Summary of the Mineral Block

PART- A – GENERAL INFORMATION ABOUT GUDIPADU


LIMESTONE BLOCK

Features Details
1. Location
Mineral Block Gudipadu Lime Stone Block

Corner Points(Latitude, Longitude) 1) N 15° 06 '46.266" X E 77°58'34.94"


2) N 15° 06 '59.276" X E 77°57'54.883”
3) N 15° 07 '0.679" X E 77°58'24.231"
4) N 15° 07 '10.7" X E 77°57'56.394".

Villages Gudipadu Village


Tehsil/Taluka/Mandal Yadaki Mandal
District Ananthapuramu
State Andhra Pradesh
2. Area(hectares/Square kilometers)
Mineralized Area ( Explored) 40.816 Ha
Mineralized Area ( Un Explored) 0
3. Exploration
Status (G2/G3/G4etc.) G2
Exploration Agency Geological Survey of India & Department of
Mines and Geology, Andhra Pradesh.
Total Number of Bore holes with meterage 08
Bore hole Spacing(Density) Irregular Spacing
4. Quantity of Minerals(Grade-wise)
Mineral1,Mineral2,Mineral3…….Mineral Sl.No. CaO Tonnage
N Range/Grade
1
2 >36 -<40 1.46
3 >40 -<43 1.45
4 >43 -<46 10.65
5 >46 13.10
Total 26.66

Total Geological Resources(Reserves) 26.66 Million Tones of 45.285 CaO grade.


5. Mineralized Zones
Number of Mineral Zones Simple Bedded Sedimentary Deposit.
Trend(Dipand Strike) Regional Strike of Litho Units in NW-SE & Dips
are either towards NW or SE ranging from 30 to
60 .

Total Thickness Average thickness of Limestone is 28 mts.


6. Accessibility
Nearest Rail Head Tadipatri
Road Tadipatri Town is approachable through Penna
Cement Main Road.

Airport Bangalore
7. Hydrography
Local Surface Drainage Pattern(Channels) -

Rivers/Streams ------
8. Climate
Mean Annual Rainfall 500 to 600 mm
Temperatures(December) 20 to 25 0 C
Temperatures(June) 48 0 C
9. Topography
Topo Sheet Number 57 I/4
Morphology of the Area Small Plateau at a height of 50 mts above
general level.
PART B
PARTICULARS OF STATUTORY LICENSES, PERMITS, PERMISSIONS,
CONCESSIONS, APPROVALS AND CONSENTS RELATED TO MINING
OPERATIONS
Particulars Details/Status
1. Forest clearance Not Applicable

2. Wild life clearance(sanctuary, reservoir Not Applicable


special zone clearances)

3. Environmental clearance To be obtained by


Successful bidder

4. Consent to establish To be obtained by


Successful bidder

5. Explosive license To be obtained by


Successful bidder
6. Permission for mine opening To be obtained by
Successful bidder
7. Permission of installation/trial operation of To be obtained by
equipment Successful bidder
8. Groundwater clearance(Centre/State) To be obtained by
Successful bidder
9. Railway siding approval To be obtained by
Successful bidder
10. Approval for diesel storage To be obtained by
Successful bidder
11. Power line from State Discom To be obtained by
Successful bidder
12. Clearances relating to work under an Any one of the, to be
existing transmission line or shifting of the obtained by Successful
transmission line bidder
13. Grama Sabha consent To be obtained by
Successful bidder

PART C–PARTICULARS OF LAND

Area Details
1. Total Concession Area 40.816 Ha
2. Forest Land with Status Not involved
3. Government Land with Status 15.741 Ha
4. Private Land with Status 25.075 Ha
5. Revenue survey details of the area 79/A,82/P to 84/P,92,93,96/P to 98/P of Gudipadu