Sunteți pe pagina 1din 3

STERLING AND WILSON DOC. No.

:
METHOD STATEMENT FOR
RAHEJA- SW-MS-PHE-PVC-01
PVC PIPING REV. No.: 00

PROJECT: : RAHEJA, 12D MIND SPACE HITEC CITY

1.0 Purpose

1.1 Purpose of this method statement is to outline the method of storage, handling, fabrication;
installation of Drainage piping.

2.0 Material

2.1 Pipes
PVC- IS 13598-1992(SWR Class A)

2.3 Supports as per approved schedule


Universal hangers, U Bolts, Galvanized angles / channels, Threaded rods, Anchor
fasteners, Nuts, Washers etc.

3.0 References

3.1 Manufacturers catalogue for pipes, fittings, supports, valves etc.

3.1 Approved material submittal / Technical Data Sheets

3.2 Approved Shop drawings Issued for Construction.

4.0 Method

4.1 Storage
4.1.1 Pipes shall be stacked on a flat surface with adequate supports
4.1.2 While stacking, it shall be ensured that pipes of bigger sizes are placed below
and smaller sizes on top
4.1.3 All pipes shall be covered and shall not be exposed directly to outside
conditions.
4.1.4 All supporting materials shall be stored in a covered storage area, segregated
according to size, type, model, etc. for easy retrieval.

4.2 Preparation

4.2.1 Check and ensure all drawings used for installation are latest and approved for
construction
4.2.1 Check the co-ordination of piping layout with other services and reflected
ceiling and decide pipe route with minimum bends/offsets.

4.2.2 Check and ensure sufficient clearance is available around pipe for servicing.

4.2.3 Fabricate the structural supports from angles/channels as per support schedule.
STERLING AND WILSON DOC. No.:
METHOD STATEMENT FOR
RAHEJA- SW-MS-PHE-PVC-01
PVC PIPING REV. No.: 00

PROJECT: : RAHEJA, 12D MIND SPACE HITEC CITY

4.3 Installation

4.3.1 Installation of Drainage pipes at toilets sealing level, installation of drainage


pipes at shafts, installation of drain pipe at car parking areas.

4.3.2 All pipes are laid with due regard to the fall and invert levels set out in the shop
drawing

4.3.3 Fix the anchors and threaded rods with hangers / structural supports as
applicable. Threaded rod length shall be sufficient to allow for levelling of
piping.

4.3.4 Cut the pipes accurately to measurements determined at site. For all sizes, use
hacksaw blade/disc cutter to cut the pipe. The cut ends should be clean, clear
and free from slag etc.

4.3.5 Ensure cut ends are square and free of dents.

4.3.6 After the end preparation clean the pipe ends and ensure no material and dust is
left inside.

4.3.7 Depending on site conditions, assemble the piping into manageable lengths on
the floor.

4.3.8 Install the pipe spools at heights as per approved drawings in a neat and tidy
manner.

4.3.9 Align and level the piping as per approved drawings.

4.3.10 Factory made fittings to be used. Flanges shall be slip on type

4.3.11 Check and ensure proper supporting is provided as per approved drawings and
support schedule.

4.3.12 Ensure Proper Solvent / Drip Seal is used for jointing

4.3.13 Make temporary tapping provisions at multiple points for easy and quick filling
and draining of pressure testing water.

4.3.14 Do the Smoke or Gravity water column testing of pipes.


STERLING AND WILSON DOC. No.:
METHOD STATEMENT FOR
RAHEJA- SW-MS-PHE-PVC-01
PVC PIPING REV. No.: 00

PROJECT: : RAHEJA, 12D MIND SPACE HITEC CITY

5.0 Record:

5.1 Signed off Material Inspection Request.

5.2 Signed off Installation inspection request with check list.

5.3 Signed off JMS checklist

S-ar putea să vă placă și