Sunteți pe pagina 1din 2
EIS OUTLINE (Maximum of about 250 pages) NOTE: REFER TO ANNEX 2-7a (EIS SCOPING AND PROCEDURAL SCREENING CHECKLIST) FOR SPECIFIC CONTENTS/RE QUIREMENTS OF EACH SECTION Project Fact Sheet Table of Contents Executive Summary Biel Project Description Biel Summary of Project's EIA Process ‘Summary of Baseline Characterization ‘Summary of impact Assessment and Environmental Management Pian ‘Summary of Environmental Nontoring Plan EMF and EGF Commitments a) 2) 3) 4) 5) 6) DRAFT MAIN EIS BASIC PROJECT INFORMATION 1. 2 3. DESCRIPTION OF THE PROJECT'S EIA PROCESS 21. 22 23, 24. 25. 26. ‘Terns of Reference of the EIA Study EIA Team EIA Study Schedule EIA Study Area EIA Methodology Public Participation PROJECT DESCRIPTION aA. 32. 33, 34, 35, 36. 37. 3.8. Project Location and Area Project Rationale Project Atematives Project Development Plan, Process/Technology Optons.andProject Components Description of Project Phases (Actvites/Environmental Aspects, Associated Wastes and Buin Polluton Control Measures) 3.5.1, Pre-consiruction/ Pre-operational phase 3.52. Constucton/Development phase 3.53. Operational hase 3.54. Abandonment phase Manpower Requirements Project Cost Project Duration and Schedule 4, BASELINE ENVIRONMENTAL CONDITIONS, IMPACT ASSESSMENT AND MITIGATION 4A ‘The Land (Discuss onl relevant modules) ‘4.1.4. Land Use and Classifcation 4.12. Pedology 4.13, Geology and Geomorphology 414 Terrestial Biology 4.2. The Water (Discuss only relevant modules) 42.1. Hydrology & Hydrogeology 422. Oceanography 423. Water Quaity 424. Freshwater Biology 425, Marine Biology 4.3. The Air (Discuss ony relevant modules) 43.1. Meteorology 432. At Qualty and Noise 44, The People 5. _ ENVIRONMENTAL RISK ASSESSMENT (WHEN APPLICABLE) 6 ENVIRONMENTAL MANAGEMENT PLAN 6.1. Impacts Management Plan 6.2. Social Development Framework 6.3. IEC Framework 6.4, Emergency Response Polcy and Generic Guidelines 6.5. Abandonment /Decommissioning Rehabilitation Policies and Generic Guidelines 6.6. Environmental Monitoring Pan 6.2.1. Self-Monitoring Plan Note: Attach under this section the filled out Project Environmental Monitoring and Audit Priontization Scheme (PEMAPS) Questionnaire in Annex 2-76 of the RPM 62.1. Multisectoral Monitoring Framework 62.4. Environmental Guarantee and Monitoring Fund Commitment 6.7. Insttutional Pian for EMP imelementaton 7. BIBLIOGRAPHY/REFERENCES 8. ANNEXES 8.1. Scoping Checkiist 8.2. Original Swom Accountability Statement of Proponent 8.3. Original Swom Accountabiliy Statement of Key ES Consultants 8.4. Proof of Publc Partcipation 8.5. Baseline Study Suppot Information 8.6. Impact Assessment and EMP Support Information NOTE: The EIA review process wil achise DOH if the project will pose a significant public health risk 0 the environment, ¢.g. public health may be affected if the wastes/dscharges are direct contributors to the leading causes of mortalty/morbidity in the DIA, regardless of environmental management measures. To assist EMB on its review, DOH shall coordinate with the DENR-EMB on the dedaration of Heath Sensitive Projects and Health ‘Senstive Areas. Until such time, DOH shall review EHIA independently of the EIA Process, consistent with the DENR-DOH MOA on EHIA. Further, workers’ HIA component of the EHIA is recommended to be coordinated by DOH wit DOLE for the latter's consideration in ts requirement of an Occupational Health and Safety Program from the Proponent.

S-ar putea să vă placă și