PROJECT NAME
ENGR. JOEL C. LOBRINO LOVELY JEAN CORTEJOS
CONSTRUCTION OF LEVEL II GRAVITY DRIVEN WATER
INSTRUCTOR, CETE 4 STUDENT
SUPPLY SYSTEM
CONSTRUCTION OF LEVEL II GRAVITY DRIVEN WATER
SUPPLY SYSTEM
SOLVE FOR DISCHARGE (Q) SOLVE FOR HEADLOSS SOLVE FOR RESIDUAL HEAD
Q = [(No. of HH) x (Ave. size per HH) x (Cons. Rate)]/86400 HLD = [(0.979/100)(52.22)] RHC = 137.25 - 4.98
QH = [(18)(5)(80)]/86400 = 0.08 lps HLD = 0.511 m RHC = 132.27 m
QF = QG = QE = 0.08 lps HLE = [(9.79/100)(22.30)]+1.52 RHD = 144.25 - 0.511
QD = QE + QG = 0.08 + 0.08 = 0.16 lps HLE = 3.70 m RHD = 143.739 m
QC = [(18)(5)(80)]/86400 = 0.08 lps HLF = (0.979/100)(80.19) RHE = 154.739 - 3.70
QB = QD + QC = 0.16 + 0.08 = 0.24 lps HLF = 0.785 m RHE = 151.039 m
QA = QB = 0.24 lps HLG = [(9.79/100)(32.70)]+0.335 RHF = 158.739 - 0.785
HLG = 3.54 m RHF = 157.954 m
SOLVE FOR HEADLOSS RHG = 166.954 - 3.54
HLA = (0.979/100)(365.02) SOLVE FOR RESIDUAL HEAD RHG = 163.414 m
HLA = 3.57 m RH = AVAIL. HEAD - HL
HLB = [(0.979/100)(89.69)]+0.305 RHA = 120 - 3.57
HLB = 1.18 m RHA = 116.43 m
HLC = [(9.79/100)(35.30)]+1.52 RHB = 129.43 - 1.18
HLC = 4.98 m RHB = 128.25 m
PROJECT NAME:
ENGR. JOEL C. LOBRINO LOVELY JEAN CORTEJOS
CONSTRUCTION OF LEVEL II GRAVITY DRIVEN WATER
INSTRUCTOR, CETE 4 STUDENT
SUPPLY SYSTEM
BILL OF MATERIALS
DESCRIPTION QUANTITY
REINFORCED CONC.(CLASS AA) 33.80 m3
CEMENT 406 bag
SAND 16.90 m3
GRAVEL 33.80 m3
FILL AND BACKFILL 123.12 m3
REBARS
10 mm dia. 10 pcs.
12 mm dia. 20 pcs.
16 mm dia. 15 pcs.
TIE WIRE 3 kls.
ORDINARY PLYWOOD 17 Shee
1x2x8 Stick 28 pcs.
Nails 4 kls.
PVC PIPES
3/4 dia. pipe 91 m
1 1/4 dia. pipe 507 m
1 1/2 dia. pipe 81 m
2" dia. G.I. pipe 7m
Tee 2 pcs.
Elbow 1 pc.
Galvanized Faucet 3 pcs.
1/2" dia. Gate valve 1 pc.
Gate valve 1 pc.