MATERIA PRIMA
COSTO COSTO
FECHA DESCRIPCION CANTIDAD UNIDAD UNITARIO TOTAL
Lana 25000 gr. S/. 0.09 S/. 2,150.00
Tinte 5000 gr. S/. 0.02 S/. 120.00
Fijador 2300 gr. S/. 0.07 S/. 161.00
Hilo 1000 m S/. 0.01 S/. 5.00
TOTAL MATERIA PRIMA; S/. 2,436.00
MANO DE OBRA
COSTO COSTO
SEMANA OPERARIOS T.TIEMPO HORAS UNITARIO TOTAL
Tejedoras 192 S/. 6.50 S/. 1,248.00
Bordadoras 96 S/. 6.50 S/. 624.00
Horas extras 8 S/. 8.13 S/. 65.04
TOTAL MANO DE OBRA; S/. 1,937.04
COSTO COSTO
CONCEPTO BASE DE DIST. FACTOR UNITARIO TOTAL
Suministros 32 0.01699888 S/. 27.74
Supervisor S/. 169.90
Acabados S/. 260.05
Otros gastos S/. 7.80
TOTAL COSTOS INDIRECTOS DE FABRICACIOÓN: S/. 465.49
RESUMEN