Dry stone
3 1 15 6.5 0.2 19.5
soling
Total 19.5
Concreting 1 5 6.5 1.8 58.5
Deduct volume of hume pipe 14.25
Total 44.25
Total Concrete(60%) 26.55
8 Humepipe 6 @1.1 ext dia
9 Gabion works 2 5 1.5 1 15
Total 15
Aggreg
Cemen Sand
Unit Grade ate
t (bags) (m3)
(m3)
Cum
M20 0 0 0
Cum
Total No. Length Of
Member Bar Mark Size Spacing
of bars Each Bar
1000
1000
Vented causeway (18m Span)
S.N Description Quantity Unit Rate Amount Remarks
1 Earthwork excavation Err:509 cum 300 300
2 Backfilling Err:509
3 Soling 19.5 cum 3200 62400
4 PCC M10 Err:509 cum 15000 15000
5 RCC M25 Err:509 22000 22000
6 Humepipe 900mm 9 Nos 57000 513000
5 Humepipe 600mm 6 Nos 37470 224820
6 Plum Concrete 44.25 cum 12000 531000
7 Formwork Err:509 sqm 200 200
8 Gabion works 15 cum 4500 67500
9 Reinforcement 936 kg 20 18720
Total 1454940