EIS OUTLINE
(Maximum of about 250 pages)
NOTE: REFER TO ANNEX 2-7a (EIS SCOPING AND PROCEDURAL SCREENING CHECKLIST)
FOR SPECIFIC CONTENTS/RE QUIREMENTS OF EACH SECTION
Project Fact Sheet
Table of Contents
Executive Summary
Biel Project Description
Biel Summary of Project's EIA Process
‘Summary of Baseline Characterization
‘Summary of impact Assessment and Environmental Management Pian
‘Summary of Environmental Nontoring Plan
EMF and EGF Commitments
a)
2)
3)
4)
5)
6)
DRAFT MAIN EIS
BASIC PROJECT INFORMATION
1.
2
3.
DESCRIPTION OF THE PROJECT'S EIA PROCESS
21.
22
23,
24.
25.
26.
‘Terns of Reference of the EIA Study
EIA Team
EIA Study Schedule
EIA Study Area
EIA Methodology
Public Participation
PROJECT DESCRIPTION
aA.
32.
33,
34,
35,
36.
37.
3.8.
Project Location and Area
Project Rationale
Project Atematives
Project Development Plan, Process/Technology Optons.andProject Components
Description of Project Phases (Actvites/Environmental Aspects, Associated Wastes and
Buin Polluton Control Measures)
3.5.1, Pre-consiruction/ Pre-operational phase
3.52. Constucton/Development phase
3.53. Operational hase
3.54. Abandonment phase
Manpower Requirements
Project Cost
Project Duration and Schedule
4, BASELINE ENVIRONMENTAL CONDITIONS, IMPACT ASSESSMENT AND
MITIGATION
4A
‘The Land (Discuss onl relevant modules)
‘4.1.4. Land Use and Classifcation4.12. Pedology
4.13, Geology and Geomorphology
414 Terrestial Biology
4.2. The Water (Discuss only relevant modules)
42.1. Hydrology & Hydrogeology
422. Oceanography
423. Water Quaity
424. Freshwater Biology
425, Marine Biology
4.3. The Air (Discuss ony relevant modules)
43.1. Meteorology
432. At Qualty and Noise
44, The People
5. _ ENVIRONMENTAL RISK ASSESSMENT (WHEN APPLICABLE)
6 ENVIRONMENTAL MANAGEMENT PLAN
6.1. Impacts Management Plan
6.2. Social Development Framework
6.3. IEC Framework
6.4, Emergency Response Polcy and Generic Guidelines
6.5. Abandonment /Decommissioning Rehabilitation Policies and Generic Guidelines
6.6. Environmental Monitoring Pan
6.2.1. Self-Monitoring Plan
Note: Attach under this section the filled out Project Environmental Monitoring
and Audit Priontization Scheme (PEMAPS) Questionnaire in Annex 2-76 of the
RPM
62.1. Multisectoral Monitoring Framework
62.4. Environmental Guarantee and Monitoring Fund Commitment
6.7. Insttutional Pian for EMP imelementaton
7. BIBLIOGRAPHY/REFERENCES
8. ANNEXES
8.1. Scoping Checkiist
8.2. Original Swom Accountability Statement of Proponent
8.3. Original Swom Accountabiliy Statement of Key ES Consultants
8.4. Proof of Publc Partcipation
8.5. Baseline Study Suppot Information
8.6. Impact Assessment and EMP Support Information
NOTE: The EIA review process wil achise DOH if the project will pose a significant public health risk 0 the
environment, ¢.g. public health may be affected if the wastes/dscharges are direct contributors to the leading
causes of mortalty/morbidity in the DIA, regardless of environmental management measures. To assist EMB on
its review, DOH shall coordinate with the DENR-EMB on the dedaration of Heath Sensitive Projects and Health
‘Senstive Areas. Until such time, DOH shall review EHIA independently of the EIA Process, consistent with the
DENR-DOH MOA on EHIA. Further, workers’ HIA component of the EHIA is recommended to be coordinated by
DOH wit DOLE for the latter's consideration in ts requirement of an Occupational Health and Safety Program
from the Proponent.