Ref.

No: EEEPL -05 JOB SAFETY &


Revision No. 01 ENVIRONMENT ANALYSIS
Date 19/04/19

Job Title: Light fitting Erection Date of Job Analysis:

Projects: BSH HOUSE HOLD APPLIANCES. Reference No:

Analyst/ Reviewer: PTK/BSH

Description of Job:
LIGHT FITTING ERECTION

Sequence of job steps Risks identified Precautions advised


Vehicle accident The following documents to be
Vehicle with light fixture boxes enclosed before permit the vehicle;
(Unloading) Enters via Gate 3 Vehicle documents(Registration and
reach to storage area. Insurance)
Driver License with valid date
Speed limit is 15kmph at inside the
campus.
Ensure Safety and traffic marshals
been informed about the vehicle entry.
Ensure logistic plan explained to the
driver by banks man.
Safety marshal and bangs man will
walk with TATA truck from entrance to
unloading point(B-2 & US)
Stop the other tenant vehicle
movement by security while entering
and reversing the vehicle.
Provide barricade(cone with chain) at
around the vehicle while unloading
Basic PPE’S (Safety Helmets,
Reflective jacket, , Hand gloves,
Safety shoe,)
Unloading of light fixtures boxes Ergonomic Hazards All workers must undergo site specific
Manually from the loaded Vehicle. Hand injury safety induction without fail.
Slip and trip Deploy two persons to unload material
Per box at one time by an individual Weight limit for male<25kgs
worker Labor should be ensure proper
induction and job specific training
Medical certificate of those who
involved must be submitted.
Stop block shall be provided to avoid
roll over and materials stacking should
not exceed 1.5m height.
Access should be free from unwanted
materials and debris
Basic PPE’S (Safety Helmets,
Reflective jacket, , Hand gloves,
Safety shoe, Shoulder pad)
Ref. No: EEEPL -05 JOB SAFETY &
Revision No. 01 ENVIRONMENT ANALYSIS
Date 19/04/19

Failure of service lift Instruct worker not to panic


Shifting of light fixtures from Breakdown of service lift Call emergency number displayed in
Basement to floors through service the service lift
lift. With pallets Don’t load more than 1.5 Ton
Follow the instructions given by the
lift operator
Instruct them to communicate through
the telephonic inside

Collapse of scaffold. Mobile scaffold shall be erected by


Scaffolding erection and dismantling trained person and training must to
attend before deploy.
Scaffolding checklist to be done and
display the tag system.
Do not stack the material at platform.
Ladder/ stair case to be provided for
access to reach platform.
Complete platform to be provided at
above & below level.
Basic PPE’S (Safety Helmets,
Reflective jacket, Hand gloves, Safety
shoe, Full body harness.)

Fall of person /material on scaffold


Ensured free from gap on working
platform.
Handrail, mid rails and toe board must
to provide.
Height work Permit to be taken prior
to start the work.
Do not drop the material from height.
Ensure the erected pipes
Provide barricading cone with signage.

Fall from height


Light fixture sling installation point Scaffolding shall be erected /
Marking on the ceiling dismantle by competent person and
inspected by competent person.
Area to be isolated to avoid
unauthorized entry.
Only two persons are permitted to
work at a time in working platform.
Adequate sign / caution boards to be
displayed.
SWL single baltform 225kgs shall be
displayed in mobile scaffoldings.
Mobile scaffolding must not be pulled
or dragged when persons are above.
Inspection shall be carried out on
weekly basis and recorded in
inspection checklists daily.
Ref. No: EEEPL -05 JOB SAFETY &
Revision No. 01 ENVIRONMENT ANALYSIS
Date 19/04/19

Full body harness shall be used for


works carried out more than 1.8m
height.

Slip & Trip All obstructions shall be removed off


Cut & Crush injury from access areas.
Skin irritation Adequate signage shall be provided.
eye injury Use appropriate hand tools
All hand tools to be inspected prior to
start activity.
Ensure the area is isolated using
barricades.
MSDS shall be kept avail and
explained to the workers engaged in
that activity.
Rubber hand gloves shall be provided.
Adequate illumination shall be
provided @ 150 lux in work area.

Fall from height Scaffolding shall be erected /


Installation of Sling rope with 1mm dismantle by competent person and
thick and 1.5m length from ceiling inspected by competent person.
using drilling machine and anchor Area to be isolated to avoid
fastener. unauthorized entry.
Only two persons are permitted to
work at a time in working platform.
Adequate sign / boards to be
displayed.
SWL of 225kgs shall be displayed in
mobile scaffoldings.
Mobile scaffolding must not be pulled
or dragged when persons are above.
Inspection shall be carried out on
weekly basis and recorded in
inspection checklists daily.
Full body harness shall be used for
works carried out more than 1.8m
height.

Provide RCCB (30mA tripping


Electrocution. capacity) and inspect on daily basis.
Electrical machineries should be
checked by ‘B’ license holder prior to
use.
Display the tag on machine.
Cable should be over headed.
Provide polyvinyl chloride gloves and
6mm rubber/Earth mate.
Provide PPE’s (safety helmet, safety
shoes, hand gloves, safety goggles
(Partition drillings), (For ceiling
Ref. No: EEEPL -05 JOB SAFETY &
Revision No. 01 ENVIRONMENT ANALYSIS
Date 19/04/19

drilling), nose mask, Ear Plug and


safety harness).
Fallen screws to be collected with
magnetic catcher at the completion of
the activity.

Puncture of PT marking while Do not drill on red marking (PT line).


drilling. Explained to the workers in induction
Dust inhalation. and toolbox talk.
Provide PPE’s (safety helmet, safety
shoes, hand glove, Face shield, and
filter nose mask) for drilling.
Adequate IS 3mm Nose mask shall be
provided for all workers engaged.

Fall from height Scaffolding shall be erected /


Installation of light fixtures in the dismantle by competent person and
hanging sling rope ( bold and thread inspected by competent person.
type) Area to be isolated to avoid
unauthorized entry.
Only two persons are permitted to
work at a time in working platform.
Adequate sign / caution boards to be
displayed.
SWL of 225 kgs shall be displayed in
mobile scaffoldings.
Mobile scaffolding must not be pulled
or dragged when persons are above.
Inspection shall be carried out on
weekly basis and recorded in
inspection checklists daily

Electrocution. Provide RCCB (30mA tripping capacity)


and inspect on daily basis.
Electrical machineries should be checked
based on ‘prior to use.
Display the tag on machine.
Cable should be over headed.
Provide polyvinyl chloride gloves and
6mm rubber//Earth mate.
Basic PPE’s ( safety helmet, safety shoes,
hand gloves, safety goggles for partition
drilling, nose mask and safety harness ,
face shield for ceiling drilling).
Fallen screws to be collected with
magnetic catcher at the completion of the
activity.
Cut & crush injury All hand tools to be inspected for any
defective prior to use.
Area to be barricaded to avoid
Ref. No: EEEPL -05 JOB SAFETY &
Revision No. 01 ENVIRONMENT ANALYSIS
Date 19/04/19

unauthorized entry.
All sharp edges to be protected until it
get installed.
PPE’ such as Hand Gloves, Helmets,
Safety Shoes, Goggles and Nose Mask
shall be worn
Ref. No: EEEPL -05 JOB SAFETY &
Revision No. 01 ENVIRONMENT ANALYSIS
Date 19/04/19

Suggested safe system of work:

Suggested Review date: (if required)

Suggested further job safety instructions: (if required)

Suggested training programs: (Tool Box Talks)

Signed By: Approved By: