Sunteți pe pagina 1din 10

TYPES OF ISSUES/PP OBSERVED IN FIELD WITH RIGHT

& WRONG SNAPS


SR N
PUNCH POINT WRONG CORRECT
OS

DO NOT INSTALL RRH ON


MAIN POLE.NO
1 OBSTURCTION TO
ANTENNA IN ANY CASE TO
CHANGE AZIMUTH

ALWAYS CHECK BOOKLET


BEFORE MAKING
2 I-AS-GWHT-ENB-8202,
ANTENNA PORT
CONNECTION

I-AS-GWHT-ENB-8202,
I-AS-GWHT-ENB-8207,
DU MUST BE INSTALLED
I-AS-RNGA-ENB-0003,
3 BELOW ODC FAN AND
I-AS-GWHT-ENB-8184,
GIVE 3U SPACE FROM TOP
I-AS-SILG-ENB-G002,

1
SR N
PUNCH POINT WRONG CORRECT
OS

I-AS-GWHT-ENB-8202,
ALWAYS USE PPE WHILE
4 I-AS-GWHT-ENB-8207,
WORKING AT SITE
I-AS-GWHT-ENB-8206

CHECK POLE MOUNT BEFORE


INSTALLATION AND MAKE
5 ,
IT STRAIGHT & TILT MUST
BE ZERO.USE TILT METER

BOTH MB AND 850 ANTENN


AS MUST BE FACING IN SAM
6 E DIRECTION.ALWAYS CHECK
AZIMUTH BEFORE & AFTER
INSTALLATION

2
SR NOS PUNCH POINT WRONG CORRECT

I-AS-GWHT-ENB-8207,
I-AS-GWHT-ENB-8218,
ROXTECK MUST BE SEAL I-AS-RNGA-ENB-0003,
ED PROPERLY. REMOVE I-AS-GWHT-ENB-8179,
ONLY ONE BOOT FOR I-AS-GWHT-ENB-8184,
7
CPRI AND 3 BOOTS FOR I-AS-SNPU-ENB-9005,
POWER CABLE. DO NOT I-AS-GWHT-ENB-T022,
REMOVE EXTRA BOOTS I-AS-SBGR-ENB-6022,
I-AS-SBGR-ENB-6020

I-AS-GWHT-ENB-8207,
ALWAYS CHECK WASHER
I-AS-GWHT-ENB-8218,
SEQUENCE.PLAIN WASH
8 I-AS-GWHT-ENB-8189,
ER/SPRING WASHER &
I-AS-GWHT-ENB-8189 ,
THEN NUT
I-AS-GWHT-ENB-6032,
SR N
PUNCH POINT WRONG CORRECT
OS

I-AS-GWHT-ENB-8218,
CPRI CABLES ROUTING
I-AS-GWHT-ENB-0119,
NOT PROPER. CPRI
11 SILG-ENB-G002,
ROUTING MUST BE U
I-AS-SBGR-ENB-6022,
SHAPE
I-AS-SBGR-ENB-6020

ANTENNA RESTED ON
POLE MOUNT. DO NOT
I-AS-GWHT-ENB-8218,
REST ANY CLAMPS ON
12 I-AS-GWHT-ENB-8189 ,
MAIN POLE. IT IS NOT POS
SIBLE TO CHANGE
AZIMUTH IN FUTURE

RRH POWER TAPPING


I-AS-GWHT-ENB-8218,
MUST BE FROM 16 AMPS
I-AS-RNGA-ENB-0003,
13 MCB. DO NOT USE 32 AMP
I-AS-GWHT-ENB-8179
S OR LESS THAN 16 AMPS
MCB
4
SR NOS PUNCH POINT WRONG CORRECT

ALWAYS CONNECT CNT


14 I-AS-RNGA-ENB-0003,
CABLE ANT PP PORT

DU GROUNDING MUST BE
CONNECTED ON THE BACK LUG MUST COVER BOTH PORT
15
SIDE OF DU WITH BOTH PORT ON BACK SIDE
COVERED

I-AS-RNGA-ENB-0003,
ALWAYS INSTALL GPS
I-AS-GWHT-ENB-8189 ,
16 ANTENNA ON TOP AND GIVE
I-AS-GWHT-ENB-6032,
DRIFT LOOP TO CABLE
SR NOS PUNCH POINT WRONG CORRECT

CRIMPPED THE RRH LUG I-AS-RNGA-ENB-0003,


17 PROPERLY AND PULL IT I-AS-GWHT-ENB-8189
AFTERWARDS TO CHECK.

RF JUMPER/GROUNDING I-AS-RNGA-ENB-0003,
18 CABLES ROUTING MUST BE I-AS-GWHT-ENB-8189,
PROPER

WATER SEEPAGE INSIDE


CPRI/RF JUMPERS. DO NOT H
DON’T REMOVE DUST CAP
19 ANG CPRI CABLES OUTSIDE D
BEFORE CONNECTION
URING INSTALLATION WITHO
UT PROPER COVERING

6
SR NOS PUNCH POINT WRONG CORRECT

RET FIRST HAND TIGHT &


THEN WITH RET WRENCH
FOR ACE & ONLY HAND
21 I-AS-GWHT-ENB-8189,
TIGHT PROPERLY FOR
ROSENBERGER. DO NOT
OVERTIGHT.

I-AS-GWHT-ENB-8184,
I-AS-GWHT-ENB-8207,
RRH GROUNDING MUST
22 I-AS-SBGR-ENB-6022,
BE TIGHT AT TG END
I-AS-SBGR-ENB-6020,
I-AS-SBGR-ENB-6012

7
SR PUNCH POINT WRONG CORRECT

LOCKING NUTS MUST BE


I-AS-GWHT-ENB-8189,
23 TIGHT PROPERLY
I-AS-GWHT-ENB-8184
EVERYWHERE

DO NOT SHARP BEND RET


24 I-AS-GWHT-ENB-8184,
CABLE. GIVE U SHAPE LOOP

ANY DUST CAP MISSING.


25 I-AS-GWHT-ENB-8184,
SEAL USING BUTYL TAPE

8
SR PUNCH POINT WRONG CORRECT

INFRA ISSUES, POLE MOUNT


S FIXING ISSUES CHECK
BEFORE INSTALLATION, I-AS-SNPU-ENB-9005,
26
FIXED IT IF POSSIBLE ELSE I-AS-GWHT-ENB-8207
ESCALATE TO AREA
MANAGER

DO PROPER SAGGING OF
27 CABLES NEAR ROXTECK USE I-AS-SNPU-ENB-9005,
CABLE TIES

DO NOT STRETCH RET


28 I-AS-SNPU-ENB-9005
CABLES
SR PUNCH POINT WRONG CORRECT

USE 4 SQMM POWER


CABLE FOR 2300 RRH &
6 SQMM CABLE FOR 850 & I-AS-SNPU-ENB-9005
29
1800 RRH. DO NOT USE
LESS THAN 6SQMM CABLE
FOR 850 & 1800 RRHS.

CHECK GPS ARRESTOR


DIRECTION.3 TYPES
SILG-ENB-G002,
1) SURGE– TOWARDS
I-AS-GWHT-ENB-T022,
ANTENNA
30 I-AS-GWHT-ENB-0119,
2) ANT:- TOWARDS
I-AS-SBGR-ENB-6020,
ANTENNA
I-AS-SBGR-ENB-6012
3)PROECTED SIDE:-
TOWARDS DU

10

S-ar putea să vă placă și