Advances in Social Science, Education and Humanities Research, volume 286

3rd International Seminar on Education Innovation and Economic Management (SEIEM 2018)

Research on Performance Management System of


Electric Power Enterprise Based on BSC
Shipeng Zheng
Financial Management Dept., Economics and Management School
North China Electric Power University
Beijing, China

Abstract—With the deepening of China's power market Using BSC can make electric power enterprise no longer
reform, the electric power enterprise are facing increasingly limited to the evaluation of business results, but pay more
fierce external competition. This paper wants to find a way to attention to the management of the basic business processes of
improve enterprise internal performance management systems, enterprises. It can avoid the management model of the
performance assessment and enhance competitiveness. Based on performance evaluation of electric power enterprise in the past,
the overview of domestic electric power enterprise, this paper regardless of the results. Enterprises can no longer rely solely
introduces the theory of BSC and its advantages, and proposes a on the data of financial indicators to measure their development,
research on the performance management system of electric add some non-financial indicators that affect the survival and
power enterprise based on BSC. The electric power enterprise development of enterprises, and closely integrate the corporate
BSC has design innovation, starting from the four aspects of
finance, customer, internal operation and learning & growth.
strategy to make up for the short-term behavior caused by
Finally constructs the performance management of electric traditional financial evaluation, which is beneficial to
power enterprise with BSC as the core. This system has strong maximize the long-term interests of the company.
operational and practical value.
II. THEORETICA L OVERVIEW
Keywords—The electric power enterprise; BSC; Performance A. The electric power enterprise Overview
management system; Performance appraisal
1) Production and operation characteristics
I. INTRODUCTION Electric power enterprise is capital-intensive and
Since 2002, China has implemented the power system technology-intensive enterprises. From preparation to operation,
electric power enterprise has large-scale investment, high
reform. Nowadays, with the rapid development of the power
original assets, high operating costs, large production scale,
industry, the regional power market bidding trial operation.
The direct customer power supply trial operation and other complete production, supply and sales chains and out of stored.
policies have been implemented. The government further Therefore, its production management has the following
promotes the reform of electric power system and introduces characteristics [1]:
competition mechanism. It is important to further promote the a) Production management characteristics
formation of a reasonable power market mechanism. The production chain of electric power enterprise includes
At present, the competitive environment, organizational operation and maintenance. The operation personnel start the
structure, management model, and customer needs of Chinese unit, use knowledge and skill to ensure that the generator set
electric power enterprise are undergoing profound changes. generates electricity and heat supply normally. After the unit is
The original performance management system has clearly operated for a certain period of time, it is necessary to conduct
fallen behind the times. The original performance management regular classification inspection and comprehensive inspection.
system of electric power enterprise is essentially a negative Since electric power enterprise generally aim at safe and stable
incentive management mode based on deduction method. The power generation, the maintenance and repair links in electric
assessment content is simple and extensive, does not consider power enterprise are more important than those in general
the difference in performance between employees as enterprises. Maintenance is a complicated and sudden work.
knowledge carriers. Finally it leads to the average on the Therefore, the management of maintenance by electric power
distribution system. Doctrine cannot fully mobilize the enterprise is backward, and it is difficult to formulate detailed
enthusiasm and creativity of employees, which obviously work standards. The production of electric power enterprise is
cannot meet the competition needs of electric power enterprise a continuous process, and there is no product storage, each
to participate in the markets. With the gradual improvement of production process is required to perform its duties. The cost
China's market-oriented economic system and the deepening of increase caused by the interruption of production in electric
the market-oriented operation of electric power enterprise, it power enterprise is enormous, and the impact of accidents is
has become inevitable to establish a strategy-oriented much greater than that of ordinary companies.
performance management system.

Copyright © 2019, the Authors. Published by Atlantis Press.


This is an open access article under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/). 176
Advances in Social Science, Education and Humanities Research, volume 286

b) Financial management characteristics level, the performance appraisal is indispensable. There are
Compared with the financial management of general performance appraisal of subordinate enterprises, subordinate
manufacturing enterprises, the cost of main business is departments, posts and personnel.
different. The products produced by electric power enterprises c) Complexity of power enterprise performance
are electricity and heat, the products cannot be stored; the main management
income is power generation and heating income, and the main
costs include variable costs such as fuel and water charges; From the reality, most of the current performance
fixed costs such as repair costs, material costs, equipment management methods of China's electric power enterprise are
depreciation, and staff salaries. Due to the particularity of the based on the use of unified performance appraisal indicators,
electric power enterprise, there is basically no operating including performance, satisfaction, security and so on.
expenses, the management expenses are included in the main Obviously, this single method is not universal, and it is difficult
cost, shared by the electric heating products. to get employees' recognition of performance management
work, and even a monotonous system will cause employees to
c) Characteristics of human resource management resent. The design of performance appraisal indicators for
The integration and automation of electric power enterprise electric power enterprise must take into account the scientific
are relatively high. The general monitoring personnel work nature of indicators and the inherent connectivity of indicators.
after a period of training, those with a certain level of The business of China's electric power enterprise from power
knowledge can do the job. Some new large installed capacity generation to supply, from the city to the countryside, gradually
power plants have a small number of actual operators, while to the world, it is clear that the use of unified performance
some old power plants have a large installed capacity and a indicators can’t adapt to the complex and varied objective
large number of personnel. This is mainly due to the fact that environment. All kinds of contradictions will increase the
the power system reform has not been long, and the historical complexity of the performance appraisal indicator system.
personnel and problems of some old power plants have caused. 3) Disadvantages of power enterprise performance
All the old power plants are the key units that really need to
improve the performance appraisal system. management
In recent years, many electric power enterprises have
d) Marketing management characteristics introduced management concepts and methods, made a lot of
There are no product quality problems in the products attempts in performance management. But there is still room
produced by electric power enterprise. There are only for improvement. The factors affecting and restricting
quantitative problems. The electricity price is set by the performance appraisal mainly include the following aspects:
government, and the power generation quantity is also issued • The performance management system of electric power
by the power grid dispatching center. Therefore, it is not enterprises is not detailed enough, resulting in lack of
necessary for enterprises to advertise a lot or go to marketing, pertinence in performance evaluation;
which is different from the general manufacturing enterprises.
• In the power enterprise, the enterprise-department-post
2) Characteristics of electricity enterprise performance three-level performance appraisal is out of line, and
management there is no organic whole from top to bottom;
The particularity of the production and management of
electric power enterprise determines the management mode of • The decomposition of job target responsibility is not
electric power enterprise and also determines the characteristics clear. Managers and employees generally have no
of power enterprise performance management. enthusiasm for performance appraisal. Performance
appraisal is in the form;
a) Diversity of power enterprise performance
management • Some electric power enterprise have weak market and
Traditionally, electric power enterprise has been seen as a innovation awareness, constantly ignoring long-term
type of manufacturing industry. In fact, the production performance;
activities of electric power enterprise span multiple fields, • The performance evaluation of electric power enterprise
including power generation, heating, power design, and power lacks effective communication and management in the
sales. Therefore, when designing the performance appraisal implementation process and the feedback stage, which
system, the electric power enterprise must establish the target cannot help them improve the problems in their work;
design; clarify the focus of performance appraisal. the application range of performance evaluation results
b) Hierarchical of power enterprise performance is limited.
management • The purpose of performance evaluation of most electric
From the organizational level of China's power system; power enterprise is to adjust the salary of employees,
there are two major power grid companies and five major but they are rarely planned and implemented effectively
power generation groups. Under the power grid company, there from the perspective of department development and
are large-scale grid companies and provincial, municipal, and department management.
county-level power grid branches. There are also hundreds of
power plants under the five major power generation groups.
From the highest strategic level to the lowest post executive

177
Advances in Social Science, Education and Humanities Research, volume 286

B. The BSC Overview company. Balance non-financial and financial indicators


1) The BSC concept from the perspective of the company's financial situation.
The BSC is a performance evaluation system based on From the perspective of the company's customers, balance
Robert Kaplan and David Norton's "Future Organizational the external personnel and internal personnel: the customer
Performance Measurement Method" in the past 90 years. In and the shareholder are the external personnel of the
1990, the financial performance indicators gradually more and enterprise, and the employees are the internal personnel of
more ineffective for modern enterprise organizations. The the enterprise. The balanced scorecard comprehensively
evaluation of enterprise performance by relying solely on considers the internal factors and external factors of the
financial indicators will affect many problems when the enterprise, balances the interests of all relevant personnel.
enterprises creating values. Probably replacing the exploration Finally, the Balanced Scorecard balances the results and
of financial performance indicators, they ultimately decided to causes, no longer results-oriented, begins to focus on the
use the concept of a scorecard that would summarize the process.
performance indicators of all activities of the organization.
Second, to provide companies with a guide to future
a) The BSC features actions. The Balanced Scorecard has always been guided by
The Balanced Scorecard is centered on the company's the completion of corporate strategic, which has led
strategy and forms an organic whole. It not only includes the companies to constantly seek all the drivers that contribute
financial accounting indicators in the traditional performance to achieving strategic goals. This shows that the Balanced
appraisal, but also supplements the performance appraisal Scorecard is superior to other performance evaluation
indicator system through business indicators such as customer methods, and it overcomes the shortcomings that the past
satisfaction, internal processes, learning and growth. In this evaluation cannot find the real cause of the problem.
way, the organization is able to track financial results and
closely focus on intangible assets. The enterprise will increase III. P ERFORMANCE MANAGEMENT SYSTEM OF ELECTRIC
their capabilities and gaining future growth potential. At the P OWER ENTERPRISE BASED ON BSC
same time, the balanced scorecard brings strong support to the
quality management of the enterprise, improves the overall A. Balanced scorecard design
management level. The enthusiasm of employees and the When different companies use the Balanced Scorecard as
incentive effect on employees got improved. their performance evaluation method, they must design a
balanced scorecard system suitable for the long-term
b) The details of BSC
development of the company according to the nature of the
The balanced scorecard theory mainly introducing four enterprise and the strategic goal vision.
dimension from the traditional financial perspective: the
perspective of finance, customer, internal business process, TABLE I. ELECT RIC ENT ERPRISE’S FINANCIAL DIMENSION INDEX
learning and growth. The main contents of which are shown
in the figure [2]. BSC
Target Indicators Measures
dimensions

Improve the
Increase Total increase of company's marketing
electricity sales electricity sold input and service
quality level
Increase technology
Reduce production capability and
Control cost
costs introduce new
equipment
Financial Purchase electricity
Reduce sales Decrease in sales
dimension Online; Expand the
expenses cost
scope of publicity
Use new equipment,
Fig. 1. Fundamental contents of BSC Index System Increase power
Full utilization of new methods and high
generation
resources efficiency energy to
efficiency
2) The advantages of BSC reduce resource waste
The balanced scorecard has been continuously improved Reduce
Total expenditure Strengthen
in the later research, and many scholars have supplemented Unnecessary
reduction supervision function
the theory from different angles. The current Balanced expenses
Scorecard shows the following advantages [3]:
First, emphasizes the balance. Through the four levels of
indicators, build a comprehensive, balanced system to
reflect the development of the company objectively and
effectively. From the perspective of business operations,
balance the short-term goals and long-term goals of the

178
Advances in Social Science, Education and Humanities Research, volume 286

TABLE II. ELECT RIC ENT ERPRISE’S CUST OMER, INT ERNAL BUSINESS
AND LEARNING & GROWT H DIMENSION INDEX
IV. THE EXPECTED EFFECT OF BALANCED SCORECA RD IN
Increase the
Improving the power POWER ENTERPRISE PERFORMANCE MANAGEMENT SYSTEM
convenience of System average
purchase system on the
purchasing account rate Achieve dynamic management of the department. Each
Internet
electricity
quarter's dynamic assessment can reflect the gaps and upgrade
Improving company points between the current quarter and the previous quarter,
service quality
Expand
Market share management and
thus continuously improving the comprehensive
the market competitiveness [5].
Customer marketing management
dimension ability
Identify problems and correct internal employees. It also
Enhance the service
Increase residents'
Customer loyalty consciousness of helps to strengthen communication between leaders and
satisfaction employees, create a more harmonious and mutually supportive
enterprises
Upgrading the departmental work atmosphere, and mobilize the enthusiasm
Control
voltage Voltage standard
management level of of all employees [6].
transmission equipment
stability
and personnel V. CONCLUSION
Improve Equipment Equipment maintenance
equipment safety failure rate and repair
In the future, optimizing the performance management
system will be a very important means for electric power
Incidence of Strengthen the training of
Improve personnel
personal safety awareness for enterprise to gain competitive advantage. The use of the BSC
safety performance evaluation system in electric power enterprise is
accident employees
Internal not the ultimate goal. Compare the evaluation results in the
Safety work Enthusiasm for staff
business Safety education
dimension
status participation operation process of the enterprise with the expected goals,
Improving the Power grid Management of quality find out the main failure causes, re-determine the evaluation
quality of project renovation level in construction indicators, and establish an effective performance
management project projects management cycle. This has certain reference significance for
Improving process Improvement of Design of scientific its power enterprises to improve their competitiveness.
management technology level standard of power supply
Provide internal training
Employees
Investment in courses to encourage
grow in the
Learning and organization.
staff education employees to receive REFERENCES
growth further education.
[1] Ren Fang. The Application of Balanced Scorecard in the Performance
dimension Improving Construction of Management of China's Co mmercial Ban ks Behavior example [D].
Enhance Smart grid
information information Chengdu: Southwestern University of Finance and Economics, 2012. (In
construction
construction facilities Chinese)
[2] Deng Huan. Analysis of Enterprise Strategy and Performance
B. Determining the BSC scores Management Based on Balanced Scorecard--Taking V Co mpany to
After the initial establishment of a balanced scorecard for Construct Balanced Scorecard System as an Examp le [J]. Youth years,
electric power enterprise, more important is the 2013 (5).
comprehensive use of quantitative and qualitative indicators. [3] Sánchez-Ortiz J, García-Valderrama T, Rodríguez-Cornejo V. Towards
Then selecting the key performance indicators of different a balanced scorecard in regulated co mpanies: A study of the Spanish
electricity sector[J]. Electricity Journal, 2016, 29(9):36-43.
levels of electric power enterprise [4]. The following table
[4] Ferreira A M S D C. Ho w managers use the balanced scorecard to
quantifies the performance indicators in the Balanced support strategy imp lementation and formu lation processes[J]. Tékhne,
Scorecard. 2017.
[5] Sheng Yu ming, Li Shenghui. Perfo rmance Evaluation System for
TABLE III. THE BSC QUANT IT AT IVE INDICAT ORS Balanced Scorecard of State-owned Power Enterprises with the Purpose
of Realizing Strategic Landing[J].Enterprise Management, 2016(S2):18-
level Specific description 19.(In Chinese)
Outstanding Actual performance is significantly higher than expected. [6] Lei, Guo, L. I. Yun-Feng and S. Xiao-Ping. "Analysis on Application of
The actual performance has reached or exceeded the expected the Balanced Score Card in the Performance Evaluation for Power Grid
Good
plan. Enterprises in China." Energy Technology & Economics (2010)
Normal The actual performance is basically up to the expected plan.
Actual performance did not meet the expected plan. Obvious
Poor
mistake

179