WEEK
ACTIVITIES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Mobilization
Site Clearing
Staking and Layouting
Ground Works
Excavation
1. (column footing & wall
footing)
Termite
2. proofing
Concreting and Formworks
Fabrication
1. of steel frame for columns
and footings
Installation
2. of steel frame
Installation
3. of steel bars for slabs and
beams
Fabrication
4. of formworks
Installation
5. of formworks
Concreting
6. of Footing and Column
Removal
7. of Forms
Masonry Works
Installation
1. of Masonry Reinforcements
CHB
2. Wall Laying
Rough
3. plastering
Plumbing Works
a. Sewer and Drainage
Pipe
1. installation
Storm
2. drains installation
Layout
3. of septic tank
Excavation
4. of Septic Tank
Fabrication
5. of Steel frame for septic tank
Steel
6. frame installation
Concreting
7. of septic tank
WEEK
ACTIVITIES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
b. Water system
Installation
8. of Pipes
Installation
9. of plumbing fixtures
Electrical Works
Installation
1. of conduits
Installation
2 of wires
.
Installation
1. of switches and outlets
Installation
2. of electrical fixtures
Installation
3. of main power line
Roofing Works
Fabrication
1. of roofing materials
Installation
2. of roofing materials
Miscellaneous Works
Installation
1. of Doors and Windows
Installation
2. of stair railings
Installation
3. ceiling and partition
Finishing Works
Tileworks
1.
Plastering
2.
Painting
3.
Demobilization
b. Water system
8. Installation of Pipes
9. Installation of plumbing fixtures
Electrical Works
1. Installation of conduits
2. Installation of wires
1. Installation of switches and outlets
2. Installation of electrical fixtures
3. Installation of main power line
Roofing Works
1. Fabrication of roofing materials
2. Installation of roofing materials
Miscellaneous Works