Documente Academic
Documente Profesional
Documente Cultură
C1F1 C1F1
B1 B1
1 1 1 1
B1 B2 B1 B1 B2 B1
C1F1 C1F1
B1 B1
B1
2 2 2 2
B1 B1 B1 B1
B2 B2 B2
C1F1 C1F1
B1
3 3 3 3
B1
B1 B1
B2 B1 B1
C2F2 B1 B2
B1
3' 3' 3' B1 B1
3'
C1F1 B1 B2 B2
B1
4 4 4 4
B1 B1
B1
B1
C1F1 B2 B2 B1 B2
B1
SPACED O.C. B1 B1
B2
5 5 B2 5 5
4"THK. REINF.
CONC. GROUND FLOORS W/
SPACED O.C.
FOUNDATION PLAN 2F FLOOR FRAMING PLAN RD FLOOR FRAMING PLAN ROOF FRAMING PLAN
SIDE
TOP
SIDE
06 SPOT DETAIL "A" 07 SPOT DETAIL "B" 08 SPOT DETAIL "C" 09 SPOT DETAIL "D"
S-2 N T S S-2 N T S S-2 N T S S-2 N T S
TOP
CIVIL ENGINEER: DISCLAIMER: PROJECT TITLE: OWNER: SHEET CONTENTS: LOCATION CADD BY: MRH
SHEET NO:
REPUBLIC ACT 545 SECTION 25 (4) FOUNDATION PLAN
DESIGNED BY: MRH
MARK ROGER HUBERIT II DRAWINGS AND SPECIFIATIONS DULY SIGNED, STAMPED OR SEALED AS TWO STOREYS /W LOLITA T. DELA CRUZ
SECOND FLOOR FRAMING PLAN B6 L2-A HAWK S. CAMELLA II DATE: 2/19/19
05
ROOF DECK FLOOR FRAMING PLAN
INSTRUMENTS OF SERVICE ARE THE PROPERTIES AND DOCUMENTS OF THE ROOF FRAMING PLAN SOLDIERS HILL PUTATAN
SCHEDULE OF TRUSSES CHECKED BY: MRH
REG. NO.: PTR NO.: ENGINEER, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
ROOF DECK SPOT DETAIL "A" MUNTINLUPA
S-2
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON, WITHOUT THE WRITTEN CONSENT
OF THE ENGINEER OR AUTHOR OF SAID DOCUMENTS, TO DUPLICATE OR MAKE DETAIL OF STEEL RAFTER DATE:
DATE: DATE: COPIES OF SAID DOCUMENTS FOR THE USE IN THE REPETITION OF AND FOR
PROJECTS OR BUILDING, WHETHER EXECUTED PARTLY OR IN WHOLE
RESIDENTIAL BLDG. TO CONCRETE COLUMN
DET. OF TRUSS BOTTOM CHORD
TO BASE PLATE & COLUMN REVISION: