CHECK LIST FOR CONCRETING

Informed date of concreting: 2073/12/01

Scheduled date of Concreting: 2073/12/01

1. ALIGNMENT & LEVEL OF FORMWORK:


a. BEAM
b. COLUMN
c. SLAB EDGES: CENTRE OF SLAB:
d. Depth of slab after concreting: ..............mm
e. Depth of beam after concreting: ...............mm
f. Footing orientation:
2. Cover Block
a. Slab:
b. Beam:
c. Column:
d. Footing
3. Reinforcement:
a. Beam:
i. Lapping: As per drawing As per Detailing (IS13920)
ii. Extra Bar : As per drawing As per Detailing (IS13920)
iii. Development length As per Detailing (IS13920)
iv. Stirrups Spacing Hook Length, angle
v. Stirrups at beam column joint Yes No
b. Column
i. Lapping: As per drawing As per Detailing (IS13920)
ii. Development length As per Detailing (IS13920)
iii. Stirrups Spacing Hook Length, angle
iv. Stirrups at beam column joint Yes No
c. Slab
i. Bottom mesh As per drawing As per Detailing (IS13920)
ii. Top mesh : As per drawing As per Detailing (IS13920)
iii. chairs Spacing Height
iv. cantilever portion sufficient
d. Footing:
i. Bottom mesh As per drawing As per Detailing (IS13920)
ii. Top mesh if any: As per drawing As per Detailing (IS13920)
iii. Cloumn orientation:
iv. Depth at edge at face of column
4. Material quality
a. Sand
i. Grain size:
ii. Bulking:
iii. Silt contained:
iv. Wetness
b. Aggregates
i. Grain size:
ii. Shape of aggregate:
iii. Clay contained:
iv. Pebbles contained:
v. Wetness
c. Cement:
i. Fineness (by hand):
ii. Name of brand:
iii. Type of cement: OPC PPC
iv. Duration of Stock: ...................days
d. Reinforcement
i. Used size:
ii. Corrosion:
iii. Bar bend accuracy:
e. Formwork: Props Spacing Smoothness oiling

f. Water: Purity Turbidity

g. Admixture if any
i. Name of brand:
ii. Planned Volume:
iii. Setting time”
iv. Purpose:
5. Material Stock
a. Sand
b. Cement
c. Coarse Aggregate
d. Water
e. Admixture if any:
6. Machine at site
a. Mixture:
i. Nos:
ii. type
iii. Condition:
iv. Mixing per hour in cu.m.
b. Loader:
i. Nos:
ii. type
iii. Condition:
iv. Loading per hour in cu.m.
c. Concrete Pump
i. Nos:
ii. type
iii. Condition:
iv. Pumping per hour in cu.m.
d. Water Pump
i. Nos:
ii. type
iii. Condition:
iv. Pumping per hour in cu. m.
e. Vibrator
i. Nos:
ii. Needle size:
iii. type
iv. Condition:
f. Electricity condition during concreting: optional (if any)
7. Manpower at site during concreting (available only)
i. Skilled:
ii. Unskilled:
iii. Machine operator
iv. Machine Helper
v. Supervisors:
vi. Assistant sub-engineer
vii. Sub-Engineer
viii. Engineer:
ix. Site In charge:
8. Safety:
a. Safety Helmets
i. Available Nos:
ii. Used Nos:
b. Safety Globes
i. Available Nos:
ii. Used Nos:
c. Safety Boot
i. Available Nos:
ii. Used Nos:
d. Safety Jackets
i. Available Nos:
ii. Used Nos:
e. Safety Belts
i. Available Nos:
ii. Used Nos:

We hereby duly agree to proceed for the concreting work on the Site; Hotel Mechi Crown, Dhulabari,
Jhapa.

(...........................................) (...........................................) (...........................................)


Er. Chandrasen Chaudhary Mr. Dipendra kakshapati Er. Krishna Sapkota
Consultant Engineer Client’s Representative Project Manager
Hotel Mechi Crown Hotel Mechi Crown Construction
Construction Gauriparbati Nirman Sewa (P)
Architect’s Studio (P) Ltd. Ltd.
Company Seal: Company Seal: