PROJECT : PTA

CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-01 DATE: 07.04.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Newage

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS- 10A Plant lightening system (PX shed)

Refer Annexure -C For Details Punch List(01nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: BOILER-11

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
L&T

Punch points for below Non-process system is being sent for your necessary liquidation . You are
requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : 1.10 / 05 ASH SILO FOUNDATION

Refer Annexure -Against each system for details Punch List - Page/s

JBF:

TECHNIP:

NAME SIGN DATE


DATE:28-05-2016

sary liquidation . You are


g.

SH SILO FOUNDATION

Page/s

TIME
QUALITY CONTROL FORM :TPIL/JBF/SITE-05A
PROJECT : PTA
CLIENT : JBF
PMC : TECHNIP NDIA LIMITED
PROJECT NO : 830
UNIT NO : OSBL
ANNEXURE TO FORMAT - II
Ref. No : DATE:
SYSTEM NO : SUB SYSTEM NO :
MASTER PUNCH LIST RECORD
Sr. Closed by Witnessed by
PID No: PUNCH POINT DESCRIPTION Descipline Priority Raised by Remarks
No. Name Sign / Date Name Sign / Date

10

11

19

20

Legend:
Priority-"1 " : To be closeout Prior to system turn over
Priority-"2" : To be closeout Prior After system turn over
Priority-"3" : To be closeout After startup
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: 23

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
ABC

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS 02/05

Refer Annexure -C For Details Punch List

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 05-04-2016

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: 029

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
ABC

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS 02/14

Refer Annexure -C For Details Punch List

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 12-04-2016

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: 030

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
ABC

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS 01/15

Refer Annexure -C For Details Punch List

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 12-04-2016

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: 031

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
ABC

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS 02/13

Refer Annexure -C For Details Punch List

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 12-04-2016

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: 032

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
ABC

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS 01/17

Refer Annexure -C For Details Punch List

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 12-04-2016

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: 033

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
ABC

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS 02-16 MBBR & CLARIFIER

Refer Annexure -C For Details Punch List (3 sheets)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 11-08-2016

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: BF-11171/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Supertech Engineeres

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : PS-BF-1171 LSHS TANK

Refer Annexure -C For Details Punch List (01 sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 24.02.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: BF-1050/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Supertech Engineeres

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : PS-BF-1050 DWST TANK

Refer Annexure -C For Details Punch List (01 sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 24.02.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: BF-1090/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Supertech Engineeres

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

CONCENTRATED CAUSTIC
Non-Process / Process System No : PS-BF-1090
STROAGE TANK BF-1090

Refer Annexure -C For Details Punch List (01 sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 21.02.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO:

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Fabtech

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No :

Refer Annexure -C For Details Punch List ( sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE:

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: PX-201A/02

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Fabtech

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

PARAXYLENE Stroage tank


Non-Process / Process System No : PS-PX/201B
BF-201A

Refer Annexure -C For Details Punch List (02 sheets)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 07.12.16

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: U-12/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Bridge and Roof Co (I) Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : 814-U-12 Boiler Feed Water-OSBL

Refer Annexure -C For Details Punch List (02 sheets)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 17.12.16

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: 01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Tyco Fire and Security Pvt Ltd

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS-16 Fire Alarm system for CCR

Refer Annexure -C For Details Punch List (01 sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 20.12.16

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: 02

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Tyco Fire and Security Pvt Ltd

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS-16 Fire Alarm system for ITR-2

Refer Annexure -C For Details Punch List (01 sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 20.12.16

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: TYCO/NP-16C/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Tyco Fire and Security Pvt Ltd

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Fire Alarm system and


Non-Process / Process System No : NPS-16C
associated work for ITR-3

Refer Annexure -C For Details Punch List (01 sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 23.03.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: TYCO/NP-16G/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Tyco Fire and Security Pvt Ltd

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Fire Alarm system and


Non-Process / Process System No : NPS-16G
associated work for SS-3

Refer Annexure -C For Details Punch List (01 sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 23.03.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: U-16A/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : 814-U-16-A Disel fuel system-OSBL

Refer Annexure -C For Details Punch List (07 sheets)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 29.12.16

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/01
including grouting-PR-01

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 08.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


cluding grouting-PR-01

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/03

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/03
including grouting-PR-02A

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 01.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


luding grouting-PR-02A

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/04

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/03
including grouting-PR-03

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 01.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


cluding grouting-PR-03

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/05

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/03
including grouting-PR-04

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 01.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


cluding grouting-PR-04

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/13

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/13
including grouting-PR-13

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 01.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


cluding grouting-PR-13

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/06/PR-05

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/06
including grouting-PR-05

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 08.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


cluding grouting-PR-05

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/16/PR-05

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/16
including grouting-PR-14

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 08.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


cluding grouting-PR-14

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/17/PR-05

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/17
including grouting-PR-15

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 08.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


cluding grouting-PR-15

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/19/PR-17

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/17
including grouting-PR-17

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 08.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


cluding grouting-PR-17

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/21/PR-20

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/21
including grouting-PR-20

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 08.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


cluding grouting-PR-20

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/12/PR-10

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/12
including grouting-PR-10

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 08.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


cluding grouting-PR-10

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-05/WWTP

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Petron Engineering Construction Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Civil works for casting of foundtion for pipe rack pedestal


Non-Process / Process System No : NPS 05/WWTP
including grouting-WWTP

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 08.02.17

your necessary liquidation .


issioning.

ting of foundtion for pipe rack pedestal


cluding grouting-WWTP

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: CTC-10/A-1-10

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : B-104-CT-M-CIVIL-A-1-10 CT Cell-10(Cooling tower)

Refer Annexure -C For Details Punch List ( nos sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 02.02.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: CTC-10/A-1-09

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : B-104-CT-M-CIVIL-A-1-09 CT Cell-09(Cooling tower)

Refer Annexure -C For Details Punch List ( nos sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 02.02.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: CTC-06/A-1-06/01 DATE: 02.03.17

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : B-104-CT-M-CIVIL-A-1-06 CT Cell-06(Cooling tower)

Refer Annexure -C For Details Punch List ( 05 nos sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: CTC-07/A-1-07/01 DATE: 02.03.17

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : B-104-CT-M-CIVIL-A-1-07 CT Cell-07(Cooling tower)

Refer Annexure -C For Details Punch List ( 05 nos sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: CTC-10/A-1-08

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : B-104-CT-M-CIVIL-A-1-08 CT Cell-08(Cooling tower)

Refer Annexure -C For Details Punch List ( nos sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 02.02.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-01 DATE: 07.04.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Newage

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS- 10A Plant lightening system (PX shed)

Refer Annexure -C For Details Punch List(01nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: ELE/08.01/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS-08.01 Earthing for Cell no.01 to 05

Refer Annexure -C For Details Punch List ( 02 nos sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 04.03.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: ELE/09.01/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS-09.01 Panels for SS-01 (VFD)

Refer Annexure -C For Details Punch List ( 01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 04.03.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: ELE/09.03/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Panels for Cell no. 01 to Cell


Non-Process / Process System No : NPS-09.03
no.05

Refer Annexure -C For Details Punch List (01 no sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 06.03.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: ELE/11.02.02/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

LT cable laying for Cell no. 01


Non-Process / Process System No : NPS-11.02.02
to Cell no.05

Refer Annexure -C For Details Punch List (01 no sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 06.03.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: ELE/11.04.02/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

LT cable Termination for Cell


Non-Process / Process System No : NPS-11.04.02
no. 01 to Cell no.05

Refer Annexure -C For Details Punch List (01 no sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 06.03.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: ELE/11.05.02/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Installation of Cable tray for


Non-Process / Process System No : NPS-11.05.02
Cell no. 01 to Cell no.05

Refer Annexure -C For Details Punch List (01 no sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 06.03.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: U-7A/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Jobby

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : 814-U-07A D M Water system

Refer Annexure -C For Details Punch List ( nos sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 06.02.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: U-18A/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Jobby

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : 814-U-18 A LSHS system

Refer Annexure -C For Details Punch List ( 14 nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 17.03.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: U-18B/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Jobby

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : 814-U-18 B LSHS Drain system

Refer Annexure -C For Details Punch List ( 01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 17.03.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: L&T/03

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Jobby

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : PS-04/01 ONG-A Pressure Part

Refer Annexure -C For Details Punch List ( 05 nos sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 10.02.17

your necessary liquidation .


issioning.

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL


REPORT NO: NPS-01/08/BFW-
DE -STR/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
L&T Hydrocarbon Engineering Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS -01/08 BFW & Deaerator working platform

Refer Annexure -C For Details Punch List(03 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 18.03.17

your necessary liquidation .


issioning.

Deaerator working platform

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL


REPORT NO: NPS-01/OS
-STR/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
L&T Hydrocarbon Engineering Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Boiler side structures for PR-10B, Other silo and SFB


Non-Process / Process System No : NPS -01/02,04&05
supporting

Refer Annexure -C For Details Punch List(09 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 28.02.17

your necessary liquidation .


issioning.

tures for PR-10B, Other silo and SFB


supporting

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL


REPORT NO: NPS-01/03/ONG-
B/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
L&T Hydrocarbon Engineering Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS -01/03 ONG Boiler 920B Foundation

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 21.02.17

your necessary liquidation .


issioning.

G Boiler 920B Foundation

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL


REPORT NO: NPS-001/08/ID
FAN/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
L&T Hydrocarbon Engineering Ltd.

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS -01/08 ID Fan Foundation

Refer Annexure -C For Details Punch List(01 no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 21.02.17

your necessary liquidation .


issioning.

ID Fan Foundation

TIME
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-09-01-06/01 DATE: 28.02.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Power Net Distribution Solutions

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS -09-01-06 SS-3 UPS

Refer Annexure -C For Details Punch List(02nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-09-01-03/01 DATE: 28.02.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Power Net Distribution Solutions

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS -09-01-03 SS-3 Transformers

Refer Annexure -C For Details Punch List(05nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-09-01-02/01 DATE: 28.02.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Power Net Distribution Solutions

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Non-Process / Process System No : NPS -09-01-02 SS-3 Bus duct installation Work

Refer Annexure -C For Details Punch List(02nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-09-01-01/01 DATE: 28.02.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Power Net Distribution Solutions

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

SS-3 panel installation work


1) SS-3 ESWG-01
Non-Process / Process System No : NPS -09-01-01,02,03,04 2) SS-3 EPMCC-01
3) SS-3 EPMCC-02
4) SS-3 EMCC-01

Refer Annexure -C For Details Punch List(04nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-09.01.07/02 DATE: 28.02.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Power Net Distribution Solutions

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

SS-3 panel installation work


1) SS-3 UPS1-PDC-01
Non-Process / Process System No : NPS -09-01-07 2) SS-3 UPS1-PDC-02
3) SS-03 UPS2-PDC-01

Refer Annexure -C For Details Punch List(01nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-11-01,03/01 DATE: 28.02.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Power Net Distribution Solutions

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

SS1 to SS-3 HT cable laying and Cable termination


Non-Process / Process System No : NPS -11-01,11-03

Refer Annexure -C For Details Punch List(01nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-11-02/02 DATE: 28.02.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Power Net Distribution Solutions

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

SS-3 LT cable laying


Non-Process / Process System No : NPS -11-02

Refer Annexure -C For Details Punch List(01nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-08/01 DATE: 28.02.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Power Net Distribution Solutions

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

ITR-03 Earthing work


Non-Process / Process System No : NPS -08

Refer Annexure -C For Details Punch List(01nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-18A/SS1/01 DATE: 10.03.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Newage

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

NPS -18A(NPS-18A-1.1,NPS- Fire Escape Hydrant System For SS1


Non-Process / Process System No :
18A-1.2, NPS-18A-1.3)

Refer Annexure -C For Details Punch List(01nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-18B/SS2/01 DATE: 27.03.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Newage

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

NPS -18B(NPS-18B.1,NPS- Fire Escape Hydrant System For SS2


Non-Process / Process System No :
18B.2, NPS-18B.3)

Refer Annexure -C For Details Punch List(02nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-19A/19A.2/01 DATE: 18.03.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Newage

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

HVWS system for SS 1 Transformer -1B


Non-Process / Process System No : NPS -19A-19A.2

Refer Annexure -C For Details Punch List(01no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-19B/01 DATE: 27.03.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Newage

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

NPS -19B(19B.1,19B.2 and HVWS system for SS 2 Transformer


Non-Process / Process System No :
19B.3)

Refer Annexure -C For Details Punch List(02nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-21/SFB/01 DATE: 11.03.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Supertech Engineers

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Ducting work for SFB Boiler


Non-Process / Process System No : NPS -21

Refer Annexure -C For Details Punch List(01no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL


REPORT NO: NPS-
DATE: 14.03.2017
09.01.02/INS/01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Supertech Engineers

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

Crusher House-Instrumentation
Non-Process / Process System No : NPS -09.01.02

Refer Annexure -C For Details Punch List(01no. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS-18C/01 DATE: 07.04.2017

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Newage

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

NPS- 18C
Non-Process / Process System No : FIRE EXHAUST HYDRANTS FOR SS3 & ITR 3
(18.C1,18.C2,18.C3,18.C4)

Refer Annexure -C For Details Punch List(01nos. sheet)

JBF:

TECHNIP:

NAME SIGN DATE TIME


PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: NPS.08.04.A-01

FORMAT-II
PUNCH POINTS AGAINST FORMAT-I
To
Construction Manager
Hamon Shriram Cottrell

Punch points for above Non-process / Process system is being sent for your necessary liquidation .
You are requested to liquidate the same and make it ready for pre-commissioning.

EARTHING SYSYTEM SSFA


Non-Process / Process System No : NPS-08.04-A
DOSING SYSTEM

Refer Annexure -C For Details Punch List ( 01 nos sheet)

EXCEPTIONS : ClO2 DOSING SYSTEM

JBF:

TECHNIP:

NAME SIGN DATE


DATE: 09.05.2017

your necessary liquidation .


issioning.

TIME