Sr.No.

Description

1 Concrete Demolition

Mechanical Breaking:Breaking & demolition of reinforced cement concrete (columns ,


beams ,slabs , drops ) of any dimension and at any level, manually or by mechanical
means as the case may be with necessary tools and plants, scaffolding, staging,
working platform and as specified by in the structural drawings . The scope also includes
1.1
removal of debris, it's disposing at approved location, loading and unloading and making
the surface good etc.complete. The contractor shall cut of steel rods of any dia using
gas cutter, stack and hand over the steel to Clients. The entire breaking / dismantling
operation shall be carried out as per specific instructions & directions of EIC.

1.1.1 Demolition at Upper Ground Level (+102.05m) (With Mechanical Breaking)

Diamond Sawing:Breaking & demolition of reinforced cement concrete (columns ,


beams ,slabs , drops ) of any dimension and at any level, manually or by diamond
sawing as the case may be with necessary tools and plants, scaffolding, staging,
working platform and as specified in the structural consultants drawings and method
statements.The rate shall also include removal of debris,disposal of cut sections,
1.2 disposing at approved location, loading and unloading and making the surface good
etc.complete. The steel in the cut section will be contractors property. The entire
breaking / dismantling operation shall be carried out strictly as per method statement
given by structural consultant. Contractor shall arrange for all safety precautions and
safety measures strictly in accordance with the safety manual and method statement.

1.2.1 Demolition at Lower Ground Level (+96.05m) (With Diamond Saw Cutting)
1.2.2 Demolition at Upper Ground Level (+102.05m) (With Diamond Saw Cutting)
1.2.3 Demolition at First Floor Level (+107.95m) (With Diamond Saw Cutting)

Providing & erecting sturdy H frames, other structural steel members for temporary
nature back propping / scaffolding as specified in the structural drawings or any other
level as required for a specified period. Providing & fixing steel props with steel section
or wooden runners, (4”x 3”) if approved and planks & bracings to support beam, slab &
adjacent areas of column etc. as per instruction and as directed by consultant etc.
1.3 complete. The scope shall also include covering entire building portion to be dismantled
safety including providing necessary horizontal supports etc. with column or beam and
maintaining the same for the entire duration of the works including dismantling & taking
away on completion of work from the site etc. complete. The contractor under specif
cases shall submit the design for shuttering, staging, supporting etc for Consultants
review & comments.

Back Propping shall be considered for approximate period of 2 months


Sub Total for Demolition of concrete

2 Fire Protection Work


Fire Protection using Cement based Spray Vermiculite
Supplying and applying light weight vermiculite portland cement based wet mix spray
to structural steel elements to get fire protection up to 2 hours, by certified applicator.
Applied thickness to suit structural steel size and relevant Hp/A calculation. Substrate
must be clean, dry and free from dust, or any other condition preventing good adhesion.
Substrate shall be treated with adhesive key coat /primer prior to spray application as
required . The vermiculate spray material used shall pass all the necessary testing
2.1
criteria required for specified fire rating as per NBC / BS or applicable international code
and shall be applied with necessary priming of the surface to get attractive, monolithic ,
textured finish which is durable and economical. The treated surface shall be with a
monolithic spray texture cured with hydraulic set with no cracks or delamination's , no
erosion, no spalling etc and does not promote corrosion of steel. compund like Isolotek
CP2 Spray, Monokote or equivalent conforming to UL - 263 Product. Approved makes
Newkem, Akzonobel, Berger, Carboline.

Fire Protection using Intumescent Paint.


Supplying and applying (single pack water based intumescent paint, certified Green
Label) to structural steel for fire protection up to 2 hours. , by certified applicator.
Applied thickness to suit structural steel size and relevant Hp/A calculation. Substrate
must be clean, dry and free from dust, or any other condition preventing good
adhesion.Intumescent coating is applied using airless spray machine. Structures
protected with intumescent paint, should have undergone extensive fire resistance
tests for up to 120 minutes in approved independent accredited international
2.2 laboratories to recognised standards throughout the world and assessed in accordance
with ASFP (Fire protection of structural steel in buildings) procedures.
The intumescent paint of density 1.33kg / litre and 70% solids by weight having
Durometer Hardness 80 shore D when tested to ASTM D2240, impact resistance
18kg/m when tested to ASTM D2794, abrasion resistance 0.6505g/1000 cycles when
tested to ASTM D4060 with PH value 8.0 +/- 0.2 at 25oC. Paint to be approved for
Loss Prevention Certificate Board (LPCB), and Green Label Material (Low VOC) • The
system is tested to BS 476 Part 21, AS 1530: Part 4: 2005 and UL Certified/ASTM E119:
2007 standards. Approved makes Newkem, Akzonobel, Berger, Carboline.

Sub Total Fire Protection Works

3 Structural Strenghtening
Providing / supplying, fabricating, transporting structural steel members, hoisting using
crane, lifting, erecting and placement in its final position of grade E 250 Mpa and
required size comprising of built up sections, readily available sections, welded frame
works, etc with necessary castellations, bolting provisions, slots, nitches, bearing plates,
connection plates, extension plates, splices, etc for proper execution of works.
Cost to include straightening, cutting, welding, bending to shape and size, provisions for
bolting, primer application, and approved factory finish including stamping, packing,
transportation and storage after necessary submission and approval of designs,
development drawings, GA drawings, shop drawings, fabrication drawings from the
principle consultant.
Fabricated structural steel members shall be provided with 2 coat of rusticide till final
erection is carried out, at site.
The rate to include the cost of all materials, labour, tools, tackles, cranes, devices and
plants, wastage etc., as per specification and drawings complete
The structural steel work shall include welded / bolted and built up sections, trusses,
purlins, frame work welded and / or bolted, girders, gusset plates, base plates, cleats,
3.10 installing inserts, bearing plates etc., as per drawings. Cost to include fabricating
necessary Gusset Plates, welding Stiffener plates, Brackets, Bolts, Cleats, seating
angles, bolts, washers, and grouting for bolts etc., to the required size, shape, alignment
etc, as per the drawings .
The rate to include the cost of all materials, labour, tools, tackles, cranes, devices and
plants, wastage etc., as per specification and drawings complete
The structural steel work shall include welded / bolted and built up sections, trusses,
purlins, frame work welded and / or bolted, girders, gusset plates, base plates, cleats,
installing inserts, bearing plates etc., as per drawings. Cost to include fabricating
necessary Gusset Plates, welding Stiffener plates, Brackets, Bolts, Cleats, seating
angles, bolts, washers, and grouting for bolts etc., to the required size, shape, alignment
etc, as per the drawings .

3.1.1 Lower Ground (+96.05m)


3.1.2 Upper Ground (+102.00m)
3.1.3 Miscellaneous (Bridge/Strengthening/Other Similar Structures)
Structural Strengthening Using Tyfo Sch - 41 Composite (Fibre Wrap).
Strengthening using approved brand / quality fibre wrap to achieve desired strength
enhancement and ductility as per the design in accordance to the latest earthquake
codal provisions.
Preparing the surface to be wrapped, free from fins, protrusions, depressions, spalls,
cracks, moisture and honeycombed / segregated concrete patches removal of debris
away from banks premises. Rounding off the corners of the element around which the
high strength composite system is to be wrapped to a minimum radius of 20 mm, by
mechanical or other approved means, including preparing the surface with a bedding
coat as surface preparation in cement mortar as required to form rounded edges to
receive pre-cut fabric.
Priming the prepared surface with the fabric saturate epoxy, saturating the fabric
3.20 reinforcement with the approved two component high strength epoxy resin and wrapping
the prepared surface in accordance to designed main fiber orientation with the approved
high strength composite wrapping system, including removing / drawing out of the
entrapped air etc. all complete as per approved system manufacturer's specifications
and directions of the consultants, prior to or upon curing application of quartz sand or
other approved means to form keys for the subsequent plastering or finishing
operations.
Surface preparation as above and wrapping with one layer of approved high strength
composite system on the surfaces of columns, beams, walls etc.,
Note: Actual area of application over rcc surface will be measured for payment.

Sub Total Structural Strenghtening


TOTAL
Amount
Unit Quantity Rate
(Rs)

cum 368 -

cum 324 -
cum 724 -
cum 198 -

Sqm 14,762 -
-
MT 235 -

mt 40 -

-
mt 113 -
mt 90 -
mt 120 -
sqm 3,850 -

-
-