Sunteți pe pagina 1din 76

XUAN PHU HAI INVESTMENT & CONSTRUCTION JSC

Ha My Dong A, Dien Duong, Dien Ban district, Quang Nam province, Vietnam
t (+24) 3 7475 266
e: info@xuancau.com.vn

© boydens engineering
XUAN PHU HAI INVESTMENT & CONSTRUCTION JSC
Ha My Dong A, Dien Duong, Dien Ban district, Quang Nam province, Vietnam
t (+24) 3 7475 266
e info@xuancau.com.vn

CLIENT | Xuan Phu Hai Investment & Construction JSC CONSULTANT | Boydens Engineering
General Director: Chairman:
Tổng Giám Đốc Chủ tịch

Đào Trọng Khanh Dirk Boydens

© boydens engineering
XUAN PHU HAI
HOTEL CONCEPT DESIGN
01/08/2018

LE TRUNG KIEN
PROJECT MANAGER

KIENLT@BOYDENSVN.COM
1. HVAC 4

HVAC

© boydens engineering
1. HVAC 5

STANDARDS AND CODES


 International codes
- ALILA Standards
- ASHRAE: The American Society of Heating, Refrigerating and Air Conditioning Engineers
- EN: European Standards

 Local standards and codes:


- QCVN 02: 2009/BXD Vietnam Building Code – Natural Physical & Climatic Data for Construction
- QCVN 08: 2009/BXD Vietnam civil code for urban underground works – Part 2: Parking
- QCVN 06: 2009/BXD National technical code for fire safety in building & works
- TCVN 232-1999 Air conditioning and Ventilation – Installation and Approval.
- TCXDVN 175-2005 Allowed maximum noise for public buildings
- TCVN 5687: 2010: Ventilation-air conditioning Design standards
- QCVN 09:2013/BXD: National Technical Regulation On Energy Efficiency Buildings (for reference only)

© boydens engineering
1. HVAC 6

DESIGN CRITERIA
 Location: Hoi An, Quang Ngai, Vietnam
 Ambient Air Temperatures:
- Summer: 37.6°C Dry Bulk/ 28.3°C Wet Bulk
- Winter: No winter time in Hoi An (Boydens recommends no heating mode required in XPH project)
 Air-conditioned space design conditions
- Guest room: 22°C ± 1oC
- Other function rooms: 24°C ± 1oC
- Open public area shall be applied passive design
- Sports room, Fitness : 21°C (Summer)
- Switch, computer room: 26~28C
- Kitchen: 28C
The detail temperature requirement will be provided in Design Brief

© boydens engineering
1. HVAC 7

DESIGN CRITERIA
 Comparison about Ventilation rates:

FRESH AIR
REQUIREMENT

Guestroom 11 (l/s) 17 (l/s) 13.89 (l/s) 17 (l/s) 8.33 (l/s) 9.44 (l/s)
39.6 (m3/h) 61.2 (m3/h) 50 (m3/h) 61.2 (m3/h) 30 (m3/h) 35 (m3/h)

Offices 8.5 (l/s) 8.0 (l/s) 9.72 (l/s) 11.67 (l/s) 8.00 (l/s) 8.33 (l/s)
30.6 (m3/h) 28.8 (m3/h) 35 (m3/h) 42 (m3/h) 28.8 (m3/h) 30 (m3/h)

Restaurant 10 (l/s) 7 (l/s) 11.11 (l/s) 11.67 (l/s) 3~5ACH 8.33 (l/s)
36 (m3/h) 36 (m3/h) 40 (m3/h) 17 (m3/h) 30 (m3/h)

Public Areas 10 (l/s) 7 (l/s) 6.97 (l/s) 11.67 (l/s) 3~5ACH 6.97 (l/s)
36 (m3/h) 36 (m3/h) 25 (m3/h) 17 (m3/h) 25 (m3/h)

Fitness (Exercise) 22 (l/s) 20 (l/s) 13.89 (l/s) 9.44 (l/s) Not Available 11.11 (l/s)
Areas 79.2 (m3/h) 72 (m3/h) 50 (m3/h) 34 (m3/h) 40 (m3/h)

ALILA agrees to apply 3-Star Hotel Appendix F TCVN


ASHRAE standard for requirement 5687
fresh air requirement.

RECOMMENDATION
ASHRAE
Standard
© boydens engineering
1. HVAC 8

DESIGN CRITERIA AIR VELOCITY IN DUCTWORK


 Duct velocities must be within the following range, to ensure acceptable noise levels

- Fan outlets: 6.5 ~ 10 m/s

- Main duct: 5.0 ~ 6.5 m/s

- Brand duct: 3.0 ~ 4.5 m/s

- Risers: 3.0 ~ 3.5 m/s

- Guestroom risers: 3.0 ~ 4.5 m/s

- Open lobby and public spaces: natural ventilation + ceiling fan

- Sports room, Fitness : 50 m³/h/person

- Enclosed Car park: 6 vol/h and 10 vol/h (Smoke exhaust)

The duct insulation shall be closed cell elastomeric foam materials with the minimum thickness followed QCVN 09/2013

RECOMMENDATION

SOURCE: REFERENCE ALILA HOTEL STANDARD

© boydens engineering
1.HVAC – COOLING PRODUCTION 9

1. Hotel
• Little distance between guests
• Available shafts and trays
• Lower peak power per guest

Comfort

Cost Energy

© boydens engineering
1.HVAC – COOLING PRODUCTION 10

Hotel
Chiller system

RECOMMENDATION

© boydens engineering
1.HVAC 11

HVAC PLANT CONFIGURATION


COOLING TOWERS

AHU FCU

CHILLER PIPING
DOMESIC HOT WATER
CONDENSER PIPING

HOT WATER PIPING

PLATE HEAT EXCHAGER

04 CHILLER PUMP 03 WATER-COOLED CHILLER 04 CONDENSER PUMP WATER SOURCE HEAT PUMPs

RECOMMENDATION
© boydens engineering
1.HVAC 12

HYGIENIC VENTILATION

AIR HANDLING UNIT (AHU) FOR HOTEL ROOM


(Pre-cooling outdoor air)

AHU

AHU

AHU

ROTARY HEAT WHEEL

© boydens engineering
1.HVAC 13

HYGIENIC VENTILATION

HEAT RECLAIM VENTILATION FOR SOME SMALL ROOMS

© boydens engineering
1.HVAC 14

HVAC SYSTEM TOTAL COST ESTIMATION

ITEM PRICE (USD)

CHILLER 300,000

AIR HANDLING UNIT 60,000

COOLING TOWER 8,000

PUMP 12,000

FAN COIL UNIT 222,000

HRV UNIT 8,000

MATERIAL 172,000

LABOR COST 143,000

TOTAL 925,000

© boydens engineering
2.PLUMBING 15

PLUMBING

© boydens engineering
2.PLUMBING 16

STANDARDS AND CODES


 International codes
- Alila Standards
- EN: European Standards
- Plumbing Engineering services design guide

 Local standards and codes:


- QCVN 01:2009/BYT: National technical regulation on drinking water quality
- QCVN 02: 2009/BYT: National technical regulation on domestic water quality
- QCVN 14: 2008/BTNMT: National technical regulation on domestic wastewater
- QCVN - Plumbing Code
- TCVN 4474:1987 : Standard design drainage systems inside
- TCVN 4513:1988: Standard design of water supply systems inside
- TCVN 6772:2000: Water quality-Wastewater-limit pollution permit
- TCVN 7957:2008: Standard design external drainage system
- TCVN 33:2006: Standard design external water supply system

© boydens engineering
2. PLUMBING 17

DESIGN CRITERIA
 Comparison about water demand

HOT/COLD WATER
REQUIREMENT

Cold water 300 l/Guests 450 650 850 200 300


(l/room.day) tropics.day 550 (with
350l/ Guests- Laundry)
resorts.day
Hot water 100 l/Guests 150 325 360 80 210
(l/room.day) tropics.day (no long bath)
140l/ Guests-
resorts.day

Storage capacity two day one day two day one day one day one day

© boydens engineering
2.PLUMBING 18

DESIGN CRITERIA
 Location: Hoi An, Quang Ngai, Vietnam
 Water consumption
- Hotel: 300 litres/person/day
- Staff: 50 litres/staff/day
 Hot water
- Hotel: 100 l/person/day
- Hot water temperature of the distribution: 55-60°C
- Time for hot water to reach the tap:
o Bedroom: less than 05 seconds
o Service area: less than 10 seconds
 Water pressure
- Minimum: 2.4 Bar
- Maximum: 3.5 Bar
 Water velocity: From 0.5-1.2 m/s

© boydens engineering
2.PLUMBING 19

COLD/HOT WATER SUPPLY RECIRCULATION FOR HOTEL

HOTEL WATER CONSUMTION


 Fresh water supply for hotel: ~440 m3/day
 Hot water requirement: ~ 109 m3/day
 Waste water for hotel: ~270 m3/day

WATER TECHNICAL SPACE REQUIREMENT


 Water storage requirement (to supply whole project): 1700 m3
 Raw water tank underground : ~850m3
 Fresh water tank underground :~850m3
 Water technical room : 116m2

© boydens engineering
2.PLUMBING 20

COLD WATER SUPPLY RECIRCULATION FOR HOTEL

RO-FILTER WATER TREATMENT (NO.2)


BOOSTER WATER PUMP

TO VILLA & INFRASTRUCTURE


TO KITCHEN & PURIFIED WATER
BOTTLING STATION
(QCVN – 021:2009/BYT)

RAW WATER TANK PRE-TREATED WATER TANK


(QCVN – 02:2009/BYT) (850m3)
(850 m3)

PRE-FILTER WATER TREATMENT (NO.1)

© boydens engineering
2.PLUMBING 21

HOT WATER SUPPLY RECIRCULATION FOR HOTEL SOLAR PANEL

DHW PIPING

DHW RECIRCULATING PIPING

HOTWATER
RECIRCULATING PUMP

COLD WATER INLET

SOLAR HOT WATER HOT WATER TANK WATER SOURCE HEAT


TANK PUMP
© boydens engineering
2.DRAINAGE 22

WASTE WATER SYSTEM


VENT CAP

HOTEL WASTEWATER REQUIREMENT


 Centralized Sewage treatment plant for both Villa and Hotel

 Waste water for hotel: ~270 m3/day

 Estimated centralized wastewater capacity: 260 m3/day

 Estimated greywater reclaimation capacity: 100 m3/day

 Proposed 3-pipe system Grey – Vent – Black water for easier


smell controlling and operating

DISCHARGE STACK
SECONDARY VENTILATED

WASTEWATER FROM VILLA CITY SEWER


Waste water treatment Plant

Greywater Reclamations Plant FOR RE-USE

© boydens engineering
2.PLUMBING 23

SEWER TREATMENT PLAN


260 m³/day

© boydens engineering
2.PLUMBING 24

GREY WATER RECLAIMATION UNIT SCHEMATIC

USING MBR TECHNOLOGY


ESTIMATED INVESTMENT COST: 150,000 USD

© boydens engineering
2.PLUMBING 25

WATER RECLAIMATION CIRCULATION FOR HOTEL

Hotel

24h storage Greywater Conventional


Table 1 – PUB Technical Guide for Greywater recycling system reclamation Activated Sludge
treatment unit WWTP
Natural Pond

Overflow

Run-off rainwater
To Sewer
Discharge
Column A - QCVN14:2008/BTNMT
© boydens engineering
2.PLUMBING 26

SWIMMING POOL TREATMENT SYSTEM

ESTIMATED EQUIPMENT COST FOR 600 m2 SWIMMING POOL: 250,000 USD

© boydens engineering
2.PLUMBING 27

HEATING FOR LAUNDRY


NEW DESIGN

STEAM PIPING

WASHING MACHINE DRYER IRONING MACHINE SAUNA, SPA

NOTE: TO BE CONFIRMED WITH LAUNDRY CONTRACTOR BUT GENERALLY THE ADVISED


CAPACITY FOR LAUNDY IS 17KG/ROOM/DAY.

STEAM BOILER

RECOMMENDATION

© boydens engineering
3.ELECTRICAL 28

ELECTRICAL

© boydens engineering
3.ELECTRICAL 29

STANDARDS AND CODES


 International codes
- The ALILA standard
- IEC: International Electrotechnical Commission Standards
- ISO 11801: Information Technology – Generic Cabling For Customer Premises
- TIA/EIA 568: Commercial Building Communications Cabling Standard
 Local standards and codes:
- QCVN 09:2013/BXD: National Technical Regulation on Energy Efficiency Buildings.
- QCVN 12:2014/BXD: National technical regulation on electrical installations of dwelling and public buildings.
- TCVN 7447: Low-voltage electrical installations.
- TCVN 9206: 2012: Installation of electric equipments in dwellings and public building - Design standard
- TCVN 9207: 2012: Installation of electrical wiring in dwellings and public building - Design standard.
- TCVN 9385: 2012 : Protection of structures against lightning - Guide for design, inspection and maintenance.
- TCVN 9888: 2013: Protection against lightning
- TCVN 8238: 2009: Telecommunication network – Metallic cables for local telephone networks
- TCVN 8665: 2011: Optical fibre for telecommunication network - General technical requirements
- TCVN 8696: 2011: Telecommunication network – Optical fiber connected from cable box to terminals – Technical
Requirements

© boydens engineering
3.ELECTRICAL 30

ESTIMATED POWER DEMANDS


 The estimated electrical power capacity based upon the follow (TCVN 9206: 2012, QCVN 09:2013/BXD):
- Hotel: 80 W/m².
- Beach club: 80 W/m².
- Circulation & Parking area: 5 W/m².
- Landscape: 2 W/m².
 Total estimated power: 2.463 kVA

© boydens engineering
3.ELECTRICAL 31

MV INCOMING

 Operation voltage: 22kV, frequency: 50Hz, 3 phase


 Supply source: Power Supply for the building will be
derived from MV panel of Villas electrical
substation (Substation 1).
 The equipment used for MV panel is SF6 type.
 Transformer protection device is SF6 circuit
breaker.

© boydens engineering
3.ELECTRICAL 32

TRANSFORMER

 Medium voltage: 22kV, frequency: 50Hz, 3 phase


 Low voltage: 3 phases, 4 line 380/220V.
 Dry type, encased in resin.
 Configured in IP31 metallic envelop.
 Each Transformer to be sized for 75% of maximum load of building.

GENERATOR

 Generator is used to provide standby electrical power generation to the building and specific
selected systems, as later described, during periods of loss of the normal incoming electricity
supply and emergency situations. Generator must be sized to maintain 100% loads.
 Generator system feeds only emergency load in case of fire.
 Generator system feeds all load in the event of a fault in the normal supply.
 Daily fuel tank size: for 8 hours (full load)
 Storage fuel tank size: for 48 hours (full load)

© boydens engineering
3.ELECTRICAL 33

STRUCTURE OF LOW VOLTAGE SYSTEM EMERGENCY LOAD


NORMAL LOAD NORMAL LOAD

COUPLING

ATS ATS

SYN PANEL

BACK UP GENERATOR
(100% LOAD)

DRY TRANSFORMER DRY TRANSFORMER

© boydens engineering
3.ELECTRICAL 34

LV DISTRIBUITION BOARD

 Voltage system: 3 phases, 4 line 380/220V


 Designed with 20% spare space for future additions.
 Main switchboards shall be full type test type, Form 3b, IP 43 construction.
 Local distribution boards shall be Form 2b, IP 42 construction.
 Outdoor distribution boards shall be Form 2b, IP 65 construction.
 The panel must be a factory assembled type consisting of cubicles assembled.
POWER CABLE, CONDUIT
 LV main: Copper bus – duct, Cu/XLPE/PVC (on cable tray)
 LV sub – main: Cu/XLPE/PVC (on cable tray)
 LV final circuits: Cu/PVC (in conduit)
 Conduits:
 Exposed: GI type.
 Buried in wall or in ceiling void: PVC type

POWER CONSUMPTION METERS


 Main consumption meter installed in MV panel
 Multi-meter is installed in each distribution panel

© boydens engineering
3.ELECTRICAL 35

EARTHING SYSTEM

 In an electrical installation an earthing system or grounding system connects specific


parts of that installation with the Earth's conductive surface for safety and functional
purposes.
 TN-S earthing system will be used.
 Earthing resistance for Electrical system: Rn< 4 Ω in all season
 Earthing resistance for Telecom system: Rn< 1 Ω in all season

© boydens engineering
3.ELECTRICAL 36

LIGHTING

 Lighting design is out of scope


 Provide power system for lighting only.
 Emergency lighting powered by individual battery.
 Exit & Emergency lighting – Lighting system powered via battery in compact, using to
lighting the way to exit door.
 Exit lighting to be followed local regulation.

© boydens engineering
3.ELECTRICAL 37

LIGHTING CONTROL

 It must be programmable through the timer or controlled by sensors is also


considered)
 Public areas
- Public areas are controlled locally from a general lighting
command board (near reception) and from BMS.
 Bedrooms corridor
- In this area, there must be 2 different types of lighting : - One
permanent lighting, representing 1/3 of luminaries, always “ON”.
One non-permanent lighting, representing 2/3 of luminaries,
controlled by presence sensors.
 Public Toilet
- Controlled by presence sensors.
 Parking, Landscape
- Controlled by photocell and BMS.

© boydens engineering
3.ELECTRICAL 38

LIGHTNING PROTECTION SYSTEM

 Lightning system includes:


- Air termination network – grid system.
- Not using air-termination rod
- Down conductors.
- Earth termination network.
- Testing box.
 Lightning faraday cadge will be applied for tall building (complied with TCVN).
 Cooper or aluminum tape lightning conductor in cooperate with architectural
facade.
 Earthling resistance < 10 Ω in all season.
 Surge Protective Devices
- The main objective of the electrical installation protection system is to limit over
voltages to values that are acceptable for the equipment.
- So, to complete building protection, SPDs for electrical equipment must be
provided:
+ For MDB panel: Type 1 SPD.
+ For DB panel: Type 2 SPD.

©©
boydens
boydens engineering
engineering
4.EXTRA LOW VOLTAGE 39

EXTRA LOW VOLTAGE

© boydens engineering
4.EXTRA LOW VOLTAGE 40

EXTRA LOW VOLTAGE SYSTEMS

Extra low voltage systems include:


 Communication system  Integrated security system
o Data system (wireless and wired system) o Close circuit television (camera system)
o IP Telephone system o Access control
o IPTV system
 Public address system
 Fire alarm system
 Building management system

© boydens engineering
4.EXTRA LOW VOLTAGE 41

COMMUNICATION SYSTEM

 All communication systems (Data, telephone, television) are IP-


TV
based

 Use distributed management solution: SET TOP


BOX
o Building Distribution (BD) rack at 1st basement
o Floor Distribution (FD) rack for each floor.
o Use high bandwidth cables: FO multimode (BD to FDs);
UTP Cat6 (FD to outlets) for high speed transmission
IP PBX
 Guarantee sustainability:
o Use 02 Core Switch to get a redundant channel in case
one of them fail. FD racks are connected to both core
switches.
TECHNICAL ROOM
o UPS for each technical rack (BD and FDs).

 Use both wired and wireless networks. Access points for public
areas and in each guestrooms.

SWITCH
IP PHONE DATA CABLE

© boydens engineering
4.EXTRA LOW VOLTAGE 42

INTEGRATED SECURITY SYSTEM

 IP-based systems (both camera and access control).


 The same transmission solution (distributed management) with
communication system.

 Use multi-functional high quality cameras (Full HD, IR,


day/night, motion detection, …)
o Monitor all security areas: access way, corridor, hall,
parking area, elevator, …
o Use PoE power supply solution ensure convenience and
ease in installation and maintenance.
o Storage capacity is at least 30 days.

 Integrated with access control system to perform full safety


function for all sensitivity areas:
o Access doors
o Technical rooms …

© boydens engineering
4.EXTRA LOW VOLTAGE 43

PUBLIC ADDRESS SYSTEM

 Use centralize management solution. Central monitoring room


at 1st level.

 Supply multi-functional system:


o Play background music in public areas.
o Play recorded or urgent messages.
o Integrated with fire alarm system.

 Speakers are located at: Corridor, stair, technical room,


guestroom …

 Arrange the speakers into areas to make the message more


convenient and accurate.

© boydens engineering
4.EXTRA LOW VOLTAGE 44

BUILDING MANAGEMENT SYSTEM

 Manage all MEP systems in the project.

 From the central control room (1st basement), the operation


team can monitor the operation status of the devices and
control them: labor saving.

 Main targets:
o Coordinate the operations of all systems to ensure the
highest efficiency (ex: energy saving).
o Monitor the operation of the system to ensure the fastest
error detection and fixing.

© boydens engineering
5.FIRE PROTECTION 45

FIRE PROTECTION

© boydens engineering
5.FIRE PROTECTION 46

STANDARDS AND CODES


 International codes
- Commonly Applied Hotel Standards for 4 to 4.5-star brand: Hyatt or Accor standards. The InterContinental standard or
similar standards will be referred and applied once Hotel Operator is confirmed.
- NFPA: The National Fire Protection Association
- EN: European Standards
 Local standards and codes:
- QCVN 06:2010 : Vietnam National Technical Regulation on Fire Safety of Buildings and Structures.
- QCVN 08:2009 : Vietnam Building Code for Urban Underground Structures. Part 2. The Parking
- TCVN 5760:1993: Vietnamese Fire Code for Fire extinguishing system - General requirements for design, installation and
use.
- TCVN 2622:1995: Vietnamese Fire Code for Fire prevention and protection for buildings and structures - Design
requirements
- TCVN 6160:1996: Vietnamese Fire Code for Fire protection - High rise building – Design requirements.
- TCVN 3890:2009: Fire protection equipment for construction and building – Providing, installation, inspection,
maintenance
- TCVN 5738:2000: Automatic fire alarm system – Technical requirements.
- TCVN 7336:2003: Automatic fire protection system
- TCVN 7161-1:2002 : Gaseous fire-extinguishing systems – Physical properties and system design

© boydens engineering
5.FIRE PROTECTION 47

FIRE ALARM SYSTEM

 Provide addressable fire alarm system.


 Fire alarm systems include the following components:
- Fire alarm control panel (FACP).
- Fire alarm detector (smoke detector, heat detector…).
- Manual push button.
- Sounder and Strobe
- Module.
- Telephone jack
- Cable must be Fire resistant type
 Integrated with other systems:
- Fire fighting system
- Public address system.
- Access control.

© boydens engineering
5.FIRE PROTECTION 48

DESIGN CRITERIA
 Automatic Sprinkler System
- K-factor
o Basement (OH group 2) : K= 80 lpm/bar
o Hotel area (OH group 1) : K=0.92
 Drencher System (if needed)
- Q=01 l/s.m
 Fire hose reel system
- Q=2.5l/s with pressure 06 mH2O per Fire hose reel cabinet
- Every point in a floor shall be reached by 02 Fire hose reels.
- 01 Angle Valve DN50 in each Fire hose reel cabinet
 Fire hydrant
- Q=10l/s per Fire hydrant
- Pressure: Min 10 mH2O

©©boydens
boydens engineering
engineering
4.FIRE PROTECTION 49

FIRE PROTECTION FOR HOTEL

SPINKLER HEAD
FIRE HOSE REEL

SIDE WALL
SPINKLER HEAD

FIRE PROTECTION VILLA

FIRE PUMP
(GROUND FLOOR )

ALARM VALVE

FIRE WATER TANK

© boydens engineering
5.FIRE PROTECTION 50

SUPPRESSION SYSTEM: FM200

•Transformer and electrical room


•Data room

Heat Detector

©©boydens
boydens engineering
engineering
5.FIRE PROTECTION 51

STANDARDS AND CODES


 International codes
- Amari Standards for 5-star band
- NFPA: The National Fire Protection Association
- EN: European Standards

 Local standards and codes:


- QCVN 06:2010 : Vietnam National Technical Regulation on Fire Safety of Buildings and Structures.
- QCVN 08:2009 : Vietnam Building Code for Urban Underground Structures. Part 2. The Parking
- TCVN 5760:1993: Vietnamese Fire Code for Fire extinguishing system - General requirements for design, installation and
use.
- TCVN 2622:1995: Vietnamese Fire Code for Fire prevention and protection for buildings and structures - Design
requirements
- TCVN 6160:1996: Vietnamese Fire Code for Fire protection - High rise building – Design requirements.
- TCVN 3890:2009: Fire protection equipment for construction and building – Providing, installation, inspection,
maintenance
- TCVN 5738:2000: Automatic fire alarm system – Technical requirements.
- TCVN 7336:2003: Automatic fire protection system
- TCVN 7161-1:2002 : Gaseous fire-extinguishing systems – Physical properties and system design

©©boydens
boydens engineering
engineering
5. FIRE PROTECTION 52

DESIGN CRITERIA
 Comparison about Fire protection standard:

Type of Sprinkler Stand Hose Fire Fire


building Pipe Station hose Hydrant
(Wet Reel
riser) D25
Area Density Protection Duration (l/s) Dista
(l/s)
Operation (l/s.m2) Area/Spk (min) nce
(m2) (m2) (m)

TCVN Hotel, 120 0.08 12 30 D150 D50 N/A 15 150


condotel

Restaurant 240 0.12 12 60 D150 D50 N/A 15 150

NFPA Hotel, 139 0.068 12.1 30 D150 D65 D25 9.45 152

Restaurant 139 0.1 12.1 60-90 D150 D65 D40 9.45 152

 The QUDOS project must be complied with at least TCVN. But follow NFPA and Amari’s requirement, the project
need to be equipped with the private Hosereel system.
 The additional cost for Hosereel system is about ($US)30,000.

© boydens engineering
5. FIRE PROTECTION 53

DESIGN CRITERIA
 Comparison about Fire protection standard:

Location of Fire water tank Pump

Fire pump Approval Est. Cost


Capacity standard (USD)
kW

TCVN Can be underground type. 2x40 N/A 25,000


Less affect to usable area.

NFPA Pump room and fire water tank must 2x 37 FM 50,000


be the same level UL (~50% higer)
(On ground level)
Area:
Hotel : 50m2
Condotel and Villas : 122.5 m2
Affect more to usable area.

© boydens engineering
5.FIRE PROTECTION 54

DESIGN CRITERIA
 Automatic Spinkler System
- K-factor
o Restaurant (OH group 1 ) : K= 80 lpm/bar
o Hotel area (Light) : K=56 lpm/bar

 Drencher System
- Q=01 l/s.m
 Fire hose reel system
- Q=2.5l/s with pressure 06 mH2O per Fire hose reel cabinet
- Every point in a floor shall be reached by 02 Fire hose reels.
- 01 Angle Valve DN50 in each Fire hose reel cabinet
 Fire hydrant
- Q=15l/s per Fire hydrant
- Pressure: Min 10 mH2O

© boydens engineering
5.ENERGY OPTIMISATION 55

ENERGY OPTIMISATION

© boydens engineering
5.ENERGY OPTIMISATION 56

GENERAL RECOMMENDATIONS

Avoid oversizing

Cooling/heating systems Sustainable energy


are adapted with climate
ENGERGY
OPTIMISATION

Simply technical installations High efficient equipment

© boydens engineering
5.ENERGY OPTIMISATION 57

MECHANICAL

•High Efficiency Motor/Equipment


•Variable Speed Drive(VSD)
•Heat Recovery
•Demand Control of Fresh Air, CO2 Monitoring
•Carpark Ventilation Control,CO Monitoring
•Building Management System (BMS)
•Tube Cleaning System for Chillers

Note: Solutions above are optional depending on decision of the Client

© boydens engineering
5.ENERGY OPTIMISATION 58

ELECTRICAL

•Daylight and Occupancy Sensor for Lighting Control


•Energy Meter and Monitoring
•LED lighting

Note: Solutions above are optional depending on decision of the Client


and proposal from Lighting specialist

© boydens engineering
5.ENERGY OPTIMISATION 59

Amari STANDARD
PV PANELS

Quantity:
1000 Panels of 220 Wp
220 kWp installed
Investment $ 550.000

Electricity production: 9%

Payback 18y
Why is the payback low?
1. Low electricity price
2. No subsidies from the government
3. Prices of PV installers in Vietnam is still high due to the low demand
Electricity Price: 0.11 USD/kWh
Energy Inflation: 5.6%

© boydens engineering
6.ACOUSTIC 60

NOISE CONTROL

©©boydens
boydens engineering
engineering
6.ACOUSTIC 61

NOISE CONTROL IN MEPF SYSTEMS

•Low noise MEPF equipment's


•Sound absorption piping
•Duct silencer
•Low air velocity in ductwork
•Low water velocity in pipework
•Inertia base for water pump

©©boydens
boydens engineering
engineering
62

PASSIVE DESIGN
FOR HOTEL
(RESULT OF STUDYING)

© boydens engineering
© boydens engineering
CONTROLLING THE SOLAR GAINS 63

© boydens engineering
Good

VERY GOOD RESULTS Dark

Overlit

© boydens engineering
65

© boydens engineering
CONTROLLING THE SOLAR GAINS 66

EAST JANUARY MORNING EAST JUNE MORNING

WEST JANUARY AFTERNOON WEST JUNE AFTERNOON

© boydens engineering
BUILDING ENVELOPE

100 mm

200 mm

300 mm

400 mm
WALL THICKNESS

© boydens engineering
BUILDING ENVELOPE 68

27 37

36
26

35

25
34

24 33

32
23
Temperature (°C)

Temperature (°C)
31
22
30

21
29

20 28

27
19

26

18
25

17 24
Sun Mon Tue Wed Thu Fri Sat Sun Sun Mon Tue Wed Thu Fri Sat Sun

Date: Sun 03/Jan to Sat 09/Jan Date: Sun 04/Jul to Sat 10/Jul

Dry-bulb temperature: (VNM_DA-NANG_488550_IW2.epw) Dry-bulb temperature: (VNM_DA-NANG_488550_IW2.epw)

CLIMATE 1 CLIMATE 2

© boydens engineering
COMFORT RESULTS 69

27

26

25

24
Temperature (°C)

23

22

Warmer in
dry climate
21

100 mm
20 200 mm
Sun Mon Tue Wed Thu Fri Sat Sun
Date: Sun 03/Jan to Sat 09/Jan 300 mm
Air temperature: 47 Space (Hotel 100mm.aps) Air temperature: 47 Space (HOTEL AC 400mm.aps) Air temperature: 47 Space (HOTEL AC 300mm.aps) Air temperature: 47 Space (HOTEL AC 200mm.aps)
400 mm

© boydens engineering
COMFORT RESULTS 70

37

36

Cooler in
hot climate 35

34

33

32
Temperature (°C)

31

30

29

28

27

100 mm
26

25 200 mm
Sun Mon Tue Wed Thu Fri Sat Sun
Date: Sun 04/Jul to Sat 10/Jul 300 mm
Air temperature: 47 Space (Hotel 100mm.aps) Air temperature: 47 Space (HOTEL AC 400mm.aps) Air temperature: 47 Space (HOTEL AC 300mm.aps) Air temperature: 47 Space (HOTEL AC 200mm.aps)
400 mm

© boydens engineering
BUILDING ENVELOPE

GREEN ROOF

© boydens engineering
COMFORT RESULTS 72

27.0

26.5

26.0

25.5
Temperature (°C)

25.0

24.5

24.0

23.5

23.0

Normal
22.5
Sun Mon Tue Wed Thu Fri Sat Sun Green
Date: Sun 10/Jan to Sat 16/Jan

Air temperature: 41 01 Livingroom (Villa Normal Roof.aps) Air temperature: 41 01 Livingroom (VILLA GREEN ROOF.aps)

© boydens engineering
COMFORT RESULTS 73

40

38

36

34
Temperature (°C)

32

30

28

26

Normal
24
Sun Mon Tue Wed Thu Fri Sat Sun Green
Date: Sun 11/Jul to Sat 17/Jul

Air temperature: 41 01 Livingroom (Villa Normal Roof.aps) Air temperature: 41 01 Livingroom (VILLA GREEN ROOF.aps)

© boydens engineering
HOTEL 56

© boydens engineering
HOTEL 57

Indoor Temperatures in the room

Base case g0.76; Uex.wall1.82

Better glazing g0.4


Better ex. wall U0.39

Better glazing & ex.


wall

© boydens engineering