DEPARTMENT OF BUILDING AND CONSTRUCTION ENGINEERING

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING


UNIVERSITI TUN HUSSEIN ONN MALAYSIA

BFC32703 – SUSTAINABLE CONSTRUCTION MANAGEMENT


INDIVIDUAL ASSIGNMENT
SEM II, 2018/2019

Q1 Outline & elaborate the critical elements for construction project management.

Q2 Please discuss the importance of percentage S-Curve in project planning and scheduling.

Q3 Make comparison between the two most prominent green building rating tools which are
Green Building Index (GBI) and MyCrest.

Q4 A list of activities that are required to complete a project is shown in Table Q4. Based on the
information provided in Table Q4;
i. Construct an Arrow Diagram for the project
ii. Calculate the ES, EF, LS and LF for each activities
TABLE Q4

Activity Duration (days) Cost (RM) Labor/day Successor(s)

A 2 500 1 C,D
B 3 900 2 D
C 3 1,600 2 E,F
D 4 500 3 G
E 3 1,400 3 G
F 9 1,500 3 K
G 5 2,400 2 H,J,K
H 2 800 1 I
I 4 1,000 1 L
J 4 3,600 4 L
K 3 2,000 1 M
L 5 1,200 2 N
M 1 900 1 N
N 5 1,700 2 -

*Submit your answer in a report form with cover page consisting your details and picture*

*Submission deadline is on 12 May 2019*