NLC- NEYVELI, TPS-II 2 x 250 MW CFBC BOILER

WRITE UP ON BURNER MANAGEMENT SYSTEM


FUNCTION GROUP: BED LANCES 6 TO 10

1. Reference P & ID: AIR & FLUE GAS DRG.NO. 0-97-400-80086-91


SCHEME OF FO SYSTEM DRG.NO. 1-00-056-50592,
DRG.NO. 1-00-056-50593 &
DRG.NO. 1-00-056-50599

2.2 EQUIPMENTS APPLICABLE

The BED LANCES system consists of ten nos. of lances located five in front pant leg
and five in rear pant leg of the combustor, at the elevation just above the nozzle grate in the
combustor. These LANCES are capable of burning HFO with steam atomization as fuel.
Lances are used to increase the combustor temperature during the cold or hot start up
beyond 595  C up to lignite ignition temperature (>680  C).
Required no of lances can be put in service, and it is recommended to select the lances one
by one and also in opposite sides. Lances 6, 8, 10 are located in front side and lance no. 7, 9
are located at rear side of the rear pant leg.
Lances can be operated during load conditions also, if necessary, to maintain the combustor
temperature if requirement arises.

This Lances HFO system consists essentially of the following equipments / system.

COMMON SYSTEM
HFO SYSTEM
A. DP SWITCH ACROSS HFO SUCTION STRAINERS FOR DP HIGH ALARM
(0HJF21/22 CP001)
B. HFO PUMP I / II (0HJF21 AP001 /0HJF22 AP002)
C. HFO PUMP OUTLET PRESSURE CONTROLLER (0HJF34 AA001)
D. HFO HEATER TEMPERATURE CONTROLLER (0HJF31 CT001, 0HJF32 AA001)
E. DPS ACROSS HFO HEATER OUTLET STRAINER for DP high alarm (0HJF31
CP001, 0HJF32 CP001)
F. HFO PRESSURE O.K. (1HJF70 CP001)
G. HFO TEMPERATURE O.K. (1HJF70 CT901)
H. HFO MASTER TRIP VALVE (1HJF70 AA101)
I. ATOMISING STEAM PRESSURE OK SWITCH (1HJT70 CP901)
J. BED LANCES ATOMISING STEAM DP CONTROLLER (1HJT90 AA001)
K. BED LANCES ATOMISING STEAM DP LOW (1HJT90 CP901)
L. HFO FORWARD FLOW METER (1HJF70 CF001)
M. HFO RETURN FLOW METER (1HJF70 CF002)
N. BED LANCES CV (1HJF90 AA001)
O. BED LANCES HFO PRESSURE HIGH (1HJF90 CP901)
P. BED LANCES HFO PRESSURE LOW (1HJF90 CP901)
Q. BED LANCES ATOMISING STEAM PRESSURE LOW SWITCH (1HJT90 CP901)

FOR BED LANCE -6


FO SYSTEM
R. BED LANCES -6 HFO TRIP VALVE (1HJF91 AA101)
S. BED LANCES -6 HFO MANUAL VALVE (1HJF91 AA501)
T. BED LANCES -6 ATOMISING STEAM TRIP VALVE (1HJT91 AA101)
U. BED LANCES -6 ATOMISING STEAM MANUAL VALVE (1HJT91 AA501)
V. BED LANCE -6 SCAVENGE VALVE (1HJT91 AA102)
W. BED LANCE -6 GUN IN POSITION LS (1HJA91 CG390)
X. BED LANCE -6 FUEL LINE SEAL AIR VLV (1HJN91 AA401)

SIMILAR EQUIPMENTS ARE APPLICABLE FOR BED LANCES 6 TO 10, WHICH


HAVE RESPECTIVE TAG No. i.e., 91 IS REPLACED WITH 92 TO 95
RESPECTIVELY.

420721962.doc0 Page 1 of 4
NLC- NEYVELI, TPS-II 2 x 250 MW CFBC BOILER
WRITE UP ON BURNER MANAGEMENT SYSTEM
FUNCTION GROUP: BED LANCES 6 TO 10

3. OPERATING LOGIC

3.1 Start up Operation

Before starting the system all the following conditions should be satisfied.

3.1.1 Permissive

- Boiler protection MASTER not acted.


- Boiler protection LANCES not acted.
- DP COMBUSTOR TOTAL >min.1 (1HHC01 CP001) >70 mbar
- Any one Purge & Seal air Blower in service.
- PA FLOW > MIN.2 (1HLA11 CF901) >50 Kg/cm2
- INSTRUMENT AIR PRESSURE OK
- O2 AT BACK PASS OUTLET > min.1 (1HNA21/22 CQ001,002) >2%
- HFO PUMP I / II RUNNING (1HJF21 AP001 /1HJF22 AP002)
- HFO PUMP OUTLET PRESSURE CONTROLLER IN AUTO (0HJF34 AA001)
- HFO PRESSURE O.K. (1HJF70 CP001)
- HFO TEMPERATURE > min. 2 (1HJF70 CT901) >100deg C
- ATOMISING STEAM PRESSURE O.K. (1HJT70 CP901) >12 kG
- HFO MASTER TRIP VALVE OPENED (1HJF70 CG101A)
- BED LANCES TO RECIRCULATION VALVE OPENED (1HJN91AA103) OR
ANY ONE LANCE IN SERVICE(TRIP VALVE OPEN).
- HFO PRESSURE AFTER FCV > min. (1HJF90 CP901)
- ANY ONE LANCE (6 TO 10) SELECTED
- SELECTED BED LANCES SCAVENGE VALVE CLOSED (1HJT91 CG102B)
- SELECTED BED LANCES TRIP VALVE CLOSED (1HJF91 CG101B)
- SELECTED BED LANCES ATOMISING STEAM TRIP VALVE CLOSED
(1HJT91 CG101B)
- SELECTED BED LANCE IS IN POSITION (1HJA91 CG390)
- SELECTED BED LANCE HFO MANUAL VALVE OPEN (1HJF91 CG501A)
- SELECTED BED LANCE STEAM MANUAL VALVE OPEN (1HJT91 CG501A)

3.1.2 Sequence

Following actions will happen when START command given for the
selected BED LANCE example BED LANCE-1:

 SELECTED BED LANCE’S START UP TIMER ON MAX (120 SEC)


 SELECTED BED LANCE ‘S FUEL LINE SEAL AIR VALVE CLOSE
(1HJN91 CG401B)
 SELECTED BED LANCE ‘S SCAVENGE VALVE CLOSE (1HJT91
CG102B)
 SELECTED BED LANCE ‘S ATOMISING STEAM TRIP VALVE OPEN
(1HJT91 CG101A)
 WAIT FOR LANCE HEATING TIME MIN 30SEC
 SELECTED BED LANCE ‘S TRIP VALVE OPEN (1HJF91 CG101A) IF
START UP TIME NOT ELAPSED
 BED LANCES HFO RECIRCULATION VALVE CLOSE (1HJF91
CG103B) (IF IN OPEN)

420721962.doc0 Page 2 of 4
NLC- NEYVELI, TPS-II 2 x 250 MW CFBC BOILER
WRITE UP ON BURNER MANAGEMENT SYSTEM
FUNCTION GROUP: BED LANCES 6 TO 10

3.2 SHUT DOWN OPERATION

3.2.1 Permissive

3.2.2 Sequence
Following actions will occur automatically, when STOP command given for a
selected BED LANCE or TRIP occurs.

 BED LANCES FO RECIRCULATION VALVE OPEN (1HJF91 CG103A)


– SKIP WHEN OTHER BED LANCES IN SERVICE.
 SELECTED BED LANCE ‘S TRIP VLV CLOSE (1HJF91 CG101B)
 SELECTED BED LANCE ‘S SCVANGE VLV OPEN (1HJT91 CG102A)
 AFTER SCAVANGE TIME (MIN 60 sec) OVER, SCAVANGE VLV
CLOSE (1HJT91 CG102B)
 SELECTED BED LANCE ‘S ATOMISING STEAM TRIP VLV CLOSE
(1HJT91 CG101B)
 SELECTED BED LANCE ‘S FUEL LINE SEAL AIR VALVE OPEN
(1HJN81 AA401A)

3.3 Protection

ALL BED LANCES will trip and trip indication / signal will be ON, when any one of the
following condition occurs.

 Emergency push buttons activated.


 Boiler Protection MASTER acted
 Boiler Protection LANCES acted
 PA Flow < min 3 (1HLA11 CF001,002,003) 2 OF 3
 HFO PRESSURE AFTER FCV < min.2 (1HJF90 CP901) 2 OF 3
 HFO PRESSURE AFTER FCV > max. 2 (1HJF90 CP901) 2 OF 3
 HFO TEMP. < Minimum 2 (1HJF70 CT001,002,003)
 HFO TEMP. > Maximum 2 (1HJF70 CT001,002,003)
 PD Combustor < minimum 2 (1HHC01 CP003) For Rear Pant leg.
 O2 BACK PASS Outlet < min 2 1%(1HNA 21/22 CQ001,002)

3.4 Note
1. Similar operations are applicable for other bed lances with respective
accessories and its tag no. as per the selected bed lances. For the tag no of the
selected lances, wherever no. 91 meant for bed lance-6 to be changed as
92,93,94& 95 for bed lances 7,8,9 & 10 respectively.
2. If combustor temp. > 593 deg C, Hot start up can be done without SUB in
service.
3. Any of the BED LANCES can be started independently irrespective of SUB –
I / II/III/IV is in operation or not.
4. The Start cycle should be completed within 120 sec i.e., from Start PB pressed
to opening of BTV of selected Bed Lances.
5. Bed Lances start and stop sequence actions shall be done as per the
indicated order of sequence and also confirming the completion of previous
action through feedback.

420721962.doc0 Page 3 of 4
NLC- NEYVELI, TPS-II 2 x 250 MW CFBC BOILER
WRITE UP ON BURNER MANAGEMENT SYSTEM
FUNCTION GROUP: BED LANCES 6 TO 10

420721962.doc0 Page 4 of 4