Service Connection charges for effecting LT Three phase Service Connction With
CT meter
Quantity Description Rate in Per Amount
Rs.
3 SPIC Cutout with fuse unit 100 Amps 354 E 1062
1 3 phase LTCT Meter 3803 E 3803
3 LTCT 264 E 792
1 Triple compartment box 1759 E 1759
1.5 GI wire 7/20 SWG 68.64 KG 103
5 GI Pipe 278 m 1390
Cost of materials 8909
Contingencies 1% 89
Total cost of materials 8998
Labour 10% 900
Transport 3% 297
Sub-total 10195
Estt. & Supervision charges 3647
Gross Total 13842
Less : cost of meter 3803
Net Total 10039
Proposed service connection charges 10000
Note: All the other Service connection materials are to be provided by the applicants.
ANNEXURE-II
DETAILS FOR METER RENT (HT SERVICES )
Sl.No. Type of Service Cost of Cost of Monthly interest for Meter Rent
Meter in Rs. Metering metering proposed by
Set/CT-PT in arrangements @ TNEB in Rs. Per
Rs. 12.5% p.a. in Rs. service per
month.
Electronics Trivector Meter
LTCT Services
Sl. No. Man power required Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Asst.Exe.Engineer 48575 1619 202 3 607
2 Asst.Engineer/MRT, O& 39223 1307 163 6 981
3 Technical Assistant 22475 749 94 3 281
4 Foreman 38425 1281 160 3 480
5 Wireman 21750 725 91 3 272
Total 2621
The changing meter Box fee now proposed is Rs 2600/-.
HT Services
Sl. No. Man power required Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Asst.Exe.Engineer/O&M 48575 1619 202 3 607
2 Asst.Exe.Engineer /MRT 48575 1619 202 3 607
3 Asst.Engineer 39223 1307 163 3 490
4 Technical Assistant 22475 749 94 3 281
5 Foreman 39223 1307 163 3 490
6 Wireman 38425 1281 160 3 480
Total 2956
The changing meter Box fee now proposed is Rs 3000/-.
ANNEXURE - IV
DETAILS OF EXPENDITURE FOR CHANGING OF METER
Single phase
Sl. No. Man power required Wages Wages Wages Man hour Total amount
per month per day per hour required required Rs.
Rs. Rs. Rs.
1 Foreman 38425 1281 160 1 160
2 Wireman 21750 725 91 1 91
Total 251
The changing of meter fee now proposed is only Rs 250/-.
Total 80
The proposed charges is Rs 80/-.
LT Static meters
Sl. No. Man power require Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Asst.Engineer 39223 1307 163 0.5 82
2 Transport 750 150
Total 232
The proposed charges is Rs 230/-.
H.T.Services
Sl. No. Man power require Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Asst.Exe.Engineer
48575 1619 202 0.75 152
2 Hepler 21315 711 89 0.75 67
3 Transport 750 250
Total 468
The proposed charges is Rs 460/-.
ANNEXURE-VII
Meter Caution Deposit
Cost of the meter Existing proposed
in Rs. in Rs. in Rs.
LT Services
Single phase Meter 821 700/Meter 825/Meter
10-60 A 3450
2500/Meter 3650/Meter
50-100 A 3800
HT Services
11 KV Meter plus metering
set 48107
22 KV Meter plus metering Rs.40,000 per Rs.65000 per
set 69606 service service
33 KV Meter plus metering
set 79020
EHT Services
110 KV
Meter 3665
Rs.1,00,000
CTs and PTs 181825 per service
Rs.2,35,000 per
230 KV service
Meter 3665
Rs.1,00,000
CTs and PTs 280185 per service
ANNEXURE - VIII
DETAILS OF EXPENDITURE FOR RECONNECTION
Cut out (Single phase)
Sl. No. Man power required Wages per Wages per Wages per Man hour Total amount
month Rs. day Rs. hour Rs. required required Rs.
1 Wireman 21750 725 91 1.5 136
Total 269
The proposed charges is Rs 270/-.
Total 359
The proposed charges is Rs 360/-.
Total 538
The proposed charges is Rs 540/-.
Total 752
The proposed charges is Rs 750/-.
Total 718
The proposed charges is Rs 700/-.
Total 987
The reconnection fee now proposed is only RS 1000/-.
ANNEXURE-IX
Reconnection of LT CT.Services within Six months after the date of DC
Wages per Wages per Wages per man hour
Sl.No. Man Power required month day hour required Amount required
1 AEE/Dist 48575 1619 202 2 405
2 AE/Dist 39223 1307 163 4 654
3 Foreman 38425 1281 160 4 640
4 Area WM 21750 725 91 4 363
5 Helper 21315 711 89 4 355
Total 169288 2417
The Reconnection now proposed Rs 2500
1 Asst.Exe.Engineer
48575 1619 202 5 1012
2 FM
38425 1281 160 5 801
3 Wireman 21750 725 91 5 453
4 Hepler 21315 711 89 5 444
5 Clerical Work LS 500
6 Transport charges LS 1000
Total 4210
The reconnection fee now proposed only RS 4000/-.
1 Asst.Exe.Engineer
48575 1619 202 6 1214
MRT
2 Asst.Exe.Engineer 48575 1619 202 6 1214
3 Technical Assistant 22475 749 94 6 562
3 FM 38425 1281 160 6 961
3 Wireman 21750 725 91 6 544
4 Hepler 21315 711 89 6 533
5 Clerical Work LS 500
6 Transport charges LS 1000
Total 6528
The reconnection fee now proposed only RS 6500/-.
ANNEXURE - X
DETAILS OF EXPENDITURE FOR NAME TRANSFER OF SERVICES
LT Category
Sl. No. Man power required Wages Wages Wages Man hour Total amount
per month per day per hour required required Rs.
Rs. Rs. Rs.
For HT Service
Sl. No. Man power required Wages Wages Wages Man hour Total amount
per month per day per hour required required Rs.
Rs. Rs. Rs.
Total 4392
Name transfer fee proposed is only Rs.4500/-
ANNEXURE-XI
Development Charges
Cost of Length
Establishment of Length of Cost of Cost of
substation/ of Out Cost of Total
substations/ incoming incoming Out going Total Cost per
Sl NO Distribution going land in Cost in
Distribution line in line in line line in KVA KVA
Transformers line in Rs lakhs Rs lakhs
Transformers in Rs lakhs
KM Rs lakhs KM Rs lakhs
9
1 2 3 4 5 6 7 8 =3+5+7 10 11
+8
Erection of 230 KV
substation with 100
a MVA Power 2590 1 37.3 1 22 24 2673 100000 2673
Transformers and 6
Nos 110 KV feeders
Erection of 110/11
KV substation with
b 2*10 MVA Power 527 1 22 1 3.87 10 563 20000 2814
Transformers and 4
Nos 11 KV feeders
Erection of 33 KV
substation with 2*8
c MVA Power 371 1 3.83 1 3.87 4 383 16000 2392
Transformers and 3
Nos 11 KV feeders
Erection of
11 KV/100 KVA
d 1.61 1 3.0 1 2.1 0 7 100 6636
Distribution
Transformers
Erection of
11 KV/250 KVA
e 2.89 1 3.0 1 2.1 0 8 250 3167
Distribution
Transformers
Erection of
11 KV/500 KVA
f 4.30 1 3.0 1 2.1 0 9 500 1867
Distribution
Transformers
Erection of
22 KV/100 KVA
g 2.02 1 3.23 1 2.1 0 7 100 7328
Distribution
Transformers
Erection of
22 KV/250 KVA
h 3.60 1 3.23 1 2.1 0 9 250 3562
Distribution
Transformers
Erection of
22 KV/500 KVA
i 6.54 1 3.23 1 2.1 0 12 500 2369
Distribution
Transformers
Average cost per KVA 3645
Average cost per KVA with diversity factor of 1.5 2430
Development charges now proposed for HT services 2500
Average cost per KVA for LT services @ diversity factor of 1.5 and power factor of 0.9 1852
Development charges now proposed for LT services 1800
ANNEXURE - XII
DETAILS OF EXPENDITURE FOR REGISTRATION AND
PROCESSING OF APPLICATION
LT Category involving Minor extension (LT services)
Sl. No. Man power Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required Rs.
1 AE 39223 1307 163 0.5 82
For HT Service
Sl. No. Man power Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required Rs.
1 SE 88885 2963 370 1 370
3 EE/Dist. &
49880 1663 208 6 1247
EE/GL
Total 3034
Proposed charge is Rs.3000
ANNEXURE - XIII
DETAILS OF EXPENDITURE FOR CHANGE OF TARIFF
LT Category lower to higher tariff
Sl. No. Man power Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required Rs.
1 AE 39223 1307 163 1 163
3 CI / CA 21750 725 91 1 91
Total 254
For HT Service
Sl. No. Man power Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required Rs.
1 SE 88885 2963 370 0.5 185
3 EE/Dist. &
49880 1663 208 3 624
EE/GL
Total 2023
ANNEXURE - XIV
SECURITY DEPOSITS
LT services
Energy Electricity
Rate of
Consumption Charges CCD
Sl. realisation Connected No of No of No of
Tariff for for 3 proposed by
No. in Rs/ load in Kw Hours days Months
3 months/ months TANGEDCO
KWH.
KW in Rs.
1 2 3 4 5 6 7 8=4*5*6*7 9=8*3 10
LT tariff
a IA
Single Rs.900/-per
I 2.42 1 4 30 3 360 871
Phase service
Three Rs.650/-per
II 2.42 1 6 30 3 540 1307
Phase Kw
LT tariff Rs.900/-per
b 4.00 1 10 30 3 900 3600
IC Kw
LT tariff
IIA
Steet
3.42 1 10 30 3 900 3078
light Rs.900/-per
c Public Kw
Water 3.42 1 4 30 3 360 918
Supply
LT tariff Rs.540/-per
d 4.87 1 6 30 3 540 1308
II B(1) Kw
LT tariff Rs.540/-per
f 5.56 1 6 30 3 540 1494
II B(2) Kw
LT tariff Rs.540/-per
g 3.17 1 6 30 3 540 850
II C Kw
LT tariff Rs.720/-per
h 2.71 1 8 30 3 720 728
III A(1) Kw
LT tariff Rs.720/-per
i 2.04 1 8 30 3 720 548
III A(2) Kw
LT tariff Rs.720/-per
j 4.92 1 8 30 3 720 1321
III (B) Kw
Rs.900/-per
k LT tariff V 6.76 1 10 30 3 900 1815
Kw
HT services
Total
Energy CCD @
Energy Powe % of Demand Electricity
Sl. Demand Days/ Total units/ charges two
Tariff charges in KVA r utilisati No of Hours charges Charges/
No. charges Month Month / months
Rs/Unit factor on / Month month
Month charges
in Rs.
10 11=10 13=11+
1 2 3 4 5 6 7 8 9 =5*6*7*8 12=4*5 14=13*2
*3 12
*9
HT tariff
a 4.0 300 1 0.9 0.75 8 30 162 648 300 948 1896
I (A)
Other
than HT
b Tariff I(A) 4.5 300 1 0.9 0.75 6 30 122 547 300 847 1694
and HT
Tariff III
HT tariff
c 5.8 300 1 0.9 0.75 8 30 162 940 300 1240 2479