RESUME

Objective
Intend to build a career with leading corporate of hi-tech environment with
committed & dedicated people, who will support me to explore myself fully,
realize my potential. Willing to work as a key player in challenging & creative
environment. Adaptable and a quick learner, possess skills to work under
pressure.

7 Years Electrical Experience


1. Worked as CATHODIC PROTECTION Site Incharge from October
M.Thiruselvam 2015 to at present in Electro Corr Damp Pvt.Ltd, GUJARAT,
INDIA.

Mobile No 2. Worked as Electrical Project Engineer from October 2012 to


+91-8608798549 December 2014 with Ali Haider Al Yami &Sons in Kingdom of
Saudi Arabia
Email:
thirunan48@gmail.com
3. Worked as Design & Development Engineer in Sre Vishnu
Magnetics pvt. ltd - Chennai - Tamil Nadu, INDIA. from 2011 to
Skype id: October 2012.
Thiruselvam
or 4. Worked as Site Incharge in gas pipe line Cathodic protection
8608798549 in Corrosion Control Engineers from 2010 to 2011 at Karaikudi,
Tamil Nadu, INDIA.
Permanent Address:
3/3087-4 Education
Meenachi Nagar
1st Street BE. (EEE) – (2006 to 2010) – Syed Ammal Engineering College,
Pattinamkathan, (Under Anna University - Chennai.), Ramanathapuram, Tamil Nadu.
Ramanathapuram
Pincode: 623503 Higher Secondary- (2005 to 2006) – Louis Levail Matriculation Higher
Tamilnadu, India Secondary School, Ramanathapuram, Tamil Nadu.

SSLC–(2003 to 2004) – United Matric High School, Ramanathapuram,


Tamil Nadu.
Personal Data:
Software Skills
DOB : 07/12/1988 Worked Softwares : Auto-cadd, RAY MEDI, SAP.
Sex : Male
Nationality : Indian Office Applications : MS-Office, MS-Word, MS-Excel,
Marital Status: Married MS-Powerpoint.
Operating Systems : Windows-98, 2000, Windows XP,
Windows 7,8,10

1|Page
2|Page
Set of Experiences:
Present Experience ELECTRICAL PROJECT INCHARGE
Client Gujarat State Petronet Limited
Duration October 2015 to Till Date
Team Size As per work Requirement
MAINTENANCE,TESTING,
Role
COMMISIONING & MONITORING.

Description :
 Arrange working material and process requirement for the project.

 Check and verify Electrical installations after work has been finished.

 Installation of Surge Diverter, Polirazation Cell, GIRK Cell,TLP’s

 TCP Testing & Commisiong, ICCP Testing ,Commisioning, Monitoring & Maintenance.

 TLP’S Monitoring & Maintenance, Tr Unit Monitoring & Maintenance, Anode Bed
Monitoring & Maintenance, CTSu Testing, Er Probe Testing

 AC Intereference Survey

 Casing Survey, CIPL Survey.

 Monthly Report Preparation and Site Expense Management.

 Invoice preparation For Finished Work Assignment

 Satisfy the customer with reliable and safety electrical works .

 Plan the work to finish in time.

Responsibilities:
.
 Preparation of bill of quantities(BOQ)
 Take of quantities of area (civil, electrical and mechanical works from GFC drawings)
 Checking of site inspection reports JMs for various works as per approved construction
drawings and site verification works executed by the contractor
 Preparation of rate analysis for variation orders.
 Preparation of Site Monitoring report as per GSPL Standards.
 Preparation of QS Report and Monthly Cash Flow.
 Preparations scrutinizing certifying and processing of contractor running and final account
bills.
 This involves verification of contractor bills with the applicable terms and conditions
certification and ensuring compliance to the statutory requirements like Service Tax.

3|Page
1.Past Experience ELECTRICAL PROJECT ENGINEER
Client Saudi Electricity (SCECO)
Duration October 2012 to December 2014
Team Size Above 8 to10
Role Project Execution

Description :

 Project Estimating & scheduling for FEEDER LINES, MINI PROJECTS, CONSUMER
PROJECTS upto 69KV &13.8KV.
 Erection of 3 Phase Transformers, 1Phase Transformers & RMU installations.
 Underground cable lay Equipments estimating, scheduling, planning , supervising (from1kv
to13.8kv).
 Handling of Cable Fault Detection Works,Cable Jointing Works, Phase Angle Detection
Works, Meger Tests, Cable Puncture works & Electrical Shutdown Works upto
69KV,13.8kv, 11kv
 Quality of work provide with respect to Saudi Electricity SCECO standards.
 Manage and Maintain the SCECO FIVE STAR Safety standards in the working
environment.
 Site Analyzing, Surveying and provide report to SCECO Engineering team
 Check the technical specification, BOQ as per our client requirement which received from
in house Engineering or any consultant firm
 Handling the design part and prepare the BOQ in brief as per requirement of
tender/Project.
 Account maintenance for total expense of each projects and coordinate the process of
invoice preparation for finished projects.
 Customer problem solving with interactions.

Responsibilities:

 Electrical Project Execution as per Saudi Electricity board builted design and drawings.
 Arrangement of Project needs by Site requirement
 Erection of Cable, Transformer, RMU, Electrical Protection Equipments.
 Site Coordination with Manpower
 Timesheet Management Of Site Workers.
 Preparation of bill of quantities(BOQ)
 Preparation of Site Monitoring report as per SCECO Standards.
 Preparation of QS Report and Monthly Cash Flow.
 Preparations scrutinizing certifying and processing of contractor running and final account
bills.
 Problem Solving with Saudi Customers.
 Ensure the Project Completion With Time

4|Page
2. Past Experience DESIGN & DEVELOPMENT ENGINEER
Client More Transformer related companies like
SALCOMP, GE Healthcare, Nokia, etc
Duration 2011 to October 2012.
Team Size As per work requirement
Role New project Development in R&D Department

Description:

 The main purpose of this project is "Collecting the electrical and mechanical product
details by using sourcing, cleansing and enrichment process.

 Preparation of Transformer designs, BOQs, PFC charts, FMEAs as per


customer requirements and interact with customers.

 Preparation of New transformer samples for companies like GE, NOKIA, SALCOMP,
SAMSUNG,Testing and Commissioning Transformers upto 10KVA,7KVA,5KVA,50VA,

 Documentation of new development samples.

Responsibilities:
 Collecting the equipment details.
 Co-ordinate with Quality team, software team for effective data production, quality
feedback and software up gradation.
 Resource Utilization for proper achievement of management’s objective in terms of
productivity and quality
 Project / Production Documentation
 Interaction with customer

3.Past Experience SITE INCHARGE


Client ONGC, GAIL, HPCL, IOCL
Duration 2010 to 2011
Team Size As per work Requirement
Role Site Coordinator
Description:

 Site checking and analyzing process,

 Estimation, Quotation preparation and Documentation.

 Preparation of materials for give protection against corrosion,

 Communicate with customers and give financial benefits to company,

 Employee arrangements for work.


5|Page
Responsibilities:
 Collecting the equipment details.
 Linking of Function Location, Equipment Master, Material Master, Bill Of Materials (BOM) &
other engineering Drawing Documents as per LSMW Template
 Creation of Bill Of Materials (BOM).Core Responsibilities
 Production Planning, control and execution
 Developing process based on the project specification, process approval steps
 Daily Productivity Reporting to the management
 Conduct Production Review Meeting on weekly basis, and take appropriate steps towards
100% productivity

INDUSTRIAL TRAININGS:
ARKAY Power Plant, Tamil Nadu, INDIA.
3 months trained at ARKAY Power generation & distribution unit in 2010,
Ramanathapuram.

Government Power Transmission & Distribution in 2011, TamilNadu, INDIA.


3 months trained at Valuthur gas power plant,
Ramanathapuram.

SKILLS SET:
Preparing engineering drawings of Electrical Services and technical specifications.
Performing requirement analysis, Finalising specifications and validating designs.
Providing technical inputs & engineering support to the team from conception
to completion of project.
Coordinating techno-commercial activities and drawing specifications.
Managing tendering process from floating bids to awarding contracts.
Managing installation, erection & commissioning of electrical systems.

PROJECTS:
Academic Project (Final year college project):
Title: Energy Auditing and Study of Inter relationship between the load power
factors in three phases,
Description: Maintain the load power factor =1 in three phases, by equalize the load
acting at each phases(R,Y,B). Due to this project, penalty payed by my college to
government electricity board get reduced .
Inter College Project :
Participate in intercollege project presentation in third year, Title: Portable Mobile
Charger Using Wind Energy,
Description: Using DC motor with the help of wind produce sufficient voltage for charging
mobile

6|Page
Languages known
Tamil: Speak, Read, Write.
English: Speak, Read, Write.
Hindi: Speak only.
Arabic: Speak (not fluency).

Passport Details
 Passport Number: J5672108
 Date Of Issue: 24-03-2011
 Date Of Expiry: 23-03-2021

Declaration
I assure that I can prove very successful and do my best to the advancement and progress of
your esteemed organization.

Place: Gujarat Regards,


Date: 20/12/2018 Thiruselvam M