0.002 0.002 1,261 606 OK!
227 1.2(DS+DT)+1.0 WX 0.854 0.002 0.002 1,261 831 OK!
228 1.2(DS+DT)+1.0 WZ 0.854 0.002 0.002 1,261 831 OK!
229 1.2(DS+DT)-1.0 WX 0.854 0.002 0.002 1,261 831 OK!
230 1.2(DS+DT)-1.0 WZ 0.854 0.002 0.002 1,261 831 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 35 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction
Unit (Ton/m2, mm, Ton-m)
L. Comb Qu max Qu min Qu eq. Pos. d Muz
201 1.4(DS+DO+L+TF+AF+FF) 5.9 5.87 5.87 top 230.5 0.00
202 1.2(DS+DO+L+TF+AF+FF) 5.0 5.03 5.03 top 230.5 0.00
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.9 3.68 3.77 top 230.5 0.00
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.8 3.77 3.77 top 230.5 0.00
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.9 3.68 3.77 top 230.5 0.00
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.8 3.77 3.77 top 230.5 0.00
207 1.2(DS+DO+AF+TF)+1.0WX 5.1 4.94 5.03 top 230.5 0.00
208 1.2(DS+DO+AF+TF)+1.0WZ 5.0 5.03 5.03 top 230.5 0.00
209 1.2(DS+DO+AF+TF)-1.0WX 5.1 4.94 5.03 top 230.5 0.00
210 1.2(DS+DO+AF+TF)-1.0WZ 5.0 5.03 5.03 top 230.5 0.00
211 0.9(DS+DO)+1.0EQ-X 4.3 3.22 3.77 top 230.5 0.00
212 0.9(DS+DO)+1.0EQ-Z 3.8 3.77 3.77 top 230.5 0.00
213 0.9(DS+DO)-1.0EQ-X 4.3 3.22 3.77 top 230.5 0.00
214 0.9(DS+DO)-1.0EQ-Z 3.8 3.77 3.77 top 230.5 0.00
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 4.3 3.22 3.77 top 230.5 0.00
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.8 3.77 3.77 top 230.5 0.00
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 4.3 3.22 3.77 top 230.5 0.00
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.8 3.77 3.77 top 230.5 0.00
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.6 4.48 5.03 top 230.5 0.00
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 5.0 5.03 5.03 top 230.5 0.00
221 1.2(DS+DO+AF+TF)-1.0EQ-X 5.6 4.48 5.03 top 230.5 0.00
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 5.0 5.03 5.03 top 230.5 0.00
223 0.9(DS+DE)+1.0 WX 3.8 3.60 3.69 top 230.5 0.00
224 0.9(DS+DE)+1.0 WZ 3.7 3.69 3.69 top 230.5 0.00
225 0.9(DS+DE)-1.0 WX 3.8 3.60 3.69 top 230.5 0.00
226 0.9(DS+DE)-1.0 WZ 3.7 3.69 3.69 top 230.5 0.00
227 1.2(DS+DT)+1.0 WX 5.1 4.94 5.03 top 230.5 0.00
228 1.2(DS+DT)+1.0 WZ 5.0 5.03 5.03 top 230.5 0.00
229 1.2(DS+DT)-1.0 WX 5.1 4.94 5.03 top 230.5 0.00
230 1.2(DS+DT)-1.0 WZ 5.0 5.03 5.03 top 230.5 0.00
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 36 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 1,261 584 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 1,261 584 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.000 0.000 0.002 1,261 584 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.000 0.000 0.002 1,261 584 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.000 0.000 0.002 1,261 584 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.000 0.000 0.002 1,261 584 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.000 0.000 0.002 1,261 584 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.000 0.000 0.002 1,261 584 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.000 0.000 0.002 1,261 584 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.000 0.000 0.002 1,261 584 OK!
211 0.9(DS+DO)+1.0EQ-X 0.000 0.000 0.002 1,261 584 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.000 0.000 0.002 1,261 584 OK!
213 0.9(DS+DO)-1.0EQ-X 0.000 0.000 0.002 1,261 584 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.000 0.000 0.002 1,261 584 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.000 0.000 0.002 1,261 584 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.000 0.000 0.002 1,261 584 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.000 0.000 0.002 1,261 584 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.000 0.000 0.002 1,261 584 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.000 0.000 0.002 1,261 584 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.000 0.000 0.002 1,261 584 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.000 0.000 0.002 1,261 584 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.000 0.000 0.002 1,261 584 OK!
223 0.9(DS+DE)+1.0 WX 0.000 0.000 0.002 1,261 584 OK!
224 0.9(DS+DE)+1.0 WZ 0.000 0.000 0.002 1,261 584 OK!
225 0.9(DS+DE)-1.0 WX 0.000 0.000 0.002 1,261 584 OK!
226 0.9(DS+DE)-1.0 WZ 0.000 0.000 0.002 1,261 584 OK!
227 1.2(DS+DT)+1.0 WX 0.000 0.000 0.002 1,261 584 OK!
228 1.2(DS+DT)+1.0 WZ 0.000 0.000 0.002 1,261 584 OK!
229 1.2(DS+DT)-1.0 WX 0.000 0.000 0.002 1,261 584 OK!
230 1.2(DS+DT)-1.0 WZ 0.000 0.000 0.002 1,261 584 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 37 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (Ton/m2, mm, Ton-m)


L. Comb Qu max Qu min Qu eq. Pos. d Muz
201 1.4(DS+DO+L+TF+AF+FF) 5.9 5.87 5.87 bottom 205.5 6.60
202 1.2(DS+DO+L+TF+AF+FF) 5.0 5.03 5.03 bottom 205.5 5.66
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.9 3.68 3.77 bottom 205.5 4.24
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.8 3.77 3.77 bottom 205.5 4.24
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.9 3.68 3.77 bottom 205.5 4.24
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.8 3.77 3.77 bottom 205.5 4.24
207 1.2(DS+DO+AF+TF)+1.0WX 5.1 4.94 5.03 bottom 205.5 5.66
208 1.2(DS+DO+AF+TF)+1.0WZ 5.0 5.03 5.03 bottom 205.5 5.66
209 1.2(DS+DO+AF+TF)-1.0WX 5.1 4.94 5.03 bottom 205.5 5.66
210 1.2(DS+DO+AF+TF)-1.0WZ 5.0 5.03 5.03 bottom 205.5 5.66
211 0.9(DS+DO)+1.0EQ-X 4.3 3.22 3.77 bottom 205.5 4.24
212 0.9(DS+DO)+1.0EQ-Z 3.8 3.77 3.77 bottom 205.5 4.24
213 0.9(DS+DO)-1.0EQ-X 4.3 3.22 3.77 bottom 205.5 4.24
214 0.9(DS+DO)-1.0EQ-Z 3.8 3.77 3.77 bottom 205.5 4.24
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 4.3 3.22 3.77 bottom 205.5 4.24
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.8 3.77 3.77 bottom 205.5 4.24
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 4.3 3.22 3.77 bottom 205.5 4.24
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.8 3.77 3.77 bottom 205.5 4.24
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.6 4.48 5.03 bottom 205.5 5.66
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 5.0 5.03 5.03 bottom 205.5 5.66
221 1.2(DS+DO+AF+TF)-1.0EQ-X 5.6 4.48 5.03 bottom 205.5 5.66
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 5.0 5.03 5.03 bottom 205.5 5.66
223 0.9(DS+DE)+1.0 WX 3.8 3.60 3.69 bottom 205.5 4.15
224 0.9(DS+DE)+1.0 WZ 3.7 3.69 3.69 bottom 205.5 4.15
225 0.9(DS+DE)-1.0 WX 3.8 3.60 3.69 bottom 205.5 4.15
226 0.9(DS+DE)-1.0 WZ 3.7 3.69 3.69 bottom 205.5 4.15
227 1.2(DS+DT)+1.0 WX 5.1 4.94 5.03 bottom 205.5 5.65
228 1.2(DS+DT)+1.0 WZ 5.0 5.03 5.03 bottom 205.5 5.65
229 1.2(DS+DT)-1.0 WX 5.1 4.94 5.03 bottom 205.5 5.65
230 1.2(DS+DT)-1.0 WZ 5.0 5.03 5.03 bottom 205.5 5.65
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 38 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 1.127 0.003 0.002 1,261 183 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.966 0.003 0.002 1,261 156 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.725 0.002 0.002 1,261 117 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.725 0.002 0.002 1,261 117 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.725 0.002 0.002 1,261 117 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.725 0.002 0.002 1,261 117 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.966 0.003 0.002 1,261 156 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.966 0.003 0.002 1,261 156 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.966 0.003 0.002 1,261 156 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.966 0.003 0.002 1,261 156 OK!
211 0.9(DS+DO)+1.0EQ-X 0.725 0.002 0.002 1,261 117 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.725 0.002 0.002 1,261 117 OK!
213 0.9(DS+DO)-1.0EQ-X 0.725 0.002 0.002 1,261 117 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.725 0.002 0.002 1,261 117 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.725 0.002 0.002 1,261 117 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.725 0.002 0.002 1,261 117 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.725 0.002 0.002 1,261 117 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.725 0.002 0.002 1,261 117 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.966 0.003 0.002 1,261 156 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.966 0.003 0.002 1,261 156 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.966 0.003 0.002 1,261 156 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.966 0.003 0.002 1,261 156 OK!
223 0.9(DS+DE)+1.0 WX 0.709 0.002 0.002 1,261 114 OK!
224 0.9(DS+DE)+1.0 WZ 0.709 0.002 0.002 1,261 114 OK!
225 0.9(DS+DE)-1.0 WX 0.709 0.002 0.002 1,261 114 OK!
226 0.9(DS+DE)-1.0 WZ 0.709 0.002 0.002 1,261 114 OK!
227 1.2(DS+DT)+1.0 WX 0.966 0.003 0.002 1,261 156 OK!
228 1.2(DS+DT)+1.0 WZ 0.966 0.003 0.002 1,261 156 OK!
229 1.2(DS+DT)-1.0 WX 0.966 0.003 0.002 1,261 156 OK!
230 1.2(DS+DT)-1.0 WZ 0.966 0.003 0.002 1,261 156 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 39 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5.11 One Way Shear


ACI 318-05 Chapter 11.3.1.1 :
For members subject to shear and flexure only :
Vc = 1/6*fc'^0.5*bw*d Vu < φ Vc ---> OK!
Vu = Qu eq. * Tributary Area (TA)
Reduction factor for shear, φ = 0.75

Z - Direction
L. Comb Qu eq. d TA Vu φ Vc Check
(ton/m2) (mm) (m2) (kN) (kN)
201 1.4(DS+DO+L+TF+AF+FF) 5.87 243.5 0.52 30.01 257.68 OK!
202 1.2(DS+DO+L+TF+AF+FF) 5.03 243.5 0.52 25.72 257.68 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.77 243.5 0.52 19.29 257.68 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.77 243.5 0.52 19.29 257.68 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.77 243.5 0.52 19.29 257.68 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.77 243.5 0.52 19.29 257.68 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 5.03 243.5 0.52 25.72 257.68 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 5.03 243.5 0.52 25.72 257.68 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 5.03 243.5 0.52 25.72 257.68 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 5.03 243.5 0.52 25.72 257.68 OK!
211 0.9(DS+DO)+1.0EQ-X 3.77 243.5 0.52 19.29 257.68 OK!
212 0.9(DS+DO)+1.0EQ-Z 3.77 243.5 0.52 19.29 257.68 OK!
213 0.9(DS+DO)-1.0EQ-X 3.77 243.5 0.52 19.29 257.68 OK!
214 0.9(DS+DO)-1.0EQ-Z 3.77 243.5 0.52 19.29 257.68 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 3.77 243.5 0.52 19.29 257.68 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.77 243.5 0.52 19.29 257.68 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 3.77 243.5 0.52 19.29 257.68 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.77 243.5 0.52 19.29 257.68 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.03 243.5 0.52 25.72 257.68 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 5.03 243.5 0.52 25.72 257.68 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 5.03 243.5 0.52 25.72 257.68 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 5.03 243.5 0.52 25.72 257.68 OK!
223 0.9(DS+DE)+1.0 WX 3.69 243.5 0.52 18.86 257.68 OK!
224 0.9(DS+DE)+1.0 WZ 3.69 243.5 0.52 18.86 257.68 OK!
225 0.9(DS+DE)-1.0 WX 3.69 243.5 0.52 18.86 257.68 OK!
226 0.9(DS+DE)-1.0 WZ 3.69 243.5 0.52 18.86 257.68 OK!
227 1.2(DS+DT)+1.0 WX 5.03 243.5 0.52 25.71 257.68 OK!
228 1.2(DS+DT)+1.0 WZ 5.03 243.5 0.52 25.71 257.68 OK!
229 1.2(DS+DT)-1.0 WX 5.03 243.5 0.52 25.71 257.68 OK!
230 1.2(DS+DT)-1.0 WZ 5.03 243.5 0.52 25.71 257.68 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 40 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction
L. Comb Qu eq. d TA Vu φ Vc Check
(ton/m2) (mm) (m2) (kN) (kN)
201 1.4(DS+DO+L+TF+AF+FF) 5.87 230.5 0.54 31.3 243.9 OK!
202 1.2(DS+DO+L+TF+AF+FF) 5.03 230.5 0.54 26.8 243.9 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.77 230.5 0.54 20.1 243.9 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.77 230.5 0.54 20.1 243.9 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.77 230.5 0.54 20.1 243.9 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.77 230.5 0.54 20.1 243.9 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 5.03 230.5 0.54 26.8 243.9 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 5.03 230.5 0.54 26.8 243.9 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 5.03 230.5 0.54 26.8 243.9 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 5.03 230.5 0.54 26.8 243.9 OK!
211 0.9(DS+DO)+1.0EQ-X 3.77 230.5 0.54 20.1 243.9 OK!
212 0.9(DS+DO)+1.0EQ-Z 3.77 230.5 0.54 20.1 243.9 OK!
213 0.9(DS+DO)-1.0EQ-X 3.77 230.5 0.54 20.1 243.9 OK!
214 0.9(DS+DO)-1.0EQ-Z 3.77 230.5 0.54 20.1 243.9 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 3.77 230.5 0.54 20.1 243.9 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.77 230.5 0.54 20.1 243.9 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 3.77 230.5 0.54 20.1 243.9 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.77 230.5 0.54 20.1 243.9 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.03 230.5 0.54 26.8 243.9 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 5.03 230.5 0.54 26.8 243.9 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 5.03 230.5 0.54 26.8 243.9 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 5.03 230.5 0.54 26.8 243.9 OK!
223 0.9(DS+DE)+1.0 WX 3.69 230.5 0.54 19.7 243.9 OK!
224 0.9(DS+DE)+1.0 WZ 3.69 230.5 0.54 19.7 243.9 OK!
225 0.9(DS+DE)-1.0 WX 3.69 230.5 0.54 19.7 243.9 OK!
226 0.9(DS+DE)-1.0 WZ 3.69 230.5 0.54 19.7 243.9 OK!
227 1.2(DS+DT)+1.0 WX 5.03 230.5 0.54 26.8 243.9 OK!
228 1.2(DS+DT)+1.0 WZ 5.03 230.5 0.54 26.8 243.9 OK!
229 1.2(DS+DT)-1.0 WX 5.03 230.5 0.54 26.8 243.9 OK!
230 1.2(DS+DT)-1.0 WZ 5.03 230.5 0.54 26.8 243.9 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 41 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5.12 Two Way Shear


ACI 318-05 Chapter 11.12.2.1 :
For nonprestressed slabs and footings, Vc shall be the smallest of (a), (b) and (c):
(a) Vc1 = 1/6*(1+2/β)*(fc')^0.5*bo*d
(b) Vc2 = (αs*d/bo+2)*((fc')^0.5*bo*d)/12
(c) Vc3 = ((fc')^0.5*bo*d)/3
Pier Name = 1
Ratio of long side to short side of pedestal, β = 1.00
Perimeter of critical section for footing, bo = 850 mm
Exterior pedestal, αs = 20 (For exterior / corner column)

Z & X - Direction
L. Comb Qu eq. d ave TA Vu φ Vc Check
(ton/m2) (mm) (m2) (kN) (kN)
201 1.4(DS+DO+L+TF+AF+FF) 5.87 212 2.23 128.5 224.5 OK!
202 1.2(DS+DO+L+TF+AF+FF) 5.03 212 2.23 110.1 224.5 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.77 212 2.23 82.6 224.5 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.77 212 2.23 82.6 224.5 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.77 212 2.23 82.6 224.5 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.77 212 2.23 82.6 224.5 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 5.03 212 2.23 110.1 224.5 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 5.03 212 2.23 110.1 224.5 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 5.03 212 2.23 110.1 224.5 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 5.03 212 2.23 110.1 224.5 OK!
211 0.9(DS+DO)+1.0EQ-X 3.77 212 2.23 82.6 224.5 OK!
212 0.9(DS+DO)+1.0EQ-Z 3.77 212 2.23 82.6 224.5 OK!
213 0.9(DS+DO)-1.0EQ-X 3.77 212 2.23 82.6 224.5 OK!
214 0.9(DS+DO)-1.0EQ-Z 3.77 212 2.23 82.6 224.5 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 3.77 212 2.23 82.6 224.5 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.77 212 2.23 82.6 224.5 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 3.77 212 2.23 82.6 224.5 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.77 212 2.23 82.6 224.5 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.03 212 2.23 110.1 224.5 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 5.03 212 2.23 110.1 224.5 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 5.03 212 2.23 110.1 224.5 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 5.03 212 2.23 110.1 224.5 OK!
223 0.9(DS+DE)+1.0 WX 3.69 212 2.23 80.8 224.5 OK!
224 0.9(DS+DE)+1.0 WZ 3.69 212 2.23 80.8 224.5 OK!
225 0.9(DS+DE)-1.0 WX 3.69 212 2.23 80.8 224.5 OK!
226 0.9(DS+DE)-1.0 WZ 3.69 212 2.23 80.8 224.5 OK!
227 1.2(DS+DT)+1.0 WX 5.03 212 2.23 110.1 224.5 OK!
228 1.2(DS+DT)+1.0 WZ 5.03 212 2.23 110.1 224.5 OK!
229 1.2(DS+DT)-1.0 WX 5.03 212 2.23 110.1 224.5 OK!
230 1.2(DS+DT)-1.0 WZ 5.03 212 2.23 110.1 224.5 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 42 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.5.13 Pedestal Reinforcement

Design Parameters
Unit (MPa, mm)
φ (Bending) φ (Shear) fc' fy cl_c
0.8 0.75 24.8 390 50

φ = Reduction factor for bending and shear


fc' = Concrete strength of pedestal
fy = Yield strength of rebar
cl_c = Clear concrete cover for pedestal rebar for all sides

Pedestal reinforcement are 0.5% from foundation gross section (ACI 318-05 Chapter 15.8.2.1)
ρo = 0.005 50
As-req = ρr Ap
= 0.005 x 0.3600
= 0.0018 m2
600 mm
= 18.000 cm2
db = 13 mm, ; A = 132.73 mm2 50
n = 18 ea
So, use : 18 D 13 for longitudinal reinforcement.
600 mm
Check Pedestal Flexural Reinforcement
Unit (mm)
Pr. Name Bp Lp dz dx ph
1 600.00 600.00 533.50 533.50 2000
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 43 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Z - Direction Unit (N/mm2, mm2)


Pr. Name L. Comb Rn ρ req ρ min Using As As req Check
1 201 1.4(DS+DO+L+TF+AF+FF) 0.186 0.000 0.002 929 534 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.160 0.000 0.002 929 534 OK!
0.000
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.000 0.002 929 534 OK!
0.011
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.000 0.002 929 534 OK!
0.000
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.000 0.002 929 534 OK!
0.011
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.000 0.002 929 534 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.000 0.000 0.002 929 534 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.011 0.000 0.002 929 534 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.000 0.000 0.002 929 534 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.011 0.000 0.002 929 534 OK!
211 0.9(DS+DO)+1.0EQ-X 0.000 0.000 0.002 929 534 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.027 0.000 0.002 929 534 OK!
213 0.9(DS+DO)-1.0EQ-X 0.000 0.000 0.002 929 534 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.027 0.000 0.002 929 534 OK!
0.000
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.000 0.002 929 534 OK!
0.027
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.000 0.002 929 534 OK!
0.000
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.000 0.002 929 534 OK!
0.027
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.000 0.002 929 534 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.000 0.000 0.002 929 534 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.027 0.000 0.002 929 534 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.000 0.000 0.002 929 534 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.027 0.000 0.002 929 534 OK!
223 0.9(DS+DE)+1.0 WX 0.000 0.000 0.002 929 534 OK!
224 0.9(DS+DE)+1.0 WZ 0.011 0.000 0.002 929 534 OK!
225 0.9(DS+DE)-1.0 WX 0.000 0.000 0.002 929 534 OK!
226 0.9(DS+DE)-1.0 WZ 0.011 0.000 0.002 929 534 OK!
227 1.2(DS+DT)+1.0 WX 0.000 0.000 0.002 929 534 OK!
228 1.2(DS+DT)+1.0 WZ 0.011 0.000 0.002 929 534 OK!
229 1.2(DS+DT)-1.0 WX 0.000 0.000 0.002 929 534 OK!
230 1.2(DS+DT)-1.0 WZ 0.011 0.000 0.002 929 534 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 44 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (N/mm2, mm2)


Pr. Name L. Comb Rn ρ req ρ min Using As As req Check
1 201 1.4(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 929 534 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 929 534 OK!
0.005
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.000 0.002 929 534 OK!
0.000
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.000 0.002 929 534 OK!
0.005
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.000 0.002 929 534 OK!
0.000
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.000 0.002 929 534 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.005 0.000 0.002 929 534 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.000 0.000 0.002 929 534 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.005 0.000 0.002 929 534 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.000 0.000 0.002 929 534 OK!
211 0.9(DS+DO)+1.0EQ-X 0.027 0.000 0.002 929 534 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.000 0.000 0.002 929 534 OK!
213 0.9(DS+DO)-1.0EQ-X 0.027 0.000 0.002 929 534 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.000 0.000 0.002 929 534 OK!
0.027
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.000 0.002 929 534 OK!
0.000
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.000 0.002 929 534 OK!
0.027
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.000 0.002 929 534 OK!
0.000
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.000 0.002 929 534 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.027 0.000 0.002 929 534 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.000 0.000 0.002 929 534 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.027 0.000 0.002 929 534 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.000 0.000 0.002 929 534 OK!
223 0.9(DS+DE)+1.0 WX 0.005 0.000 0.002 929 534 OK!
224 0.9(DS+DE)+1.0 WZ 0.000 0.000 0.002 929 534 OK!
225 0.9(DS+DE)-1.0 WX 0.005 0.000 0.002 929 534 OK!
226 0.9(DS+DE)-1.0 WZ 0.000 0.000 0.002 929 534 OK!
227 1.2(DS+DT)+1.0 WX 0.005 0.000 0.002 929 534 OK!
228 1.2(DS+DT)+1.0 WZ 0.000 0.000 0.002 929 534 OK!
229 1.2(DS+DT)-1.0 WX 0.005 0.000 0.002 929 534 OK!
230 1.2(DS+DT)-1.0 WZ 0.000 0.000 0.002 929 534 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 45 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Shear Reinforcement

Unit (mm, MPa)


Dia Spacing fyt
10 200 240

Z - Direction Unit (kN, mm, mm2)


Pr. Name L. Comb φ Vc Vu s Max Av min As use Check
1 201 1.4(DS+DO+L+TF+AF+FF) 199.261 1.7 250 0 157.08 OK!
202 1.2(DS+DO+L+TF+AF+FF) 199.261 1.5 250 0 157.08 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX
199.261 0.0 250 0 157.08 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ
199.261 0.1 250 0 157.08 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX
199.261 0.0 250 0 157.08 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ
199.261 0.1 250 0 157.08 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 199.261 0.0 250 0 157.08 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 199.261 0.1 250 0 157.08 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 199.261 0.0 250 0 157.08 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 199.261 0.1 250 0 157.08 OK!
211 0.9(DS+DO)+1.0EQ-X 199.261 0.0 250 0 157.08 OK!
212 0.9(DS+DO)+1.0EQ-Z 199.261 0.2 250 0 157.08 OK!
213 0.9(DS+DO)-1.0EQ-X 199.261 0.0 250 0 157.08 OK!
214 0.9(DS+DO)-1.0EQ-Z 199.261 0.2 250 0 157.08 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X
199.261 0.0 250 0 157.08 OK!
199.261
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.2 250 0 157.08 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X
199.261 0.0 250 0 157.08 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z
199.261 0.2 250 0 157.08 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 199.261 0.0 250 0 157.08 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 199.261 0.2 250 0 157.08 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 199.261 0.0 250 0 157.08 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 199.261 0.2 250 0 157.08 OK!
223 0.9(DS+DE)+1.0 WX 199.261 0.0 250 0 157.08 OK!
224 0.9(DS+DE)+1.0 WZ 199.261 0.1 250 0 157.08 OK!
225 0.9(DS+DE)-1.0 WX 199.261 0.0 250 0 157.08 OK!
226 0.9(DS+DE)-1.0 WZ 199.261 0.1 250 0 157.08 OK!
227 1.2(DS+DT)+1.0 WX 199.261 0.0 250 0 157.08 OK!
228 1.2(DS+DT)+1.0 WZ 199.261 0.1 250 0 157.08 OK!
229 1.2(DS+DT)-1.0 WX 199.261 0.0 250 0 157.08 OK!
230 1.2(DS+DT)-1.0 WZ 199.261 0.1 250 0 157.08 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 46 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (kN, mm, mm2)


Pr. Name L. Comb φ Vc Vu s Max Av min As use Check
1 201 1.4(DS+DO+L+TF+AF+FF) 199.261 0.0 250 0 157.08 OK!
202 1.2(DS+DO+L+TF+AF+FF) 199.261 0.0 250 0 157.08 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX
199.261 0.0 250 0 157.08 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ
199.261 0.0 250 0 157.08 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX
199.261 0.0 250 0 157.08 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ
199.261 0.0 250 0 157.08 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 199.261 0.0 250 0 157.08 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 199.261 0.0 250 0 157.08 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 199.261 0.0 250 0 157.08 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 199.261 0.0 250 0 157.08 OK!
211 0.9(DS+DO)+1.0EQ-X 199.261 0.2 250 0 157.08 OK!
212 0.9(DS+DO)+1.0EQ-Z 199.261 0.0 250 0 157.08 OK!
213 0.9(DS+DO)-1.0EQ-X 199.261 0.2 250 0 157.08 OK!
214 0.9(DS+DO)-1.0EQ-Z 199.261 0.0 250 0 157.08 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X
199.261 0.2 250 0 157.08 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z
199.261 0.0 250 0 157.08 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X
199.261 0.2 250 0 157.08 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z
199.261 0.0 250 0 157.08 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 199.261 0.2 250 0 157.08 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 199.261 0.0 250 0 157.08 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 199.261 0.2 250 0 157.08 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 199.261 0.0 250 0 157.08 OK!
223 0.9(DS+DE)+1.0 WX 199.261 0.0 250 0 157.08 OK!
224 0.9(DS+DE)+1.0 WZ 199.261 0.0 250 0 157.08 OK!
225 0.9(DS+DE)-1.0 WX 199.261 0.0 250 0 157.08 OK!
226 0.9(DS+DE)-1.0 WZ 199.261 0.0 250 0 157.08 OK!
227 1.2(DS+DT)+1.0 WX 199.261 0.0 250 0 157.08 OK!
228 1.2(DS+DT)+1.0 WZ 199.261 0.0 250 0 157.08 OK!
229 1.2(DS+DT)-1.0 WX 199.261 0.0 250 0 157.08 OK!
230 1.2(DS+DT)-1.0 WZ 199.261 0.0 250 0 157.08 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 47 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.6 Anchor Bolt Design


B1.6.1 Material Properties
Concrete strength, f c' = 24.8 MPa
Anchor bolt yield strength, fy = 240 MPa
Specified tensile strength of anchor, futa = Min (1.9 fy or 860 MPa)
= 456 MPa
Weld E70XX Electrode, Fuw = 70000 psi = 483 MPa
Fvw = 42000 psi = 290 MPa

B1.6.2 Anchor Bolt Capacity

Bolt diameter, do = 22 mm

Effective area, Ase =

= 291 mm2
Thread per mm, nt = 0.35 ea
Embedment depth, heff = 270 mm
Nut size, N = 35 mm
Plate thickness, tL = 22 mm
Bearing Area, Abrg = 681 mm2
Anchor Edge. Dist. ca1 = 145 mm
ca2 = 145 mm

Anchor bolt dist. X-Dir, a = 310 mm


Anchor bolt dist. Z-Dir, b = 310 mm

Number of AB X-Dir nx = 2 mm
Number of AB Z-Dir nz = 2 mm
Total Numb. of AB nt = 4 mm
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 48 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Shear Capacity
a. Steel strength of anchor in shear :
Vsa = φ 0.6 Ase futa
= 0.65 x 0.6 x 291.048 x 456
= 51760 N

b. Concrete breakout strength of anchor in shear


Vcb = φ

ha = Dp + Gp
= 2000 mm
Avc = (Min(ha; 1.5ca1))*(1.5ca1+ca1)
= 78844 mm2
2
Avco = 4.5 ca1
2
= 94613 mm
Avc
= 0.83
Avco

ψed,V = , ACI Appendix D Section D.6.2.6

= 0.90
ψc,V = 1.00 , ACI Appendix D Section D.6.2.7

Vb = 0.6*(le/do)^0.2*do^0.5*fc'^0.5*ca1^1.5
= 0.6 x (270/22)^0.2 x sqrt(22) x sqrt(24.8) x (145)^1.5
= 40404 N
Vcb = 0.7 x 0.83 x 0.9 x 1 x 40404.399
= 21212 N

c. Concrete Pryout Strength of Anchor in Shear


kcp = 2.00 for hef > 65 mm
Vcp = kcp Ncb
= 2 x 71966.04
= 143932.081 N

Shear capacity on anchor bolt


Vn = Min (Vsa, Vcb, Vcp)
= 21212 N
= 2162.3 kg
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 49 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Tension Capacity
a. Steel strength of anchor in tension :
Nsa = φ Ase futa
= 0.75 x 291.05 x 456
= 99539 N

b. Concrete breakout strength of anchor in tension


Ncb = φ
ANc = (ca1 + 1.5hef)^2
= 302500 mm2
2
ANco = 9 hef
= 656100 mm2
Anc
= 0.46
Anco

ψed,N = , ACI Appendix D Section D.5.2.5

= 0.81
ψc,N = 1.25 , for cast-in anchor , ACI Appendix D Section D.5.2.6
= 1.40 , for post-installed anchor , ACI Appendix D Section D.5.2.6
ψcp,N = 1.00 , ACI Appendix D Section D.5.2.7
kc = 10 , for cast-in anchor , ACI Appendix D Section D.5.2.2
= 7 , for post-installed anchor , ACI Appendix D Section D.5.2.2
Nb =
= 10 x sqrt(24.8) x 270^1.5
= 220938.543 N
Ncb = 0.7 x 0.46 x 1 x 1.25 x 0.81 x 220938.54
= 71966.0407 N

c. Pullout Strength of Anchor in Tension


Npn = φ ψc,P Np
ψc,P = 1.00 , ACI Appendix D Section D.5.3.6
Np = , for headed stud, or headed bolt
= , for hooked bolt
= 8 x 680.72 x 24.8
= 135054.848 N

Npn = 0.7 x 135054.85 x 1


= 94538.3936 N

d. Concrete Side-face Blowout Strength of Anchor in Tension


Nsb = φ
= 0.7 x 13 x 145 x sqrt(680.72) x sqrt(24.8)
= 171442.553 N
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 50 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Tension capacity of anchor bolt


Tn = Min (Nsa, Ncb, Npn, Nsb)
= 71966 N
= 7336 kg

Capacity of Shear
φ Rn = nb Vn
= 4 x 2162.31
= 8649.2 kg

Capacity of Tension
φ Tn = nt Tn
= 4 x 7335.99
= 29344 kg
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 51 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.6.3 Check Anchor Bolt Capacity

Factored Loading Combination in Pier Top Center (Without Pier Selfweight)


Unit (Ton, Ton-m) Check
Pr. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz Shear Tension
1 0.0
201 1.4(DS+DO+L+TF+AF+FF) -1.4 -1.7 -5.6 0.0 OK! OK!
0.0
202 1.2(DS+DO+L+TF+AF+FF) -1.2 -1.5 -4.8 0.0 OK! OK!
0.0 -0.9
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.0 0.1 0.1 OK! OK!
0.0 -0.9
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ -0.1 -0.2 0.0 OK! OK!
0.0 -0.9
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.0 0.1 -0.1 OK! OK!
0.0 -0.9
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.1 0.3 0.0 OK! OK!
0.0
207 1.2(DS+DO+AF+TF)+1.0WX -1.2 0.0 0.1 0.1 OK! OK!
0.0
208 1.2(DS+DO+AF+TF)+1.0WZ -1.2 -0.1 -0.2 0.0 OK! OK!
0.0
209 1.2(DS+DO+AF+TF)-1.0WX -1.2 0.0 0.1 -0.1 OK! OK!
0.0
210 1.2(DS+DO+AF+TF)-1.0WZ -1.2 0.1 0.3 0.0 OK! OK!
211 0.9(DS+DO)+1.0EQ-X-0.2 -0.9 0.0 0.1 0.7 OK! OK!
212 0.9(DS+DO)+1.0EQ-Z 0.0 -0.9 -0.2 -0.6 0.0 OK! OK!
213 0.9(DS+DO)-1.0EQ-X 0.2 -0.9 0.0 0.1 -0.7 OK! OK!
214 0.9(DS+DO)-1.0EQ-Z 0.0 -0.9 0.2 0.7 0.0 OK! OK!
-0.2 -0.9
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.0 0.1 0.7 OK! OK!
0.0 -0.9
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z -0.2 -0.6 0.0 OK! OK!
0.2 -0.9
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.0 0.1 -0.7 OK! OK!
0.0 -0.9
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.2 0.7 0.0 OK! OK!
-0.2
219 1.2(DS+DO+AF+TF)+1.0EQ-X -1.2 0.0 0.1 0.7 OK! OK!
0.0
220 1.2(DS+DO+AF+TF)+1.0EQ-Z -1.2 -0.2 -0.6 0.0 OK! OK!
0.2
221 1.2(DS+DO+AF+TF)-1.0EQ-X -1.2 0.0 0.1 -0.7 OK! OK!
0.0
222 1.2(DS+DO+AF+TF)-1.0EQ-Z -1.2 0.2 0.8 0.0 OK! OK!
223 0.9(DS+DE)+1.0 WX 0.0 -0.7 0.0 0.0 0.1 OK! OK!
224 0.9(DS+DE)+1.0 WZ 0.0 -0.7 -0.1 -0.2 0.0 OK! OK!
225 0.9(DS+DE)-1.0 WX 0.0 -0.7 0.0 0.0 -0.1 OK! OK!
226 0.9(DS+DE)-1.0 WZ 0.0 -0.7 0.1 0.3 0.0 OK! OK!
227 1.2(DS+DT)+1.0 WX 0.0 -1.2 0.0 0.1 0.1 OK! OK!
228 1.2(DS+DT)+1.0 WZ 0.0 -1.2 -0.1 -0.2 0.0 OK! OK!
229 1.2(DS+DT)-1.0 WX 0.0 -1.2 0.0 0.1 -0.1 OK! OK!
230 1.2(DS+DT)-1.0 WZ 0.0 -1.2 0.1 0.3 0.0 OK! OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 52 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B1.7 STAAD.Pro Input


STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 06-Jul-17
JOB NAME Calculation for Miscellaneous Pipe Support and Sleeper ARR-1A
JOB CLIENT PT. Medco Energi E&P Malaka
JOB NO BLA-FTP-C-CC-00-012
JOB REV 0A
CHECKER NAME KHB/BD
APPROVED NAME BHK
CHECKER DATE 06-Jul-17
APPROVED DATE 06-Jul-17
ENGINEER NAME RN/LG
JOB PART T-Post Type
JOB COMMENT SPS-TP2-ARR-01
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KG
JOINT COORDINATES
1 0 0.3 0; 2 0 2.5 -0.6; 3 0 2.5 0; 4 0 2.5 0.6; 5 0 4 -0.6; 6 0 4 0;
MEMBER INCIDENCES
100 1 3; 101 3 6; 200 2 3; 201 3 4; 202 5 6;
SUPPORTS
1 FIXED
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.09042e+010
POISSON 0.3
DENSITY 7833.41
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY JAPANESE
200 TO 202 TABLE ST H200X200X8
100 101 TABLE ST H250X250X9
***********SEISMIC DEFINITION***********
CONSTANTS
BETA 90 MEMB 100 101
MATERIAL STEEL ALL
*
DEFINE UBC LOAD
ZONE 0.3 I 1.25 RWX 4.5 RWZ 4.5 STYP 4 CT 0.0853 NA 1 NV 1
SELFWEIGHT 1.12
MEMBER WEIGHT
*
202 CON 157.3
*
200 CON 221.9
*
201 CON 223.6
*
**********LOADING CASES**********
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 53 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
LOAD 1 LOADTYPE Seismic TITLE EX (EARTHQUAKE LOAD X-DIR)
UBC LOAD X 1
PERFORM ANALYSIS
CHANGE
LOAD 2 LOADTYPE Seismic TITLE EZ (EARTHQUAKE LOAD Z-DIR)
UBC LOAD Z 1
PERFORM ANALYSIS
CHANGE
LOAD 3 LOADTYPE Seismic TITLE EY (EARTHQUAKE LOAD Y-DIR)
LOAD 4 LOADTYPE Dead TITLE DS (DEAD LOAD STRUCTURE)
SELFWEIGHT Y -1.12 LIST 100 101 200 TO 202
LOAD 5 LOADTYPE Dead TITLE DE (EQUIPMENT EMPTY DEAD LOAD)
MEMBER LOAD
202 CON GY -111.8
200 CON GY -111.8
201 CON GY -111.8
LOAD 6 LOADTYPE Dead TITLE DO (EQUIPMENT OPERATING DEAD LOAD)
MEMBER LOAD
*
202 CON GY -157.3
*
200 CON GY -221.9
*
201 CON GY -223.6
*
LOAD 7 LOADTYPE Dead TITLE DT (EQUIPMENT TEST DEAD LOAD)
MEMBER LOAD
*
202 CON GY -185.8
*
200 CON GY -185.5
*
201 CON GY -226.9
*
LOAD 8 LOADTYPE Live TITLE L (LIVE LOAD)
LOAD 9 LOADTYPE None TITLE I (HANDLING DEVICE/IMPACT LOAD)
LOAD 10 LOADTYPE Wind TITLE WX (WIND LOAD X-DIR)
MEMBER LOAD
100 101 200 TO 202 UNI GX 7.2
MEMBER LOAD
202 CON GX 0.798
200 CON GX 0.798
201 CON GX 0.798
LOAD 11 LOADTYPE Wind TITLE WZ (WIND LOAD Z-DIR)
MEMBER LOAD
100 101 UNI GZ 7.2
MEMBER LOAD
202 CON GZ 24.18
200 CON GZ 24.18
201 CON GZ 24.18
LOAD 12 LOADTYPE None TITLE J (VIBRATION LOAD)
LOAD 13 LOADTYPE None TITLE TF (SELF-STRAINING AND THERMAL FORCES)
MEMBER LOAD
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 54 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
202 CON GZ 869.9
*
200 CON GZ 338.2
*
201 CON GZ 26.8
*
LOAD 14 LOADTYPE None TITLE FF (SURFACE FRICTION FORCES)
LOAD 15 LOADTYPE None TITLE AF (ANCHOR FORCES)
LOAD 16 LOADTYPE None TITLE HS (EARTH PRESSURE
LOAD 17 LOADTYPE None TITLE HW (WATER PRESSURE)
LOAD 18 LOADTYPE None TITLE R (RAIN LOAD)
LOAD 19 LOADTYPE None TITLE VH (VEHICLE LOAD)
LOAD 20 LOADTYPE None TITLE C (CRANE LOAD)
*****
*****LOADING COMBINATION
*****
*****Operating Condition
LOAD COMB 101 DS + DO + L + TF + AF + FF
4 1.0 6 1.0 8 1.0 13 1.0 15 1.0 14 1.0
*****Operating + Wind
LOAD COMB 102 0.6 (DS + DO + WX) + AF + TF + FF
4 0.6 6 0.6 10 0.6 15 1.0 13 1.0 14 1.0
LOAD COMB 103 0.6 (DS + DO + WZ) + AF + TF + FF
4 0.6 6 0.6 11 0.6 15 1.0 13 1.0 14 1.0
LOAD COMB 104 0.6 (DS + DO - WX) + AF + TF + FF
4 0.6 6 0.6 10 -0.6 15 1.0 13 1.0 14 1.0
LOAD COMB 105 0.6 (DS + DO - WZ) + AF + TF + FF
4 0.6 6 0.6 11 -0.6 15 1.0 13 1.0 14 1.0
LOAD COMB 106 DS + DO + 0.75 L + AF + TF + 0.45 WX
4 1.0 6 1.0 8 0.75 15 1.0 10 0.45 13 1.0
LOAD COMB 107 DS + DO + 0.75 L + AF + TF + 0.45 WZ
4 1.0 6 1.0 8 0.75 15 1.0 11 0.45 13 1.0
LOAD COMB 108 DS + DO + 0.75 L + AF + TF - 0.45 WX
4 1.0 6 1.0 8 0.75 15 1.0 10 -0.45 13 1.0
LOAD COMB 109 DS + DO + 0.75 L + AF + TF - 0.45 WZ
4 1.0 6 1.0 8 0.75 15 1.0 11 -0.45 13 1.0
LOAD COMB 110 DS + DO + AF + TF + 0.6 WX
4 1.0 6 1.0 15 1.0 10 0.6 13 1.0
LOAD COMB 111 DS + DO + AF + TF + 0.6 WZ
4 1.0 6 1.0 15 1.0 11 0.6 13 1.0
LOAD COMB 112 DS + DO + AF + TF - 0.6 WX
4 1.0 6 1.0 15 1.0 10 -0.6 13 1.0
LOAD COMB 113 DS + DO + AF + TF - 0.6 WZ
4 1.0 6 1.0 15 1.0 11 -0.6 13 1.0
******Operating + Earthquake
LOAD COMB 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
4 0.6 6 0.6 1 0.7 2 0.21 3 0.111 15 1.0 13 1.0
LOAD COMB 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z
4 0.6 6 0.6 2 0.7 1 0.21 3 0.111 15 1.0 13 1.0
LOAD COMB 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X
4 0.6 6 0.6 1 -0.7 2 0.21 3 0.111 15 1.0 13 1.0
LOAD COMB 117 0.6 (DS + DO) + AF + TF - 0.7 EO-Z
4 0.6 6 0.6 2 -0.7 1 0.21 3 0.111 15 1.0 13 1.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 55 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
*
LOAD COMB 118 DS + DO + AF + TF + 0.75 L + 0.525 EO-X
4 1.0 6 1.0 15 1.0 1 0.525 2 0.158 3 0.111 13 1.0 8 0.75
LOAD COMB 119 DS + DO + AF + TF + 0.75 L + 0.525 EO-Z
4 1.0 6 1.0 15 1.0 2 0.525 1 0.158 3 0.111 13 1.0 8 0.75
LOAD COMB 120 DS + DO + AF + TF + 0.75 L - 0.525 EO-X
4 1.0 6 1.0 15 1.0 1 -0.525 2 0.158 3 0.111 13 1.0 8 0.75
LOAD COMB 121 DS + DO + AF + TF + 0.75 L - 0.525 EO-Z
4 1.0 6 1.0 15 1.0 2 -0.525 1 0.158 3 0.111 13 1.0 8 0.75
*
LOAD COMB 122 DS + DO + AF + TF + 0.7 EO-X
4 1.0 6 1.0 15 1.0 1 0.7 2 0.21 3 0.111 13 1.0
LOAD COMB 123 DS + DO + AF + TF + 0.7 EO-Z
4 1.0 6 1.0 15 1.0 2 0.7 1 0.21 3 0.111 13 1.0
LOAD COMB 124 DS + DO + AF + TF - 0.7 EO-X
4 1.0 6 1.0 15 1.0 1 -0.7 2 0.21 3 0.111 13 1.0
LOAD COMB 125 DS + DO + AF + TF - 0.7 EO-Z
4 1.0 6 1.0 15 1.0 2 -0.7 1 0.21 3 0.111 13 1.0
******Erection + Wind
LOAD COMB 126 DS + DE + 0.6 WX
4 1.0 5 1.0 10 0.6
LOAD COMB 127 DS + DE + 0.6 WZ
4 1.0 5 1.0 11 0.6
LOAD COMB 128 DS + DE - 0.6 WX
4 1.0 5 1.0 10 -0.6
LOAD COMB 129 DS + DE - 0.6 WZ
4 1.0 5 1.0 11 -0.6
******Test
LOAD COMB 130 DS + DT + L
4 1.0 7 1.0 8 1.0
LOAD COMB 131 DS + DT + 0.6 WX
4 1.0 7 1.0 10 0.6
LOAD COMB 132 DS + DT + 0.6 WZ
4 1.0 7 1.0 11 0.6
LOAD COMB 133 DS + DT - 0.6 WX
4 1.0 7 1.0 10 -0.6
LOAD COMB 134 DS + DT - 0.6 WZ
4 1.0 7 1.0 11 -0.6
*
*
PERFORM ANALYSIS
LOAD LIST 101 TO 134
PRINT STORY DRIFT
*
PARAMETER 1
CODE AISC
FYLD 2.53107e+007 ALL
FU 4.21844e+007 ALL
KY 2 MEMB 100 101
KZ 2 MEMB 100 101
LY 2.2 MEMB 100
LZ 2.2 MEMB 100
LY 1.5 MEMB 101
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 56 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
LZ 1.5 MEMB 101
DJ1 3 MEMB 201
DJ2 4 MEMB 201
DJ1 3 MEMB 200
DJ2 2 MEMB 200
DJ1 6 MEMB 202
DJ2 5 MEMB 202
DJ1 1 MEMB 100 101
DJ2 6 MEMB 100 101
DFF 360 MEMB 200 TO 202
DFF 200 MEMB 100 101
TRACK 1 ALL
RATIO 1 ALL
CHECK CODE ALL
FINISH
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 57 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2. T-Post Type (Calculation for : SPS-TP1-ARR-02 - Civil Scope)


B2.1 Dimension and Size

B1 B2
Notes :
Bf = Width of footing,
Lf = Length of footing,
Hf = Height of footing,
H1 Df = Depth of foundation below ground,
Af = Area of foundation,
Ht Wf = Weight of footing
H2
Ws = Weight of soil
Bp = Width of pedestal,
Lp = Length of pedestal,
Gp Hp = Height of pedestal,
Dp = Depth of pedestal below ground,
Hp Gp = Height of pedestal above ground,
Dp
y Df Ap = Area of pedestal,

Hf
z
Off Z

1 Lp
Off X
z
(0,0) Lf

Bp
Bf
Foundation Plan

Footing Size
Width of footing, Bf = 1.00 m
Length of footing, Lf = 1.00 m
Height of footing, Hf = 0.30 m
Depth of foundation below ground, Df = 1.50 m
Area of foundation, Af = 1.00 m2
Weight of footing Wf = 0.72 ton
Weight of soil Ws = 1.62 ton

Off Z, Off X is offset position from the center of the footing. (-) = Left or bottom from center of footing.
Unit (m, Ton)
Ft. Name Pr. Name Bp Lp Hp Dp Gp Area Weight Off Z Off X
FPS-02B 1 0.50 0.50 1.50 1.20 0.30 0.25 0.900 0 0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 58 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Structure Size
Width of beam, Bt = 0.90 m
B1 = 0.25 m
B2 = 0.25 m
Height of column, Ht = 2.50 m
H1 = 2.20 m
H2 = 0.20 m
Column Size, = H200x200x8x12
Beam Size, = H200x200x8x12

B2.2 Loading
Pipe Load
Pipe Diameter, dp = 0.152 m
Distance between support, Ls = 2.50 m
Piping support tag number, = SPS-TP1-ARR-02
Reference = BLA-FTP-P-RE-00-003 Pipe Stress Analysis Report Alur
Rambong Cluster - AR1
Pipe loading data is taken from node 2510 which have the largest load for this T post type.
Pipe Direction
Node Type Load Type Index Unit
Dia. X Y Z
Empty De N - -1791 -
Operating Do N - -1791 -
6" 2510 Guide Thermal Tf N - 672
Anchor Af N - - -
Test T N - -2769 -
Empty De N - -5.50 -
Operating Do N - -5.50 -
3/4" Manual Guide Thermal Tf N - - -
Anchor Af N - - -
Test T N - -6.25 -

*For detail see Appendix E

Wind Load
Velocity Pressure, qz = 0.613*Kz*Kzt*Kd*V2*I
= 70.56 kg/m2
Wind Force, W = qz G C A
Wind Force on the Pipe, W pz = 70.56 x 0.85 x 0.6 x (0.25 x 3.14 x 0.0508^2)
= 0.073 kg
W px = 70.56 x 0.85 x 0.6 x 2.5 x 0.0508
= 4.57 kg
Wind Force on the PS, W sz = 70.56 x 0.85 x 0.6 x 0.15
= 5.40 kg/m
W sx = 70.56 x 0.85 x 0.6 x 0.15
= 5.40 kg/m
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 59 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Seismic Load
Calculated automatically using STAAD.Pro using UBC 1997 with parameter shown in Appendix A.8

B2.3 STAAD.Pro Modeling

Isometric View Beam Number Node Number Member Properties

Seismic X-Dir Seismic Z-Dir Equipment Empty Equipment Operating

Equipment Test Wind Load X-Dir Wind Load Z-Dir


Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 60 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Support Reaction Summary - Unfactored Load (Permanent)


Horizontal Vertical Horizontal Moment
Node L/C
Fx kg Fy kg Fz kg Mx kg-m My kg-m Mz kg-m
Max Fx 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1
Min Fx 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1
Max Fy 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1
Min Fy 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1
Max Fz 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1
Min Fz 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1
Max Mx 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1
Min Mx 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1
Max My 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1
Min My 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1
Max Mz 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1
Min Mz 1 101 DS + DO + L + TF + AF + FF -11.4 183.0 0.0 0.7 0.0 25.1

Support Reaction Summary - Unfactored Load (Temporary)


Horizontal Vertical Horizontal Moment
Node L/C
Fx kg Fy kg Fz kg Mx kg-m My kg-m Mz kg-m
Max Fx 1 116 0.6 DS + 0.6 DE - 0.7 EE-X 102.8 109.8 -30.8 -66.6 8.6 -223.3
Min Fx 1 122 DS + DO + AF + 0.7 EO-X -114.2 183.0 -30.8 -66.3 -8.6 248.4
Max Fy 1 130 DS + DT + WP-X -20.8 229.9 0.0 0.8 0.0 28.4
Min Fy 1 102 0.6 DS + 0.6 DE + WX -20.8 109.8 0.0 0.4 0.0 28.4
Max Fz 1 117 0.6 DS + 0.6 DE - 0.7 EE-Z -30.8 109.8 102.8 223.8 -2.6 67.0
Min Fz 1 115 0.6 DS + 0.6 DE + 0.7 EE-Z -30.8 109.8 -102.8 -222.9 -2.6 67.0
Max Mx 1 125 DS + DO + AF - 0.7 EO-Z -42.2 183.0 102.8 224.0 -2.6 92.1
Min Mx 1 115 0.6 DS + 0.6 DE + 0.7 EE-Z -30.8 109.8 -102.8 -222.9 -2.6 67.0
Max My 1 116 0.6 DS + 0.6 DE - 0.7 EE-X 102.8 109.8 -30.8 -66.6 8.6 -223.3
Min My 1 114 0.6 DS + 0.6 DE + 0.7 EE-X -102.8 109.8 -30.8 -66.6 -8.6 223.3
Max Mz 1 122 DS + DO + AF + 0.7 EO-X -114.2 183.0 -30.8 -66.3 -8.6 248.4
Min Mz 1 116 0.6 DS + 0.6 DE - 0.7 EE-X 102.8 109.8 -30.8 -66.6 8.6 -223.3

Displacement Summary
Horizontal Vertical HorizontalResultantRotationalHorizontal
Node L/C
X mm Y mm Z mm mm rX rad rY rad
Max X 6 122 DS + DO + AF + 0.7 EO-X 3.47 -0.02 0.11 3.474 0 0.009
Min X 6 116 0.6 DS + 0.6 DE - 0.7 EE-X -3.35 -0.02 0.11 3.352 0 -0.009
Max Y 6 117 0.6 DS + 0.6 DE - 0.7 EE-Z 1.01 0.06 -0.38 1.077 0 0.003
Min Y 7 125 DS + DO + AF - 0.7 EO-Z -0.23 -0.07 -0.38 0.452 0 0.003
Max Z 6 115 0.6 DS + 0.6 DE + 0.7 EE-Z 1.01 -0.06 0.38 1.077 0 0.003
Min Z 6 125 DS + DO + AF - 0.7 EO-Z 1.13 0.06 -0.38 1.192 0 0.003
Max rX 6 123 DS + DO + AF + 0.7 EO-Z 1.13 -0.07 0.38 1.192 0 0.003
Min rX 7 125 DS + DO + AF - 0.7 EO-Z -0.23 -0.07 -0.38 0.452 0 0.003
Max rY 6 114 0.6 DS + 0.6 DE + 0.7 EE-X 3.35 -0.02 0.11 3.352 0 0.009
Min rY 6 116 0.6 DS + 0.6 DE - 0.7 EE-X -3.35 -0.02 0.11 3.352 0 -0.009
Max rZ 5 116 0.6 DS + 0.6 DE - 0.7 EE-X -1.09 0.00 0.11 1.091 0 -0.009
Min rZ 5 122 DS + DO + AF + 0.7 EO-X 1.21 0.00 0.11 1.212 0 0.009
Max Rst 6 122 DS + DO + AF + 0.7 EO-X 3.47 -0.02 0.11 3.474 0 0.009
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 61 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.4 Steel Structure Design


Steel Member Size and Unity Check
Steel design were performed based on AISC-ASD. In STAADPro, maximum stress on frame member
directly selected by STAADPro software, taken from the worst loading combination. The member stress is
indicated as check ratio which should be less than 1.0, unless the member will be overstress or fail.

Ratio
Beam No. Section Clause L/C
Actual Allow
100 H200X200X8 0.092 1.00 AISC- H1-3 122
101 H200X200X8 0.001 1.00 SHEAR -Y 101
102 H200X200X8 0.003 1.00 AISC- H2-1 122
103 H200X200X8 0.084 1.00 AISC- H1-3 122
104 H200X200X8 0.000 1.00 SHEAR -Y 130

Deflection

∆y : Vertical Displacement
∆x : Lateral Displacement

Max Dis. (∆) Span (L)


Direction Node ∆/L All. ∆/L Check
mm mm
Vertical 7 0.065 250 1/3846.16 1/120 OK
Lateral 6 3.474 2500 1/719.63 1/200 OK
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 62 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5 Foundation Design (FPS-16A)


Support Reaction (From output Staad pro)
Support reaction value are taken from output staad pro analysis. This reaction occur on base plate of
pedestal or pier. Maximum support reaction for permanent & temporary condition are summarized in the
following table.

B2.5.1 Summary of Load at Top of Pedestal or Pier Unit (Ton, Ton-m)


Ft. Name Pr. Name Load Case Fx Fy Fz Mx Mz
FPS-02B 1 Dead Load of Structure Proper (Ds) 0.00 -0.04 0.00 0.00 0.00
Equipment Empty Dead Load (De) 0.00 -0.14 0.00 0.00 0.00
Equipment Operating Dead Load (Do) -0.01 -0.14 0.00 0.00 0.03
Equipment Test Dead Load (Dt) 0.00 -0.19 0.00 0.00 0.00
Live Load (L) 0.00 0.00 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) 0.00 0.00 0.00 0.00 0.00
Anchor Force (Af) 0.00 0.00 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 0.00 0.00 0.00 0.00
Wind Load in X-Dir (Wx) -0.02 0.00 0.00 0.00 0.03
Wind Load in Z-Dir (Wz) 0.00 0.00 -0.05 -0.09 0.00
Earthquake in X-Dir (EQ-X) -0.15 0.00 0.00 0.00 0.32
Earthquake in Z-Dir (EQ-Z) 0.00 0.00 -0.15 -0.32 0.00

B2.5.2 Summary of Load at Pier bottom center Unit (Ton, Ton-m)


Ft. Name Pr. Name Load Case Fx Fy Fz Mx Mz
FPS-02B 1 Dead Load of Structure Proper (Ds) 0.00 -0.94 0.00 0.00 0.00
Equipment Empty Dead Load (De) 0.00 -1.04 0.00 0.00 0.00
Equipment Operating Dead Load (Do) -0.01 -1.04 0.00 0.00 0.02
Equipment Test Dead Load (Dt) 0.00 -1.09 0.00 0.00 0.00
Live Load (L) 0.00 -0.90 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) 0.00 -0.90 0.00 0.00 0.00
Anchor Force (Af) 0.00 -0.90 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 -0.90 0.00 0.00 0.00
Wind Load in X-Dir (Wx) -0.02 -0.90 0.00 0.00 0.03
Wind Load in Z-Dir (Wz) 0.00 -0.90 -0.05 -0.07 0.00
Earthquake in X-Dir (EQ-X) -0.15 -0.90 0.00 0.00 0.22
Earthquake in Z-Dir (EQ-Z) 0.00 -0.90 -0.15 -0.22 0.00

B2.5.3 Summary of Load at Footing bottom center Unit (Ton, Ton-m)


Ft. Name Pr. Name Load Case Fx Fy Fz Mx Mz
FPS-02B 1 Dead Load of Structure Proper (Ds) 0.00 -3.28 0.00 0.00 0.00
Equipment Empty Dead Load (De) 0.00 -0.14 0.00 0.00 0.00
Equipment Operating Dead Load (Do) -0.01 -0.14 0.00 0.00 0.02
Equipment Test Dead Load (Dt) 0.00 -0.19 0.00 0.00 0.00
Live Load (L) 0.00 0.00 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) 0.00 0.00 0.00 0.00 0.00
Anchor Force (Af) 0.00 0.00 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 0.00 0.00 0.00 0.00
Wind Load in X-Dir (Wx) -0.02 0.00 0.00 0.00 0.04
Wind Load in Z-Dir (Wz) 0.00 0.00 -0.05 -0.09 0.00
Earthquake in X-Dir (EQ-X) -0.15 0.00 0.00 0.00 0.26
Earthquake in Z-Dir (EQ-Z) 0.00 0.00 -0.15 -0.26 0.00
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 63 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5.4 Loading Combination - Unfactored Load Combination

EQ-X

EQ-Z
Wx

Wz
Do
Ds

De

Dt

Af
Tf

Ff
L
101 DS+DO+L+TF+AF+FF 1 1 1 1 1
102 0.6(DS+DO+WX)+AF+TF+FF 0.6 0.6 0.6
103 0.6(DS+DO+WZ)+AF+TF+FF 0.6 0.6 0.6
104 0.6(DS+DO-WX)+AF+TF+FF 0.6 0.6 -0.6
105 0.6(DS+DO-WZ)+AF+TF+FF 0.6 0.6 -0.6
106 DS+DO+0.75L+AF+TF+0.45WX 1 1 1 0.45
107 DS+DO+0.75L+AF+TF+0.45 WZ 1 1 1 0.45
108 DS+DO+0.75L+AF+TF-0.45 WX 1 1 1 -0.45
109 DS+DO+0.75L+AF+TF-0.45 WZ 1 1 1 -0.45
110 DS+DO+AF+TF+0.6WX 1 1 1 0.6
111 DS+DO+AF+TF+0.6 WZ 1 1 1 0.6
112 DS+DO+AF+TF-0.6 WX 1 1 1 -0.6
113 DS+DO+AF+TF-0.6 WZ 1 1 1 -0.6
114 0.6(DS+DO)+AF+TF+0.7EQ-X 0.6 0.6 0.7
115 0.6(DS+DO)+AF+TF+0.7EQ-Z 0.6 0.6 0.7
116 0.6(DS+DO)+AF+TF-0.7EQ-X 0.6 0.6 -0.7
117 0.6(DS+DO)+AF+TF-0.7EQ-Z 0.6 0.6 -0.7
118 DS+DO+AF+TF+0.75L+0.525EQ-X 1 1 0.525
119 DS+DO+AF+TF+0.75L+0.525EO-Z 1 1 0.525
120 DS+DO+AF+TF+0.75L-0.525 EQ-X 1 1 -0.525

121 DS+DO+AF+TF+0.75L-0.525 EQ-Z 1 1 -0.525

122 DS+DO+AF+TF+0.7EQ-X 1 1 1 0.7


123 DS+DO+AF+TF+0.7EQ-Z 1 1 1 0.7
124 DS+DO+AF+TF-0.7EQ-X 1 1 1 -0.7
125 DS+DO+AF+TF-0.7EQ-Z 1 1 1 -0.7
126 DS+DE+0.6 WX 1 1 0.6
127 DS+DE+0.6 WZ 1 1 0.6
128 DS+DE-0.6 WX 1 1 -0.6
129 DS+DE-0.6 WZ 1 1 -0.6
130 DS+DT+L 1 1
131 DS+DT+0.6 WX 1 1 0.6
132 DS+DT+0.6 WZ 1 1 0.6
133 DS+DT-0.6 WX 1 1 -0.6
134 DS+DT-0.6 WZ 1 1 -0.6
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 64 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5.5 Loading Combination - Factored Load Combination

EQ-X

EQ-Z
Wx

Wz
Do
Ds

De

Dt

Af
Tf

Ff
L
201 1.4(DS+DO+L+TF+AF+FF) 1.4 1.4 1.4 1.4 1.4
202 1.2(DS+DO+L+TF+AF+FF) 1.2 1.2 1.2 1.2 1.2
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.9 0.9 1
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.9 0.9 1
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.9 0.9 -1
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.9 0.9 -1
207 1.2(DS+DO+AF+TF)+1.0WX 1.2 1.2 1.2 1
208 1.2(DS+DO+AF+TF)+1.0WZ 1.2 1.2 1.2 1
209 1.2(DS+DO+AF+TF)-1.0WX 1.2 1.2 1.2 -1
210 1.2(DS+DO+AF+TF)-1.0WZ 1.2 1.2 1.2 -1
211 0.9(DS+DO)+1.0EQ-X 0.9 0.9 1
212 0.9(DS+DO)+1.0EQ-Z 0.9 0.9 1
213 0.9(DS+DO)-1.0EQ-X 0.9 0.9 -1
214 0.9(DS+DO)-1.0EQ-Z 0.9 0.9 -1
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.9 0.9 1.2 1
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.9 0.9 1.2 1
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.9 0.9 1.2 -1
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.9 0.9 1.2 -1
219 1.2(DS+DO+AF+TF)+1.0EQ-X 1.2 1.2 1.2 1
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 1.2 1.2 1.2 1
221 1.2(DS+DO+AF+TF)-1.0EQ-X 1.2 1.2 1.2 -1
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 1.2 1.2 1.2 -1
223 0.9(DS+DE)+1.0 WX 0.9 0.9 1
224 0.9(DS+DE)+1.0 WZ 0.9 0.9 1
225 0.9(DS+DE)-1.0 WX 0.9 0.9 -1
226 0.9(DS+DE)-1.0 WZ 0.9 0.9 -1
227 1.2(DS+DT)+1.0 WX 1.2 1.2 1
228 1.2(DS+DT)+1.0 WZ 1.2 1.2 1
229 1.2(DS+DT)-1.0 WX 1.2 1.2 -1
230 1.2(DS+DT)-1.0 WZ 1.2 1.2 -1
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 65 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5.6 Unfactored Loading Combination in Footing Bottom Center (With Pier & Footing Selfweight)
Unit (Ton, Ton-m)
Ft. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz
FPS-02B 101 DS+DO+L+TF+AF+FF 0.0 -3.4 0.0 0.0 0.0
102 0.6(DS+DO+WX)+AF+TF+FF 0.0 -2.1 0.0 0.0 0.0
103 0.6(DS+DO+WZ)+AF+TF+FF 0.0 -2.1 0.0 -0.1 0.0
104 0.6(DS+DO-WX)+AF+TF+FF 0.0 -2.1 0.0 0.0 0.0
105 0.6(DS+DO-WZ)+AF+TF+FF 0.0 -2.1 0.0 0.1 0.0
106 DS+DO+0.75L+AF+TF+0.45WX 0.0 -3.4 0.0 0.0 0.0
107 DS+DO+0.75L+AF+TF+0.45 WZ 0.0 -3.4 0.0 0.0 0.0
108 DS+DO+0.75L+AF+TF-0.45 WX 0.0 -3.4 0.0 0.0 0.0
109 DS+DO+0.75L+AF+TF-0.45 WZ 0.0 -3.4 0.0 0.0 0.0
110 DS+DO+AF+TF+0.6WX 0.0 -3.4 0.0 0.0 0.0
111 DS+DO+AF+TF+0.6 WZ 0.0 -3.4 0.0 -0.1 0.0
112 DS+DO+AF+TF-0.6 WX 0.0 -3.4 0.0 0.0 0.0
113 DS+DO+AF+TF-0.6 WZ 0.0 -3.4 0.0 0.1 0.0
114 0.6(DS+DO)+AF+TF+0.7EQ-X -0.1 -2.1 0.0 0.0 0.2
115 0.6(DS+DO)+AF+TF+0.7EQ-Z 0.0 -2.1 -0.1 -0.2 0.0
116 0.6(DS+DO)+AF+TF-0.7EQ-X 0.1 -2.1 0.0 0.0 -0.2
117 0.6(DS+DO)+AF+TF-0.7EQ-Z 0.0 -2.1 0.1 0.2 0.0
118 DS+DO+AF+TF+0.75L+0.525EQ-X -0.1 -3.4 0.0 0.0 0.2
119 DS+DO+AF+TF+0.75L+0.525EO-Z 0.0 -3.4 -0.1 -0.1 0.0
120 DS+DO+AF+TF+0.75L-0.525 EQ-X 0.1 -3.4 0.0 0.0 -0.1
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z 0.0 -3.4 0.1 0.1 0.0
122 DS+DO+AF+TF+0.7EQ-X -0.1 -3.4 0.0 0.0 0.2
123 DS+DO+AF+TF+0.7EQ-Z 0.0 -3.4 -0.1 -0.2 0.0
124 DS+DO+AF+TF-0.7EQ-X 0.1 -3.4 0.0 0.0 -0.2
125 DS+DO+AF+TF-0.7EQ-Z 0.0 -3.4 0.1 0.2 0.0
126 DS+DE+0.6 WX 0.0 -3.4 0.0 0.0 0.0
127 DS+DE+0.6 WZ 0.0 -3.4 0.0 -0.1 0.0
128 DS+DE-0.6 WX 0.0 -3.4 0.0 0.0 0.0
129 DS+DE-0.6 WZ 0.0 -3.4 0.0 0.1 0.0
130 DS+DT+L 0.0 -3.5 0.0 0.0 0.0
131 DS+DT+0.6 WX 0.0 -3.5 0.0 0.0 0.0
132 DS+DT+0.6 WZ 0.0 -3.5 0.0 -0.1 0.0
133 DS+DT-0.6 WX 0.0 -3.5 0.0 0.0 0.0
134 DS+DT-0.6 WZ 0.0 -3.5 0.0 0.1 0.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 66 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5.7 Factored Loading Combination in Footing Bottom Center (With Pier & Footing Selfweight)
Unit (Ton, Ton-m)
Ft. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz
FPS-02B 201 1.4(DS+DO+L+TF+AF+FF) 0.0 -4.8 0.0 0.0 0.0
202 1.2(DS+DO+L+TF+AF+FF) 0.0 -4.1 0.0 0.0 0.0
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.0 -3.1 0.0 0.0 0.1
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.0 -3.1 0.0 -0.1 0.0
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.0 -3.1 0.0 0.0 0.0
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.0 -3.1 0.0 0.1 0.0
207 1.2(DS+DO+AF+TF)+1.0WX 0.0 -4.1 0.0 0.0 0.1
208 1.2(DS+DO+AF+TF)+1.0WZ 0.0 -4.1 0.0 -0.1 0.0
209 1.2(DS+DO+AF+TF)-1.0WX 0.0 -4.1 0.0 0.0 0.0
210 1.2(DS+DO+AF+TF)-1.0WZ 0.0 -4.1 0.0 0.1 0.0
211 0.9(DS+DO)+1.0EQ-X -0.2 -3.1 0.0 0.0 0.3
212 0.9(DS+DO)+1.0EQ-Z 0.0 -3.1 -0.1 -0.3 0.0
213 0.9(DS+DO)-1.0EQ-X 0.1 -3.1 0.0 0.0 -0.2
214 0.9(DS+DO)-1.0EQ-Z 0.0 -3.1 0.1 0.3 0.0
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X -0.2 -3.1 0.0 0.0 0.3
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.0 -3.1 -0.1 -0.3 0.0
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.1 -3.1 0.0 0.0 -0.2
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.0 -3.1 0.1 0.3 0.0
219 1.2(DS+DO+AF+TF)+1.0EQ-X -0.2 -4.1 0.0 0.0 0.3
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.0 -4.1 -0.1 -0.3 0.0
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.1 -4.1 0.0 0.0 -0.2
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.0 -4.1 0.1 0.3 0.0
223 0.9(DS+DE)+1.0 WX 0.0 -3.1 0.0 0.0 0.0
224 0.9(DS+DE)+1.0 WZ 0.0 -3.1 0.0 -0.1 0.0
225 0.9(DS+DE)-1.0 WX 0.0 -3.1 0.0 0.0 0.0
226 0.9(DS+DE)-1.0 WZ 0.0 -3.1 0.0 0.1 0.0
227 1.2(DS+DT)+1.0 WX 0.0 -4.2 0.0 0.0 0.0
228 1.2(DS+DT)+1.0 WZ 0.0 -4.2 0.0 -0.1 0.0
229 1.2(DS+DT)-1.0 WX 0.0 -4.2 0.0 0.0 0.0
230 1.2(DS+DT)-1.0 WZ 0.0 -4.2 0.0 0.1 0.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 67 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5.8 Factored Loading Combination in Pier Bottom Center (With Pier Selfweight)
Unit (Ton, Ton-m)
Pr. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz
1 201 1.4(DS+DO+L+TF+AF+FF) 0.0 -6.6 0.0 0.0 0.0
202 1.2(DS+DO+L+TF+AF+FF) 0.0 -5.6 0.0 0.0 0.0
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.0 -2.7 0.0 0.0 0.0
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.0 -2.7 0.0 -0.1 0.0
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.0 -0.9 0.0 0.0 0.0
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.0 -0.9 0.0 0.1 0.0
207 1.2(DS+DO+AF+TF)+1.0WX 0.0 -4.4 0.0 0.0 0.1
208 1.2(DS+DO+AF+TF)+1.0WZ 0.0 -4.4 0.0 -0.1 0.0
209 1.2(DS+DO+AF+TF)-1.0WX 0.0 -2.6 0.0 0.0 0.0
210 1.2(DS+DO+AF+TF)-1.0WZ 0.0 -2.6 0.0 0.1 0.0
211 0.9(DS+DO)+1.0EQ-X -0.2 -2.7 0.0 0.0 0.2
212 0.9(DS+DO)+1.0EQ-Z 0.0 -2.7 -0.1 -0.2 0.0
213 0.9(DS+DO)-1.0EQ-X 0.1 -0.9 0.0 0.0 -0.2
214 0.9(DS+DO)-1.0EQ-Z 0.0 -0.9 0.1 0.2 0.0
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X -0.2 -3.8 0.0 0.0 0.2
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.0 -3.8 -0.1 -0.2 0.0
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.1 -2.0 0.0 0.0 -0.2
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.0 -2.0 0.1 0.2 0.0
219 1.2(DS+DO+AF+TF)+1.0EQ-X -0.2 -4.4 0.0 0.0 0.2
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.0 -4.4 -0.1 -0.2 0.0
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.1 -2.6 0.0 0.0 -0.2
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.0 -2.6 0.1 0.2 0.0
223 0.9(DS+DE)+1.0 WX 0.0 -2.7 0.0 0.0 0.0
224 0.9(DS+DE)+1.0 WZ 0.0 -2.7 0.0 -0.1 0.0
225 0.9(DS+DE)-1.0 WX 0.0 -0.9 0.0 0.0 0.0
226 0.9(DS+DE)-1.0 WZ 0.0 -0.9 0.0 0.1 0.0
227 1.2(DS+DT)+1.0 WX 0.0 -3.3 0.0 0.0 0.0
228 1.2(DS+DT)+1.0 WZ 0.0 -3.3 0.0 -0.1 0.0
229 1.2(DS+DT)-1.0 WX 0.0 -1.5 0.0 0.0 0.0
230 1.2(DS+DT)-1.0 WZ 0.0 -1.5 0.0 0.1 0.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 68 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5.9 Check of Stability

B2.5.9.1 Check Soil Pressure


Formula : ΣFy/Af ± ΣMz/Wz or ΣFy/Af ± ΣMx/Wx > Allow. Bearing Capacity (Q all.)

Input Data :
Ft. Name Af (m2) Bf (m) Lf (m) Wz (m3) Wx (m3)
FPS-02B 1.000 1.000 1.000 0.167 0.167

Z - Direction Unit (Ton, Ton-m, Ton/m2)


L. Comb Σ Fy Σ Mx Q max Q min Q all. Check
101 DS+DO+L+TF+AF+FF -3.4 0.0 3.4 3.4 7.4 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -2.1 0.0 2.1 2.1 7.4 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -2.1 -0.1 2.4 1.7 7.4 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -2.1 0.0 2.1 2.1 7.4 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -2.1 0.1 2.4 1.7 7.4 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -3.4 0.0 3.4 3.4 7.4 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -3.4 0.0 3.7 3.2 7.4 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -3.4 0.0 3.4 3.4 7.4 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -3.4 0.0 3.7 3.2 7.4 OK!
110 DS+DO+AF+TF+0.6WX -3.4 0.0 3.4 3.4 7.4 OK!
111 DS+DO+AF+TF+0.6 WZ -3.4 -0.1 3.7 3.1 7.4 OK!
112 DS+DO+AF+TF-0.6 WX -3.4 0.0 3.4 3.4 7.4 OK!
113 DS+DO+AF+TF-0.6 WZ -3.4 0.1 3.7 3.1 7.4 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -2.1 0.0 2.1 2.1 7.4 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -2.1 -0.2 3.2 0.9 7.4 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -2.1 0.0 2.1 2.1 7.4 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -2.1 0.2 3.2 0.9 7.4 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -3.4 0.0 3.4 3.4 7.4 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -3.4 -0.1 4.3 2.6 7.4 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -3.4 0.0 3.4 3.4 7.4 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -3.4 0.1 4.3 2.6 7.4 OK!
122 DS+DO+AF+TF+0.7EQ-X -3.4 0.0 3.4 3.4 7.4 OK!
123 DS+DO+AF+TF+0.7EQ-Z -3.4 -0.2 4.5 2.3 7.4 OK!
124 DS+DO+AF+TF-0.7EQ-X -3.4 0.0 3.4 3.4 7.4 OK!
125 DS+DO+AF+TF-0.7EQ-Z -3.4 0.2 4.5 2.3 7.4 OK!
126 DS+DE+0.6 WX -3.4 0.0 3.4 3.4 7.4 OK!
127 DS+DE+0.6 WZ -3.4 -0.1 3.7 3.1 7.4 OK!
128 DS+DE-0.6 WX -3.4 0.0 3.4 3.4 7.4 OK!
129 DS+DE-0.6 WZ -3.4 0.1 3.7 3.1 7.4 OK!
130 DS+DT+L -3.5 0.0 3.5 3.5 7.4 OK!
131 DS+DT+0.6 WX -3.5 0.0 3.5 3.5 7.4 OK!
132 DS+DT+0.6 WZ -3.5 -0.1 3.8 3.2 7.4 OK!
133 DS+DT-0.6 WX -3.5 0.0 3.5 3.5 7.4 OK!
134 DS+DT-0.6 WZ -3.5 0.1 3.8 3.2 7.4 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 69 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (Ton, Ton-m, Ton/m2)


L. Comb Σ Fy Σ Mz Q max Q min Q all. Check
101 DS+DO+L+TF+AF+FF -3.4 0.0 3.5 3.3 7.4 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -2.1 0.0 2.3 1.8 7.4 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -2.1 0.0 2.1 2.0 7.4 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -2.1 0.0 2.1 2.0 7.4 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -2.1 0.0 2.1 2.0 7.4 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -3.4 0.0 3.6 3.2 7.4 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -3.4 0.0 3.5 3.3 7.4 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -3.4 0.0 3.4 3.4 7.4 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -3.4 0.0 3.5 3.3 7.4 OK!
110 DS+DO+AF+TF+0.6WX -3.4 0.0 3.7 3.2 7.4 OK!
111 DS+DO+AF+TF+0.6 WZ -3.4 0.0 3.5 3.3 7.4 OK!
112 DS+DO+AF+TF-0.6 WX -3.4 0.0 3.4 3.4 7.4 OK!
113 DS+DO+AF+TF-0.6 WZ -3.4 0.0 3.5 3.3 7.4 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -2.1 0.2 3.2 0.9 7.4 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -2.1 0.0 2.1 2.0 7.4 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -2.1 -0.2 3.1 1.0 7.4 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -2.1 0.0 2.1 2.0 7.4 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -3.4 0.2 4.4 2.5 7.4 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -3.4 0.0 3.5 3.3 7.4 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -3.4 -0.1 4.1 2.7 7.4 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -3.4 0.0 3.5 3.3 7.4 OK!
122 DS+DO+AF+TF+0.7EQ-X -3.4 0.2 4.7 2.2 7.4 OK!
123 DS+DO+AF+TF+0.7EQ-Z -3.4 0.0 3.5 3.3 7.4 OK!
124 DS+DO+AF+TF-0.7EQ-X -3.4 -0.2 4.4 2.4 7.4 OK!
125 DS+DO+AF+TF-0.7EQ-Z -3.4 0.0 3.5 3.3 7.4 OK!
126 DS+DE+0.6 WX -3.4 0.0 3.6 3.3 7.4 OK!
127 DS+DE+0.6 WZ -3.4 0.0 3.4 3.4 7.4 OK!
128 DS+DE-0.6 WX -3.4 0.0 3.6 3.3 7.4 OK!
129 DS+DE-0.6 WZ -3.4 0.0 3.4 3.4 7.4 OK!
130 DS+DT+L -3.5 0.0 3.5 3.5 7.4 OK!
131 DS+DT+0.6 WX -3.5 0.0 3.6 3.3 7.4 OK!
132 DS+DT+0.6 WZ -3.5 0.0 3.5 3.5 7.4 OK!
133 DS+DT-0.6 WX -3.5 0.0 3.6 3.3 7.4 OK!
134 DS+DT-0.6 WZ -3.5 0.0 3.5 3.5 7.4 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 70 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5.9.2 Check Sliding


Formula : (µΣFy/ΣFz or µΣFy/ΣFx) > Allow. Safety Factor ---> OK!

Z - Direction Unit (Ton)


L. Comb Σ Fy Σ Fz µΣFy/Σ
µΣ Σ Fz Allow. Check
101 DS+DO+L+TF+AF+FF -3.4 0.0 N.A 1.75 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -2.1 0.0 N.A 1.75 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -2.1 0.0 28.8 1.75 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -2.1 0.0 N.A 1.75 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -2.1 0.0 28.8 1.75 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -3.4 0.0 N.A 1.75 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -3.4 0.0 64.0 1.75 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -3.4 0.0 N.A 1.75 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -3.4 0.0 64.0 1.75 OK!
110 DS+DO+AF+TF+0.6WX -3.4 0.0 N.A 1.75 OK!
111 DS+DO+AF+TF+0.6 WZ -3.4 0.0 48.0 1.75 OK!
112 DS+DO+AF+TF-0.6 WX -3.4 0.0 N.A 1.75 OK!
113 DS+DO+AF+TF-0.6 WZ -3.4 0.0 48.0 1.75 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -2.1 0.0 N.A 1.75 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -2.1 -0.1 8.0 1.75 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -2.1 0.0 N.A 1.75 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -2.1 0.1 8.0 1.75 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -3.4 0.0 N.A 1.75 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -3.4 -0.1 17.8 1.75 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -3.4 0.0 N.A 1.75 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -3.4 0.1 17.8 1.75 OK!
122 DS+DO+AF+TF+0.7EQ-X -3.4 0.0 N.A 1.75 OK!
123 DS+DO+AF+TF+0.7EQ-Z -3.4 -0.1 13.3 1.75 OK!
124 DS+DO+AF+TF-0.7EQ-X -3.4 0.0 N.A 1.75 OK!
125 DS+DO+AF+TF-0.7EQ-Z -3.4 0.1 13.3 1.75 OK!
126 DS+DE+0.6 WX -3.4 0.0 N.A 1.75 OK!
127 DS+DE+0.6 WZ -3.4 0.0 48.0 1.75 OK!
128 DS+DE-0.6 WX -3.4 0.0 N.A 1.75 OK!
129 DS+DE-0.6 WZ -3.4 0.0 48.0 1.75 OK!
130 DS+DT+L -3.5 0.0 N.A 1.75 OK!
131 DS+DT+0.6 WX -3.5 0.0 N.A 1.75 OK!
132 DS+DT+0.6 WZ -3.5 0.0 48.7 1.75 OK!
133 DS+DT-0.6 WX -3.5 0.0 N.A 1.75 OK!
134 DS+DT-0.6 WZ -3.5 0.0 48.7 1.75 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 71 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (Ton)


L. Comb Σ Fy Σ Fx µΣFy/Σ
µΣ Σ Fx Allow. Check
101 DS+DO+L+TF+AF+FF -3.4 0.0 120.1 1.75 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -2.1 0.0 42.5 1.75 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -2.1 0.0 120.1 1.75 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -2.1 0.0 145.5 1.75 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -2.1 0.0 120.1 1.75 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -3.4 0.0 65.9 1.75 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -3.4 0.0 120.1 1.75 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -3.4 0.0 672.4 1.75 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -3.4 0.0 120.1 1.75 OK!
110 DS+DO+AF+TF+0.6WX -3.4 0.0 57.3 1.75 OK!
111 DS+DO+AF+TF+0.6 WZ -3.4 0.0 120.1 1.75 OK!
112 DS+DO+AF+TF-0.6 WX -3.4 0.0 1262.2 1.75 OK!
113 DS+DO+AF+TF-0.6 WZ -3.4 0.0 120.1 1.75 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -2.1 -0.1 7.5 1.75 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -2.1 0.0 120.1 1.75 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -2.1 0.1 8.6 1.75 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -2.1 0.0 120.1 1.75 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -3.4 -0.1 15.5 1.75 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -3.4 0.0 120.1 1.75 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -3.4 0.1 20.8 1.75 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -3.4 0.0 120.1 1.75 OK!
122 DS+DO+AF+TF+0.7EQ-X -3.4 -0.1 12.0 1.75 OK!
123 DS+DO+AF+TF+0.7EQ-Z -3.4 0.0 120.1 1.75 OK!
124 DS+DO+AF+TF-0.7EQ-X -3.4 0.1 15.0 1.75 OK!
125 DS+DO+AF+TF-0.7EQ-Z -3.4 0.0 120.1 1.75 OK!
126 DS+DE+0.6 WX -3.4 0.0 109.7 1.75 OK!
127 DS+DE+0.6 WZ -3.4 0.0 N.A 1.75 OK!
128 DS+DE-0.6 WX -3.4 0.0 109.7 1.75 OK!
129 DS+DE-0.6 WZ -3.4 0.0 N.A 1.75 OK!
130 DS+DT+L -3.5 0.0 N.A 1.75 OK!
131 DS+DT+0.6 WX -3.5 0.0 111.2 1.75 OK!
132 DS+DT+0.6 WZ -3.5 0.0 N.A 1.75 OK!
133 DS+DT-0.6 WX -3.5 0.0 111.2 1.75 OK!
134 DS+DT-0.6 WZ -3.5 0.0 N.A 1.75 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 72 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5.9.3 Check Overturning


Formula : ΣFy*Lf/(2ΣMz) or ΣFy*Bf/(2ΣMx) > Allow. Safety Factor ---> OK!

Z - Direction Unit (Ton, Ton-m)


L. Comb Σ Fy Σ Mx Σ Fy*Bf/(2Σ
Σ Mx) Allow. Check
101 DS+DO+L+TF+AF+FF -3.4 0.0 N.A 2.00 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -2.1 0.0 N.A 2.00 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -2.1 -0.1 20.0 2.00 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -2.1 0.0 N.A 2.00 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -2.1 0.1 20.0 2.00 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -3.4 0.0 N.A 2.00 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -3.4 0.0 44.5 2.00 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -3.4 0.0 N.A 2.00 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -3.4 0.0 44.5 2.00 OK!
110 DS+DO+AF+TF+0.6WX -3.4 0.0 N.A 2.00 OK!
111 DS+DO+AF+TF+0.6 WZ -3.4 -0.1 33.4 2.00 OK!
112 DS+DO+AF+TF-0.6 WX -3.4 0.0 N.A 2.00 OK!
113 DS+DO+AF+TF-0.6 WZ -3.4 0.1 33.4 2.00 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -2.1 0.0 N.A 2.00 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -2.1 -0.2 5.6 2.00 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -2.1 0.0 N.A 2.00 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -2.1 0.2 5.6 2.00 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -3.4 0.0 N.A 2.00 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -3.4 -0.1 12.3 2.00 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -3.4 0.0 N.A 2.00 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -3.4 0.1 12.3 2.00 OK!
122 DS+DO+AF+TF+0.7EQ-X -3.4 0.0 N.A 2.00 OK!
123 DS+DO+AF+TF+0.7EQ-Z -3.4 -0.2 9.3 2.00 OK!
124 DS+DO+AF+TF-0.7EQ-X -3.4 0.0 N.A 2.00 OK!
125 DS+DO+AF+TF-0.7EQ-Z -3.4 0.2 9.3 2.00 OK!
126 DS+DE+0.6 WX -3.4 0.0 N.A 2.00 OK!
127 DS+DE+0.6 WZ -3.4 -0.1 33.4 2.00 OK!
128 DS+DE-0.6 WX -3.4 0.0 N.A 2.00 OK!
129 DS+DE-0.6 WZ -3.4 0.1 33.4 2.00 OK!
130 DS+DT+L -3.5 0.0 N.A 2.00 OK!
131 DS+DT+0.6 WX -3.5 0.0 N.A 2.00 OK!
132 DS+DT+0.6 WZ -3.5 -0.1 33.8 2.00 OK!
133 DS+DT-0.6 WX -3.5 0.0 N.A 2.00 OK!
134 DS+DT-0.6 WZ -3.5 0.1 33.8 2.00 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 73 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (Ton, Ton-m)


L. Comb Σ Fy Σ Mz Σ Fy*Lf/(2Σ
Σ Mz) Allow. Check
101 DS+DO+L+TF+AF+FF -3.4 0.0 83.4 2.00 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -2.1 0.0 29.5 2.00 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -2.1 0.0 83.4 2.00 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -2.1 0.0 101.1 2.00 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -2.1 0.0 83.4 2.00 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -3.4 0.0 45.8 2.00 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -3.4 0.0 83.4 2.00 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -3.4 0.0 466.9 2.00 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -3.4 0.0 83.4 2.00 OK!
110 DS+DO+AF+TF+0.6WX -3.4 0.0 39.8 2.00 OK!
111 DS+DO+AF+TF+0.6 WZ -3.4 0.0 83.4 2.00 OK!
112 DS+DO+AF+TF-0.6 WX -3.4 0.0 876.5 2.00 OK!
113 DS+DO+AF+TF-0.6 WZ -3.4 0.0 83.4 2.00 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -2.1 0.2 5.2 2.00 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -2.1 0.0 83.4 2.00 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -2.1 -0.2 5.9 2.00 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -2.1 0.0 83.4 2.00 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -3.4 0.2 10.7 2.00 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -3.4 0.0 83.4 2.00 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -3.4 -0.1 14.5 2.00 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -3.4 0.0 83.4 2.00 OK!
122 DS+DO+AF+TF+0.7EQ-X -3.4 0.2 8.3 2.00 OK!
123 DS+DO+AF+TF+0.7EQ-Z -3.4 0.0 83.4 2.00 OK!
124 DS+DO+AF+TF-0.7EQ-X -3.4 -0.2 10.4 2.00 OK!
125 DS+DO+AF+TF-0.7EQ-Z -3.4 0.0 83.4 2.00 OK!
126 DS+DE+0.6 WX -3.4 0.0 76.2 2.00 OK!
127 DS+DE+0.6 WZ -3.4 0.0 N.A 2.00 OK!
128 DS+DE-0.6 WX -3.4 0.0 76.2 2.00 OK!
129 DS+DE-0.6 WZ -3.4 0.0 N.A 2.00 OK!
130 DS+DT+L -3.5 0.0 N.A 2.00 OK!
131 DS+DT+0.6 WX -3.5 0.0 77.2 2.00 OK!
132 DS+DT+0.6 WZ -3.5 0.0 N.A 2.00 OK!
133 DS+DT-0.6 WX -3.5 0.0 77.2 2.00 OK!
134 DS+DT-0.6 WZ -3.5 0.0 N.A 2.00 OK!

B2.5.10 Footing Reinforcement


ACI 318-05 Chapter 10.5.4 :
For structural slabs and footings of uniform thickness, As min in the direction of the span shall be same as that
required by :
Area of shrinkage and temperature reinforcement shall provide at least the following ratios of
reinforcement area to gross concrete area, but not less than 0.0014:
(a) Slabs where grade 280 or 350 deformed bars are used …..0.0020
(b) Slabs where grade 420 deformed bars or welded wire reinforcement are used ….. 0.0018
(c) Slabs where reinforcement with yield stress exceeding 420 MPa measured at a yield strain of 0.35
percent is used ….. 0.0018*420/fy

As req' = Max(As1, As2) As 1 = ρreq*b*d As 2 = ρmin*b*h


Rn = Mu/(φ∗b*d^2) ρreq = 0.85*fc'/fy*(1-(1-(2*Rn/(0.85*fc')))^0.5)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 74 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Design Parameters
Unit (MPa, mm)
φ (Bending) fc' fy cl_b cl_t
0.8 24.8 390 75 50

φ = Reduction factor for bending


fc' = Concrete strength of footing
fy = Yield strength of rebar
cl_b = Clear concrete cover for bottom rebar
cl_t = Clear concrete cover for top rebar

Using Bar = D 13 - 200 (Z - direction) Max. Spacing OK!


D 13 - 200 (X - direction) Max. Spacing OK!
Z - Direction
Unit (Ton/m2, mm, Ton-m)
L. Comb Qu max Qu min Qu eq. Pos. d Mux
201 1.4(DS+DO+L+TF+AF+FF) 4.8 4.79 4.79 top 243.5 0.00
202 1.2(DS+DO+L+TF+AF+FF) 4.1 4.11 4.11 top 243.5 0.00
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.1 3.08 3.08 top 243.5 0.00
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.6 2.57 3.08 top 243.5 0.00
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.1 3.08 3.08 top 243.5 0.00
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.6 2.57 3.08 top 243.5 0.00
207 1.2(DS+DO+AF+TF)+1.0WX 4.1 4.11 4.11 top 243.5 0.00
208 1.2(DS+DO+AF+TF)+1.0WZ 4.6 3.59 4.11 top 243.5 0.00
209 1.2(DS+DO+AF+TF)-1.0WX 4.1 4.11 4.11 top 243.5 0.00
210 1.2(DS+DO+AF+TF)-1.0WZ 4.6 3.59 4.11 top 243.5 0.00
211 0.9(DS+DO)+1.0EQ-X 3.1 3.08 3.08 top 243.5 0.00
212 0.9(DS+DO)+1.0EQ-Z 4.7 1.50 3.08 top 243.5 0.00
213 0.9(DS+DO)-1.0EQ-X 3.1 3.08 3.08 top 243.5 0.00
214 0.9(DS+DO)-1.0EQ-Z 4.7 1.50 3.08 top 243.5 0.00
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 3.1 3.08 3.08 top 243.5 0.00
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 4.7 1.50 3.08 top 243.5 0.00
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 3.1 3.08 3.08 top 243.5 0.00
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 4.7 1.50 3.08 top 243.5 0.00
219 1.2(DS+DO+AF+TF)+1.0EQ-X 4.1 4.11 4.11 top 243.5 0.00
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 5.7 2.52 4.11 top 243.5 0.00
221 1.2(DS+DO+AF+TF)-1.0EQ-X 4.1 4.11 4.11 top 243.5 0.00
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 5.7 2.52 4.11 top 243.5 0.00
223 0.9(DS+DE)+1.0 WX 3.1 3.08 3.08 top 243.5 0.00
224 0.9(DS+DE)+1.0 WZ 3.6 2.57 3.08 top 243.5 0.00
225 0.9(DS+DE)-1.0 WX 3.1 3.08 3.08 top 243.5 0.00
226 0.9(DS+DE)-1.0 WZ 3.6 2.57 3.08 top 243.5 0.00
227 1.2(DS+DT)+1.0 WX 4.2 4.16 4.16 top 243.5 0.00
228 1.2(DS+DT)+1.0 WZ 4.7 3.65 4.16 top 243.5 0.00
229 1.2(DS+DT)-1.0 WX 4.2 4.16 4.16 top 243.5 0.00
230 1.2(DS+DT)-1.0 WZ 4.7 3.65 4.16 top 243.5 0.00
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 75 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 796 383 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 796 383 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.000 0.000 0.002 796 383 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.000 0.000 0.002 796 383 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.000 0.000 0.002 796 383 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.000 0.000 0.002 796 383 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.000 0.000 0.002 796 383 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.000 0.000 0.002 796 383 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.000 0.000 0.002 796 383 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.000 0.000 0.002 796 383 OK!
211 0.9(DS+DO)+1.0EQ-X 0.000 0.000 0.002 796 383 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.000 0.000 0.002 796 383 OK!
213 0.9(DS+DO)-1.0EQ-X 0.000 0.000 0.002 796 383 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.000 0.000 0.002 796 383 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.000 0.000 0.002 796 383 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.000 0.000 0.002 796 383 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.000 0.000 0.002 796 383 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.000 0.000 0.002 796 383 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.000 0.000 0.002 796 383 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.000 0.000 0.002 796 383 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.000 0.000 0.002 796 383 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.000 0.000 0.002 796 383 OK!
223 0.9(DS+DE)+1.0 WX 0.000 0.000 0.002 796 383 OK!
224 0.9(DS+DE)+1.0 WZ 0.000 0.000 0.002 796 383 OK!
225 0.9(DS+DE)-1.0 WX 0.000 0.000 0.002 796 383 OK!
226 0.9(DS+DE)-1.0 WZ 0.000 0.000 0.002 796 383 OK!
227 1.2(DS+DT)+1.0 WX 0.000 0.000 0.002 796 383 OK!
228 1.2(DS+DT)+1.0 WZ 0.000 0.000 0.002 796 383 OK!
229 1.2(DS+DT)-1.0 WX 0.000 0.000 0.002 796 383 OK!
230 1.2(DS+DT)-1.0 WZ 0.000 0.000 0.002 796 383 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 76 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (Ton/m2, mm, Ton-m)


L. Comb Qu max Qu min Qu eq. Pos. d Mux
201 1.4(DS+DO+L+TF+AF+FF) 4.8 4.79 4.79 bottom 218.5 1.35
202 1.2(DS+DO+L+TF+AF+FF) 4.1 4.11 4.11 bottom 218.5 1.16
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.1 3.08 3.08 bottom 218.5 0.87
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.6 2.57 3.08 bottom 218.5 0.87
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.1 3.08 3.08 bottom 218.5 0.87
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.6 2.57 3.08 bottom 218.5 0.87
207 1.2(DS+DO+AF+TF)+1.0WX 4.1 4.11 4.11 bottom 218.5 1.16
208 1.2(DS+DO+AF+TF)+1.0WZ 4.6 3.59 4.11 bottom 218.5 1.16
209 1.2(DS+DO+AF+TF)-1.0WX 4.1 4.11 4.11 bottom 218.5 1.16
210 1.2(DS+DO+AF+TF)-1.0WZ 4.6 3.59 4.11 bottom 218.5 1.16
211 0.9(DS+DO)+1.0EQ-X 3.1 3.08 3.08 bottom 218.5 0.87
212 0.9(DS+DO)+1.0EQ-Z 4.7 1.50 3.08 bottom 218.5 0.87
213 0.9(DS+DO)-1.0EQ-X 3.1 3.08 3.08 bottom 218.5 0.87
214 0.9(DS+DO)-1.0EQ-Z 4.7 1.50 3.08 bottom 218.5 0.87
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 3.1 3.08 3.08 bottom 218.5 0.87
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 4.7 1.50 3.08 bottom 218.5 0.87
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 3.1 3.08 3.08 bottom 218.5 0.87
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 4.7 1.50 3.08 bottom 218.5 0.87
219 1.2(DS+DO+AF+TF)+1.0EQ-X 4.1 4.11 4.11 bottom 218.5 1.16
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 5.7 2.52 4.11 bottom 218.5 1.16
221 1.2(DS+DO+AF+TF)-1.0EQ-X 4.1 4.11 4.11 bottom 218.5 1.16
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 5.7 2.52 4.11 bottom 218.5 1.16
223 0.9(DS+DE)+1.0 WX 3.1 3.08 3.08 bottom 218.5 0.87
224 0.9(DS+DE)+1.0 WZ 3.6 2.57 3.08 bottom 218.5 0.87
225 0.9(DS+DE)-1.0 WX 3.1 3.08 3.08 bottom 218.5 0.87
226 0.9(DS+DE)-1.0 WZ 3.6 2.57 3.08 bottom 218.5 0.87
227 1.2(DS+DT)+1.0 WX 4.2 4.16 4.16 bottom 218.5 1.17
228 1.2(DS+DT)+1.0 WZ 4.7 3.65 4.16 bottom 218.5 1.17
229 1.2(DS+DT)-1.0 WX 4.2 4.16 4.16 bottom 218.5 1.17
230 1.2(DS+DT)-1.0 WZ 4.7 3.65 4.16 bottom 218.5 1.17
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 77 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 0.346 0.001 0.002 796 308 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.297 0.001 0.002 796 308 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.223 0.001 0.002 796 308 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.223 0.001 0.002 796 308 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.223 0.001 0.002 796 308 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.223 0.001 0.002 796 308 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.297 0.001 0.002 796 308 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.297 0.001 0.002 796 308 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.297 0.001 0.002 796 308 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.297 0.001 0.002 796 308 OK!
211 0.9(DS+DO)+1.0EQ-X 0.223 0.001 0.002 796 308 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.223 0.001 0.002 796 308 OK!
213 0.9(DS+DO)-1.0EQ-X 0.223 0.001 0.002 796 308 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.223 0.001 0.002 796 308 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.223 0.001 0.002 796 308 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.223 0.001 0.002 796 308 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.223 0.001 0.002 796 308 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.223 0.001 0.002 796 308 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.297 0.001 0.002 796 308 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.297 0.001 0.002 796 308 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.297 0.001 0.002 796 308 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.297 0.001 0.002 796 308 OK!
223 0.9(DS+DE)+1.0 WX 0.223 0.001 0.002 796 308 OK!
224 0.9(DS+DE)+1.0 WZ 0.223 0.001 0.002 796 308 OK!
225 0.9(DS+DE)-1.0 WX 0.223 0.001 0.002 796 308 OK!
226 0.9(DS+DE)-1.0 WZ 0.223 0.001 0.002 796 308 OK!
227 1.2(DS+DT)+1.0 WX 0.301 0.001 0.002 796 308 OK!
228 1.2(DS+DT)+1.0 WZ 0.301 0.001 0.002 796 308 OK!
229 1.2(DS+DT)-1.0 WX 0.301 0.001 0.002 796 308 OK!
230 1.2(DS+DT)-1.0 WZ 0.301 0.001 0.002 796 308 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 78 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction
Unit (Ton/m2, mm, Ton-m)
L. Comb Qu max Qu min Qu eq. Pos. d Muz
201 1.4(DS+DO+L+TF+AF+FF) 5.0 4.62 4.79 top 230.5 0.00
202 1.2(DS+DO+L+TF+AF+FF) 4.3 3.96 4.11 top 230.5 0.00
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.4 2.75 3.08 top 230.5 0.00
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.2 2.97 3.08 top 230.5 0.00
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.2 2.97 3.08 top 230.5 0.00
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.2 2.97 3.08 top 230.5 0.00
207 1.2(DS+DO+AF+TF)+1.0WX 4.5 3.74 4.11 top 230.5 0.00
208 1.2(DS+DO+AF+TF)+1.0WZ 4.3 3.96 4.11 top 230.5 0.00
209 1.2(DS+DO+AF+TF)-1.0WX 4.2 4.03 4.11 top 230.5 0.00
210 1.2(DS+DO+AF+TF)-1.0WZ 4.3 3.96 4.11 top 230.5 0.00
211 0.9(DS+DO)+1.0EQ-X 4.8 1.38 3.08 top 230.5 0.00
212 0.9(DS+DO)+1.0EQ-Z 3.2 2.97 3.08 top 230.5 0.00
213 0.9(DS+DO)-1.0EQ-X 4.6 1.61 3.08 top 230.5 0.00
214 0.9(DS+DO)-1.0EQ-Z 3.2 2.97 3.08 top 230.5 0.00
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 4.8 1.38 3.08 top 230.5 0.00
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.2 2.97 3.08 top 230.5 0.00
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 4.6 1.61 3.08 top 230.5 0.00
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.2 2.97 3.08 top 230.5 0.00
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.8 2.37 4.11 top 230.5 0.00
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 4.3 3.96 4.11 top 230.5 0.00
221 1.2(DS+DO+AF+TF)-1.0EQ-X 5.5 2.67 4.11 top 230.5 0.00
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 4.3 3.96 4.11 top 230.5 0.00
223 0.9(DS+DE)+1.0 WX 3.3 2.86 3.08 top 230.5 0.00
224 0.9(DS+DE)+1.0 WZ 3.1 3.08 3.08 top 230.5 0.00
225 0.9(DS+DE)-1.0 WX 3.3 2.86 3.08 top 230.5 0.00
226 0.9(DS+DE)-1.0 WZ 3.1 3.08 3.08 top 230.5 0.00
227 1.2(DS+DT)+1.0 WX 4.4 3.94 4.16 top 230.5 0.00
228 1.2(DS+DT)+1.0 WZ 4.2 4.16 4.16 top 230.5 0.00
229 1.2(DS+DT)-1.0 WX 4.4 3.94 4.16 top 230.5 0.00
230 1.2(DS+DT)-1.0 WZ 4.2 4.16 4.16 top 230.5 0.00
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 79 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 796 343 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 796 343 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.000 0.000 0.002 796 343 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.000 0.000 0.002 796 343 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.000 0.000 0.002 796 343 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.000 0.000 0.002 796 343 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.000 0.000 0.002 796 343 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.000 0.000 0.002 796 343 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.000 0.000 0.002 796 343 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.000 0.000 0.002 796 343 OK!
211 0.9(DS+DO)+1.0EQ-X 0.000 0.000 0.002 796 343 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.000 0.000 0.002 796 343 OK!
213 0.9(DS+DO)-1.0EQ-X 0.000 0.000 0.002 796 343 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.000 0.000 0.002 796 343 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.000 0.000 0.002 796 343 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.000 0.000 0.002 796 343 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.000 0.000 0.002 796 343 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.000 0.000 0.002 796 343 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.000 0.000 0.002 796 343 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.000 0.000 0.002 796 343 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.000 0.000 0.002 796 343 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.000 0.000 0.002 796 343 OK!
223 0.9(DS+DE)+1.0 WX 0.000 0.000 0.002 796 343 OK!
224 0.9(DS+DE)+1.0 WZ 0.000 0.000 0.002 796 343 OK!
225 0.9(DS+DE)-1.0 WX 0.000 0.000 0.002 796 343 OK!
226 0.9(DS+DE)-1.0 WZ 0.000 0.000 0.002 796 343 OK!
227 1.2(DS+DT)+1.0 WX 0.000 0.000 0.002 796 343 OK!
228 1.2(DS+DT)+1.0 WZ 0.000 0.000 0.002 796 343 OK!
229 1.2(DS+DT)-1.0 WX 0.000 0.000 0.002 796 343 OK!
230 1.2(DS+DT)-1.0 WZ 0.000 0.000 0.002 796 343 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 80 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (Ton/m2, mm, Ton-m)


L. Comb Qu max Qu min Qu eq. Pos. d Muz
201 1.4(DS+DO+L+TF+AF+FF) 5.0 4.62 4.79 bottom 205.5 1.35
202 1.2(DS+DO+L+TF+AF+FF) 4.3 3.96 4.11 bottom 205.5 1.16
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.4 2.75 3.08 bottom 205.5 0.87
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.2 2.97 3.08 bottom 205.5 0.87
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.2 2.97 3.08 bottom 205.5 0.87
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.2 2.97 3.08 bottom 205.5 0.87
207 1.2(DS+DO+AF+TF)+1.0WX 4.5 3.74 4.11 bottom 205.5 1.16
208 1.2(DS+DO+AF+TF)+1.0WZ 4.3 3.96 4.11 bottom 205.5 1.16
209 1.2(DS+DO+AF+TF)-1.0WX 4.2 4.03 4.11 bottom 205.5 1.16
210 1.2(DS+DO+AF+TF)-1.0WZ 4.3 3.96 4.11 bottom 205.5 1.16
211 0.9(DS+DO)+1.0EQ-X 4.8 1.38 3.08 bottom 205.5 0.87
212 0.9(DS+DO)+1.0EQ-Z 3.2 2.97 3.08 bottom 205.5 0.87
213 0.9(DS+DO)-1.0EQ-X 4.6 1.61 3.08 bottom 205.5 0.87
214 0.9(DS+DO)-1.0EQ-Z 3.2 2.97 3.08 bottom 205.5 0.87
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 4.8 1.38 3.08 bottom 205.5 0.87
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.2 2.97 3.08 bottom 205.5 0.87
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 4.6 1.61 3.08 bottom 205.5 0.87
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.2 2.97 3.08 bottom 205.5 0.87
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.8 2.37 4.11 bottom 205.5 1.16
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 4.3 3.96 4.11 bottom 205.5 1.16
221 1.2(DS+DO+AF+TF)-1.0EQ-X 5.5 2.67 4.11 bottom 205.5 1.16
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 4.3 3.96 4.11 bottom 205.5 1.16
223 0.9(DS+DE)+1.0 WX 3.3 2.86 3.08 bottom 205.5 0.87
224 0.9(DS+DE)+1.0 WZ 3.1 3.08 3.08 bottom 205.5 0.87
225 0.9(DS+DE)-1.0 WX 3.3 2.86 3.08 bottom 205.5 0.87
226 0.9(DS+DE)-1.0 WZ 3.1 3.08 3.08 bottom 205.5 0.87
227 1.2(DS+DT)+1.0 WX 4.4 3.94 4.16 bottom 205.5 1.17
228 1.2(DS+DT)+1.0 WZ 4.2 4.16 4.16 bottom 205.5 1.17
229 1.2(DS+DT)-1.0 WX 4.4 3.94 4.16 bottom 205.5 1.17
230 1.2(DS+DT)-1.0 WZ 4.2 4.16 4.16 bottom 205.5 1.17
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 81 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 0.391 0.001 0.002 796 62 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.335 0.001 0.002 796 53 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.252 0.001 0.002 796 40 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.252 0.001 0.002 796 40 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.252 0.001 0.002 796 40 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.252 0.001 0.002 796 40 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.335 0.001 0.002 796 53 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.335 0.001 0.002 796 53 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.335 0.001 0.002 796 53 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.335 0.001 0.002 796 53 OK!
211 0.9(DS+DO)+1.0EQ-X 0.252 0.001 0.002 796 40 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.252 0.001 0.002 796 40 OK!
213 0.9(DS+DO)-1.0EQ-X 0.252 0.001 0.002 796 40 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.252 0.001 0.002 796 40 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.252 0.001 0.002 796 40 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.252 0.001 0.002 796 40 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.252 0.001 0.002 796 40 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.252 0.001 0.002 796 40 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.335 0.001 0.002 796 53 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.335 0.001 0.002 796 53 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.335 0.001 0.002 796 53 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.335 0.001 0.002 796 53 OK!
223 0.9(DS+DE)+1.0 WX 0.252 0.001 0.002 796 40 OK!
224 0.9(DS+DE)+1.0 WZ 0.252 0.001 0.002 796 40 OK!
225 0.9(DS+DE)-1.0 WX 0.252 0.001 0.002 796 40 OK!
226 0.9(DS+DE)-1.0 WZ 0.252 0.001 0.002 796 40 OK!
227 1.2(DS+DT)+1.0 WX 0.340 0.001 0.002 796 54 OK!
228 1.2(DS+DT)+1.0 WZ 0.340 0.001 0.002 796 54 OK!
229 1.2(DS+DT)-1.0 WX 0.340 0.001 0.002 796 54 OK!
230 1.2(DS+DT)-1.0 WZ 0.340 0.001 0.002 796 54 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 82 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5.11 One Way Shear


ACI 318-05 Chapter 11.3.1.1 :
For members subject to shear and flexure only :
Vc = 1/6*fc'^0.5*bw*d Vu < φ Vc ---> OK!
Vu = Qu eq. * Tributary Area (TA)
Reduction factor for shear, φ = 0.75

Z - Direction
L. Comb Qu eq. d TA Vu φ Vc Check
(ton/m2) (mm) (m2) (kN) (kN)
201 1.4(DS+DO+L+TF+AF+FF) 4.79 243.5 0.01 0.31 151.58 OK!
202 1.2(DS+DO+L+TF+AF+FF) 4.11 243.5 0.01 0.26 151.58 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.08 243.5 0.01 0.20 151.58 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.08 243.5 0.01 0.20 151.58 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.08 243.5 0.01 0.20 151.58 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.08 243.5 0.01 0.20 151.58 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 4.11 243.5 0.01 0.26 151.58 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 4.11 243.5 0.01 0.26 151.58 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 4.11 243.5 0.01 0.26 151.58 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 4.11 243.5 0.01 0.26 151.58 OK!
211 0.9(DS+DO)+1.0EQ-X 3.08 243.5 0.01 0.20 151.58 OK!
212 0.9(DS+DO)+1.0EQ-Z 3.08 243.5 0.01 0.20 151.58 OK!
213 0.9(DS+DO)-1.0EQ-X 3.08 243.5 0.01 0.20 151.58 OK!
214 0.9(DS+DO)-1.0EQ-Z 3.08 243.5 0.01 0.20 151.58 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 3.08 243.5 0.01 0.20 151.58 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.08 243.5 0.01 0.20 151.58 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 3.08 243.5 0.01 0.20 151.58 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.08 243.5 0.01 0.20 151.58 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 4.11 243.5 0.01 0.26 151.58 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 4.11 243.5 0.01 0.26 151.58 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 4.11 243.5 0.01 0.26 151.58 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 4.11 243.5 0.01 0.26 151.58 OK!
223 0.9(DS+DE)+1.0 WX 3.08 243.5 0.01 0.20 151.58 OK!
224 0.9(DS+DE)+1.0 WZ 3.08 243.5 0.01 0.20 151.58 OK!
225 0.9(DS+DE)-1.0 WX 3.08 243.5 0.01 0.20 151.58 OK!
226 0.9(DS+DE)-1.0 WZ 3.08 243.5 0.01 0.20 151.58 OK!
227 1.2(DS+DT)+1.0 WX 4.16 243.5 0.01 0.27 151.58 OK!
228 1.2(DS+DT)+1.0 WZ 4.16 243.5 0.01 0.27 151.58 OK!
229 1.2(DS+DT)-1.0 WX 4.16 243.5 0.01 0.27 151.58 OK!
230 1.2(DS+DT)-1.0 WZ 4.16 243.5 0.01 0.27 151.58 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 83 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction
L. Comb Qu eq. d TA Vu φ Vc Check
(ton/m2) (mm) (m2) (kN) (kN)
201 1.4(DS+DO+L+TF+AF+FF) 4.79 230.5 0.02 0.9 143.5 OK!
202 1.2(DS+DO+L+TF+AF+FF) 4.11 230.5 0.02 0.8 143.5 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.08 230.5 0.02 0.6 143.5 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.08 230.5 0.02 0.6 143.5 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.08 230.5 0.02 0.6 143.5 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.08 230.5 0.02 0.6 143.5 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 4.11 230.5 0.02 0.8 143.5 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 4.11 230.5 0.02 0.8 143.5 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 4.11 230.5 0.02 0.8 143.5 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 4.11 230.5 0.02 0.8 143.5 OK!
211 0.9(DS+DO)+1.0EQ-X 3.08 230.5 0.02 0.6 143.5 OK!
212 0.9(DS+DO)+1.0EQ-Z 3.08 230.5 0.02 0.6 143.5 OK!
213 0.9(DS+DO)-1.0EQ-X 3.08 230.5 0.02 0.6 143.5 OK!
214 0.9(DS+DO)-1.0EQ-Z 3.08 230.5 0.02 0.6 143.5 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 3.08 230.5 0.02 0.6 143.5 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.08 230.5 0.02 0.6 143.5 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 3.08 230.5 0.02 0.6 143.5 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.08 230.5 0.02 0.6 143.5 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 4.11 230.5 0.02 0.8 143.5 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 4.11 230.5 0.02 0.8 143.5 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 4.11 230.5 0.02 0.8 143.5 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 4.11 230.5 0.02 0.8 143.5 OK!
223 0.9(DS+DE)+1.0 WX 3.08 230.5 0.02 0.6 143.5 OK!
224 0.9(DS+DE)+1.0 WZ 3.08 230.5 0.02 0.6 143.5 OK!
225 0.9(DS+DE)-1.0 WX 3.08 230.5 0.02 0.6 143.5 OK!
226 0.9(DS+DE)-1.0 WZ 3.08 230.5 0.02 0.6 143.5 OK!
227 1.2(DS+DT)+1.0 WX 4.16 230.5 0.02 0.8 143.5 OK!
228 1.2(DS+DT)+1.0 WZ 4.16 230.5 0.02 0.8 143.5 OK!
229 1.2(DS+DT)-1.0 WX 4.16 230.5 0.02 0.8 143.5 OK!
230 1.2(DS+DT)-1.0 WZ 4.16 230.5 0.02 0.8 143.5 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 84 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5.12 Two Way Shear


ACI 318-05 Chapter 11.12.2.1 :
For nonprestressed slabs and footings, Vc shall be the smallest of (a), (b) and (c):
(a) Vc1 = 1/6*(1+2/β)*(fc')^0.5*bo*d
(b) Vc2 = (αs*d/bo+2)*((fc')^0.5*bo*d)/12
(c) Vc3 = ((fc')^0.5*bo*d)/3
Pier Name = 1
Ratio of long side to short side of pedestal, β = 1.00
Perimeter of critical section for footing, bo = 850 mm
Exterior pedestal, αs = 20 (For exterior / corner column)

Z & X - Direction
L. Comb Qu eq. d ave TA Vu φ Vc Check
(ton/m2) (mm) (m2) (kN) (kN)
201 1.4(DS+DO+L+TF+AF+FF) 4.79 212 0.49 23.2 224.3 OK!
202 1.2(DS+DO+L+TF+AF+FF) 4.11 212 0.49 19.9 224.3 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.08 212 0.49 14.9 224.3 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.08 212 0.49 14.9 224.3 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.08 212 0.49 14.9 224.3 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.08 212 0.49 14.9 224.3 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 4.11 212 0.49 19.9 224.3 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 4.11 212 0.49 19.9 224.3 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 4.11 212 0.49 19.9 224.3 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 4.11 212 0.49 19.9 224.3 OK!
211 0.9(DS+DO)+1.0EQ-X 3.08 212 0.49 14.9 224.3 OK!
212 0.9(DS+DO)+1.0EQ-Z 3.08 212 0.49 14.9 224.3 OK!
213 0.9(DS+DO)-1.0EQ-X 3.08 212 0.49 14.9 224.3 OK!
214 0.9(DS+DO)-1.0EQ-Z 3.08 212 0.49 14.9 224.3 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 3.08 212 0.49 14.9 224.3 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.08 212 0.49 14.9 224.3 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 3.08 212 0.49 14.9 224.3 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.08 212 0.49 14.9 224.3 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 4.11 212 0.49 19.9 224.3 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 4.11 212 0.49 19.9 224.3 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 4.11 212 0.49 19.9 224.3 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 4.11 212 0.49 19.9 224.3 OK!
223 0.9(DS+DE)+1.0 WX 3.08 212 0.49 14.9 224.3 OK!
224 0.9(DS+DE)+1.0 WZ 3.08 212 0.49 14.9 224.3 OK!
225 0.9(DS+DE)-1.0 WX 3.08 212 0.49 14.9 224.3 OK!
226 0.9(DS+DE)-1.0 WZ 3.08 212 0.49 14.9 224.3 OK!
227 1.2(DS+DT)+1.0 WX 4.16 212 0.49 20.1 224.3 OK!
228 1.2(DS+DT)+1.0 WZ 4.16 212 0.49 20.1 224.3 OK!
229 1.2(DS+DT)-1.0 WX 4.16 212 0.49 20.1 224.3 OK!
230 1.2(DS+DT)-1.0 WZ 4.16 212 0.49 20.1 224.3 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 85 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.5.13 Pedestal Reinforcement

Design Parameters
Unit (MPa, mm)
φ (Bending) φ (Shear) fc' fy cl_c
0.8 0.75 24.8 390 50

φ = Reduction factor for bending and shear


fc' = Concrete strength of pedestal
fy = Yield strength of rebar
cl_c = Clear concrete cover for pedestal rebar for all sides

Pedestal reinforcement are 0.5% from foundation gross section (ACI 318-05 Chapter 15.8.2.1)
ρo = 0.005 50
As-req = ρr Ap
= 0.005 x 0.2500
= 0.0013 m2
500 mm
= 12.500 cm2
db = 13 mm, ; A = 132.73 mm2 50
n = 12 ea
So, use : 12 D 13 for longitudinal reinforcement.
500 mm
Check Pedestal Flexural Reinforcement
Unit (mm)
Pr. Name Bp Lp dz dx ph
1 500.00 500.00 433.50 433.50 1600
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 86 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Z - Direction Unit (N/mm2, mm2)


Pr. Name L. Comb Rn ρ req ρ min Using As As req Check
1 201 1.4(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 929 361 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 929 361 OK!
0.000
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.000 0.002 929 361 OK!
0.009
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.000 0.002 929 361 OK!
0.000
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.000 0.002 929 361 OK!
0.009
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.000 0.002 929 361 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.000 0.000 0.002 929 361 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.009 0.000 0.002 929 361 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.000 0.000 0.002 929 361 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.009 0.000 0.002 929 361 OK!
211 0.9(DS+DO)+1.0EQ-X 0.000 0.000 0.002 929 361 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.029 0.000 0.002 929 361 OK!
213 0.9(DS+DO)-1.0EQ-X 0.000 0.000 0.002 929 361 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.029 0.000 0.002 929 361 OK!
0.000
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.000 0.002 929 361 OK!
0.029
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.000 0.002 929 361 OK!
0.000
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.000 0.002 929 361 OK!
0.029
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.000 0.002 929 361 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.000 0.000 0.002 929 361 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.029 0.000 0.002 929 361 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.000 0.000 0.002 929 361 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.029 0.000 0.002 929 361 OK!
223 0.9(DS+DE)+1.0 WX 0.000 0.000 0.002 929 361 OK!
224 0.9(DS+DE)+1.0 WZ 0.009 0.000 0.002 929 361 OK!
225 0.9(DS+DE)-1.0 WX 0.000 0.000 0.002 929 361 OK!
226 0.9(DS+DE)-1.0 WZ 0.009 0.000 0.002 929 361 OK!
227 1.2(DS+DT)+1.0 WX 0.000 0.000 0.002 929 361 OK!
228 1.2(DS+DT)+1.0 WZ 0.009 0.000 0.002 929 361 OK!
229 1.2(DS+DT)-1.0 WX 0.000 0.000 0.002 929 361 OK!
230 1.2(DS+DT)-1.0 WZ 0.009 0.000 0.002 929 361 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 87 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (N/mm2, mm2)


Pr. Name L. Comb Rn ρ req ρ min Using As As req Check
1 201 1.4(DS+DO+L+TF+AF+FF) 0.003 0.000 0.002 929 361 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.003 0.000 0.002 929 361 OK!
0.006
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.000 0.002 929 361 OK!
0.002
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.000 0.002 929 361 OK!
0.002
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.000 0.002 929 361 OK!
0.002
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.000 0.002 929 361 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.007 0.000 0.002 929 361 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.003 0.000 0.002 929 361 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.001 0.000 0.002 929 361 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.003 0.000 0.002 929 361 OK!
211 0.9(DS+DO)+1.0EQ-X 0.031 0.000 0.002 929 361 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.002 0.000 0.002 929 361 OK!
213 0.9(DS+DO)-1.0EQ-X 0.027 0.000 0.002 929 361 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.002 0.000 0.002 929 361 OK!
0.031
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.000 0.002 929 361 OK!
0.002
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.000 0.002 929 361 OK!
0.027
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.000 0.002 929 361 OK!
0.002
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.000 0.002 929 361 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.031 0.000 0.002 929 361 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.003 0.000 0.002 929 361 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.026 0.000 0.002 929 361 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.003 0.000 0.002 929 361 OK!
223 0.9(DS+DE)+1.0 WX 0.004 0.000 0.002 929 361 OK!
224 0.9(DS+DE)+1.0 WZ 0.000 0.000 0.002 929 361 OK!
225 0.9(DS+DE)-1.0 WX 0.004 0.000 0.002 929 361 OK!
226 0.9(DS+DE)-1.0 WZ 0.000 0.000 0.002 929 361 OK!
227 1.2(DS+DT)+1.0 WX 0.004 0.000 0.002 929 361 OK!
228 1.2(DS+DT)+1.0 WZ 0.000 0.000 0.002 929 361 OK!
229 1.2(DS+DT)-1.0 WX 0.004 0.000 0.002 929 361 OK!
230 1.2(DS+DT)-1.0 WZ 0.000 0.000 0.002 929 361 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 88 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Shear Reinforcement

Unit (mm, MPa)


Dia Spacing fyt
10 200 240

Z - Direction Unit (kN, mm, mm2)


Pr. Name L. Comb φ Vc Vu s Max Av min As use Check
1 201 1.4(DS+DO+L+TF+AF+FF) 134.926 0.0 200 0 157.08 OK!
202 1.2(DS+DO+L+TF+AF+FF) 134.926 0.0 200 0 157.08 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX
134.926 0.0 200 0 157.08 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ
134.926 0.0 200 0 157.08 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX
134.926 0.0 200 0 157.08 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ
134.926 0.0 200 0 157.08 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 134.926 0.0 200 0 157.08 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 134.926 0.0 200 0 157.08 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 134.926 0.0 200 0 157.08 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 134.926 0.0 200 0 157.08 OK!
211 0.9(DS+DO)+1.0EQ-X 134.926 0.0 200 0 157.08 OK!
212 0.9(DS+DO)+1.0EQ-Z 134.926 0.1 200 0 157.08 OK!
213 0.9(DS+DO)-1.0EQ-X 134.926 0.0 200 0 157.08 OK!
214 0.9(DS+DO)-1.0EQ-Z 134.926 0.1 200 0 157.08 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X
134.926 0.0 200 0 157.08 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z
134.926 0.1 200 0 157.08 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X
134.926 0.0 200 0 157.08 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z
134.926 0.1 200 0 157.08 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 134.926 0.0 200 0 157.08 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 134.926 0.1 200 0 157.08 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 134.926 0.0 200 0 157.08 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 134.926 0.1 200 0 157.08 OK!
223 0.9(DS+DE)+1.0 WX 134.926 0.0 200 0 157.08 OK!
224 0.9(DS+DE)+1.0 WZ 134.926 0.0 200 0 157.08 OK!
225 0.9(DS+DE)-1.0 WX 134.926 0.0 200 0 157.08 OK!
226 0.9(DS+DE)-1.0 WZ 134.926 0.0 200 0 157.08 OK!
227 1.2(DS+DT)+1.0 WX 134.926 0.0 200 0 157.08 OK!
228 1.2(DS+DT)+1.0 WZ 134.926 0.0 200 0 157.08 OK!
229 1.2(DS+DT)-1.0 WX 134.926 0.0 200 0 157.08 OK!
230 1.2(DS+DT)-1.0 WZ 134.926 0.0 200 0 157.08 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 89 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (kN, mm, mm2)


Pr. Name L. Comb φ Vc Vu s Max Av min As use Check
1 201 1.4(DS+DO+L+TF+AF+FF) 134.926 0.0 200 0 157.08 OK!
202 1.2(DS+DO+L+TF+AF+FF) 134.926 0.0 200 0 157.08 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX
134.926 0.0 200 0 157.08 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ
134.926 0.0 200 0 157.08 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX
134.926 0.0 200 0 157.08 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ
134.926 0.0 200 0 157.08 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 134.926 0.0 200 0 157.08 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 134.926 0.0 200 0 157.08 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 134.926 0.0 200 0 157.08 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 134.926 0.0 200 0 157.08 OK!
211 0.9(DS+DO)+1.0EQ-X 134.926 0.2 200 0 157.08 OK!
212 0.9(DS+DO)+1.0EQ-Z 134.926 0.0 200 0 157.08 OK!
213 0.9(DS+DO)-1.0EQ-X 134.926 0.1 200 0 157.08 OK!
214 0.9(DS+DO)-1.0EQ-Z 134.926 0.0 200 0 157.08 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X
134.926 0.2 200 0 157.08 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z
134.926 0.0 200 0 157.08 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X
134.926 0.1 200 0 157.08 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z
134.926 0.0 200 0 157.08 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 134.926 0.2 200 0 157.08 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 134.926 0.0 200 0 157.08 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 134.926 0.1 200 0 157.08 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 134.926 0.0 200 0 157.08 OK!
223 0.9(DS+DE)+1.0 WX 134.926 0.0 200 0 157.08 OK!
224 0.9(DS+DE)+1.0 WZ 134.926 0.0 200 0 157.08 OK!
225 0.9(DS+DE)-1.0 WX 134.926 0.0 200 0 157.08 OK!
226 0.9(DS+DE)-1.0 WZ 134.926 0.0 200 0 157.08 OK!
227 1.2(DS+DT)+1.0 WX 134.926 0.0 200 0 157.08 OK!
228 1.2(DS+DT)+1.0 WZ 134.926 0.0 200 0 157.08 OK!
229 1.2(DS+DT)-1.0 WX 134.926 0.0 200 0 157.08 OK!
230 1.2(DS+DT)-1.0 WZ 134.926 0.0 200 0 157.08 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 90 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.6 Anchor Bolt Design


B2.6.1 Material Properties
Concrete strength, f c' = 24.8 MPa
Anchor bolt yield strength, fy = 240 MPa
Specified tensile strength of anchor, futa = Min (1.9 fy or 860 MPa)
= 456 MPa
Weld E70XX Electrode, Fuw = 70000 psi = 483 MPa
Fvw = 42000 psi = 290 MPa

B2.6.2 Anchor Bolt Capacity

Bolt diameter, do = 20 mm

Effective area, Ase =

= 234 mm2
Thread per mm, nt = 0.35 ea
Embedment depth, heff = 270 mm
Nut size, N = 35 mm
Plate thickness, tL = 22 mm
Bearing Area, Abrg = 747 mm2
Anchor Edge. Dist. ca1 = 120 mm
ca2 = 120 mm

Anchor bolt dist. X-Dir, a = 260 mm


Anchor bolt dist. Z-Dir, b = 260 mm

Number of AB X-Dir nx = 2 mm
Number of AB Z-Dir nz = 2 mm
Total Numb. of AB nt = 4 mm
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 91 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Shear Capacity
a. Steel strength of anchor in shear :
Vsa = φ 0.6 Ase futa
= 0.65 x 0.6 x 233.713 x 456
= 41564 N

b. Concrete breakout strength of anchor in shear


Vcb = φ

ha = Dp + Gp
= 1500 mm
Avc = (Min(ha; 1.5ca1))*(1.5ca1+ca1)
= 54000 mm2
2
Avco = 4.5 ca1
2
= 64800 mm
Avc
= 0.83
Avco

ψed,V = , ACI Appendix D Section D.6.2.6

= 0.90
ψc,V = 1.00 , ACI Appendix D Section D.6.2.7

Vb = 0.6*(le/do)^0.2*do^0.5*fc'^0.5*ca1^1.5
= 0.6 x (270/20)^0.2 x sqrt(20) x sqrt(24.8) x (120)^1.5
= 29562 N
Vcb = 0.7 x 0.83 x 0.9 x 1 x 29561.789
= 15520 N

c. Concrete Pryout Strength of Anchor in Shear


kcp = 2.00 for hef > 65 mm
Vcp = kcp Ncb
= 2 x 64068.41
= 128136.821 N

Shear capacity on anchor bolt


Vn = Min (Vsa, Vcb, Vcp)
= 15520 N
= 1582.1 kg
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 92 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Tension Capacity
a. Steel strength of anchor in tension :
Nsa = φ Ase futa
= 0.75 x 233.71 x 456
= 79930 N

b. Concrete breakout strength of anchor in tension


Ncb = φ
ANc = (ca1 + 1.5hef)^2
= 275625 mm2
2
ANco = 9 hef
= 656100 mm2
Anc
= 0.42
Anco

ψed,N = , ACI Appendix D Section D.5.2.5

= 0.79
ψc,N = 1.25 , for cast-in anchor , ACI Appendix D Section D.5.2.6
= 1.40 , for post-installed anchor , ACI Appendix D Section D.5.2.6
ψcp,N = 1.00 , ACI Appendix D Section D.5.2.7
kc = 10 , for cast-in anchor , ACI Appendix D Section D.5.2.2
= 7 , for post-installed anchor , ACI Appendix D Section D.5.2.2
Nb =
= 10 x sqrt(24.8) x 270^1.5
= 220938.543 N
Ncb = 0.7 x 0.42 x 1 x 1.25 x 0.79 x 220938.54
= 64068.4103 N

c. Pullout Strength of Anchor in Tension


Npn = φ ψc,P Np
ψc,P = 1.00 , ACI Appendix D Section D.5.3.6
Np = , for headed stud, or headed bolt
= , for hooked bolt
= 8 x 746.69 x 24.8
= 148143.296 N

Npn = 0.7 x 148143.3 x 1


= 103700.307 N

d. Concrete Side-face Blowout Strength of Anchor in Tension


Nsb = φ
= 0.7 x 13 x 120 x sqrt(746.69) x sqrt(24.8)
= 148600.017 N
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 93 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Tension capacity of anchor bolt


Tn = Min (Nsa, Ncb, Npn, Nsb)
= 64068 N
= 6530.9 kg

Capacity of Shear
φ Rn = nb Vn
= 4 x 1582.05
= 6328.2 kg

Capacity of Tension
φ Tn = nt Tn
= 4 x 6530.93
= 26124 kg
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 94 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.6.3 Check Anchor Bolt Capacity

Factored Loading Combination in Pier Top Center (Without Pier Selfweight)


Unit (Ton, Ton-m) Check
Pr. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz Shear Tension
1 0.0
201 1.4(DS+DO+L+TF+AF+FF) -0.3 0.0 0.0 0.0 OK! OK!
0.0
202 1.2(DS+DO+L+TF+AF+FF) -0.2 0.0 0.0 0.0 OK! OK!
0.0 -0.2
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.0 0.0 0.1 OK! OK!
0.0 -0.2
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.0 -0.1 0.0 OK! OK!
0.0 -0.2
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.0 0.0 0.0 OK! OK!
0.0 -0.2
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.0 0.1 0.0 OK! OK!
0.0
207 1.2(DS+DO+AF+TF)+1.0WX -0.2 0.0 0.0 0.1 OK! OK!
0.0
208 1.2(DS+DO+AF+TF)+1.0WZ -0.2 0.0 -0.1 0.0 OK! OK!
0.0
209 1.2(DS+DO+AF+TF)-1.0WX -0.2 0.0 0.0 0.0 OK! OK!
0.0
210 1.2(DS+DO+AF+TF)-1.0WZ -0.2 0.0 0.1 0.0 OK! OK!
211 0.9(DS+DO)+1.0EQ-X-0.2 -0.2 0.0 0.0 0.3 OK! OK!
212 0.9(DS+DO)+1.0EQ-Z 0.0 -0.2 -0.1 -0.3 0.0 OK! OK!
213 0.9(DS+DO)-1.0EQ-X 0.1 -0.2 0.0 0.0 -0.3 OK! OK!
214 0.9(DS+DO)-1.0EQ-Z 0.0 -0.2 0.1 0.3 0.0 OK! OK!
-0.2 -0.2
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.0 0.0 0.3 OK! OK!
0.0 -0.2
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z -0.1 -0.3 0.0 OK! OK!
0.1 -0.2
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.0 0.0 -0.3 OK! OK!
0.0 -0.2
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.1 0.3 0.0 OK! OK!
-0.2
219 1.2(DS+DO+AF+TF)+1.0EQ-X -0.2 0.0 0.0 0.3 OK! OK!
0.0
220 1.2(DS+DO+AF+TF)+1.0EQ-Z -0.2 -0.1 -0.3 0.0 OK! OK!
0.1
221 1.2(DS+DO+AF+TF)-1.0EQ-X -0.2 0.0 0.0 -0.3 OK! OK!
0.0
222 1.2(DS+DO+AF+TF)-1.0EQ-Z -0.2 0.1 0.3 0.0 OK! OK!
223 0.9(DS+DE)+1.0 WX 0.0 -0.2 0.0 0.0 0.0 OK! OK!
224 0.9(DS+DE)+1.0 WZ 0.0 -0.2 0.0 -0.1 0.0 OK! OK!
225 0.9(DS+DE)-1.0 WX 0.0 -0.2 0.0 0.0 0.0 OK! OK!
226 0.9(DS+DE)-1.0 WZ 0.0 -0.2 0.0 0.1 0.0 OK! OK!
227 1.2(DS+DT)+1.0 WX 0.0 -0.3 0.0 0.0 0.0 OK! OK!
228 1.2(DS+DT)+1.0 WZ 0.0 -0.3 0.0 -0.1 0.0 OK! OK!
229 1.2(DS+DT)-1.0 WX 0.0 -0.3 0.0 0.0 0.0 OK! OK!
230 1.2(DS+DT)-1.0 WZ 0.0 -0.3 0.0 0.1 0.0 OK! OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 95 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B2.7 STAAD.Pro Input


STAAD SPACE
START JOB INFORMATION

JOB CLIENT PT. Medco Energi E&P Malaka

CHECKER NAME KHB/BD


APPROVED NAME BHK

ENGINEER NAME RN/LG


END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KG
JOINT COORDINATES
1 0 0.3 0; 5 0 2.5 0; 6 0 2.5 0.25; 7 0 2.5 -0.25; 8 0 0.5 0; 9 0 0.5 -0.25;
MEMBER INCIDENCES
100 1 8; 101 7 5; 102 5 6; 103 8 5; 104 8 9;
SUPPORTS
1 FIXED
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.09042e+010
POISSON 0.3
DENSITY 7833.41
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY JAPANESE
100 TO 104 TABLE ST H200X200X8
***********SEISMIC DEFINITION***********
CONSTANTS
BETA 90 MEMB 100 103
MATERIAL STEEL ALL
*
*
*
DEFINE UBC LOAD
ZONE 0.3 I 1.25 RWX 4.5 RWZ 4.5 STYP 4 CT 0.0853 NA 1 NV 1
SELFWEIGHT 1.12
*
JOINT WEIGHT
5 WEIGHT 156.6
*
MEMBER WEIGHT
101 CON 94.2 0.25
*
MEMBER WEIGHT
102 CON 172 0.7
*
**********LOADING CASES**********
LOAD 1 LOADTYPE Seismic TITLE EX (EARTHQUAKE LOAD X-DIR)
UBC LOAD X 1
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 96 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
LOAD 2 LOADTYPE Seismic TITLE EZ (EARTHQUAKE LOAD Z-DIR)
UBC LOAD Z 1
LOAD 3 LOADTYPE Seismic TITLE EY (EARTHQUAKE LOAD Y-DIR)
LOAD 4 LOADTYPE Dead TITLE DS (DEAD LOAD STRUCTURE)
SELFWEIGHT Y -1.12 LIST 100 TO 102
LOAD 5 LOADTYPE Dead TITLE DE (EQUIPMENT EMPTY DEAD LOAD)
JOINT LOAD
5 FY -138.5
MEMBER LOAD
104 CON GY -5.5
LOAD 6 LOADTYPE Dead TITLE DO (EQUIPMENT OPERATING DEAD LOAD)
*
*
JOINT LOAD
5 FX 11.4
5 FY -138.5
MEMBER LOAD
104 CON GY -5.5
*
*
LOAD 7 LOADTYPE Dead TITLE DT (EQUIPMENT TEST DEAD LOAD)
JOINT LOAD
5 FY -184.6
MEMBER LOAD
104 CON GY -6.25
*
LOAD 8 LOADTYPE Live TITLE L (LIVE LOAD)
LOAD 9 LOADTYPE None TITLE I (HANDLING DEVICE/IMPACT LOAD)
LOAD 10 LOADTYPE Wind TITLE WX (WIND LOAD X-DIR)
MEMBER LOAD
100 TO 103 UNI GX 7.2
JOINT LOAD
5 FX 1.368
LOAD 11 LOADTYPE Wind TITLE WZ (WIND LOAD Z-DIR)
MEMBER LOAD
100 103 UNI GZ 7.2
JOINT LOAD
5 FZ 31.67
LOAD 12 LOADTYPE None TITLE J (VIBRATION LOAD)
LOAD 13 LOADTYPE None TITLE TF (SELF-STRAINING AND THERMAL FORCES)
LOAD 14 LOADTYPE None TITLE FF (SURFACE FRICTION FORCES)
LOAD 15 LOADTYPE None TITLE AF (ANCHOR FORCES)
LOAD 16 LOADTYPE None TITLE HS (EARTH PRESSURE
LOAD 17 LOADTYPE None TITLE HW (WATER PRESSURE)
LOAD 18 LOADTYPE None TITLE R (RAIN LOAD)
LOAD 19 LOADTYPE None TITLE VH (VEHICLE LOAD)
LOAD 20 LOADTYPE None TITLE C (CRANE LOAD)
*****
*****LOADING COMBINATION
*****
*****Operating Condition
LOAD COMB 101 DS + DO + L + TF + AF + FF
4 1.0 6 1.0 8 1.0 13 1.0 15 1.0 14 1.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 97 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
*****Operating + Wind
LOAD COMB 102 0.6 DS + 0.6 DE + WX
4 0.6 5 0.6 10 1.0
LOAD COMB 103 0.6 DS + 0.6 DE + WZ
4 0.6 5 0.6 11 1.0
LOAD COMB 104 0.6 DS + 0.6 DE - WX
4 0.6 5 0.6 10 -1.0
LOAD COMB 105 0.6 DS + 0.6 DE - WZ
4 0.6 5 0.6 11 -1.0
LOAD COMB 106 DS + DO + 0.75 L + AF + 0.75 WX
4 1.0 6 1.0 8 0.75 15 1.0 10 0.75
LOAD COMB 107 DS + DO + 0.75 L + AF + 0.75 WZ
4 1.0 6 1.0 8 0.75 15 1.0 11 0.75
LOAD COMB 108 DS + DO + 0.75 L + AF - 0.75 WX
4 1.0 6 1.0 8 0.75 15 1.0 10 -0.75
LOAD COMB 109 DS + DO + 0.75 L + AF - 0.75 WZ
4 1.0 6 1.0 8 0.75 15 1.0 11 -0.75
LOAD COMB 110 DS + DO + AF + WX
4 1.0 6 1.0 15 1.0 10 1.0
LOAD COMB 111 DS + DO + AF + WZ
4 1.0 6 1.0 15 1.0 11 1.0
LOAD COMB 112 DS + DO + AF - WX
4 1.0 6 1.0 15 1.0 10 -1.0
LOAD COMB 113 DS + DO + AF - WZ
4 1.0 6 1.0 15 1.0 11 -1.0
******Operating + Earthquake
LOAD COMB 114 0.6 DS + 0.6 DE + 0.7 EE-X
4 0.6 5 0.6 1 0.7 2 0.21 3 0.111
LOAD COMB 115 0.6 DS + 0.6 DE + 0.7 EE-Z
4 0.6 5 0.6 2 0.7 1 0.21 3 0.111
LOAD COMB 116 0.6 DS + 0.6 DE - 0.7 EE-X
4 0.6 5 0.6 1 -0.7 2 0.21 3 0.111
LOAD COMB 117 0.6 DS + 0.6 DE - 0.7 EE-Z
4 0.6 5 0.6 2 -0.7 1 0.21 3 0.111
LOAD COMB 118 DS + DO + AF + 0.525 EO-X
4 1.0 6 1.0 15 1.0 1 0.525 2 0.158 3 0.111
LOAD COMB 119 DS + DO + AF + 0.525 EO-Z
4 1.0 6 1.0 15 1.0 2 0.525 1 0.158 3 0.111
LOAD COMB 120 DS + DO + AF - 0.525 EO-X
4 1.0 6 1.0 15 1.0 1 -0.525 2 0.158 3 0.111
LOAD COMB 121 DS + DO + AF - 0.525 EO-Z
4 1.0 6 1.0 15 1.0 2 -0.525 1 0.158 3 0.111
LOAD COMB 122 DS + DO + AF + 0.7 EO-X
4 1.0 6 1.0 15 1.0 1 0.7 2 0.21 3 0.111
LOAD COMB 123 DS + DO + AF + 0.7 EO-Z
4 1.0 6 1.0 15 1.0 2 0.7 1 0.21 3 0.111
LOAD COMB 124 DS + DO + AF - 0.7 EO-X
4 1.0 6 1.0 15 1.0 1 -0.7 2 0.21 3 0.111
LOAD COMB 125 DS + DO + AF - 0.7 EO-Z
4 1.0 6 1.0 15 1.0 2 -0.7 1 0.21 3 0.111
******Erection + Wind
LOAD COMB 126 DS + DE + WP-X
4 1.0 5 1.0 10 1.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 98 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
LOAD COMB 127 DS + DE + WP-Z
4 1.0 5 1.0 11 1.0
LOAD COMB 128 DS + DE - WP-X
4 1.0 5 1.0 10 -1.0
LOAD COMB 129 DS + DE - WP-Z
4 1.0 5 1.0 11 -1.0
******Test
LOAD COMB 130 DS + DT + WP-X
4 1.0 7 1.0 10 1.0
LOAD COMB 131 DS + DT + WP-Z
4 1.0 7 1.0 11 1.0
LOAD COMB 132 DS + DT - WP-X
4 1.0 7 1.0 10 -1.0
LOAD COMB 133 DS + DT - WP-Z
4 1.0 7 1.0 11 -1.0
*
PERFORM ANALYSIS
LOAD LIST 101 TO 133
PRINT STORY DRIFT
*
PARAMETER 1
CODE AISC
FYLD 2.53107e+007 ALL
FU 4.21844e+007 ALL
TRACK 0 ALL
RATIO 1 ALL
CHECK CODE ALL
FINISH
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 99 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3. T-Post Type (Calculation for TP-F-P04-05-05 - Foundation Only - Piping Scope)
B3.1 Dimension and Size
Bt

Ht

Gp

Hp
Dp
y Df

Hf
z

x
Bf1 Off Z Off Z Bf2

Lf1

1 Lp
Off X z
Lf
Off X (0,0) 2

Lf2
Bp

Bf

Foundation Plan

Footing Size
Width of footing, Bf = 2.50 m Bf1 = 0.74 m
Length of footing, Lf = 2.20 m Bf2 = 0.74 m
Height of footing, Hf = 0.30 m Lf1 = 0.83 m
Depth of footing below ground, Df = 1.50 m Lf2 = 0.83 m
Area of footing, Af = m2
5.50
Weight of footing Wf = 3.96
ton W f-i = 1.98 ton
Weight of soil Ws = 11.46 ton W s-i = 5.73 ton
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 100 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Off Z, Off X is offset position from the center of the footing. (-) = Left or bottom from center of footing.
Unit (m, Ton)
Ft. Name Pr. Name Bp Lp Hp Dp Gp Area Weight Off Z Off X
FC-7- 1 0.31 0.31 1.30 1.20 0.10 0.10 0.300 -0.5065 0.275
ARR1 2 0.31 0.31 1.30 1.20 0.10 0.10 0.300 0.5065 -0.275

Structure Size
Width of beam, Bt1 = 0.50 m Bt2 = 0.50 m
Height of column, Ht1 = 0.50 m Ht2 = 0.50 m
Column Size, = Pipe 4"
Beam Size, = H100x100x6x8

Note
This pipe support is Piping Scope. Civil modeling only to obtain reaction of each pipe support as input for
civil foundation.

B3.2 Loading
Pipe Diameter, dp 0.152 m=
Distance between support, Ls = 2.50 m
Piping support tag number, = TP-F-P04-05-05
Reference = BLA-FTP-P-RE-00-003 Pipe Stress Analysis Report Alur
Rambong Cluster - AR1
Pipe loading data is taken from node 140 and 160 which have the largest load for this foundation
Pipe Direction
Node Type Load Type Index Unit
Dia. X Y Z
Empty De N - -698 -
Operating Do N - 41038 -
6" 140 Guide Thermal Tf N 5652 - -
Anchor Af N - - -
Test T N - -3294 -
Empty De N - -698 -
Operating Do N - -35211 -
6" 160 Rest Thermal Tf N - - -
Anchor Af N - - -
Test T N - -4836 -
*For detail see Appendix E

Wind Load
Velocity Pressure, qz = 0.613*Kz*Kzt*Kd*V2*I
= 70.56 kg/m2

Wind Force, W = qz G C A
Wind Force on the Pipe, W px = 70.56 x 0.85 x 0.6 x (0.25 x 3.14 x 0.1524^2)
= 0.656 kg
W pz = 70.56 x 0.85 x 0.6 x 2.5 x 0.1524
= 13.71 kg

Wind Force on the PS, W sx = 70.56 x 0.85 x 0.6 x 0.1


= 3.60 kg/m
W sz = 70.56 x 0.85 x 0.6 x 0.10
= 3.60 kg/m
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 101 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Seismic Load
Calculated automatically using STAAD.Pro using UBC 1997 with parameter shown in Appendix A.8

B3.3 STAAD.Pro Modeling

Isometric View Beam Number Node Number Member Properties

Seismic X-Dir Seismic Z-Dir Equipment Empty Equipment Operating

Equipment Test Thermal Forces Wind Load X-Dir Wind Load Z-Dir
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 102 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Support Reaction Summary - Unfactored Load (Permanent)


Horizontal Vertical Horizontal Moment
Node L/C
Fx kg Fy kg Fz kg Mx kg-m My kg-m Mz kg-m
Max Fx 5 101 DS + DO + L + TF + AF + FF 0.0 3539.5 0.0 0 0 0
Min Fx 1 101 DS + DO + L + TF + AF + FF -565.2 -4085.4 -1.0 -0.5 0 282.6
Max Fy 5 101 DS + DO + L + TF + AF + FF 0.0 3539.5 0.0 0 0 0
Min Fy 1 101 DS + DO + L + TF + AF + FF -565.2 -4085.4 -1.0 -0.5 0 282.6
Max Fz 5 101 DS + DO + L + TF + AF + FF 0.0 3539.5 0.0 0 0 0
Min Fz 1 101 DS + DO + L + TF + AF + FF -565.2 -4085.4 -1.0 -0.5 0 282.6
Max Mx 5 101 DS + DO + L + TF + AF + FF 0.0 3539.5 0.0 0 0 0
Min Mx 1 101 DS + DO + L + TF + AF + FF -565.2 -4085.4 -1.0 -0.5 0 282.6
Max My 1 101 DS + DO + L + TF + AF + FF -565.2 -4085.4 -1.0 -0.5 0 282.6
Min My 5 101 DS + DO + L + TF + AF + FF 0.0 3539.5 0.0 0 0 0
Max Mz 1 101 DS + DO + L + TF + AF + FF -565.2 -4085.4 -1.0 -0.5 0 282.6
Min Mz 5 101 DS + DO + L + TF + AF + FF 0.0 3539.5 0.0 0 0 0

Support Reaction Summary - Unfactored Load (Temporary)


Horizontal Vertical Horizontal Moment
Node L/C
Fx kg Fy kg Fz kg Mx kg-m My kg-m Mz kg-m
Max Fx 5 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X 623.9 2123.7 -187.2 -93.58 0 -311.93
Min Fx 5 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
-623.9 2123.7 -187.2 -93.58 0 311.93
Max Fy 5 106 DS + DO + 0.75 L + AF + TF + 0.45-1.9WX 3539.5 0.0 0 0 0.76
Min Fy 1 106 DS + DO + 0.75 L + AF + TF + 0.45-572.2
WX -4085.4 -1.0 -0.5 0 285.89
Max Fz 5 117 0.6 (DS + DO) + AF + TF - 0.7 EO-Z-187.2 2123.7 623.9 311.93 0 93.58
Min Fz 5 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z
-187.2 2123.7 -623.9 -311.93 0 93.58
Max Mx 5 117 0.6 (DS + DO) + AF + TF - 0.7 EO-Z-187.2 2123.7 623.9 311.93 0 93.58
Min Mx 5 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z-187.2 2123.7 -623.9 -311.93 0 93.58
Max My 5 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X 623.9 2123.7 -187.2 -93.58 0 -311.93
Min My 5 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X-623.9 2123.7 -187.2 -93.58 0 311.93
Max Mz 5 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X-623.9 2123.7 -187.2 -93.58 0 311.93
Min Mz 5 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X 623.9 2123.7 -187.2 -93.58 0 -311.93

Displacement Summary
Horizontal Vertical HorizontalResultantRotationalHorizontal
Node L/C
X mm Y mm Z mm mm rX rad rY rad
Max X 7 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X0.45 0.07 0.14 0.474 0 0
Min X 7 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X
-0.45 0.07 0.14 0.474 0 0
Max Y 3 122 DS + DO + AF + TF + 0.7 EO-X 0.42 0.34 0.00 0.536 0 0
Min Y 8 123 DS + DO + AF + TF + 0.7 EO-Z 0.14 -0.35 0.45 0.586 0 0
Max Z 7 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z0.14 0.29 0.45 0.548 0 0
Min Z 7 117 0.6 (DS + DO) + AF + TF - 0.7 EO-Z0.14 -0.34 -0.45 0.576 0 0
Max rX 8 123 DS + DO + AF + TF + 0.7 EO-Z 0.14 -0.35 0.45 0.586 0 0
Min rX 7 125 DS + DO + AF + TF - 0.7 EO-Z 0.14 -0.35 -0.45 0.586 0 0
Max rY 8 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X0.45 -0.12 0.14 0.483 0 0
Min rY 8 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X
-0.45 -0.12 0.14 0.483 0 0
Max rZ 6 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X
-0.45 -0.03 0.14 0.469 0 0
Min rZ 6 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X0.45 -0.03 0.14 0.469 0 0
Max Rst 8 123 DS + DO + AF + TF + 0.7 EO-Z 0.14 -0.35 0.45 0.586 0 0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 103 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.4 Steel Structure Design


Steel Member Size and Unity Check
Steel design were performed based on AISC-ASD. In STAADPro, maximum stress on frame member
directly selected by STAADPro software, taken from the worst loading combination. The member stress is
indicated as check ratio which should be less than 1.0, unless the member will be overstress or fail.
Ratio
Beam No. Section Clause L/C
Actual Allow
100 PIPS40 0.461 1.00 AISC- H2-1 122
101 H100X100X6 0.001 1.00 SHEAR -Y 101
102 H100X100X6 0.001 1.00 SHEAR -Y 101
200 PIPS40 0.492 1.00 AISC- H1-3 122
201 H100X100X6 0.001 1.00 SHEAR -Y 101
202 H100X100X6 0.001 1.00 SHEAR -Y 101

Deflection

∆y : Vertical Displacement
∆x : Lateral Displacement

Max Dis. (∆) Span (L)


Direction Node ∆/L All. ∆/L Check
mm mm
Vertical 8 0.351 250 1/712.26 1/360 OK
Lateral 8 0.59 500 1/853.24 1/200 OK
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 104 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5 Foundation Design (FC-7-ARR)

Support Reaction (From output Staad pro)


Support reaction value are taken from output staad pro analysis. This reaction occur on base plate of
pedestal or pier. Maximum support reaction for permanent & temporary condition are summarized in the
following table.

B3.5.1 Summary of Load at Top of Pedestal or Pier


Unit (Ton, Ton-m)
Ft. Name Pr. Name Load Case Fx Fy Fz Mx Mz
FC-7- 1 Dead Load of Structure Proper (Ds) 0.00 -0.02 0.00 0.00 0.00
ARR1 Equipment Empty Dead Load (De) 0.00 -0.07 0.00 0.00 0.00
Equipment Operating Dead Load (Do) 0.00 4.10 0.00 0.00 0.00
Equipment Test Dead Load (Dt) 0.00 -0.33 0.00 0.00 0.00
Live Load (L) 0.00 0.00 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) -0.57 0.00 0.00 0.00 0.28
Anchor Force (Af) 0.00 0.00 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 0.00 0.00 0.00 0.00
Wind Load in X-Dir (Wx) -0.02 0.00 0.00 0.00 0.01
Wind Load in Z-Dir (Wz) 0.00 0.00 0.00 0.00 0.00
Earthquake in X-Dir (EQ-X) -0.02 0.00 0.00 0.00 0.01
Earthquake in Z-Dir (EQ-Z) 0.00 0.00 -0.02 -0.01 0.00
2 Dead Load of Structure Proper (Ds) 0.00 -0.02 0.00 0.00 0.00
Equipment Empty Dead Load (De) 0.00 -0.07 0.00 0.00 0.00
Equipment Operating Dead Load (Do) 0.00 -3.52 0.00 0.00 0.00
Equipment Test Dead Load (Dt) 0.00 -0.48 0.00 0.00 0.00
Live Load (L) 0.00 0.00 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) 0.00 0.00 0.00 0.00 0.00
Anchor Force (Af) 0.00 0.00 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 0.00 0.00 0.00 0.00
Wind Load in X-Dir (Wx) 0.00 0.00 0.00 0.00 0.00
Wind Load in Z-Dir (Wz) 0.00 0.00 -0.02 -0.01 0.00
Earthquake in X-Dir (EQ-X) -0.89 0.00 0.00 0.00 0.45
Earthquake in Z-Dir (EQ-Z) 0.00 0.00 -0.89 -0.45 0.00
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 105 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.2 Summary of Load at Pier bottom center


Unit (Ton, Ton-m)
Ft. Name Pr. Name Load Case Fx Fy Fz Mx Mz
FC-7- 1 Dead Load of Structure Proper (Ds) 0.00 -0.32 0.00 0.00 0.00
ARR1 Equipment Empty Dead Load (De) 0.00 -0.07 0.00 0.00 0.00
Equipment Operating Dead Load (Do) 0.00 4.10 0.00 0.00 0.00
Equipment Test Dead Load (Dt) 0.00 -0.33 0.00 0.00 0.00
Live Load (L) 0.00 0.00 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) -0.57 0.00 0.00 0.00 -0.73
Anchor Force (Af) 0.00 0.00 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 0.00 0.00 0.00 0.00
Wind Load in X-Dir (Wx) -0.02 0.00 0.00 0.00 -0.02
Wind Load in Z-Dir (Wz) 0.00 0.00 0.00 0.00 0.00
Earthquake in X-Dir (EQ-X) -0.02 0.00 0.00 0.00 -0.03
Earthquake in Z-Dir (EQ-Z) 0.00 0.00 -0.02 -0.03 0.00
2 Dead Load of Structure Proper (Ds) 0.00 -0.32 0.00 0.00 0.00
Equipment Empty Dead Load (De) 0.00 -0.07 0.00 0.00 0.00
Equipment Operating Dead Load (Do) 0.00 -3.52 0.00 0.00 0.00
Equipment Test Dead Load (Dt) 0.00 -0.48 0.00 0.00 0.00
Live Load (L) 0.00 0.00 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) 0.00 0.00 0.00 0.00 0.00
Anchor Force (Af) 0.00 0.00 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 0.00 0.00 0.00 0.00
Wind Load in X-Dir (Wx) 0.00 0.00 0.00 0.00 -0.01
Wind Load in Z-Dir (Wz) 0.00 0.00 -0.02 -0.02 0.00
Earthquake in X-Dir (EQ-X) -0.89 0.00 0.00 0.00 -1.16
Earthquake in Z-Dir (EQ-Z) 0.00 0.00 -0.89 -1.16 0.00
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 106 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.3 Summary of Load at Footing bottom center


Unit (Ton, Ton-m)
Ft. Name Pr. Name Load Case Fx Fy Fz Mx Mz
FC-7- 1 Dead Load of Structure Proper (Ds) 0.00 -8.03 0.00 -0.01 -0.01
ARR1 Equipment Empty Dead Load (De) 0.00 -0.07 0.00 -0.04 -0.02
Equipment Operating Dead Load (Do) 0.00 4.10 0.00 2.08 1.13
Equipment Test Dead Load (Dt) 0.00 -0.33 0.00 -0.17 -0.09
Live Load (L) 0.00 0.00 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) -0.57 0.00 0.00 0.00 0.90
Anchor Force (Af) 0.00 0.00 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 0.00 0.00 0.00 0.00
Wind Load in X-Dir (Wx) -0.02 0.00 0.00 0.00 0.02
Wind Load in Z-Dir (Wz) 0.00 0.00 0.00 -0.01 0.00
Earthquake in X-Dir (EQ-X) -0.02 0.00 0.00 0.00 0.03
Earthquake in Z-Dir (EQ-Z) 0.00 0.00 -0.02 -0.03 0.00
2 Dead Load of Structure Proper (Ds) 0.00 -8.03 0.00 0.01 0.01
Equipment Empty Dead Load (De) 0.00 -0.07 0.00 0.04 0.02
Equipment Operating Dead Load (Do) 0.00 -3.52 0.00 1.78 0.97
Equipment Test Dead Load (Dt) 0.00 -0.48 0.00 0.24 0.13
Live Load (L) 0.00 0.00 0.00 0.00 0.00
Self-Straining & Thermal Forces (Tf) 0.00 0.00 0.00 0.00 0.00
Anchor Force (Af) 0.00 0.00 0.00 0.00 0.00
Surface Friction Forces (Ff) 0.00 0.00 0.00 0.00 0.00
Wind Load in X-Dir (Wx) 0.00 0.00 0.00 0.00 0.01
Wind Load in Z-Dir (Wz) 0.00 0.00 -0.02 -0.03 0.00
Earthquake in X-Dir (EQ-X) -0.89 0.00 0.00 0.00 1.43
Earthquake in Z-Dir (EQ-Z) 0.00 0.00 -0.89 -1.43 0.00
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 107 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.4 Loading Combination - Unfactored Load Combination

EQ-X

EQ-Z
Wx

Wz
Do
Ds

De

Dt

Af
Tf

Ff
L
101 DS+DO+L+TF+AF+FF 1 1 1 1 1
102 0.6(DS+DO+WX)+AF+TF+FF 0.6 0.6 0.6
103 0.6(DS+DO+WZ)+AF+TF+FF 0.6 0.6 0.6
104 0.6(DS+DO-WX)+AF+TF+FF 0.6 0.6 -0.6
105 0.6(DS+DO-WZ)+AF+TF+FF 0.6 0.6 -0.6
106 DS+DO+0.75L+AF+TF+0.45WX 1 1 1 0.45
107 DS+DO+0.75L+AF+TF+0.45 WZ 1 1 1 0.45
108 DS+DO+0.75L+AF+TF-0.45 WX 1 1 1 -0.45
109 DS+DO+0.75L+AF+TF-0.45 WZ 1 1 1 -0.45
110 DS+DO+AF+TF+0.6WX 1 1 1 0.6
111 DS+DO+AF+TF+0.6 WZ 1 1 1 0.6
112 DS+DO+AF+TF-0.6 WX 1 1 1 -0.6
113 DS+DO+AF+TF-0.6 WZ 1 1 1 -0.6
114 0.6(DS+DO)+AF+TF+0.7EQ-X 0.6 0.6 0.7
115 0.6(DS+DO)+AF+TF+0.7EQ-Z 0.6 0.6 0.7
116 0.6(DS+DO)+AF+TF-0.7EQ-X 0.6 0.6 -0.7
117 0.6(DS+DO)+AF+TF-0.7EQ-Z 0.6 0.6 -0.7
118 DS+DO+AF+TF+0.75L+0.525EQ-X 1 1 0.525
119 DS+DO+AF+TF+0.75L+0.525EO-Z 1 1 0.525
120 DS+DO+AF+TF+0.75L-0.525 EQ-X 1 1 -0.525

121 DS+DO+AF+TF+0.75L-0.525 EQ-Z 1 1 -0.525

122 DS+DO+AF+TF+0.7EQ-X 1 1 1 0.7


123 DS+DO+AF+TF+0.7EQ-Z 1 1 1 0.7
124 DS+DO+AF+TF-0.7EQ-X 1 1 1 -0.7
125 DS+DO+AF+TF-0.7EQ-Z 1 1 1 -0.7
126 DS+DE+0.6 WX 1 1 0.6
127 DS+DE+0.6 WZ 1 1 0.6
128 DS+DE-0.6 WX 1 1 -0.6
129 DS+DE-0.6 WZ 1 1 -0.6
130 DS+DT+L 1 1
131 DS+DT+0.6 WX 1 1 0.6
132 DS+DT+0.6 WZ 1 1 0.6
133 DS+DT-0.6 WX 1 1 -0.6
134 DS+DT-0.6 WZ 1 1 -0.6
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 108 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.5 Loading Combination - Factored Load Combination

EQ-X

EQ-Z
Wx

Wz
Do
Ds

De

Dt

Af
Tf

Ff
L
201 1.4(DS+DO+L+TF+AF+FF) 1.4 1.4 1.4 1.4 1.4
202 1.2(DS+DO+L+TF+AF+FF) 1.2 1.2 1.2 1.2 1.2
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.9 0.9 1
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.9 0.9 1
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.9 0.9 -1
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.9 0.9 -1
207 1.2(DS+DO+AF+TF)+1.0WX 1.2 1.2 1.2 1
208 1.2(DS+DO+AF+TF)+1.0WZ 1.2 1.2 1.2 1
209 1.2(DS+DO+AF+TF)-1.0WX 1.2 1.2 1.2 -1
210 1.2(DS+DO+AF+TF)-1.0WZ 1.2 1.2 1.2 -1
211 0.9(DS+DO)+1.0EQ-X 0.9 0.9 1
212 0.9(DS+DO)+1.0EQ-Z 0.9 0.9 1
213 0.9(DS+DO)-1.0EQ-X 0.9 0.9 -1
214 0.9(DS+DO)-1.0EQ-Z 0.9 0.9 -1
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.9 0.9 1.2 1
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.9 0.9 1.2 1
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.9 0.9 1.2 -1
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.9 0.9 1.2 -1
219 1.2(DS+DO+AF+TF)+1.0EQ-X 1.2 1.2 1.2 1
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 1.2 1.2 1.2 1
221 1.2(DS+DO+AF+TF)-1.0EQ-X 1.2 1.2 1.2 -1
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 1.2 1.2 1.2 -1
223 0.9(DS+DE)+1.0 WX 0.9 0.9 1
224 0.9(DS+DE)+1.0 WZ 0.9 0.9 1
225 0.9(DS+DE)-1.0 WX 0.9 0.9 -1
226 0.9(DS+DE)-1.0 WZ 0.9 0.9 -1
227 1.2(DS+DT)+1.0 WX 1.2 1.2 1
228 1.2(DS+DT)+1.0 WZ 1.2 1.2 1
229 1.2(DS+DT)-1.0 WX 1.2 1.2 -1
230 1.2(DS+DT)-1.0 WZ 1.2 1.2 -1
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 109 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.6 Unfactored Loading Combination in Footing Bottom Center (With Pier & Footing Selfweight)
Unit (Ton, Ton-m)
Ft. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz
FC-7- 101 DS+DO+L+TF+AF+FF -0.6 -15.5 0.0 3.9 3.0
ARR1 102 0.6(DS+DO+WX)+AF+TF+FF 0.0 -9.3 0.0 2.3 1.3
103 0.6(DS+DO+WZ)+AF+TF+FF 0.0 -9.3 0.0 2.3 1.3
104 0.6(DS+DO-WX)+AF+TF+FF 0.0 -9.3 0.0 2.3 1.2
105 0.6(DS+DO-WZ)+AF+TF+FF 0.0 -9.3 0.0 2.3 1.3
106 DS+DO+0.75L+AF+TF+0.45WX 0.0 -15.5 0.0 3.9 2.1
107 DS+DO+0.75L+AF+TF+0.45 WZ 0.0 -15.5 0.0 3.8 2.1
108 DS+DO+0.75L+AF+TF-0.45 WX 0.0 -15.5 0.0 3.9 2.1
109 DS+DO+0.75L+AF+TF-0.45 WZ 0.0 -15.5 0.0 3.9 2.1
110 DS+DO+AF+TF+0.6WX 0.0 -15.5 0.0 3.9 2.1
111 DS+DO+AF+TF+0.6 WZ 0.0 -15.5 0.0 3.8 2.1
112 DS+DO+AF+TF-0.6 WX 0.0 -15.5 0.0 3.9 2.1
113 DS+DO+AF+TF-0.6 WZ 0.0 -15.5 0.0 3.9 2.1
114 0.6(DS+DO)+AF+TF+0.7EQ-X -0.6 -9.3 0.0 2.3 2.3
115 0.6(DS+DO)+AF+TF+0.7EQ-Z 0.0 -9.3 -0.6 1.3 1.3
116 0.6(DS+DO)+AF+TF-0.7EQ-X 0.6 -9.3 0.0 2.3 0.2
117 0.6(DS+DO)+AF+TF-0.7EQ-Z 0.0 -9.3 0.6 3.3 1.3
118 DS+DO+AF+TF+0.75L+0.525EQ-X -0.5 -15.5 0.0 3.9 2.9
119 DS+DO+AF+TF+0.75L+0.525EO-Z 0.0 -15.5 -0.5 3.1 2.1
120 DS+DO+AF+TF+0.75L-0.525 EQ-X 0.5 -15.5 0.0 3.9 1.3
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z 0.0 -15.5 0.5 4.6 2.1
122 DS+DO+AF+TF+0.7EQ-X -0.6 -15.5 0.0 3.9 3.1
123 DS+DO+AF+TF+0.7EQ-Z 0.0 -15.5 -0.6 2.8 2.1
124 DS+DO+AF+TF-0.7EQ-X 0.6 -15.5 0.0 3.9 1.1
125 DS+DO+AF+TF-0.7EQ-Z 0.0 -15.5 0.6 4.9 2.1
126 DS+DE+0.6 WX 0.0 -16.2 0.0 0.0 0.0
127 DS+DE+0.6 WZ 0.0 -16.2 0.0 0.0 0.0
128 DS+DE-0.6 WX 0.0 -16.2 0.0 0.0 0.0
129 DS+DE-0.6 WZ 0.0 -16.2 0.0 0.0 0.0
130 DS+DT+L 0.0 -16.9 0.0 0.1 0.0
131 DS+DT+0.6 WX 0.0 -16.9 0.0 0.1 0.1
132 DS+DT+0.6 WZ 0.0 -16.9 0.0 0.1 0.0
133 DS+DT-0.6 WX 0.0 -16.9 0.0 0.1 0.0
134 DS+DT-0.6 WZ 0.0 -16.9 0.0 0.1 0.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 110 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.7 Factored Loading Combination in Footing Bottom Center (With Pier & Footing Selfweight)
Unit (Ton, Ton-m)
Ft. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz
FC-7- 201 1.4(DS+DO+L+TF+AF+FF) -0.8 -21.7 0.0 5.4 4.2
ARR1 202 1.2(DS+DO+L+TF+AF+FF) -0.7 -18.6 0.0 4.6 3.6
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.0 -13.9 0.0 3.5 1.9
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.0 -13.9 0.0 3.4 1.9
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.0 -13.9 0.0 3.5 1.9
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.0 -13.9 0.0 3.5 1.9
207 1.2(DS+DO+AF+TF)+1.0WX 0.0 -18.6 0.0 4.6 2.5
208 1.2(DS+DO+AF+TF)+1.0WZ 0.0 -18.6 0.0 4.6 2.5
209 1.2(DS+DO+AF+TF)-1.0WX 0.0 -18.6 0.0 4.6 2.5
210 1.2(DS+DO+AF+TF)-1.0WZ 0.0 -18.6 0.0 4.7 2.5
211 0.9(DS+DO)+1.0EQ-X -0.9 -13.9 0.0 3.5 3.3
212 0.9(DS+DO)+1.0EQ-Z 0.0 -13.9 -0.9 2.0 1.9
213 0.9(DS+DO)-1.0EQ-X 0.9 -13.9 0.0 3.5 0.4
214 0.9(DS+DO)-1.0EQ-Z 0.0 -13.9 0.9 4.9 1.9
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X -0.9 -13.9 0.0 3.5 3.3
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.0 -13.9 -0.9 2.0 1.9
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.9 -13.9 0.0 3.5 0.4
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.0 -13.9 0.9 4.9 1.9
219 1.2(DS+DO+AF+TF)+1.0EQ-X -0.9 -18.6 0.0 4.6 4.0
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.0 -18.6 -0.9 3.2 2.5
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.9 -18.6 0.0 4.6 1.1
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.0 -18.6 0.9 6.1 2.5
223 0.9(DS+DE)+1.0 WX 0.0 -14.6 0.0 0.0 0.0
224 0.9(DS+DE)+1.0 WZ 0.0 -14.6 0.0 0.0 0.0
225 0.9(DS+DE)-1.0 WX 0.0 -14.6 0.0 0.0 0.0
226 0.9(DS+DE)-1.0 WZ 0.0 -14.6 0.0 0.0 0.0
227 1.2(DS+DT)+1.0 WX 0.0 -20.2 0.0 0.1 0.1
228 1.2(DS+DT)+1.0 WZ 0.0 -20.2 0.0 0.1 0.1
229 1.2(DS+DT)-1.0 WX 0.0 -20.2 0.0 0.1 0.0
230 1.2(DS+DT)-1.0 WZ 0.0 -20.2 0.0 0.1 0.1
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 111 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.8 Factored Loading Combination in Pier Bottom Center (With Pier Selfweight)
Unit (Ton, Ton-m)
Pr. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz
1 201 1.4(DS+DO+L+TF+AF+FF) -0.8 5.3 0.0 0.0 -1.0
202 1.2(DS+DO+L+TF+AF+FF) -0.7 4.5 0.0 0.0 -0.9
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.0 3.4 0.0 0.0 0.0
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.0 3.4 0.0 0.0 0.0
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.0 3.4 0.0 0.0 0.0
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.0 3.4 0.0 0.0 0.0
207 1.2(DS+DO+AF+TF)+1.0WX 0.0 4.5 0.0 0.0 0.0
208 1.2(DS+DO+AF+TF)+1.0WZ 0.0 4.5 0.0 0.0 0.0
209 1.2(DS+DO+AF+TF)-1.0WX 0.0 4.5 0.0 0.0 0.0
210 1.2(DS+DO+AF+TF)-1.0WZ 0.0 4.5 0.0 0.0 0.0
211 0.9(DS+DO)+1.0EQ-X 0.0 3.4 0.0 0.0 0.0
212 0.9(DS+DO)+1.0EQ-Z 0.0 3.4 0.0 0.0 0.0
213 0.9(DS+DO)-1.0EQ-X 0.0 3.4 0.0 0.0 0.0
214 0.9(DS+DO)-1.0EQ-Z 0.0 3.4 0.0 0.0 0.0
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.0 3.4 0.0 0.0 0.0
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.0 3.4 0.0 0.0 0.0
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.0 3.4 0.0 0.0 0.0
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.0 3.4 0.0 0.0 0.0
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.0 4.5 0.0 0.0 0.0
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.0 4.5 0.0 0.0 0.0
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.0 4.5 0.0 0.0 0.0
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.0 4.5 0.0 0.0 0.0
223 0.9(DS+DE)+1.0 WX 0.0 -0.3 0.0 0.0 0.0
224 0.9(DS+DE)+1.0 WZ 0.0 -0.3 0.0 0.0 0.0
225 0.9(DS+DE)-1.0 WX 0.0 -0.3 0.0 0.0 0.0
226 0.9(DS+DE)-1.0 WZ 0.0 -0.3 0.0 0.0 0.0
227 1.2(DS+DT)+1.0 WX 0.0 -0.8 0.0 0.0 0.0
228 1.2(DS+DT)+1.0 WZ 0.0 -0.8 0.0 0.0 0.0
229 1.2(DS+DT)-1.0 WX 0.0 -0.8 0.0 0.0 0.0
230 1.2(DS+DT)-1.0 WZ 0.0 -0.8 0.0 0.0 0.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 112 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (Ton, Ton-m)


Pr. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz
2 201 1.4(DS+DO+L+TF+AF+FF) 0.0 -5.4 0.0 0.0 0.0
202 1.2(DS+DO+L+TF+AF+FF) 0.0 -4.6 0.0 0.0 0.0
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.0 -3.5 0.0 0.0 0.0
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.0 -3.5 0.0 0.0 0.0
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.0 -3.5 0.0 0.0 0.0
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.0 -3.5 0.0 0.0 0.0
207 1.2(DS+DO+AF+TF)+1.0WX 0.0 -4.6 0.0 0.0 0.0
208 1.2(DS+DO+AF+TF)+1.0WZ 0.0 -4.6 0.0 0.0 0.0
209 1.2(DS+DO+AF+TF)-1.0WX 0.0 -4.6 0.0 0.0 0.0
210 1.2(DS+DO+AF+TF)-1.0WZ 0.0 -4.6 0.0 0.0 0.0
211 0.9(DS+DO)+1.0EQ-X -0.9 -3.5 0.0 0.0 -1.2
212 0.9(DS+DO)+1.0EQ-Z 0.0 -3.5 -0.9 -1.2 0.0
213 0.9(DS+DO)-1.0EQ-X 0.9 -3.5 0.0 0.0 1.2
214 0.9(DS+DO)-1.0EQ-Z 0.0 -3.5 0.9 1.2 0.0
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X -0.9 -3.5 0.0 0.0 -1.2
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.0 -3.5 -0.9 -1.2 0.0
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.9 -3.5 0.0 0.0 1.2
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.0 -3.5 0.9 1.2 0.0
219 1.2(DS+DO+AF+TF)+1.0EQ-X -0.9 -4.6 0.0 0.0 -1.2
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.0 -4.6 -0.9 -1.2 0.0
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.9 -4.6 0.0 0.0 1.2
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.0 -4.6 0.9 1.2 0.0
223 0.9(DS+DE)+1.0 WX 0.0 -0.3 0.0 0.0 0.0
224 0.9(DS+DE)+1.0 WZ 0.0 -0.3 0.0 0.0 0.0
225 0.9(DS+DE)-1.0 WX 0.0 -0.3 0.0 0.0 0.0
226 0.9(DS+DE)-1.0 WZ 0.0 -0.3 0.0 0.0 0.0
227 1.2(DS+DT)+1.0 WX 0.0 -1.0 0.0 0.0 0.0
228 1.2(DS+DT)+1.0 WZ 0.0 -1.0 0.0 0.0 0.0
229 1.2(DS+DT)-1.0 WX 0.0 -1.0 0.0 0.0 0.0
230 1.2(DS+DT)-1.0 WZ 0.0 -1.0 0.0 0.0 0.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 113 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.9 Check of Stability

B3.5.9.1 Check Soil Pressure


Formula : ΣFy/Af ± ΣMz/Wz or ΣFy/Af ± ΣMx/Wx > Allow. Bearing Capacity (Q all.)

Input Data :
Ft. Name Af (m2) Bf (m) Lf (m) Wz (m3) Wx (m3)
FC-7-ARR1 5.500 2.500 2.200 2.017 2.292

Z - Direction Unit (Ton, Ton-m, Ton/m2)


L. Comb Σ Fy Σ Mx Q max Q min Q all. Check
101 DS+DO+L+TF+AF+FF -15.5 3.9 4.5 1.1 7.4 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -9.3 2.3 2.7 0.7 7.4 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -9.3 2.3 2.7 0.7 7.4 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -9.3 2.3 2.7 0.7 7.4 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -9.3 2.3 2.7 0.7 7.4 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -15.5 3.9 4.5 1.1 7.4 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -15.5 3.8 4.5 1.1 7.4 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -15.5 3.9 4.5 1.1 7.4 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -15.5 3.9 4.5 1.1 7.4 OK!
110 DS+DO+AF+TF+0.6WX -15.5 3.9 4.5 1.1 7.4 OK!
111 DS+DO+AF+TF+0.6 WZ -15.5 3.8 4.5 1.1 7.4 OK!
112 DS+DO+AF+TF-0.6 WX -15.5 3.9 4.5 1.1 7.4 OK!
113 DS+DO+AF+TF-0.6 WZ -15.5 3.9 4.5 1.1 7.4 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -9.3 2.3 2.7 0.7 7.4 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -9.3 1.3 2.3 1.1 7.4 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -9.3 2.3 2.7 0.7 7.4 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -9.3 3.3 3.1 0.2 7.4 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -15.5 3.9 4.5 1.1 7.4 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -15.5 3.1 4.2 1.5 7.4 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -15.5 3.9 4.5 1.1 7.4 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -15.5 4.6 4.8 0.8 7.4 OK!
122 DS+DO+AF+TF+0.7EQ-X -15.5 3.9 4.5 1.1 7.4 OK!
123 DS+DO+AF+TF+0.7EQ-Z -15.5 2.8 4.1 1.6 7.4 OK!
124 DS+DO+AF+TF-0.7EQ-X -15.5 3.9 4.5 1.1 7.4 OK!
125 DS+DO+AF+TF-0.7EQ-Z -15.5 4.9 4.9 0.7 7.4 OK!
126 DS+DE+0.6 WX -16.2 0.0 2.9 2.9 7.4 OK!
127 DS+DE+0.6 WZ -16.2 0.0 3.0 2.9 7.4 OK!
128 DS+DE-0.6 WX -16.2 0.0 2.9 2.9 7.4 OK!
129 DS+DE-0.6 WZ -16.2 0.0 3.0 2.9 7.4 OK!
130 DS+DT+L -16.9 0.1 3.1 3.0 7.4 OK!
131 DS+DT+0.6 WX -16.9 0.1 3.1 3.0 7.4 OK!
132 DS+DT+0.6 WZ -16.9 0.1 3.1 3.0 7.4 OK!
133 DS+DT-0.6 WX -16.9 0.1 3.1 3.0 7.4 OK!
134 DS+DT-0.6 WZ -16.9 0.1 3.1 3.0 7.4 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 114 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (Ton, Ton-m, Ton/m2)


L. Comb Σ Fy Σ Mz Q max Q min Q all. Check
101 DS+DO+L+TF+AF+FF -15.5 3.0 4.3 1.3 7.4 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -9.3 1.3 2.3 1.1 7.4 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -9.3 1.3 2.3 1.1 7.4 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -9.3 1.2 2.3 1.1 7.4 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -9.3 1.3 2.3 1.1 7.4 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -15.5 2.1 3.9 1.8 7.4 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -15.5 2.1 3.9 1.8 7.4 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -15.5 2.1 3.8 1.8 7.4 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -15.5 2.1 3.9 1.8 7.4 OK!
110 DS+DO+AF+TF+0.6WX -15.5 2.1 3.9 1.8 7.4 OK!
111 DS+DO+AF+TF+0.6 WZ -15.5 2.1 3.9 1.8 7.4 OK!
112 DS+DO+AF+TF-0.6 WX -15.5 2.1 3.8 1.8 7.4 OK!
113 DS+DO+AF+TF-0.6 WZ -15.5 2.1 3.9 1.8 7.4 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -9.3 2.3 2.8 0.6 7.4 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -9.3 1.3 2.3 1.1 7.4 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -9.3 0.2 1.8 1.6 7.4 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -9.3 1.3 2.3 1.1 7.4 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -15.5 2.9 4.2 1.4 7.4 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -15.5 2.1 3.9 1.8 7.4 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -15.5 1.3 3.5 2.2 7.4 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -15.5 2.1 3.9 1.8 7.4 OK!
122 DS+DO+AF+TF+0.7EQ-X -15.5 3.1 4.4 1.3 7.4 OK!
123 DS+DO+AF+TF+0.7EQ-Z -15.5 2.1 3.9 1.8 7.4 OK!
124 DS+DO+AF+TF-0.7EQ-X -15.5 1.1 3.3 2.3 7.4 OK!
125 DS+DO+AF+TF-0.7EQ-Z -15.5 2.1 3.9 1.8 7.4 OK!
126 DS+DE+0.6 WX -16.2 0.0 3.0 2.9 7.4 OK!
127 DS+DE+0.6 WZ -16.2 0.0 2.9 2.9 7.4 OK!
128 DS+DE-0.6 WX -16.2 0.0 3.0 2.9 7.4 OK!
129 DS+DE-0.6 WZ -16.2 0.0 2.9 2.9 7.4 OK!
130 DS+DT+L -16.9 0.0 3.1 3.0 7.4 OK!
131 DS+DT+0.6 WX -16.9 0.1 3.1 3.0 7.4 OK!
132 DS+DT+0.6 WZ -16.9 0.0 3.1 3.0 7.4 OK!
133 DS+DT-0.6 WX -16.9 0.0 3.1 3.1 7.4 OK!
134 DS+DT-0.6 WZ -16.9 0.0 3.1 3.0 7.4 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 115 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.9.2 Check Sliding


Formula : (µΣFy/ΣFz or µΣFy/ΣFx) > Allow. Safety Factor ---> OK!

Z - Direction Unit (Ton)


L. Comb Σ Fy Σ Fz µΣFy/Σ
µΣ Σ Fz Allow. Check
101 DS+DO+L+TF+AF+FF -15.5 0.0 6191.5 1.75 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -9.3 0.0 N.A 1.75 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -9.3 0.0 313.2 1.75 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -9.3 0.0 N.A 1.75 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -9.3 0.0 313.2 1.75 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -15.5 0.0 N.A 1.75 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -15.5 0.0 695.9 1.75 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -15.5 0.0 N.A 1.75 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -15.5 0.0 695.9 1.75 OK!
110 DS+DO+AF+TF+0.6WX -15.5 0.0 N.A 1.75 OK!
111 DS+DO+AF+TF+0.6 WZ -15.5 0.0 522.0 1.75 OK!
112 DS+DO+AF+TF-0.6 WX -15.5 0.0 N.A 1.75 OK!
113 DS+DO+AF+TF-0.6 WZ -15.5 0.0 522.0 1.75 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -9.3 0.0 N.A 1.75 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -9.3 -0.6 5.8 1.75 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -9.3 0.0 N.A 1.75 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -9.3 0.6 5.8 1.75 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -15.5 0.0 N.A 1.75 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -15.5 -0.5 12.9 1.75 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -15.5 0.0 N.A 1.75 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -15.5 0.5 12.9 1.75 OK!
122 DS+DO+AF+TF+0.7EQ-X -15.5 0.0 N.A 1.75 OK!
123 DS+DO+AF+TF+0.7EQ-Z -15.5 -0.6 9.7 1.75 OK!
124 DS+DO+AF+TF-0.7EQ-X -15.5 0.0 N.A 1.75 OK!
125 DS+DO+AF+TF-0.7EQ-Z -15.5 0.6 9.7 1.75 OK!
126 DS+DE+0.6 WX -16.2 0.0 N.A 1.75 OK!
127 DS+DE+0.6 WZ -16.2 0.0 546.3 1.75 OK!
128 DS+DE-0.6 WX -16.2 0.0 N.A 1.75 OK!
129 DS+DE-0.6 WZ -16.2 0.0 546.3 1.75 OK!
130 DS+DT+L -16.9 0.0 N.A 1.75 OK!
131 DS+DT+0.6 WX -16.9 0.0 N.A 1.75 OK!
132 DS+DT+0.6 WZ -16.9 0.0 569.0 1.75 OK!
133 DS+DT-0.6 WX -16.9 0.0 N.A 1.75 OK!
134 DS+DT-0.6 WZ -16.9 0.0 569.0 1.75 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 116 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (Ton)


L. Comb Σ Fy Σ Fx µΣFy/Σ
µΣ Σ Fx Allow. Check
101 DS+DO+L+TF+AF+FF -15.5 -0.6 11.0 1.75 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -9.3 0.0 313.2 1.75 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -9.3 0.0 N.A 1.75 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -9.3 0.0 313.2 1.75 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -9.3 0.0 N.A 1.75 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -15.5 0.0 695.9 1.75 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -15.5 0.0 N.A 1.75 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -15.5 0.0 695.9 1.75 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -15.5 0.0 N.A 1.75 OK!
110 DS+DO+AF+TF+0.6WX -15.5 0.0 522.0 1.75 OK!
111 DS+DO+AF+TF+0.6 WZ -15.5 0.0 N.A 1.75 OK!
112 DS+DO+AF+TF-0.6 WX -15.5 0.0 522.0 1.75 OK!
113 DS+DO+AF+TF-0.6 WZ -15.5 0.0 N.A 1.75 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -9.3 -0.6 5.8 1.75 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -9.3 0.0 N.A 1.75 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -9.3 0.6 5.8 1.75 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -9.3 0.0 N.A 1.75 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -15.5 -0.5 12.9 1.75 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -15.5 0.0 N.A 1.75 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -15.5 0.5 12.9 1.75 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -15.5 0.0 N.A 1.75 OK!
122 DS+DO+AF+TF+0.7EQ-X -15.5 -0.6 9.7 1.75 OK!
123 DS+DO+AF+TF+0.7EQ-Z -15.5 0.0 N.A 1.75 OK!
124 DS+DO+AF+TF-0.7EQ-X -15.5 0.6 9.7 1.75 OK!
125 DS+DO+AF+TF-0.7EQ-Z -15.5 0.0 N.A 1.75 OK!
126 DS+DE+0.6 WX -16.2 0.0 546.3 1.75 OK!
127 DS+DE+0.6 WZ -16.2 0.0 N.A 1.75 OK!
128 DS+DE-0.6 WX -16.2 0.0 546.3 1.75 OK!
129 DS+DE-0.6 WZ -16.2 0.0 N.A 1.75 OK!
130 DS+DT+L -16.9 0.0 N.A 1.75 OK!
131 DS+DT+0.6 WX -16.9 0.0 569.0 1.75 OK!
132 DS+DT+0.6 WZ -16.9 0.0 N.A 1.75 OK!
133 DS+DT-0.6 WX -16.9 0.0 569.0 1.75 OK!
134 DS+DT-0.6 WZ -16.9 0.0 N.A 1.75 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 117 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.9.3 Check Overturning


Formula : ΣFy*Lf/(2ΣMz) or ΣFy*Bf/(2ΣMx) > Allow. Safety Factor ---> OK!

Z - Direction Unit (Ton, Ton-m)


L. Comb Σ Fy Σ Mx Σ Fy*Bf/(2Σ
Σ Mx) Allow. Check
101 DS+DO+L+TF+AF+FF -15.5 3.9 5.0 2.00 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -9.3 2.3 5.0 2.00 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -9.3 2.3 5.1 2.00 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -9.3 2.3 5.0 2.00 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -9.3 2.3 5.0 2.00 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -15.5 3.9 5.0 2.00 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -15.5 3.8 5.0 2.00 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -15.5 3.9 5.0 2.00 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -15.5 3.9 5.0 2.00 OK!
110 DS+DO+AF+TF+0.6WX -15.5 3.9 5.0 2.00 OK!
111 DS+DO+AF+TF+0.6 WZ -15.5 3.8 5.0 2.00 OK!
112 DS+DO+AF+TF-0.6 WX -15.5 3.9 5.0 2.00 OK!
113 DS+DO+AF+TF-0.6 WZ -15.5 3.9 5.0 2.00 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -9.3 2.3 5.0 2.00 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -9.3 1.3 9.0 2.00 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -9.3 2.3 5.0 2.00 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -9.3 3.3 3.5 2.00 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -15.5 3.9 5.0 2.00 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -15.5 3.1 6.3 2.00 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -15.5 3.9 5.0 2.00 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -15.5 4.6 4.2 2.00 OK!
122 DS+DO+AF+TF+0.7EQ-X -15.5 3.9 5.0 2.00 OK!
123 DS+DO+AF+TF+0.7EQ-Z -15.5 2.8 6.8 2.00 OK!
124 DS+DO+AF+TF-0.7EQ-X -15.5 3.9 5.0 2.00 OK!
125 DS+DO+AF+TF-0.7EQ-Z -15.5 4.9 4.0 2.00 OK!
126 DS+DE+0.6 WX -16.2 0.0 N.A 2.00 OK!
127 DS+DE+0.6 WZ -16.2 0.0 1067.0 2.00 OK!
128 DS+DE-0.6 WX -16.2 0.0 N.A 2.00 OK!
129 DS+DE-0.6 WZ -16.2 0.0 1067.0 2.00 OK!
130 DS+DT+L -16.9 0.1 270.1 2.00 OK!
131 DS+DT+0.6 WX -16.9 0.1 270.1 2.00 OK!
132 DS+DT+0.6 WZ -16.9 0.1 356.8 2.00 OK!
133 DS+DT-0.6 WX -16.9 0.1 270.1 2.00 OK!
134 DS+DT-0.6 WZ -16.9 0.1 217.3 2.00 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 118 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (Ton, Ton-m)


L. Comb Σ Fy Σ Mz Σ Fy*Lf/(2Σ
Σ Mz) Allow. Check
101 DS+DO+L+TF+AF+FF -15.5 3.0 5.7 2.00 OK!
102 0.6(DS+DO+WX)+AF+TF+FF -9.3 1.3 8.0 2.00 OK!
103 0.6(DS+DO+WZ)+AF+TF+FF -9.3 1.3 8.1 2.00 OK!
104 0.6(DS+DO-WX)+AF+TF+FF -9.3 1.2 8.2 2.00 OK!
105 0.6(DS+DO-WZ)+AF+TF+FF -9.3 1.3 8.1 2.00 OK!
106 DS+DO+0.75L+AF+TF+0.45WX -15.5 2.1 8.1 2.00 OK!
107 DS+DO+0.75L+AF+TF+0.45 WZ -15.5 2.1 8.1 2.00 OK!
108 DS+DO+0.75L+AF+TF-0.45 WX -15.5 2.1 8.2 2.00 OK!
109 DS+DO+0.75L+AF+TF-0.45 WZ -15.5 2.1 8.1 2.00 OK!
110 DS+DO+AF+TF+0.6WX -15.5 2.1 8.0 2.00 OK!
111 DS+DO+AF+TF+0.6 WZ -15.5 2.1 8.1 2.00 OK!
112 DS+DO+AF+TF-0.6 WX -15.5 2.1 8.2 2.00 OK!
113 DS+DO+AF+TF-0.6 WZ -15.5 2.1 8.1 2.00 OK!
114 0.6(DS+DO)+AF+TF+0.7EQ-X -9.3 2.3 4.5 2.00 OK!
115 0.6(DS+DO)+AF+TF+0.7EQ-Z -9.3 1.3 8.1 2.00 OK!
116 0.6(DS+DO)+AF+TF-0.7EQ-X -9.3 0.2 43.2 2.00 OK!
117 0.6(DS+DO)+AF+TF-0.7EQ-Z -9.3 1.3 8.1 2.00 OK!
118 DS+DO+AF+TF+0.75L+0.525EQ-X -15.5 2.9 5.9 2.00 OK!
119 DS+DO+AF+TF+0.75L+0.525EO-Z -15.5 2.1 8.1 2.00 OK!
120 DS+DO+AF+TF+0.75L-0.525 EQ-X -15.5 1.3 12.8 2.00 OK!
121 DS+DO+AF+TF+0.75L-0.525 EQ-Z -15.5 2.1 8.1 2.00 OK!
122 DS+DO+AF+TF+0.7EQ-X -15.5 3.1 5.5 2.00 OK!
123 DS+DO+AF+TF+0.7EQ-Z -15.5 2.1 8.1 2.00 OK!
124 DS+DO+AF+TF-0.7EQ-X -15.5 1.1 15.8 2.00 OK!
125 DS+DO+AF+TF-0.7EQ-Z -15.5 2.1 8.1 2.00 OK!
126 DS+DE+0.6 WX -16.2 0.0 939.0 2.00 OK!
127 DS+DE+0.6 WZ -16.2 0.0 N.A 2.00 OK!
128 DS+DE-0.6 WX -16.2 0.0 939.0 2.00 OK!
129 DS+DE-0.6 WZ -16.2 0.0 N.A 2.00 OK!
130 DS+DT+L -16.9 0.0 437.7 2.00 OK!
131 DS+DT+0.6 WX -16.9 0.1 302.4 2.00 OK!
132 DS+DT+0.6 WZ -16.9 0.0 437.7 2.00 OK!
133 DS+DT-0.6 WX -16.9 0.0 792.4 2.00 OK!
134 DS+DT-0.6 WZ -16.9 0.0 437.7 2.00 OK!

B3.5.10 Footing Reinforcement


ACI 318-05 Chapter 10.5.4 :
For structural slabs and footings of uniform thickness, As min in the direction of the span shall be same as that
required by :
Area of shrinkage and temperature reinforcement shall provide at least the following ratios of
reinforcement area to gross concrete area, but not less than 0.0014:
(a) Slabs where grade 280 or 350 deformed bars are used …..0.0020
(b) Slabs where grade 420 deformed bars or welded wire reinforcement are used ….. 0.0018
(c) Slabs where reinforcement with yield stress exceeding 420 MPa measured at a yield strain of 0.35
percent is used ….. 0.0018*420/fy

As req' = Max(As1, As2) As 1 = ρreq*b*d As 2 = ρmin*b*h


Rn = Mu/(φ∗b*d^2) ρreq = 0.85*fc'/fy*(1-(1-(2*Rn/(0.85*fc')))^0.5)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 119 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Design Parameters
Unit (MPa, mm)
φ (Bending) fc' fy cl_b cl_t
0.8 24.8 390 75 50

φ = Reduction factor for bending


fc' = Concrete strength of footing
fy = Yield strength of rebar
cl_b = Clear concrete cover for bottom rebar
cl_t = Clear concrete cover for top rebar

Using Bar = D 13 - 200 (Z - direction) Max. Spacing OK!


D 13 - 200 (X - direction) Max. Spacing OK!
Z - Direction
Unit (Ton/m2, mm, Ton-m)
L. Comb Qu max Qu min Qu eq. Pos. d Mux
201 1.4(DS+DO+L+TF+AF+FF) 6.6 1.26 3.94 top 243.5 1.28
202 1.2(DS+DO+L+TF+AF+FF) 5.7 1.08 3.38 top 243.5 1.10
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 4.3 0.81 2.53 top 243.5 0.83
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 4.2 0.83 2.53 top 243.5 0.83
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 4.3 0.81 2.53 top 243.5 0.83
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 4.3 0.79 2.53 top 243.5 0.83
207 1.2(DS+DO+AF+TF)+1.0WX 5.7 1.08 3.38 top 243.5 1.10
208 1.2(DS+DO+AF+TF)+1.0WZ 5.7 1.09 3.38 top 243.5 1.10
209 1.2(DS+DO+AF+TF)-1.0WX 5.7 1.08 3.38 top 243.5 1.10
210 1.2(DS+DO+AF+TF)-1.0WZ 5.7 1.06 3.38 top 243.5 1.10
211 0.9(DS+DO)+1.0EQ-X 4.3 0.81 2.53 top 243.5 0.83
212 0.9(DS+DO)+1.0EQ-Z 3.5 1.53 2.53 top 243.5 0.83
213 0.9(DS+DO)-1.0EQ-X 4.3 0.81 2.53 top 243.5 0.83
214 0.9(DS+DO)-1.0EQ-Z 5.0 0.09 2.53 top 243.5 0.83
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 4.3 0.81 2.53 top 243.5 0.83
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.5 1.53 2.53 top 243.5 0.83
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 4.3 0.81 2.53 top 243.5 0.83
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 5.0 0.09 2.53 top 243.5 0.83
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.7 1.08 3.38 top 243.5 1.10
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 5.0 1.80 3.38 top 243.5 1.10
221 1.2(DS+DO+AF+TF)-1.0EQ-X 5.7 1.08 3.38 top 243.5 1.10
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 6.4 0.36 3.38 top 243.5 1.10
223 0.9(DS+DE)+1.0 WX 2.7 2.65 2.65 top 243.5 0.86
224 0.9(DS+DE)+1.0 WZ 2.7 2.64 2.65 top 243.5 0.86
225 0.9(DS+DE)-1.0 WX 2.7 2.65 2.65 top 243.5 0.86
226 0.9(DS+DE)-1.0 WZ 2.7 2.64 2.65 top 243.5 0.86
227 1.2(DS+DT)+1.0 WX 3.7 3.64 3.68 top 243.5 1.20
228 1.2(DS+DT)+1.0 WZ 3.7 3.65 3.68 top 243.5 1.20
229 1.2(DS+DT)-1.0 WX 3.7 3.64 3.68 top 243.5 1.20
230 1.2(DS+DT)-1.0 WZ 3.7 3.62 3.68 top 243.5 1.20
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 120 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 0.121 0.000 0.002 1,593 843 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.103 0.000 0.002 1,593 843 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.078 0.000 0.002 1,593 843 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.078 0.000 0.002 1,593 843 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.078 0.000 0.002 1,593 843 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.078 0.000 0.002 1,593 843 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.103 0.000 0.002 1,593 843 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.103 0.000 0.002 1,593 843 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.103 0.000 0.002 1,593 843 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.103 0.000 0.002 1,593 843 OK!
211 0.9(DS+DO)+1.0EQ-X 0.078 0.000 0.002 1,593 843 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.078 0.000 0.002 1,593 843 OK!
213 0.9(DS+DO)-1.0EQ-X 0.078 0.000 0.002 1,593 843 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.078 0.000 0.002 1,593 843 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.078 0.000 0.002 1,593 843 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.078 0.000 0.002 1,593 843 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.078 0.000 0.002 1,593 843 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.078 0.000 0.002 1,593 843 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.103 0.000 0.002 1,593 843 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.103 0.000 0.002 1,593 843 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.103 0.000 0.002 1,593 843 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.103 0.000 0.002 1,593 843 OK!
223 0.9(DS+DE)+1.0 WX 0.081 0.000 0.002 1,593 843 OK!
224 0.9(DS+DE)+1.0 WZ 0.081 0.000 0.002 1,593 843 OK!
225 0.9(DS+DE)-1.0 WX 0.081 0.000 0.002 1,593 843 OK!
226 0.9(DS+DE)-1.0 WZ 0.081 0.000 0.002 1,593 843 OK!
227 1.2(DS+DT)+1.0 WX 0.113 0.000 0.002 1,593 843 OK!
228 1.2(DS+DT)+1.0 WZ 0.113 0.000 0.002 1,593 843 OK!
229 1.2(DS+DT)-1.0 WX 0.113 0.000 0.002 1,593 843 OK!
230 1.2(DS+DT)-1.0 WZ 0.113 0.000 0.002 1,593 843 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 121 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (Ton/m2, mm, Ton-m)


L. Comb Qu max Qu min Qu eq. Pos. d Mux
201 1.4(DS+DO+L+TF+AF+FF) 6.6 1.26 3.94 bottom 218.5 2.40
202 1.2(DS+DO+L+TF+AF+FF) 5.7 1.08 3.38 bottom 218.5 2.05
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 4.3 0.81 2.53 bottom 218.5 1.54
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 4.2 0.83 2.53 bottom 218.5 1.54
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 4.3 0.81 2.53 bottom 218.5 1.54
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 4.3 0.79 2.53 bottom 218.5 1.54
207 1.2(DS+DO+AF+TF)+1.0WX 5.7 1.08 3.38 bottom 218.5 2.05
208 1.2(DS+DO+AF+TF)+1.0WZ 5.7 1.09 3.38 bottom 218.5 2.05
209 1.2(DS+DO+AF+TF)-1.0WX 5.7 1.08 3.38 bottom 218.5 2.05
210 1.2(DS+DO+AF+TF)-1.0WZ 5.7 1.06 3.38 bottom 218.5 2.05
211 0.9(DS+DO)+1.0EQ-X 4.3 0.81 2.53 bottom 218.5 1.54
212 0.9(DS+DO)+1.0EQ-Z 3.5 1.53 2.53 bottom 218.5 1.54
213 0.9(DS+DO)-1.0EQ-X 4.3 0.81 2.53 bottom 218.5 1.54
214 0.9(DS+DO)-1.0EQ-Z 5.0 0.09 2.53 bottom 218.5 1.54
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 4.3 0.81 2.53 bottom 218.5 1.54
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.5 1.53 2.53 bottom 218.5 1.54
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 4.3 0.81 2.53 bottom 218.5 1.54
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 5.0 0.09 2.53 bottom 218.5 1.54
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.7 1.08 3.38 bottom 218.5 2.05
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 5.0 1.80 3.38 bottom 218.5 2.05
221 1.2(DS+DO+AF+TF)-1.0EQ-X 5.7 1.08 3.38 bottom 218.5 2.05
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 6.4 0.36 3.38 bottom 218.5 2.05
223 0.9(DS+DE)+1.0 WX 2.7 2.65 2.65 bottom 218.5 1.61
224 0.9(DS+DE)+1.0 WZ 2.7 2.64 2.65 bottom 218.5 1.61
225 0.9(DS+DE)-1.0 WX 2.7 2.65 2.65 bottom 218.5 1.61
226 0.9(DS+DE)-1.0 WZ 2.7 2.64 2.65 bottom 218.5 1.61
227 1.2(DS+DT)+1.0 WX 3.7 3.64 3.68 bottom 218.5 2.24
228 1.2(DS+DT)+1.0 WZ 3.7 3.65 3.68 bottom 218.5 2.24
229 1.2(DS+DT)-1.0 WX 3.7 3.64 3.68 bottom 218.5 2.24
230 1.2(DS+DT)-1.0 WZ 3.7 3.62 3.68 bottom 218.5 2.24
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 122 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 0.280 0.001 0.002 1,593 679 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.240 0.001 0.002 1,593 679 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.180 0.000 0.002 1,593 679 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.180 0.000 0.002 1,593 679 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.180 0.000 0.002 1,593 679 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.180 0.000 0.002 1,593 679 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.240 0.001 0.002 1,593 679 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.240 0.001 0.002 1,593 679 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.240 0.001 0.002 1,593 679 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.240 0.001 0.002 1,593 679 OK!
211 0.9(DS+DO)+1.0EQ-X 0.180 0.000 0.002 1,593 679 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.180 0.000 0.002 1,593 679 OK!
213 0.9(DS+DO)-1.0EQ-X 0.180 0.000 0.002 1,593 679 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.180 0.000 0.002 1,593 679 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.180 0.000 0.002 1,593 679 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.180 0.000 0.002 1,593 679 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.180 0.000 0.002 1,593 679 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.180 0.000 0.002 1,593 679 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.240 0.001 0.002 1,593 679 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.240 0.001 0.002 1,593 679 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.240 0.001 0.002 1,593 679 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.240 0.001 0.002 1,593 679 OK!
223 0.9(DS+DE)+1.0 WX 0.188 0.000 0.002 1,593 679 OK!
224 0.9(DS+DE)+1.0 WZ 0.188 0.000 0.002 1,593 679 OK!
225 0.9(DS+DE)-1.0 WX 0.188 0.000 0.002 1,593 679 OK!
226 0.9(DS+DE)-1.0 WZ 0.188 0.000 0.002 1,593 679 OK!
227 1.2(DS+DT)+1.0 WX 0.261 0.001 0.002 1,593 679 OK!
228 1.2(DS+DT)+1.0 WZ 0.261 0.001 0.002 1,593 679 OK!
229 1.2(DS+DT)-1.0 WX 0.261 0.001 0.002 1,593 679 OK!
230 1.2(DS+DT)-1.0 WZ 0.261 0.001 0.002 1,593 679 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 123 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction
Unit (Ton/m2, mm, Ton-m)
L. Comb Qu max Qu min Qu eq. Pos. d Muz
201 1.4(DS+DO+L+TF+AF+FF) 5.8 2.11 3.94 top 230.5 0.00
202 1.2(DS+DO+L+TF+AF+FF) 4.9 1.81 3.38 top 230.5 0.00
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.4 1.70 2.53 top 230.5 0.00
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.4 1.71 2.53 top 230.5 0.00
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.3 1.72 2.53 top 230.5 0.00
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.4 1.71 2.53 top 230.5 0.00
207 1.2(DS+DO+AF+TF)+1.0WX 4.5 2.27 3.38 top 230.5 0.00
208 1.2(DS+DO+AF+TF)+1.0WZ 4.5 2.28 3.38 top 230.5 0.00
209 1.2(DS+DO+AF+TF)-1.0WX 4.5 2.29 3.38 top 230.5 0.00
210 1.2(DS+DO+AF+TF)-1.0WZ 4.5 2.28 3.38 top 230.5 0.00
211 0.9(DS+DO)+1.0EQ-X 4.0 1.07 2.53 top 230.5 0.00
212 0.9(DS+DO)+1.0EQ-Z 3.4 1.71 2.53 top 230.5 0.00
213 0.9(DS+DO)-1.0EQ-X 2.7 2.35 2.53 top 230.5 0.00
214 0.9(DS+DO)-1.0EQ-Z 3.4 1.71 2.53 top 230.5 0.00
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 4.0 1.07 2.53 top 230.5 0.00
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.4 1.71 2.53 top 230.5 0.00
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 2.7 2.35 2.53 top 230.5 0.00
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.4 1.71 2.53 top 230.5 0.00
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.1 1.64 3.38 top 230.5 0.00
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 4.5 2.28 3.38 top 230.5 0.00
221 1.2(DS+DO+AF+TF)-1.0EQ-X 3.8 2.92 3.38 top 230.5 0.00
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 4.5 2.28 3.38 top 230.5 0.00
223 0.9(DS+DE)+1.0 WX 2.7 2.64 2.65 top 230.5 0.00
224 0.9(DS+DE)+1.0 WZ 2.7 2.65 2.65 top 230.5 0.00
225 0.9(DS+DE)-1.0 WX 2.7 2.64 2.65 top 230.5 0.00
226 0.9(DS+DE)-1.0 WZ 2.7 2.65 2.65 top 230.5 0.00
227 1.2(DS+DT)+1.0 WX 3.7 3.65 3.68 top 230.5 0.00
228 1.2(DS+DT)+1.0 WZ 3.7 3.66 3.68 top 230.5 0.00
229 1.2(DS+DT)-1.0 WX 3.7 3.67 3.68 top 230.5 0.00
230 1.2(DS+DT)-1.0 WZ 3.7 3.66 3.68 top 230.5 0.00
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 124 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 1,792 858 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 1,792 858 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.000 0.000 0.002 1,792 858 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.000 0.000 0.002 1,792 858 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.000 0.000 0.002 1,792 858 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.000 0.000 0.002 1,792 858 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.000 0.000 0.002 1,792 858 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.000 0.000 0.002 1,792 858 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.000 0.000 0.002 1,792 858 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.000 0.000 0.002 1,792 858 OK!
211 0.9(DS+DO)+1.0EQ-X 0.000 0.000 0.002 1,792 858 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.000 0.000 0.002 1,792 858 OK!
213 0.9(DS+DO)-1.0EQ-X 0.000 0.000 0.002 1,792 858 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.000 0.000 0.002 1,792 858 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.000 0.000 0.002 1,792 858 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.000 0.000 0.002 1,792 858 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.000 0.000 0.002 1,792 858 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.000 0.000 0.002 1,792 858 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.000 0.000 0.002 1,792 858 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.000 0.000 0.002 1,792 858 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.000 0.000 0.002 1,792 858 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.000 0.000 0.002 1,792 858 OK!
223 0.9(DS+DE)+1.0 WX 0.000 0.000 0.002 1,792 858 OK!
224 0.9(DS+DE)+1.0 WZ 0.000 0.000 0.002 1,792 858 OK!
225 0.9(DS+DE)-1.0 WX 0.000 0.000 0.002 1,792 858 OK!
226 0.9(DS+DE)-1.0 WZ 0.000 0.000 0.002 1,792 858 OK!
227 1.2(DS+DT)+1.0 WX 0.000 0.000 0.002 1,792 858 OK!
228 1.2(DS+DT)+1.0 WZ 0.000 0.000 0.002 1,792 858 OK!
229 1.2(DS+DT)-1.0 WX 0.000 0.000 0.002 1,792 858 OK!
230 1.2(DS+DT)-1.0 WZ 0.000 0.000 0.002 1,792 858 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 125 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (Ton/m2, mm, Ton-m)


L. Comb Qu max Qu min Qu eq. Pos. d Muz
201 1.4(DS+DO+L+TF+AF+FF) 5.8 2.11 3.94 bottom 205.5 9.31
202 1.2(DS+DO+L+TF+AF+FF) 4.9 1.81 3.38 bottom 205.5 7.98
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 3.4 1.70 2.53 bottom 205.5 5.99
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 3.4 1.71 2.53 bottom 205.5 5.99
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 3.3 1.72 2.53 bottom 205.5 5.99
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 3.4 1.71 2.53 bottom 205.5 5.99
207 1.2(DS+DO+AF+TF)+1.0WX 4.5 2.27 3.38 bottom 205.5 7.98
208 1.2(DS+DO+AF+TF)+1.0WZ 4.5 2.28 3.38 bottom 205.5 7.98
209 1.2(DS+DO+AF+TF)-1.0WX 4.5 2.29 3.38 bottom 205.5 7.98
210 1.2(DS+DO+AF+TF)-1.0WZ 4.5 2.28 3.38 bottom 205.5 7.98
211 0.9(DS+DO)+1.0EQ-X 4.0 1.07 2.53 bottom 205.5 5.99
212 0.9(DS+DO)+1.0EQ-Z 3.4 1.71 2.53 bottom 205.5 5.99
213 0.9(DS+DO)-1.0EQ-X 2.7 2.35 2.53 bottom 205.5 5.99
214 0.9(DS+DO)-1.0EQ-Z 3.4 1.71 2.53 bottom 205.5 5.99
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 4.0 1.07 2.53 bottom 205.5 5.99
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 3.4 1.71 2.53 bottom 205.5 5.99
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 2.7 2.35 2.53 bottom 205.5 5.99
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 3.4 1.71 2.53 bottom 205.5 5.99
219 1.2(DS+DO+AF+TF)+1.0EQ-X 5.1 1.64 3.38 bottom 205.5 7.98
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 4.5 2.28 3.38 bottom 205.5 7.98
221 1.2(DS+DO+AF+TF)-1.0EQ-X 3.8 2.92 3.38 bottom 205.5 7.98
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 4.5 2.28 3.38 bottom 205.5 7.98
223 0.9(DS+DE)+1.0 WX 2.7 2.64 2.65 bottom 205.5 6.27
224 0.9(DS+DE)+1.0 WZ 2.7 2.65 2.65 bottom 205.5 6.27
225 0.9(DS+DE)-1.0 WX 2.7 2.64 2.65 bottom 205.5 6.27
226 0.9(DS+DE)-1.0 WZ 2.7 2.65 2.65 bottom 205.5 6.27
227 1.2(DS+DT)+1.0 WX 3.7 3.65 3.68 bottom 205.5 8.70
228 1.2(DS+DT)+1.0 WZ 3.7 3.66 3.68 bottom 205.5 8.70
229 1.2(DS+DT)-1.0 WX 3.7 3.67 3.68 bottom 205.5 8.70
230 1.2(DS+DT)-1.0 WZ 3.7 3.66 3.68 bottom 205.5 8.70
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 126 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (N/mm2, mm2)


L. Comb Rn ρ req ρ min Using As As req Check
201 1.4(DS+DO+L+TF+AF+FF) 1.082 0.003 0.002 1,792 1,463 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.927 0.002 0.002 1,792 1,249 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.695 0.002 0.002 1,792 931 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.695 0.002 0.002 1,792 931 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.695 0.002 0.002 1,792 931 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.695 0.002 0.002 1,792 931 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.927 0.002 0.002 1,792 1,249 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.927 0.002 0.002 1,792 1,249 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.927 0.002 0.002 1,792 1,249 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.927 0.002 0.002 1,792 1,249 OK!
211 0.9(DS+DO)+1.0EQ-X 0.695 0.002 0.002 1,792 931 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.695 0.002 0.002 1,792 931 OK!
213 0.9(DS+DO)-1.0EQ-X 0.695 0.002 0.002 1,792 931 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.695 0.002 0.002 1,792 931 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.695 0.002 0.002 1,792 931 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.695 0.002 0.002 1,792 931 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.695 0.002 0.002 1,792 931 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.695 0.002 0.002 1,792 931 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.927 0.002 0.002 1,792 1,249 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.927 0.002 0.002 1,792 1,249 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.927 0.002 0.002 1,792 1,249 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.927 0.002 0.002 1,792 1,249 OK!
223 0.9(DS+DE)+1.0 WX 0.728 0.002 0.002 1,792 976 OK!
224 0.9(DS+DE)+1.0 WZ 0.728 0.002 0.002 1,792 976 OK!
225 0.9(DS+DE)-1.0 WX 0.728 0.002 0.002 1,792 976 OK!
226 0.9(DS+DE)-1.0 WZ 0.728 0.002 0.002 1,792 976 OK!
227 1.2(DS+DT)+1.0 WX 1.011 0.003 0.002 1,792 1,365 OK!
228 1.2(DS+DT)+1.0 WZ 1.011 0.003 0.002 1,792 1,365 OK!
229 1.2(DS+DT)-1.0 WX 1.011 0.003 0.002 1,792 1,365 OK!
230 1.2(DS+DT)-1.0 WZ 1.011 0.003 0.002 1,792 1,365 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 127 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.11 One Way Shear


ACI 318-05 Chapter 11.3.1.1 :
For members subject to shear and flexure only :
Vc = 1/6*fc'^0.5*bw*d Vu < φ Vc ---> OK!
Vu = Qu eq. * Tributary Area (TA)
Reduction factor for shear, φ = 0.75

Z - Direction
L. Comb Qu eq. d TA Vu φ Vc Check
(ton/m2) (mm) (m2) (kN) (kN)
201 1.4(DS+DO+L+TF+AF+FF) 3.94 243.5 2.99 115.48 333.47 OK!
202 1.2(DS+DO+L+TF+AF+FF) 3.38 243.5 2.99 98.98 333.47 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 2.53 243.5 2.99 74.23 333.47 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 2.53 243.5 2.99 74.23 333.47 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 2.53 243.5 2.99 74.23 333.47 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 2.53 243.5 2.99 74.23 333.47 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 3.38 243.5 2.99 98.98 333.47 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 3.38 243.5 2.99 98.98 333.47 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 3.38 243.5 2.99 98.98 333.47 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 3.38 243.5 2.99 98.98 333.47 OK!
211 0.9(DS+DO)+1.0EQ-X 2.53 243.5 2.99 74.23 333.47 OK!
212 0.9(DS+DO)+1.0EQ-Z 2.53 243.5 2.99 74.23 333.47 OK!
213 0.9(DS+DO)-1.0EQ-X 2.53 243.5 2.99 74.23 333.47 OK!
214 0.9(DS+DO)-1.0EQ-Z 2.53 243.5 2.99 74.23 333.47 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 2.53 243.5 2.99 74.23 333.47 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 2.53 243.5 2.99 74.23 333.47 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 2.53 243.5 2.99 74.23 333.47 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 2.53 243.5 2.99 74.23 333.47 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 3.38 243.5 2.99 98.98 333.47 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 3.38 243.5 2.99 98.98 333.47 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 3.38 243.5 2.99 98.98 333.47 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 3.38 243.5 2.99 98.98 333.47 OK!
223 0.9(DS+DE)+1.0 WX 2.65 243.5 2.99 77.70 333.47 OK!
224 0.9(DS+DE)+1.0 WZ 2.65 243.5 2.99 77.70 333.47 OK!
225 0.9(DS+DE)-1.0 WX 2.65 243.5 2.99 77.70 333.47 OK!
226 0.9(DS+DE)-1.0 WZ 2.65 243.5 2.99 77.70 333.47 OK!
227 1.2(DS+DT)+1.0 WX 3.68 243.5 2.99 107.90 333.47 OK!
228 1.2(DS+DT)+1.0 WZ 3.68 243.5 2.99 107.90 333.47 OK!
229 1.2(DS+DT)-1.0 WX 3.68 243.5 2.99 107.90 333.47 OK!
230 1.2(DS+DT)-1.0 WZ 3.68 243.5 2.99 107.90 333.47 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 128 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction
L. Comb Qu eq. d TA Vu φ Vc Check
(ton/m2) (mm) (m2) (kN) (kN)
201 1.4(DS+DO+L+TF+AF+FF) 3.94 230.5 2.44 94.4 358.7 OK!
202 1.2(DS+DO+L+TF+AF+FF) 3.38 230.5 2.44 80.9 358.7 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 2.53 230.5 2.44 60.7 358.7 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 2.53 230.5 2.44 60.7 358.7 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 2.53 230.5 2.44 60.7 358.7 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 2.53 230.5 2.44 60.7 358.7 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 3.38 230.5 2.44 80.9 358.7 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 3.38 230.5 2.44 80.9 358.7 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 3.38 230.5 2.44 80.9 358.7 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 3.38 230.5 2.44 80.9 358.7 OK!
211 0.9(DS+DO)+1.0EQ-X 2.53 230.5 2.44 60.7 358.7 OK!
212 0.9(DS+DO)+1.0EQ-Z 2.53 230.5 2.44 60.7 358.7 OK!
213 0.9(DS+DO)-1.0EQ-X 2.53 230.5 2.44 60.7 358.7 OK!
214 0.9(DS+DO)-1.0EQ-Z 2.53 230.5 2.44 60.7 358.7 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 2.53 230.5 2.44 60.7 358.7 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 2.53 230.5 2.44 60.7 358.7 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 2.53 230.5 2.44 60.7 358.7 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 2.53 230.5 2.44 60.7 358.7 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 3.38 230.5 2.44 80.9 358.7 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 3.38 230.5 2.44 80.9 358.7 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 3.38 230.5 2.44 80.9 358.7 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 3.38 230.5 2.44 80.9 358.7 OK!
223 0.9(DS+DE)+1.0 WX 2.65 230.5 2.44 63.5 358.7 OK!
224 0.9(DS+DE)+1.0 WZ 2.65 230.5 2.44 63.5 358.7 OK!
225 0.9(DS+DE)-1.0 WX 2.65 230.5 2.44 63.5 358.7 OK!
226 0.9(DS+DE)-1.0 WZ 2.65 230.5 2.44 63.5 358.7 OK!
227 1.2(DS+DT)+1.0 WX 3.68 230.5 2.44 88.2 358.7 OK!
228 1.2(DS+DT)+1.0 WZ 3.68 230.5 2.44 88.2 358.7 OK!
229 1.2(DS+DT)-1.0 WX 3.68 230.5 2.44 88.2 358.7 OK!
230 1.2(DS+DT)-1.0 WZ 3.68 230.5 2.44 88.2 358.7 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 129 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.12 Two Way Shear


ACI 318-05 Chapter 11.12.2.1 :
For nonprestressed slabs and footings, Vc shall be the smallest of (a), (b) and (c):
(a) Vc1 = 1/6*(1+2/β)*(fc')^0.5*bo*d
(b) Vc2 = (αs*d/bo+2)*((fc')^0.5*bo*d)/12
(c) Vc3 = ((fc')^0.5*bo*d)/3
Pier Name = 1
Ratio of long side to short side of pedestal, β = 1.00
Perimeter of critical section for footing, bo = 849.24 mm
Exterior pedestal, αs = 20 (For exterior / corner column)

Z & X - Direction
L. Comb Qu eq. d ave TA Vu φ Vc Check
(ton/m2) (mm) (m2) (kN) (kN)
201 1.4(DS+DO+L+TF+AF+FF) 3.94 212 5.23 202.1 224.1 OK!
202 1.2(DS+DO+L+TF+AF+FF) 3.38 212 5.23 173.2 224.1 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 2.53 212 5.23 129.9 224.1 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 2.53 212 5.23 129.9 224.1 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 2.53 212 5.23 129.9 224.1 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 2.53 212 5.23 129.9 224.1 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 3.38 212 5.23 173.2 224.1 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 3.38 212 5.23 173.2 224.1 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 3.38 212 5.23 173.2 224.1 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 3.38 212 5.23 173.2 224.1 OK!
211 0.9(DS+DO)+1.0EQ-X 2.53 212 5.23 129.9 224.1 OK!
212 0.9(DS+DO)+1.0EQ-Z 2.53 212 5.23 129.9 224.1 OK!
213 0.9(DS+DO)-1.0EQ-X 2.53 212 5.23 129.9 224.1 OK!
214 0.9(DS+DO)-1.0EQ-Z 2.53 212 5.23 129.9 224.1 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 2.53 212 5.23 129.9 224.1 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 2.53 212 5.23 129.9 224.1 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 2.53 212 5.23 129.9 224.1 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 2.53 212 5.23 129.9 224.1 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 3.38 212 5.23 173.2 224.1 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 3.38 212 5.23 173.2 224.1 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 3.38 212 5.23 173.2 224.1 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 3.38 212 5.23 173.2 224.1 OK!
223 0.9(DS+DE)+1.0 WX 2.65 212 5.23 136.0 224.1 OK!
224 0.9(DS+DE)+1.0 WZ 2.65 212 5.23 136.0 224.1 OK!
225 0.9(DS+DE)-1.0 WX 2.65 212 5.23 136.0 224.1 OK!
226 0.9(DS+DE)-1.0 WZ 2.65 212 5.23 136.0 224.1 OK!
227 1.2(DS+DT)+1.0 WX 3.68 212 5.23 188.8 224.1 OK!
228 1.2(DS+DT)+1.0 WZ 3.68 212 5.23 188.8 224.1 OK!
229 1.2(DS+DT)-1.0 WX 3.68 212 5.23 188.8 224.1 OK!
230 1.2(DS+DT)-1.0 WZ 3.68 212 5.23 188.8 224.1 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 130 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.5.13 Pedestal Reinforcement

Design Parameters
Unit (MPa, mm)
φ (Bending) φ (Shear) fc' fy cl_c
0.8 0.75 24.8 390 50

φ = Reduction factor for bending and shear


fc' = Concrete strength of pedestal
fy = Yield strength of rebar
cl_c = Clear concrete cover for pedestal rebar for all sides

Pedestal reinforcement are 0.5% from foundation gross section (ACI 318-05 Chapter 15.8.2.1)
ρo = 0.005 50
As-req = ρr Ap
= 0.005 x 0.0961
= 0.0005 m2
310 mm
= 4.805 cm2
db = 13 mm, ; A = 132.73 mm2
n = 4 ea 50
So, use : 4 D 13 for longitudinal reinforcement.
310 mm
Check Pedestal Flexural Reinforcement
Unit (mm)
Pr. Name Bp Lp dz dx ph
1 310.00 310.00 243.50 243.50 840
2 310.00 310.00 243.50 243.50 840
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 131 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Z - Direction
Pr. Name L. Comb Rn ρ req ρ min Using As As req Check
1 201 1.4(DS+DO+L+TF+AF+FF) 0.001 0.000 0.002 265 126 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.001 0.000 0.002 265 126 OK!
0.000
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.000 0.002 265 126 OK!
0.003
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.000 0.002 265 126 OK!
0.000
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.000 0.002 265 126 OK!
0.003
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.000 0.002 265 126 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.000 0.000 0.002 265 126 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.003 0.000 0.002 265 126 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.000 0.000 0.002 265 126 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.003 0.000 0.002 265 126 OK!
211 0.9(DS+DO)+1.0EQ-X 0.000 0.000 0.002 265 126 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.018 0.000 0.002 265 126 OK!
213 0.9(DS+DO)-1.0EQ-X 0.000 0.000 0.002 265 126 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.018 0.000 0.002 265 126 OK!
0.000
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.000 0.002 265 126 OK!
0.018
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.000 0.002 265 126 OK!
0.000
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.000 0.002 265 126 OK!
0.018
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.000 0.002 265 126 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.000 0.000 0.002 265 126 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.018 0.000 0.002 265 126 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.000 0.000 0.002 265 126 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.018 0.000 0.002 265 126 OK!
223 0.9(DS+DE)+1.0 WX 0.000 0.000 0.002 265 126 OK!
224 0.9(DS+DE)+1.0 WZ 0.003 0.000 0.002 265 126 OK!
225 0.9(DS+DE)-1.0 WX 0.000 0.000 0.002 265 126 OK!
226 0.9(DS+DE)-1.0 WZ 0.003 0.000 0.002 265 126 OK!
227 1.2(DS+DT)+1.0 WX 0.000 0.000 0.002 265 126 OK!
228 1.2(DS+DT)+1.0 WZ 0.003 0.000 0.002 265 126 OK!
229 1.2(DS+DT)-1.0 WX 0.000 0.000 0.002 265 126 OK!
230 1.2(DS+DT)-1.0 WZ 0.003 0.000 0.002 265 126 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 132 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Z - Direction
Pr. Name L. Comb Rn ρ req ρ min Using As As req Check
2 201 1.4(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 265 126 OK!
202 1.2(DS+DO+L+TF+AF+FF) 0.000 0.000 0.002 265 126 OK!
0.000
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.000 0.002 265 126 OK!
0.014
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.000 0.002 265 126 OK!
0.000
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.000 0.002 265 126 OK!
0.014
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.000 0.002 265 126 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 0.000 0.000 0.002 265 126 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 0.014 0.000 0.002 265 126 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 0.000 0.000 0.002 265 126 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 0.014 0.000 0.002 265 126 OK!
211 0.9(DS+DO)+1.0EQ-X 0.000 0.000 0.002 265 126 OK!
212 0.9(DS+DO)+1.0EQ-Z 0.773 0.002 0.002 265 152 OK!
213 0.9(DS+DO)-1.0EQ-X 0.000 0.000 0.002 265 126 OK!
214 0.9(DS+DO)-1.0EQ-Z 0.773 0.002 0.002 265 152 OK!
0.000
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.000 0.002 265 126 OK!
0.773
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.002 0.002 265 152 OK!
0.000
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.000 0.002 265 126 OK!
0.773
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.002 0.002 265 152 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 0.000 0.000 0.002 265 126 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 0.773 0.002 0.002 265 152 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 0.000 0.000 0.002 265 126 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 0.773 0.002 0.002 265 152 OK!
223 0.9(DS+DE)+1.0 WX 0.000 0.000 0.002 265 126 OK!
224 0.9(DS+DE)+1.0 WZ 0.014 0.000 0.002 265 126 OK!
225 0.9(DS+DE)-1.0 WX 0.000 0.000 0.002 265 126 OK!
226 0.9(DS+DE)-1.0 WZ 0.014 0.000 0.002 265 126 OK!
227 1.2(DS+DT)+1.0 WX 0.000 0.000 0.002 265 126 OK!
228 1.2(DS+DT)+1.0 WZ 0.014 0.000 0.002 265 126 OK!
229 1.2(DS+DT)-1.0 WX 0.000 0.000 0.002 265 126 OK!
230 1.2(DS+DT)-1.0 WZ 0.014 0.000 0.002 265 126 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 133 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Shear Reinforcement

Unit (mm, MPa)


Dia Spacing fyt
10 100 240

Z - Direction Unit (kN, mm, mm2)


Pr. Name L. Comb φ Vc Vu s Max Av min As use Check
1 201 1.4(DS+DO+L+TF+AF+FF) 46.989 0.0 105 0 157.08 OK!
202 1.2(DS+DO+L+TF+AF+FF) 46.989 0.0 105 0 157.08 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX
46.989 0.0 105 0 157.08 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ
46.989 0.0 105 0 157.08 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX
46.989 0.0 105 0 157.08 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ
46.989 0.0 105 0 157.08 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 46.989 0.0 105 0 157.08 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 46.989 0.0 105 0 157.08 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 46.989 0.0 105 0 157.08 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 46.989 0.0 105 0 157.08 OK!
211 0.9(DS+DO)+1.0EQ-X 46.989 0.0 105 0 157.08 OK!
212 0.9(DS+DO)+1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
213 0.9(DS+DO)-1.0EQ-X 46.989 0.0 105 0 157.08 OK!
214 0.9(DS+DO)-1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X
46.989 0.0 105 0 157.08 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z
46.989 0.0 105 0 157.08 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X
46.989 0.0 105 0 157.08 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z
46.989 0.0 105 0 157.08 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 46.989 0.0 105 0 157.08 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 46.989 0.0 105 0 157.08 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
223 0.9(DS+DE)+1.0 WX 46.989 0.0 105 0 157.08 OK!
224 0.9(DS+DE)+1.0 WZ 46.989 0.0 105 0 157.08 OK!
225 0.9(DS+DE)-1.0 WX 46.989 0.0 105 0 157.08 OK!
226 0.9(DS+DE)-1.0 WZ 46.989 0.0 105 0 157.08 OK!
227 1.2(DS+DT)+1.0 WX 46.989 0.0 105 0 157.08 OK!
228 1.2(DS+DT)+1.0 WZ 46.989 0.0 105 0 157.08 OK!
229 1.2(DS+DT)-1.0 WX 46.989 0.0 105 0 157.08 OK!
230 1.2(DS+DT)-1.0 WZ 46.989 0.0 105 0 157.08 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 134 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Z - Direction Unit (kN, mm, mm2)


Pr. Name L. Comb φ Vc Vu s Max Av min As use Check
2 201 1.4(DS+DO+L+TF+AF+FF) 46.989 0.0 105 0 157.08 OK!
202 1.2(DS+DO+L+TF+AF+FF) 46.989 0.0 105 0 157.08 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX
46.989 0.0 105 0 157.08 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ
46.989 0.0 105 0 157.08 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX
46.989 0.0 105 0 157.08 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ
46.989 0.0 105 0 157.08 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 46.989 0.0 105 0 157.08 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 46.989 0.0 105 0 157.08 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 46.989 0.0 105 0 157.08 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 46.989 0.0 105 0 157.08 OK!
211 0.9(DS+DO)+1.0EQ-X 46.989 0.0 105 0 157.08 OK!
212 0.9(DS+DO)+1.0EQ-Z 46.989 0.9 105 0 157.08 OK!
213 0.9(DS+DO)-1.0EQ-X 46.989 0.0 105 0 157.08 OK!
214 0.9(DS+DO)-1.0EQ-Z 46.989 0.9 105 0 157.08 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X
46.989 0.0 105 0 157.08 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z
46.989 0.9 105 0 157.08 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X
46.989 0.0 105 0 157.08 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z
46.989 0.9 105 0 157.08 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 46.989 0.0 105 0 157.08 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 46.989 0.9 105 0 157.08 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 46.989 0.0 105 0 157.08 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 46.989 0.9 105 0 157.08 OK!
223 0.9(DS+DE)+1.0 WX 46.989 0.0 105 0 157.08 OK!
224 0.9(DS+DE)+1.0 WZ 46.989 0.0 105 0 157.08 OK!
225 0.9(DS+DE)-1.0 WX 46.989 0.0 105 0 157.08 OK!
226 0.9(DS+DE)-1.0 WZ 46.989 0.0 105 0 157.08 OK!
227 1.2(DS+DT)+1.0 WX 46.989 0.0 105 0 157.08 OK!
228 1.2(DS+DT)+1.0 WZ 46.989 0.0 105 0 157.08 OK!
229 1.2(DS+DT)-1.0 WX 46.989 0.0 105 0 157.08 OK!
230 1.2(DS+DT)-1.0 WZ 46.989 0.0 105 0 157.08 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 135 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (kN, mm, mm2)


Pr. Name L. Comb φ Vc Vu s Max Av min As use Check
1 201 1.4(DS+DO+L+TF+AF+FF) 46.989 0.8 105 0 157.08 OK!
202 1.2(DS+DO+L+TF+AF+FF) 46.989 0.7 105 0 157.08 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX
46.989 0.0 105 0 157.08 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ
46.989 0.0 105 0 157.08 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX
46.989 0.0 105 0 157.08 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ
46.989 0.0 105 0 157.08 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 46.989 0.0 105 0 157.08 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 46.989 0.0 105 0 157.08 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 46.989 0.0 105 0 157.08 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 46.989 0.0 105 0 157.08 OK!
211 0.9(DS+DO)+1.0EQ-X 46.989 0.0 105 0 157.08 OK!
212 0.9(DS+DO)+1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
213 0.9(DS+DO)-1.0EQ-X 46.989 0.0 105 0 157.08 OK!
214 0.9(DS+DO)-1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X
46.989 0.0 105 0 157.08 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z
46.989 0.0 105 0 157.08 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X
46.989 0.0 105 0 157.08 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z
46.989 0.0 105 0 157.08 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 46.989 0.0 105 0 157.08 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 46.989 0.0 105 0 157.08 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
223 0.9(DS+DE)+1.0 WX 46.989 0.0 105 0 157.08 OK!
224 0.9(DS+DE)+1.0 WZ 46.989 0.0 105 0 157.08 OK!
225 0.9(DS+DE)-1.0 WX 46.989 0.0 105 0 157.08 OK!
226 0.9(DS+DE)-1.0 WZ 46.989 0.0 105 0 157.08 OK!
227 1.2(DS+DT)+1.0 WX 46.989 0.0 105 0 157.08 OK!
228 1.2(DS+DT)+1.0 WZ 46.989 0.0 105 0 157.08 OK!
229 1.2(DS+DT)-1.0 WX 46.989 0.0 105 0 157.08 OK!
230 1.2(DS+DT)-1.0 WZ 46.989 0.0 105 0 157.08 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 136 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction Unit (kN, mm, mm2)


Pr. Name L. Comb φ Vc Vu s Max Av min As use Check
2 201 1.4(DS+DO+L+TF+AF+FF) 46.989 0.0 105 0 157.08 OK!
202 1.2(DS+DO+L+TF+AF+FF) 46.989 0.0 105 0 157.08 OK!
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX
46.989 0.0 105 0 157.08 OK!
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ
46.989 0.0 105 0 157.08 OK!
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX
46.989 0.0 105 0 157.08 OK!
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ
46.989 0.0 105 0 157.08 OK!
207 1.2(DS+DO+AF+TF)+1.0WX 46.989 0.0 105 0 157.08 OK!
208 1.2(DS+DO+AF+TF)+1.0WZ 46.989 0.0 105 0 157.08 OK!
209 1.2(DS+DO+AF+TF)-1.0WX 46.989 0.0 105 0 157.08 OK!
210 1.2(DS+DO+AF+TF)-1.0WZ 46.989 0.0 105 0 157.08 OK!
211 0.9(DS+DO)+1.0EQ-X 46.989 0.9 105 0 157.08 OK!
212 0.9(DS+DO)+1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
213 0.9(DS+DO)-1.0EQ-X 46.989 0.9 105 0 157.08 OK!
214 0.9(DS+DO)-1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X
46.989 0.9 105 0 157.08 OK!
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z
46.989 0.0 105 0 157.08 OK!
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X
46.989 0.9 105 0 157.08 OK!
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z
46.989 0.0 105 0 157.08 OK!
219 1.2(DS+DO+AF+TF)+1.0EQ-X 46.989 0.9 105 0 157.08 OK!
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
221 1.2(DS+DO+AF+TF)-1.0EQ-X 46.989 0.9 105 0 157.08 OK!
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 46.989 0.0 105 0 157.08 OK!
223 0.9(DS+DE)+1.0 WX 46.989 0.0 105 0 157.08 OK!
224 0.9(DS+DE)+1.0 WZ 46.989 0.0 105 0 157.08 OK!
225 0.9(DS+DE)-1.0 WX 46.989 0.0 105 0 157.08 OK!
226 0.9(DS+DE)-1.0 WZ 46.989 0.0 105 0 157.08 OK!
227 1.2(DS+DT)+1.0 WX 46.989 0.0 105 0 157.08 OK!
228 1.2(DS+DT)+1.0 WZ 46.989 0.0 105 0 157.08 OK!
229 1.2(DS+DT)-1.0 WX 46.989 0.0 105 0 157.08 OK!
230 1.2(DS+DT)-1.0 WZ 46.989 0.0 105 0 157.08 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 137 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.6 Anchor Bolt Design


B3.6.1 Material Properties
Concrete strength, f c' = 24.8 MPa
Anchor bolt yield strength, fy = 240 MPa
Specified tensile strength of anchor, futa = Min (1.9 fy or 860 MPa)
= 456 MPa
Weld E70XX Electrode, Fuw = 70000 psi = 483 MPa
Fvw = 42000 psi = 290 MPa

B3.6.2 Anchor Bolt Capacity

Bolt diameter, do = 16 mm

Effective area, Ase =

= 148 mm2
Thread per mm, nt = 0.43 ea
Embedment depth, heff = 200 mm
Nut size, N = 26 mm
Plate thickness, tL = 9 mm
Bearing Area, Abrg = 392 mm2
Anchor Edge. Dist. ca1 = 65 mm
ca2 = 65 mm

Anchor bolt dist. X-Dir, a = 180 mm


Anchor bolt dist. Z-Dir, b = 180 mm

Number of AB X-Dir nx = 2 mm
Number of AB Z-Dir nz = 2 mm
Total Numb. of AB nt = 4 mm
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 138 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Shear Capacity
a. Steel strength of anchor in shear :
Vsa = φ 0.6 Ase futa
= 0.65 x 0.6 x 148.495 x 456
= 26408 N

b. Concrete breakout strength of anchor in shear


Vcb = φ

ha = Dp + Gp
= 1300 mm
Avc = (Min(ha; 1.5ca1))*(1.5ca1+ca1)
= 15844 mm2
2
Avco = 4.5 ca1
2
= 19013 mm
Avc
= 0.83
Avco

ψed,V = , ACI Appendix D Section D.6.2.6

= 0.90
ψc,V = 1.00 , ACI Appendix D Section D.6.2.7

Vb = 0.6*(le/do)^0.2*do^0.5*fc'^0.5*ca1^1.5
= 0.6 x (200/16)^0.2 x sqrt(16) x sqrt(24.8) x (65)^1.5
= 10380 N
Vcb = 0.7 x 0.83 x 0.9 x 1 x 10379.803
= 5449.4 N

c. Concrete Pryout Strength of Anchor in Shear


kcp = 2.00 for hef > 65 mm
Vcp = kcp Ncb
= 2 x 34891.81
= 69783.6282 N

Shear capacity on anchor bolt


Vn = Min (Vsa, Vcb, Vcp)
= 5449.4 N
= 555.49 kg
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 139 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Tension Capacity
a. Steel strength of anchor in tension :
Nsa = φ Ase futa
= 0.75 x 148.49 x 456
= 50785 N

b. Concrete breakout strength of anchor in tension


Ncb = φ
ANc = (ca1 + 1.5hef)^2
= 133225 mm2
2
ANco = 9 hef
= 360000 mm2
Anc
= 0.37
Anco

ψed,N = , ACI Appendix D Section D.5.2.5

= 0.77
ψc,N = 1.25 , for cast-in anchor , ACI Appendix D Section D.5.2.6
= 1.40 , for post-installed anchor , ACI Appendix D Section D.5.2.6
ψcp,N = 1.00 , ACI Appendix D Section D.5.2.7
kc = 10 , for cast-in anchor , ACI Appendix D Section D.5.2.2
= 7 , for post-installed anchor , ACI Appendix D Section D.5.2.2
Nb =
= 10 x sqrt(24.8) x 200^1.5
= 140854.535 N
Ncb = 0.7 x 0.37 x 1 x 1.25 x 0.77 x 140854.53
= 34891.8141 N

c. Pullout Strength of Anchor in Tension


Npn = φ ψc,P Np
ψc,P = 1.00 , ACI Appendix D Section D.5.3.6
Np = , for headed stud, or headed bolt
= , for hooked bolt
= 8 x 391.58 x 24.8
= 77689.472 N

Npn = 0.7 x 77689.47 x 1


= 54382.630 N

d. Concrete Side-face Blowout Strength of Anchor in Tension


Nsb = φ
= 0.7 x 13 x 65 x sqrt(391.58) x sqrt(24.8)
= 58289.6697 N
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 140 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Tension capacity of anchor bolt


Tn = Min (Nsa, Ncb, Npn, Nsb)
= 34892 N
= 3556.8 kg

Capacity of Shear
φ Rn = nb Vn
= 4 x 555.49
= 2222 kg

Capacity of Tension
φ Tn = φt nt Tn
= 4 x 3556.76
= 14227 kg
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 141 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.6.3 Check Anchor Bolt Capacity

Factored Loading Combination in Pier Top Center (Without Pier Selfweight)


Unit (Ton, Ton-m) Check
Pr. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz Shear Tension
1 -0.8
201 1.4(DS+DO+L+TF+AF+FF) 5.7 0.0 0.0 0.4 OK! OK!
-0.7
202 1.2(DS+DO+L+TF+AF+FF) 4.9 0.0 0.0 0.3 OK! OK!
0.0 3.7
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.0 0.0 0.0 OK! OK!
0.0 3.7
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.0 0.0 0.0 OK! OK!
0.0 3.7
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.0 0.0 0.0 OK! OK!
0.0 3.7
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.0 0.0 0.0 OK! OK!
0.0
207 1.2(DS+DO+AF+TF)+1.0WX 4.9 0.0 0.0 0.0 OK! OK!
0.0
208 1.2(DS+DO+AF+TF)+1.0WZ 4.9 0.0 0.0 0.0 OK! OK!
0.0
209 1.2(DS+DO+AF+TF)-1.0WX 4.9 0.0 0.0 0.0 OK! OK!
0.0
210 1.2(DS+DO+AF+TF)-1.0WZ 4.9 0.0 0.0 0.0 OK! OK!
211 0.9(DS+DO)+1.0EQ-X 0.0 3.7 0.0 0.0 0.0 OK! OK!
212 0.9(DS+DO)+1.0EQ-Z 0.0 3.7 0.0 0.0 0.0 OK! OK!
213 0.9(DS+DO)-1.0EQ-X 0.0 3.7 0.0 0.0 0.0 OK! OK!
214 0.9(DS+DO)-1.0EQ-Z 0.0 3.7 0.0 0.0 0.0 OK! OK!
0.0 3.7
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.0 0.0 0.0 OK! OK!
0.0 3.7
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z 0.0 0.0 0.0 OK! OK!
0.0
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X3.7 0.0 0.0 0.0 OK! OK!
0.0
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z3.7 0.0 0.0 0.0 OK! OK!
0.0
219 1.2(DS+DO+AF+TF)+1.0EQ-X 4.9 0.0 0.0 0.0 OK! OK!
0.0
220 1.2(DS+DO+AF+TF)+1.0EQ-Z 4.9 0.0 0.0 0.0 OK! OK!
0.0
221 1.2(DS+DO+AF+TF)-1.0EQ-X 4.9 0.0 0.0 0.0 OK! OK!
0.0
222 1.2(DS+DO+AF+TF)-1.0EQ-Z 4.9 0.0 0.0 0.0 OK! OK!
223 0.9(DS+DE)+1.0 WX 0.0 -0.1 0.0 0.0 0.0 OK! OK!
224 0.9(DS+DE)+1.0 WZ 0.0 -0.1 0.0 0.0 0.0 OK! OK!
225 0.9(DS+DE)-1.0 WX 0.0 -0.1 0.0 0.0 0.0 OK! OK!
226 0.9(DS+DE)-1.0 WZ 0.0 -0.1 0.0 0.0 0.0 OK! OK!
227 1.2(DS+DT)+1.0 WX 0.0 -0.4 0.0 0.0 0.0 OK! OK!
228 1.2(DS+DT)+1.0 WZ 0.0 -0.4 0.0 0.0 0.0 OK! OK!
229 1.2(DS+DT)-1.0 WX 0.0 -0.4 0.0 0.0 0.0 OK! OK!
230 1.2(DS+DT)-1.0 WZ 0.0 -0.4 0.0 0.0 0.0 OK! OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 142 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Unit (Ton, Ton-m) Check


Pr. Name L. Comb Σ Fx Σ Fy Σ Fz Σ Mx Σ Mz Shear Tension
2 0.0
201 1.4(DS+DO+L+TF+AF+FF) -5.0 0.0 0.0 0.0 OK! OK!
0.0
202 1.2(DS+DO+L+TF+AF+FF) -4.2 0.0 0.0 0.0 OK! OK!
0.0 -3.2
203 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WX 0.0 0.0 0.0 OK! OK!
0.0 -3.2
204 0.9(DS+DO)+1.2(AF+TF+FF)+1.0WZ 0.0 0.0 0.0 OK! OK!
0.0 -3.2
205 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WX 0.0 0.0 0.0 OK! OK!
0.0 -3.2
206 0.9(DS+DO)+1.2(AF+TF+FF)-1.0WZ 0.0 0.0 0.0 OK! OK!
0.0
207 1.2(DS+DO+AF+TF)+1.0WX -4.2 0.0 0.0 0.0 OK! OK!
0.0
208 1.2(DS+DO+AF+TF)+1.0WZ -4.2 0.0 0.0 0.0 OK! OK!
0.0
209 1.2(DS+DO+AF+TF)-1.0WX -4.2 0.0 0.0 0.0 OK! OK!
0.0
210 1.2(DS+DO+AF+TF)-1.0WZ -4.2 0.0 0.0 0.0 OK! OK!
211 0.9(DS+DO)+1.0EQ-X-0.9 -3.2 0.0 0.0 0.4 OK! OK!
212 0.9(DS+DO)+1.0EQ-Z 0.0 -3.2 -0.9 -0.4 0.0 OK! OK!
213 0.9(DS+DO)-1.0EQ-X 0.9 -3.2 0.0 0.0 -0.4 OK! OK!
214 0.9(DS+DO)-1.0EQ-Z 0.0 -3.2 0.9 0.4 0.0 OK! OK!
-0.9 -3.2
215 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-X 0.0 0.0 0.4 OK! OK!
0.0 -3.2
216 0.9(DS+DO)+1.2(AF+TF)+1.0EQ-Z -0.9 -0.4 0.0 OK! OK!
0.9 -3.2
217 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-X 0.0 0.0 -0.4 OK! OK!
0.0 -3.2
218 0.9(DS+DO)+1.2(AF+TF)-1.0EQ-Z 0.9 0.4 0.0 OK! OK!
-0.9
219 1.2(DS+DO+AF+TF)+1.0EQ-X -4.2 0.0 0.0 0.4 OK! OK!
0.0
220 1.2(DS+DO+AF+TF)+1.0EQ-Z -4.2 -0.9 -0.4 0.0 OK! OK!
0.9
221 1.2(DS+DO+AF+TF)-1.0EQ-X -4.2 0.0 0.0 -0.4 OK! OK!
0.0
222 1.2(DS+DO+AF+TF)-1.0EQ-Z -4.2 0.9 0.4 0.0 OK! OK!
223 0.9(DS+DE)+1.0 WX 0.0 -0.1 0.0 0.0 0.0 OK! OK!
224 0.9(DS+DE)+1.0 WZ 0.0 -0.1 0.0 0.0 0.0 OK! OK!
225 0.9(DS+DE)-1.0 WX 0.0 -0.1 0.0 0.0 0.0 OK! OK!
226 0.9(DS+DE)-1.0 WZ 0.0 -0.1 0.0 0.0 0.0 OK! OK!
227 1.2(DS+DT)+1.0 WX 0.0 -0.6 0.0 0.0 0.0 OK! OK!
228 1.2(DS+DT)+1.0 WZ 0.0 -0.6 0.0 0.0 0.0 OK! OK!
229 1.2(DS+DT)-1.0 WX 0.0 -0.6 0.0 0.0 0.0 OK! OK!
230 1.2(DS+DT)-1.0 WZ 0.0 -0.6 0.0 0.0 0.0 OK! OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 143 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

B3.7 STAAD.Pro Input


STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 12-Jun-17
JOB NAME Calculation for Miscellaneous Pipe Support and Pipe Sleeper ARR-1
JOB CLIENT PT. Medco Energi E&P Malaka
JOB NO BLA-FTP-C-CC-00-012
JOB REV 0A
CHECKER NAME KHB/BD
APPROVED NAME BHK
CHECKER DATE 12-Jun-17
APPROVED DATE 12-Jun-17
ENGINEER NAME RN/LG
JOB COMMENT TP-F-P04-05-05
JOB COMMENT Node 140 & 160
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KG
JOINT COORDINATES
1 0.55 0.1 0; 2 0.55 0.6 0; 3 0.3 0.6 0; 4 0.8 0.6 0; 5 0 0.1 1; 6 0 0.6 1;
7 0 0.6 0.75; 8 0 0.6 1.25;
MEMBER INCIDENCES
1 5 1; 100 1 2; 101 2 3; 102 2 4; 200 5 6; 201 6 7; 202 6 8;
SUPPORTS
1 5 FIXED
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.09042e+010
POISSON 0.3
DENSITY 7833.41
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY JAPANESE
1 101 102 201 202 TABLE ST H100X100X6
MEMBER PROPERTY AMERICAN
100 200 TABLE ST PIPS40
***********SEISMIC DEFINITION***********
CONSTANTS
BETA 0 MEMB 100
MATERIAL STEEL ALL
*
*
*
DEFINE UBC LOAD
ZONE 0.3 I 1.25 RWX 4.5 RWZ 4.5 STYP 4 CT 0.0853 NA 1 NV 1
SELFWEIGHT 1.12
JOINT WEIGHT
2 WEIGHT 69.8
6 WEIGHT 3521.1
*
*
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 144 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
*
*
**********LOADING CASES**********
LOAD 1 LOADTYPE Seismic TITLE EX (EARTHQUAKE LOAD X-DIR)
UBC LOAD X 1
PERFORM ANALYSIS
CHANGE
LOAD 2 LOADTYPE Seismic TITLE EZ (EARTHQUAKE LOAD Z-DIR)
UBC LOAD Z 1
PERFORM ANALYSIS
CHANGE
LOAD 3 LOADTYPE Seismic TITLE EY (EARTHQUAKE LOAD Y-DIR)
LOAD 4 LOADTYPE Dead TITLE DS (DEAD LOAD STRUCTURE)
SELFWEIGHT Y -1.12 LIST 100 TO 102 200 TO 202
LOAD 5 LOADTYPE Dead TITLE DE (EQUIPMENT EMPTY DEAD LOAD)
JOINT LOAD
2 FY -69.8
6 FY -69.8
LOAD 6 LOADTYPE Dead TITLE DO (EQUIPMENT OPERATING DEAD LOAD)
*
*
JOINT LOAD
2 FY 4103.8
6 FY -3521.1
*
*
LOAD 7 LOADTYPE Dead TITLE DT (EQUIPMENT TEST DEAD LOAD)
JOINT LOAD
2 FY -329.4
6 FY -483.6
*
LOAD 8 LOADTYPE Live TITLE L (LIVE LOAD)
LOAD 9 LOADTYPE None TITLE I (HANDLING DEVICE/IMPACT LOAD)
LOAD 10 LOADTYPE Wind TITLE WX (WIND LOAD X-DIR)
MEMBER LOAD
100 200 TO 202 UNI GX 3.6
JOINT LOAD
6 FX 0.656
2 FX 13.71
LOAD 11 LOADTYPE Wind TITLE WZ (WIND LOAD Z-DIR)
MEMBER LOAD
100 200 UNI GZ 5.4
JOINT LOAD
6 FZ 13.71
2 FZ 0.656
LOAD 12 LOADTYPE None TITLE J (VIBRATION LOAD)
LOAD 13 LOADTYPE None TITLE TF (SELF-STRAINING AND THERMAL FORCES)
JOINT LOAD
2 FX 565.2 FZ 1
LOAD 14 LOADTYPE None TITLE FF (SURFACE FRICTION FORCES)
LOAD 15 LOADTYPE None TITLE AF (ANCHOR FORCES)
LOAD 16 LOADTYPE None TITLE HS (EARTH PRESSURE
LOAD 17 LOADTYPE None TITLE HW (WATER PRESSURE)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 145 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
LOAD 18 LOADTYPE None TITLE R (RAIN LOAD)
LOAD 19 LOADTYPE None TITLE VH (VEHICLE LOAD)
LOAD 20 LOADTYPE None TITLE C (CRANE LOAD)
*****
*****LOADING COMBINATION
*****
*****Operating Condition
LOAD COMB 101 DS + DO + L + TF + AF + FF
4 1.0 6 1.0 8 1.0 13 1.0 15 1.0 14 1.0
*****Operating + Wind
LOAD COMB 102 0.6 (DS + DO + WX) + AF + TF + FF
4 0.6 6 0.6 10 0.6 15 1.0 13 1.0 14 1.0
LOAD COMB 103 0.6 (DS + DO + WZ) + AF + TF + FF
4 0.6 6 0.6 11 0.6 15 1.0 13 1.0 14 1.0
LOAD COMB 104 0.6 (DS + DO - WX) + AF + TF + FF
4 0.6 6 0.6 10 -0.6 15 1.0 13 1.0 14 1.0
LOAD COMB 105 0.6 (DS + DO - WZ) + AF + TF + FF
4 0.6 6 0.6 11 -0.6 15 1.0 13 1.0 14 1.0
LOAD COMB 106 DS + DO + 0.75 L + AF + TF + 0.45 WX
4 1.0 6 1.0 8 0.75 15 1.0 10 0.45 13 1.0
LOAD COMB 107 DS + DO + 0.75 L + AF + TF + 0.45 WZ
4 1.0 6 1.0 8 0.75 15 1.0 11 0.45 13 1.0
LOAD COMB 108 DS + DO + 0.75 L + AF + TF - 0.45 WX
4 1.0 6 1.0 8 0.75 15 1.0 10 -0.45 13 1.0
LOAD COMB 109 DS + DO + 0.75 L + AF + TF - 0.45 WZ
4 1.0 6 1.0 8 0.75 15 1.0 11 -0.45 13 1.0
LOAD COMB 110 DS + DO + AF + TF + 0.6 WX
4 1.0 6 1.0 15 1.0 10 0.6 13 1.0
LOAD COMB 111 DS + DO + AF + TF + 0.6 WZ
4 1.0 6 1.0 15 1.0 11 0.6 13 1.0
LOAD COMB 112 DS + DO + AF + TF - 0.6 WX
4 1.0 6 1.0 15 1.0 10 -0.6 13 1.0
LOAD COMB 113 DS + DO + AF + TF - 0.6 WZ
4 1.0 6 1.0 15 1.0 11 -0.6 13 1.0
******Operating + Earthquake
LOAD COMB 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
4 0.6 6 0.6 1 0.7 2 0.21 3 0.111 15 1.0 13 1.0
LOAD COMB 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z
4 0.6 6 0.6 2 0.7 1 0.21 3 0.111 15 1.0 13 1.0
LOAD COMB 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X
4 0.6 6 0.6 1 -0.7 2 0.21 3 0.111 15 1.0 13 1.0
LOAD COMB 117 0.6 (DS + DO) + AF + TF - 0.7 EO-Z
4 0.6 6 0.6 2 -0.7 1 0.21 3 0.111 15 1.0 13 1.0
*
LOAD COMB 118 DS + DO + AF + TF + 0.75 L + 0.525 EO-X
4 1.0 6 1.0 15 1.0 1 0.525 2 0.158 3 0.111 13 1.0 8 0.75
LOAD COMB 119 DS + DO + AF + TF + 0.75 L + 0.525 EO-Z
4 1.0 6 1.0 15 1.0 2 0.525 1 0.158 3 0.111 13 1.0 8 0.75
LOAD COMB 120 DS + DO + AF + TF + 0.75 L - 0.525 EO-X
4 1.0 6 1.0 15 1.0 1 -0.525 2 0.158 3 0.111 13 1.0 8 0.75
LOAD COMB 121 DS + DO + AF + TF + 0.75 L - 0.525 EO-Z
4 1.0 6 1.0 15 1.0 2 -0.525 1 0.158 3 0.111 13 1.0 8 0.75
*
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 146 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
LOAD COMB 122 DS + DO + AF + TF + 0.7 EO-X
4 1.0 6 1.0 15 1.0 1 0.7 2 0.21 3 0.111 13 1.0
LOAD COMB 123 DS + DO + AF + TF + 0.7 EO-Z
4 1.0 6 1.0 15 1.0 2 0.7 1 0.21 3 0.111 13 1.0
LOAD COMB 124 DS + DO + AF + TF - 0.7 EO-X
4 1.0 6 1.0 15 1.0 1 -0.7 2 0.21 3 0.111 13 1.0
LOAD COMB 125 DS + DO + AF + TF - 0.7 EO-Z
4 1.0 6 1.0 15 1.0 2 -0.7 1 0.21 3 0.111 13 1.0
******Erection + Wind
LOAD COMB 126 DS + DE + 0.6 WX
4 1.0 5 1.0 10 0.6
LOAD COMB 127 DS + DE + 0.6 WZ
4 1.0 5 1.0 11 0.6
LOAD COMB 128 DS + DE - 0.6 WX
4 1.0 5 1.0 10 -0.6
LOAD COMB 129 DS + DE - 0.6 WZ
4 1.0 5 1.0 11 -0.6
******Test
LOAD COMB 130 DS + DT + L
4 1.0 7 1.0 8 1.0
LOAD COMB 131 DS + DT + 0.6 WX
4 1.0 7 1.0 10 0.6
LOAD COMB 132 DS + DT + 0.6 WZ
4 1.0 7 1.0 11 0.6
LOAD COMB 133 DS + DT - 0.6 WX
4 1.0 7 1.0 10 -0.6
LOAD COMB 134 DS + DT - 0.6 WZ
4 1.0 7 1.0 11 -0.6
*
*
PERFORM ANALYSIS
LOAD LIST 101 TO 134
PRINT STORY DRIFT
*
PARAMETER 1
CODE AISC
FYLD 2.53107e+007 MEMB 100 TO 102 200 TO 202
FU 4.21844e+007 MEMB 100 TO 102 200 TO 202
KY 2 MEMB 100 200
KZ 2 MEMB 100 200
LY 0.5 MEMB 100 200
LZ 0.5 MEMB 100 200
DJ1 3 MEMB 101
DJ2 2 MEMB 101
DJ1 4 MEMB 102
DJ2 2 MEMB 102
DJ1 1 MEMB 100
DJ2 2 MEMB 100
DJ1 7 MEMB 201
DJ2 6 MEMB 201
DJ1 8 MEMB 202
DJ2 6 MEMB 202
DJ1 5 MEMB 200
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 147 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
DJ2 6 MEMB 200
DFF 360 MEMB 101 102 201 202
DFF 200 MEMB 100 200
TRACK 1 MEMB 100 TO 102 200 TO 202
RATIO 1 MEMB 100 TO 102 200 TO 202
CHECK CODE MEMB 100 TO 102 200 TO 202
FINISH
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 148 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

APPENDIX C

CONCRETE TRENCH TYPE


Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 149 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

C. Concrete Trench Type (SPS-CT-ARR-01)


C.1 Dimension and Size
FGL ± 0.000

1/2" Pipe 6" Pipe

Sleeper
UNP-150

L1
Structure Size
Width of beam, L1 = 1.00 m
Beam Size, = C150x75x9

C.2 Loading
Pipe Load
Pipe Diameter, dp = 0.152 m
Distance between support, Ls = 6.00 m
Piping support tag number, = SPS-CT-ARR-01
Reference = BLA-FTP-P-RE-00-003 Pipe Stress Analysis Report Alur
Rambong
Line/Calculation = Calculation 9 and Calculation 10
Pipe loading data is taken from node 610 which have the largest load for Concrete Trench type.
Pipe Direction
Node Type Load Type Index Unit
Dia. X Y Z
Empty De N - -1676 -
Operating Do N - -1979 -
Limit &
6" 450 Thermal Tf N - - -
Guide
Anchor Af N 984 - 8
Test T N - -2838 -
Empty De N - -75 -
Operating Do N - -87 -
1/2" - Guide Thermal Tf N 26 - 26
Anchor Af N - - -
Test T N - -87 -
*For detail see Appendix E
Seismic Load
Calculated automatically using STAAD.Pro using UBC 1997 with parameter shown in Appendix A.8
Height of structure, hn = 0.20 m
3/4
Structure period, T = Ct (hn)
= 0.026 s
Base shear of structure, V = 0.150 W/T
= 5.880 W
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 150 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Allowable maximum base shear, V = 0.250 W


Allowable minimum base shear, V = 0.050 W
Base shear used, V = 0.250 W
Load due to the pipe load, V = 0.25 x 1979
= 495 N (for 6" Pipe)
= 22 N (for 1/2" Pipe)

C.3 STAAD.Pro Modeling

Isometric View Node Number Member Number

Member Properties Seismic-X Seismic -Z

Dead Load Equipment Empty Equipment Operating

Thermal Forces Equipment Test


Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 151 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Support Reaction Summary - Unfactored Load (Permanent)


Horizontal Vertical Horizontal Moment
Node L/C
Fx kg Fy kg Fz kg Mx kg-m My kg-m Mz kg-m
Max Fx 2 101 DS + DO + L + TF + AF + FF -49.7 114.1 -0.9 0 0 0
Min Fx 1 101 DS + DO + L + TF + AF + FF -51.3 119.3 -2.5 0 0 0
Max Fy 1 101 DS + DO + L + TF + AF + FF -51.3 119.3 -2.5 0 0 0
Min Fy 2 101 DS + DO + L + TF + AF + FF -49.7 114.1 -0.9 0 0 0
Max Fz 2 101 DS + DO + L + TF + AF + FF -49.7 114.1 -0.9 0 0 0
Min Fz 1 101 DS + DO + L + TF + AF + FF -51.3 119.3 -2.5 0 0 0
Max Mx 1 101 DS + DO + L + TF + AF + FF -51.3 119.3 -2.5 0 0 0
Min Mx 1 101 DS + DO + L + TF + AF + FF -51.3 119.3 -2.5 0 0 0
Max My 1 101 DS + DO + L + TF + AF + FF -51.3 119.3 -2.5 0 0 0
Min My 1 101 DS + DO + L + TF + AF + FF -51.3 119.3 -2.5 0 0 0
Max Mz 1 101 DS + DO + L + TF + AF + FF -51.3 119.3 -2.5 0 0 0
Min Mz 1 101 DS + DO + L + TF + AF + FF -51.3 119.3 -2.5 0 0 0

Support Reaction Summary - Unfactored Load (Temporary)


Horizontal Vertical Horizontal Moment
Node L/C
Fx kg Fy kg Fz kg Mx kg-m My kg-m Mz kg-m
Max Fx 1 126 DS + DE + 0.6 WX 0.0 103.2 0.0 0 0 0
Min Fx 1 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X-69.2 71.6 -7.9 0 0 0
Max Fy 1 130 DS + DT + L 0.0 162.3 0.0 0 0 0
Min Fy 2 102 0.6 (DS + DO + WX) + AF + TF + FF -49.7 68.5 -0.9 0 0 0
Max Fz 2 117 0.6 (DS + DO) + AF + TF - 0.7 EO-Z -54.8 68.5 16.1 0 0 0
Min Fz 1 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z-56.7 71.6 -20.4 0 0 0
Max Mx 1 102 0.6 (DS + DO + WX) + AF + TF + FF -51.3 71.6 -2.5 0 0 0
Min Mx 1 102 0.6 (DS + DO + WX) + AF + TF + FF -51.3 71.6 -2.5 0 0 0
Max My 1 102 0.6 (DS + DO + WX) + AF + TF + FF -51.3 71.6 -2.5 0 0 0
Min My 1 102 0.6 (DS + DO + WX) + AF + TF + FF -51.3 71.6 -2.5 0 0 0
Max Mz 1 102 0.6 (DS + DO + WX) + AF + TF + FF -51.3 71.6 -2.5 0 0 0
Min Mz 1 102 0.6 (DS + DO + WX) + AF + TF + FF -51.3 71.6 -2.5 0 0 0

Displacement Summary
Horizontal Vertical HorizontalResultantRotationalHorizontal
Node L/C
X mm Y mm Z mm mm rX rad rY rad
Max X 3 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
0.09 -0.02 0.00 0.096 0 0
Min X 1 101 DS + DO + L + TF + AF + FF 0.00 0.00 0.00 0 0 0
Max Y 1 101 DS + DO + L + TF + AF + FF 0.00 0.00 0.00 0 0 0
Min Y 3 130 DS + DT + L 0.00 -0.04 0.00 0.036 0 0
Max Z 3 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z
0.08 -0.02 0.00 0.079 0 0
Min Z 3 117 0.6 (DS + DO) + AF + TF - 0.7 EO-Z
0.08 -0.02 0.00 0.079 0 0
Max rX 1 130 DS + DT + L 0.00 0.00 0.00 0 0 0
Min rX 2 130 DS + DT + L 0.00 0.00 0.00 0 0 0
Max rY 1 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
0.00 0.00 0.00 0 0 0
Min rY 2 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
0.00 0.00 0.00 0 0 0
Max rZ 1 101 DS + DO + L + TF + AF + FF 0.00 0.00 0.00 0 0 0
Min rZ 1 101 DS + DO + L + TF + AF + FF 0.00 0.00 0.00 0 0 0
Max Rst 3 122 DS + DO + AF + TF + 0.7 EO-X 0.09 -0.03 0.00 0.098 0 0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 152 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

C.4 Steel Structure Design


Steel Member Size and Unity Check
Steel design were performed based on AISC-ASD. In STAADPro, maximum stress on frame member
directly selected by STAADPro software, taken from the worst loading combination. The member stress is
indicated as check ratio which should be less than 1.0, unless the member will be overstress or fail.

Ratio
Beam No. Section Clause L/C
Actual Allow
101 C150X75X9 0.098 1.00 AISC- H2-1 122
102 C150X75X9 0.098 1.00 AISC- H2-1 122

Deflection

∆y : Vertical Displacement
∆x : Lateral Displacement

Max Dis. (∆) Span (L)


Direction Node ∆/L All. ∆/L Check
mm mm
Vertical 3 0.036 1000 1/27777.78 1/360 OK
Lateral 3 0.094 1000 1/10638.3 1/200 OK

C.5 Foundation Design


The foundation design of this type pipe support is on the BLA-FTP-C-CC-00-003 Calculation for Concrete
Culvert, Duct Bank and Other Underground Structure
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 153 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

C.6 STAAD.Pro Input


STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 07-Jul-17
JOB NAME Calculation for Miscellaneous Pipe Support and Pipe Sleeper ARR
JOB CLIENT PT. Medco Energi E&P Malaka
JOB NO BLA-FTP-C-CC-00-012
JOB REV 0A
CHECKER NAME KHB/BD
APPROVED NAME BHK
CHECKER DATE 07-Jul-17
APPROVED DATE 07-Jul-17
ENGINEER NAME RN/LG
JOB PART Concrete Trench
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KG
JOINT COORDINATES
1 0 0 0; 2 0 0 1; 3 0 0 0.5;
MEMBER INCIDENCES
101 2 3; 102 3 1;
SUPPORTS
1 2 PINNED
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.09042e+010
POISSON 0.3
DENSITY 7833.41
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY JAPANESE
101 102 TABLE ST C150X75X9
CONSTANTS
MATERIAL STEEL ALL
*
*
*
**********LOADING CASES
LOAD 1 LOADTYPE Seismic TITLE EX (EARTHQUAKE LOAD X-DIR)
MEMBER LOAD
*
102 CON GX 2.2 0.3
101 CON GX 47.7 0.5
*
LOAD 2 LOADTYPE Seismic TITLE EZ (EARTHQUAKE LOAD Z-DIR)
MEMBER LOAD
*
102 CON GZ 2.2 0.3
101 CON GZ 47.7 0.5
*
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 154 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
LOAD 3 LOADTYPE Seismic TITLE EY (EARTHQUAKE LOAD Y-DIR)
LOAD 4 LOADTYPE Dead TITLE DS (DEAD LOAD STRUCTURE)
SELFWEIGHT Y -1.12 LIST 101 102
LOAD 5 LOADTYPE Dead TITLE DE (EQUIPMENT EMPTY DEAD LOAD)
MEMBER LOAD
102 CON GY -7.5 0.3
101 CON GY -167.6 0.5
LOAD 6 LOADTYPE Dead TITLE DO (EQUIPMENT OPERATING DEAD LOAD)
MEMBER LOAD
*
102 CON GY -8.7 0.3
*
101 CON GY -197.9 0.5
*
LOAD 7 LOADTYPE Dead TITLE DT (EQUIPMENT TEST DEAD LOAD)
MEMBER LOAD
102 CON GY -8.7 0.3
101 CON GY -283.8 0.5
LOAD 8 LOADTYPE Live TITLE L (LIVE LOAD)
LOAD 9 LOADTYPE None TITLE I (HANDLING DEVICE/IMPACT LOAD)
LOAD 10 LOADTYPE Wind TITLE WX (WIND LOAD X-DIR)
LOAD 11 LOADTYPE Wind TITLE WZ (WIND LOAD Z-DIR)
LOAD 12 LOADTYPE None TITLE J (VIBRATION LOAD)
LOAD 13 LOADTYPE None TITLE TF (SELF-STRAINING AND THERMAL FORCES)
MEMBER LOAD
*
102 CON GX 2.6 0.3
102 CON GZ 2.6 0.3
101 CON GX 98.4 0.5
101 CON GZ 0.8 0.5
*
LOAD 14 LOADTYPE None TITLE FF (SURFACE FRICTION FORCES)
LOAD 15 LOADTYPE None TITLE AF (ANCHOR FORCES)
*
*
LOAD 16 LOADTYPE None TITLE HS (EARTH PRESSURE
LOAD 17 LOADTYPE None TITLE HW (WATER PRESSURE)
LOAD 18 LOADTYPE None TITLE R (RAIN LOAD)
LOAD 19 LOADTYPE None TITLE VH (VEHICLE LOAD)
LOAD 20 LOADTYPE None TITLE C (CRANE LOAD)
*****
*****LOADING COMBINATION
*****
*****Operating Condition
LOAD COMB 101 DS + DO + L + TF + AF + FF
4 1.0 6 1.0 8 1.0 13 1.0 15 1.0 14 1.0
*****Operating + Wind
LOAD COMB 102 0.6 (DS + DO + WX) + AF + TF + FF
4 0.6 6 0.6 10 0.6 15 1.0 13 1.0 14 1.0
LOAD COMB 103 0.6 (DS + DO + WZ) + AF + TF + FF
4 0.6 6 0.6 11 0.6 15 1.0 13 1.0 14 1.0
LOAD COMB 104 0.6 (DS + DO - WX) + AF + TF + FF
4 0.6 6 0.6 10 -0.6 15 1.0 13 1.0 14 1.0
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 155 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
LOAD COMB 105 0.6 (DS + DO - WZ) + AF + TF + FF
4 0.6 6 0.6 11 -0.6 15 1.0 13 1.0 14 1.0
LOAD COMB 106 DS + DO + 0.75 L + AF + TF + 0.45 WX
4 1.0 6 1.0 8 0.75 15 1.0 10 0.45 13 1.0
LOAD COMB 107 DS + DO + 0.75 L + AF + TF + 0.45 WZ
4 1.0 6 1.0 8 0.75 15 1.0 11 0.45 13 1.0
LOAD COMB 108 DS + DO + 0.75 L + AF + TF - 0.45 WX
4 1.0 6 1.0 8 0.75 15 1.0 10 -0.45 13 1.0
LOAD COMB 109 DS + DO + 0.75 L + AF + TF - 0.45 WZ
4 1.0 6 1.0 8 0.75 15 1.0 11 -0.45 13 1.0
LOAD COMB 110 DS + DO + AF + TF + 0.6 WX
4 1.0 6 1.0 15 1.0 10 0.6 13 1.0
LOAD COMB 111 DS + DO + AF + TF + 0.6 WZ
4 1.0 6 1.0 15 1.0 11 0.6 13 1.0
LOAD COMB 112 DS + DO + AF + TF - 0.6 WX
4 1.0 6 1.0 15 1.0 10 -0.6 13 1.0
LOAD COMB 113 DS + DO + AF + TF - 0.6 WZ
4 1.0 6 1.0 15 1.0 11 -0.6 13 1.0
******Operating + Earthquake
LOAD COMB 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
4 0.6 6 0.6 1 0.7 2 0.21 3 0.111 15 1.0 13 1.0
LOAD COMB 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z
4 0.6 6 0.6 2 0.7 1 0.21 3 0.111 15 1.0 13 1.0
LOAD COMB 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X
4 0.6 6 0.6 1 -0.7 2 0.21 3 0.111 15 1.0 13 1.0
LOAD COMB 117 0.6 (DS + DO) + AF + TF - 0.7 EO-Z
4 0.6 6 0.6 2 -0.7 1 0.21 3 0.111 15 1.0 13 1.0
*
LOAD COMB 118 DS + DO + AF + TF + 0.75 L + 0.525 EO-X
4 1.0 6 1.0 15 1.0 1 0.525 2 0.158 3 0.111 13 1.0 8 0.75
LOAD COMB 119 DS + DO + AF + TF + 0.75 L + 0.525 EO-Z
4 1.0 6 1.0 15 1.0 2 0.525 1 0.158 3 0.111 13 1.0 8 0.75
LOAD COMB 120 DS + DO + AF + TF + 0.75 L - 0.525 EO-X
4 1.0 6 1.0 15 1.0 1 -0.525 2 0.158 3 0.111 13 1.0 8 0.75
LOAD COMB 121 DS + DO + AF + TF + 0.75 L - 0.525 EO-Z
4 1.0 6 1.0 15 1.0 2 -0.525 1 0.158 3 0.111 13 1.0 8 0.75
*
LOAD COMB 122 DS + DO + AF + TF + 0.7 EO-X
4 1.0 6 1.0 15 1.0 1 0.7 2 0.21 3 0.111 13 1.0
LOAD COMB 123 DS + DO + AF + TF + 0.7 EO-Z
4 1.0 6 1.0 15 1.0 2 0.7 1 0.21 3 0.111 13 1.0
LOAD COMB 124 DS + DO + AF + TF - 0.7 EO-X
4 1.0 6 1.0 15 1.0 1 -0.7 2 0.21 3 0.111 13 1.0
LOAD COMB 125 DS + DO + AF + TF - 0.7 EO-Z
4 1.0 6 1.0 15 1.0 2 -0.7 1 0.21 3 0.111 13 1.0
******Erection + Wind
LOAD COMB 126 DS + DE + 0.6 WX
4 1.0 5 1.0 10 0.6
LOAD COMB 127 DS + DE + 0.6 WZ
4 1.0 5 1.0 11 0.6
LOAD COMB 128 DS + DE - 0.6 WX
4 1.0 5 1.0 10 -0.6
LOAD COMB 129 DS + DE - 0.6 WZ
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 156 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
4 1.0 5 1.0 11 -0.6
******Test
LOAD COMB 130 DS + DT + L
4 1.0 7 1.0 8 1.0
LOAD COMB 131 DS + DT + 0.6 WX
4 1.0 7 1.0 10 0.6
LOAD COMB 132 DS + DT + 0.6 WZ
4 1.0 7 1.0 11 0.6
LOAD COMB 133 DS + DT - 0.6 WX
4 1.0 7 1.0 10 -0.6
LOAD COMB 134 DS + DT - 0.6 WZ
4 1.0 7 1.0 11 -0.6
*
*
PERFORM ANALYSIS
LOAD LIST 101 TO 134
PRINT STORY DRIFT
*
PARAMETER 1
CODE AISC
FYLD 2.53107e+007 ALL
FU 4.21844e+007 ALL
DJ1 1 ALL
DJ2 2 ALL
DFF 240 ALL
TRACK 1 ALL
RATIO 1 ALL
CHECK CODE ALL
FINISH
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 157 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

APPENDIX D

PIPE SLEEPER TYPE


Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 158 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

D1. Pipe Sleeper (SPS-PSL-ARR-01)


D1.1 Dimension and Size
Neutral Axis
(x=0, y=0) pipe i
flow
LP direction
xi
A

BF TP
HP c.o.g of Pedestal y
c.o.g
z
x
Footing Foundation LF
x A

Pedestal Dimension Footing Dimension


Height of pedestal fr ground, HT = 0.50 m Width of footing, BF = 1.00 m
Thickness of pedestal, TP = 0.30 m Dimension, B1 = 0.50 m
Height of pedestal, HP = 1.70 m ### Dimension, B2 = 0.50 m
Length of pedestal, LP
0B = 2.40 m Thickness of footing, TF = 0.30 m
Depth of footing, DF = 1.50 m
Length of Footing, LF = 2.40 m
Area of Footing, AF = 2.40 m2

Pedestal C.L
Neutral Axis
TP

HT
HP

DF z
TF

y
B1 B2
BF

Section A-A

*Foundation plan and section, dimension in meter, not scaled (for illustration only)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 159 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

D1.2 Loading
Structural Dead Load (Ds)
Weight of footing = 2.4*0.3*2.4 = 1.73 ton
Weight of pedestal = 1.7*2.4*0.3*2.4 = 2.94 ton
Weight of embedded plate = 2.4*0.3*0.01*7.85 = 0.06 ton
Weight of soil (left side of pedestal) = (1.5-0.3)*(0.5-0.15)*2.4*1.8 = 1.81 ton
Weight of soil (right side of pedestal) = (1.5-0.3)*(0.5-0.15)*2.4*1.8 = 1.81 ton +
8.35 ton

Moment due to Dead Load (Mx) = -2.9376*(0.5-0.5)-(1.81*(0.5-(0.5- = 0.00 ton.m


0.15)/2))+1.81*(0.5-(0.5-0.15)/2) (+ = clockwise)
(- = counterclockwise)

Equipment Empty Dead Load (De)


qLpipe Lz De xi Myi
Pipeline
lb/ft kg/m m kg m kg.m
Pipe 6" 18.82 28.25 6.00 169.47 1.00 169.47
Pipe 6" 18.82 28.25 6.00 169.47 -0.40 -67.79
Pipe 6" 18.82 28.25 6.00 169.47 -1.00 -169.47
Total 508.41 -67.79

Equipment Operating Dead Load (Do)


Pipe loading data for operating condition is taken from node 1160, 1310, and 1460 which have the
largest load for this pipe sleeper type.
Do xi Myi
Pipeline Reference
kg m kg.m
Pipe 6" 104.90 1.00 104.90
BLA-FTP-P-RE-00-003 - Pipe Stress
Pipe 6" 203.00 -0.40 -81.20
Analysis Report Alur Rambong
Pipe 6" 185.80 -1.00 -185.80
Total 493.70 -162.10

Equipment Test Dead Load (Dt)


Pipe loading data for test condition is taken from node 1160, 1310, and 1460 which have the largest
load for this pipe sleeper type.
Dt xi Myi
Pipeline Reference
kg m kg.m
Pipe 6" 161.50 1.00 161.50
BLA-FTP-P-RE-00-003 - Pipe Stress
Pipe 6" 289.20 -0.40 -115.68
Analysis Report Alur Rambong
Pipe 6" 267.10 -1.00 -267.10
Total 717.80 -221.28

Thermal Forces (Tf)


Pipe loading data for thermal condition is taken from node 1160, 1310, and 1460 which have the
largest load for this pipe sleeper type.
Fyi Fxi
Pipeline Reference
(kg) (kg)
Pipe 6" BLA-FTP-P-RE-00-003 - 0.00 71.60
Pipe 6" Pipe Stress Analysis 0.00 376.00
Pipe 6" Report Alur Rambong 0.00 154.20
Total 0.00 601.80
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 160 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Wind Load (W)


Velocity Pressure, qz = 0.613*Kz*Kzt*Kd*V2*I
= 70.56 kg/m2

Wind Force, W = qz G C A

Dia. Lz
Pipeline
mm m
Pipe 6" 152.40 6.00
Pipe 6" 152.40 6.00
Pipe 6" 152.40 6.00

qz = 692.16 N/m2
h tributary = 0.39 m h tributary = Max dia. of pipe + 10% of Pedestal Length
A tributary = 2.35 m2 A tributary = h tributary x Pipe length
Cf = 0.60
Fwx Mwy Fwy Mwx
Element
(kN) (kN.m) (kN) (kN.m)
Pipe 0.831 1.413 0.000 0.000
Pedestal 0.005 0.005 0.043 0.037
Total 0.837 1.417 0.043 0.037

Summary of the reaction on the top of footing due to wind load is listed below :
Wind Load, Fwx = 0.085 Ton
Wind Moment, Mwy = 0.144 Ton.m
Wind Load, Fwy = 0.004 Ton
Wind Moment, Mwx = 0.004 Ton.m

Seismic Load (E)


3/4
T = Ct (hn)
Where :
Ct = 0.0853 (for steel moment-resisting frames)
= 0.0731 (for concrete moment-resisting frames)
= 0.0488 (for all other building)

T = 0.029 s

Base shear from the structure may be found by using this formula :
Cv I
V = W
R T

0,54 x 1,25
V = W = 5.169 W
4,5 x 0,029
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 161 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Shall not be more than :


2.5 C a I
V = W
R

2.5 x 0,36 x 1,25


V = W
4.50
= 0.250 W
And not less than :
V = 0.11 Ca I W

V = 0.11 x 0,36 x 1,25 x W


= 0.050 W

Base Shear Used: V = 0.250 W

Dia. y c.o.g Operating Fp Mp


Pipeline
mm (m) Load (kg) (Ton) (Ton.m)
Pipe 6" 152.40 1.70 104.90 0.03 0.04
Pipe 6" 152.40 1.70 203.00 0.05 0.09
Pipe 6" 152.40 1.70 185.80 0.05 0.08
Total 0.12 0.21

Summary of the reaction on the top of footing due to seismic load is listed below :
Horizontal seismic force, Vs = 0.12 Ton
Total moment, Ms = 0.21 Ton.m

Load Summary and Combination


Base on load calculation for Foundation above, load summary and load combination summary for
allowable stress and ultimate strength design shall be as follows :

Summary of Design Load at Top of Footing

FX FY P MX MY
Legend
(Ton) (Ton) (Ton) (Ton.m) (Ton.m)
Dead Load of Structure Proper Ds 0 0 6.62 0 0
Empty Load (Equipment) De 0 0 0.51 0 -0.07
Operating Load (Equipment) Do 0 0 0.49 0 -0.16
Test Load (Equipment) Dt 0 0 0.72 0 -0.22
Live Load L 0 0 0 0 0
Thermal Load Tf 0 0 0 0 0
Thermal Anchoring Load Af 0 0 0 0 0
Thermal Friction Load Ff 0.60 0.00 0 0.00 1.02
Soil Pressure Hs 0 0 0 0 0
Water pressure Hw 0 0 0 0 0
Wind Load W 0.09 0.00 0 0.00 0.14
Earthquake Load E 0.12 0.12 0 0.21 0.21
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 162 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Summary of Design Load at Footing bottom center

FX FY P MX MY
Legend
(Ton) (Ton) (Ton) (Ton.m) (Ton.m)
Dead Load of Structure Proper Ds 0 0 8.35 0 0
Empty Load (Equipment) De 0 0 0.51 0 -0.07
Operating Load (Equipment) Do 0 0 0.49 0 -0.16
Test Load (Equipment) Dt 0 0 0.72 0 -0.22
Live Load L 0 0 0 0 0
Thermal Load Tf 0.60 0.00 0 0.00 1.20
Thermal Anchoring Load Af 0 0 0 0 0
Thermal Friction Load Ff 0 0 0 0 0
Soil Pressure Hs 0 0 0 0 0
Water pressure Hw 0 0 0 0 0
Wind Load W 0.09 0.00 0 0.01 0.17
Earthquake Load E 0.12 0.12 0 0.25 0.25

Loading Combination - Unfactored Load Combination

Load Combination
Hw
De

Do
Ds

Hs
Dt

W
Af
Tf

Ff

E
L

101 Ds + Do + Tf + Af + Ff 1 1 1 1 1
102 0.6 (Ds + Do + W) + Af + Tf 0.6 0.6 1 1 0.6
103 Ds + Do + Af + Tf + 0.45W 1 1 1 1 0.45
104 Ds + Do + Af + Tf + 0.6W 1 1 1 1 0.6
105 0.6 (Ds + Do) + Af + Tf + 0.7Eo 0.6 0.6 1 1 0.7
106 Ds + Do + Af + Tf + 0.525Eo 1 1 1 1 0.53
107 Ds + Do + Af + Tf + 0.7Eo 1 1 1 1 0.7
108 Ds + De + 0.6W 1 1 0.6
109 Ds + Dt + 0.6W 1 1 0.6

Loading Combination - Factored Load Combination


Load Combination
Hw
De

Do
Ds

Hs
Dt

W
Af
Tf

Ff

E
L

201 1.4 (Ds + Do + Tf + Af + Ff) 1.4 1.4 1.4 1.4 1.4


202 1.2 (Ds + Do + Tf + Af + Ff) 1.2 1.2 1.2 1.2 1.2
203 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0W 0.9 0.9 1.2 1.2 1
204 1.2 (Ds + Do + Af + Tf) + 1.0W 1.2 1.2 1.2 1.2 1
205 0.9 (Ds + Do) + 1.0Ee 0.9 0.9 1
206 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0Eo 0.9 0.9 1.2 1.2 1
207 1.2 (Ds + Do + Af + Tf) + 1.0Eo 1.2 1.2 1.2 1.2 1
208 0.9 (Ds + De) + 1.0W 0.9 0.9 1
209 1.2 (Ds + Dt) + W 1.2 1.2 1
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 163 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Loading Combination
Unfactored Loading Combination
FX FY P MX MY
Load Combination
(Ton) (Ton) (Ton) (Ton.m) (Ton.m)
101 Ds + Do + Tf + Af + Ff 0.60 0.00 8.84 0.00 1.04
102 0.6 (Ds + Do + W) + Af + Tf 0.65 0.00 5.31 0.00 1.21
103 Ds + Do + Af + Tf + 0.45W 0.64 0.00 8.84 0.00 1.12
104 Ds + Do + Af + Tf + 0.6W 0.65 0.00 8.84 0.00 1.14
105 0.6 (Ds + Do) + Af + Tf + 0.7Eo 0.69 0.09 5.31 0.17 1.28
106 Ds + Do + Af + Tf + 0.525Eo 0.67 0.06 8.84 0.13 1.17
107 Ds + Do + Af + Tf + 0.7Eo 0.69 0.09 8.84 0.17 1.21
108 Ds + De + 0.6W 0.05 0.00 8.86 0.00 0.03
109 Ds + Dt + 0.6W 0.05 0.00 9.07 0.00 -0.12

Factored Loading Combination


FuX FuY Pu MuX MuY
Load Combination
(Ton) (Ton) (Ton) (Ton.m) (Ton.m)
201 1.4 (Ds + Do + Tf + Af + Ff) 0.84 0.00 12.38 0.00 1.46
202 1.2 (Ds + Do + Tf + Af + Ff) 0.72 0.00 10.61 0.00 1.25
203 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0W 0.81 0.00 7.96 0.01 1.47
204 1.2 (Ds + Do + Af + Tf) + 1.0W 0.81 0.00 10.61 0.01 1.42
205 0.9 (Ds + Do) + 1.0Ee 0.12 0.12 7.96 0.25 0.10
206 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0Eo 0.85 0.12 7.96 0.25 1.55
207 1.2 (Ds + Do + Af + Tf) + 1.0Eo 0.85 0.12 10.61 0.25 1.50
208 0.9 (Ds + De) + 1.0W 0.09 0.00 7.97 0.01 0.11
209 1.2 (Ds + Dt) + W 0.09 0.00 10.88 0.01 -0.10

D1.3 Check of Stability

Check Soil Pressure


Formula : ΣP/Ab ± My/Wy or ΣP/Ab ± Mx/Wx > Allow. Bearing Capacity x %90
LF = 2.40 m
BF = 1.00 m
Ab = L x B
= 2.4 x 1
2
= 2.40 m
2
Wx = 1/6 L x B
2
Wy = 1/6 B x L
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 164 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Wy ΣP My Q max Q min Q all.


Direction LC Check
(m3) (Ton) (ton.m) (ton/m2) (ton/m2) (ton/m2)
101 8.84 1.04 4.77 2.60 7.36 OK!
102 5.31 1.21 3.47 0.95 7.36 OK!
103 8.84 1.12 4.85 2.52 7.36 OK!
104 8.84 1.14 4.88 2.49 7.36 OK!
X - direction 105 0.96 5.31 1.28 3.54 0.88 7.36 OK!
106 8.84 1.17 4.91 2.47 7.36 OK!
107 8.84 1.21 4.95 2.42 7.36 OK!
108 8.86 0.03 3.73 3.66 7.36 OK!
109 9.07 -0.12 3.65 3.90 7.36 OK!

Wx ΣP Mx Q max Q min Q all.


Direction LC Check
(m3) (Ton) (ton.m) (ton/m2) (ton/m2) (ton/m2)
101 8.84 0.00 3.69 3.69 7.36 OK!
102 5.31 0.00 2.22 2.20 7.36 OK!
103 8.84 0.00 3.69 3.68 7.36 OK!
104 8.84 0.00 3.69 3.68 7.36 OK!
Y - direction 105 0.40 5.31 0.17 2.64 1.78 7.36 OK!
106 8.84 0.13 4.01 3.36 7.36 OK!
107 8.84 0.17 4.12 3.25 7.36 OK!
108 8.86 0.00 3.70 3.68 7.36 OK!
109 9.07 0.00 3.79 3.77 7.36 OK!

Check Sliding
Friction Coeff. Between Soil and Concrete, µ = 0.3
Formula : (µΣP/ΣFx or µΣP/ΣFy) > Allow. Safety Factor ---> OK!
ΣP Σ Fx
Direction LC µΣP
µΣ /Σ ΣFx Allow. Check
(ton) (ton)
101 8.84 0.60 4.41 1.50 OK!
102 5.31 0.65 2.44 1.50 OK!
103 8.84 0.64 4.14 1.50 OK!
104 8.84 0.65 4.06 1.50 OK!
X - direction 105 5.31 0.69 2.31 1.50 OK!
106 8.84 0.67 3.98 1.50 OK!
107 8.84 0.69 3.86 1.50 OK!
108 8.86 0.05 51.95 1.50 OK!
109 9.07 0.05 53.18 1.50 OK!

ΣP Σ Fy
Direction LC µΣP ΣFy
µΣ /Σ Allow. Check
(ton) (ton)
101 8.84 0.00 N.A 1.50 OK!
102 5.31 0.00 602.81 1.50 OK!
103 8.84 0.00 1339.58 1.50 OK!
104 8.84 0.00 1004.69 1.50 OK!
Y - direction 105 5.31 0.09 18.43 1.50 OK!
106 8.84 0.06 40.95 1.50 OK!
107 8.84 0.09 30.71 1.50 OK!
108 8.86 0.00 1006.36 1.50 OK!
109 9.07 0.00 1030.14 1.50 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 165 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Check Overturning
Formula :ΣPL/(2My) or ΣPB/(2Mx) > Allow. Safety Factor ---> OK!
ΣP Σ My Σ PL/2
Direction LC Σ PL/(2My) Allow. Check
(ton) (ton.m) (ton.m)
101 8.84 1.04 10.61 10.19 1.50 OK!
102 5.31 1.21 6.37 5.27 1.50 OK!
103 8.84 1.12 10.61 9.49 1.50 OK!
104 8.84 1.14 10.61 9.28 1.50 OK!
X - direction 105 5.31 1.28 6.37 4.98 1.50 OK!
106 8.84 1.17 10.61 9.06 1.50 OK!
107 8.84 1.21 10.61 8.74 1.50 OK!
108 8.86 0.03 10.63 310.35 1.50 OK!
109 9.07 -0.12 10.88 91.27 1.50 OK!

ΣP Σ Mx Σ PB/2
Direction LC Σ PB/(2Mx) Allow. Check
(ton) (ton.m) (ton.m)
101 8.84 0.00 4.42 N.A 1.50 OK!
102 5.31 0.00 2.65 873.64 1.50 OK!
103 8.84 0.00 4.42 1941.43 1.50 OK!
104 8.84 0.00 4.42 1456.07 1.50 OK!
Y - direction 105 5.31 0.17 2.65 15.36 1.50 OK!
106 8.84 0.13 4.42 34.12 1.50 OK!
107 8.84 0.17 4.42 25.59 1.50 OK!
108 8.86 0.00 4.43 1458.49 1.50 OK!
109 9.07 0.00 4.53 1492.96 1.50 OK!

D1.4 Design of Footing


Footing Reinforcement
ACI 318-05 Chapter 10.5.4 :
For structural slabs and footings of uniform thickness, As min in the direction of the span shall be same
as that required by :
Area of shrinkage and temperature reinforcement shall provide at least the following ratios of
reinforcement area to gross concrete area, but not less than 0.0014:
(a) Slabs where grade 280 or 350 deformed bars are used …..0.0020
(b) Slabs where grade 420 deformed bars or welded wire reinforcement are used ….. 0.0018
(c) Slabs where reinforcement with yield stress exceeding 420 MPa measured at a yield strain of
0.35 percent is used ….. 0.0018*420/fy

As req' = Max(As1, As2) As 1 = ρreq*b*d As 2 = ρmin*b*h


Rn = Mu/(φ∗b*d^2) ρreq = 0.85*fc'/fy*(1-(1-(2*Rn/(0.85*fc')))^0.5)

Concrete strength of footing, fc' = 24.8 MPa


Yield strength of rebar, fy = 390 MPa
Clear concrete cover, c = 75 mm
Reduction factor for bending, φ = 0.85
Using Bar = D 13 - 200 (X - direction) Max. Spacing OK!
D 13 - 200 (Y - direction) Max. Spacing OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 166 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction
Qu max Qu min Qu eq. Muy Rn
Direction LC ρ req. ρ min.
(ton/m2) (ton/m2) (ton/m2) (ton.m) (N/mm2)
201 6.68 3.64 5.16 0.00 0.000 0.0000 0.0018
202 5.72 3.12 4.42 0.00 0.000 0.0000 0.0018
203 4.85 1.79 3.32 0.00 0.000 0.0000 0.0018
204 5.90 2.94 4.42 0.00 0.000 0.0000 0.0018
X - direction 205 3.42 3.21 3.32 0.00 0.000 0.0000 0.0018
206 4.93 1.71 3.32 0.00 0.000 0.0000 0.0018
207 5.98 2.86 4.42 0.00 0.000 0.0000 0.0018
208 3.44 3.21 3.32 0.00 0.000 0.0000 0.0018
209 4.43 4.63 4.53 0.00 0.000 0.0000 0.0018

d Using As As req.
Direction LC Check
(mm) (mm2) (mm2)
201 205.5 796.39 253.382 OK!
202 205.5 796.39 253.382 OK!
203 205.5 796.39 253.382 OK!
204 205.5 796.39 253.382 OK!
X - direction 205 205.5 796.39 253.382 OK!
206 205.5 796.39 253.382 OK!
207 205.5 796.39 253.382 OK!
208 205.5 796.39 253.382 OK!
209 205.5 796.39 253.382 OK!

Y - Direction
Qu max Qu min Qu eq. Mux Rn
Direction LC ρ req. ρ min.
(ton/m2) (ton/m2) (ton/m2) (ton.m) (N/mm2)
201 5.16 5.16 5.16 0.76 0.076 0.0002 0.0018
202 4.42 4.42 4.42 0.65 0.065 0.0002 0.0018
203 3.33 3.30 3.32 0.49 0.049 0.0001 0.0018
204 4.43 4.41 4.42 0.65 0.065 0.0002 0.0018
Y - direction 205 3.93 2.70 3.32 0.49 0.049 0.0001 0.0018
206 3.93 2.70 3.32 0.49 0.049 0.0001 0.0018
207 5.04 3.81 4.42 0.65 0.065 0.0002 0.0018
208 3.33 3.31 3.32 0.49 0.049 0.0001 0.0018
209 4.55 4.52 4.53 0.67 0.067 0.0002 0.0018

d Using As As req.
Direction LC Check
(mm) (mm2) (mm2)
201 218.5 1725.52 687.49 OK!
202 218.5 1725.52 687.49 OK!
203 218.5 1725.52 687.49 OK!
204 218.5 1725.52 687.49 OK!
Y - direction 205 218.5 1725.52 687.49 OK!
206 218.5 1725.52 687.49 OK!
207 218.5 1725.52 687.49 OK!
208 218.5 1725.52 687.49 OK!
209 218.5 1725.52 687.49 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 167 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

One Way Shear


ACI 318-05 Chapter 11.3.1.1 :
For members subject to shear and flexure only :
Vc = 1/6*fc'^0.5*bw*d Vu < φ Vc ---> OK!
Vu = Qu eq. * Tributary Area
Reduction factor for shear, φ = 0.75

X - Direction
Qu eq. d Tributary Area Vu φ Vc
Direction LC Check
(ton/m2) (mm) (m2) (kN) (kN)
201 5.16 205.5 0.35 17.55 127.92 OK!
202 4.42 205.5 0.35 15.05 127.92 OK!
203 3.32 205.5 0.35 11.28 127.92 OK!
204 4.42 205.5 0.35 15.05 127.92 OK!
X - direction 205 3.32 205.5 0.35 11.28 127.92 OK!
206 3.32 205.5 0.35 11.28 127.92 OK!
207 4.42 205.5 0.35 15.05 127.92 OK!
208 3.32 205.5 0.35 11.30 127.92 OK!
209 4.53 205.5 0.35 15.43 127.92 OK!

Y - Direction
Qu eq. d Tributary Area Vu φ Vc
Direction LC Check
(ton/m2) (mm) (m2) (kN) (kN)
201 5.16 218.5 0.00 0.00 326.4 OK!
202 4.42 218.5 0.00 0.00 326.4 OK!
203 3.32 218.5 0.00 0.00 326.4 OK!
204 4.42 218.5 0.00 0.00 326.4 OK!
Y - direction 205 3.32 218.5 0.00 0.00 326.4 OK!
206 3.32 218.5 0.00 0.00 326.4 OK!
207 4.42 218.5 0.00 0.00 326.4 OK!
208 3.32 218.5 0.00 0.00 326.4 OK!
209 4.53 218.5 0.00 0.00 326.4 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 168 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Two Way Shear

ACI 318-05 Chapter 11.12.2.1 :


For nonprestressed slabs and footings, Vc shall be the smallest of (a), (b) and (c):

(a) Vc1 = 1/6*(1+2/β)*(fc')^0.5*bo*d


(b) Vc2 = (αs*d/bo+2)*((fc')^0.5*bo*d)/12
(c) Vc3 = ((fc')^0.5*bo*d)/3

Ratio of long side to short side of wall, β = 8.00


Perimeter of critical section for footing, bo = 6248 mm
Exterior pedestal, αs = 20 (For exterior / corner column)

X & Y - Direction

Qu eq. d ave Tributary Area Vu


Direction LC
(ton/m2) (mm) (m2) (kN)
201 5.16 212 1.06 53.78
202 4.42 212 1.06 46.10
203 3.32 212 1.06 34.58
204 4.42 212 1.06 46.10
X&Y-
205 3.32 212 1.06 34.58
direction
206 3.32 212 1.06 34.58
207 4.42 212 1.06 46.10
208 3.32 212 1.06 34.63
209 4.53 212 1.06 47.27

Vc1 Vc2 Vc3 φ Vc


Direction LC Check
(kN) (kN) (kN) (kN)
201 1374.2 1472.4 2198.8 1030.7 OK!
202 1374.2 1472.4 2198.8 1030.7 OK!
203 1374.2 1472.4 2198.8 1030.7 OK!
204 1374.2 1472.4 2198.8 1030.7 OK!
X&Y-
205 1374.2 1472.4 2198.8 1030.7 OK!
direction
206 1374.2 1472.4 2198.8 1030.7 OK!
207 1374.2 1472.4 2198.8 1030.7 OK!
208 1374.2 1472.4 2198.8 1030.7 OK!
209 1374.2 1472.4 2198.8 1030.7 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 169 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

D1.5 Design of Pedestal


c

A Horizontal reinforcement
x
Vertical reinforcement

Plan of Pipe Sleeper


y

tp

Section A

Length of pedestal, Lp = 2400 mm


Reduction factor, φ = 0.85
Vertical rebar dia. = 13 mm
Horizontal rebar dia. = 13 mm
Clear cover to vertical rebar, c = 50 mm
Distance of concrete cover to center of hor. rebar= 69.5 mm
Distance of concrete cover to center of vertical rebar = 56.5 mm
Thickness of wall, tp = 300 mm
Grade of Concrete = 25 MPa
Grade of Rebar = 390 MPa
Max. Ultimate Moment at top of footing, Mux = 2.42 kN.m

Calculate Rebar :
a. Support position moment rebar in Horizontal direction
ρ min = 0.0020 (ACI318-Chapter 14.3.3, Minimum ratio of horizontal reinforcement area
2
As = 1440 mm to gross concrete area= 0.0020 for db<=16mm, or 0.0025 for other bars)
2
Use D 13 - 200 As = 1726 mm OK!

b. Support position moment rebar in Vertical direction

Mn = 6837.5 N.m Mn = Mu/φ


Rn = 0.115 N/mm
2
Rn = Mn/(b.d2) = ρ.fy.(1-0.59.ρ.fy/fc')
ρ = 0.0003 ρreq = 0.85*fc'/fy*(1-(1-(2*Rn/(0.85*fc')))^0.5)
ρ min = 0.0050 (ACI318-Chapter 14.3.2, Minimum ratio of vertical reinforcement area to
gross concrete area= 0.0012 for db<=16mm, or 0.0015 for other bars)
(ACI318-Chapter 15.8.2.1, For cast-in-place columns and pedestals,
area of reinforcement across interface shall be not less than 0.005 Ag
2
As = 3600 mm
Use D 13 - 150 As = 4047 mm2 OK!
0B or 30 - D 13
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 170 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

D2. Pipe Sleeper (SPS-PSL-ARR-02A)


D2.1 Dimension and Size
Neutral Axis
(x=0, y=0) pipe i
flow
LP direction
xi
A

BF TP
HP c.o.g of Pedestal y
c.o.g
z
x
Footing Foundation LF
x A

Pedestal Dimension Footing Dimension


Height of pedestal fr ground, HT = 0.50 m Width of footing, BF = 1.40 m
Thickness of pedestal, TP = 0.30 m Dimension, B1 = 0.70 m
Height of pedestal, HP = 1.70 m ### Dimension, B2 = 0.70 m
Length of pedestal, LP
0B 2.00 m Thickness of footing, TF 0.30 m
= =
Depth of footing, DF = 1.50 m
Length of Footing, LF = 2.00 m
Area of Footing, AF = 2.80 m2

Pedestal C.L
Neutral Axis
TP

HT
HP

DF z
TF

y
B1 B2
BF

Section A-A

*Foundation plan and section, dimension in meter, not scaled (for illustration only)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 171 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

D2.2 Loading
Structural Dead Load (Ds)
Weight of footing = 2.8*0.3*2.4 = 2.02 ton
Weight of pedestal = 1.7*2*0.3*2.4 = 2.45 ton
Weight of embedded plate = 2*0.3*0.01*7.85 = 0.05 ton
Weight of soil (left side of pedestal) = (1.5-0.3)*(0.7-0.15)*2*1.8 = 2.38 ton
Weight of soil (right side of pedestal) = (1.5-0.3)*(0.7-0.15)*2*1.8 = 2.38 ton +
9.26 ton

Moment due to Dead Load (Mx) = -2.448*(0.7-0.7)-(2.38*(0.7-(0.7- = 0.00 ton.m


0.15)/2))+2.38*(0.7-(0.7-0.15)/2) (+ = clockwise)
(- = counterclockwise)

Equipment Empty Dead Load (De)


qLpipe Lz De xi Myi
Pipeline
lb/ft kg/m m kg m kg.m
Pipe 6" 18.82 28.25 6.00 169.47 0.70 118.63
Pipe 6" 18.82 28.25 6.00 169.47 -0.70 -118.63
Total 338.94 0.00

Equipment Operating Dead Load (Do)


Pipe loading data for operating condition is taken from node 1400 and 1550 which have the largest
load for this pipe sleeper type.
Do xi Myi
Pipeline Reference
kg m kg.m
Pipe 6" BLA-FTP-P-RE-00-003 - Pipe Stress 617.90 0.70 432.53
Pipe 6" Analysis Report Alur Rambong 1243.90 -0.70 -870.73
Total 1861.80 -438.20

Equipment Test Dead Load (Dt)


Pipe loading data for test condition is taken from node 1400 and 1550 which have the largest load for
this pipe sleeper type.
Dt xi Myi
Pipeline Reference
kg m kg.m
Pipe 6" BLA-FTP-P-RE-00-003 - Pipe Stress 658.50 0.70 460.95
Pipe 6" Analysis Report Alur Rambong 596.10 -0.70 -417.27
Total 1254.60 43.68

Thermal Forces (Tf)


Pipe loading data for thermal condition is taken from node 1400 and 1550 which have the largest
load for this pipe sleeper type.
Fyi Fxi
Pipeline Reference
(kg) (kg)
Pipe 6" BLA-FTP-P-RE-00-003 - 0.00 147.10
Pipe 6" Pipe Stress Analysis 0.00 764.80
Report Alur Rambong
Total 0.00 911.90
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 172 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Wind Load (W)


Velocity Pressure, qz = 0.613*Kz*Kzt*Kd*V2*I
= 70.56 kg/m2

Wind Force, W = qz G C A

Dia. Lz
Pipeline
mm m
Pipe 6" 152.40 6.00
Pipe 6" 152.40 6.00

qz = 692.16 N/m2
h tributary = 0.35 m h tributary = Max dia. of pipe + 10% of Pedestal Length
A tributary = 2.11 m2 A tributary = h tributary x Pipe length
Cf = 0.60
Fwx Mwy Fwy Mwx
Element
(kN) (kN.m) (kN) (kN.m)
Pipe 0.746 1.269 0.000 0.000
Pedestal 0.005 0.005 0.036 0.031
Total 0.752 1.273 0.036 0.031

Summary of the reaction on the top of footing due to wind load is listed below :
Wind Load, Fwx = 0.077 Ton
Wind Moment, Mwy = 0.130 Ton.m
Wind Load, Fwy = 0.004 Ton
Wind Moment, Mwx = 0.003 Ton.m

Seismic Load (E)


3/4
T = Ct (hn)
Where :
Ct = 0.0853 (for steel moment-resisting frames)
= 0.0731 (for concrete moment-resisting frames)
= 0.0488 (for all other building)

T = 0.029 s

Base shear from the structure may be found by using this formula :
Cv I
V = W
R T

0.54 x 1.25
V = W = 5.169 W
4.5 x 0.029
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 173 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Shall not be more than :


2.5 C a I
V = W
R

2.5 x 0.36 x 1.25


V = W
4.50
= 0.250 W
And not less than :
V = 0.11 Ca I W

V = 0.11 x 0.36 x 1.25 x W


= 0.050 W

Base Shear Used: V = 0.250 W

Dia. y c.o.g Operating Fp Mp


Pipeline
mm (m) Load (kg) (Ton) (Ton.m)
Pipe 6" 152.40 1.70 617.90 0.15 0.26
Pipe 6" 152.40 1.70 1243.90 0.31 0.53
Total 0.47 0.79

Summary of the reaction on the top of footing due to seismic load is listed below :
Horizontal seismic force, Vs = 0.47 Ton
Total moment, Ms = 0.79 Ton.m

Load Summary and Combination


Base on load calculation for Foundation above, load summary and load combination summary for
allowable stress and ultimate strength design shall be as follows :

Summary of Design Load at Top of Footing

FX FY P MX MY
Legend
(Ton) (Ton) (Ton) (Ton.m) (Ton.m)
Dead Load of Structure Proper Ds 0 0 7.25 0 0
Empty Load (Equipment) De 0 0 0.34 0 0.00
Operating Load (Equipment) Do 0 0 1.86 0 -0.44
Test Load (Equipment) Dt 0 0 1.25 0 0.04
Live Load L 0 0 0 0 0
Thermal Load Tf 0 0 0 0 0
Thermal Anchoring Load Af 0 0 0 0 0
Thermal Friction Load Ff 0.91 0.00 0 0.00 1.55
Soil Pressure Hs 0 0 0 0 0
Water pressure Hw 0 0 0 0 0
Wind Load W 0.08 0.00 0 0.00 0.13
Earthquake Load E 0.47 0.47 0 0.79 0.79
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 174 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Summary of Design Load at Footing bottom center

FX FY P MX MY
Legend
(Ton) (Ton) (Ton) (Ton.m) (Ton.m)
Dead Load of Structure Proper Ds 0 0 9.26 0 0
Empty Load (Equipment) De 0 0 0.34 0 0.00
Operating Load (Equipment) Do 0 0 1.86 0 -0.44
Test Load (Equipment) Dt 0 0 1.25 0 0.04
Live Load L 0 0 0 0 0
Thermal Load Tf 0.91 0.00 0 0.00 1.82
Thermal Anchoring Load Af 0 0 0 0 0
Thermal Friction Load Ff 0 0 0 0 0
Soil Pressure Hs 0 0 0 0 0
Water pressure Hw 0 0 0 0 0
Wind Load W 0.08 0.00 0 0.00 0.15
Earthquake Load E 0.47 0.47 0 0.93 0.93

Loading Combination - Unfactored Load Combination

Load Combination
Hw
De

Do
Ds

Hs
Dt

W
Af
Tf

Ff

E
L

101 Ds + Do + Tf + Af + Ff 1 1 1 1 1
102 0.6 (Ds + Do + W) + Af + Tf 0.6 0.6 1 1 0.6
103 Ds + Do + Af + Tf + 0.45W 1 1 1 1 0.45
104 Ds + Do + Af + Tf + 0.6W 1 1 1 1 0.6
105 0.6 (Ds + Do) + Af + Tf + 0.7Eo 0.6 0.6 1 1 0.7
106 Ds + Do + Af + Tf + 0.525Eo 1 1 1 1 0.53
107 Ds + Do + Af + Tf + 0.7Eo 1 1 1 1 0.7
108 Ds + De + 0.6W 1 1 0.6
109 Ds + Dt + 0.6W 1 1 0.6

Loading Combination - Factored Load Combination


Load Combination
Hw
De

Do
Ds

Hs
Dt

W
Af
Tf

Ff

E
L

201 1.4 (Ds + Do + Tf + Af + Ff) 1.4 1.4 1.4 1.4 1.4


202 1.2 (Ds + Do + Tf + Af + Ff) 1.2 1.2 1.2 1.2 1.2
203 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0W 0.9 0.9 1.2 1.2 1
204 1.2 (Ds + Do + Af + Tf) + 1.0W 1.2 1.2 1.2 1.2 1
205 0.9 (Ds + Do) + 1.0Ee 0.9 0.9 1
206 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0Eo 0.9 0.9 1.2 1.2 1
207 1.2 (Ds + Do + Af + Tf) + 1.0Eo 1.2 1.2 1.2 1.2 1
208 0.9 (Ds + De) + 1.0W 0.9 0.9 1
209 1.2 (Ds + Dt) + W 1.2 1.2 1
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 175 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Loading Combination
Unfactored Loading Combination
FX FY P MX MY
Load Combination
(Ton) (Ton) (Ton) (Ton.m) (Ton.m)
101 Ds + Do + Tf + Af + Ff 0.91 0.00 11.12 0.00 1.39
102 0.6 (Ds + Do + W) + Af + Tf 0.96 0.00 6.67 0.00 1.65
103 Ds + Do + Af + Tf + 0.45W 0.95 0.00 11.12 0.00 1.45
104 Ds + Do + Af + Tf + 0.6W 0.96 0.00 11.12 0.00 1.48
105 0.6 (Ds + Do) + Af + Tf + 0.7Eo 1.24 0.33 6.67 0.65 2.21
106 Ds + Do + Af + Tf + 0.525Eo 1.16 0.24 11.12 0.49 1.87
107 Ds + Do + Af + Tf + 0.7Eo 1.24 0.33 11.12 0.65 2.04
108 Ds + De + 0.6W 0.05 0.00 9.60 0.00 0.09
109 Ds + Dt + 0.6W 0.05 0.00 10.52 0.00 0.14

Factored Loading Combination


FuX FuY Pu MuX MuY
Load Combination
(Ton) (Ton) (Ton) (Ton.m) (Ton.m)
201 1.4 (Ds + Do + Tf + Af + Ff) 1.28 0.00 15.57 0.00 1.94
202 1.2 (Ds + Do + Tf + Af + Ff) 1.09 0.00 13.35 0.00 1.66
203 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0W 1.17 0.00 10.01 0.00 1.95
204 1.2 (Ds + Do + Af + Tf) + 1.0W 1.17 0.00 13.35 0.00 1.82
205 0.9 (Ds + Do) + 1.0Ee 0.47 0.47 10.01 0.93 0.54
206 0.9 (Ds + Do) + 1.2 (Af + Tf) + 1.0Eo 1.56 0.47 10.01 0.93 2.73
207 1.2 (Ds + Do + Af + Tf) + 1.0Eo 1.56 0.47 13.35 0.93 2.59
208 0.9 (Ds + De) + 1.0W 0.08 0.00 8.64 0.00 0.15
209 1.2 (Ds + Dt) + W 0.08 0.00 12.62 0.00 0.21

D2.3 Check of Stability

Check Soil Pressure


Formula : ΣP/Ab ± My/Wy or ΣP/Ab ± Mx/Wx > Allow. Bearing Capacity x %90
LF = 2.00 m
BF = 1.40 m
Ab = L x B
= 2 x 1.4
2
= 2.80 m
2
Wx = 1/6 L x B
2
Wy = 1/6 B x L
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 176 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Wy ΣP My Q max Q min Q all.


Direction LC Check
(m3) (Ton) (ton.m) (ton/m2) (ton/m2) (ton/m2)
101 11.12 1.39 5.46 2.49 7.36 OK!
102 6.67 1.65 4.15 0.61 7.36 OK!
103 11.12 1.45 5.53 2.41 7.36 OK!
104 11.12 1.48 5.56 2.39 7.36 OK!
X - direction 105 0.93 6.67 2.21 4.75 0.01 7.36 OK!
106 11.12 1.87 5.98 1.96 7.36 OK!
107 11.12 2.04 6.16 1.79 7.36 OK!
108 9.60 0.09 3.53 3.33 7.36 OK!
109 10.52 0.14 3.90 3.61 7.36 OK!

Wx ΣP Mx Q max Q min Q all.


Direction LC Check
(m3) (Ton) (ton.m) (ton/m2) (ton/m2) (ton/m2)
101 11.12 0.00 3.97 3.97 7.36 OK!
102 6.67 0.00 2.39 2.38 7.36 OK!
103 11.12 0.00 3.98 3.97 7.36 OK!
104 11.12 0.00 3.98 3.97 7.36 OK!
Y - direction 105 0.65 6.67 0.65 3.38 1.39 7.36 OK!
106 11.12 0.49 4.72 3.23 7.36 OK!
107 11.12 0.65 4.97 2.98 7.36 OK!
108 9.60 0.00 3.43 3.43 7.36 OK!
109 10.52 0.00 3.76 3.75 7.36 OK!

Check Sliding
Friction Coeff. Between Soil and Concrete, µ = 0.3
Formula : (µΣP/ΣFx or µΣP/ΣFy) > Allow. Safety Factor ---> OK!
ΣP Σ Fx
Direction LC µΣP
µΣ /Σ ΣFx Allow. Check
(ton) (ton)
101 11.12 0.91 3.66 1.50 OK!
102 6.67 0.96 2.09 1.50 OK!
103 11.12 0.95 3.53 1.50 OK!
104 11.12 0.96 3.48 1.50 OK!
X - direction 105 6.67 1.24 1.62 1.50 OK!
106 11.12 1.16 2.89 1.50 OK!
107 11.12 1.24 2.70 1.50 OK!
108 9.60 0.05 62.65 1.50 OK!
109 10.52 0.05 68.62 1.50 OK!

ΣP Σ Fy
Direction LC µΣP ΣFy
µΣ /Σ Allow. Check
(ton) (ton)
101 11.12 0.00 N.A 1.50 OK!
102 6.67 0.00 909.87 1.50 OK!
103 11.12 0.00 2021.94 1.50 OK!
104 11.12 0.00 1516.45 1.50 OK!
Y - direction 105 6.67 0.33 6.15 1.50 OK!
106 11.12 0.24 13.66 1.50 OK!
107 11.12 0.33 10.24 1.50 OK!
108 9.60 0.00 1308.87 1.50 OK!
109 10.52 0.00 1433.69 1.50 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 177 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Check Overturning
Formula :ΣPL/(2My) or ΣPB/(2Mx) > Allow. Safety Factor ---> OK!
ΣP Σ My Σ PL/2
Direction LC Σ PL/(2My) Allow. Check
(ton) (ton.m) (ton.m)
101 11.12 1.39 11.12 8.03 1.50 OK!
102 6.67 1.65 6.67 4.04 1.50 OK!
103 11.12 1.45 11.12 7.65 1.50 OK!
104 11.12 1.48 11.12 7.53 1.50 OK!
X - direction 105 6.67 2.21 6.67 3.02 1.50 OK!
106 11.12 1.87 11.12 5.94 1.50 OK!
107 11.12 2.04 11.12 5.46 1.50 OK!
108 9.60 0.09 9.60 104.73 1.50 OK!
109 10.52 0.14 10.52 77.70 1.50 OK!

ΣP Σ Mx Σ PB/2
Direction LC Σ PB/(2Mx) Allow. Check
(ton) (ton.m) (ton.m)
101 11.12 0.00 7.79 N.A 1.50 OK!
102 6.67 0.00 4.67 1846.12 1.50 OK!
103 11.12 0.00 7.79 4102.48 1.50 OK!
104 11.12 0.00 7.79 3076.86 1.50 OK!
Y - direction 105 6.67 0.65 4.67 7.17 1.50 OK!
106 11.12 0.49 7.79 15.93 1.50 OK!
107 11.12 0.65 7.79 11.95 1.50 OK!
108 9.60 0.00 6.72 2655.68 1.50 OK!
109 10.52 0.00 7.36 2908.93 1.50 OK!

D2.4 Design of Footing


Footing Reinforcement
ACI 318-05 Chapter 10.5.4 :
For structural slabs and footings of uniform thickness, As min in the direction of the span shall be same
as that required by :
Area of shrinkage and temperature reinforcement shall provide at least the following ratios of
reinforcement area to gross concrete area, but not less than 0.0014:
(a) Slabs where grade 280 or 350 deformed bars are used …..0.0020
(b) Slabs where grade 420 deformed bars or welded wire reinforcement are used ….. 0.0018
(c) Slabs where reinforcement with yield stress exceeding 420 MPa measured at a yield strain of
0.35 percent is used ….. 0.0018*420/fy

As req' = Max(As1, As2) As 1 = ρreq*b*d As 2 = ρmin*b*h


Rn = Mu/(φ∗b*d^2) ρreq = 0.85*fc'/fy*(1-(1-(2*Rn/(0.85*fc')))^0.5)

Concrete strength of footing, fc' = 24.8 MPa


Yield strength of rebar, fy = 390 MPa
Clear concrete cover, c = 75 mm
Reduction factor for bending, φ = 0.85
Using Bar = D 13 - 200 (X - direction) Max. Spacing OK!
D 13 - 200 (Y - direction) Max. Spacing OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 178 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

X - Direction
Qu max Qu min Qu eq. Muy Rn
Direction LC ρ req. ρ min.
(ton/m2) (ton/m2) (ton/m2) (ton.m) (N/mm2)
201 7.64 3.48 5.56 0.00 0.000 0.0000 0.0018
202 6.55 2.99 4.77 0.00 0.000 0.0000 0.0018
203 5.66 1.49 3.58 0.00 0.000 0.0000 0.0018
204 6.71 2.82 4.77 0.00 0.000 0.0000 0.0018
X - direction 205 4.15 3.00 3.58 0.00 0.000 0.0000 0.0018
206 6.50 0.66 3.58 0.00 0.000 0.0000 0.0018
207 7.55 1.99 4.77 0.00 0.000 0.0000 0.0018
208 3.25 2.92 3.09 0.00 0.000 0.0000 0.0018
209 4.73 4.29 4.51 0.00 0.000 0.0000 0.0018

d Using As As req.
Direction LC Check
(mm) (mm2) (mm2)
201 205.5 1061.86 354.734 OK!
202 205.5 1061.86 354.734 OK!
203 205.5 1061.86 354.734 OK!
204 205.5 1061.86 354.734 OK!
X - direction 205 205.5 1061.86 354.734 OK!
206 205.5 1061.86 354.734 OK!
207 205.5 1061.86 354.734 OK!
208 205.5 1061.86 354.734 OK!
209 205.5 1061.86 354.734 OK!

Y - Direction
Qu max Qu min Qu eq. Mux Rn
Direction LC ρ req. ρ min.
(ton/m2) (ton/m2) (ton/m2) (ton.m) (N/mm2)
201 5.56 5.56 5.56 1.68 0.203 0.0005 0.0018
202 4.77 4.77 4.77 1.44 0.174 0.0004 0.0018
203 3.58 3.57 3.58 1.08 0.131 0.0003 0.0018
204 4.77 4.76 4.77 1.44 0.174 0.0004 0.0018
Y - direction 205 5.00 2.15 3.58 1.08 0.131 0.0003 0.0018
206 5.00 2.15 3.58 1.08 0.131 0.0003 0.0018
207 6.19 3.34 4.77 1.44 0.174 0.0004 0.0018
208 3.09 3.08 3.09 0.93 0.113 0.0003 0.0018
209 4.51 4.50 4.51 1.36 0.165 0.0004 0.0018

d Using As As req.
Direction LC Check
(mm) (mm2) (mm2)
201 218.5 1460.06 572.91 OK!
202 218.5 1460.06 572.91 OK!
203 218.5 1460.06 572.91 OK!
204 218.5 1460.06 572.91 OK!
Y - direction 205 218.5 1460.06 572.91 OK!
206 218.5 1460.06 572.91 OK!
207 218.5 1460.06 572.91 OK!
208 218.5 1460.06 572.91 OK!
209 218.5 1460.06 572.91 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 179 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

One Way Shear


ACI 318-05 Chapter 11.3.1.1 :
For members subject to shear and flexure only :
Vc = 1/6*fc'^0.5*bw*d Vu < φ Vc ---> OK!
Vu = Qu eq. * Tributary Area
Reduction factor for shear, φ = 0.75

X - Direction
Qu eq. d Tributary Area Vu φ Vc
Direction LC Check
(ton/m2) (mm) (m2) (kN) (kN)
201 5.56 205.5 0.69 37.60 179.09 OK!
202 4.77 205.5 0.69 32.23 179.09 OK!
203 3.58 205.5 0.69 24.17 179.09 OK!
204 4.77 205.5 0.69 32.23 179.09 OK!
X - direction 205 3.58 205.5 0.69 24.17 179.09 OK!
206 3.58 205.5 0.69 24.17 179.09 OK!
207 4.77 205.5 0.69 32.23 179.09 OK!
208 3.09 205.5 0.69 20.86 179.09 OK!
209 4.51 205.5 0.69 30.47 179.09 OK!

Y - Direction
Qu eq. d Tributary Area Vu φ Vc
Direction LC Check
(ton/m2) (mm) (m2) (kN) (kN)
201 5.56 218.5 0.00 0.00 272.0 OK!
202 4.77 218.5 0.00 0.00 272.0 OK!
203 3.58 218.5 0.00 0.00 272.0 OK!
204 4.77 218.5 0.00 0.00 272.0 OK!
Y - direction 205 3.58 218.5 0.00 0.00 272.0 OK!
206 3.58 218.5 0.00 0.00 272.0 OK!
207 4.77 218.5 0.00 0.00 272.0 OK!
208 3.09 218.5 0.00 0.00 272.0 OK!
209 4.51 218.5 0.00 0.00 272.0 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 180 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Two Way Shear

ACI 318-05 Chapter 11.12.2.1 :


For nonprestressed slabs and footings, Vc shall be the smallest of (a), (b) and (c):

(a) Vc1 = 1/6*(1+2/β)*(fc')^0.5*bo*d


(b) Vc2 = (αs*d/bo+2)*((fc')^0.5*bo*d)/12
(c) Vc3 = ((fc')^0.5*bo*d)/3

Ratio of long side to short side of wall, β = 6.67


Perimeter of critical section for footing, bo = 5448 mm
Exterior pedestal, αs = 20 (For exterior / corner column)

X & Y - Direction

Qu eq. d ave Tributary Area Vu


Direction LC
(ton/m2) (mm) (m2) (kN)
201 5.56 212 1.67 90.99
202 4.77 212 1.67 77.99
203 3.58 212 1.67 58.49
204 4.77 212 1.67 77.99
X&Y-
205 3.58 212 1.67 58.49
direction
206 3.58 212 1.67 58.49
207 4.77 212 1.67 77.99
208 3.09 212 1.67 50.49
209 4.51 212 1.67 73.73

Vc1 Vc2 Vc3 φ Vc


Direction LC Check
(kN) (kN) (kN) (kN)
201 1246.2 1331.7 1917.2 934.7 OK!
202 1246.2 1331.7 1917.2 934.7 OK!
203 1246.2 1331.7 1917.2 934.7 OK!
204 1246.2 1331.7 1917.2 934.7 OK!
X&Y-
205 1246.2 1331.7 1917.2 934.7 OK!
direction
206 1246.2 1331.7 1917.2 934.7 OK!
207 1246.2 1331.7 1917.2 934.7 OK!
208 1246.2 1331.7 1917.2 934.7 OK!
209 1246.2 1331.7 1917.2 934.7 OK!
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 181 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

D2.5 Design of Pedestal


c

A Horizontal reinforcement
x
Vertical reinforcement

Plan of Pipe Sleeper


y

tp

Section A

Length of pedestal, Lp = 2000 mm


Reduction factor, φ = 0.85
Vertical rebar dia. = 13 mm
Horizontal rebar dia. = 13 mm
Clear cover to vertical rebar, c = 50 mm
Distance of concrete cover to center of hor. rebar= 69.5 mm
Distance of concrete cover to center of vertical rebar = 56.5 mm
Thickness of wall, tp = 300 mm
Grade of Concrete = 25 MPa
Grade of Rebar = 390 MPa
Max. Ultimate Moment at top of footing, Mux = 9.13 kN.m

Calculate Rebar :
a. Support position moment rebar in Horizontal direction
ρ min = 0.0020 (ACI318-Chapter 14.3.3, Minimum ratio of horizontal reinforcement area
2
As = 1200 mm to gross concrete area= 0.0020 for db<=16mm, or 0.0025 for other bars)
2
Use D 13 - 200 As = 1460 mm OK!

b. Support position moment rebar in Vertical direction

Mn = 21487 N.m Mn = Mu/φ


Rn = 0.362 N/mm
2
Rn = Mn/(b.d2) = ρ.fy.(1-0.59.ρ.fy/fc')
ρ = 0.0009 ρreq = 0.85*fc'/fy*(1-(1-(2*Rn/(0.85*fc')))^0.5)
ρ min = 0.0050 (ACI318-Chapter 14.3.2, Minimum ratio of vertical reinforcement area to
gross concrete area= 0.0012 for db<=16mm, or 0.0015 for other bars)
(ACI318-Chapter 15.8.2.1, For cast-in-place columns and pedestals,
area of reinforcement across interface shall be not less than 0.005 Ag
2
As = 3000 mm
Use D 13 - 150 As = 3340 mm2 OK!
0B or 26 - D 13
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 182 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

APPENDIX E

STRESS ANALYSIS REPORT


Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 183 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 184 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Pipe Sleeper Max. Load


0B SPS-PSL-ARR-02
Pipe Sleeper Max. Load
SPS-PSL-ARR-01

T-Post Max. Load


SPS-TP2-ARR-01
(Civil Scope)

Conc. Trench Max. Load


SPS-CT-ARR-01

T-Post Max. Load


TP-F-P04-05-05
(Piping Scope)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 185 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

T-Post Max. Load


SPS-TP1-ARR-02
(Civil Scope)

T-Post Max. Load


SPS-TP2-ARR-01
(Civil Scope)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 186 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

T-Post Max. Load


TP-F-P04-05-05
(Piping Scope)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 187 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Conc. Trench Max. Load


SPS-CT-ARR-01
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 188 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

T-Post Max. Load


SPS-TP2-ARR-01
(Civil Scope)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 189 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

T-Post Max. Load


SPS-TP2-ARR-01
(Civil Scope)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 190 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Pipe Sleeper Max. Load


SPS-PSL-ARR-01

Pipe Sleeper Max. Load


SPS-PSL-ARR-01
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 191 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Pipe Sleeper Max. Load


SPS-PSL-ARR-01

Pipe Sleeper Max. Load


SPS-PSL-ARR-03

Pipe Sleeper Max. Load


SPS-PSL-ARR-01

Pipe Sleeper Max. Load


SPS-PSL-ARR-03
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 192 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

APPENDIX F

PIPE SUPPORT LOCATION


Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 193 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

T-Post Max. Load


TP-F-P04-05-05
(Piping Scope)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 194 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

Conc. Trench Max. Load


SPS-CT-ARR-01
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 195 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

0B

Pipe Sleeper Max. Load


SPS-PSL-ARR-02

Pipe Sleeper Max. Load


SPS-PSL-ARR-01

T-Post Max. Load


SPS-TP2-ARR-01
(Civil Scope)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 196 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

T-Post Max. Load


SPS-TP1-ARR-02
(Civil Scope)
Doc. No.
BLOCK A GAS DEVELOPMENT PROJECT
BLA-FTP-C-CC-00-012
CALCULATION FOR MISCELLANEOUS PIPE Rev. 0B Page : 197 of 197
SUPPORT AND PIPE SLEEPER AT ALUR
RAMBONG CLUSTER AR-1A Date : 29-SEP-17

APPENDIX G

STAAD OUTPUT FILE


Wednesday, July 12, 2017, 04:16 PM
PAGE NO. 1

****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 04 *
* Proprietary Program of *
* Research Engineers, Intl. *
* Date= JUL 7, 2017 *
* Time= 11: 8:16 *
* *
* USER ID: - *
****************************************************

1. STAAD SPACE
INPUT FILE: SPS-TP2-ARR-01.STD
2. START JOB INFORMATION
3. ENGINEER DATE 06-JUL-17
4. JOB NAME CALCULATION FOR MISCELLANEOUS PIPE SUPPORT AND SLEEPER ARR-1A
5. JOB CLIENT PT. MEDCO ENERGI EP MALAKA
6. JOB NO BLA-FTP-C-CC-00-012
7. JOB REV 0A
8. CHECKER NAME KHB/BD
9. APPROVED NAME BHK
10. CHECKER DATE 06-JUL-17
11. APPROVED DATE 06-JUL-17
12. ENGINEER NAME RN/LG
13. JOB PART T-POST TYPE
14. JOB COMMENT SPS-TP2-ARR-01
15. END JOB INFORMATION
16. INPUT WIDTH 79
17. UNIT METER KG
18. JOINT COORDINATES
19. 1 0 0.3 0; 2 0 2.5 -0.6; 3 0 2.5 0; 4 0 2.5 0.6; 5 0 4 -0.6; 6 0 4 0
20. MEMBER INCIDENCES
21. 100 1 3; 101 3 6; 200 2 3; 201 3 4; 202 5 6
22. SUPPORTS
23. 1 FIXED
24. DEFINE MATERIAL START
25. ISOTROPIC STEEL
26. E 2.09042E+010
27. POISSON 0.3
28. DENSITY 7833.41
29. ALPHA 1.2E-005
30. DAMP 0.03
31. END DEFINE MATERIAL
32. MEMBER PROPERTY JAPANESE
33. 200 TO 202 TABLE ST H200X200X8
34. 100 101 TABLE ST H250X250X9
35. ***********SEISMIC DEFINITION***********
36. CONSTANTS
37. BETA 90 MEMB 100 101
38. MATERIAL STEEL ALL
39. *
40. DEFINE UBC LOAD

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 1 of 12


Wednesday, July 12, 2017, 04:16 PM
STAAD SPACE -- PAGE NO. 2

41. ZONE 0.3 I 1.25 RWX 4.5 RWZ 4.5 STYP 4 CT 0.0853 NA 1 NV 1
42. SELFWEIGHT 1.12
43. MEMBER WEIGHT
44. *
45. 202 CON 157.3
46. *
47. 200 CON 221.9
48. *
49. 201 CON 223.6
50. *
51. **********LOADING CASES**********
52. LOAD 1 LOADTYPE SEISMIC TITLE EX (EARTHQUAKE LOAD X-DIR)
53. UBC LOAD X 1
54. PERFORM ANALYSIS

P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 6/ 5/ 1

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER

ORIGINAL/FINAL BAND-WIDTH= 3/ 3/ 24 DOF


TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 30
SIZE OF STIFFNESS MATRIX = 1 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 12.0/ 90717.3 MB

***********************************************************
* *
* X DIRECTION : Ta = 0.228 Tb = 0.356 Tuser = 0.000 *
* T = 0.228, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.2500 x 999.92 = 249.98 KG *
* *
***********************************************************

55. CHANGE
56. LOAD 2 LOADTYPE SEISMIC TITLE EZ (EARTHQUAKE LOAD Z-DIR)
57. UBC LOAD Z 1
58. PERFORM ANALYSIS

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 2 of 12


Wednesday, July 12, 2017, 04:16 PM
STAAD SPACE -- PAGE NO. 3

***********************************************************
* *
* Z DIRECTION : Ta = 0.228 Tb = 0.109 Tuser = 0.000 *
* T = 0.109, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.2500 x 999.92 = 249.98 KG *
* *
***********************************************************

59. CHANGE
60. LOAD 3 LOADTYPE SEISMIC TITLE EY (EARTHQUAKE LOAD Y-DIR)
61. LOAD 4 LOADTYPE DEAD TITLE DS (DEAD LOAD STRUCTURE)
62. SELFWEIGHT Y -1.12 LIST 100 101 200 TO 202
63. LOAD 5 LOADTYPE DEAD TITLE DE (EQUIPMENT EMPTY DEAD LOAD)
64. MEMBER LOAD
65. 202 CON GY -111.8
66. 200 CON GY -111.8
67. 201 CON GY -111.8
68. LOAD 6 LOADTYPE DEAD TITLE DO (EQUIPMENT OPERATING DEAD LOAD)
69. MEMBER LOAD
70. *
71. 202 CON GY -157.3
72. *
73. 200 CON GY -221.9
74. *
75. 201 CON GY -223.6
76. *
77. LOAD 7 LOADTYPE DEAD TITLE DT (EQUIPMENT TEST DEAD LOAD)
78. MEMBER LOAD
79. *
80. 202 CON GY -185.8
81. *
82. 200 CON GY -185.5
83. *
84. 201 CON GY -226.9
85. *
86. LOAD 8 LOADTYPE LIVE TITLE L (LIVE LOAD)
87. LOAD 9 LOADTYPE NONE TITLE I (HANDLING DEVICE/IMPACT LOAD)
88. LOAD 10 LOADTYPE WIND TITLE WX (WIND LOAD X-DIR)
89. MEMBER LOAD
90. 100 101 200 TO 202 UNI GX 7.2
91. MEMBER LOAD
92. 202 CON GX 0.798
93. 200 CON GX 0.798
94. 201 CON GX 0.798
95. LOAD 11 LOADTYPE WIND TITLE WZ (WIND LOAD Z-DIR)
96. MEMBER LOAD
97. 100 101 UNI GZ 7.2
98. MEMBER LOAD

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 3 of 12


Wednesday, July 12, 2017, 04:16 PM
STAAD SPACE -- PAGE NO. 4

99. 202 CON GZ 24.18


100. 200 CON GZ 24.18
101. 201 CON GZ 24.18
102. LOAD 12 LOADTYPE NONE TITLE J (VIBRATION LOAD)
103. LOAD 13 LOADTYPE NONE TITLE TF (SELF-STRAINING AND THERMAL FORCES)
104. MEMBER LOAD
105. 202 CON GZ 869.9
106. *
107. 200 CON GZ 338.2
108. *
109. 201 CON GZ 26.8
110. *
111. LOAD 14 LOADTYPE NONE TITLE FF (SURFACE FRICTION FORCES)
112. LOAD 15 LOADTYPE NONE TITLE AF (ANCHOR FORCES)
113. LOAD 16 LOADTYPE NONE TITLE HS (EARTH PRESSURE
114. LOAD 17 LOADTYPE NONE TITLE HW (WATER PRESSURE)
115. LOAD 18 LOADTYPE NONE TITLE R (RAIN LOAD)
116. LOAD 19 LOADTYPE NONE TITLE VH (VEHICLE LOAD)
117. LOAD 20 LOADTYPE NONE TITLE C (CRANE LOAD)
118. *****
119. *****LOADING COMBINATION
120. *****
121. *****OPERATING CONDITION
122. LOAD COMB 101 DS + DO + L + TF + AF + FF
123. 4 1.0 6 1.0 8 1.0 13 1.0 15 1.0 14 1.0
124. *****OPERATING + WIND
125. LOAD COMB 102 0.6 (DS + DO + WX) + AF + TF + FF
126. 4 0.6 6 0.6 10 0.6 15 1.0 13 1.0 14 1.0
127. LOAD COMB 103 0.6 (DS + DO + WZ) + AF + TF + FF
128. 4 0.6 6 0.6 11 0.6 15 1.0 13 1.0 14 1.0
129. LOAD COMB 104 0.6 (DS + DO - WX) + AF + TF + FF
130. 4 0.6 6 0.6 10 -0.6 15 1.0 13 1.0 14 1.0
131. LOAD COMB 105 0.6 (DS + DO - WZ) + AF + TF + FF
132. 4 0.6 6 0.6 11 -0.6 15 1.0 13 1.0 14 1.0
133. LOAD COMB 106 DS + DO + 0.75 L + AF + TF + 0.45 WX
134. 4 1.0 6 1.0 8 0.75 15 1.0 10 0.45 13 1.0
135. LOAD COMB 107 DS + DO + 0.75 L + AF + TF + 0.45 WZ
136. 4 1.0 6 1.0 8 0.75 15 1.0 11 0.45 13 1.0
137. LOAD COMB 108 DS + DO + 0.75 L + AF + TF - 0.45 WX
138. 4 1.0 6 1.0 8 0.75 15 1.0 10 -0.45 13 1.0
139. LOAD COMB 109 DS + DO + 0.75 L + AF + TF - 0.45 WZ
140. 4 1.0 6 1.0 8 0.75 15 1.0 11 -0.45 13 1.0
141. LOAD COMB 110 DS + DO + AF + TF + 0.6 WX
142. 4 1.0 6 1.0 15 1.0 10 0.6 13 1.0
143. LOAD COMB 111 DS + DO + AF + TF + 0.6 WZ
144. 4 1.0 6 1.0 15 1.0 11 0.6 13 1.0
145. LOAD COMB 112 DS + DO + AF + TF - 0.6 WX
146. 4 1.0 6 1.0 15 1.0 10 -0.6 13 1.0
147. LOAD COMB 113 DS + DO + AF + TF - 0.6 WZ
148. 4 1.0 6 1.0 15 1.0 11 -0.6 13 1.0
149. ******OPERATING + EARTHQUAKE
150. LOAD COMB 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
151. 4 0.6 6 0.6 1 0.7 2 0.21 3 0.111 15 1.0 13 1.0
152. LOAD COMB 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z
153. 4 0.6 6 0.6 2 0.7 1 0.21 3 0.111 15 1.0 13 1.0
154. LOAD COMB 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 4 of 12


Wednesday, July 12, 2017, 04:16 PM
STAAD SPACE -- PAGE NO. 5

155. 4 0.6 6 0.6 1 -0.7 2 0.21 3 0.111 15 1.0 13 1.0


156. LOAD COMB 117 0.6 (DS + DO) + AF + TF - 0.7 EO-Z
157. 4 0.6 6 0.6 2 -0.7 1 0.21 3 0.111 15 1.0 13 1.0
158. *
159. LOAD COMB 118 DS + DO + AF + TF + 0.75 L + 0.525 EO-X
160. 4 1.0 6 1.0 15 1.0 1 0.525 2 0.158 3 0.111 13 1.0 8 0.75
161. LOAD COMB 119 DS + DO + AF + TF + 0.75 L + 0.525 EO-Z
162. 4 1.0 6 1.0 15 1.0 2 0.525 1 0.158 3 0.111 13 1.0 8 0.75
163. LOAD COMB 120 DS + DO + AF + TF + 0.75 L - 0.525 EO-X
164. 4 1.0 6 1.0 15 1.0 1 -0.525 2 0.158 3 0.111 13 1.0 8 0.75
165. LOAD COMB 121 DS + DO + AF + TF + 0.75 L - 0.525 EO-Z
166. 4 1.0 6 1.0 15 1.0 2 -0.525 1 0.158 3 0.111 13 1.0 8 0.75
167. *
168. LOAD COMB 122 DS + DO + AF + TF + 0.7 EO-X
169. 4 1.0 6 1.0 15 1.0 1 0.7 2 0.21 3 0.111 13 1.0
170. LOAD COMB 123 DS + DO + AF + TF + 0.7 EO-Z
171. 4 1.0 6 1.0 15 1.0 2 0.7 1 0.21 3 0.111 13 1.0
172. LOAD COMB 124 DS + DO + AF + TF - 0.7 EO-X
173. 4 1.0 6 1.0 15 1.0 1 -0.7 2 0.21 3 0.111 13 1.0
174. LOAD COMB 125 DS + DO + AF + TF - 0.7 EO-Z
175. 4 1.0 6 1.0 15 1.0 2 -0.7 1 0.21 3 0.111 13 1.0
176. ******ERECTION + WIND
177. LOAD COMB 126 DS + DE + 0.6 WX
178. 4 1.0 5 1.0 10 0.6
179. LOAD COMB 127 DS + DE + 0.6 WZ
180. 4 1.0 5 1.0 11 0.6
181. LOAD COMB 128 DS + DE - 0.6 WX
182. 4 1.0 5 1.0 10 -0.6
183. LOAD COMB 129 DS + DE - 0.6 WZ
184. 4 1.0 5 1.0 11 -0.6
185. ******TEST
186. LOAD COMB 130 DS + DT + L
187. 4 1.0 7 1.0 8 1.0
188. LOAD COMB 131 DS + DT + 0.6 WX
189. 4 1.0 7 1.0 10 0.6
190. LOAD COMB 132 DS + DT + 0.6 WZ
191. 4 1.0 7 1.0 11 0.6
192. LOAD COMB 133 DS + DT - 0.6 WX
193. 4 1.0 7 1.0 10 -0.6
194. LOAD COMB 134 DS + DT - 0.6 WZ
195. 4 1.0 7 1.0 11 -0.6
196. *
197. *
198. PERFORM ANALYSIS

199. LOAD LIST 101 TO 134


200. PRINT STORY DRIFT

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 5 of 12


Wednesday, July 12, 2017, 04:16 PM
STAAD SPACE -- PAGE NO. 6

STORY HEIGHT LOAD DRIFT(CM ) ECCENTRICITY RATIO


------------------------------------------------------------------------
(METE) X Z (METE)

BASE= 0.30

1 0.30 101 0.0000 0.0000 0.0000 L / 0


102 0.0000 0.0000 0.0000 L / 0
103 0.0000 0.0000 0.0000 L / 0
104 0.0000 0.0000 0.0000 L / 0
105 0.0000 0.0000 0.0000 L / 0
106 0.0000 0.0000 0.0000 L / 0
107 0.0000 0.0000 0.0000 L / 0
108 0.0000 0.0000 0.0000 L / 0
109 0.0000 0.0000 0.0000 L / 0
110 0.0000 0.0000 0.0000 L / 0
111 0.0000 0.0000 0.0000 L / 0
112 0.0000 0.0000 0.0000 L / 0
113 0.0000 0.0000 0.0000 L / 0
114 0.0000 0.0000 0.0000 L / 0
115 0.0000 0.0000 0.0000 L / 0
116 0.0000 0.0000 0.0000 L / 0
117 0.0000 0.0000 0.0000 L / 0
118 0.0000 0.0000 0.0000 L / 0
119 0.0000 0.0000 0.0000 L / 0
120 0.0000 0.0000 0.0000 L / 0
121 0.0000 0.0000 0.0000 L / 0
122 0.0000 0.0000 0.0000 L / 0
123 0.0000 0.0000 0.0000 L / 0
124 0.0000 0.0000 0.0000 L / 0
125 0.0000 0.0000 0.0000 L / 0
126 0.0000 0.0000 0.0000 L / 0
127 0.0000 0.0000 0.0000 L / 0
128 0.0000 0.0000 0.0000 L / 0
129 0.0000 0.0000 0.0000 L / 0
130 0.0000 0.0000 0.0000 L / 0
131 0.0000 0.0000 0.0000 L / 0
132 0.0000 0.0000 0.0000 L / 0
133 0.0000 0.0000 0.0000 L / 0
134 0.0000 0.0000 0.0000 L / 0

2 2.50 101 0.0000 0.3460 0.0000 L / 636


102 0.0121 0.3485 0.0000 L / 631
103 0.0000 0.3605 0.0000 L / 610
104 -0.0121 0.3485 0.0000 L / 631
105 0.0000 0.3364 0.0000 L / 654
106 0.0091 0.3460 0.0000 L / 636
107 0.0000 0.3551 0.0000 L / 619
108 -0.0091 0.3460 0.0000 L / 636
109 0.0000 0.3370 0.0000 L / 653
110 0.0121 0.3460 0.0000 L / 636
111 0.0000 0.3581 0.0000 L / 614

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 6 of 12


Wednesday, July 12, 2017, 04:16 PM
STAAD SPACE -- PAGE NO. 7

STORY HEIGHT LOAD DRIFT(CM ) ECCENTRICITY RATIO


------------------------------------------------------------------------
(METE) X Z (METE)

BASE=

112 -0.0121 0.3460 0.0000 L / 636


113 0.0000 0.3340 0.0000 L / 658
114 0.1152 0.3608 0.0000 L / 610
115 0.0346 0.3895 0.0000 L / 565
116 -0.1152 0.3608 0.0000 L / 610
117 0.0346 0.3075 0.0000 L / 715
118 0.0864 0.3553 0.0000 L / 619
119 0.0260 0.3768 0.0000 L / 584
120 -0.0864 0.3553 0.0000 L / 619
121 0.0260 0.3153 0.0000 L / 698
122 0.1152 0.3583 0.0000 L / 614
123 0.0346 0.3870 0.0000 L / 568
124 -0.1152 0.3583 0.0000 L / 614
125 0.0346 0.3051 0.0000 L / 721
126 0.0121 -0.0047 0.0000 L / 18184
127 0.0000 0.0073 0.0000 L / 29995
128 -0.0121 -0.0047 0.0000 L / 18184
129 0.0000 -0.0168 0.0000 L / 13124
130 0.0000 -0.0058 0.0000 L / 38112
131 0.0121 -0.0058 0.0000 L / 18184
132 0.0000 0.0063 0.0000 L / 35052
133 -0.0121 -0.0058 0.0000 L / 18184
134 0.0000 -0.0178 0.0000 L / 12345

3 4.00 101 0.0000 0.7788 0.0000 L / 475


102 0.0509 0.7857 0.0000 L / 471
103 0.0000 0.8113 0.0000 L / 456
104 -0.0509 0.7857 0.0000 L / 471
105 0.0000 0.7601 0.0000 L / 487
106 0.0382 0.7788 0.0000 L / 475
107 0.0000 0.7980 0.0000 L / 463
108 -0.0382 0.7788 0.0000 L / 475
109 0.0000 0.7596 0.0000 L / 487
110 0.0509 0.7788 0.0000 L / 475
111 0.0000 0.8044 0.0000 L / 460
112 -0.0509 0.7788 0.0000 L / 475
113 0.0000 0.7532 0.0000 L / 491
114 0.6719 0.8122 0.0000 L / 455
115 0.2016 0.8742 0.0000 L / 423
116 -0.6719 0.8122 0.0000 L / 455
117 0.2016 0.6973 0.0000 L / 530
118 0.5039 0.7987 0.0000 L / 463
119 0.1517 0.8451 0.0000 L / 438
120 -0.5039 0.7987 0.0000 L / 463
121 0.1517 0.7124 0.0000 L / 519
122 0.6719 0.8053 0.0000 L / 459
123 0.2016 0.8672 0.0000 L / 426
124 -0.6719 0.8053 0.0000 L / 459
125 0.2016 0.6903 0.0000 L / 536

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 7 of 12


Wednesday, July 12, 2017, 04:16 PM
STAAD SPACE -- PAGE NO. 8

STORY HEIGHT LOAD DRIFT(CM ) ECCENTRICITY RATIO


------------------------------------------------------------------------
(METE) X Z (METE)

BASE=

126 0.0509 -0.0133 0.0000 L / 7271


127 0.0000 0.0123 0.0000 L / 30155
128 -0.0509 -0.0133 0.0000 L / 7271
129 0.0000 -0.0389 0.0000 L / 9502
130 0.0000 -0.0170 0.0000 L / 21826
131 0.0509 -0.0170 0.0000 L / 7271
132 0.0000 0.0087 0.0000 L / 42763
133 -0.0509 -0.0170 0.0000 L / 7271
134 0.0000 -0.0426 0.0000 L / 8694
201. *
202. PARAMETER 1
203. CODE AISC
204. FYLD 2.53107E+007 ALL
205. FU 4.21844E+007 ALL
206. KY 2 MEMB 100 101
207. KZ 2 MEMB 100 101
208. LY 2.2 MEMB 100
209. LZ 2.2 MEMB 100
210. LY 1.5 MEMB 101
211. LZ 1.5 MEMB 101
212. DJ1 3 MEMB 201
213. DJ2 4 MEMB 201
214. DJ1 3 MEMB 200
215. DJ2 2 MEMB 200
216. DJ1 6 MEMB 202
217. DJ2 5 MEMB 202
218. DJ1 1 MEMB 100 101
219. DJ2 6 MEMB 100 101
220. DFF 360 MEMB 200 TO 202
221. DFF 200 MEMB 100 101
222. TRACK 1 ALL
223. RATIO 1 ALL
224. CHECK CODE ALL

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 8 of 12


Wednesday, July 12, 2017, 04:16 PM
STAAD SPACE -- PAGE NO. 9

STAAD.Pro CODE CHECKING - (AISC 9TH EDITION)


***********************

ALL UNITS ARE - KG METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

100 ST H250X250X9 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.385 122
999.92 C 487.27 -4111.10 0.00

-----------------------------------------------------------------------
| MEM= 100 , UNIT NEW-MMS, L= 2200. AX= 9143.SZ= 856000.SY= 292000.|
| KL/R-Y= 69.6 CB= 1.00 YLD= 248.21 ALLOWABLE STRESSES: FCZ= 163.8 |
| FTZ= 163.8 FCY= 186.2 FTY= 186.2 FC= 114.2 FT= 148.9 FV= 99.3 |
-----------------------------------------------------------------------

101 ST H250X250X9 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.111 114
186.64 C 102.29 -1301.20 0.00

-----------------------------------------------------------------------
| MEM= 101 , UNIT NEW-MMS, L= 1500. AX= 9143.SZ= 856000.SY= 292000.|
| KL/R-Y= 47.5 CB= 1.00 YLD= 248.21 ALLOWABLE STRESSES: FCZ= 163.8 |
| FTZ= 163.8 FCY= 186.2 FTY= 186.2 FC= 128.4 FT= 148.9 FV= 99.3 |
-----------------------------------------------------------------------

200 ST H200X200X8 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.017 122
344.39 C -12.38 76.60 0.60

-----------------------------------------------------------------------
| MEM= 200 , UNIT NEW-MMS, L= 600. AX= 6353.SZ= 472000.SY= 160000.|
| KL/R-Y= 12.0 CB= 1.00 YLD= 248.21 ALLOWABLE STRESSES: FCZ= 163.8 |
| FTZ= 163.8 FCY= 186.2 FTY= 186.2 FC= 145.2 FT= 148.9 FV= 99.3 |
-----------------------------------------------------------------------

201 ST H200X200X8 (JAPANESE SECTIONS)


PASS SHEAR -Y 0.017 130
0.00 T 0.00 78.10 0.00

-----------------------------------------------------------------------
| MEM= 201 , UNIT NEW-MMS, L= 600. AX= 6353.SZ= 472000.SY= 160000.|
| KL/R-Y= 12.0 CB= 1.00 YLD= 248.21 ALLOWABLE STRESSES: FCZ= 163.8 |
| FTZ= 163.8 FCY= 186.2 FTY= 186.2 FC= 145.2 FT= 148.9 FV= 99.3 |
-----------------------------------------------------------------------

202 ST H200X200X8 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.022 122
877.68 C -15.55 57.22 0.60

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 9 of 12


Wednesday, July 12, 2017, 04:16 PM
STAAD SPACE -- PAGE NO. 10

ALL UNITS ARE - KG METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

-----------------------------------------------------------------------
| MEM= 202 , UNIT NEW-MMS, L= 600. AX= 6353.SZ= 472000.SY= 160000.|
| KL/R-Y= 12.0 CB= 1.00 YLD= 248.21 ALLOWABLE STRESSES: FCZ= 163.8 |
| FTZ= 163.8 FCY= 186.2 FTY= 186.2 FC= 145.2 FT= 148.9 FV= 99.3 |
-----------------------------------------------------------------------

225. FINISH

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= JUL 7,2017 TIME= 11: 8:16 ****

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 10 of 12


Wednesday, July 12, 2017, 04:16 PM
STAAD SPACE -- PAGE NO. 11

************************************************************
* For questions on STAAD.Pro, please contact *
* Research Engineers Offices at the following locations *
* *
* Telephone Email *
* USA: +1 (714)974-2500 support@bentley.com *
* CANADA +1 (905)632-4771 detech@odandetech.com *
* UK +44(1454)207-000 support@bentley.com *
* NORWAY +47 67 57 21 30 staad@edr.no *
* SINGAPORE +65 6225-6158 support@bentley.com *
* INDIA +91(033)4006-2021 support@bentley.com *
* JAPAN +81(03)5952-6500 eng-eye@crc.co.jp *
* CHINA +86(411)8479-1166 support@bentley.com *
* THAILAND +66(0)2645-1018/19 support@bentley.com *
* *
* North America support@bentley.com *
* Europe support@bentley.com *
* Asia support@bentley.com *
************************************************************

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 11 of 12


Wednesday, July 12, 2017, 04:16 PM
STAAD SPACE -- PAGE NO. 12

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\SPS-TP2-ARR-01.anl Page 12 of 12


Friday, September 29, 2017, 09:15 AM
PAGE NO. 1

****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 04 *
* Proprietary Program of *
* Research Engineers, Intl. *
* Date= SEP 29, 2017 *
* Time= 9:15:29 *
* *
* USER ID: - *
****************************************************

1. STAAD SPACE
INPUT FILE: SPS-TP2-ARR-01.STD
2. START JOB INFORMATION
3. JOB CLIENT PT. MEDCO ENERGI EP MALAKA
4. CHECKER NAME KHB/BD
5. APPROVED NAME BHK
6. ENGINEER NAME RN/LG
7. ENGINEER DATE 29-SEP-17
8. JOB NAME SPS-TP2-ARR-01
9. END JOB INFORMATION
10. INPUT WIDTH 79
11. UNIT METER KG
12. JOINT COORDINATES
13. 1 0 0.3 0; 5 0 2.5 0; 6 0 2.5 0.25; 7 0 2.5 -0.25; 8 0 0.5 0; 9 0 0.5 -0.25
14. MEMBER INCIDENCES
15. 100 1 8; 101 7 5; 102 5 6; 103 8 5; 104 8 9
16. SUPPORTS
17. 1 FIXED
18. DEFINE MATERIAL START
19. ISOTROPIC STEEL
20. E 2.09042E+010
21. POISSON 0.3
22. DENSITY 7833.41
23. ALPHA 1.2E-005
24. DAMP 0.03
25. END DEFINE MATERIAL
26. MEMBER PROPERTY JAPANESE
27. 100 TO 104 TABLE ST H200X200X8
28. ***********SEISMIC DEFINITION***********
29. CONSTANTS
30. BETA 90 MEMB 100 103
31. MATERIAL STEEL ALL
32. *
33. *
34. *
35. DEFINE UBC LOAD
36. ZONE 0.3 I 1.25 RWX 4.5 RWZ 4.5 STYP 4 CT 0.0853 NA 1 NV 1
37. SELFWEIGHT 1.12
38. *
39. JOINT WEIGHT
40. 5 WEIGHT 156.6

D:\Kelsri-Medco\STAADPro\STAADPro\SPS-TP2-ARR-01.anl Page 1 of 11
Friday, September 29, 2017, 09:15 AM
STAAD SPACE -- PAGE NO. 2

41. *
42. MEMBER WEIGHT
43. 101 CON 94.2 0.25
44. *
45. MEMBER WEIGHT
46. 102 CON 172 0.7
47. *
48. **********LOADING CASES**********
49. LOAD 1 LOADTYPE SEISMIC TITLE EX (EARTHQUAKE LOAD X-DIR)
50. UBC LOAD X 1
51. LOAD 2 LOADTYPE SEISMIC TITLE EZ (EARTHQUAKE LOAD Z-DIR)
52. UBC LOAD Z 1
53. LOAD 3 LOADTYPE SEISMIC TITLE EY (EARTHQUAKE LOAD Y-DIR)
54. LOAD 4 LOADTYPE DEAD TITLE DS (DEAD LOAD STRUCTURE)
55. SELFWEIGHT Y -1.12 LIST 100 TO 102
56. LOAD 5 LOADTYPE DEAD TITLE DE (EQUIPMENT EMPTY DEAD LOAD)
57. JOINT LOAD
58. 5 FY -138.5
59. MEMBER LOAD
60. 104 CON GY -5.5
61. LOAD 6 LOADTYPE DEAD TITLE DO (EQUIPMENT OPERATING DEAD LOAD)
62. *
63. *
64. JOINT LOAD
65. 5 FX 11.4
66. 5 FY -138.5
67. MEMBER LOAD
68. 104 CON GY -5.5
69. *
70. *
71. LOAD 7 LOADTYPE DEAD TITLE DT (EQUIPMENT TEST DEAD LOAD)
72. JOINT LOAD
73. 5 FY -184.6
74. MEMBER LOAD
75. 104 CON GY -6.25
76. *
77. LOAD 8 LOADTYPE LIVE TITLE L (LIVE LOAD)
78. LOAD 9 LOADTYPE NONE TITLE I (HANDLING DEVICE/IMPACT LOAD)
79. LOAD 10 LOADTYPE WIND TITLE WX (WIND LOAD X-DIR)
80. MEMBER LOAD
81. 100 TO 103 UNI GX 7.2
82. JOINT LOAD
83. 5 FX 1.368
84. LOAD 11 LOADTYPE WIND TITLE WZ (WIND LOAD Z-DIR)
85. MEMBER LOAD
86. 100 103 UNI GZ 7.2
87. JOINT LOAD
88. 5 FZ 31.67
89. LOAD 12 LOADTYPE NONE TITLE J (VIBRATION LOAD)
90. LOAD 13 LOADTYPE NONE TITLE TF (SELF-STRAINING AND THERMAL FORCES)

D:\Kelsri-Medco\STAADPro\STAADPro\SPS-TP2-ARR-01.anl Page 2 of 11
Friday, September 29, 2017, 09:15 AM
STAAD SPACE -- PAGE NO. 3

91. LOAD 14 LOADTYPE NONE TITLE FF (SURFACE FRICTION FORCES)


92. LOAD 15 LOADTYPE NONE TITLE AF (ANCHOR FORCES)
93. LOAD 16 LOADTYPE NONE TITLE HS (EARTH PRESSURE
94. LOAD 17 LOADTYPE NONE TITLE HW (WATER PRESSURE)
95. LOAD 18 LOADTYPE NONE TITLE R (RAIN LOAD)
96. LOAD 19 LOADTYPE NONE TITLE VH (VEHICLE LOAD)
97. LOAD 20 LOADTYPE NONE TITLE C (CRANE LOAD)
98. *****
99. *****LOADING COMBINATION
100. *****
101. *****OPERATING CONDITION
102. LOAD COMB 101 DS + DO + L + TF + AF + FF
103. 4 1.0 6 1.0 8 1.0 13 1.0 15 1.0 14 1.0
104. *****OPERATING + WIND
105. LOAD COMB 102 0.6 DS + 0.6 DE + WX
106. 4 0.6 5 0.6 10 1.0
107. LOAD COMB 103 0.6 DS + 0.6 DE + WZ
108. 4 0.6 5 0.6 11 1.0
109. LOAD COMB 104 0.6 DS + 0.6 DE - WX
110. 4 0.6 5 0.6 10 -1.0
111. LOAD COMB 105 0.6 DS + 0.6 DE - WZ
112. 4 0.6 5 0.6 11 -1.0
113. LOAD COMB 106 DS + DO + 0.75 L + AF + 0.75 WX
114. 4 1.0 6 1.0 8 0.75 15 1.0 10 0.75
115. LOAD COMB 107 DS + DO + 0.75 L + AF + 0.75 WZ
116. 4 1.0 6 1.0 8 0.75 15 1.0 11 0.75
117. LOAD COMB 108 DS + DO + 0.75 L + AF - 0.75 WX
118. 4 1.0 6 1.0 8 0.75 15 1.0 10 -0.75
119. LOAD COMB 109 DS + DO + 0.75 L + AF - 0.75 WZ
120. 4 1.0 6 1.0 8 0.75 15 1.0 11 -0.75
121. LOAD COMB 110 DS + DO + AF + WX
122. 4 1.0 6 1.0 15 1.0 10 1.0
123. LOAD COMB 111 DS + DO + AF + WZ
124. 4 1.0 6 1.0 15 1.0 11 1.0
125. LOAD COMB 112 DS + DO + AF - WX
126. 4 1.0 6 1.0 15 1.0 10 -1.0
127. LOAD COMB 113 DS + DO + AF - WZ
128. 4 1.0 6 1.0 15 1.0 11 -1.0
129. ******OPERATING + EARTHQUAKE
130. LOAD COMB 114 0.6 DS + 0.6 DE + 0.7 EE-X
131. 4 0.6 5 0.6 1 0.7 2 0.21 3 0.111
132. LOAD COMB 115 0.6 DS + 0.6 DE + 0.7 EE-Z
133. 4 0.6 5 0.6 2 0.7 1 0.21 3 0.111
134. LOAD COMB 116 0.6 DS + 0.6 DE - 0.7 EE-X
135. 4 0.6 5 0.6 1 -0.7 2 0.21 3 0.111
136. LOAD COMB 117 0.6 DS + 0.6 DE - 0.7 EE-Z
137. 4 0.6 5 0.6 2 -0.7 1 0.21 3 0.111
138. LOAD COMB 118 DS + DO + AF + 0.525 EO-X
139. 4 1.0 6 1.0 15 1.0 1 0.525 2 0.158 3 0.111
140. LOAD COMB 119 DS + DO + AF + 0.525 EO-Z
141. 4 1.0 6 1.0 15 1.0 2 0.525 1 0.158 3 0.111
142. LOAD COMB 120 DS + DO + AF - 0.525 EO-X
143. 4 1.0 6 1.0 15 1.0 1 -0.525 2 0.158 3 0.111
144. LOAD COMB 121 DS + DO + AF - 0.525 EO-Z
145. 4 1.0 6 1.0 15 1.0 2 -0.525 1 0.158 3 0.111
146. LOAD COMB 122 DS + DO + AF + 0.7 EO-X

D:\Kelsri-Medco\STAADPro\STAADPro\SPS-TP2-ARR-01.anl Page 3 of 11
Friday, September 29, 2017, 09:15 AM
STAAD SPACE -- PAGE NO. 4

147. 4 1.0 6 1.0 15 1.0 1 0.7 2 0.21 3 0.111


148. LOAD COMB 123 DS + DO + AF + 0.7 EO-Z
149. 4 1.0 6 1.0 15 1.0 2 0.7 1 0.21 3 0.111
150. LOAD COMB 124 DS + DO + AF - 0.7 EO-X
151. 4 1.0 6 1.0 15 1.0 1 -0.7 2 0.21 3 0.111
152. LOAD COMB 125 DS + DO + AF - 0.7 EO-Z
153. 4 1.0 6 1.0 15 1.0 2 -0.7 1 0.21 3 0.111
154. ******ERECTION + WIND
155. LOAD COMB 126 DS + DE + WP-X
156. 4 1.0 5 1.0 10 1.0
157. LOAD COMB 127 DS + DE + WP-Z
158. 4 1.0 5 1.0 11 1.0
159. LOAD COMB 128 DS + DE - WP-X
160. 4 1.0 5 1.0 10 -1.0
161. LOAD COMB 129 DS + DE - WP-Z
162. 4 1.0 5 1.0 11 -1.0
163. ******TEST
164. LOAD COMB 130 DS + DT + WP-X
165. 4 1.0 7 1.0 10 1.0
166. LOAD COMB 131 DS + DT + WP-Z
167. 4 1.0 7 1.0 11 1.0
168. LOAD COMB 132 DS + DT - WP-X
169. 4 1.0 7 1.0 10 -1.0
170. LOAD COMB 133 DS + DT - WP-Z
171. 4 1.0 7 1.0 11 -1.0
172. *
173. PERFORM ANALYSIS

P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 6/ 5/ 1

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER

ORIGINAL/FINAL BAND-WIDTH= 4/ 4/ 24 DOF


TOTAL PRIMARY LOAD CASES = 20, TOTAL DEGREES OF FREEDOM = 30
SIZE OF STIFFNESS MATRIX = 1 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 12.0/ 286924.4 MB

**WARNING: IF THIS UBC/IBC ANALYSIS HAS TENSION/COMPRESSION


OR REPEAT LOAD OR RE-ANALYSIS OR SELECT OPTIMIZE, THEN EACH
UBC/IBC CASE SHOULD BE FOLLOWED BY PERFORM ANALYSIS CHANGE.

D:\Kelsri-Medco\STAADPro\STAADPro\SPS-TP2-ARR-01.anl Page 4 of 11
Friday, September 29, 2017, 09:15 AM
STAAD SPACE -- PAGE NO. 5

***********************************************************
* *
* X DIRECTION : Ta = 0.154 Tb = 0.226 Tuser = 0.000 *
* T = 0.154, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.2500 x 587.23 = 146.81 KG *
* *
***********************************************************

***********************************************************
* *
* Z DIRECTION : Ta = 0.154 Tb = 0.088 Tuser = 0.000 *
* T = 0.088, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.2500 x 587.23 = 146.81 KG *
* *
***********************************************************

174. LOAD LIST 101 TO 133


175. PRINT STORY DRIFT

D:\Kelsri-Medco\STAADPro\STAADPro\SPS-TP2-ARR-01.anl Page 5 of 11
Friday, September 29, 2017, 09:15 AM
STAAD SPACE -- PAGE NO. 6

STORY HEIGHT LOAD DRIFT(CM ) ECCENTRICITY RATIO


------------------------------------------------------------------------
(METE) X Z (METE)

BASE= 0.30

1 0.30 101 0.0000 0.0000 0.0000 L / 0


102 0.0000 0.0000 0.0000 L / 0
103 0.0000 0.0000 0.0000 L / 0
104 0.0000 0.0000 0.0000 L / 0
105 0.0000 0.0000 0.0000 L / 0
106 0.0000 0.0000 0.0000 L / 0
107 0.0000 0.0000 0.0000 L / 0
108 0.0000 0.0000 0.0000 L / 0
109 0.0000 0.0000 0.0000 L / 0
110 0.0000 0.0000 0.0000 L / 0
111 0.0000 0.0000 0.0000 L / 0
112 0.0000 0.0000 0.0000 L / 0
113 0.0000 0.0000 0.0000 L / 0
114 0.0000 0.0000 0.0000 L / 0
115 0.0000 0.0000 0.0000 L / 0
116 0.0000 0.0000 0.0000 L / 0
117 0.0000 0.0000 0.0000 L / 0
118 0.0000 0.0000 0.0000 L / 0
119 0.0000 0.0000 0.0000 L / 0
120 0.0000 0.0000 0.0000 L / 0
121 0.0000 0.0000 0.0000 L / 0
122 0.0000 0.0000 0.0000 L / 0
123 0.0000 0.0000 0.0000 L / 0
124 0.0000 0.0000 0.0000 L / 0
125 0.0000 0.0000 0.0000 L / 0
126 0.0000 0.0000 0.0000 L / 0
127 0.0000 0.0000 0.0000 L / 0
128 0.0000 0.0000 0.0000 L / 0
129 0.0000 0.0000 0.0000 L / 0
130 0.0000 0.0000 0.0000 L / 0
131 0.0000 0.0000 0.0000 L / 0
132 0.0000 0.0000 0.0000 L / 0
133 0.0000 0.0000 0.0000 L / 0

2 0.50 101 0.0002 0.0000 0.0000 L / 0


102 0.0002 0.0000 0.0000 L / 0
103 0.0000 0.0002 0.0000 L / 0
104 -0.0002 0.0000 0.0000 L / 0
105 0.0000 -0.0002 0.0000 L / 0
106 0.0003 0.0000 0.0000 L / 0
107 0.0002 0.0002 0.0000 L / 0
108 0.0000 0.0000 0.0000 L / 0
109 0.0002 -0.0002 0.0000 L / 0
110 0.0003 0.0000 0.0000 L / 0
111 0.0002 0.0002 0.0000 L / 0
112 0.0000 0.0000 0.0000 L / 0

D:\Kelsri-Medco\STAADPro\STAADPro\SPS-TP2-ARR-01.anl Page 6 of 11
Friday, September 29, 2017, 09:15 AM
STAAD SPACE -- PAGE NO. 7

STORY HEIGHT LOAD DRIFT(CM ) ECCENTRICITY RATIO


------------------------------------------------------------------------
(METE) X Z (METE)

BASE=

113 0.0002 -0.0002 0.0000 L / 0


114 -0.0089 0.0002 0.0000 L / 2251
115 -0.0027 0.0006 0.0000 L / 7504
116 0.0089 0.0002 0.0000 L / 2251
117 -0.0027 -0.0006 0.0000 L / 7504
118 -0.0065 0.0001 0.0000 L / 3073
119 -0.0019 0.0004 0.0000 L / 10805
120 0.0068 0.0001 0.0000 L / 2934
121 -0.0019 -0.0005 0.0000 L / 10805
122 -0.0087 0.0002 0.0000 L / 2291
123 -0.0025 0.0006 0.0000 L / 7965
124 0.0090 0.0002 0.0000 L / 2213
125 -0.0025 -0.0006 0.0000 L / 7965
126 0.0002 0.0000 0.0000 L / 0
127 0.0000 0.0002 0.0000 L / 0
128 -0.0002 0.0000 0.0000 L / 0
129 0.0000 -0.0002 0.0000 L / 0
130 0.0002 0.0000 0.0000 L / 0
131 0.0000 0.0002 0.0000 L / 0
132 -0.0002 0.0000 0.0000 L / 0
133 0.0000 -0.0002 0.0000 L / 0

3 2.50 101 0.0122 0.0000 0.0000 L / 18040


102 0.0117 0.0000 0.0000 L / 18824
103 0.0000 0.0142 0.0000 L / 15505
104 -0.0117 0.0000 0.0000 L / 18824
105 0.0000 -0.0142 0.0000 L / 15467
106 0.0210 0.0000 0.0000 L / 10496
107 0.0122 0.0106 0.0000 L / 18040
108 0.0034 0.0000 0.0000 L / 64143
109 0.0122 -0.0107 0.0000 L / 18040
110 0.0239 0.0000 0.0000 L / 9212
111 0.0122 0.0142 0.0000 L / 15518
112 0.0005 0.0000 0.0000 L / 0
113 0.0122 -0.0142 0.0000 L / 15454
114 0.1085 0.0114 0.0000 L / 2027
115 0.0326 0.0382 0.0000 L / 5759
116 -0.1085 0.0114 0.0000 L / 2027
117 0.0326 -0.0382 0.0000 L / 5753
118 0.0936 0.0086 0.0000 L / 2351
119 0.0367 0.0286 0.0000 L / 5996
120 -0.0692 0.0086 0.0000 L / 3179
121 0.0367 -0.0287 0.0000 L / 5996
122 0.1207 0.0114 0.0000 L / 1822
123 0.0447 0.0382 0.0000 L / 4916
124 -0.0963 0.0114 0.0000 L / 2284
125 0.0447 -0.0382 0.0000 L / 4916
126 0.0117 0.0000 0.0000 L / 18824
127 0.0000 0.0142 0.0000 L / 15518

D:\Kelsri-Medco\STAADPro\STAADPro\SPS-TP2-ARR-01.anl Page 7 of 11
Friday, September 29, 2017, 09:15 AM
STAAD SPACE -- PAGE NO. 8

STORY HEIGHT LOAD DRIFT(CM ) ECCENTRICITY RATIO


------------------------------------------------------------------------
(METE) X Z (METE)

BASE=

128 -0.0117 0.0000 0.0000 L / 18824


129 0.0000 -0.0142 0.0000 L / 15454
130 0.0117 0.0000 0.0000 L / 18824
131 0.0000 0.0142 0.0000 L / 15522
132 -0.0117 0.0000 0.0000 L / 18824
133 0.0000 -0.0142 0.0000 L / 15450
176. *
177. PARAMETER 1
178. CODE AISC
179. FYLD 2.53107E+007 ALL
180. FU 4.21844E+007 ALL
181. TRACK 0 ALL
182. RATIO 1 ALL
183. CHECK CODE ALL

D:\Kelsri-Medco\STAADPro\STAADPro\SPS-TP2-ARR-01.anl Page 8 of 11
Friday, September 29, 2017, 09:15 AM
STAAD SPACE -- PAGE NO. 9

STAAD.Pro CODE CHECKING - (AISC 9TH EDITION)


***********************

ALL UNITS ARE - KG METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

100 ST H200X200X8 (JAPANESE SECTIONS)


PASS AISC- H1-3 0.092 122
183.02 C 248.42 -66.32 0.00
101 ST H200X200X8 (JAPANESE SECTIONS)
PASS SHEAR -Y 0.001 101
0.00 T 0.00 1.74 0.25
102 ST H200X200X8 (JAPANESE SECTIONS)
PASS AISC- H2-1 0.003 122
10.75 T -8.96 1.74 0.00
103 ST H200X200X8 (JAPANESE SECTIONS)
PASS AISC- H1-3 0.084 122
166.37 C 225.59 -60.84 0.00
104 ST H200X200X8 (JAPANESE SECTIONS)
PASS SHEAR -Y 0.000 130
0.00 T 0.00 0.78 0.00

184. FINISH

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= SEP 29,2017 TIME= 9:15:29 ****

D:\Kelsri-Medco\STAADPro\STAADPro\SPS-TP2-ARR-01.anl Page 9 of 11
Friday, September 29, 2017, 09:15 AM
STAAD SPACE -- PAGE NO. 10

************************************************************
* For questions on STAAD.Pro, please contact *
* Research Engineers Offices at the following locations *
* *
* Telephone Email *
* USA: +1 (714)974-2500 support@bentley.com *
* CANADA +1 (905)632-4771 detech@odandetech.com *
* UK +44(1454)207-000 support@bentley.com *
* NORWAY +47 67 57 21 30 staad@edr.no *
* SINGAPORE +65 6225-6158 support@bentley.com *
* INDIA +91(033)4006-2021 support@bentley.com *
* JAPAN +81(03)5952-6500 eng-eye@crc.co.jp *
* CHINA +86(411)8479-1166 support@bentley.com *
* THAILAND +66(0)2645-1018/19 support@bentley.com *
* *
* North America support@bentley.com *
* Europe support@bentley.com *
* Asia support@bentley.com *
************************************************************

D:\Kelsri-Medco\STAADPro\STAADPro\SPS-TP2-ARR-01.anl Page 10 of 11
Friday, September 29, 2017, 09:15 AM
STAAD SPACE -- PAGE NO. 11

D:\Kelsri-Medco\STAADPro\STAADPro\SPS-TP2-ARR-01.anl Page 11 of 11
Wednesday, July 12, 2017, 04:22 PM
PAGE NO. 1

****************************************************
* *
* STAAD.Pro *
* Version 2007 Build 04 *
* Proprietary Program of *
* Research Engineers, Intl. *
* Date= JUL 12, 2017 *
* Time= 16:18:29 *
* *
* USER ID: - *
****************************************************

1. STAAD SPACE
INPUT FILE: Node 140-160 TP Comb.STD
2. START JOB INFORMATION
3. ENGINEER DATE 12-JUN-17
4. JOB NAME CALCULATION FOR MISCELLANEOUS PIPE SUPPORT AND PIPE SLEEPER ARR-1
5. JOB CLIENT PT. MEDCO ENERGI EP MALAKA
6. JOB NO BLA-FTP-C-CC-00-012
7. JOB REV 0A
8. CHECKER NAME KHB/BD
9. APPROVED NAME BHK
10. CHECKER DATE 12-JUN-17
11. APPROVED DATE 12-JUN-17
12. ENGINEER NAME RN/LG
13. JOB COMMENT TP-F-P04-05-05
14. JOB COMMENT NODE 140 160
15. END JOB INFORMATION
16. INPUT WIDTH 79
17. UNIT METER KG
18. JOINT COORDINATES
19. 1 0.55 0.1 0; 2 0.55 0.6 0; 3 0.3 0.6 0; 4 0.8 0.6 0; 5 0 0.1 1; 6 0 0.6 1
20. 7 0 0.6 0.75; 8 0 0.6 1.25
21. MEMBER INCIDENCES
22. 1 5 1; 100 1 2; 101 2 3; 102 2 4; 200 5 6; 201 6 7; 202 6 8
23. SUPPORTS
24. 1 5 FIXED
25. DEFINE MATERIAL START
26. ISOTROPIC STEEL
27. E 2.09042E+010
28. POISSON 0.3
29. DENSITY 7833.41
30. ALPHA 1.2E-005
31. DAMP 0.03
32. END DEFINE MATERIAL
33. MEMBER PROPERTY JAPANESE
34. 1 101 102 201 202 TABLE ST H100X100X6
35. MEMBER PROPERTY AMERICAN
36. 100 200 TABLE ST PIPS40
37. ***********SEISMIC DEFINITION***********
38. CONSTANTS
39. BETA 0 MEMB 100
40. MATERIAL STEEL ALL

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 1 of 12
Wednesday, July 12, 2017, 04:22 PM
STAAD SPACE -- PAGE NO. 2

41. *
42. *
43. *
44. DEFINE UBC LOAD
45. ZONE 0.3 I 1.25 RWX 4.5 RWZ 4.5 STYP 4 CT 0.0853 NA 1 NV 1
46. SELFWEIGHT 1.12
47. JOINT WEIGHT
48. 2 WEIGHT 69.8
49. 6 WEIGHT 3521.1
50. *
51. *
52. *
53. *
54. **********LOADING CASES**********
55. LOAD 1 LOADTYPE SEISMIC TITLE EX (EARTHQUAKE LOAD X-DIR)
56. UBC LOAD X 1
57. PERFORM ANALYSIS

P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 8/ 7/ 2

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER

ORIGINAL/FINAL BAND-WIDTH= 4/ 4/ 18 DOF


TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 36
SIZE OF STIFFNESS MATRIX = 1 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 12.0/ 90697.2 MB

***********************************************************
* *
* X DIRECTION : Ta = 0.051 Tb = 0.101 Tuser = 0.000 *
* T = 0.051, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.2500 x 3649.40 = 912.35 KG *
* *
***********************************************************

58. CHANGE
59. LOAD 2 LOADTYPE SEISMIC TITLE EZ (EARTHQUAKE LOAD Z-DIR)
60. UBC LOAD Z 1

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 2 of 12
Wednesday, July 12, 2017, 04:22 PM
STAAD SPACE -- PAGE NO. 3

61. PERFORM ANALYSIS

***********************************************************
* *
* Z DIRECTION : Ta = 0.051 Tb = 0.101 Tuser = 0.000 *
* T = 0.051, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.2500 x 3649.40 = 912.35 KG *
* *
***********************************************************

62. CHANGE
63. LOAD 3 LOADTYPE SEISMIC TITLE EY (EARTHQUAKE LOAD Y-DIR)
64. LOAD 4 LOADTYPE DEAD TITLE DS (DEAD LOAD STRUCTURE)
65. SELFWEIGHT Y -1.12 LIST 100 TO 102 200 TO 202
66. LOAD 5 LOADTYPE DEAD TITLE DE (EQUIPMENT EMPTY DEAD LOAD)
67. JOINT LOAD
68. 2 FY -69.8
69. 6 FY -69.8
70. LOAD 6 LOADTYPE DEAD TITLE DO (EQUIPMENT OPERATING DEAD LOAD)
71. *
72. *
73. JOINT LOAD
74. 2 FY 4103.8
75. 6 FY -3521.1
76. *
77. *
78. LOAD 7 LOADTYPE DEAD TITLE DT (EQUIPMENT TEST DEAD LOAD)
79. JOINT LOAD
80. 2 FY -329.4
81. 6 FY -483.6
82. *
83. LOAD 8 LOADTYPE LIVE TITLE L (LIVE LOAD)
84. LOAD 9 LOADTYPE NONE TITLE I (HANDLING DEVICE/IMPACT LOAD)
85. LOAD 10 LOADTYPE WIND TITLE WX (WIND LOAD X-DIR)
86. MEMBER LOAD
87. 100 200 TO 202 UNI GX 3.6
88. JOINT LOAD
89. 6 FX 0.656
90. 2 FX 13.71
91. LOAD 11 LOADTYPE WIND TITLE WZ (WIND LOAD Z-DIR)
92. MEMBER LOAD
93. 100 200 UNI GZ 5.4
94. JOINT LOAD
95. 6 FZ 13.71
96. 2 FZ 0.656
97. LOAD 12 LOADTYPE NONE TITLE J (VIBRATION LOAD)
98. LOAD 13 LOADTYPE NONE TITLE TF (SELF-STRAINING AND THERMAL FORCES)
99. JOINT LOAD
100. 2 FX 565.2 FZ 1

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 3 of 12
Wednesday, July 12, 2017, 04:22 PM
STAAD SPACE -- PAGE NO. 4

101. LOAD 14 LOADTYPE NONE TITLE FF (SURFACE FRICTION FORCES)


102. LOAD 15 LOADTYPE NONE TITLE AF (ANCHOR FORCES)
103. LOAD 16 LOADTYPE NONE TITLE HS (EARTH PRESSURE
104. LOAD 17 LOADTYPE NONE TITLE HW (WATER PRESSURE)
105. LOAD 18 LOADTYPE NONE TITLE R (RAIN LOAD)
106. LOAD 19 LOADTYPE NONE TITLE VH (VEHICLE LOAD)
107. LOAD 20 LOADTYPE NONE TITLE C (CRANE LOAD)
108. *****
109. *****LOADING COMBINATION
110. *****
111. *****OPERATING CONDITION
112. LOAD COMB 101 DS + DO + L + TF + AF + FF
113. 4 1.0 6 1.0 8 1.0 13 1.0 15 1.0 14 1.0
114. *****OPERATING + WIND
115. LOAD COMB 102 0.6 (DS + DO + WX) + AF + TF + FF
116. 4 0.6 6 0.6 10 0.6 15 1.0 13 1.0 14 1.0
117. LOAD COMB 103 0.6 (DS + DO + WZ) + AF + TF + FF
118. 4 0.6 6 0.6 11 0.6 15 1.0 13 1.0 14 1.0
119. LOAD COMB 104 0.6 (DS + DO - WX) + AF + TF + FF
120. 4 0.6 6 0.6 10 -0.6 15 1.0 13 1.0 14 1.0
121. LOAD COMB 105 0.6 (DS + DO - WZ) + AF + TF + FF
122. 4 0.6 6 0.6 11 -0.6 15 1.0 13 1.0 14 1.0
123. LOAD COMB 106 DS + DO + 0.75 L + AF + TF + 0.45 WX
124. 4 1.0 6 1.0 8 0.75 15 1.0 10 0.45 13 1.0
125. LOAD COMB 107 DS + DO + 0.75 L + AF + TF + 0.45 WZ
126. 4 1.0 6 1.0 8 0.75 15 1.0 11 0.45 13 1.0
127. LOAD COMB 108 DS + DO + 0.75 L + AF + TF - 0.45 WX
128. 4 1.0 6 1.0 8 0.75 15 1.0 10 -0.45 13 1.0
129. LOAD COMB 109 DS + DO + 0.75 L + AF + TF - 0.45 WZ
130. 4 1.0 6 1.0 8 0.75 15 1.0 11 -0.45 13 1.0
131. LOAD COMB 110 DS + DO + AF + TF + 0.6 WX
132. 4 1.0 6 1.0 15 1.0 10 0.6 13 1.0
133. LOAD COMB 111 DS + DO + AF + TF + 0.6 WZ
134. 4 1.0 6 1.0 15 1.0 11 0.6 13 1.0
135. LOAD COMB 112 DS + DO + AF + TF - 0.6 WX
136. 4 1.0 6 1.0 15 1.0 10 -0.6 13 1.0
137. LOAD COMB 113 DS + DO + AF + TF - 0.6 WZ
138. 4 1.0 6 1.0 15 1.0 11 -0.6 13 1.0
139. ******OPERATING + EARTHQUAKE
140. LOAD COMB 114 0.6 (DS + DO) + AF + TF + 0.7 EO-X
141. 4 0.6 6 0.6 1 0.7 2 0.21 3 0.111 15 1.0 13 1.0
142. LOAD COMB 115 0.6 (DS + DO) + AF + TF + 0.7 EO-Z
143. 4 0.6 6 0.6 2 0.7 1 0.21 3 0.111 15 1.0 13 1.0
144. LOAD COMB 116 0.6 (DS + DO) + AF + TF - 0.7 EO-X
145. 4 0.6 6 0.6 1 -0.7 2 0.21 3 0.111 15 1.0 13 1.0
146. LOAD COMB 117 0.6 (DS + DO) + AF + TF - 0.7 EO-Z
147. 4 0.6 6 0.6 2 -0.7 1 0.21 3 0.111 15 1.0 13 1.0
148. *
149. LOAD COMB 118 DS + DO + AF + TF + 0.75 L + 0.525 EO-X
150. 4 1.0 6 1.0 15 1.0 1 0.525 2 0.158 3 0.111 13 1.0 8 0.75
151. LOAD COMB 119 DS + DO + AF + TF + 0.75 L + 0.525 EO-Z
152. 4 1.0 6 1.0 15 1.0 2 0.525 1 0.158 3 0.111 13 1.0 8 0.75
153. LOAD COMB 120 DS + DO + AF + TF + 0.75 L - 0.525 EO-X
154. 4 1.0 6 1.0 15 1.0 1 -0.525 2 0.158 3 0.111 13 1.0 8 0.75
155. LOAD COMB 121 DS + DO + AF + TF + 0.75 L - 0.525 EO-Z
156. 4 1.0 6 1.0 15 1.0 2 -0.525 1 0.158 3 0.111 13 1.0 8 0.75

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 4 of 12
Wednesday, July 12, 2017, 04:22 PM
STAAD SPACE -- PAGE NO. 5

157. *
158. LOAD COMB 122 DS + DO + AF + TF + 0.7 EO-X
159. 4 1.0 6 1.0 15 1.0 1 0.7 2 0.21 3 0.111 13 1.0
160. LOAD COMB 123 DS + DO + AF + TF + 0.7 EO-Z
161. 4 1.0 6 1.0 15 1.0 2 0.7 1 0.21 3 0.111 13 1.0
162. LOAD COMB 124 DS + DO + AF + TF - 0.7 EO-X
163. 4 1.0 6 1.0 15 1.0 1 -0.7 2 0.21 3 0.111 13 1.0
164. LOAD COMB 125 DS + DO + AF + TF - 0.7 EO-Z
165. 4 1.0 6 1.0 15 1.0 2 -0.7 1 0.21 3 0.111 13 1.0
166. ******ERECTION + WIND
167. LOAD COMB 126 DS + DE + 0.6 WX
168. 4 1.0 5 1.0 10 0.6
169. LOAD COMB 127 DS + DE + 0.6 WZ
170. 4 1.0 5 1.0 11 0.6
171. LOAD COMB 128 DS + DE - 0.6 WX
172. 4 1.0 5 1.0 10 -0.6
173. LOAD COMB 129 DS + DE - 0.6 WZ
174. 4 1.0 5 1.0 11 -0.6
175. ******TEST
176. LOAD COMB 130 DS + DT + L
177. 4 1.0 7 1.0 8 1.0
178. LOAD COMB 131 DS + DT + 0.6 WX
179. 4 1.0 7 1.0 10 0.6
180. LOAD COMB 132 DS + DT + 0.6 WZ
181. 4 1.0 7 1.0 11 0.6
182. LOAD COMB 133 DS + DT - 0.6 WX
183. 4 1.0 7 1.0 10 -0.6
184. LOAD COMB 134 DS + DT - 0.6 WZ
185. 4 1.0 7 1.0 11 -0.6
186. *
187. *
188. PERFORM ANALYSIS

189. LOAD LIST 101 TO 134


190. PRINT STORY DRIFT

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 5 of 12
Wednesday, July 12, 2017, 04:22 PM
STAAD SPACE -- PAGE NO. 6

STORY HEIGHT LOAD DRIFT(CM ) ECCENTRICITY RATIO


------------------------------------------------------------------------
(METE) X Z (METE)

BASE= 0.10

1 0.10 101 0.0000 0.0000 0.0000 L / 0


102 0.0000 0.0000 0.0000 L / 0
103 0.0000 0.0000 0.0000 L / 0
104 0.0000 0.0000 0.0000 L / 0
105 0.0000 0.0000 0.0000 L / 0
106 0.0000 0.0000 0.0000 L / 0
107 0.0000 0.0000 0.0000 L / 0
108 0.0000 0.0000 0.0000 L / 0
109 0.0000 0.0000 0.0000 L / 0
110 0.0000 0.0000 0.0000 L / 0
111 0.0000 0.0000 0.0000 L / 0
112 0.0000 0.0000 0.0000 L / 0
113 0.0000 0.0000 0.0000 L / 0
114 0.0000 0.0000 0.0000 L / 0
115 0.0000 0.0000 0.0000 L / 0
116 0.0000 0.0000 0.0000 L / 0
117 0.0000 0.0000 0.0000 L / 0
118 0.0000 0.0000 0.0000 L / 0
119 0.0000 0.0000 0.0000 L / 0
120 0.0000 0.0000 0.0000 L / 0
121 0.0000 0.0000 0.0000 L / 0
122 0.0000 0.0000 0.0000 L / 0
123 0.0000 0.0000 0.0000 L / 0
124 0.0000 0.0000 0.0000 L / 0
125 0.0000 0.0000 0.0000 L / 0
126 0.0000 0.0000 0.0000 L / 0
127 0.0000 0.0000 0.0000 L / 0
128 0.0000 0.0000 0.0000 L / 0
129 0.0000 0.0000 0.0000 L / 0
130 0.0000 0.0000 0.0000 L / 0
131 0.0000 0.0000 0.0000 L / 0
132 0.0000 0.0000 0.0000 L / 0
133 0.0000 0.0000 0.0000 L / 0
134 0.0000 0.0000 0.0000 L / 0

2 0.60 101 0.0203 0.0000 0.0000 L / 2459


102 0.0207 0.0000 0.0000 L / 2414
103 0.0203 0.0004 0.0000 L / 2459
104 0.0200 0.0000 0.0000 L / 2506
105 0.0203 -0.0003 0.0000 L / 2459
106 0.0206 0.0000 0.0000 L / 2425
107 0.0203 0.0003 0.0000 L / 2459
108 0.0200 0.0000 0.0000 L / 2494
109 0.0203 -0.0002 0.0000 L / 2459
110 0.0207 0.0000 0.0000 L / 2414
111 0.0203 0.0004 0.0000 L / 2459

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 6 of 12
Wednesday, July 12, 2017, 04:22 PM
STAAD SPACE -- PAGE NO. 7

STORY HEIGHT LOAD DRIFT(CM ) ECCENTRICITY RATIO


------------------------------------------------------------------------
(METE) X Z (METE)

BASE=

112 0.0200 0.0000 0.0000 L / 2506


113 0.0203 -0.0003 0.0000 L / 2459
114 0.0433 0.0069 0.0000 L / 1154
115 0.0272 0.0230 0.0000 L / 1836
116 -0.0026 0.0069 0.0000 L / 7216
117 0.0272 -0.0229 0.0000 L / 1836
118 0.0376 0.0052 0.0000 L / 1331
119 0.0255 0.0173 0.0000 L / 1959
120 0.0031 0.0052 0.0000 L / 9574
121 0.0255 -0.0172 0.0000 L / 1959
122 0.0433 0.0069 0.0000 L / 1154
123 0.0272 0.0230 0.0000 L / 1836
124 -0.0026 0.0069 0.0000 L / 7216
125 0.0272 -0.0229 0.0000 L / 1836
126 0.0004 0.0000 0.0000 L / 0
127 0.0000 0.0004 0.0000 L / 0
128 -0.0004 0.0000 0.0000 L / 0
129 0.0000 -0.0004 0.0000 L / 0
130 0.0000 0.0000 0.0000 L / 0
131 0.0004 0.0000 0.0000 L / 0
132 0.0000 0.0004 0.0000 L / 0
133 -0.0004 0.0000 0.0000 L / 0
134 0.0000 -0.0004 0.0000 L / 0
191. *
192. PARAMETER 1
193. CODE AISC
194. FYLD 2.53107E+007 MEMB 100 TO 102 200 TO 202
195. FU 4.21844E+007 MEMB 100 TO 102 200 TO 202
196. KY 2 MEMB 100 200
197. KZ 2 MEMB 100 200
198. LY 0.5 MEMB 100 200
199. LZ 0.5 MEMB 100 200
200. DJ1 3 MEMB 101
201. DJ2 2 MEMB 101
202. DJ1 4 MEMB 102
203. DJ2 2 MEMB 102
204. DJ1 1 MEMB 100
205. DJ2 2 MEMB 100
206. DJ1 7 MEMB 201
207. DJ2 6 MEMB 201
208. DJ1 8 MEMB 202
209. DJ2 6 MEMB 202
210. DJ1 5 MEMB 200
211. DJ2 6 MEMB 200
212. DFF 360 MEMB 101 102 201 202
213. DFF 200 MEMB 100 200
214. TRACK 1 MEMB 100 TO 102 200 TO 202
215. RATIO 1 MEMB 100 TO 102 200 TO 202
216. CHECK CODE MEMB 100 TO 102 200 TO 202

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 7 of 12
Wednesday, July 12, 2017, 04:22 PM
STAAD SPACE -- PAGE NO. 8

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 8 of 12
Wednesday, July 12, 2017, 04:22 PM
STAAD SPACE -- PAGE NO. 9

STAAD.Pro CODE CHECKING - (AISC 9TH EDITION)


***********************

ALL UNITS ARE - KG METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

100 ST PIPS40 (AISC SECTIONS)


PASS AISC- H2-1 0.461 122
4085.36 T 2.72 289.99 0.00

-----------------------------------------------------------------------
| MEM= 100 , UNIT NEW-MMS, L= 500. AX= 2045.SZ= 52657.SY= 52657.|
| KL/R-Y= 26.1 CB= 1.00 YLD= 248.21 ALLOWABLE STRESSES: FCZ= 163.8 |
| FTZ= 163.8 FCY= 163.8 FTY= 163.8 FC= 139.5 FT= 148.9 FV= 99.3 |
-----------------------------------------------------------------------

101 ST H100X100X6 (JAPANESE SECTIONS)


PASS SHEAR -Y 0.001 101
0.00 T 0.00 0.59 0.00

-----------------------------------------------------------------------
| MEM= 101 , UNIT NEW-MMS, L= 250. AX= 2159.SZ= 75600.SY= 26800.|
| KL/R-Y= 10.0 CB= 1.00 YLD= 248.21 ALLOWABLE STRESSES: FCZ= 163.8 |
| FTZ= 163.8 FCY= 186.2 FTY= 186.2 FC= 145.9 FT= 148.9 FV= 99.3 |
-----------------------------------------------------------------------

102 ST H100X100X6 (JAPANESE SECTIONS)


PASS SHEAR -Y 0.001 101
0.00 T 0.00 0.59 0.00

-----------------------------------------------------------------------
| MEM= 102 , UNIT NEW-MMS, L= 250. AX= 2159.SZ= 75600.SY= 26800.|
| KL/R-Y= 10.0 CB= 1.00 YLD= 248.21 ALLOWABLE STRESSES: FCZ= 163.8 |
| FTZ= 163.8 FCY= 186.2 FTY= 186.2 FC= 145.9 FT= 148.9 FV= 99.3 |
-----------------------------------------------------------------------

200 ST PIPS40 (AISC SECTIONS)


PASS AISC- H1-3 0.492 122
3539.54 C 93.58 311.93 0.00

-----------------------------------------------------------------------
| MEM= 200 , UNIT NEW-MMS, L= 500. AX= 2045.SZ= 52657.SY= 52657.|
| KL/R-Y= 26.1 CB= 1.00 YLD= 248.21 ALLOWABLE STRESSES: FCZ= 163.8 |
| FTZ= 163.8 FCY= 163.8 FTY= 163.8 FC= 139.5 FT= 148.9 FV= 99.3 |
-----------------------------------------------------------------------

201 ST H100X100X6 (JAPANESE SECTIONS)


PASS SHEAR -Y 0.001 101
0.00 T 0.00 0.59 0.00

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 9 of 12
Wednesday, July 12, 2017, 04:22 PM
STAAD SPACE -- PAGE NO. 10

ALL UNITS ARE - KG METE (UNLESS OTHERWISE NOTED)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

-----------------------------------------------------------------------
| MEM= 201 , UNIT NEW-MMS, L= 250. AX= 2159.SZ= 75600.SY= 26800.|
| KL/R-Y= 10.0 CB= 1.00 YLD= 248.21 ALLOWABLE STRESSES: FCZ= 163.8 |
| FTZ= 163.8 FCY= 186.2 FTY= 186.2 FC= 145.9 FT= 148.9 FV= 99.3 |
-----------------------------------------------------------------------

202 ST H100X100X6 (JAPANESE SECTIONS)


PASS SHEAR -Y 0.001 101
0.00 T 0.00 0.59 0.00

-----------------------------------------------------------------------
| MEM= 202 , UNIT NEW-MMS, L= 250. AX= 2159.SZ= 75600.SY= 26800.|
| KL/R-Y= 10.0 CB= 1.00 YLD= 248.21 ALLOWABLE STRESSES: FCZ= 163.8 |
| FTZ= 163.8 FCY= 186.2 FTY= 186.2 FC= 145.9 FT= 148.9 FV= 99.3 |
-----------------------------------------------------------------------

217. FINISH

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= JUL 12,2017 TIME= 16:18:30 ****

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 10 of 12
Wednesday, July 12, 2017, 04:22 PM
STAAD SPACE -- PAGE NO. 11

************************************************************
* For questions on STAAD.Pro, please contact *
* Research Engineers Offices at the following locations *
* *
* Telephone Email *
* USA: +1 (714)974-2500 support@bentley.com *
* CANADA +1 (905)632-4771 detech@odandetech.com *
* UK +44(1454)207-000 support@bentley.com *
* NORWAY +47 67 57 21 30 staad@edr.no *
* SINGAPORE +65 6225-6158 support@bentley.com *
* INDIA +91(033)4006-2021 support@bentley.com *
* JAPAN +81(03)5952-6500 eng-eye@crc.co.jp *
* CHINA +86(411)8479-1166 support@bentley.com *
* THAILAND +66(0)2645-1018/19 support@bentley.com *
* *
* North America support@bentley.com *
* Europe support@bentley.com *
* Asia support@bentley.com *
************************************************************

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 11 of 12
Wednesday, July 12, 2017, 04:22 PM
STAAD SPACE -- PAGE NO. 12

D:\Data Radea\Medco Energi\Blok A EPC Project\Calculation\Pipe Support\STAAD-0A\ARR\Node 140-160 TP Comb.anl


Page 12 of 12

S-ar putea să vă placă și