Sunteți pe pagina 1din 1

4 5

600 X 600 mm TEXTURED CERAMIC TILE 5000 CANOPY WITH ALUMINUM METAL
(NON-SKID) FLOOR FINISH CLADDING (COLOR: NATURAL ALUMINUM)
400 4500 400 REFER TO STRUCTURAL FOR DETAIL
4 CL (CENTER LINE OF TREAD)
5
A-1
PIPE CHASE

750
(TYPICAL OTHER SIDE)
(FULLY WELDED ON STEEL BAR RAILING) 300
CANOPY

1500
75

500
W-7 300 X 300 mm HOMOGENOUS TILES 2-19 mm SQUARE BAR RAILING WITH
FLOOR FINISH PAINTED FINISH
D (TREADS AND RISERS) ( FULLY WELDED ON HANDRAIL )

600 X 600 mm TEXTURED CERAMIC TILE (NON-SKID) 6 mm THK. NON-SKID METAL


FLOOR FINISH (FL - 2) NOSING STRIP (SUBMIT SAMPLE)

PARTIAL PART OF FINANCE MANAGEMENT SECTION


LANDING

900

175
2325

2325
PARTIAL PART OF MAINTENANCE SECTION

175
5

100
A-15 REINFORCED CONCRETE STAIR
19 mm SQUARE BAR RAILING WITH PAINTED FINISH

175
150
8 - EQUAL TREADS @ 275 = 2200 mm

11 ( FULLY WELDED ON HANDRAIL )


12
10 19 mm SQUARE BAR RAILING EMBEDDED
550

(TYPICAL DEPTH)
740

175
13 ON REINFORCED CONCRETE STAIR

10 - TREADS @ 275 = 2750 mm


9
14

100 mm
8
15 38 38

175
7
1400 (CLEAR)

16
6
17
18
5 6 mm THK. NON-SKID METAL
NOSING STRIP (SEE DETAIL)
5 SPOT DETAIL (NON - SKID NOSING STRIP)
4 SCALE 1:5 M.
19
3
A-15
50 50 50 50 50

200
20
C
UP REINFORCED CONCRETE STAIR
600 X 600 mm TEXTURED CERAMIC TILE (SEE STRUCTURAL DETAIL)
(NON-SKID) FLOOR FINISH 250 250 250 250
WELDED ON 19 mm SQUARE BAR RAILINGS 1200 (CLEAR)
WITH PAINTED FINISH
100 1300 100
3 DETAIL SECTION (STEPS)
1500 1500 1500
A-14 SCALE 1 : 15 M.
4 SPOT DETAIL (HANDRAIL)
1A DETAIL PLAN @ SECOND FLOOR LEVEL A-15 SCALE 1:5 M.

4 5 C D
5000 5000
400 4500 400 8 EQUAL TREADS @ 275 = 2200 mm
325 2525 1250
50
LINE OF R.C. CANOPY ABOVE

UP MECHANICAL LIFT FOR PWD


(BY OTHERS) 200 PROJECTING WALL W/ ALUM. METAL

50
PIPE CHASE - SUBMIT SHOP DRAWINGS FOR APPROVAL CLADDING (COLOR: ROYAL BLUE)
750

(TYPICAL OTHER SIDE) W-7


2 FULLY WELDED
1500

A-15 WELDED ON RAILINGS WITH PAINTED

900
500

FINISH
50 mm DROP SECOND FLOOR LINE 20
19 MM SQUARE BAR RAILING WITH PAINTED FINISH

9 EQUAL RISERS @ 175


D SDW-1 600 X 600 mm TEXTURED CERAMIC TILE
800 200

=1575 mm
(NON-SKID) FLOOR FINISH

1575
CANOPY WITH ALUMINUM METAL
PARTIAL PART OF FINANCE MANAGEMENT SECTION

CEILING LINE CLADDING (COLOR: NATURAL ALUMINUM)

900
MECH'L-ELECT'L ROOM REFER TO STRUCTURAL FOR DETAIL
2325

2325
PARTIAL PART OF MAINTENANCE SECTION

12
11 LANDING

125
10
3500

600 X 600 mm TEXTURED CERAMIC MECH'L - ELECT'L ROOM

11 EQUAL RISERS @175


9

200
TILE (NON-SKID) FLOOR FINISH
CEILING LINE
7

= 1925 mm
6 REINFORCED CONCRETE SLAB (LANDING)
WITH PLAIN CEMENT PLASTER PAINTED
150
8 - EQUAL TREADS @ 275 = 2200 mm

2325
FINISH @ SOFFIT

2150
4 SDW-1
550

3
740

19 mm SQUARE BAR RAILING WITH PAINTED


10 - TREADS @ 275 = 2750 mm

2
3 FINISH FULLY WELDED ON G.I. PIPE
1
GROUND FLOOR LINE A-15
8 MECH'L- ELECT'L HANDRAIL
7 ROOM

400
1400 (CLEAR)

920

50
5 FINISH GRADE LINE 100
4 REINFORCED CONCRETE STAIR
3 (SLAB WITH PLAIN CEMENT PLASTER 550
PAINTED FINISH @ SOFFIT)
C
2
1
550 1500
10 EQUAL TREADS @ 275 =2750 mm
700

2725 750
2 DETAIL SECTION OF MAIN STAIR
600 X 600 mm TEXTURED CERAMIC TILE A-15 SCALE 1:50 M.
50 mm G.I. PIPE HANDRAIL FULLY WELDED UP
1200 (CLEAR) (NON-SKID) FLOOR FINISH
ON 19 mm SQUARE BAR RAILINGS WITH
PAINTED FINISH
100 1300 100
1500 1500 1500 1 DETAIL PLAN OF MAIN STAIR
1A DETAIL PLAN @ GROUND FLOOR LEVEL A-15 SCALE 1:50 M.

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED & VERIFIED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH - DETAIL OF MAIN STAIR Engineering Assistant
- DETAIL SECTION OF STAIR
DISTRICT ENGINEERING OFFICE CHECKED BY :
- DETAIL SECTION OF STEPS
BUILDING, MANCAROGO, BISLIG CITY,
(SHOWING RISERS AND TREADS) RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
- SPOT DETAILS JEFFREY M. CORDERO Asst. Chief, Planning & Design Section
Architect II

S-ar putea să vă placă și