Sunteți pe pagina 1din 1
PETRONAS CARIGALI SDN. BHD. CSP Release 2 - 2015 REGISTER- 01/02/15 NO.| CSP CSP TITLE REVISION REMARKS NO. STATUS NO. DATE 1_| CSP.07_| CHANGE ORDER PROCEDURE 3 _[2anara 2 | CSP-02 | PROGRESS- MEASUREMENT 1 17/04/98 | Replaced by PTS PROCEDURS (DELETED) 19.80.04 - Progress Measurement System for Upstream Projects 3 | CSP-03 | FINAL DOCUMENTATION TABLE OF 3 | 24102109 | Under revision CONTENT 4 | CSP-04 | PROJECT SPECIFIC PROCEDURE 4 | 2207108 | Under revision GUIDELINE CSP-J05 | WEIGHT CONTROL PROCEDURE 2 7008 WACKET) 6 | CSP. | WEIGHT CONTROL PROCEDURE z 710808 T05_| (TOPSIDES) 7_| CSP-06_| SOURCE INSPECTION PROCEDURE 2 THOTIOS 8_| CSP-07 | SHIPLOOSE/ PACKING PROCEDURE z 7109/09 ‘9 | CSP-08 | SURPLUS MATERIAL RETURNING 2 7108/08 PROCEDURE 10 | CSP-09 | SURFACE PREPARATION AND PAINTING | 3 THOTIOS PROCEDURE 71 | CSP-10 | TEST PANEL AND COATING SYSTEM 4 | 2enine QUALIFICATION PROCEDURE. ¥2_| CSP-17_| GALVANIZING PROCEDURE z T7078 73_| CSP-12_| REPAIR PAINTING PROCEDURE 3 7107109) 14 | CSP-13 | BOLT TIGHTENING PROCEDURE 2 7/07/08 15_| CSP-14_| WELDING CONTROL PROCEDURE. 4 30/074 | 6 | CSP-15 | WELDING QUALIFICATION TEST 3 30rt0rt4 PROCEDURE 17 | CSP-16 | WELD REPAIR AND BUTTERING 3 | sonora PROCEDURE 18 | CSP-17 | WELDING CONSUMABLE CONTROL 3 Paani PROCEDURE 19 | CSP-18 | WELDER / WELDING OPEARTOR 3 [aera QUALIFICATION TEST PROCEDURE. 20_|-CSP-19_[ NON CONFORMANCE PROCEDURE i FOTOS 21 CSP-20 | TESTING, PRE-COMMISSIONING & 1 1108/44 COMMISSIONING GUIDELINE 22 | CSP-21 | UPSTREAM FACILITIES HANDOVER 7 roats MANUAL 23_| CSP-22_| FLUSHING /HYDROTEST PROCEDURE oO | 2ar0sri7 24 | CSP-23 | COATING SYSTEM FOR BOLTS AND 0 07/2 NUTS 25 | CSP-24 | GLASS-FIBRE REINFORCED PLASTIC a FSOTS (GRP) PIPING SYSTEM GUIDELINE

S-ar putea să vă placă și