NAMA PAKET : MASJID

PROP/KAB/KODYA : DI Yogyakarta/Kulonprogo-Yogyakarata
PPK : ANGKASA PURA I
KONTRAKTOR PELAKSANA : PP KSO
KONSULTAN PENGAWAS : KSO CITIAJASA BLUEVISION TGP

DED

Uraian Sat
Volume DED

b c d'

MASJID
PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR PONDASI
Pondasi Spunpile D600 mm M 320
- Pre Boring Kedalaman 20 m M 320
- Pemancangan M 320
- Joint + Welding Titik 16
- Bobok Kepala Tiang Pancang Bh 16
- Isian Spunpile K-350 M3 7.0336
- Stek pembesian kg
- Pengujian Tiang Pancang dengan cara PDA Test Titik
Pekerjaan Tanah
- Dynamic compaction M2
- Galian tanah M3 46.568
Urugan pasir M3 7.024
Lantai Kerja M3 3.512
Pilecap
- Pembesian U.40 Kg 2669.31440064
- Bekisting M2 86.08
- Beton Pondasi Tapak K-350 M3 26.832
PEKERJAAN STRUKTUR LANTAI DASAR (+0.00)
Anti Rayap M2
Tie Beam
- Galian tanah M3
- Urugan Pasir M3
- Lantai Kerja M3
- Pembesian U.40 Kg
- Bekisting M2
- Beton Tie Beam K-350 Integral M3
Slab Beton
- Urugan Pasir M3 71.899
- Lantai Kerja M3 35.9495
- Pembesian Wiremesh M10-150 M2 718.99
- Slab Beton t=15 cm K.350 Integral M3 718.99
- Waterproofing M2
Pekerjaan Kolom
- Beton Kolom K-350 M3 12.2
- Pembesian U.40 Kg 3939.010848
- Bekisting M2 98.56
PEKERJAAN STRUKTUR LANTAI ATAP
Balok
- Pembesian U.40 Kg 301.33651968
- Bekisting M2 14.96
- Beton Balok K-350 M3 1.632
Slab Lantai Atap
- Bekisting M2
- Pembesian Kg
- Slab Beton t=15 cm K.350 M3
- Waterproofing M2
Kubah rangka pipa
Rangka Atap kg 50790.85
PEKERJAAN HARDSCAPE
Lantai Kerja M3 35.9495
Pembesian M2
Beton K-300 M3
PEKERJAAN ARSITEKTUR DAN INTERIOR
PEKERJAAN FINISHING LANTAI
Lantai Homogenous Tile (HT) MASJID m2 795.4525509
Lantai Homogenous Tile (HT) TOILET PRIA m2 163.49124015
Lantai Homogenous Tile (HT) TOILET WANITA m2 165.9287742
Lantai Homogenous Tile (HT) SELASAR dalam m2 107.07732
Lantai Homogenous Tile (HT) SELASAR luar m2 131.03118
Pekerjaan Koral sikat m2 1620.41491265
Pekerjaan Paving block (grassblock) m2 957.22614435
Pekerjaan WPC Decking 20 mm m2 171.8208828
Pekerjaan Cat + Koral tabur m2 721.6228845
Pekerjaan Grass m2 1870.109409
PEKERJAAN INTERIOR DINDING LANTAI
Kolom Praktis 10x10cm (Tulangan 4 dia.10 mm, ring dia. 8-20 cm) m1 221.8976085333
Balok Praktis (Tulangan 4 dia.10 mm, ring dia. 8-20 cm) m1 68.84
Pekerjaan Plesteran Kolom beton exposed m2 44.352
PEKERJAAN PINTU
Pintu WD1 uk 900 x 2150 mm unit 3
Pintu WD2 uk 800 x 2150 mm unit 1
Jendela AW1 uk 1310 x 1250 mm unit 2
Jendela AW2 uk 910 x 500mm unit 8
PEKERJAAN TOILET
toilet pria
Pekerjaan Hebel dan plesteran m3 314.414
Washtafel Unit 3
Closet Duduk m' 6
Urinoir m' 12
Urinoir Devider m' 12
Floor drai m' 38
Paper holder m' 1
Shower spray m' 1
Kran dinding m' 27
Cubicle Toilet Pria set 5
Bak air set 1
Meja wastefel m2 1.92
toilet wanita
Pekerjaan Hebel dan plesteran m3 314.414
Washtafel Unit 4
Closet Duduk m' 5
Floor drai m' 64
Kran dinding m' 63
Cubicle Toilet Pria set 5
Meja wastefel m2 2.64
PEKERJAAN PLAFOND
LANTAI 1 ( SATU )
GRC Board 6mm, Rangka Hollow m2 571.463024
Gypsum - C5 Stetch Membrane m2 1287.77392
PEKERJAAN ATAP
Penutup atap Kubah Masjid m2 1287.77392
Lisplank m1 4419.1
Plashing m1 4419.1
Talang datar m1 35.8
Talana vertikal m1 25.6
Roof Drain bh 4
Penutup atap Metal toilet m2 313.25
Rangka atap Baja, Gording m2 313.25
Lisplank m1 89.1
Plashing m1 89.1
Talang datar toilet m1 35.8
Talang vertikal toilet m1 25.6
Ruuf drair toilet bh 4
Penutup atap canopi selasar dan penitipan sandal m2 567.203289
Rangka atap canopi selasar m2 567.203289
PEKERJAAN PAGAR DAN RAILLING
Railling Stainlessteel m1 9.2
Pagar Keliling m1 350.921
Gerbang unit 1
ulonprogo-Yogyakarata

BLUEVISION TGP

DURASI
Harga Jumlah
Sat
Satuan Harga-Harga BOBOT BOBOT START RENCANA
(Rupiah) PP (Rupiah) (HARI)
e f=(dxe) c

764224 244551680 M 320 0.003877929 8 9/22/2018


336200 107584000 M 320 0.001705992 8 9/22/2018
110045.76238 35214643.960396 M 320 0.000558409 8 9/22/2018
198492.93 3175886.88 Titik 16 0.000050361 8 9/22/2018
158900 2542400 Bh 16 4.03156E-05 8 9/22/2018
1024690.8038 7207265.23752964 M3 7.0336 0.000114288 8 9/22/2018
12714.524365 kg 8 9/22/2018
6114900 Titik 8 9/22/2018

0 M2 10 9/30/2018
54976.190476 2560131.23809524 M3 46.568 4.05968E-05 10 9/30/2018
385165.39683 2705401.74730159 M3 7.024 4.29004E-05 10 9/30/2018
951918.44395 3343137.57515176 M3 3.512 5.30131E-05 10 9/30/2018
1
12496.524365 33357152.4467304 Kg 2669.31440064 0.000528954 16 12/2/2018
147291.00855 12678810.0161643 M2 86.08 0.000201052 16 12/2/2018
1228444.2503 32961616.1250771 M3 26.832 0.000522682 16 12/2/2018

14600 M2 21 12/2/2018

54976.190476 M3 21 12/2/2018
385165.39683 M3 21 12/2/2018
951918.44395 M3 21 12/2/2018
12496.524365 Kg 21 12/2/2018
147291.00855 M2 21 12/2/2018
1336544.2503 M3 21 12/2/2018

385165.39683 27693006.8663492 M3 71.899 0.000439136 21 12/2/2018


951918.44395 34220992.100774 M3 35.9495 0.000542653 21 12/2/2018
231058.03692 166128417.967323 M2 718.99 0.002634348 21 12/2/2018
1336544.2503 960961950.550731 M3 718.99 0.015238261 21 12/2/2018
183400 M2 21 12/2/2018

1228444.2503 14987019.8541272 M3 12.2 0.000237654 16 12/7/2018


12496.524365 49223945.0379308 Kg 3939.010848 0.000780559 16 12/7/2018
147265.50963 14514488.6291794 M2 98.56 0.000230161 16 12/7/2018

12496.524365 3765659.16039074 Kg 301.33651968 5.97132E-05 16 12/9/2018


147279.74348 2203304.962432 M2 14.96 3.49385E-05 16 12/9/2018
1228444.2503 2004821.0165521 M3 1.632 0.000031791 16 12/9/2018

147265.77534 0 M2 16 12/9/2018
12496.524365 0 Kg 16 12/9/2018
1228444.2503 0 M3 16 12/9/2018
183400 0 M2 16 12/9/2018

61100 3103320935 kg 0.049210289 16 12/9/2018

951918.44395 34220992.100774 M3 0.000542653 21 12/21/2018


12496.524365 0 M2 21 12/21/2018
907885.25034 0 M3 21 12/21/2018
-

379670.5 302009867.726478 m2 795.4525509 0.004789061 19 12/23/2018


379670.5 62072800.8933706 m2 163.49124015 0.000984307 19 12/23/2018
379670.5 62998260.6649011 m2 165.9287742 0.000998982 19 12/23/2018
379670.5 40654099.62306 m2 107.07732 0.000644664 19 12/23/2018
379670.5 49748673.62619 m2 131.03118 0.00078888 19 12/23/2018
525000 850717829.14125 m2 1620.41491265 0.013490087 19 12/23/2018
195000 186659098.14825 m2 957.22614435 0.002959909 19 12/23/2018
650000 111683573.82 m2 171.8208828 0.001771 19 12/23/2018
71630 51689847.216735 m2 721.6228845 0.000819661 19 12/23/2018
26000 48622844.634 m2 1870.109409 0.000771027 19 12/23/2018

130695.70087 29001063.4676914 m1 221.897608533 0.000459879 19 12/23/2018


130695.70087 8997092.04759624 m1 68.84 0.00014267 19 12/23/2018
128977.51335 5720410.67228587 m2 44.352 9.07103E-05 19 12/23/2018

6723824.7573 20171474.2718664 unit 3 0.000319865 15 1/7/2019


5976733.1176 5976733.11759004 unit 1 9.47748E-05 15 1/7/2019
4503125 9006250 unit 2 0.000142815 15 1/7/2019
1237500 9900000 unit 8 0.000156987 15 1/7/2019
750000 235810500 m3 314.414 1.003715882 16 12/30/2018
2532915 7598745 Unit 3 0.000120496 16 12/30/2018
3008000 18048000 m' 6 0.000286193 16 12/30/2018
6700000 80400000 m' 12 0.001274927 16 12/30/2018
2215000 26580000 m' 12 0.000421487 16 12/30/2018
1097100 41689800 m' 38 0.000661088 16 12/30/2018
323600 323600 m' 1 5.13142E-06 16 12/30/2018
952800 952800 m' 1 1.51088E-05 16 12/30/2018
594000 16038000 m' 27 0.000254319 16 12/30/2018
13330500 66652500 set 5 0.001056929 16 12/30/2018
13330500 13330500 set 1 0.000211386 16
304200 584064 m2 1.92 9.26168E-06 16 12/30/2018

750000 235810500 m3 314.414 0.0098929 16 12/30/2018


2532915 10131660 Unit 4 0.000160661 16 12/30/2018
3008000 15040000 m' 5 0.000238494 16 12/30/2018
1097100 70214400 m' 64 0.001113411 16 12/30/2018
594000 37422000 m' 63 0.000593412 16 12/30/2018
13330500 66652500 set 5 0.001056929 16 12/30/2018
304200 803088 m2 2.64 1.27348E-05 16 12/30/2018

910000 520031351.84 m2 571.463024 0.008246293 21 1/11/2019


198000 254979236.16 m2 1287.77392 0.004043282 21 1/11/2019

260000 334821219.2 m2 1287.77392 0.00530936 31 12/25/2018


405000 1789735500 m1 4419.1 0.028380372 31 12/25/2018
195000 861724500 m1 4419.1 0.013664623 31 12/25/2018
169000 6050200 m1 35.8 9.59398E-05 31 12/25/2018
78000 1996800 m1 25.6 3.16639E-05 31 12/25/2018
404700 1618800 bh 4 2.56698E-05 31 12/25/2018
260000 81445000 m2 313.25 0.001291498 31 12/25/2018
405000 126866250 m2 313.25 0.002011756 31 12/25/2018
405000 36085500 m1 89.1 0.000572219 31 12/25/2018
195000 17374500 m1 89.1 0.000275513 31 12/25/2018
169000 6050200 m1 35.8 9.59398E-05 31 12/25/2018
78000 1996800 m1 25.6 3.16639E-05 31 12/25/2018
343600 1374400 bh 4 2.17943E-05 31 12/25/2018
169000 95857355.841 m2 567.203289 0.001520039 31 12/25/2018
405000 229717332.045 m2 567.203289 0.003642696 31 12/25/2018

1625000 14950000 m1 9.2 0.000237067 21 12/21/2018


1625000 570246625 m1 350.921 0.009042571 21 12/21/2018
52000000 52000000 unit 1 0.00082458 21 12/21/2018
31781.7832174
FINISH RENCANA 1 2 3
1/21/2019 1/28/2019 2/4/2019 bobot progress Bobot
1/27/2019 2/3/2019 2/10/2019

9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
- - - - -
10/9/2018 - - - - -
10/9/2018 - - - - -
10/9/2018 - - - - -
10/9/2018 - - - - -
- - - - -
12/17/2018 - - - - -
12/17/2018 - - - - -
12/17/2018 - - - - -
- - - - -
12/22/2018 - - - - -
- - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
- - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
- - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
- - - - -
- - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
- - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
- - - - -
12/24/2018 - - - - -
- - - - -
1/10/2019 - - - - -
1/10/2019 - - - - -
1/10/2019 - - - - -
- - - - -
- - - - -
1/10/2019 159.09 318.18 130.28 607.55 795.45
1/10/2019 - - 32.69 32.69 163.49
1/10/2019 - - 27.65 27.65 165.93
1/10/2019 - - 35.69 35.69 107.08
1/10/2019 - - 43.67 43.67 131.03
1/10/2019 202.55 405.13 358.95 966.63 1620.41
1/10/2019 106.35 114.87 212.71 433.93 957.23
1/10/2019 - 28.63 76.36 104.99 171.82
1/10/2019 - - - - -
1/10/2019 - - 831.16 831.16 1870.11
- - - - -
1/10/2019 147.93 73.96 - 221.89 221.89
1/10/2019 - 22.95 45.89 68.84 68.84
1/10/2019 8.87 35.48 - 44.35 44.35
- - - - -
1/21/2019 - - - -
1/21/2019 - - - -
1/21/2019 - - - -
1/21/2019 - - - -
- - - - -
- - - - -
1/14/2019 62.88 188.64 62.88 314.4 314.40
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
- - - - -
1/14/2019 52.41 104.82 157.18 314.41 314.41
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -
1/14/2019 - - - - -

1/31/2019 - - 244.92 244.92 571.46


1/31/2019 - 515.32 772.45 1287.77 1287.77

1/24/2019 107.31 367.93 740.23 1108.16 1287.77


1/24/2019 - 1104.77 2209.08 3313.85 4419.10
1/24/2019 - 982.42 1964.86 2947.28 4419.10
1/24/2019 - - - - -
1/24/2019 - - - - -
1/24/2019 - - - - -
1/24/2019 - 223.74 89.51 313.25 313.25
1/24/2019 208.33 104.92 - 313.25 313.25
1/24/2019 - 35.64 53.46 89.1 89.10
1/24/2019 - 22.62 66.48 89.1 89.10
1/24/2019 - - 35.8 35.8 35.80
1/24/2019 - - 25.6 25.6 25.60
1/24/2019 - - 4 4 4.00
1/24/2019 - - 576.21 576.21 576.21
1/24/2019 - 189.06 387.14 576.2 576.20

1/10/2019 - - 2.3 2.3 9.20


1/10/2019 70.16 116.37 120.67 307.2 350.92
1/10/2019 0.2 0.2 0.2 0.6 1.00
persen progress ket

proyek masjid telah masuk dalam proyek


percepatan, ketika terjadi keterlambatan
pihak kontraktor pelaksana melaksanakan
rapat harian dan membuat schedule detail
- tiap pekerjaan, setiap pengambilan keputusan
- berhubungan dengan manpower, material
- method, dan location
-
- progress didapat dari proses mapping lapangan
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
76%
20%
17%
33%
33%
60%
45%
61%
-
44%
-
100%
100%
100%
-
-
-
-
-
-
-
100%
-
-
-
-
-
-
-
-
-
-
-
-
100%
-
-
-
-
-
-

43%
100%

86%
75%
67%
-
-
-
100%
100%
100%
100%
100%
100%
100%
100%
100%

25%
88%
60%
NAMA PAKET : MASJID
PROP/KAB/KODYA : DI Yogyakarta/Kulonprogo-Yogyakarata
PPK : PT. ANGKASA PURA I
KONTRAKTOR PELAKSANA : PT. PP KSO
KONSULTAN PENGAWAS : KSO CIRIAJASA BLUEVISION TGP

DED

Uraian Sat
Volume DED

b c d'

MASJID
PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR PONDASI
Pondasi Spunpile D600 mm M 320
- Pre Boring Kedalaman 20 m M 320
- Pemancangan M 320
- Joint + Welding Titik 16
- Bobok Kepala Tiang Pancang Bh 16
- Isian Spunpile K-350 M3 7.0336
- Stek pembesian kg
- Pengujian Tiang Pancang dengan cara PDA Test Titik
Pekerjaan Tanah
- Dynamic compaction M2
- Galian tanah M3 46.568
Urugan pasir M3 7.024
Lantai Kerja M3 3.512
Pilecap
- Pembesian U.40 Kg 2669.31440064
- Bekisting M2 86.08
- Beton Pondasi Tapak K-350 M3 26.832
PEKERJAAN STRUKTUR LANTAI DASAR (+0.00)
Anti Rayap M2
Tie Beam
- Galian tanah M3
- Urugan Pasir M3
- Lantai Kerja M3
- Pembesian U.40 Kg
- Bekisting M2
- Beton Tie Beam K-350 Integral M3
Slab Beton
- Urugan Pasir M3 71.899
- Lantai Kerja M3 35.9495
- Pembesian Wiremesh M10-150 M2 718.99
- Slab Beton t=15 cm K.350 Integral M3 718.99
- Waterproofing M2
Pekerjaan Kolom
- Beton Kolom K-350 M3 12.2
- Pembesian U.40 Kg 3939.010848
- Bekisting M2 98.56
PEKERJAAN STRUKTUR LANTAI ATAP
Balok
- Pembesian U.40 Kg 301.33651968
- Bekisting M2 14.96
- Beton Balok K-350 M3 1.632
Slab Lantai Atap
- Bekisting M2
- Pembesian Kg
- Slab Beton t=15 cm K.350 M3
- Waterproofing M2
Kubah rangka pipa
Rangka Atap kg 50790.85
PEKERJAAN HARDSCAPE
Lantai Kerja M3 35.9495
Pembesian M2
Beton K-300 M3
PEKERJAAN ARSITEKTUR DAN INTERIOR
PEKERJAAN FINISHING LANTAI
Lantai Homogenous Tile (HT) MASJID m2 795.4525509
Lantai Homogenous Tile (HT) TOILET PRIA m2 163.49124015
Lantai Homogenous Tile (HT) TOILET WANITA m2 165.9287742
Lantai Homogenous Tile (HT) SELASAR dalam m2 107.07732
Lantai Homogenous Tile (HT) SELASAR luar m2 131.03118
Pekerjaan Koral sikat m2 1620.41491265
Pekerjaan Paving block (grassblock) m2 957.22614435
Pekerjaan WPC Decking 20 mm m2 171.8208828
Pekerjaan Cat + Koral tabur m2 721.6228845
Pekerjaan Grass m2 1870.109409
PEKERJAAN INTERIOR DINDING LANTAI
Kolom Praktis 10x10cm (Tulangan 4 dia.10 mm, ring dia. 8-20 cm) m1 221.8976085333
Balok Praktis (Tulangan 4 dia.10 mm, ring dia. 8-20 cm) m1 68.84
Pekerjaan Plesteran Kolom beton exposed m2 44.352
PEKERJAAN PINTU
Pintu WD1 uk 900 x 2150 mm unit 3
Pintu WD2 uk 800 x 2150 mm unit 1
Jendela AW1 uk 1310 x 1250 mm unit 2
Jendela AW2 uk 910 x 500mm unit 8
PEKERJAAN TOILET
toilet pria
Pekerjaan Hebel dan plesteran m3 314.414
Washtafel Unit 3
Closet Duduk m' 6
Urinoir m' 12
Urinoir Devider m' 12
Floor draiN m' 38
Paper holder m' 1
Shower spray m' 1
Kran dinding m' 27
Cubicle Toilet Pria set 5
Bak air set 1
Meja wastefel m2 1.92
toilet wanita
Pekerjaan Hebel dan plesteran m3 314.414
Washtafel Unit 4
Closet Duduk m' 5
Floor drai m' 64
Kran dinding m' 63
Cubicle Toilet Pria set 5
Meja wastefel m2 2.64
PEKERJAAN PLAFOND
LANTAI 1 ( SATU )
GRC Board 6mm, Rangka Hollow m2 571.463024
Stetch Membrane m2 1287.77392
PEKERJAAN ATAP
Penutup atap Kubah Masjid m2 1287.77392
Lisplank m1 4419.1
Plashing m1 4419.1
Talang datar m1 35.8
Talana vertikal m1 25.6
Roof Drain bh 4
Penutup atap Metal toilet m2 313.25
Rangka atap Baja, Gording m2 313.25
Lisplank m1 89.1
Plashing m1 89.1
Ruuf drair toilet bh 4
Penutup atap canopi selasar dan penitipan sandal m2 567.203289
Rangka atap canopi selasar m2 567.203289
PEKERJAAN PAGAR DAN RAILLING
Railling Stainlessteel m1 9.2
Pagar Keliling m1 350.921
Gerbang unit 1
BOBOT
BOBOT KUMULATIF
o-Yogyakarata

DURASI
Harga Jumlah
Sat
Satuan Harga-Harga BOBOT START RENCANA
(Rupiah) Rp (Rupiah) (HARI)
e f=(dxe) c

764224 244551680 M 320 8 9/22/2018


336200 107584000 M 320 8 9/22/2018
110045.8 35214643.960396 M 320 8 9/22/2018
198492.9 3175886.88 Titik 16 8 9/22/2018
158900 2542400 Bh 16 8 9/22/2018
1024691 7207265.23752964 M3 7.0336 8 9/22/2018
12714.52 kg 8 9/22/2018
6114900 Titik 8 9/22/2018

0 M2 10 9/30/2018
54976.19 2560131.23809524 M3 46.568 10 9/30/2018
385165.4 2705401.74730159 M3 7.024 10 9/30/2018
951918.4 3343137.57515176 M3 3.512 10 9/30/2018
1
12496.52 33357152.4467304 Kg 2669.31440064 16 12/2/2018
147291 12678810.0161643 M2 86.08 16 12/2/2018
1228444 32961616.1250771 M3 26.832 16 12/2/2018

14600 M2 21 12/2/2018

54976.19 M3 21 12/2/2018
385165.4 M3 21 12/2/2018
951918.4 M3 21 12/2/2018
12496.52 Kg 21 12/2/2018
147291 M2 21 12/2/2018
1336544 M3 21 12/2/2018

385165.4 27693006.8663492 M3 71.899 21 12/2/2018


951918.4 34220992.100774 M3 35.9495 21 12/2/2018
231058 166128417.967323 M2 718.99 21 12/2/2018
1336544 960961950.550731 M3 718.99 21 12/2/2018
183400 M2 21 12/2/2018

1228444 14987019.8541272 M3 12.2 16 12/7/2018


12496.52 49223945.0379308 Kg 3939.010848 16 12/7/2018
147265.5 14514488.6291794 M2 98.56 16 12/7/2018

12496.52 3765659.16039074 Kg 301.33651968 16 12/9/2018


147279.7 2203304.962432 M2 14.96 16 12/9/2018
1228444 2004821.0165521 M3 1.632 16 12/9/2018

147265.8 0 M2 16 12/9/2018
12496.52 0 Kg 16 12/9/2018
1228444 0 M3 16 12/9/2018
183400 0 M2 16 12/9/2018

61100 3103320935 kg 16 12/9/2018

951918.4 34220992.100774 M3 21 12/21/2018


12496.52 0 M2 21 12/21/2018
907885.3 0 M3 21 12/21/2018

379670.5 302009867.726478 m2 0.04 19 12/23/2018


379670.5 62072800.8933706 m2 0.0079615349 19 12/23/2018
379670.5 62998260.6649011 m2 0.0080802356 19 12/23/2018
379670.5 40654099.62306 m2 0.0052143456 19 12/23/2018
379670.5 49748673.62619 m2 0.006380827 19 12/23/2018
525000 850717829.14125 m2 0.1091141307 19 12/23/2018
195000 186659098.14825 m2 0.0239411289 19 12/23/2018
650000 111683573.82 m2 0.0143246746 19 12/23/2018
71630 51689847.216735 m2 0.0066298043 19 12/23/2018
26000 48622844.634 m2 0.0062364267 19 12/23/2018
0 0
130695.7 29001063.4676914 m1 0.0037197126 19 12/23/2018
130695.7 8997092.04759624 m1 0.0011539783 19 12/23/2018
128977.5 5720410.67228587 m2 0.000733707 19 12/23/2018
0 0
6723825 20171474.2718664 unit 0.0025872185 15 1/7/2019
5976733 5976733.11759004 unit 0.0007665833 15 1/7/2019
4503125 9006250 unit 0.0011551529 15 1/7/2019
1237500 9900000 unit 0.0012697864 15 1/7/2019
0 0
0 0
750000 235810500 m3 0.0302453491 16 12/30/2018
2532915 7598745 Unit 0.0009746245 16 12/30/2018
3008000 18048000 m' 0.002314859 16 12/30/2018
6700000 80400000 m' 0.0103122044 16 12/30/2018
2215000 26580000 m' 0.003409184 16 12/30/2018
1097100 41689800 m' 0.0053471858 16 12/30/2018
323600 323600 m' 4.150534E-05 16 12/30/2018
952800 952800 m' 0.0001222073 16 12/30/2018
594000 16038000 m' 0.0020570539 16 12/30/2018
13330500 66652500 set 0.0085489329 16 12/30/2018
13330500 13330500 set 0.0017097866 16
304200 584064 m2 7.4912778E-05 16 12/30/2018
0 0
750000 235810500 m3 0.0302453491 16 12/30/2018
2532915 10131660 Unit 0.0012994994 16 12/30/2018
3008000 15040000 m' 0.0019290492 16 12/30/2018
1097100 70214400 m' 0.0090057866 16 12/30/2018
594000 37422000 m' 0.0047997924 16 12/30/2018
13330500 66652500 set 0.0085489329 16 12/30/2018
304200 803088 m2 0.0001030051 16 12/30/2018
0 0
0 0
910000 520031351.84 m2 0.0666998704 21 1/11/2019
198000 254979236.16 m2 0.0327039551 21 1/11/2019
0 0
260000 334821219.2 m2 0.0429445875 31 12/25/2018
405000 1789735500 m1 0.2295537094 31 12/25/2018
195000 861724500 m1 0.1105258601 31 12/25/2018
169000 6050200 m1 0.0007760062 31 12/25/2018
78000 1996800 m1 0.0002561121 31 12/25/2018
404700 1618800 bh 0.0002076293 31 12/25/2018
260000 81445000 m2 0.0104462374 31 12/25/2018
405000 126866250 m2 0.0162720236 31 12/25/2018
405000 36085500 m1 0.0046283713 31 12/25/2018
195000 17374500 m1 0.0022284751 31 12/25/2018
343600 1374400 bh 0.0001762823 31 12/25/2018
169000 95857355.841 m2 0.0122947841 31 12/25/2018
405000 229717332.045 m2 0.0294638318 31 12/25/2018
0 0
1625000 14950000 m1 0.0019175057 21 12/21/2018
1625000 570246625 m1 0.073140544 21 12/21/2018
52000000 52000000 unit 0.0066695849 21 12/21/2018

7,796,587,146.16 1
FINISH RENCANA 23 24 25 26 27
17-Dec 24-Dec 31-Dec 7-Jan 14-Jan
23-Dec 30-Dec 6-Jan 13-Jan 20-Jan

9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
9/29/2018 - - - - -
- - - - -
10/9/2018 - - - - -
10/9/2018 - - - - -
10/9/2018 - - - - -
10/9/2018 - - - - -
- - - - -
12/17/2018 - - - - -
12/17/2018 - - - - -
12/17/2018 - - - - -
- - - - -
12/22/2018 - - - - -
- - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
- - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
- - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
12/22/2018 - - - - -
- - - - -
- - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
- - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
12/24/2018 - - - - -
- - - - -
12/24/2018 - - - - -
- - - - -
1/10/2019 - - - - -
1/10/2019 - - - - -
1/10/2019 - - - - -
- - - - -
- - - - -
1/10/2019 41.866 293.061 293.061 167.464 -
1/10/2019 8.605 60.234 60.234 34.419 -
1/10/2019 8.733 61.132 61.132 34.932 -
1/10/2019 5.636 39.450 39.450 22.543 -
1/10/2019 6.896 48.275 48.275 27.586 -
1/10/2019 85.285 596.995 596.995 341.140 -
1/10/2019 50.380 352.662 352.662 201.521 -
1/10/2019 9.043 63.302 63.302 36.173 -
1/10/2019 37.980 265.861 265.861 151.921 -
1/10/2019 98.427 688.988 688.988 393.707 -
- - - - -
1/10/2019 11.679 81.752 81.752 46.715 -
1/10/2019 3.623 25.362 25.362 14.493 -
1/10/2019 2.334 16.340 16.340 9.337 -
- - - - -
1/21/2019 - - - 1.400 1.400
1/21/2019 - - - 0.467 0.467
1/21/2019 - - - 0.933 0.933
1/21/2019 - - - 3.733 3.733
- - - - -
- - - - -
1/14/2019 - - - - -
1/14/2019 - 0.1875 1.3125 1.3125 0.1875
1/14/2019 - 0.375 2.625 2.625 0.375
1/14/2019 - 0.75 5.25 5.25 0.75
1/14/2019 - 0.75 5.25 5.25 0.75
1/14/2019 - 2.375 16.625 16.625 2.375
1/14/2019 - 0.0625 0.4375 0.4375 0.0625
1/14/2019 - 0.0625 0.4375 0.4375 0.0625
1/14/2019 - 1.6875 11.8125 11.8125 1.6875
1/14/2019 - 0.3125 2.1875 2.1875 0.3125
1/14/2019 - 0.0625 0.4375 0.4375 0.0625
1/14/2019 - 0.12 0.84 0.84 0.12
- - - - -
1/14/2019 - - - - -
1/14/2019 - 0.25 1.75 1.75 0.25
1/14/2019 - 0.3125 2.1875 2.1875 0.3125
1/14/2019 - 4 28 28 4
1/14/2019 - 3.9375 27.5625 27.5625 3.9375
1/14/2019 - - - - -
1/14/2019 - 0.165 1.115 1.155 0.165
- - - - -
- - - - -
1/31/2019 - - - 81.638 190.488
1/31/2019 - - - 183.968 429.258
- - - - -
1/24/2019 - 249.247 290.788 290.788 290.788
1/24/2019 - 855.310 997.861 997.861 997.861
1/24/2019 - 855.310 997.861 997.861 997.861
1/24/2019 - 6.929 8.084 8.084 8.084
1/24/2019 - 4.955 5.781 5.781 5.781
1/24/2019 - 0.774 0.903 0.903 0.903
1/24/2019 - 60.629 70.734 70.734 70.734
1/24/2019 - 60.629 70.734 70.734 70.734
1/24/2019 - 17.245 20.119 20.119 20.119
1/24/2019 - 17.245 20.119 20.119 20.119
1/24/2019 - 0.774 0.903 0.903 0.903
1/24/2019 - 109.781 128.078 128.078 128.078
1/24/2019 - 109.781 128.078 128.078 128.078
- - - - -
1/10/2019 - 3.067 3.067 1.752 -
1/10/2019 - 116.974 116.974 66.842 -
1/10/2019 - 0.333 0.333 0.190 -
28 29 30 1 2 3 4
21-Jan 28-Jan 4-Feb 1/21/2019 1/28/2019 2/4/2019 2/11/2019
27-Jan 3-Feb 10-Feb 1/27/2019 2/3/2019 2/10/2019 2/17/2019

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - 159.09 318.18 130.28 62.23
- - - - - 32.69 61.81
- - - - - 27.65 42.57
- - - - - 35.69 23.79
- - - - - 43.67 40.35
- - - 202.55 405.13 358.95 217.92
- - - 40.23 312.71 412.65 100.24
- - - - 28.63 76.36 26.73
- - - - - - 90.2
- - - - - 831.16 139.86
- - - - - - -
- - - 147.93 73.96 - -
- - - - 22.95 45.89 -
- - - 8.87 35.48 - -
- - - - - - -
0.200 - - - - - -
0.067 - - - - - -
0.133 - - - - - -
0.533 - - - - - -
- - - - - - -
- - - - - - -
- - - 62.88 188.64 62.88 -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - 52.41 104.82 157.18 -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
190.488 108.850 - - - 244.92 108.84
429.258 245.290 - - 315.23 972.54 -
- - - - - - -
166.164 - - 107.31 367.93 540.36 252.98
570.206 - - - 1104.77 2209.08 1105.25
570.206 - - - 982.42 1964.86 1471.82
4.619 - - - - - -
3.303 - - - - - -
0.516 - - - - - -
40.419 - - - 223.74 89.51 -
40.419 - - 208.33 104.92 - -
11.497 - - - 35.64 53.46 -
11.497 - - - 22.62 66.48 -
0.516 - - - - 4 -
73.188 - - - - 576.21 -
73.188 - - - 189.06 387.14 -
- - - - - - -
- - - - - 2.3 4.6
- - - 70.16 116.37 120.67 14.57
- - - 0.2 - - 0.2
5
2/18/2019 bobot progress Bobot persen progress
2/24/2019

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
125.67 795.45 795.45 100%
68.99 163.49 163.49 100%
95.71 165.93 165.93 100%
47.60 107.08 107.08 100%
29.12 113.14 131.03 86%
435.86 1620.41 1620.41 100%
91.40 957.23 957.23 100%
40.10 171.82 171.82 100%
237.34 327.54 721.62 45%
415.28 1386.3 1870.11 74%
- - - -
- 221.89 221.89 100%
- 68.84 68.84 100%
- 44.35 44.35 100%
- - - -
3 3 3.00 100%
1 1 1.00 100%
2 2 2.00 100%
8 8 8.00 100%
- - - -
- - - -
- 314.4 314.40 100%
3.00 3.00 3.00 100%
6.00 6.00 6.00 100%
12.00 12.00 12.00 100%
12.00 12.00 12.00 100%
38.00 38.00 38.00 100%
1.00 1.00 1.00 100%
- 0.00 1.00
27.00 27.00 27.00 100%
5.00 5.00 5.00 100%
- - 1.00
1.92 1.92 1.92 100%
- - - -
- 314.41 314.41 100%
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
217.70 571.46 571.46 100%
- 1287.77 1287.77 100%
-
19.19 1287.77 1287.77 100%
- 4419.1 4419.10 100%
- 4419.1 4419.10 100%
35.80 35.80 35.80 100%
25.60 25.60 25.60 100%
4.00 4.00 4.00 100%
- 313.25 313.25 100%
- 313.25 313.25 100%
- 89.1 89.10 100%
- 89.1 89.10 100%
- 4 4.00 100%
- 576.21 576.21 100%
- 576.2 576.20 100%
-
2.30 9.2 9.20 100%
29.15 350.92 350.92 100%
0.4 0.8 1.00 80%
23 24
ket 17-Dec 24-Dec
23-Dec 30-Dec
proyek masjid telah masuk dalam proyek
percepatan, ketika terjadi keterlambatan
pihak kontraktor pelaksana melaksanakan
rapat harian dan membuat schedule detail
tiap pekerjaan, setiap pengambilan keputusan - -
berhubungan dengan manpower, material - -
method, dan location - -
- -
progress didapat dari proses mapping lapangan - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
0.00204 0.01427
0.00042 0.00293
0.00043 0.00298
0.00027 0.00192
0.00034 0.00235
0.00574 0.04020
0.00126 0.00882
0.00075 0.00528
0.00035 0.00244
0.00033 0.00230
- -
0.00020 0.00137
0.00006 0.00043
0.00004 0.00027
- -
- -
- -
- -
- -
- -
- -
- -
- 0.00006
- 0.00014
- 0.00064
- 0.00021
- 0.00033
- 0.00000
- 0.00001
- 0.00013
- 0.00053
- 0.00011
- 0.00000
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 0.00831
- 0.04443
- 0.02139
- 0.00015
- 0.00005
- 0.00004
- 0.00202
- 0.00315
- 0.00090
- 0.00043
- 0.00003
- 0.00234
- 0.00561
- -
- 0.00064
- 0.02438
- 0.00222
0.01222 0.20384
0.01222 0.22
25 26 27 28
31-Dec 7-Jan 14-Jan 21-Jan
6-Jan 13-Jan 20-Jan 27-Jan

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.01427 0.00815 - -
0.00293 0.00168 - -
0.00298 0.00170 - -
0.00192 0.00110 - -
0.00235 0.00134 - -
0.04020 0.02297 - -
0.00882 0.00504 - -
0.00528 0.00302 - -
0.00244 0.00140 - -
0.00230 0.00131 - -
- - - -
0.00137 0.00078 - -
0.00043 0.00024 - -
0.00027 0.00015 - -
- - - -
- 0.00121 0.00121 0.00017
- 0.00036 0.00036 0.00005
- 0.00054 0.00054 0.00008
- 0.00059 0.00059 0.00008
- - - -
- - - -
- - - -
0.00043 0.00043 0.00006 -
0.00101 0.00101 0.00014 -
0.00451 0.00451 0.00064 -
0.00149 0.00149 0.00021 -
0.00234 0.00234 0.00033 -
0.00002 0.00002 0.00000 -
0.00005 0.00005 0.00001 -
0.00090 0.00090 0.00013 -
0.00374 0.00374 0.00053 -
0.00075 0.00075 0.00011 -
0.00003 0.00003 0.00000 -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 0.00953 0.02223 0.02223
- 0.00467 0.01090 0.01090
- - - -
0.00970 0.00970 0.00970 0.00554
0.05183 0.05183 0.05183 0.02962
0.02496 0.02496 0.02496 0.01426
0.00018 0.00018 0.00018 0.00010
0.00006 0.00006 0.00006 0.00003
0.00005 0.00005 0.00005 0.00003
0.00236 0.00236 0.00236 0.00135
0.00367 0.00367 0.00367 0.00210
0.00105 0.00105 0.00105 0.00060
0.00050 0.00050 0.00050 0.00029
0.00004 0.00004 0.00004 0.00002
0.00273 0.00273 0.00273 0.00156
0.00655 0.00655 0.00655 0.00374
- - - -
0.00064 0.00037 - -
0.02438 0.01393 - -
0.00222 0.00127 - -
0.23175 0.20030 0.14169 0.09276
0.45 0.65 0.79 0.88
29 30 1 2
28-Jan 4-Feb 1/21/2019 1/28/2019
3-Feb 10-Feb 1/27/2019 2/3/2019

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 0.00775 0.01549
- - - -
- - - -
- - - -
- - - -
- - 0.01364 0.02728
- - 0.00101 0.00782
- - - 0.00239
- - - -
- - - -
- - - -
- - 0.00248 0.00124
- - - 0.00038
- - 0.00015 0.00059
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 0.00605 0.01815
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 0.00504 0.01008
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
0.01270 - - -
0.00623 - - 0.00801
- - - -
- - 0.00358 0.01227
- - - 0.05739
- - - 0.02457
- - - -
- - - -
- - - -
- - - 0.00746
- - 0.01082 0.00545
- - - 0.00185
- - - 0.00057
- - - -
- - - -
- - - 0.00967
- - - -
- - - -
- - 0.01462 0.02425
- - 0.00133 -
0.01893 0.06647 0.23491
1.00 0.06647 0.30138
3 4 5
2/4/2019 2/11/2019 2/18/2019
2/10/2019 2/17/2019 2/24/2019

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
0.00634 0.00303 0.00612
0.00159 0.00301 0.00336
0.00135 0.00207 0.00466
0.00174 0.00116 0.00232
0.00213 0.00196 0.00142
0.02417 0.01467 0.02935
0.01032 0.00251 0.00229
0.00637 0.00223 0.00334
- 0.00083 0.00218
0.00277 0.00047 0.00138
- - -
- - -
0.00077 - -
- - -
- - -
- - 0.00259
- - 0.00077
- - 0.00116
- - 0.00127
- - -
- - -
0.00605 - -
- - 0.00097
- - 0.00231
- - 0.01031
- - 0.00341
- - 0.00535
- - 0.00004
- - -
- - 0.00206
- - 0.00855
- - -
- - 0.00007
- - -
0.01512 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
0.02859 0.01270 0.02541
0.02470 - -
- - -
0.01802 0.00844 0.00064
0.11475 0.05741 -
0.04914 0.03681 -
- - 0.00078
- - 0.00026
- - 0.00021
0.00298 - -
- - -
0.00278 - -
0.00166 - -
0.00018 - -
0.01229 - -
0.01980 - -
- - -
0.00048 0.00096 0.00048
0.02515 0.00304 0.00608
- 0.00133 0.00267
0.37924 0.15264 0.13179
0.68061 0.83325 0.96504
Uraian Sat

b c

MASJID
PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR PONDASI
Pondasi Spunpile D600 mm M
- Pre Boring Kedalaman 20 m M
- Pemancangan M
- Joint + Welding Titik
- Bobok Kepala Tiang Pancang Bh
- Isian Spunpile K-350 M3
- Stek pembesian kg
- Pengujian Tiang Pancang dengan cara PDA Test Titik
Pekerjaan Tanah
- Dynamic compaction M2
- Galian tanah M3
Urugan pasir M3
Lantai Kerja M3
Pilecap
- Pembesian U.40 Kg
- Bekisting M2
- Beton Pondasi Tapak K-350 M3

Uraian Sat

b c

MASJID
PEKERJAAN STRUKTUR LANTAI DASAR (+0.00)
Anti Rayap M2
Tie Beam
- Galian tanah M3
- Urugan Pasir M3
- Lantai Kerja M3
- Pembesian U.40 Kg
- Bekisting M2
- Beton Tie Beam K-350 Integral M3
Slab Beton
- Urugan Pasir M3
- Lantai Kerja M3
- Pembesian Wiremesh M10-150 M2
- Slab Beton t=15 cm K.350 Integral M3
- Waterproofing M2
Pekerjaan Kolom
- Beton Kolom K-350 M3
- Pembesian U.40 Kg
- Bekisting M2
PEKERJAAN STRUKTUR LANTAI ATAP
Balok
- Pembesian U.40 Kg
- Bekisting M2
- Beton Balok K-350 M3
Slab Lantai Atap
- Bekisting M2
- Pembesian Kg
- Slab Beton t=15 cm K.350 M3
- Waterproofing M2
Kubah rangka pipa
Rangka Atap kg
PEKERJAAN HARDSCAPE
Lantai Kerja M3
Pembesian M2
Beton K-300 M3

Uraian Sat

b c

MASJID
PEKERJAAN ARSITEKTUR DAN INTERIOR
PEKERJAAN FINISHING LANTAI
Lantai Homogenous Tile (HT) MASJID m2
Lantai Homogenous Tile (HT) TOILET PRIA m2
Lantai Homogenous Tile (HT) TOILET WANITA m2
Lantai Homogenous Tile (HT) SELASAR dalam m2
Lantai Homogenous Tile (HT) SELASAR luar m2
Pekerjaan Koral sikat m2
Pekerjaan Paving block (grassblock) m2
Pekerjaan WPC Decking 20 mm m2
Pekerjaan Cat + Koral tabur m2
Pekerjaan Grass m2
PEKERJAAN INTERIOR DINDING LANTAI
Kolom Praktis 10x10cm (Tulangan 4 dia.10 mm, ring dia. 8-20 cm) m1
Balok Praktis (Tulangan 4 dia.10 mm, ring dia. 8-20 cm) m1
Pekerjaan Plesteran Kolom beton exposed m2
PEKERJAAN PINTU
Pintu WD1 uk 900 x 2150 mm unit
Pintu WD2 uk 800 x 2150 mm unit
Jendela AW1 uk 1310 x 1250 mm unit
Jendela AW2 uk 910 x 500mm unit
PEKERJAAN TOILET
toilet pria
Pekerjaan Hebel dan plesteran m3
Washtafel Unit
Closet Duduk m'
Urinoir m'
Urinoir Devider m'
Floor draiN m'
Paper holder m'
Shower spray m'
Kran dinding m'
Cubicle Toilet Pria set
Bak air set
Meja wastefel m2

Uraian Sat

b c

MASJID
toilet wanita
Pekerjaan Hebel dan plesteran m3
Washtafel Unit
Closet Duduk m'
Floor drai m'
Kran dinding m'
Cubicle Toilet Pria set
Meja wastefel m2
PEKERJAAN PLAFOND
LANTAI 1 ( SATU )
GRC Board 6mm, Rangka Hollow m2
Stetch Membrane m2
PEKERJAAN ATAP
Penutup atap Kubah Masjid m2
Lisplank m1
Plashing m1
Talang datar m1
Talana vertikal m1
Roof Drain bh
Penutup atap Metal toilet m2
Rangka atap Baja, Gording m2
Lisplank m1
Plashing m1
Ruuf drair toilet bh
Penutup atap canopi selasar dan penitipan sandal m2
Rangka atap canopi selasar m2
PEKERJAAN PAGAR DAN RAILLING
Railling Stainlessteel m1
Pagar Keliling m1
Gerbang unit
BOBOT
BOBOT KUMULATIF
DED
Harga Jumlah
Sat
Volume DED Satuan Harga-Harga BOBOT
(Rupiah) Rp (Rupiah)
d' e f=(dxe) c

320 764224 244551680 M 320


320 336200 107584000 M 320
320 110045.7623762 35214643.960396 M 320
16 198492.93 3175886.88 Titik 16
16 158900 2542400 Bh 16
7.0336 1024690.803789 7207265.23752964 M3 7.0336
12714.52436548 kg
6114900 Titik

0 M2
46.568 54976.19047619 2560131.23809524 M3 46.568
7.024 385165.3968254 2705401.74730159 M3 7.024
3.512 951918.4439498 3343137.57515176 M3 3.512

2669.31440064 12496.52436548 33357152.4467304 Kg 2669.31440064


86.08 147291.0085521 12678810.0161643 M2 86.08
26.832 1228444.250338 32961616.1250771 M3 26.832

DED
Harga Jumlah
Sat
Volume DED Satuan Harga-Harga BOBOT
(Rupiah) Rp (Rupiah)
d' e f=(dxe) c

14600 M2

54976.19047619 M3
385165.3968254 M3
951918.4439498 M3
12496.52436548 Kg
147291.0085521 M2
1336544.250338 M3

71.899 385165.3968254 27693006.8663492 M3 71.899


35.9495 951918.4439498 34220992.100774 M3 35.9495
718.99 231058.0369231 166128417.967323 M2 718.99
718.99 1336544.250338 960961950.550731 M3 718.99
183400 M2

12.2 1228444.250338 14987019.8541272 M3 12.2


3939.010848 12496.52436548 49223945.0379308 Kg 3939.010848
98.56 147265.5096305 14514488.6291794 M2 98.56

301.33651968 12496.52436548 3765659.16039074 Kg 301.33651968


14.96 147279.7434781 2203304.962432 M2 14.96
1.632 1228444.250338 2004821.0165521 M3 1.632

147265.7753389 0 M2
12496.52436548 0 Kg
1228444.250338 0 M3
183400 0 M2

50790.85 61100 3103320935 kg

35.9495 951918.4439498 34220992.100774 M3


12496.52436548 0 M2
907885.2503383 0 M3

DED
Harga Jumlah
Sat
Volume DED Satuan Harga-Harga BOBOT
(Rupiah) Rp (Rupiah)
d' e f=(dxe) c

795.4525509 379670.5 302009867.726478 m2 0.0387361626


163.49124015 379670.5 62072800.8933706 m2 0.0079615349
165.9287742 379670.5 62998260.6649011 m2 0.0080802356
107.07732 379670.5 40654099.62306 m2 0.0052143456
131.03118 379670.5 49748673.62619 m2 0.0063808270
1620.41491265 525000 850717829.14125 m2 0.1091141307
957.22614435 195000 186659098.14825 m2 0.0239411289
171.8208828 650000 111683573.82 m2 0.0143246746
721.6228845 71630 51689847.216735 m2 0.0066298043
1870.109409 26000 48622844.634 m2 0.0062364267
0 -
221.8976085333 130695.7008657 29001063.4676914 m1 0.0037197126
68.84 130695.7008657 8997092.04759624 m1 0.0011539783
44.352 128977.5133542 5720410.67228587 m2 0.0007337070
0 -
3 6723824.757289 20171474.2718664 unit 0.0025872185
1 5976733.11759 5976733.11759004 unit 0.0007665833
2 4503125 9006250 unit 0.0011551529
8 1237500 9900000 unit 0.0012697864
0 -
0 -
314.414 750000 235810500 m3 0.0302453491
3 2532915 7598745 Unit 0.0009746245
6 3008000 18048000 m' 0.0023148590
12 6700000 80400000 m' 0.0103122044
12 2215000 26580000 m' 0.0034091840
38 1097100 41689800 m' 0.0053471858
1 323600 323600 m' 0.0000415053
1 952800 952800 m' 0.0001222073
27 594000 16038000 m' 0.0020570539
5 13330500 66652500 set 0.0085489329
1 13330500 13330500 set 0.0017097866
1.92 304200 584064 m2 0.0000749128

DED
Harga Jumlah
Sat
Volume DED Satuan Harga-Harga BOBOT
(Rupiah) Rp (Rupiah)
d' e f=(dxe) c

.
0 0
314.414 750000 235810500 m3 145.1141538462
4 2532915 10131660 Unit 6.2348676923
5 3008000 15040000 m' 9.2553846154
64 1097100 70214400 m' 43.2088615385
63 594000 37422000 m' 23.0289230769
5 13330500 66652500 set 41.0169230769
2.64 304200 803088 m2 0.494208
0 0
0 0
571.463024 910000 520031351.84 m2 320.01929344
1287.77392 198000 254979236.16 m2 156.9102991754
0 0
1287.77392 260000 334821219.2 m2 206.0438272
4419.1 405000 1789735500 m1 1101.3756923077
4419.1 195000 861724500 m1 530.292
35.8 169000 6050200 m1 3.7232
25.6 78000 1996800 m1 1.2288
4 404700 1618800 bh 0.9961846154
313.25 260000 81445000 m2 50.12
313.25 405000 126866250 m2 78.0715384615
89.1 405000 36085500 m1 22.2064615385
89.1 195000 17374500 m1 10.692
4 343600 1374400 bh 0.8457846154
567.203289 169000 95857355.841 m2 58.989142056
567.203289 405000 229717332.045 m2 141.3645120277
0 0
9.2 1625000 14950000 m1 9.2
350.921 1625000 570246625 m1 350.921
1 52000000 52000000 unit 32
7,796,587,146.16 1.00
DURASI

START RENCANA FINISH RENCANA


(HARI)

8 9/22/2018 9/29/2018
8 9/22/2018 9/29/2018
8 9/22/2018 9/29/2018
8 9/22/2018 9/29/2018
8 9/22/2018 9/29/2018
8 9/22/2018 9/29/2018
8 9/22/2018 9/29/2018
8 9/22/2018 9/29/2018

10 9/30/2018 10/9/2018
10 9/30/2018 10/9/2018
10 9/30/2018 10/9/2018
10 9/30/2018 10/9/2018
1
16 12/2/2018 12/17/2018
16 12/2/2018 12/17/2018
16 12/2/2018 12/17/2018

DURASI

START RENCANA FINISH RENCANA


(HARI)

21 12/2/2018 12/22/2018

21 12/2/2018 12/22/2018
21 12/2/2018 12/22/2018
21 12/2/2018 12/22/2018
21 12/2/2018 12/22/2018
21 12/2/2018 12/22/2018
21 12/2/2018 12/22/2018

21 12/2/2018 12/22/2018
21 12/2/2018 12/22/2018
21 12/2/2018 12/22/2018
21 12/2/2018 12/22/2018
21 12/2/2018 12/22/2018

16 12/7/2018 12/22/2018
16 12/7/2018 12/22/2018
16 12/7/2018 12/22/2018

16 12/9/2018 12/24/2018
16 12/9/2018 12/24/2018
16 12/9/2018 12/24/2018

16 12/9/2018 12/24/2018
16 12/9/2018 12/24/2018
16 12/9/2018 12/24/2018
16 12/9/2018 12/24/2018

16 12/9/2018 12/24/2018

21 12/21/2018 1/10/2019
21 12/21/2018 1/10/2019
21 12/21/2018 1/10/2019

DURASI

START RENCANA FINISH RENCANA


(HARI)

19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019
19 12/23/2018 1/10/2019

15 1/7/2019 1/21/2019
15 1/7/2019 1/21/2019
15 1/7/2019 1/21/2019
15 1/7/2019 1/21/2019

16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 1/14/2019
16 12/30/2018 1/14/2019

DURASI

START RENCANA FINISH RENCANA


(HARI)

16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019
16 12/30/2018 1/14/2019

21 1/11/2019 1/31/2019
21 1/11/2019 1/31/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019
31 12/25/2018 1/24/2019

21 12/21/2018 1/10/2019
21 12/21/2018 1/10/2019
21 12/21/2018 1/10/2019