PROJEK SISTEM BEKALAN AIR MUKIM BOTITION/NANGOH, BELURAN, NEGERI SABAH

Hiley's Formula for Set Calculation of R.C. Driven Pile (For Guidance Only)

Type of Pile : 200mm x 200mm R.C. Pile


Driving Machine : 3 tonnes Hydraulic Hammer
Working Load of pile : 45 tonnes
Pile Length : 6m
Weight of Hammer, W : 3 tonnes
Weight of Pile, P1 : 0.61 tonnes
Weight of Driving Cap, P2 : 0.41 tonnes
Total Weight, P = (P1 + P2) : 1.02 tonnes
Coefficient of Restitution, N : 0.45
Temporary Compression, C : 26 mm (assumed)
Hammer Drop Height, H : 600 mm
Set/Blow, S : in mm

Efficiency factor, f = W + ( P x N2 )
W + P
2
= 3 + ( 1.02 x 0.45 )
3+ 1.02
= 3.207
4.02
f= 0.798
Ultimate Resistance, R = W x H x f
R
Using factor of safety, R = 2 times working load of pile
= 90 tonnes
S + C/2 = W x H x f
R
S + 26/2 = 3 x 600 x 0.798
90
S + 13 = 1435.8
90
S + 13 = 15.953
S = 15.953 - 13
S = 2.953 mm
Set / 10 Blows = 30 mm