BAR BENDING SCHEDULE-GTG ENCLOSURE AND YIBAL KHUFF PROJECT
INLET STRUCTURE PDO CONTRACT NO. C311-375
PETROFAC JOB NO. : ES-00006

Member Bar Type and No. No. of Total Length Shape


Mark size of bars no. of each code A* B* C* D* E/R * Rev.
mbrs. in bar + Letter
each mm
mm mm mm mm mm

F15 140 T20 1 12 12 11075 21 475 10215 (475)

141 T20 1 32 32 1475 21 475 620 (475)

142 T20 1 78 78 3275 21 475 2420 (475)

143 T20 1 24 24 3050 21 475 2205 (475)

144 T20 1 24 24 4025 21 475 3160 (475)

146 T16 1 2 2 9725 21 955 8720 (100)

147 T16 1 2 2 9075 23 300 8720 (100)

148 T16 1 2 2 3825 23 100 3265 (500)

149 T16 1 8 8 3775 23 100 3230 (500)

150 T16 1 6 6 1700 21 100 1565 (100)

151 T16 1 6 6 3275 21 100 3130 (100)

152 T16 1 4 4 2050 21 100 1900 (100)

153 T16 1 2 2 2375 21 100 2235 (100)

154 T16 1 4 4 7175 21 100 7030 (100)

155 T10 1 18 18 2350 51 600 490 (130) (130)

156 T16 1 1 1 3775 21 500 3230 (100)

157 T10 1 18 18 1575 51 490 215 (130) (130)

158 T10 1 18 18 1750 51 600 190 (130) (130)

162 T16 1 2 2 3175 11 500 (2705)

163 T10 1 34 34 1925 51 450 430 (130) (130)

164 T10 1 34 34 1375 51 175 430 (130) (130)

This schedule complies with BS 8666 : 2005


All dimensions are in mm
Refer to Bar shape Code drawing
* Specified in multiples of 5 mm
† Specified in multiples of 25 mm

        