AZZAWIYA OIL REFINING

COMPANY INC
‫شركة الزاوية لتكرير النفط‬
TECHNICAL DEPARTMENT ‫اإلدارة الفنية‬

‫نموذج القراءات خالل العطلة األسبوعية‬


Weekend & Holiday Report
Date:6/10/2017
TOPPING UNITS (10&110)
ITEM Old New
Unit Capacity ( m³/hr ) 280 S/D
70%Shrara 13 %Hamada 5%wafa
FEED TYPE (VOL %) Tank (1/6)
12%Misla- sreir
Heater inlet temp. (°C) 215 S/D
Heater outlet temp. (°C) 326 S/D
Max Heater skin temp. (°C) 377 S/D
Reboiler temp. (°C) 159 S/D
L.P.G production ( Ton/hr ) 2 S/D
Mix gas oil viscosity Cst 5.04 S/D
Mix gas oil recovery @ 350 C 89 S/D
Residue viscosity Cst 15.4 S/D
Kerosene end point / flash point (°C) 251/45 S/D
10-V 4 chlorides /iron ( PPM) 17.75/0.1 S/D

ASPHALT PLANT (40)

Unit Capacity ( % ) S/D


Reduced crude tank ( NO) S/D
Heater outlet temp. (°C) S/D
Flash zone temp. (°C) S/D
Penetration S/D

L.P.G Treatment Unit ( PK170)

Unit Capacity Lab result


( Ton/hr ) C1 C2 C3 iC4 nC4 iC5 nC5
0.05 1.06 26.16 26.17 46.56 - -

R/D Tanks Lab. Results


Mix gas oil Recovery @ 350 /Flash point
(°C)
92.2/66
Fuel oil viscosity (Cst) / water content (%) 17.64/0.05
Kerosene freezing point (°C) -49
Asphalt penetration

ARC-823-FM-35 :‫نموذج رقم‬ 0000-00-00 / 2013-08-28:‫ التعديل‬/‫تاريخ اإلصدار‬ 0-1 :‫رقم اإلصدار‬
Page 1 of 3
AZZAWIYA OIL REFINING
COMPANY INC
‫شركة الزاوية لتكرير النفط‬
TECHNICAL DEPARTMENT ‫اإلدارة الفنية‬

Naphtha Hydrotreating Units (20&120)

ITEM Old New


Unit Capacity (m³/hr) 72 S/D
Reactor inlet temp. (°C) 310 S/D
Reactor outlet temp. (°C) - S/D
Reboiler temp. (°C) 233 S/D
Light naphtha flow (m³/hr) 15 S/D
Light naphtha R.V.P 1.58 S/D

Kerosene Hydrotreater Units (30&130)

ITEM Old New


Unit Capacity ( m³/hr ) / run down 38 S/D
Reboiler temp. (°C) 261 S/D

Plat forming Units (21&121)

ITEM Old New


Unit Capacity (m³/hr) 52.5 S/D
1st Reactor inlet temp. (°C) 512 S/D
1st Reactor outlet temp. (°C) 456 S/D
2nd Reactor inlet temp. (°C) 512 S/D
2nd Reactor outlet temp. (°C) 497 S/D
3rd Reactor inlet temp. (°C) 512 S/D
3rd Reactor outlet temp. (°C) 510 S/D
Octane number 94.2 S/D
L.P.G flow (m³/hr) 4 S/D
Deb bottom R.V.P 0.59 S/D

Utility Area
Boilers

ITEM A B C D W.H.B
Production ( ton /hr ) 17 15 21 12 -
Fuel Type mix gas fuel gas -

ARC-823-FM-35 :‫نموذج رقم‬ 0000-00-00 / 2013-08-28:‫ التعديل‬/‫تاريخ اإلصدار‬ 0-1 :‫رقم اإلصدار‬
Page 2 of 3
AZZAWIYA OIL REFINING
COMPANY INC
‫شركة الزاوية لتكرير النفط‬
TECHNICAL DEPARTMENT ‫اإلدارة الفنية‬

Steam Turbines

ITEM A B C
Production (MWH) 2.43 1.42 2.15

Gas Turbines

Production (MWH ) : 0.74


Income Feeder (MWH)

A S/by B M.T.C

DESALINATION UNITS
ITEM 6 7 8
Production (MWH)new
33 M.T.C 28
Sea water old unit

Water Tanks Levels

ITEM A B T10
Level (m) full M.T.C full

Notes:
 Sample of iron was taken from 30v5 and result was: 0.48ppm.
 Sample of WISM test was taken and results were as follows:
Unit30:97
Tank 3-3:
top:92 bottom:94

PROCESS ENGINEERING DIVISION


Process Engineer: Signature:

Wessam

ARC-823-FM-35 :‫نموذج رقم‬ 0000-00-00 / 2013-08-28:‫ التعديل‬/‫تاريخ اإلصدار‬ 0-1 :‫رقم اإلصدار‬
Page 3 of 3