Area coverage by sprinkler(As) : 100 ft² selected from tables As hazard type
P friction and residual = 273.348 bar P static = 1.650485437 bar P total = 274.9985
ADDRESS - CITY
Contract No. CONTRACT NUMBER Date
Design data:
Occupancy classification Special Occupancy (High-Piled) Hazards Density
Area of application 1500 ft² Coverage per sprinkler 100 f² No. of sprinklers calcula
Hose streams 15 gpm Total water required including hose streams
Hady Habib's Hydraulic calculation sheet
using
NFPA® 13 : Standard for the Installation of Sprinkler Systems - 2013 Edition
For more information: nicearb@yahoo.com
Name of contractor CONTRACTOR
Name of designer HADY HABIB
Address DESIGNER ADDRESS
Authority having jurisdiction
Date 05-Jan-15
Density 0.15 gpm/f²
of sprinklers calculated 15
ose streams 216 gpm
013 Edition
Nicearb@yahoo.com
Notes
P2 = 7.176 Psi
k = 5.6
Q2 = 15.001 gpm
P3 = 7.290 Psi
k = 5.6
Q3 = 15.119 gpm
P4 = 10.861 Psi
k = 5.6
Q4 = 18.456 gpm
P6 = 7.346 Psi
k = 5.6
Q6 = 15.178 gpm
P7 = 7.972 Psi
k = 5.6
Q7 = 15.811 gpm
P8 = 9.335 Psi
k = 5.6
Q8 = 17.110 gpm
Qa = 64.018 gpm
Nicearb@yahoo.com
Notes
Qb = 88.418 gpm
bar
Hydraulic Calculations
for
ABC COMPANY
ons
Hady Habib's Hydraulic calculation sheet
using NFPA® 13 : Standard for the Installation of Sprinkler Systems - 2013 Edition
Nicearb@yahoo.com
Item Description Unit Qyt. Rate Total
1/2 in. 45° elbow Pcs 0 50.00 0
3/4 in. 45° elbow Pcs 0 30.00 0
1 in. 45° elbow Pcs 0 17.00 0
1 1/4 in. 45° elbow Pcs 0 25.00 0
1 1/2 in. 45° elbow Pcs 0 30.00 0
2 in. 45° elbow Pcs 3 37.00 111.00
2 1/2 in. 45° elbow Pcs 0 43.50 0
3 in. 45° elbow Pcs 4 50.00 200.00
3 1/2 in. 45° elbow Pcs 0 56.50 0
4 in. 45° elbow Pcs 0 63.00 0
5 in. 45° elbow Pcs 0 69.50 0
6 in. 45° elbow Pcs 0 76.00 0
8 in. 45° elbow Pcs 0 82.50 0
10 in. 45° elbow Pcs 0 89.00 0
12 in. 45° elbow Pcs 0 95.50 0
1/2 in. 90° standard elbow Pcs 0 10.00 0
3/4 in. 90° standard elbow Pcs 0 20.00 0
1 in. 90° standard elbow Pcs 9 17.00 153.00
1 1/4 in. 90° standard elbow Pcs 0 25.00 0
1 1/2 in. 90° standard elbow Pcs 0 30.00 0
2 in. 90° standard elbow Pcs 1 15.00 15.00
2 1/2 in. 90° standard elbow Pcs 1 21.50 21.50
3 in. 90° standard elbow Pcs 0 21.40 0
3 1/2 in. 90° standard elbow Pcs 0 21.30 0
4 in. 90° standard elbow Pcs 2 21.20 42.40
5 in. 90° standard elbow Pcs 0 21.10 0
6 in. 90° standard elbow Pcs 0 21.00 0
8 in. 90° standard elbow Pcs 5 20.90 104.5
10 in. 90° standard elbow Pcs 0 20.80 0
12 in. 90° standard elbow Pcs 1 20.70 20.70
1/2 in. 90° long-turn elbow Pcs 0 30.00 0
3/4 in. 90° long-turn elbow Pcs 0 14.00 0
1 in. 90° long-turn elbow Pcs 1 45.00 45.00
1 1/4 in. 90° long-turn elbow Pcs 0 44.67 0
1 1/2 in. 90° long-turn elbow Pcs 0 52.17 0
2 in. 90° long-turn elbow Pcs 1 59.67 59.66666667
2 1/2 in. 90° long-turn elbow Pcs 0 67.17 0
3 in. 90° long-turn elbow Pcs 0 39.00 0
3 1/2 in. 90° long-turn elbow Pcs 0 60.00 0
Hady Habib's Hydraulic calculation sheet
using NFPA® 13 : Standard for the Installation of Sprinkler Systems - 2013 Edition
Nicearb@yahoo.com
Item Description Unit Qyt. Rate Total
4 in. 90° long-turn elbow Pcs 0 59.67 0
5 in. 90° long-turn elbow Pcs 0 64.67 0
6 in. 90° long-turn elbow Pcs 0 69.67 0
8 in. 90° long-turn elbow Pcs 0 74.67 0
10 in. 90° long-turn elbow Pcs 0 33.00 0
12 in. 90° long-turn elbow Pcs 0 40.00 0
1/2 in. Tee or cross (flow turned 90°) Pcs 0 10.00 0
3/4 in. Tee or cross (flow turned 90°) Pcs 0 55.56 0
1 in. Tee or cross (flow turned 90°) Pcs 0 44.83 0.00
1 1/4 in. Tee or cross (flow turned 90°) Pcs 0 44.83 0
1 1/2 in. Tee or cross (flow turned 90°) Pcs 0 44.83 0
2 in. Tee or cross (flow turned 90°) Pcs 0 44.83 0
2 1/2 in. Tee or cross (flow turned 90°) Pcs 0 44.83 0
3 in. Tee or cross (flow turned 90°) Pcs 100 54.80 5480.37
3 1/2 in. Tee or cross (flow turned 90°) Pcs 0 53.69 0
4 in. Tee or cross (flow turned 90°) Pcs 0 52.58 0
5 in. Tee or cross (flow turned 90°) Pcs 0 51.47 0
6 in. Tee or cross (flow turned 90°) Pcs 0 49.22 0
8 in. Tee or cross (flow turned 90°) Pcs 0 51.52 0
10 in. Tee or cross (flow turned 90°) Pcs 0 47.00 0
12 in. Tee or cross (flow turned 90°) Pcs 3 60.00 180.00
1/2 in. Butterfly valve Pcs 0 40.00 0
3/4 in. Butterfly valve Pcs 0 80.00 0
1 in. Butterfly valve Pcs 3 48.08 144.25
1 1/4 in. Butterfly valve Pcs 0 48.08 0
1 1/2 in. Butterfly valve Pcs 0 48.08 0
2 in. Butterfly valve Pcs 0 48.08 0
2 1/2 in. Butterfly valve Pcs 0 48.08 0
3 in. Butterfly valve Pcs 0 105.19 0
3 1/2 in. Butterfly valve Pcs 0 91.66 0
4 in. Butterfly valve Pcs 70 78.14 5469.592593
5 in. Butterfly valve Pcs 0 64.61 0
6 in. Butterfly valve Pcs 0 46.06 0
8 in. Butterfly valve Pcs 3 47.61 142.8166667
10 in. Butterfly valve Pcs 0 19.00 0
12 in. Butterfly valve Pcs 0 32.25 0
1/2 in. Gate valve Pcs 0 5.00 0
3/4 in. Gate valve Pcs 0 40.00 0
1 in. Gate valve Pcs 4 51.33 205.33
Hady Habib's Hydraulic calculation sheet
using NFPA® 13 : Standard for the Installation of Sprinkler Systems - 2013 Edition
Nicearb@yahoo.com
Item Description Unit Qyt. Rate Total
1 1/4 in. Gate valve Pcs 0 51.33 0
1 1/2 in. Gate valve Pcs 0 51.33 0
2 in. Gate valve Pcs 0 51.33 0
2 1/2 in. Gate valve Pcs 0 51.33 0
3 in. Gate valve Pcs 0 119.57 0
3 1/2 in. Gate valve Pcs 0 101.94 0
4 in. Gate valve Pcs 0 84.30 0
5 in. Gate valve Pcs 0 66.67 0
6 in. Gate valve Pcs 0 42.89 0
8 in. Gate valve Pcs 1 43.69 43.68888889
10 in. Gate valve Pcs 0 7.62 0
12 in. Gate valve Pcs 0 23.53 0
1/2 in. Swing check* Pcs 0 58.00 0
3/4 in. Swing check* Pcs 0 96.67 0
1 in. Swing check* Pcs 5 88.25 441.25
1 1/4 in. Swing check* Pcs 0 79.83 0
1 1/2 in. Swing check* Pcs 0 71.42 0
2 in. Swing check* Pcs 0 63.00 0
2 1/2 in. Swing check* Pcs 0 54.58 0
3 in. Swing check* Pcs 0 46.17 0
3 1/2 in. Swing check* Pcs 0 37.75 0
4 in. Swing check* Pcs 10 29.33 293.3333333
5 in. Swing check* Pcs 0 99.57 0
6 in. Swing check* Pcs 0 78.38 0
8 in. Swing check* Pcs 7 57.19 400.33
10 in. Swing check* Pcs 0 36.00 0
12 in. Swing check* Pcs 0 14.81 0
NFPA® 13 Libraries,
Museums
Standard for the Nursing or accomodation
Group 1 Group 2
Automobile parking Cereal mills
Bakeries Chemical plants — ordinary
Beverage manufacturing Confectionery products
Canneries Distilleries
Dairy products Dry cleaners
Electronic plants Feed mills
glass products manufacturing Horse stables
Laundries Leather goods manufacturing
Restaurant service areas Libraries — large stack room areas
showrooms Machine shops
Metal working
Mercantile
Paper and pulp mills
Paper process plants
Piers and wharves
Post offices
Printing and publishing
Repair garages
Resin application area
Stages
Textile manufacturing
Tire manufacturing
Tobacco products manufacturing
Wood machining
Wood product assembly
Extra Hazard Occupancies
Group 1 Group 2
Aircraft hangars Asphalt saturating
Combustible hydraulic fluid use areas Flammable liquids spraying
Die casting Flow coating
Metal extruding Manufactured home
Plywood and particles Open oil quenching
Printing Plastics processing
Rubber Solvent cleaning
Saw mills Varnish and paint dipping
Textile All kind
Upholstering with plastic foams
Table 6.2.3.1 Sprinkler Discharge Characteristic
Nominal
K-Factor
[gpm/(psi)1/2]
Table 23.4.4.7.1 Hazen–Williams C Values
Unlined cast or ductile iron 100 1.4
Black steel (dry systems including preaction) 100 1.9
Black steel (wet systems including deluge) 120 2.8
Galvanized steel (dry systems including preaction) 100 4.2
Galvanized steel (wet systems including deluge) 120 5.6
Plastic (listed) all 150 8.0
Cement-lined cast- or ductile iron 140
Copper tube or stainless steel 150
Asbestos cement 140 11.2
Concrete 140
14.0
16.8
19.6
22.4
25.2
28.0
2.3.1 Sprinkler Discharge Characteristics Identification
Nominal Percent of
K-Factor Range K-Factor Range Nominal Thread
K-Factor
[gpm/(psi)1/2] [L/min/(bar)1/2] K-5.6 Type
[L/min/(bar)1/2] Discharge
Construction Type
Noncombustible unobstructed
Noncombustible unobstructed
Noncombustible obstructed
Noncombustible obstructed
Combustible unobstructed with no exposed members
Combustible unobstructed with no exposed members
Combustible unobstructed with exposed members 3 f (0.91 m) or more on center
Combustible unobstructed with exposed members 3 f (0.91 m) or more on center
Combustible unobstructed with members less than 3 f (0.91 m) on center
Combustible obstructed with exposed members 3 f (0.91 m) or more on center
Combustible obstructed with members less than 3 f (0.91 m) on cente
Combustible concealed spaces in accordance with 8.6.4.1.4
*See 8.6.4.1.4.4.
pright Spray Sprinklers for Light Hazard
f2 m2 f2 m2
Hydraulically calculated 225 20.9 15 4.6
Pipe schedule 220 18.6 15 4.6
Hydraulically calculated 225 20.9 15 4.6
Pipe schedule 200 18.6 15 4.6
Hydraulically calculated 225 20.9 15 4.6
Pipe schedule 200 18.6 15 4.6
Hydraulically calculated 225 20.9 15 4.6
Pipe schedule 200 18.6 15 4.6
All 130 12.1 15 4.6
All 168 15.6 15 4.6
All 130 12.1 15 4.6
All 120 11.1 15 4.6
Parallel to Parallel to
the slope the slope
10 3.05
perpendicul perpendicu
ar to the lar to the
slop * slop *
Table 8.6.2.2.1(b) Protection Areas and Maximum Spacing of Standard Pendent
and Upright Spray Sprinklers for Ordinary Hazard
f2 m2 f2 m2
All All 130 12.1 15 4.6
Table 8.6.2.2.1(c) Protection Areas and Maximum Spacing of Standard Pendent and Upright Spray Sprinklers for
Extra Hazard
f2 m2 f2
All Pipe schedule 90 8.4 12*
All Hydraulically calculated with density ≥0.25 100 9.3 12*
All Hydraulically calculated with density <0.25 130 12.1 15
*In buildings where solid structural members create bays up to 25 f (7.6 m) wide, maximum spacing between
sprinklers is permitted up to 12 f 6 in. (3.8 m).
ray Sprinklers for Table 8.6.2.2.1(d) Protection Areas and Maximum Spacing of Standard Pendent and Upright Spray
High-Piled Storage
Maximum
Maximum Spacing Construction System Type Protection Area
Type
m2 f2
3.7* All Hydraulically calculated with density ≥0.25 100
3.7* All Hydraulically calculated with density <0.25 130
4.6 *In buildings where solid structural members create bays up to 25 f (7.6 m) wide, maximum spacing
sprinklers is permitted up to 12 f 6 in. (3.8 m).
acing between
ard Pendent and Upright Spray Sprinklers for
Table 23.4.3.1.1 Equivalent Schedule 40 Steel Pipe Length Chart
Gate valve - -
Swing check* - -
none
For SI units, 1 in. = 25.4 mm; 1 f = 0.3048 m.
Note: Information on 1⁄2 in. pipe is included in this table only because it is allow
*Due to the variation in design of swing check valves, the pipe equivalents ind
ipe Length Chart
1 in. 1 1/4 in. 1 1/2 in. 2 in. 2 1/2 in. 3 in. 3 1/2 in. 4 in. 5 in.
(25mm) (32mm) (40mm) (50mm) (65mm) (80mm) (90mm) (100mm) (125mm)
1 1 2 2 3 3 3 4 5
0.3 0.3 0.6 0.6 0.9 0.9 0.9 1.2 1.5
2 3 4 5 6 7 8 10 12
0.6 0.9 1.2 1.5 1.8 2.1 2.4 3 3.7
2 2 2 3 4 5 5 6 8
0.6 0.6 0.6 0.9 1.2 1.5 1.5 1.8 2.4
5 6 8 10 12 15 17 20 25
1.5 1.8 2.4 3 3.7 4.6 5.2 6.1 7.6
- - - 6 7 10 - 12 9
1.8 2.1 3 3.7 2.7
- - - 1 1 1 1 2 2
0.3 0.3 0.3 0.3 0.6 0.6
5 7 9 11 14 16 19 22 27
1.5 2.1 2.7 3.4 4.3 4.9 5.8 6.7 8.2
rd Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
to as ASME SA53 pipe - is intended for mechanical and pressure applications. Can be used in steam,
ble for welding and forming like coiling, bending and flanging.