Sunteți pe pagina 1din 1

101 102 103 104 105 106 107 108

1200 250
300 600 300
A A

R Y B

VOLT AM
METER METER

MIMIC C
92 92
VSS ASS
A
B
A/M P1/P2 A/M P1/P2 B B

ON O/L ON O/L ON O/L ON O/L L


START STOP START STOP START STOP START STOP
E
A/M
E.F.F TRANSFER PUMP
P1/P2 A/M
FILTER FEED PUMP
P1/P2
FRONT SIDE
1200 1200
and they should neither be copied nor given to a third person without the prior permission of Company

ON O/L ON O/L ON O/L ON O/L


A VIEW VIEW
ROOT ENGINEERING

START STOP START STOP START STOP START STOP

A/M
AIR BLOWER

P1/P2 A/M
SLUDGE PUMP

P1/P2
L
C
ON O/L ON O/L ON O/L ON O/L
L C

START STOP START STOP

SUMP PUMP
START STOP START STOP

CLEAR WATER PUMP


E
TP MCCB
100 A
A/M DOSER DOSER
Y
UV SYSTEM
ON O/L

START STOP

CENTRIFUGE

D D
The contents of this Drawing are the sole property of

1200 NOTE :-
300 600 300
1. ALL DIMENSION IN MM.
BOTTOM 2. SHEET 16 SWG.
E 250 E
VIEW 3. THE PANAL SHALL BE POWDER
COATED SIMENS GREY

REV. I- II- III- IV-

Date Name PROJECT:- Client DRG. NO. REV.


F 10-04-2019 Manoj Kumar Work F
Drawn
Sanjeev K Sharma
ROOT ENGINEERING Details
R0

Checked
SHEET NO. 01
Approved Sanjeev K Sharma Order No. ITEM
NO. OF SHEET 03

S-ar putea să vă placă și