ETTERKIB SPA

PROJECT : AIN ARNAT 1200MW CCPP / ALGERIA


SUBJECT : BUILDING WORKS INCLUDING FOUNDATION
CONTRACT N°:

ITEM 10 : PANEL & ROOF WORK Month: XXXXXXX Cumulate last


This Month Cumulate till this Month
Month

75% 20% 5%
BUILDING Total Qty Total Previous Actual Cummulative
Installation Flashing/Bolt Final check
10.1 WALL CLADDING (M²) 26 194,11 23 137,15 23 057,35 79,80 23 137,15
1.1 TBN #01 4 362,21 96% 92% 3 943,44 3 925,99 17,45 3 943,44
1.2 TBN #02 4 362,21 100% 95% 4 100,48 4 100,48 - 4 100,48
1.3 TBN #03 4 362,21 99,0% 95% 4 067,76 4 067,76 - 4 067,76
3.1 UEB #01 1 331,81 100% 95% 1 251,90 1 251,90 - 1 251,90
3.2 UEB #02 1 331,81 100% 96% 1 254,57 1 251,90 2,66 1 254,57
3.3 UEB #03 1 331,81 100% 96% 1 254,57 1 251,90 2,66 1 254,57
4. 400KV GIS & CONTROL BUILDING 3 595,94 100% 98% 3 401,76 3 401,76 - 3 401,76
5. WATER TREATMENT BUILDING 866,04 100% 98% 819,27 819,27 - 819,27
5. BSDG BUILDING 1 534,07 100% 98% 1 451,23 1 451,23 - 1 451,23
20. WORKSHOP BUILDING 1 380,00 - - - -
21. HEAVY PART WAREHOUSE 1 322,00 100% 80% 1 203,02 1 150,14 52,88 1 203,02
22. LIGHT PART WAREHOUSE 414,00 100% 95% 389,16 385,02 4,14 389,16
10.2 ROOF CLADDING (M²) 12 509,75 11 233,24 11 147,84 85,40 11 233,24
1.1 TBN #01 2 109,44 100% 100% 2 003,97 2 003,97 - 2 003,97
1.2 TBN #02 2 109,44 100% 100% 2 003,97 2 003,97 - 2 003,97
1.3 TBN #03 2 109,44 100% 100% 2 003,97 2 003,97 - 2 003,97
3.1 UEB #01 306,40 100% 98% 289,85 289,85 - 289,85
3.2 UEB #02 306,40 100% 100% 291,08 291,08 - 291,08
3.3 UEB #03 306,40 100% 100% 291,08 291,08 - 291,08
4. 400KV GIS & CONTROL BUILDING 1 598,03 100% 100% 1 518,13 1 518,13 - 1 518,13
5. WATER TREATMENT BUILDING 784,10 100% 100% 744,90 744,90 - 744,90
5. BSDG BUILDING 911,10 100% 100% 865,55 865,55 - 865,55
20. WORKSHOP BUILDING 684,00 - - - -
21. HEAVY PART WAREHOUSE 995,00 100% 100% 945,25 865,65 79,60 945,25
22. LIGHT PART WAREHOUSE 290,00 100% 100% 275,50 269,70 5,80 275,50

Page 1 de 4
ITEM 10 : PANEL & ROOF WORK Month: XXXXXXX Cumulate last
This Month Cumulate till this Month
Month

75% 20% 5%
BUILDING Total Qty Total Previous Actual Cummulative
Installation Flashing/Bolt Final check
10.3 THK. 0.8SINGLE TRAPEZOIDAL
CLADDING 273,60
FOR WALL (M²) - - - -
- - - -
25. NG SHELTER 273,60 - - - -
- - - -
10.4 THK. 0.8 SINGLE TRAPEZOIDAL
CLADDING 1 907,84
FOR ROOF (M²) 938,39 938,39 - 938,39
25. NG SHELTER (roof) 427,20 100% 100% 405,84 405,84 - 405,84
25. NG SHELTER (wall) 273,60 100% 100% 259,92 259,92 - 259,92
26. LUBE OIL STORAGE SHELTER 143,00 - - - -
27. CAR PARKING SHED #01 378,82 - - - -
27. CAR PARKING SHED #02 378,82 - - - -
28.1 GCB SHELTER #01 77,00 100% 57,75 57,75 - 57,75
28.2 GCB SHELTER #02 77,00 100% 100% 73,15 73,15 - 73,15
28.3 GCB SHELTER #03 77,00 100% 90% 71,61 71,61 - 71,61
29. DAY TANK SHELTER 75,40 100% 90% 70,12 70,12 - 70,12
10.5 GUTTER FLASHING (M) 1 152,10 1 034,96 1 029,73 5,22 1 034,96
1.1 TBN #01 153,50 100% 100% 145,83 142,76 3,07 145,83
1.2 TBN #02 153,50 100% 100% 145,83 145,83 - 145,83
1.3 TBN #03 153,50 100% 100% 145,83 144,29 1,54 145,83
3.1 UEB #01 20,60 100% 100% 19,57 19,16 0,41 19,57
3.2 UEB #02 20,60 100% 100% 19,57 19,57 - 19,57
3.3 UEB #03 20,60 100% 100% 19,57 19,36 0,21 19,57
4. 400KV GIS & CONTROL BUILDING 218,00 100% 100% 207,10 207,10 - 207,10
5. WATER TREATMENT BUILDING 91,60 100% 100% 87,02 87,02 - 87,02
5. BSDG BUILDING 106,00 100% 100% 100,70 100,70 - 100,70
20. WORKSHOP BUILDING 60,40 - - - -
21. HEAVY PART WAREHOUSE 72,40 100% 90% 67,33 67,33 - 67,33
22. LIGHT PART WAREHOUSE 35,60 100% 90% 33,11 33,11 - 33,11
25. NG SHELTER 45,80 100% 100% 43,51 43,51 - 43,51

Page 2 de 4
ITEM 10 : PANEL & ROOF WORK Month: XXXXXXX Cumulate last
This Month Cumulate till this Month
Month

75% 20% 5%
BUILDING Total Qty Total Previous Actual Cummulative
Installation Flashing/Bolt Final check
10.7 ROOF DRAIN Φ100 (EA) 55 48,25 47,43 0,82 48,25
4. 400KV GIS & CONTROL BUILDING 18 100% 100% 17,10 16,74 0,36 17,10
5. WATER TREATMENT BUILDING 9 100% 100% 8,55 8,37 0,18 8,55
5. BSDG BUILDING 10 100% 100% 9,50 9,30 0,20 9,50
20. WORKSHOP BUILDING 4 - - - -
21. HEAVY PART WAREHOUSE 6 100% 90% 5,58 5,58 - 5,58
22. LIGHT PART WAREHOUSE 4 100% 90% 3,72 3,72 - 3,72
25. NG SHELTER 4 100% 100% 3,80 3,72 0,08 3,80
10.8 ROOF DRAIN Φ150 (EA) 54 49,02 46,14 2,88 49,02
1.1 TBN #01 12 80% 80% 9,12 9,12 - 9,12
1.2 TBN #02 12 100% 100% 11,40 10,26 1,14 11,40
1.3 TBN #03 12 100% 100% 11,40 10,26 1,14 11,40
3.1 UEB #01 6 100% 100% 5,70 5,46 0,24 5,70
3.2 UEB #02 6 100% 100% 5,70 5,58 0,12 5,70
3.3 UEB #03 6 100% 100% 5,70 5,46 0,24 5,70
10.9 DOWN SPOUT Φ100 (M) 518,00 436,50 436,50 - 436,50
4. 400KV GIS & CONTROL BUILDING 234,60 100% 90% 218,18 218,18 - 218,18
5. WATER TREATMENT BUILDING 38,70 100% 90% 35,99 35,99 - 35,99
5. BSDG BUILDING 98,00 100% 90% 91,14 91,14 - 91,14
20. WORKSHOP BUILDING 42,80 - - - -
21. HEAVY PART WAREHOUSE 51,90 90% 90% 44,37 44,37 - 44,37
22. LIGHT PART WAREHOUSE 20,60 90% 90% 17,61 17,61 - 17,61
25. NG SHELTER 31,40 100% 90% 29,20 29,20 - 29,20
10.10 DOWN SPOUT Φ150 (M) 708,84 651,18 595,85 55,33 651,18
1.1 TBN #01 176,00 100% 80% 160,16 133,76 26,40 160,16
1.2 TBN #02 176,00 100% 90% 163,68 163,68 - 163,68
1.3 TBN #03 176,00 100% 90% 163,68 163,68 - 163,68
3.1 UEB #01 60,28 90% 90% 51,54 22,61 28,93 51,54
3.2 UEB #02 60,28 100% 90% 56,06 56,06 - 56,06
3.3 UEB #03 60,28 100% 90% 56,06 56,06 - 56,06

Page 3 de 4
ITEM 10 : PANEL & ROOF WORK Month: XXXXXXX Cumulate last
This Month Cumulate till this Month
Month

75% 20% 5%
BUILDING Total Qty Total Previous Actual Cummulative
Installation Flashing/Bolt Final check
10.12 DOWN SPOUT HEAD (M) 109 99,75 99,75 - 99,75
1.1 TBN #01 12 100% 100% 11,40 11,40 - 11,40
1.2 TBN #02 12 100% 100% 11,40 11,40 - 11,40
1.3 TBN #03 12 100% 100% 11,40 11,40 - 11,40
3.1 UEB #01 6 100% 100% 5,70 5,70 - 5,70
3.2 UEB #02 6 100% 100% 5,70 5,70 - 5,70
3.3 UEB #03 6 100% 100% 5,70 5,70 - 5,70
4. 400KV GIS & CONTROL BUILDING 18 100% 100% 17,10 17,10 - 17,10
5. WATER TREATMENT BUILDING 9 100% 100% 8,55 8,55 - 8,55
5. BSDG BUILDING 10 100% 100% 9,50 9,50 - 9,50
20. WORKSHOP BUILDING 4 - - - -
21. HEAVY PART WAREHOUSE 6 100% 100% 5,70 5,70 - 5,70
22. LIGHT PART WAREHOUSE 4 100% 100% 3,80 3,80 - 3,80
25. NG SHELTER 4 100% 100% 3,80 3,80 - 3,80

Page 4 de 4