PLD/F-001
MINING CONTRACTOR : Revisi : 3
SB02
FMC
1 EX2328 28,500 II 7.30 3.00 3.00 238449 1. 237385 B42551 1. C43005 1. ORING COVER SPOOL C/V LH DALAM LEAK 104
2 DT4210 41,250 I 7.30 2.00 5.00 238870 1. 238644 J42120 1. REPAIR 1. FRAME DEPAN LH CRACK 47
1. 238751 1. E42802 1. BRACKET OIL FILTER ENGINE LEAK 4 PCS
3 DT3334 50,500 II 17.00 3.00 21.00 238842 2. 238752 M42716 2. E42803 2. DRIVE PULLEY ALTENATOR AUS 29
3. 238753 3. H43176 3. INPUT SHAFT DIFFERENTIAL LEAK
FMC
1 DT3968 41,750 III 7.30 2.00 6.00 238855 N/A 1. REPAIR AUTOLUBE 25
TENTATIVE PLAN SERVICE Sunday, 26 May 2019
TOTAL EST. DOWNTIME
WORK ORDER Plan Action PS/Backlog/Sch.Maintenance/FUI
PS Start (hrs)
No C/N HM
TYPE Breakdown Washing & Washing & WR PARTS
DETAILS ACTIVITIES
BL & FUI BL & FUI WR APL PS IN DATE HPP
PS PS BACKLOG/FUI
1 EX2341 26,250 I 7.30 2.00 6.00 238795 C43102 1. REPLACE HOSE DISCHARGE AC 48
2 DR086 32,000 IV 7.30 6.00 2.00 238796 M42724 -33
3 DT4271 33,000 IV 7.30 4.00 2.00 238882 C43101 1. REPAIR AUTOLUBE 89
1. 238743 1. L42294 1. BREATHER FUEL TANK LOOSE
4 LD870 4,250 I 7.30 2.00 8.00 238918 2. 238744 F42913 2. B42542 2. BUMPSTOP REAR AXLE WORN -15
3. 238745 3. K43266 3. MUDGUARD SEAL TYRE NO 1 LOOSE
SB02
4 GR392 52,000 IV 7.30 6.00 3.00 238904 1. 238757 E42819 1. L42297 1. BRACKET AIR COMPRESSOR BROKEN -20
FMC
Catatan :
Form ini harus dibuat paling lambat pkl. 12.00 waktu setempat, Approved by, Prepared by,
1. kemudian ditandatangani oleh Dept. Head terkait & didistribusikan ke
masing-masing Dept. terkait Production Dept Head Plant Dept Head Planner
2. Pelaksanaan Daily Plant Meeting (Coordination) adalah jam 08:00-
10:00 waktu setempat
SB02
1 DT3994 42,500 II 25
2 DT4256 39,250 I 7.30 2.00 2.00 22
TENTATIVE PLAN SERVICE Tuesday, 28 May 2019
TOTAL EST. DOWNTIME
WORK ORDER Plan Action PS/Backlog/Sch.Maintenance/FUI
PS Start (hrs)
No C/N HM
TYPE Breakdown Washing & Washing & WR PARTS
DETAILS ACTIVITIES
BL & FUI BL & FUI WR APL PS IN DATE HPP
PS PS BACKLOG/FUI
1 EX1145 11,250 I 43
2 DZ1131 44,000 IV 91
1. 239095 1. J42119 1. BOLT COVER BAWAH CABIN LOST 2 PCS
2. 239096 2. E42811 2. BOLT FRONT LAMP LOST 1 PCS
3 DT4465 22,500 II 10.00 3. 239097 3. F42911 3. BOOT SIDE LAMP RH LH 49
4. 239098 4. L42303 4. HOSE B/C BESAR CRACK
5. 239099 5. K43273 5. HOSE STEERING TO DEMAND CRACK
4 DT4665 10,250 I 36
5 LD1031 2,750 III 45
SB02
1 DZ1071 53,500 II 11
2 DT3457 43,250 I 28
FMC
1 DT4017 43,000 IV 38
TENTATIVE PLAN SERVICE Wednesday, 29 May 2019
TOTAL EST. DOWNTIME
WORK ORDER Plan Action PS/Backlog/Sch.Maintenance/FUI
PS Start (hrs)
No C/N HM
TYPE Breakdown Washing & Washing & WR PARTS
DETAILS ACTIVITIES
BL & FUI BL & FUI WR APL PS IN DATE HPP
PS PS BACKLOG/FUI
1 EX1747 51,000 IV 20
2 DZ1075 51,000 IV 37
3 DT4658 10,250 I 46
4 DT2685 50,000 IV -19
5 GR386 51,250 I 9
6 LD1027 4,250 I 27
SB02