3AP1 DTC
– Dead Tank Compact
1. Standards
2. Technical details
§ Circuit breaker
§ Disconnector / earthing switch
§ Current transformer
§ Voltage transformer
§ Cable connection
§ Control system
§ Further components
5. Transportation
6. On site installation and
commissioning
7. Maintenance
AIS conventional
GIS compact
AIS conventional
GIS compact
Hybrid
IS combined
IEC 62271-205
Compact switchgear assemblies for rated voltages above 52 kV
§ Annex A
Compact switchgear assemblies consist …of a combination of air-insulated switchgear (AIS)
and gas-insulated switchgear (GIS), so called mixed technology switchgear (MTS)!
1. Standards
2. Technical details
§ Circuit breaker
§ Disconnector / earthing switch
§ Current transformer
§ Voltage transformer
§ Cable connection
§ Control system
§ Further components
5. Transportation
6. On site installation and
commissioning
7. Maintenance
Circuit breaker
Position indicator
Contact support
Nozzle
Main contact
Arc contact
Heat cylinder
Base
Lever
Pin
Cam lever
Coupler
Moving pin
Nozzle
Contact lamination
Tube contact
Heating cylinder
Valve plate
Piston
Valve group
Opening spring
Closing spring
Three-pole operated
Closing coil
Charging motor
Charging gear
Charging shaft
Coupling linkage
Closing spring
Opening coil
Opening spring
Single-pole operated
145 kV 245 kV
1. Standards
2. Technical details
§ Circuit breaker
§ Disconnector / earthing switch
§ Current transformer
§ Voltage transformer
§ Cable connection
§ Control system
§ Further components
5. Transportation
6. On site installation and
commissioning
7. Maintenance
Three-position
disconnector and
earthing switch
Position indicator
DC / ES drive
145 kV 245 kV
Disconnector Earthing /
Disconnector Switch
Trenner/Erder
Additional ES
Contact for ES
Inspection window
Filter housing
Bushing gas-tight
Kinematic chain,
tested according to
IEC 62271-102:
Ensures
correspondence
between the switch
position indication and
the actual switch
position of the main
switching device
§ Weatherproofed in
accordance with IP 55
145 kV 245 kV
§ Safety:
A good indication even
from a great distance
§ Reliability:
Well proven earthing
switch of the Siemens
program
§ Cost saving:
Low maintenance
affords - same
maintenance period like
the whole module
§ Flexibility:
Motor or hand drive
available
Available also in
combination with
GIS disconnector
and earthing switch
Motor drive
Hand drive
Inductive
80 A at 2 kV 80 A at 2 kV 100 A at 6 kV - 80 A at 2 kV -
current
Capacitive
2 A at 6 kV 3 A at 12 kV 5 A at 6 kV - 3 A at 12 kV -
current
1. Standards
2. Technical details
§ Circuit breaker
§ Disconnector / earthing switch
§ Current transformer
§ Voltage transformer
§ Cable connection
§ Control system
§ Further components
5. Transportation
6. On site installation and
commissioning
7. Maintenance
Current transformer
Free
positioning
Brackets bridge the insulated gap and allow earthing and measuring
of the fault current.
1. Standards
2. Technical details
§ Circuit breaker
§ Disconnector / earthing switch
§ Current transformer
§ Voltage transformer
§ Cable connection
§ Control system
§ Further components
5. Transportation
6. On site installation and
commissioning
7. Maintenance
Voltage transformer
Separate gas
compartment
Gas fitting
Rupture disc
Terminal box
1. Standards
2. Technical details
§ Circuit breaker
§ Disconnector / earthing switch
§ Current transformer
§ Voltage transformer
§ Cable connection
§ Control system
§ Further components
5. Transportation
6. On site installation and
commissioning
7. Maintenance
Cable connection
assembly
Cable connection
enclosure
Contact
system
Cable
connection
assembly
enclosure
Insulator
1. Standards
2. Technical details
§ Circuit breaker
§ Disconnector / earthing switch
§ Current transformer
§ Voltage transformer
§ Cable connection
§ Control system
§ Further components
5. Transportation
6. On site installation and
commissioning
7. Maintenance
2 or 3 x 46 pin cable
with plugs at both ends
(at one end, plugs for
indoors; inside cubicle)
1. Standards
2. Technical details
§ Circuit breaker
§ Disconnector / earthing switch
§ Current transformer
§ Voltage transformer
§ Cable connection
§ Control system
§ Further components
5. Transportation
6. On site installation and
commissioning
7. Maintenance
Decentral gas
No separation Separation with Bypass
compartment monitoring
Copper bypass
pipe
Advantages:
§ Economic alternative to a voltage
transformer if there is no requirement for
voltage values to be measured
§ High reliability due to use of an optical
interface
§ Guaranteed high level of safety thanks to
an integrated surge arrester which
protects electronic components and staff
§ Opportunity for simple integration of
switching error protection, such as
closing the earthing switch under live
conditions
1. Standards
2. Technical details
§ Circuit breaker
§ Disconnector / earthing switch
§ Current transformer
§ Voltage transformer
§ Cable connection
§ Control system
§ Further components
5. Transportation
6. On site installation and
commissioning
7. Maintenance
1. Standards
2. Technical details
§ Circuit breaker
§ Disconnector / earthing switch
§ Current transformer
§ Voltage transformer
§ Cable connection
§ Control system
§ Further components
5. Transportation
6. On site installation and
commissioning
7. Maintenance
§ Applicability
Easy and fast installation solution
if no access by crane is possible
1. Standards
2. Technical details
§ Circuit breaker
§ Disconnector / earthing switch
§ Current transformer
§ Voltage transformer
§ Cable connection
§ Control system
§ Further components
5. Transportation
6. On site installation and
commissioning
7. Maintenance
1) Circuit breaker
2) Disconnector / earthing switch
§ Functional check of trip circuits, reclosing § Check SF6 pressure gauge
lockout, SF6 lockout, anti-pumping feature § Check operating values of SF6 density
§ Check of motor control monitor
§ Anti-corrosion protection § Check for leaks on compact switchgear,
which is ready for operation
§ Terminal strip
§ Measuring SF6 gas humidity content
and air content
§ Spare parts supply for all Siemens compact switchgears and circuit
breakers for at least 25 years
§ Erection and commissioning
§ Training
§ Maintenance
§ Trouble-shooting
Daniel Bauer
E T HP CB PRM 4
Product Lifecycle Manager
DT and DTC
Siemens AG
High Voltage Products
Nonnendammallee 104
13629 Berlin
E-mail:
danielbauer@siemens.com
siemens.com/answers