N° DESCRIPCION DEL TRABAJO ESTADO DEL TRABAJO

1 CABEZAL DE LINEA DE POZOS MANIFOLD PAD 65 A LINEA DE FLUJO N2 TERMINADO


2 LINEA DE DESGACIFICACION DE TANQUES Y ANULAR TERMINADO
3 LINEA DE DESGACIFICACION DE ANULARES TERMINADO
4 BY PASS DE TRANFERENCIA 198 - LINEA BOMBAS BOOSER TERMINADO
5 BYPASS DE LINEA DE DESGACIFICACION DE TANQUE EMPERNADO TERMINADO
6 CAMBIO DE TRAMOS DE LINEA DE FLUJO DE ESS A ESC (ENCAMISADOS) TERMINADO
7 ESCALINATAS Y ACSESOS A NUEVAS FACILIDADES TERMINADO
8 REUBICACION DE LINEA DE SISTEMA CONTRA INCENDIOS TERMINADO
9 BYPASS DE LINEA DE DESGACIFICACION DE TANQUE EMPERNADO TERMINADO
10 BYPASS DE SEPARADOR DE GAS EN ESTACION DE GENERACION TERMINADO
11 CONSTRUCCION DE ESCAPES PARA TURBINAS DE GENERACION TERMINADO
12 CAMBIO DE VALVULA EN INYECTOR 30 TERMINADO
13 INTERCONEXION POZO 380 A 382 TERMINADO
14 INTERCONEXION POZO 306 A 307 TERMINADO
15 INTERCONEXION POZOS PAD 117 TERMINADO
16 CAMBIO DE TRAMOS POR BAJOS ESPESORES TERMINADO
21 INTERCONEXION DE POZOS 372 - 377 TERMINADO
22 CAMBIO DE TRAMOS POR BAJOS ESPESORES TERMINADO
23 INTERCONEXION DE ANULARES DE POZO TERMINADO
24 CAMBIO DE LINEA POR CORROSION NO INICIA
25 BY PASS DRENAJES SEPARADORES TERMINADO
26 INTERCONEXION DE LINEA DE GAS EN POZOS 268 AL 267 TERMINADO
27 BYPASS PARA INTERCOEXION DE POZO 361 TERMINADO
28 CAMBIO DE TRAMOS POR BAJOS ESPESORES TERMINADO
29 CAMBIO DE SPOOL FILTRO 4 POR INICIAR
30 ENCAMISADO DE LINEAS DE FLUJO DE DDV DE ESN1 A DDV SAC 59 TERMINADO
31 BYPASS DE BOMBA HPS NO INICIA
32 CAMBIO DE TRAMOS POR BAJOS ESPESORES TERMINADO
34 INSTALACION DE MALLA PERIMETRAL EN VARIADORES TERMINADO
35 CAMBIO DE SPOOL PARA TANQUE EMPERNADO EN ESN2 TERMINADO
37 CONEXIÓN DE DESCARGA DE POZOS PAD-65 TERMINADO
39 BYPASS DE LÍNEA DE FLUJO DE 6" A LÍNEA DE PRUEBA DE 4" TERMINADO
40 CAMBIO DE TRAMOS POR BAJOS ESPESORES PAD-150 TERMINADO
41 MODIFICACIÓN DESGASIFICACIÓN DE BOTAS TERMINADO
42 MODIFICACIÓN DE LÍNEA DE SUCCIÓN DE BOMBAS TERMINADO
44 INDEPENDIZACION DE LINEA DE DRENAJE DE MECHERO TERMINADO
45 INDEPENDIZACION DE LINEA DE ANULAR TERMINADO
46 LINEA DE DRENAJE DE MECHERO A SUMIDERO TERMINADO
47 CONSTRUCCION DE MECHERO (3 UNIDADES) TERMINADO
49 RETIRO DE MANGUERA PARA RECIRCULACION DE GAS TERMINADO
51 CONSTRUCCION DE ARAÑAS TERMINADO
52 CONSTRUCCION DE CAMISAS METALICAS PARA CRUCE DE VIAS TERMINADO
53 MODIFICACION DE MARCOS "H" PARA LINEA DE GAS TERMINADO
54 SOPORTE EN TRABAJOS DE ENCAMISADO TERMINADO
55 CONSTRUCCION DE PASARELA PARA FACILIDADES EN SEPARADORES TERMINADO
56 REPARACION DE PITTING CAMBIO DE VÁLVULAS TERMINADO
58 MONTAJE DE FILTRO STRAINER EN LA LINEA DE TRANSFERENCIA TERMINADO
59 MODIFICACION DE LINEAS DE ANULARES DE GAS TERMINADO
60 MODIFICACION DE SEPARADOR VERTICAL KOD EN EJECUCION
61 MODIFICACION DE CAMION GRUA TERMINADO
62 MODIFICACION DE CANASTA PARA MATERIALES DE BODEGA CENTRAL TERMINADO
63 MODIFICACION DE SCRUBBER POR INICIAR
64 REPARACION DE SISTEMA DE ESCAPE EN BOMBA #7 TERMINADO
65 MODIFICACIÓN DE MECHERO Y CONSTRUCCIÓN DE LINEA DE DRENAJE TERMINADO
67 CAMBIO DE VALVULA DE SEPARADOR #3 TERMINADO
68 COMPLETACIÓN DE ESPÁRRAGOS EN MANIFOLD DE ESS TERMINADO
69 COLOCACIÓN DE CASETA DE VÁLVULAS SAC 133 TERMINADO
70 CONSTRUCCION DE CUELLOS DE GANZO PARA PISCINAS API ESS TERMINADO
71 INSTALACIÓN DE AIRE ACONDICIONADO EN CUARTO DE CONTROL TERMINADO
72 CONSTRUCCIÓN DE PANTALLAS ANTI RUIDO PAD 390 TERMINADO
74 BYPASS PARA CAMBIO DE TRAMO PAD-149 POR INICIAR
75 REPARACION DE DE CALENTADORES DE ESC EN EJECUCION
76 CONSTRUCCION DE ARCOS TERMINADO
77 P&ID SEPARADOR PRUEBA 1 TERMINADO
78 P&ID SEPARADOR PRUEBA 2 TERMINADO
79 P&ID SEPARADOR PRODUCCION 1 TERMINADO
80 P&ID SEPARADOR PRODUCCION 2 NO INICIA
81 P&ID SEPARADOR PRODUCCION 3 NO INICIA
82 P&ID SEPARADOR PRODUCCION 4 NO INICIA
83 P&ID SEPARADOR PRODUCCION 5 NO INICIA
INSTRUCTIVO DE REGISTRO DE JUNTAS
LOCACION ISOMETRICO AS BUILT WELDING MAP CONSTRUCCION DIARIAS
PAD - 65 OK OK OK N/A OK
PAD - 65 OK OK OK N/A OK
PAD - 65 OK OK OK N/A OK
ESS OK OK OK N/A OK
ESS OK OK OK N/A OK
ESS N/A N/A N/A N/A N/A
PAD - 150 N/A N/A N/A N/A N/A
ESN2 OK OK OK OK OK
ESN2 OK OK OK N/A OK
ESN2 OK OK OK N/A OK
ESC N/A N/A N/A N/A N/A
ESC OK OK N/A N/A N/A
PAD - 380 OK OK N/A N/A N/A
PAD - 300 OK OK N/A N/A N/A
PAD - 117 OK OK N/A N/A N/A
PAD 199 OK OK OK N/A OK
PAD - 370 OK OK N/A N/A N/A
SAC 102 OK OK OK OK OK
PAD - 450 OK OK N/A N/A N/A
INY - 06 OK POR REALIZAR POR REALIZAR N/A POR REALIZAR
PAD - 198 OK OK OK N/A OK
PAD - 198 OK OK N/A N/A N/A
PAD - 360 OK OK OK N/A OK
PAD - 153 OK OK OK OK OK
ESN1 OK POR REALIZAR POR REALIZAR N/A POR REALIZAR
DDV ENS1 N/A N/A N/A N/A N/A
ESN1 OK POR REALIZAR POR REALIZAR N/A POR REALIZAR
SAC 87 OK OK OK OK OK
PAD - 98 N/A N/A N/A N/A N/A
ESN2 OK OK OK N/A OK
PAD - 65 OK OK N/A N/A N/A
PAD-300 OK OK OK N/A OK
PAD-150 OK OK OK OK OK
PAD-310 OK OK OK N/A OK
PAD-65 OK OK OK N/A OK
ESS OK OK OK N/A OK
PAD-270 OK OK OK N/A OK
PAD-270 OK OK OK N/A OK
ESC N/A N/A N/A N/A N/A
PAD-65 N/A N/A N/A N/A N/A
ESC N/A N/A N/A N/A N/A
PAD-150 N/A N/A N/A N/A N/A
PAD-310 N/A N/A N/A N/A N/A
PAD-158 N/A N/A N/A N/A N/A
PAD-198 N/A N/A N/A N/A N/A
ESN1 N/A N/A N/A N/A N/A
PAD-65 N/A N/A N/A N/A N/A
PAD-310 POR REALIZAR POR REALIZAR N/A N/A N/A
ESC N/A N/A N/A N/A N/A
ESC N/A N/A N/A N/A N/A
ESC N/A N/A N/A N/A N/A
ESC N/A N/A N/A N/A N/A
ESC N/A N/A N/A N/A N/A
PAD-150 OK OK N/A N/A N/A
ESS N/A N/A N/A N/A N/A
ESS N/A N/A N/A N/A N/A
SAC-133 N/A N/A N/A N/A N/A
ESS N/A N/A N/A N/A N/A
ESN1 N/A N/A N/A N/A N/A
PAD-390 N/A N/A N/A N/A N/A
PAD-310
ESC N/A N/A N/A N/A N/A
ESC N/A N/A N/A N/A N/A
ESN1 OK N/A N/A N/A N/A
ESN1 OK N/A N/A N/A N/A
ESN1 OK N/A N/A N/A N/A
ESN1 POR REALIZAR N/A N/A N/A N/A
ESN1 POR REALIZAR N/A N/A N/A N/A
ESN1 POR REALIZAR N/A N/A N/A N/A
ESN1 POR REALIZAR N/A N/A N/A N/A
REPORTE DE LIBERACION DE PRUEBA DE TUBERIA SOLDADURA Y E.N.D. POR APRIETE DE
NDT ISOMETRICOS ENTERRADA SISTEMA BRIDAS
REALIZADO OK N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
REALIZADO OK N/A N/A N/A
REALIZADO POR REALIZAR N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A OK N/A N/A N/A
REALIZADO POR REALIZAR N/A N/A N/A
REALIZADO POR REALIZAR N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
REALIZADO OK N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
PENDIENTE POR REALIZAR N/A N/A N/A
PENDIENTE POR REALIZAR N/A N/A N/A
N/A N/A N/A N/A N/A
PENDIENTE POR REALIZAR N/A N/A N/A
REALIZADO POR REALIZAR N/A N/A N/A
POR REALIZAR POR REALIZAR N/A N/A N/A
N/A N/A N/A N/A N/A
PENDIENTE POR REALIZAR N/A N/A N/A
OK OK N/A N/A N/A
N/A N/A N/A N/A N/A
N/A POR REALIZAR N/A N/A N/A
N/A N/A N/A N/A N/A
PENDIENTE POR REALIZAR N/A N/A N/A
OK OK N/A N/A N/A
N/A POR REALIZAR N/A N/A N/A
PENDIENTE POR REALIZAR N/A N/A N/A
N/A OK N/A N/A N/A
N/A OK N/A N/A N/A
N/A OK N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A OK N/A OK OK
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A


N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
LIMPIEZA DE TUBERIA DE LIMPIEZA DE TUBERIA DE PLAN DE PRUEBA DE REPORTE DE PRUEBAS DE
PROCESO PROCESOS PRESION DE TUBERIA PRESION DE TUBERIA
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
OK OK OK OK
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A

N/A N/A N/A N/A


N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
SOPLADO Y LIMPIEZA DE VERIFICACION Y APRIETE DE PREPARACION DE SUPERFICIE Y
TUBERIAS ACEPTACION DE LINEAS BRIDAS APLICACIÓN DE PINTURA
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
OK OK OK OK
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A

N/A N/A N/A N/A


N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
REVESTIMIENTO EN CINTA PARA LISTA DE VERIFICACION DE INSPECCION A LA
TUBERIA ENTERRADA RECUBRIMIENTO INTERNO EXTERNO RECEPCION DE PINTURA
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
OK OK OK
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A

N/A N/A N/A


N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
CONCILIACION DE
MATERIALES
OK
OK
OK
POR REALIZAR FALTA INFORME SINDES END, POR FALTA DE PAGO
OK FALTA INFORME SINDES END, POR FALTA DE PAGO
OK
OK PARA FIRMA EDISON, ING. BALDEON
OK PARA FIRMA EDISON, ING. BALDEON
OK PARA FIRMA EDISON, ING. BALDEON
OK
OK
OK
OK
OK
OK
OK FALTA INFORME SINDES END, POR FALTA DE PAGO
OK PARA FIRMA EDISON, ING. BALDEON
N/A
OK PARA FIRMA EDISON, ING. BALDEON
NO INICIA
OK
VERIFICAR SI HAY MATERIALES DE BODEGA FIC TALLER
OK
OK
OK
NO INICIA
POR REALIZAR
NO INICIA
OK
OK
OK
POR REALIZAR
HECHO
OK
OK
POR REALIZAR
OK
OK FALTA LEGALIZAR OT Y SOLICITAR 4 MATERIALES
OK FALTA LEGALIZAR OT Y SOLICITAR 4 MATERIALES
POR REALIZAR PEDIR SOLICITUDES DE MATERIALES DE BODEGA
POR REALIZAR
POR REALIZAR PEDIR SOLICITUDES DE MATERIALES DE BODEGA
POR REALIZAR PEDIR SOLICITUDES DE MATERIALES DE BODEGA
OK
N/A
POR REALIZAR PEDIR SOLICITUDES DE MATERIALES DE BODEGA
OK
POR REALIZAR
OK
POR REALIZAR
N/A
N/A
POR REALIZAR
POR REALIZAR
OK PARA FIRMA EDISON, ING. BALDEON
OK
OK
OK
OK
OK
OK

OTQ-009
POR REALIZAR
N/A
N/A
N/A
N/A
N/A
N/A
N/A
TOTAL OK (FIRMADAS)
73 22
100 30.14%

RED LINES
TOTAL OK
73 69
100 94.52

REGISTRO DE SOLDADURA
TOTAL OK
73 67
100 91.78
100 72.60
CONCILIACIONES
HECHAS POR REALIZAR NO TERMINA EL TRABAJO
(PARA REVISIÓN)
13 28 10
17.81% 38.36% 13.69%

RED LINES
POR REALIZAR
4
5.48 %

REGISTRO DE SOLDADURA
POR REALIZAR
6
8.22 %
27.40 %
%
100.00%