Sunteți pe pagina 1din 1

8E E61 148 96F 8B4 498 AFE ED5 186 66B AA

9 8 A A 5
EE E614 489 6F8 B49 98A FEDD51 1866 6BA A5 9C0
61 89 6F8 B4 8A FE 51 86 BA A5 9C 38 m
61 489 6F8 B4 98A FE D51 86 6BA A5 9C 038 EE6
4 9 D 6 0
14 896 6F8B B49 8AF FED 518 866 BA A59 9C0 38E EE61 148
89 F8 4 8A E 51 66 BA A5 C 38 E6 48 96
48 6F B 98 FE D5 86 B A 9C 03 EE 14 9 F8
96 8 49 A D 1 6 A 5 0 8E 6 8 6F B
96 F8B B49 8AF FED 518 866B BAAA59 9C0 38E E61 1489 96F 8B4 498A
F 8 3 8
6F 8B4 498 AFE ED5 5186 66B AA 59C C03 8EE E614 4896 6F8 B49 98A FED
8B 98 AF D 18 6B AA 59 03 8E 61 89 F8 B4 8A FE 5
8B 498 AF ED 518 66B AA 59 C03 8E E61 489 6F8 B4 98A FE D5 186
5 C E 1
B4 498AAFE ED5 186 66B AA 59C 038 8EE 614 4896 6F8B B49 98A FEDD51 866 6BA
uq
98 FE D5 18 6B AA 59C 03 EE 61 89 F8 49 8A FE 51 866 BA A5

ities:
49 AF D 1 66 A 59 0 8E 6 48 6F B4 8 FE D5 86 B A 9C
8A E 51 86 BA A5 C 38 E6 14 96 8B 98 AF D 18 6B AA 59 03
FE D5 86 6BA A5 9C 038 EE 14 896 F8B 49 AF ED 51 66 A 59 C0 8E
D5 186 6B A 9C 03 EE 614 89 F8 49 8A ED 51 866 BA A5 C0 38 E6
18 6B AA 59 03 8EE 61 89 6F8 B4 8A FE 51 86 BA A5 9C 38 EE 14

business.
66 A 59 C0 8E 6 48 6F B 98 FE D5 86 6B A 9C 03 EE 61 89
BA A5 C 38 E6 14 96 8B 49 AF D 18 6B AA 59 0 8E 61 48 6F
A5 9C 038 EE 14 896 F8B 49 8AF ED 518 66 AA 59 C0 38E E61 48 96F 8B4
(b) Guarantees
ue
9C 038 EE 614 896 F8 49 8A ED 51 66 BA 59 C0 38E E6 48 96F 8B 98
03 EE 61 89 F8 B4 8A FE 51 866 BA A5 C0 38 E6 148 96 8B 498 AF
8E 61 48 6F B4 98 FE D5 86 B A 9C 38 EE 14 96 F8 49 A ED
E6 48 96F 8B 98 AF D 18 6B AA 59 03 EE 61 89 F8 B4 8A FE 5

(e) Fund flow control


14 96 8B 49 AF ED 518 66 A 59 C0 8E 61 48 6F B4 98 FE D5 186
89 F8 4 8A E 51 66 BA A5 C 38 E6 48 96 8B 98 AF D 18 6B
6F B4 98 FE D5 86 B A 9C 03 EE 14 96 F8 49 A ED 51 66 A
(a) Project Management

I
8B 98 AF D 18 6B AA 59 03 8E 61 89 F8 B4 8A FE 5 86 BA A5

J
F
E
B
C

H
A

K
G
49 AF ED 51 66 A 59 C0 8E E6 48 6F B4 98 FE D5 186 6B A 9C
st
8A E 51 86 BA A5 C 38 E6 14 96 8B 98 AF D 18 6B AA 59 03
(c) List of various clearances

FE D5 86 6BA A5 9C 038 EE 14 896 F8B 49 AF ED 51 66 A 59 C0 8E


Note:(1) Q.1 is compulsory

D5 186 6B A 9C 03 EE 614 89 F8 49 8A ED 51 866 BA A5 C0 38 E6


(d) Aspects of Entrepreneurship

18 6B AA 59 03 8EE 61 89 6F8 B4 8A FE 51 86 BA A5 9C 38 EE 14
66 A 59 C0 8E 6 48 6F B 98 FE D5 86 6B A 9C 03 EE 61 89
BA A5 C 38 E6 14 96 8B 49 AF D 18 6B AA 59 0 8E 61 48 6F
io
A5 9C 038 EE 14 896 F8B 49 8AF ED 518 66 AA 59 C0 38E E61 48 96F 8B4
1. Write a short note on (any Five)

(f) Economic Order Quantity (EOQ)

9C 038 EE 614 896 F8 49 8A ED 51 66 BA 59 C0 38E E6 48 96F 8B 98


(3) Assume suitable data if necessary

03 EE 61 89 F8 B4 8A FE 51 866 BA A5 C0 38 E6 148 96 8B 498 AF



8E 61 48 6F B4 98 FE D5 86 B A 9C 38 EE 14 96 F8 49 A ED

A
A
A

G,I
E,F
E,F
B,C
B,C

D,H
E6 48 96F 8B 98 AF D 18 6B AA 59 03 EE 61 89 F8 B4 8A FE 5
14 96 8B 49 AF ED 518 66 A 59 C0 8E 61 48 6F B4 98 FE D5 186
89 F8 4 8A E 51 66 BA A5 C 38 E6 48 96 8B 98 AF D 18 6B

1
6F B4 98 FE D5 86 B A 9C 03 EE 14 96 F8 49 A ED 51 66 A
np
8B 98 AF D 18 6B AA 59 03 8E 61 89 F8 B4 8A FE 5 86 BA A5
49 AF ED 51 66 A 59 C0 8E E6 48 6F B4 98 FE D5 186 6B A 9C
8A E 51 86 BA A5 C 38 E6 14 96 8B 98 AF D 18 6B AA 59 03
FE D5 86 6BA A5 9C 038 EE 14 896 F8B 49 AF ED 51 66 A 59 C0 8E
Subject: Project Engineering & Entrepreneurship

D5 186 6B A 9C 03 EE 614 89 F8 49 8A ED 51 866 BA A5 C0 38 E6


18 6B AA 59 03 8EE 61 89 6F8 B4 8A FE 51 86 BA A5 9C 38 EE 14
(2) Answer any Three questions from remaining Five

66 A 59 C0 8E 6 48 6F B 98 FE D5 86 6B A 9C 03 EE 61 89
BA A5 C 38 E6 14 96 8B 49 AF D 18 6B AA 59 0 8E 61 48 6F
(b) Explain Work Breakdown Structure (WBS) in detail.

5
3
4

5
3
6
2
4
1
5
6
A5 9C 038 EE 14 896 F8B 49 8AF ED 518 66 AA 59 C0 38E E61 48 96F 8B4
ap

____________________
9C 038 EE 614 896 F8 49 8A ED 51 66 BA 59 C0 38E E6 48 96F 8B 98
03 EE 61 89 F8 B4 8A FE 51 866 BA A5 C0 38 E6 148 96 8B 498 AF

9C038EE614896F8B498AFED51866BAA5
8E 61 48 6F B4 98 FE D5 86 B A 9C 38 EE 14 96 F8 49 A ED

Activity Predecessor activity Time (days)


2. (a) Explain feasibility report for project selection criteria.

E6 48 96F 8B 98 AF D 18 6B AA 59 03 EE 61 89 F8 B4 8A FE 5
14 96 8B 49 AF ED 518 66 A 59 C0 8E 61 48 6F B4 98 FE D5 186
Time: 3 Hours Management

89 F8 4 8A E 51 66 BA A5 C 38 E6 48 96 8B 98 AF D 18 6B

(b) What are the time and cost control tools and techniques?
6F B4 98 FE D5 86 B A 9C 03 EE 14 96 F8 49 A ED 51 66 A
8B 98 AF D 18 6B AA 59 03 8E 61 89 F8 B4 8A FE 5 86 BA A5
Total

49 AF ED 51 66 A 59 C0 8E E6 48 6F B4 98 FE D5 186 6B A 9C
er
8A E 51 86 BA A5 C 38 E6 14 96 8B 98 AF D 18 6B AA 59 03
Max.

FE D5 86 6BA A5 9C 038 EE 14 896 F8B 49 AF ED 51 66 A 59 C0 8E


D5 186 6B A 9C 03 EE 614 89 F8 49 8A ED 51 866 BA A5 C0 38 E6

5. (a) How project schedule is made? Explain with suitable example.


18 6B AA 59 03 8EE 61 89 6F8 B4 8A FE 51 86 BA A5 9C 38 EE 14
3. (a) Explain Importance of environmental and safety aspects in project.

66 A 59 C0 8E 6 48 6F B 98 FE D5 86 6B A 9C 03 EE 61 89
BA A5 C 38 E6 14 96 8B 49 AF D 18 6B AA 59 0 8E 61 48 6F
(b) Explain various laws, regulations and clearances for starting a new projects.
Marks:80

A5 9C 038 EE 14 896 F8B 49 8AF ED 518 66 AA 59 C0 38E E61 48 96F 8B


s.
9C 038 EE 614 896 F8 49 8A ED 51 66 BA 59 C0 38E E6 48 96F 8B
03 EE 61 89 F8 B4 8A FE 51 866 BA A5 C0 38 E6 148 96 8B 4

(b) Explain project commissioning, start up, stabilization with suitable example.
4. (a) Draw a network diagram and calculate critical path for the following activ-
Marks: 80

(capacity)0.54 . The Marshall and Swift index was 1048.5 in 1996 and 1116.9 in 2002.
8E 61 48 6F B4 98 FE D5 86 B A 9C 38 EE 14 96 F8 49

was the cost of second evaporator (in $)? Assume the cost of evaporator scales as
a cost of $2,00,000. In 2002, another evaporator of area 75 m2 was added. What
(b) In a desalination plant, an evaporator of area 150 m2 was purchased in 1996 at
6. (a) Explain concept of entrepreneur and types of entrepreneurship based on
E6 48 96F 8B 98 AF D 18 6B AA 59 03 EE 61 89 F8 B4 8
14 96 8B 49 AF ED 518 66 A 59 C0 8E 61 48 6F B4 98
89 F8 4 8A E 51 66 BA A5 C 38 E6 48 96 8B 98 A
co
6F B4 98 FE D5 86 B A 9C 03 EE 14 96 F8 49 A
8B 98 AF D 18 6B AA 59 03 8E 61 89 F8 B4 8A F

(10)
(10)
(10)

(10)
(10)

(10)
(10)
(10)
(20)

(10)
(10)

49 AF ED 51 66 A 59 C0 8E E6 48 6F B4 98 FE
8A E 51 86 BA A5 C 38 E6 14 96 8B 98 AF
FE D5 86 6BA A5 9C 038 EE 14 896 F8B 49 AF ED
Q.P.Code:11954

D5 186 6B A 9C 03 EE 614 89 F8 49 8A ED
18 6B AA 59 03 8EE 61 89 6F8 B4 8A FE 51
66 A 59 C0 8E 6 48 6F B 98 FE D5
BA A5 C 38 E6 14 96 8B 49 AF D 18
m
A5 9C 038 EE 14 896 F8B 49 8AF ED 518
9C 038 EE 614 896 F8 49 8A ED 51 6
03 EE 61 89 F8 B4 8A FE 51 866
8E 61 48 6F B4 98 FE D5 86
9 A

S-ar putea să vă placă și