Documente Academic
Documente Profesional
Documente Cultură
Superintending Engineer
2 Shri C.M. Tripathi 9425186700
Executive Engineer
3 Shri N.P Batham 9425341065
Sub Engineer
5 Arivind Rathore
FORM - 195
CERTIFICATE FOR ACCORDING TECHNICAL SANCTION BY THE
COMPETENT OFFICER
(Certificate to be signed by the next Lower officer to the competent officer)
CERTIFICATE
RAWARI STOP DAM PROJECT
Certified that :-
Main items
8
Cost of land taken
i Irrigated NA
ii non irrigated NA
Forest land NA
9 amount of land acquisition NA
Private
Length of main canal
NA
11
12 Area to be acquired ( dam and canal) NA ha
Culturable Area to be acquired ( dam and canal) NA ha
13 In case of RAA cases original designed area in ha NA
Kharif
Rabi Total
Proposed max rabi irrigation
14 195 ha
Proposed max rabi irrigation
14 195 ha
15 Total cost in Rs lakhs
Unit 1 Rs. 168.57 lakhs
Unit 2 Nil
16 Cost per ha Rs. 86446/-
Rs lakhs per ha 0.86 lakhs
B.C. Ratio
2.61% 1.53%
17
Name of village benefited
1- Rawari
18
Ratio of area proposed for irrigation to culturable
area under submergence
19
Cost of AA with year AWAITED
20
RAWARI STOP DAM PROJECT
TEHSIL :- DATIA DISTRICT :- DATIA
BRIEF DESCRIPTION
CONSTITUENCY DETAILS
1
Nearest village RAWARI
2
Constituency No. DATIA
3
Name of M.L.A. Hon. Dr. Narottam mishra
4
Name of M.P Hon. Dr. Bhagirath Prasad
RAWARI STOP DAM PROJECT
TEHSIL :- DATIA DISTRICT :- DATIA
SALIENT FEATURES
1 LEADING DETAILS:
1 Name of Project :- RAWARI STOP DAM PROJECT
2 Tehsil :- DATIA
3 Name of River or Nalla :- Sonya Nalla
4 Location of Barrage :- Near Village Rawari
5 Longitude & Latitude :- 78"19'00 25"44'00
6 Basin :- Sindh Basin
2 RESERVOIR DATA:
1 Catchment area :- 57.35 Sq.km
2 Intercepted C.A. :- Nil
3 Net catchment area :- 57.35 Sq.km
4 Gross storage capacity :- 0.55 Mcum
3 PRINCIPAL LEVELS:
1 Nalla bed level :- R.L. 98.00 M
2 Sill level :- R.L. 98.00 M
3 Top Level :- R.L. 102.00 M
4 H.F.L. :- R.L. 104.00 M
4 DAM DETAILS:
1 Length of Main Dam :- 30 mtr
2 Width of crest :- 1.2 mtr
3 No of shutter :- 6 no.
5 BENEFITS:
1 Culturable command area :- 195 ha
2 Area proposed for Irrigation :-
(a) Hy. Wheat :- 110 ha.
(b) Ordinary Wheat :- 55 Ha.
( c ) Gram :- 30 Ha.
Total :- 195 ha.
P DAM PROJECT
RAWARI STOP DAM PROJECT
TEHSIL :- DATIA DIS
CHECK STATEMENT FOR MINOR IRRIGATION SCHEME (TO ACCOMPANY T.C. 70)
Cropping pattern :-
10
:-
Proposed (Ac.)
(a) Kharif- :-
:- Wheat 55
:- Gram 30
Dead Storage :-
13
(a) Required Not applicable
Submergence :-
14
1) Gross :- NIL
:-
PROJECT
rasad
Mishra
110 12"
55 12"
30 6"
195 Ha.
ac.
en made.
RAWARI STOP DAM PROJECT
TEHSIL :- DATIA DISTRICT :- D
Has the cost per Hac. Been checked and found Cost per Hac. On irrigation ara is Rs.
1 reasonable 86446/- which is reasonable.
(A) Has the site been found suitable with regard to The barrage site selected is best suited
2 Bund site. looking to site condition.
(B) Waste weir site NA
Where the construction are available in the required All the materials required are available
3 quantity and within economical lead. with in economical lead.
Is the percentage of submergence of cultivated land NA
4 to the area proposed for irrigation is 10%.
5 Weather:-
Tank percentage adopted in constant with the crop NA
(a) required and the rainfall of the Region
The storage proposed is adequate for present need It is adequate for present requirement no
(b) and future expansion. future expansion is proposed.
Soil is fit for irrigation from the point of view of The soil testing is not done. Soil is fairly
salinity and other consideration. suitable for irrigation. Moreover it is a
(ii) very small scheme and salinity is not
feared.
(iii) Reason for new minor scheme To increase the percentage of Irrigation.
Where the site inspection report of executive Yes
9 Engineer in enclosed.
DISTRICT :- DATIA
Remarks by the
Executive
Engineer
Yes
Yes
NA
NA
NA
Yes
NA
Yes
NA
Yes
Yes
Yes
Yes
Yes
Yes
Yes
RAWARI STOP DAM
DESIGNS
RAWARI STOP DAM PROJECT
Utilization of capacity
By Another Formula :-
H 4.00 mts
F 9200 mts
L 30.00 mts
M 57.35 sq. Km ( Subjected to Max Sq. Km)
Hence, the proposed irrigation of 195 Hac can be achieved by available water pool.
RAWARI STOP DAM
Hydraulic Design of Stop Dam
Where,
V Velocity of flow
Area of section 61.46 Sqm.
P wetted 31.37 m.
perimeter
R Hydraulic mean 1.96 m.
depth=A/P
S Slop of nalla 1 in 2300 m.
N Coefficient of discharge 0.03 m.
R 1.96
R 2/3
1.56
S1/2 0.0208
1.08 m/sec.
Q 66.47 Cumecs
Design of Rawari Stop Dam
AREA OF NALLA CROSS SECTION
Permeter calculations
RD GL HFL Dif Average Distance Area
Ht. (Ht.)2 (Dst.)2
15 102 102.00 0.00 0 0 0 0 0 0
14 101.3 102.00 0.70 0.35 1 0.35 0.7 0.49 1
13 100.94 102.00 1.06 0.88 1 0.88 0.36 0.1296 1
12 100.6 102.00 1.40 1.23 1 1.23 0.34 0.1156 1
11 100.53 102.00 1.47 1.44 1 1.435 0.07 0.0049 1
10 100.21 102.00 1.79 1.63 1 1.63 0.32 0.1024 1
9 100.12 102.00 1.88 1.84 1 1.835 0.09 0.0081 1
8 99.87 102.00 2.13 2.01 1 2.005 0.25 0.0625 1
7 99.74 102.00 2.26 2.2 1 2.195 0.13 0.0169 1
6 99.65 102.00 2.35 2.31 1 2.305 0.09 0.0081 1
5 99.52 102.00 2.48 2.42 1 2.415 0.13 0.0169 1
4 99.15 102.00 2.85 2.67 1 2.665 0.37 0.1369 1
3 98.7 102.00 3.30 3.08 1 3.075 0.45 0.2025 1
2 98.4 102.00 3.60 3.45 1 3.45 0.3 0.09 1
1 98.01 102.00 3.99 3.79 1 3.795 0.39 0.1521 1
0 98 102.00 4.00 4.00 1 4.00 0.01 0.0001 1
-1 98.01 102.00 3.99 4.00 1 4.00 0.01 0.0001 1
-2 98.42 102.00 3.58 3.79 1 3.79 0.41 0.1681 1
-3 98.83 102.00 3.17 3.38 1 3.38 0.41 0.1681 1
-4 99.13 102.00 2.87 3.02 1 3.02 0.3 0.09 1
-5 99.65 102.00 2.35 2.61 1 2.61 0.52 0.2704 1
-6 99.8 102.00 2.20 2.28 1 2.28 0.15 0.0225 1
-7 100.12 102.00 1.88 2.04 1 2.04 0.32 0.1024 1
-8 100.35 102.00 1.65 1.77 1 1.77 0.23 0.0529 1
-9 100.63 102.00 1.37 1.51 1 1.51 0.28 0.0784 1
-10 101 102.00 1.00 1.19 1 1.19 0.37 0.1369 1
-11 101.22 102.00 0.78 0.89 1 0.89 0.22 0.0484 1
-12 101.38 102.00 0.62 0.70 1 0.70 0.16 0.0256 1
-13 101.45 102.00 0.55 0.59 1 0.59 0.07 0.0049 1
-14 101.81 102.00 0.19 0.37 1 0.37 0.36 0.1296 1
-15 102 102.00 0.00 0.09 1 0.09 0.19 0.0361 1
TOTAL 61.46
er calculations Perimeter
(Ht.) +(Dts.) ((Ht.)2+(Dts.)2))1/2
2 2
0 0
1.49 1.22
1.1296 1.06
1.1156 1.06
1.0049 1.00
1.1024 1.05
1.0081 1.00
1.0625 1.03
1.0169 1.01
1.0081 1.00
1.0169 1.01
1.1369 1.07
1.2025 1.10
1.09 1.04
1.1521 1.07
1.0001 1.00
1.0001 1.00
1.1681 1.08
1.1681 1.08
1.09 1.04
1.2704 1.13
1.0225 1.01
1.1024 1.05
1.0529 1.03
1.0784 1.04
1.1369 1.07
1.0484 1.02
1.0256 1.01
1.0049 1.00
1.1296 1.06
1.0361 1.02
31.37
RAWARI STOP DAM
DESIGN OF STOP DAM PARAMETERS
(As per TC 36 Dt. 03-09-93)
Ds = 1.374*(qd^2/f)^1/3
Where,
Ds = Depth of scour in m measured form the H.F.L
Qd = Design Discharge per meter length of Nalla
f= Lacey's silt factor = 1.76*sqrt mr
mr = 0.8 Average Size of particle
Hence f = 1.574
q= Q/P-2R
Where,
q = discharge per mtr length of nalla
Q = Maximum Discharge in cumecs =66.5 cumecs
P = Wetted Perimeter in mtr = 31.37 mtr
R= Hydraulic Mean Radius = A/P = 1.96 mtr
Putting Values,
q = 2.42 cumec/mtr
qd = 1.2*13.45 =2.90 cumec/mtr
Hence,
F.T.L = 102.00 M
∑M=28559
Hence O.K
Hence O.K
T
Moment+ Moment-
36864
21590.4
19228
10667
58454 29895
DESIGN OF RAWARI STOP DAM PROJECT
CHECKING STABILITY AT FLOOR LAEVEL WHEN :
∑M=43698
F.O.S Against Overturning ∑M+/∑M- ═113366/69668 ═1.62 ˃ 1.5
Hence O.K
Hence O.K
T
Moment+ Moment-
36864
21590.4
19228
14440
36000
36000
14440
4472
113366 -69668
:: Certificate ::
This is certify that an enquiry was conducted is connection with the scheme for construction of RAWARI
STOP DAM tehsil. District Datia surveyed and proposed by the Water Resources Department
Collector
Distt. Datia (M.P.)
nstruction of RAWARI
es Department
RAWARI STOP DAM PROJECT
TEHSIL :- DATIA DISTRICT :- DATIA
:: Certificate ::
GENERAL ABSTRACT
1 2 3 4
4 5 6 7
L.S. 50000.00
Total 14201784.00
M
S. NO. UCSR Item No. Item of work No
L
1 2 3 4 5
2.01 Exavation in all kind of soft/loose/hard/dense soils,
moandum & moandum mixed with boulders and
mud including dressing, placing the excavated soil
neatly in dpecified dump area and disposing of the
same as directed, imncluding cost of site clearance,
1 all materials, machinery, labour and dressing, etc.
complete.
Total Excavation
CSR It 2.01 Hard soil & hard Moorum 65%
CSR It. 2.02 D.R. & S.R. 35%
2 3.14 Providing and laying M-10 grade plain Cement
Concrete Design Mix using 40 mm graded
aggregates, clean, hard for super structure including
cost of all materials, machinery, labour, formwork,
cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing,curing, packing joints of
shuttering etc. complete.
Abutment L/s 1 6.70
Body wall in central portion 1 30.00
Abutment R/s 1 6.70
U/s Protection Key wall 1 30.00
D/s Protection Key wall 1 30.00
Piers round 3 1.20
M
S. NO. UCSR Item No. Item of work No
L
1 2 3 4 5
4 3.18.2 Providing and laying M-20 grade Reinforced Cement
Concrete design mix using graded aggregate, clean,
hard including cost of all aterials (excluding cost of
providing and placing reinforcement steel/ bars),
machinery, labour, formwork, centring, scafolding,
cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing, packing joints
of shuttering etc. Complete. Using aggregate of
maximum size:-20 mm.
Piers
20 mm dia@30cm c/c 3*28 7.2
10 mm dia @30cm c/c 3*24 8.2
Design, Drawing, fabrication, supply, erection,
testing and commissioning of Vertical lift sliding
type gate with frame consisting of skin plate,
girders, guide, stainless steel flat/Brass flat, rivets,
wedges, lifting rods etc., with all accessories as per
relevant IS code including frame & gate complete
set for Canal Cross, Escape, Head regulator/Tank
head regulator incluking cost of all materials,
machinery, labour, cutting, aligning, tackles etc.
applying two coat of zinc rich epoxy primer to give
dry film thickness of 70+-5 microns and finish
coat(two coats) of solvent less coal tar epoxy paint
using airless spray to provide dry film thickness of
150+-5 microns per coat thus total dry film
6 thickness of all coats, including primer coating,
should not be less than 350 microns., complete as
per specifications and approved drawings with all
lead and lifts, including packing & forwarding,
ransportation charges for structural steel
components and other materials.
Measurment
Qty.
L B H/D
5 6 7 8
LS