A B C D drawings
6. Clear cover to main
reinforcement shall be 50mm
in footings,40mm in columns.
36'-0" 7. The mix of concrete shall be
M-25 grade in foundation
26'-41" 7'-0" 1
2'-7 " and M-20 grade in column
2 2 8. Reinforcement shall be
fe -500D grade conforming to
4 "
1
2
4 "
is 1786.
1
2
2'-6" 3'-6" 9. Min lap length shall be
sp-34.
C-1 CF-1 RAFT-1 C-3 C-6 11. Spacer bars:- shall be 20mm dia at
5'-9"
max.4'-0"(1200 mm) intervals
12.The period of curing should not be
less than 10 days for all the
concrete components such as column,
slabs, footings exposed to
hot and dry weather conditions.
12'-10 "
12'-10 "
1
1
2
2
4'-721" 9'-71"
13'-3"
5'-10 "
Spanning over 4.5 m is 14 days
5'-1021"
1
1
2
2
Props to beams and arches
Spanning up to 6 m is 14 days
Column size increased by 5%. Spanning over 6 m is 21 days
16.Site should be inspected by qualified
45'-0"
7'-0"
7'-0"
7'-0"
C-7
C-5
4 4
4'-71"
2
C-2
Does lift have RCC wall around?
1
3'-102" 7'-0" 2'-721"
FB-1(30"X30")
PROJECT TITLE:-
18'-6"
18'-1021"
18'-6"
STRUCTURAL CONSULTANT
41"
0141-2702594
1
2
1 Mobile No:-9799523888
26'-4 " 7'-0" 2'-71" E-mail:-ksdesigngroup@gmail.com
2 2
DESIGNED BY:- DEALT BY:-
36'-0"
ASHOK MUKESH
A B C D CHECKED BY:-
KAPIL SARAWAGI
DATE:- JOB. NO:- DRG. TITLE:-
FOUNDATION LAY
15-02-19 190222
OUT PLAN
DRG NO :-
S-01
REVISION:-(1) 21-02-19