Project: ETAP Page: 1

12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard
3-Phase, LG, LL, & LLG Fault Currents
30-Cycle Network

Swing V-Control Load Total


Number of Buses: 1 0 22 23

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 7 0 0 15 0 0 22

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load
Total
Number of Machines: 0 1 0 0 0 1

System Frequency: 50.00 Hz

Unit System: English

Project Filename: tugas5

Output Filename: F:\etap\tugas 5\Untitled.SA2


Project: ETAP Page: 2
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: ETAP Page: 3
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Bus1 Load 20.000 20.000 1 100.00 30.00

Bus_1 SWNG 150.000 150.000 1 100.00 0.00

Bus2 Load 20.000 20.000 1 100.00 30.00

Bus3 Load 20.000 20.000 1 100.00 30.00

Bus4 Load 20.000 20.000 1 100.00 30.00

Bus5 Load 20.000 20.000 1 100.00 30.00

Bus6 Load 0.380 0.380 1 100.00 0.00

Bus7 Load 20.000 20.000 1 100.00 30.00

Bus8 Load 0.380 0.380 1 100.00 0.00

Bus9 Load 20.000 20.000 1 100.00 30.00

Bus10 Load 0.380 0.380 1 100.00 0.00

Bus11 Load 20.000 20.000 1 100.00 30.00

Bus12 Load 20.000 20.000 1 100.00 30.00

Bus13 Load 0.380 0.380 1 100.00 0.00

Bus14 Load 20.000 20.000 1 100.00 30.00

Bus15 Load 20.000 20.000 1 100.00 30.00

Bus16 Load 0.380 0.380 1 100.00 0.00

Bus17 Load 20.000 20.000 1 100.00 30.00

Bus18 Load 20.000 20.000 1 100.00 30.00

Bus19 Load 0.380 0.380 1 100.00 0.00

Bus20 Load 20.000 20.000 1 100.00 30.00

Bus23 Load 20.000 20.000 1 100.00 30.00

Bus26 Load 20.000 20.000 1 100.00 30.00

23 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: ETAP Page: 4
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Line/Cable Input Data

Ohms or Siemens per 1000 ft per Conductor (Cable) or per Phase (Line)
Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

cable1 23OALN1 70 328.1 0.0 1 75 0.1404518 0.1309933 0.1855622 0.6015654

Cable2 23OALN1 70 328.1 0.0 1 75 0.1404518 0.1309933 0.1855622 0.6015654

Cable3 23OALN1 70 328.1 0.0 1 75 0.1404518 0.1309933 0.1855622 0.6015654

Cable8 23OALN1 70 328.1 0.0 1 75 0.1404518 0.1309933 0.1855622 0.6015654

Cable10 23OALN1 70 328.1 0.0 1 75 0.1404518 0.1309933 0.1855622 0.6015654

Cable12 23OALN1 70 328.1 0.0 1 75 0.1404518 0.1309933 0.1855622 0.6015654

Penghantar_1 23OALN1 240 13123.4 0.0 1 75 0.0409651 0.1160556 0.0860755 0.586423

Penghantar_2 23OALN1 240 13123.4 0.0 1 75 0.0409651 0.1160556 0.0860755 0.586423

Penghantar_3 23OALN1 240 13123.4 0.0 1 75 0.0409651 0.1160556 0.0860755 0.586423

penghantar_4 23OALN1 240 13123.4 0.0 1 75 0.0409651 0.1160556 0.0860755 0.586423

penghantar_5 23OALN1 240 13123.4 0.0 1 75 0.0409651 0.1160556 0.0860755 0.586423

penghantar_6 23OALN1 240 13123.4 0.0 1 75 0.0409651 0.1160556 0.0860755 0.586423

penghantar_7 23OALN1 240 13123.4 0.0 1 75 0.0409651 0.1160556 0.0860755 0.586423

penghantar_8 23OALN1 240 13123.4 0.0 1 75 0.0409651 0.1160556 0.0860755 0.586423

penghantar_9 23OALN1 240 13123.4 0.0 1 75 0.0409651 0.1160556 0.0860755 0.586423

Line / Cable resistances are listed at the specified temperatures.


Project: ETAP Page: 5
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 60.000 150.000 20.000 9.50 34.10 0 0 0 0 0 9.5000 Dyn -30.000

T2 0.100 20.000 0.380 6.75 2.47 0 0 0 0 0 6.7500 Dyn 30.000

T3 0.250 20.000 0.380 6.75 3.09 0 0 0 0 0 6.7500 Dyn 30.000

T4 0.160 20.000 0.380 6.75 3.09 0 0 0 0 0 6.7500 Dyn 30.000

T5 0.100 20.000 0.380 6.75 2.47 0 0 0 0 0 6.7500 Dyn 30.000

T7 0.160 20.000 0.380 6.75 3.09 0 0 0 0 0 6.7500 Dyn 30.000

T11 0.250 20.000 0.380 6.75 3.09 0 0 0 0 0 6.7500 Dyn 30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

T1 60.000 150.000 20.000 D/Y Solid

T2 0.100 20.000 0.380 D/Y Solid

T3 0.250 20.000 0.380 D/Y Solid

T4 0.160 20.000 0.380 D/Y Solid

T5 0.100 20.000 0.380 D/Y Solid

T7 0.160 20.000 0.380 D/Y Solid

T11 0.250 20.000 0.380 D/Y Solid


Project: ETAP Page: 6
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus_1 Bus1 0.46 15.83 15.83

T2 2W XFMR Bus5 Bus6 2533.07 6256.68 6750.00

T3 2W XFMR Bus7 Bus8 831.34 2568.83 2700.00

T4 2W XFMR Bus9 Bus10 1298.96 4013.80 4218.75

T5 2W XFMR Bus12 Bus13 2533.07 6256.68 6750.00

T7 2W XFMR Bus18 Bus19 1298.96 4013.80 4218.75

T11 2W XFMR Bus15 Bus16 831.34 2568.83 2700.00

cable1 Cable Bus2 Bus5 1.15 1.07 1.58

Cable2 Cable Bus3 Bus7 1.15 1.07 1.58

Cable3 Cable Bus4 Bus9 1.15 1.07 1.58

Cable8 Cable Bus11 Bus12 1.15 1.07 1.58

Cable10 Cable Bus14 Bus15 1.15 1.07 1.58

Cable12 Cable Bus17 Bus18 1.15 1.07 1.58

Penghantar_1 Cable Bus2 Bus1 13.44 38.08 40.38

Penghantar_2 Cable Bus3 Bus2 13.44 38.08 40.38

Penghantar_3 Cable Bus4 Bus3 13.44 38.08 40.38

penghantar_4 Cable Bus4 Bus11 13.44 38.08 40.38

penghantar_5 Cable Bus14 Bus11 13.44 38.08 40.38

penghantar_6 Cable Bus14 Bus17 13.44 38.08 40.38

penghantar_7 Cable Bus20 Bus17 13.44 38.08 40.38

penghantar_8 Cable Bus23 Bus20 13.44 38.08 40.38

penghantar_9 Cable Bus26 Bus23 13.44 38.08 40.38


Project: ETAP Page: 7
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Power Grid Input Data

% Positive Seq. Impedance % Zero Seq. Impedance


Power Grid Connected Bus Rating 100 MVA Base Grounding 100 MVA Base
ID ID MVASC kV X/R R X Type X/R R0 X0

U1 Bus_1 2572.748 150.000 0.00 3.88685 0.01794 Wye - Solid 0.04 0.839315 0.03601

Total Power Grids (= 1 ) 2572.748 MVA


Project: ETAP Page: 8
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: Bus3

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus3 Total 0.00 2.971 0.00 137.51 129.56 1.451 1.451 3.12E+001 9.20E+001 5.69E+001 4.01E+002

Bus7 Bus3 0.00 0.000 0.00 137.51 129.56 0.000 0.000


Bus2 Bus3 41.56 2.971 45.95 117.59 112.50 1.451 1.451 3.12E+001 9.20E+001 5.69E+001 4.01E+002
Bus4 Bus3 0.00 0.000 0.00 137.51 129.56 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 9
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Fault at bus: Bus11

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus11 Total 0.00 1.623 0.00 139.14 131.36 0.756 0.756 5.81E+001 1.68E+002 1.13E+002 7.85E+002

Bus12 Bus11 0.00 0.000 0.00 139.14 131.36 0.000 0.000


Bus4 Bus11 22.70 1.623 23.94 128.39 121.96 0.756 0.756 5.81E+001 1.68E+002 1.13E+002 7.85E+002
Bus14 Bus11 0.00 0.000 0.00 139.14 131.36 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 10
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Fault at bus: Bus17

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus17 Total 0.00 1.116 0.00 139.72 131.99 0.511 0.511 8.50E+001 2.44E+002 1.70E+002 1.17E+003

Bus18 Bus17 0.00 0.000 0.00 139.72 131.99 0.000 0.000


Bus14 Bus17 15.61 1.116 16.19 132.37 125.54 0.511 0.511 8.50E+001 2.44E+002 1.70E+002 1.17E+003
Bus20 Bus17 0.00 0.000 0.00 139.72 131.99 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 11
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Fault at bus: Bus23

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus23 Total 0.00 0.850 0.00 140.02 132.32 0.386 0.386 1.12E+002 3.20E+002 2.26E+002 1.55E+003

Bus20 Bus23 11.90 0.850 12.23 134.44 127.40 0.386 0.386 1.12E+002 3.20E+002 2.26E+002 1.55E+003
Bus26 Bus23 0.00 0.000 0.00 140.02 132.32 0.000 0.000

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 12
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Fault at bus: Bus26

Prefault voltage = 20.000 kV = 100.00 % of nominal bus kV ( 20.000 kV)


= 100.00 % of base kV ( 20.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus26 Total 0.00 0.760 0.00 140.12 132.43 0.344 0.344 1.25E+002 3.59E+002 2.55E+002 1.75E+003

Bus23 Bus26 10.63 0.760 10.90 135.14 128.04 0.344 0.344 1.25E+002 3.59E+002 2.55E+002 1.75E+003

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: ETAP Page: 13
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Short-Circuit Summary Report

30 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus3 20.00 0.955 -2.814 2.971 0.290 -1.422 1.451 2.437 0.827 2.573 2.360 1.300 2.694

Bus11 20.00 0.530 -1.534 1.623 0.152 -0.741 0.756 1.328 0.459 1.405 1.288 0.701 1.467

Bus17 20.00 0.367 -1.054 1.116 0.103 -0.501 0.511 0.913 0.318 0.967 0.886 0.481 1.008

Bus23 20.00 0.280 -0.803 0.850 0.078 -0.378 0.386 0.695 0.243 0.737 0.675 0.366 0.768

Bus26 20.00 0.251 -0.718 0.760 0.069 -0.337 0.344 0.621 0.217 0.658 0.603 0.327 0.686

All fault currents are symmetrical momentary (30 Cycle network) values in rms kA

* LLG fault current is the larger of the two faulted line currents
Project: ETAP Page: 14
12.6.0H
Location: Date: 10-26-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: tugas5 Config.: Normal

Short-Circuit Summary Report

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Bus3 20.000 1.24924 3.67986 3.88612 1.24924 3.67986 3.88612 2.27776 16.02474 16.18581

Bus11 20.000 2.32444 6.72594 7.11627 2.32444 6.72594 7.11627 4.53697 31.41642 31.74233

Bus17 20.000 3.39964 9.77202 10.34649 3.39964 9.77202 10.34649 6.79616 46.80810 47.29890

Bus23 20.000 4.47484 12.81810 13.57674 4.47484 12.81810 13.57674 9.05537 62.19978 62.85549

Bus26 20.000 5.01244 14.34114 15.19187 5.01244 14.34114 15.19187 10.18497 69.89562 70.63378