SECTION 1 - CONSTRUCTION PRELIMINARIES

CODE
ITEM DESCRIPTION UNIT QTY
NO

1.1 A100 CONTRACTUAL REQUIREMENTS

Bond
1.1.1 A111 Performance Bond in the Form of Bankers/Insurance Guarantee or Sum
Performance Guarantee Sum All in Accordance with the Conditons of
Contract.

Insurances
1.1.2 A121 Insurance of the Works Sum

1.1.3 A122 SOCSO/Workmen Compensation Insurance Sum

Statutory Obligations
1.1.4 A131 CIDB Levy Sum

1.2 A200 SO'S REQUIREMENTS


Facitilities for the SO's representative. Rate shall be deemed to
include the provision of water supply, electricity, and communication
facilities.

1.2.1 A211 Establishment and removal of office at km83.9 (with a floor area of Sum
minimum 90 m2 as per Fig. 1.2, 1.3 & 1.4 of the General Specification
for Slope Works).

1.2.2 A212 Establishment of site cabin office at km83.90. sum

1.2.3 A213 Maintain office for duration of contract period; time-related charge. mth 18

Equipment for Use by the So's Representative


1.2.4 A221 Establishment and removal of office equipment (with type and quantity sum
as per Standard Specification. For Road Works. Equipment to be
reverted to the Contractor after completion).

1.2.5 A222 Maintenance of office equipment. mth 18

1.2.6 A225 Surveying equipment (with type and quantity as per Appendix 1E of the sum
Specification. Equipment to be reverted to the Contractor after
completion).

1.2.7 A226 Maintenance of survey equipment. mth

B1/1
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN P
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

SECTION 1 - CONSTRUCTION PRELIMINARIES

CODE
ITEM DESCRIPTION UNIT QTY
NO
Services for the So's Representative
1.2.8 A231.2 Provision of transport vehicle Type B as per JKR Standard of nr 1
Specification for Road Works. Vehicle to be revered to the Contractor
after completion.

Carried Forward
Brought Forward

1.2.9 A232.2 Maintenance of vehicle (1 no. of Type B) mth 18

1.2.10 A233 Provision of Desktop including power supply backup an computer nr 1


accessories (and to be reverted to the Contractor after completion).

1.2.11 A235 Provision of Printer up to A3 size (and to be reverted to the Contractor nr 1


after completion).

Miscellaneous
1.2.12 A261 Progress report (in five sets). Rate to include progress photographs. mth 18

1.2.13 A262 Project signboard (As per JKR Standard Specification for Road Works). nr 1

1.2.14 A263 As-built drawings (Rate Inclusive of Digital Format in CD Rom). Sum

1.2.15 A265 Temporary fencing, hoarding. (Rate to include gates, barriers, security Sum
watching, lighting and dismantle upon completion of Work).

1.2.16 A291 Provision of Rain gauges and monitoring records for the duration of the nr 1
works.

1.2.17 A292 Supply and install slope reference marker as per S.O's direction. nr 1

1.2.18 A293 Supply and install boundary marker as per S.O.'s direction. nr

B1/2
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN P
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

SECTION 1 - CONSTRUCTION PRELIMINARIES

CODE
ITEM DESCRIPTION UNIT QTY
NO
1.30 A300 PROJECT REQUIREMENTS
1.3.1 A310 Survey and setting out (by approved site surveyor/Setting-out sum
Engineer).

Quality Assurance/Quality Control (QA/QC)


1.3.2 A321 QA/QC Plan (as per latest JKR Standard QA/QC requirements). sum

Carried Forward
Brought Forward

1.3.3 A322 Testing of materials (concrete test cubes, samples and method of testing
as per latest BS/MS Specification).

Asplantic Concrete (Wearing Course)


1.3.4 A322.1 Design Mix nr 1
1.3.5 A322.2 Bitumen Extraction nr 2
1.3.6 A322.3 Gradation Analysis nr 2
1.3.7 A322.4 Marshall Stability nr 2
1.3.8 A322.5 Thickness & Density Test nr 6

Asplantic Concrete (Binder Course)

B1/3
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN P
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

SECTION 1 - CONSTRUCTION PRELIMINARIES

CODE
ITEM DESCRIPTION UNIT QTY
NO
1.3.9 A322.6 Design Mix nr 1
1.3.10 A322.7 Bitumen Extraction nr 2
1.3.11 A322.8 Gradation Analysis nr 2
1.3.12 A322.9 Marshall Stability nr 2
1.3.13 A322.10 Thickness & Density Test nr 6

Crushed Aggregate Roadbase


1.3.14 A322.11 Atterberg Limit and Plasticity Index nr 3
1.3.15 A322.12 Gradation Analysis nr 3
1.3.16 A322.13 Laboratory Compaction nr 1
1.3.17 A322.14 Flakiness Index nr 3
1.3.18 A322.15 Los Angelas Abrasion nr 3
1.3.19 A322.16 California Bearing Ratio (CBR) nr 3
1.3.20 A322.17 Crushing Value nr 3
1.3.21 A322.18 Sodium Sulphate Soundness test nr 3
1.3.22 A322.19 Field Density (Compaction Control) nr 3

Subbase
1.3.23 A322.20 Atterberg Limit and Plasticity Index nr 3
1.3.24 A322.21 Gradation Analysis nr 3
1.3.25 A322.22 Laboratory Compaction nr 3
1.3.26 A322.23 Flakiness Index nr 3
1.3.27 A322.24 Los Angelas Abrasion nr 3
1.3.28 A322.25 California Bearing Ratio (CBR) nr 3
1.3.29 A322.26 Crushing Value nr 3
1.3.30 A322.27 Sodium Sulphate Soundness test nr 3
1.3.31 A322.28 Field Density (Compaction Control) nr 3

Earthwork
1.3.32 A322.29 Swelling and shringkage limit nr 20
1.3.33 A322.30 Atterberg Limit and Plasticity Index nr 20
1.3.34 A322.31 Gradation Analysis nr 20
1.3.35 A322.32 Soil Type nr 20
1.3.36 A322.33 Laboratory Compaction nr 5
1.3.37 A322.34 California Bearing Ratio (CBR) nr 3
1.3.38 A322.35 Field Density (Compaction Control) nr 45

B1/4
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN P
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

SECTION 1 - CONSTRUCTION PRELIMINARIES

CODE
ITEM DESCRIPTION UNIT QTY
NO
Carried Forward
Brought Forward

Quality Assurance/Quality Control (QA/QC) - (Con't/d…)

Concrete (Coarse aggregate)


1.3.39 A322.39 Gradation Analysis nr 40
1.3.40 A322.40 Flakiness and Elongation nr 20
1.3.41 A322.41 Specific Gravity and Water Absorption nr 20
1.3.42 A322.42 Crushing Value nr 20
1.3.43 A322.43 Sodioum Sulphate Soundness nr 2
1.3.44 A322.44 Sulphate Content nr 2

Concrete (Fine aggregates)


1.3.45 A322.45 Gradation Analysis nr 40
1.3.46 A322.46 Clay, Silt and Dust Content nr 40
1.3.47 A322.47 Organic Impurities nr 30

Concrete
1.3.48 A322.48 Cube Compressive Strength nr 1,675
1.3.49 A322.49 Slump Test nr 1,116

Reinforcement
1.3.50 A322.50 Tensile Test nr 2
1.3.51 A322.51 Elongation Test nr 2

1.3.52 A326 Installation of rain gauges and monitoring records for the duration of nr 1
the works

1.3.53 A350 Clearance of site upon completion Sum

1.40 A400 AUTHORITIES'S REQUIREMENTS


Occupational Safety and Health Requirements
1.4.1 A411 Health and safety plan sum
1.4.2 A412 Occupational Safety and Health officer man-mth 18
1.4.3 A413 Personnel protective equipment sum
1.4.4 A414 Health and safety report nr 18
1.4.5 A416 Safety signates sum

1.50 A500 CONTRACTOR'S REQUIREMENTS


Facilities

B1/5
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN P
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

SECTION 1 - CONSTRUCTION PRELIMINARIES

CODE
ITEM DESCRIPTION UNIT QTY
NO
Item shall be deemed to include the provision of water supply,
electricity, and sanitary facilities and their continuing operation and/or
maintenance.

1.5.1 A511.1 Set up offices (minimum built-up area of 60 m2) and remove upon sum
completion; fixed charge.

1.5.2 A511.2 Maintain office for duration of contract period; time-related charge. month 18

1.5.3 A512.1 Provision of office equipment and remove upon completion; fixed sum
charge.

Carried Forward
Brought Forward

Facilities - (Con't/d…)

1.5.4 A515.1 Set up stores and remove upon completion; fixed charge sum

1.5.5 A515.2 Maintain store for duration of contract period; time-related charge. month 18

1.5.6 A517.1 Set up workmen accommodation and remove upon completion; fixed sum
charge.

1.5.7 A517.2 Maintain workmen accommodation for duration of contract period; month 18
time-related charge.

Site Management
1.5.8 A540 Mobilisation and demobilisation. (Rate to include all plants, tools, sum
equipments, personnel and everything else necessary for the completion
of the Works (except bore piling machine and anchoring machine which
shall be measured separately).

B1/6
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN P
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

SECTION 1 - CONSTRUCTION PRELIMINARIES

CODE
ITEM DESCRIPTION UNIT QTY
NO

Total Carried to Grand Summary

B1/7
TA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
M83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

80,000.00

75,000.00

14,500.00

15,000.00

30,000.00

Nil

500.00 9,000.00

50,000.00

500.00 9,000.00

58,750.00

B1/8
TA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
M83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

90,000.00 90,000.00

431,250.00
431,250.00

1,500.00 27,000.00

5,000.00 5,000.00

3,500.00 3,500.00

150.00 2,700.00

3,500.00 3,500.00

30,000.00

10,000.00

1,200.00 1,200.00

300.00 300.00

B1/9
TA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
M83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

30,000.00

2,000.00

546,450.00
546,450.00

100.00 100.00
100.00 200.00
50.00 100.00
150.00 300.00
50.00 300.00

B1/10
TA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
M83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)
100.00 100.00
100.00 200.00
50.00 100.00
150.00 300.00
50.00 300.00

35.00 105.00
50.00 150.00
150.00 150.00
50.00 150.00
50.00 150.00
150.00 450.00
100.00 300.00
210.00 630.00
50.00 150.00

35.00 105.00
50.00 150.00
150.00 450.00
50.00 150.00
50.00 150.00
150.00 450.00
100.00 300.00
210.00 630.00
50.00 150.00

50.00 1,000.00
50.00 1,000.00
50.00 1,000.00
50.00 1,000.00
150.00 750.00
150.00 450.00
50.00 2,250.00

B1/11
TA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
M83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)
560,670.00
560,670.00

50.00 2,000.00
50.00 1,000.00
50.00 1,000.00
50.00 1,000.00
50.00 100.00
50.00 100.00

50.00 2,000.00
50.00 2,000.00
50.00 1,500.00

50.00 83,750.00
50.00 55,800.00

150.00 300.00
150.00 300.00

1,000.00 1,000.00

10,000.00

2,000.00
5,000.00 90,000.00
20,000.00
150.00 2,700.00
5,000.00

B1/12
TA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
M83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

30,000.00

1,000.00 18,000.00

15,000.00

905,220.00
905,220.00

10,000.00

300.00 5,400.00

10,000.00

300.00 5,400.00

80,000.00

B1/13
TA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
M83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

1,016,020.00

B1/14
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN P
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Appendix 1E

CODE
ITEM DESCRIPTION UNIT QTY
NO

Supply, deliver and maintain the instrument as listed below for the
use of the S.O / S.O.R for the purpose of confirmatory checks on
the setting-out works and for all other applicable joint
measurements. These instruments and accessories shall became the
property of the Government at the completion of the whole of the
contract works.

1.1 Total Station model TOPCON Electronic Total Station GPT-7500 series Set 1
with 1" accuracy or equivalent; complete with 1 set Prism Target
System consist of Single prism, Single Prism Tilting Holder c/w Target
Plate, Tribrach Adaptor, Tribrach, Carrying case and Heavy Duty
Aluminum Tripod.

1.2 Automatic level model TOPCON Automatic Level ATG-6GL/X or Set 1


equivalent complete with 1 no. Heavy Duty Aluminum Tripod and 1 no.
of Aluminum Leveling Staff-5m"mm"

1.3 Single titling prism complete with co-axial target No. 2

1.4 Waugh Tools DigiWheel measurement counter. No. 1

1.5 5m long aluminum leveling staff No. 2

1.6 5m steel box tapes, white face No. 5

1.7 30m steel box tapes, white face No. 1

1.8 30m fiberglass box tapes No. 1

1.9 2.5m ranging rods No. 10

1.10 1m spirit level, steel or sluminum No. 1

1.11 Large sruvey umbrellas No. 1

Appendix 1E/15
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN P
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Appendix 1E

CODE
ITEM DESCRIPTION UNIT QTY
NO

Total Carried Forward to Bill No. 1 (Item 1.2.6)

Appendix 1E/16
TA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
M83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

48,000.00 48,000.00

2,000.00 2,000.00

1,500.00 3,000.00

1,000.00 1,000.00

300.00 600.00

100.00 500.00

300.00 300.00

250.00 250.00

250.00 2,500.00

250.00 250.00

350.00 350.00

Appendix 1E/17
TA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
M83.90 DAN KM96.70, SABAH

RATE AMOUNT

58,750.00

Appendix 1E/18
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

SLOPE AT KM83.90
Bill No. 2.1 - CLEARING, EARTHWORKS AND TURFING
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

Items for demolition and site clearance shall be deemed to include


disposal of the materials arising.

E100 GENERAL CLEARANCE


Above Ground
2.1.1 E110.1 General clearance to (Primary forest). Rate to include the removal of ha 2.2
trees and stumps, undergrowth, shrubs, roots, and the likes. (All trees of
0.5m girth and above shall become the property of the Employer).

E400 STRUCTURES
2.1.2 E490 Gabion Wall
Demolition and removal of existing 3m high, 80m long gabion wall sum
structures.

F100 EXCAVATION

Cut to Fill (Concrete Access Road/Ramp and Gravel Access Road)


Excavation in cut shall be deemed to include trimming and preparation
of excavated surface and transportation from source to place of fill or
disposal.

2.1.3 F121.1 Excavate in earth material from original ground level to formation level m3 380
of access road at hillside

2.1.4 F121.2 Ditto from original ground level to stockpile site (approximately 1km) m3 380
approved by the Engineer/S.O./P.D.

Cut and Dispose (Sabo Dam and Gabion wall)


Excavation in cut shall be deemed to include trimming and peparation
of excavated surface and transportation from source to place of fill or
disposal.

2.1.5 F1311 Excavate in earth material from original ground elvel to formation level m3 4,140
of Sabo and Gabion, to disposal site approved by the Engineer/S.O./P.D.

B2/19
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

2.1.6 F132 Excavate in natural hard material by ripper unit from original ground m3 1,000
level to formation level of Sabo dam, to disposal site approved by the
Engineer/S.O./P.D.

2.1.7 F134 Excavate in rock by hydraulic rock breaker, from original ground level m3 200
to formation level of Sabo dam, to disposal site approved by the
Engineer/S.O./P.D.

Carried Forward
SLOPE AT KM83.90
Bill No. 2.1 - CLEARING, EARTHWORKS AND TURFING
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

F300 FILLING
General (Gabion and Sump)
2.1.8 F311 Using suitable excavated material to grading limits (as per JKR m3 300
Standard Specification for Road Works clause (2.2.1)) from stock pile.

2.1.9 F312 Imported material from borrow pit with grading limits (as per JKR m3 1,218
Standard Specification for Road Works clause 2.2.1)).

Embankments (at Access Road / Ramp)


2.1.10 F321 Using suitable excavated material to grading limits (as per JKR m3 300
Standard Specification for Road Works clause (2.2.1) or otherwise
indicated in the drawing) to form embankment. Rate to include
formation of benches.

Replacement (at Sabo Dam Structure)


2.1.11 F331 Replace unsuitable material using excavated material. m3 100

2.1.12 F332 Replace unsuitable material using imported material from Contractor's m3 100
own source.

B2/20
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

2.1.13 F340.2 Filling behing retaining wall or other structures using imported material m3 350
from Contractor's own source. Rate including grading and compacting
to levels, dimension and elevation.

F500 LANDSCAPING

Items for landscaping shall be deemed to include digging, planting


media, bedding, stalking, protection, watering, weeding, required
fertilising, and replacement of dead item until the vegetation is
established.

2.1.14 F510.1 Close turfing to flat areas. m2 100

2.1.15 F510.2 Close turfing to slopes. Rate to include pegging down with stakes. m2 2,000

Total Carried to Grand Summary :


SLOPE AT KM83.90
Bill No. 2.2 - SURFACE DRAINAGE
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

P100 DRAIN EXCAVATION


Drain excavation shall be deemed to include preparation of surfaces,
double handling, disposal of surplus excavated material, upholding
sides of excavation, allowance for joints, backfilling, and removal of
dead services and reinstatement of Original Surface unless

B2/21
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Cast insitu reinforced concrete drain/cascade drain/toe


drain/culverts/sumps as shown in Drawing No.
(SARG/JKR/SLP/R83.9/06 & 07).

2.2.1 P111.1 In earth for (450mm cast insitu reinforced concrete drain), depth not m 50
exceeding 1.5m.

2.2.2 P111.2 In earth for (750mm cast insitu reinforced concrete drain), depth not m 220
exceeding 1.5m.

Extras to Culvert Excavation


2.2.3 P121 Roads and pavement, rate to include road cutting and reinstatement. m2 80

2.2.4 P131.5 In earth for inlet and outlet structures to (1750mm x 1750mm) cast m3 10
insitu reinforced concrete sump.

P200 SURFACE DRAINS


2.2.5 P230.1 Roadside drain; 450mm wide cast insitu reinforced concrete U-shaped m 166
drain with average 450mm high; (100mm) wall thickness.

2.2.6 P230.2 Roadside drain; 750mm wide cast insitu reinforced concrete U-shaped m 220
drainwith average 600mm high; (125mm) wall thickness. (along gabion
wall).

2.2.7 P250.5 Discharge/outlet drain; 1500mm wide cast insitu reinforced concrete U- m 20
shaped drain with average 1000mm high and with dry weather flow;
(175mm) wall thickness. Rate including precast concrete struts
(1500mm x 125mm x 125mm) at 1.5m c/c for drain invert >1m.

B2/22
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Carried Forward
SLOPE AT KM83.90
Bill No. 2.2 - SURFACE DRAINAGE
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

P200 SURFACE DRAINS - (Con't/d…)

2.2.8 P260.1 Cascade drains; cast insitu reinforced concrete U-shaped drain; 450mm m 10
wide along toe of retaining wall; (100mm) wall thickness.

2.2.9 P260.6 Cascade drains; cast insitu reinforced concrete U-shaped drain; 150mm m 10
wwide at berms.

P600 CULVERTS
Items for culverts shall be deemed to include all joints, water stop,
shuttering, struts, concrete base, and concrete surround unless otherwise
stated.
2.2.10 P611.2 (900mm)diameter single precast concrete pipe culvert, Class (Z/H) in m 8
standard length of 1m.

B2/23
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM83.90
Bill No. 2.3 - CONCRETE WORK
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

I100 IN SITU CONCRETE DESIGN MIX


Rate for in situ concrete designed mix shall be deemed to include
placing and compaction of concrete.

Grade C15 Concrete


2.3.1 I111 Mass concrete blinding, (50mm) thick (to ground slab along toe, top & m2 250
sides of r.c. structures).

Grade: C30
2.3.2 PI44.2 Reinforced concrete slab to (gabion wall). m3 122

2.3.3 I147 Other concrete forms, reinforced concrete to (Sabo Structures, R.C m3 770
Culvert and Access Road).

I400 FORMWORK
Rate for formwork shall be deemed to include the projections and
instrusions and any temporary staging required.
Sides
2.3.4 I414 F2: fair finish to (gabion wall). m2 150

Sides and Soffit


2.3.5 I433.1 F2: fair finish to (R.C Culvert, Wing wall and Inlet sump). m2 350

B2/24
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

2.3.6 I433.2 F2: fair finish to (Sabo structures). m2 680

I500 REINFORCEMENT
Rate for reinforcement shall be deemed to include labour for cutting,
bending, and placing.

Mild Steel Bars


2.3.7 I512 Nominal diameter: 10mm t 6

High Tensile Bars


2.3.8 I522 Nominal diameter: 10mm t 4

2.3.9 I523 Nominal diameter: 16mm t 11

Reinforcing Bars of Other Stated Material


2.3.10 I550.2 High tensile steel fabric - mesh A252 (A8), 3.95 kg/m2 m2 670

I600 CONCRETE ANCILLARIES


Joints
Rate for joints shall be deemed to include formwork.

2.3.11 I613 Expansion joints, (350mm deep)to r.c. slabs. Rate to include 25mm m 60
thick resin bonded cork filler.

Total Carried to Grand Summary :


SLOPE AT KM83.90
Bill No. 2.4 - ROAD PAVEMENT AND ROAD FURNITURES
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

Q200 SUB-BASE
Sub-base shall be deemed to include chamfer.

2.4.1 Q220.1 Granular material with a (CBR value of more than 30, complying with m2 1,900
Type C) of Standard Specification for Road Works clause (4.1.2.2) in
(300mm) thick. (Including diversion road and access road (40m length)
for future maintenance of Sabo Structure).

B2/25
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

2.4.2 Q220.2 Granular material with a (CBR value of more than 30 complying with m2 30
Type C) of Standard Specification for Road Works clause (4.1.2.2) in
(300mm) thick to road.

Q300 ROADBASE
Roadbase shall be deemed to include chamfer.

2.4.3 Q310 Removal of flexible surfaces. Rate to include scarifying the existing m2 150
roadbase before receiving the new roadbase material.

2.4.4 Q330.1 Crushed aggegates with a (CBR value of more than 80, complying with m2 150
Type II) of Standard Specification for Road Works clause (4.1.4.2) in
(400mm) thick.

Q400 ROAD SHOULDER


Earth shoulders shall be deemed to include verge.

2.4.5 Q420 Gravel shoulder as per Standard Specification for Road Works clauses m2 120
(4.3.2.2 & 4.1.3.2) in (300mm) thick.

Q500 SURFACING
2.4.6 Q5101.1 Removing of flexible surface. Rate to include scarifying the existing m2 120
exposed surface.

2.4.7 Q530 Tack coat to be applied at a rate of (0.5 litre per square metre)as per m2 120
Standard Specification for Road Works clauses (4.2.2).

2.4.8 Q540 Prime coat to be applied at a rate of (0.35 litres per square metre)as per m2 120
Standard Specification for Road Works clauses (4.2.1).

Asphaltic Concrete
2.4.9 Q561 Binder course - ACB28, (50mm) thick as per Standard Specification for m2 120
Road Works clauses (4.2.4).

2.4.10 Q562 Wearing course - ACW20, (50mm) thick as per Standard Specification m2 120
for Road Works clauses (4.2.4)

B2/26
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Carried Forward
SLOPE AT KM83.90
Bill No. 2.4 - ROAD PAVEMENT AND ROAD FURNITURES
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

Q800 ROAD FURNITURE

Pavement Markings
Pavement markings shall generally be hot-applied superimposed
reflectorised thermoplastic (with Class "A" Solid Glass Beads to
BS6088) and in according with JKR Arahan Teknik (Jalan) 2D/85.

2.4.11 Q822.1 (100mm) wide continuous line (centre line) m 80

2.4.12 Q822.3 (150mm) wide continuous line (edge line) m 120

Traffic Barrier

2.4.13 Q843.1 (Single mounted corrugated steel beam) guardrail (with post at 2m m 20
spacing inclusive of delineators). Rate to include bolts, nuts, posts, and
other ancillary work.

2.4.14 Q844.1 Guardrail end (Wing Unit 'Type I'). Rate to include bolts, nuts, posts, nr 1
and other ancillary works.

2.4.15 Q8944.2 Guardrail end (Anchorage Unit "Type 2" terminal treatment). Rate to nr 1
include bolts, nuts, posts and other ancillary work.

B2/27
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM83.90
Bill No. 2.5 - SUBSURFACE DRAINAGE
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

Drainage Layer Beneath New Fill / behind Retaining Wall

P300 SUBSURFACE DRAINS

P300.0 FILLING

The following items for filling shall include compaction, and additional
filling necessitated by settlement or penetration into underlying material
as applicable.

Replacement

2.5.1 P334.0 Other stated material - granular material (37.5mm - 75mm clean crushed m3 100
aggregates) as per Specification to form drainage blanket behind
retaining gabion wall.

Horizontal Drain
Rate for horizontal drain shall be deemed to include drilling, filter
fabric, netting and perforated pipe.

(100mm) diameter horizontal drain hole with (75mm) diameter PVC


(Class D) perforated pipe as shown in Drawing No.
(SARG/JKR/SLP/R83.9/05)

B2/28
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

2.5.2 G351 In earth, through each gunite panel of retaining wall at 1m vertical m 50
intervals.

Total Carried to Grand Summary :


SLOPE AT KM83.90
Bill No. 2.6 - METAL WORK (BOOM GATE)
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

L200 MISCELLANEOUS METAL WORK

Item for miscellaneous metal work shall be deemed to include fixing to


other work, supply of fixing components, and drilling or cutting of other
work.

(1000mm) high boom gate as shown in Drawing No.


(SARG/JKR/SLP/R83.9/06).

B2/29
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

2.6.1 L240.2 Galvanised mild steel boom gate of 25mm diameter tubular section of nr 1
3.2mm thickness and 1100mm high with fixing accessories as shown on
the drawing.

Total Carried to Grand Summary :

B2/30
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

SLOPE AT KM83.90
Bill No. 2.7 - MICRO PILES
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

H100 PLANT AND EQUIPMENT

2.7.1 H110 Provision of all necessary piling plant and equipment, transportation to Sum
the Site, handling, assembling, and removal off the Site after completion
of operation.

2.7.2 H120 Moving and handling of all piling plant and equipment within the Site Sum
and from location to location as often as is, and whenever necessary for
the execution of the whole piling operation.

H200 PILES
Items for piling work shall be deemed to include piling records and
disposal of excavated and surplus materials.

Micropiles
(200mm) diameter micropiles as working piles.
2.7.3 H242.2 Boring through rock, up to (10m) for 66 nos. of pile points. Rate to m 450
include natural and articifial hard material.

2.7.4 H243 Supply and install (127mm OD x 9mm thick Grade N-80 API pipe). m 450

2.7.5 H245 High tensile reinforcement straight bars, nominal diameter exceeding t 9
20mm. Rate to include supporting reinforcement.

2.7.6 H247 Grouting with non-shrink cement grout Grade (C30) as specified into m3 15
drilled hole. Rate shall include excess cement required when the grout
volume exceeded the throretical volume.

B2/31
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM83.90
Bill No. 2.8 - GROUTED STONE PITCHING, GABION AND RENO MATTRESS
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

G200 RETAINING STRUCTURES

Gabion
2.8.1 G211.1 (1.0m x 1.0m x1.0m) rock-filled gabion with PVC-coated wire gauge m3 1,200
size of (2.7mm) as per Specification and as shown in the drawings.
Rates for RC slabs and geotextiles shall be included

2.8.2 G212 Rock-filled gabion mattress, (300mm) thick with PVC coated wire m2 24
gauge size of (2.2mm); and 260g per m2 zinc coating mesh size, 6cm x
8cm as per Specification and as shown in drawings.

2.8.3 G213 (Continuous UV-stabilized polypropylene filament, nonwoven) m2 2,250


geotextile as drainage and separator with effective opening size 0.09mm
(lor open area <4%) as per Specification.

G400 SURFACE PROTECTION


2.8.4 G440 (250mm) thick stone pitching as per Specification. m2 100

B2/32
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM83.90
Bill No. 2.9 - GEOTECHNICAL INSTRUMENTATION
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

D100 MOBILISATION AND DEMOBILISATION

Rate shall be deemed to include provision of all plant and equipment,


transportation to the Site, including transfer between different locations
within the Site, handling, assembling and removal off the Site after
completion of operation.

2.9.1 D110 Deep Boring of borehole to (1no.) of standpipe piezometer. Sum

B2/33
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM83.90

B2/34
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Bill No. 2.10 - GUNITING


(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

F100 EXCAVATION

Cut and Dispose, Excavation between Boredpiles Vertical face

Excavation in cut shall be deemed to include trimming and preparation


of excavated surface and transportation from source to place of fill or
disposal.

G400 SURFACE PROTECTION


2.10.1 G410.1 (100mm) thick (G25) guniting to cut slope. Rate shall be deemed to m2 120
include steel fabric mesh, PVC drain pipe, dowel bar, and filter material
as shown in Drawing No. (SARG/JKR/SLP/R83.9/05).

I500 REINFORCEMENT
Rate for reinforcement shall be deemed to include labour for cutting,
bending, and placing.

High Tensile Bars

2.10.2 I524 Nominal diameter: 16mm t 25

B2/35
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM83.90
Bill No. 2.11 - TRAFFIC MANAGEMENT
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

C100 TRAFFIC MANAGEMENT PLAN


Traffic Management Team
2.11.1 C134 Traffic controller. (Flagmen - 2 persons) man-mth 12

C200 TEMPORARY ROAD FURNITURE


Items for temporary road furniture shall be deemed to include the
supply, installation, maintenance, and removal upon completion.

The supply of temporary road furniture shall be deemed to include base


preparation, cost of materials, fabrication, and fixing including posts,
struts, bolths and nuts, base, storage, and transportation.

Installation of temporary road furniture shall be deemed to include cost


for multiple shifting within the contractual boundaries and its vicinities
that is affected by the traffic management plan.

Temporary road furniture shall be deemed to include cost for the


inspection, immediate repair and replacement of any damaged, missing
or stolen items throughout the duration of the construction, and removal
upon completion.

Temporary Traffic Signs


Temporary Traffic Signs shall be in accordance with JKR Arahan
Teknik (Jalan) 2C/85.

B2/36
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

2.11.2 C211.1 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 2


sheeting for (T.1 - 'ROAD WORKS' sign)

2.11.3 C211.2 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 2


sheeting for (T.12 - 'DANGER' sign - with 'AWAS')

2.11.4 C211.3 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 2


sheeting for (T.3 - 'STOP AND GO' - sign)

2.11.5 C211.4 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 1


sheeting for (T.8a - 'LENCONGAN' - with arrow sign)

2.11.6 C211.5 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 2


sheeting for (T.6 Advance Warning Sign - 'AWAS KERJA
PEMBINAAN DI HADAPAN 100m')

C11.7 C211.6 Ditto - for (T.6 Advance Warning Sign - "AWAS KERJA PEMBINAAN nr 2
DI HADAPAN 200m')

2.11.8 C211.7 Ditto - for (T.6 Advance Warning Sign - "AWAS KERJA PEMBINAAN nr 2
DI HADAPAN 500m')

Carried Forward
SLOPE AT KM83.90
Bill No. 2.11 - TRAFFIC MANAGEMENT
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

Temporary Traffic Signs - (Con't/d…)

2.11.9 C211.8 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 2


sheeting for (Warning Sign - T.11a- 'PEGAWAL BENDERA DI
HARAPAN…..m')

2.11.10 C211.9 Ditto - for (Warning Sign - T11c - 'PEMBINAAN DI nr


HARAPAN…..m')

B2/37
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

2.11.11 C211.10 Ditto - for (Warning Sign - T11d - 'JALAN SELORONG DI nr 2


HADAPAN…..m')
2.11.12 C211.15 Ditto - for (Warning Sign - T11M- 'PEMBINAAN TAMAT') nr 2

2.11.13 C211.16 Ditto - for (Warning Sign - T11P- 'AWAS KURANGKAN LAJU nr 2
40Km/J')

TRAFFIC MANAGEMENT & CONTROL

Delineators

2.11.14 C231 (750mm) PVC Traffic cones with reflective bands. nr 20

Total Carried to Grand Summary :

B2/38
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

SLOPE AT KM83.90
Bill No. 2.12 - MAINTENANCE OF ROAD
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

A340 Maintenance of Road


Affected section of existing road adjacent to the slope failures
throughout the duration of the construction period.

A341 Routine maintenance for existing road as per Specification, but not
necessary limited to those listed below:-

2.12.1 A341.1 Road Pavement month 12


i) Patching of potholes
ii) Sealing of surface cracks
iii) Reinstate edge deterioration of backfilled trenches

iv) Treatment to stripping of aggregate


v) Treatment for rutting
vi) Clear vegetation on paved surface
vii) Treatment to deterioration of concrete pavement

vii) Repair to concrete pavement joints

A342 Periodic maintenance of existing road as per Specification, but not


necessary limited to those listed below:-

2.12.2 A342.2 Existing Road Markings


i) Repaint roadline marking when faded or as directed by the SO. Sum

2.12.3 A342.3 Existing Roadside Drainages Cycle 3


i) Debris in lined drains
ii) Debris in unlined drains
iii) Debris in sumps
iv) Debris in culverts blocking grating

v) Non-structural repair to damaged drains and sumps


vi) Repair to misaligned unlined drains
vii) Reseat mis-seated covers
viii) Non-structural repair to damaged covers

2.12.4 A343 Routine maintenance for temporary road diversion as per Specification. Sum 1

B2/39
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PE
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Total Carried to Grand Summary :

B2/40
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

5,500.00 12,100.00

10,000.00

17.00 6,460.00

18.00 6,840.00

17.00 70,380.00

B2/41
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

25.00 25,000.00

100.00 20,000.00

150,780.00

RATE AMOUNT
(RM) (RM)
150,780.00

15.00 4,500.00

30.00 36,540.00

10.00 3,000.00

25.00 2,500.00

35.00 3,500.00

B2/42
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

25.00 8,750.00

12.00 1,200.00

15.00 30,000.00

240,770.00

RATE AMOUNT
(RM) (RM)

B2/43
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

15.00 750.00

15.00 3,300.00

20.00 1,600.00

15.00 150.00

350.00 58,100.00

600.00 132,000.00

1,100.00 22,000.00

B2/44
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

217,900.00

RATE AMOUNT
(RM) (RM)
217,900.00

450.00 4,500.00

1,500.00 15,000.00

1,500.00 12,000.00

B2/45
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

249,400.00

RATE AMOUNT
(RM) (RM)

15.00 3,750.00

550.00 67,100.00

550.00 423,500.00

70.00 10,500.00

70.00 24,500.00

B2/46
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

70.00 47,600.00

5,250.00 31,500.00

5,250.00 21,000.00

5,250.00 57,750.00

45.00 30,150.00

100.00 6,000.00

723,350.00

RATE AMOUNT
(RM) (RM)

50.00 95,000.00

B2/47
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

50.00 1,500.00

10.00 1,500.00

80.00 12,000.00

60.00 7,200.00

10.00 1,200.00

3.50 420.00

4.00 480.00

53.00 6,360.00

56.00 6,720.00

B2/48
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

132,380.00

RATE AMOUNT
(RM) (RM)
132,380.00

3.50 280.00

5.25 630.00

320.00 6,400.00

250.00 250.00

1,500.00 1,500.00

B2/49
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

141,440.00

RATE AMOUNT
(RM) (RM)

150.00 15,000.00

B2/50
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

230.00 11,500.00

26,500.00

RATE AMOUNT
(RM) (RM)

B2/51
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

10,000.00 10,000.00

10,000.00

B2/52
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

30,000.00

10,000.00

380.00 171,000.00

300.00 135,000.00

5,250.00 47,250.00

1,200.00 18,000.00

B2/53
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

411,250.00

RATE AMOUNT
(RM) (RM)

150.00 180,000.00

120.00 2,880.00

12.00 27,000.00

80.00 8,000.00

B2/54
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

217,880.00

RATE AMOUNT
(RM) (RM)

5,000.00

B2/55
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

5,000.00

B2/56
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

200.00 24,000.00

5,250.00 131,250.00

B2/57
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

155,250.00

RATE AMOUNT
(RM) (RM)

2,000.00 24,000.00

B2/58
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

650.00 1,300.00

650.00 1,300.00

650.00 1,300.00

950.00 950.00

800.00 1,600.00

800.00 1,600.00

800.00 1,600.00

33,650.00

RATE AMOUNT
(RM) (RM)
33,650.00

650.00 1,300.00

Nil

B2/59
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

650.00 1,300.00

650.00 1,300.00

650.00 1,300.00

150.00 3,000.00

41,850.00

B2/60
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

500.00 6,000.00

1,000.00

500.00 1,500.00

5,000.00 5,000.00

B2/61
A KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
83.90 DAN KM96.70, SABAH

13,500.00

B2/62
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

SLOPE AT KM96.7
Bill No. 3.1 - CLEARING, EARTHWORKS AND TURFING
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

Items for demolition and site clearance shall be deemed to include


disposal of the materials arising.

E100 GENERAL CLEARANCE


Above Ground
3.1.1 E110.1 General clearance to (Primary forest). Rate to include the removal of ha 1.3
trees and stumps, undergrowth, shrubs, roots, and the likes. (All trees of
0.5m girth and above shall become the property of the Employer).

3.1.2 E110.2 General clearance ha

Cut and Dispose


Excavation in cut shall be deemed to include trimming and peparation
of excavated surface and transportation from source to place of fill or
disposal.

Cut To Fill
3.1.3 F121.1 Excavate in earth material commencing from (ground level) to m3 40,339
(formation level) to stock pile site approved by the S.O.

3.1.4 F135 Excavate in unsuitable material commencing from (commencing m3 2,123


surface) to (formation level) to disposal site approved by the S.O.

F300 FILLING
The following items for filling shall include compaction, and additional
filling necessitated by settlement or penetration into underlying material
as applicable.

Replacement
3.1.5 F340.1 Filling behind retaining wall or other structures using excavated m3 10,775
material. Rate including grading and compacting to levels, dimension
and elevation.

F500 LANDSCAPING

B3/63
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Items for landscaping shall be deemed to include digging, planting


media, bedding, stalking, protection, watering, weeding, required
fertilising, and replacement of dead item until the vegetation is
established.

3.1.6 F510.2 Close turfing to slopes. Rate to include pegging down with stakes. m2 12,772

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.2 - SURFACE DRAINAGE
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

P100 DRAIN EXCAVATION


Drain excavation shall be deemed to include preparation of surfaces,
double handling, disposal of surplus excavated material, upholding
sides of excavation, allowance for joints, backfilling, and removal of
dead services and reinstatement of Original Surface unless

Cast insitu reinforced concrete drain/cascade drain/toe


drain/culverts/sumps as shown in Drawing No.
(SARG/JKR/SLP/R96.70/WALL1/29) &
(SARG/JKP/SLP/KM96.70/WALL2/16).

3.2.1 P111.1 In earth for (450mm cast insitu reinforced concrete drain), depth not m 239
exceeding 1.5m.

3.2.2 P111.2 In earth for (450mm cast insitu reinforced concrete cascade drain), m 134
depth not exceeding 1.5m.

3.2.3 P111.4 In earth for (600mm cast insitu reinforced concrete drain), depth not m 429
exceeding 1.5m.

3.2.4 P111.4 In earth for (600mm cast insitu reinforced concrete cascade drain), m
depth not exceeding 1.5m.

B3/64
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

3.2.5 P111.5 In earth for (750mm cast insitu reinforced concrete drain), depth not m
exceeding 1.5m.

3.2.6 P111.6 In earth for (750mm cast insitu reinforced concrete cascade drain), m 32
depth not exceeding 1.5m.

3.2.7 P111.7 In earth for (900mm precast concrete pipe culvert), depth not exceeding m 5
1.5m.

3.2.8 P112.1 In earth for (1000mm cast insitu reinforced concrete drain), depth 1.5 - m 29
2.0m.

3.2.9 P112.1 In earth for (1000mm cast insitu reinforced concrete cascade drain), m 111
depth 1.5 - 2.0m.

3.2.10 P112.1 In earth for (1000mm earth drain), depth 1.5 - 2.0m. m 215

Extras to Culvert Excavation


Excavation for Inlet and Outlet Structures and Sumps
3.2.11 P131.1 In earth for inlet and outlet structures to (750mm x 750mm) cast insitu m3 13
reinforced concrete sump.

3.2.12 P131.2 In earth for inlet and outlet structures to (1000mm x 1000mm) cast m3
insitu reinforced concrete sump.

Carried Forward
SLOPE AT KM96.7
Bill No. 3.2 - SURFACE DRAINAGE
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

Extras to Culvert Excavation


Excavation for Inlet and Outlet Structures and Sumps - (Con't/d…)

3.2.13 P131.3 In earth for inlet and outlet structures to (1200mm x 1200mm) cast m3 48
insitu reinforced concrete sump.

B3/65
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

3.2.14 P131.4 In earth for inlet and outlet structures to (1500mm x 1500mm) cast m3 16
insitu reinforced concrete sump.

3.2.15 P131.5 In earth for inlet and outlet structures to (1750mm x 1750mm) cast m3 32
insitu reinforced concrete sump.

I100 IN SITU CONCRETE DESIN MIX


Grade C15 to Drain Base
3.2.16 I111 Mass concrete blinding, (50mm) thick to base of drains m2 790
-450mm wide drain
-600mm wide drain
-750mm wide drain
-900mm wide drain
-1000mm wide drain
-450mm wide cascade drain
-600mm wide cascade drain
-750mm wide cascade drain
-900mm wide cascade drain
-1000mm wide cascade drain

Grade C20/25 to Drains


3.2.17 I132 Reinforced concrete to base of drains m3 132
-450mm wide drain
-600mm wide drain
-750mm wide drain
-900mm wide drain
-1000mm wide drain
-450mm wide cascade drain
-600mm wide cascade drain
-750mm wide cascade drain
-900mm wide cascade drain
-1000mm wide cascade drain

3.2.18 I135 Reinforced concrete to wall of drains m3 183


-450mm wide drain
-600mm wide drain
-750mm wide drain
-1000mm wide drain
-450mm wide cascade drain
-600mm wide cascade drain
-750mm wide cascade drain
-900mm wide cascade drain
-1000mm wide cascade drain

Carried Forward
SLOPE AT KM96.7

B3/66
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Bill No. 3.2 - SURFACE DRAINAGE


(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

I400 FORMWORK TO SURFACE DRAINS


Rate for formwork shall be deemed to include the projections and
instrusions and any temporary staging required.

Sides
3.2.18 I411 F1: rough finish to base of drains m2 201
-450mm wide drain
-600mm wide drain
-750mm wide drain
-900mm wide drain
-1000mm wide drain
-450mm wide cascade drain
-600mm wide cascade drain
-750mm wide cascade drain
-900mm wide cascade drain
-1000mm wide cascade drain

3.2.19 I414 F1: rough finish to wall of drains m2 3,011


-450mm wide drain
-600mm wide drain
-750mm wide drain
-1000mm wide drain
-450mm wide cascade drain
-600mm wide cascade drain
-750mm wide cascade drain
-1000mm wide cascade drain

I500 REINFORCEMENT
Rate for reinforcement shall be deemed to include labour for cutting,
bending, and placing.
Mild steel Bars to Drains
3.2.20 I519 Nominal diameter: 8mm link @ 200 c/c to concrete key beam of t 1
cascade drain
-600mm wide cascade drain
-750mm wide cascade drain
-1000 wide cascade drain

High Tensile Bars to Drains


3.2.21 I522 Nominal diameter: 10mm to drains t 5.5

B3/67
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

-750mm wide drain


-1000 wide drain
-750mm wide cascade drain
-900mm wide cascade drain
-1000mm wide cascade drain

3.2.22 I523 Nominal diameter: 12mm to concrete key beam of cascade drain t 1
-600mm wide cascade drain
-750mm wide cascade drain
-900mm wide cascade drain
-1000 wide cascade drain

Carried Forward
SLOPE AT KM96.7
Bill No. 3.2 - SURFACE DRAINAGE
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

High Tensile Steel Fabric to Drains


3.2.23 I550.1 High tensile steel fabric - mesh A252 (A8), 3.95 kg/m2 to drain. m2 334
-450mm wide drain

3.2.24 I550.2 High tensile steel fabric - mesh A393 (A10), 6.16 kg/m2 to drain m2 1,514
-600mm wide drain
-450mm wide drain
-600mm wide drain

P300 SUBSURFACE DRAIN


Item for subsurface drains shall be deemed to include geotextiles fabric,
lining, and filter material.
3.2.25 P320 Weep Holes; 75mm diameter PVC (Class D) pipe @ 2.5m c/c through m 286
wall of drains. Rate to include aggregate (20mm) wrapped with
geotextiles filter.
3.2.26 P500 DRAIN COVERS
Item for drain covers shall be deemed to include formwork,
reinforcement, lifting hook/hole and all associated fittings.

3.2.27 P520.1 Galvanised mild steel grating cover for (100 kN load), 610mm wide as m 37
shown in Drawing No. (SARG/JKR/SLP/KM96.70/32 &
SARG/JKR/SLP/KM96.70/16) for road side drain.

P600 CULVERTS

B3/68
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Items for culverts shall be deemed to include all joints, water stop,
shuttering, struts, concrete base, and concrete surround unless otherwise
stated.
3.2.28 P611.2 (900mm) diameter single precast concrete pipe culvert, Class (Z/H) in m 5
standard length of 1m.

P700 SUMPS
Item for sumps shall be deemed to include sand and concrete bedding,
cement plastering, shuttering, struts, reinforcement and metalwork.

3.2.29 P720.1 In situ concrete (G25/20); 750mm x 750mm x 1.0mm deep without m 6
cover; (150mm) wall thickness.

3.2.30 P720.2 In situ concrete (G25/20); 750mm x 750mm x 1.0m deep; (200mm) nr 2
wall thickness. Rate for PC cover for (100 kN load) to be measured
separately.

3.2.31 P720.5 In situ concrete (G25/20); 1200mm x 1200mm x 1.20m deep without nr 3
cover; (150mm) wall thickness.

Carried Forward
SLOPE AT KM96.7
Bill No. 3.2 - SURFACE DRAINAGE
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

P700 SUMPS
Item for sumps shall be deemed to include sand and concrete bedding,
cement plastering, shuttering, struts, reinforcement and metal work.

3.2.32 P720.6 In situ concrete (G25/20); 1200mm x 1200mm x 1.20m deep including nr 3
mild steel grating cover for (100 kN load); (200mm) wall thickness

3.2.33 P720.7 In situ concrete (G25/20); 1500mm x 1500mm x 1.50m deep without nr 3
cover; (150mm) wall thickness

B3/69
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

3.2.34 P720.9 In situ concrete (G25/20); 1750mm x 1750mm x 2.0m deep without nr 2
cover; (175mm) wall thickness

3.2.35 P720.10 In situ concrete (G25/20); 1750mm x 1750mm x 2.0m deep; (200mm) nr 2
wall thickness. Rate for PC cover for (100 kN load) to be measured
separately.

Extra to Sump for PC Cover Slabs


Item for sump precast concrete cover slabs shall be deemed to include
formwork, lifting hook/hole, reinforcement and all associated fittings as
shown in Drawing No. (SARG/JKR/SLP/KM96.70/29) for sumps

3.2.36 P790.1 Precast concrete (G25/20); (250mm - 300mm) wide x (900mm - nr 37


1200mm) long x (100mm) thick for (100 kN load) sump.

3.2.37 P790.2 Precast concrete (G25/20); (250mm - 300mm) wide x (1200mm - nr 19


1800mm) long x (100mm) thick for (100 kN load) sump.

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.3 - CONCRETE WORK
(All Quantities are provisional Quantities)

B3/70
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

CODE
ITEM DESCRIPTION UNIT QTY
NO

I100 IN SITU CONCRETE DESIGN MIX


Rate for in situ concrete designed mix shall be deemed to include
placing and compaction of concrete
Grade C15 Concrete
3.3.1 I111 Mass concrete blinding, (50mm) thick (to ground slab along toes of r.c.
structures).
Wall 1 m2 535
Wall 2 m2 215

3.3.2 I111.2 Mass concrete blinding, (50mm) thick to pile caps and tied-beams.
(i) Wall 1 m2 172

Grade: C25/20 /Concrete


3.3.3 I132.1 Reinforced concrete to ground slab (along toe, top & sides of retaining
wall extending upto to of drain wall).
(i) Wall 1 m3 54
(ii) Wall 2 m3 22

3.3.4 I1132.2 Reinforced concrete to ground slab (of paved road shoulder extended
upto top of drain wall along retaining wall).
(i) Wall 1 m3 60
(ii) Wall 2 m3 25

3.3.5 I132.3 Reinforced concrete to ground slab (beneath drainage blanket behind
retaining wall)
(i) Wall 1 m3 58

3.3.6 I137 Other concrete forms, reinforced concrete (to maintenance access road
(Wall1) & gabion slab (Wall2)).
(i) Wall 1 m3 31
(ii) Wall 2 m3 12

Grade: C30/20 Concrete


3.3.7 I142 Reinforced concrete pile caps m3 213
(i) Wall 1

3.3.8 I143 Reinforced concrete columns


(i) Wall 1 m3 473

3.3.9 I144.1 Reinforced concrete beams to tied-beam between piles and columns.
(i) Wall 1 m3 59

3.3.10 I144.2 Reinforced concrete beams to capping beam on top of wall

B3/71
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

(i) Wall 1 m3 203


(ii) Wall 2 m3 84

Carried Forward
SLOPE AT KM96.7
Bill No. 3.3 - CONCRETE WORK
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

Grade: C30 Concrete- (Con't/d…)


3.3.11 I144.3 Reinforced concrete beams to handrail and posts on top of wall
(i) Wall 1 m3 22
(ii) Wall 2 m3 9

3.3.12 I145 Reinforced concrete walls to (insitu panel between bored-piles above
gunite panels)
(i) Wall 1 m3 18
(ii) Wall 2 m3 11

3.3.13 I147 Other concrete forms, reinforced concrete to (encasement of anchor


head assembly).
(i) Wall 1 m3 157
(ii) Wall 2 m3 30

Grade: C40 Concrete


3.3.14 I173 Reinforced concrete beams to tied-beam between piles and columns.
(i) Wall 1 m3

I300 PRECAST CONCRETE


Item for precast concrete cover slabs shall be deemed to include
reinforcement, formwork, joints, and finishes, and items for prestressed
precast units shall include prestressing. Rate also to include weep holes
lined with PVC & covered with wire mesh, and filter cloth as shown in
Drawing No. (SARG/JKR/SLP/KM96.70/WALL/23).

3.3.15 I310.1 (Grade C40) Type A1 (1000mm high x 200mm thick x 1870m long) nr 72
panel fixed behind columns.

B3/72
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

3.3.16 I310.3 (Grade C40) Type A2 (1000mm high x 200mm thick x 1870m long) nr 34
panel fixed behind columns.

3.3.17 I310.4 (Grade C40) Type A2A (1000mm high x 200mm thick x 1870m long) nr 8
panel fixed behind columns.

3.3.18 I310.5 (Grade C40) Type A3 (1000mm high x 200mm thick x 1870m long) nr 2
panel fixed behind columns.

3.3.19 I310.6 (Grade C40) Type A3A (1000mm high x 200mm thick x 1870m long) nr 10
panel fixed behind columns.

3.3.20 I310.9 (Grade C40) Type B1 (1000mm high x 200mm thick x 2370m long) nr 183
panel fixed behind columns.

Carried Forward
SLOPE AT KM96.7
Bill No. 3.3 - CONCRETE WORK
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

I300 PRECAST CONCRETE- (Con't/d…)


3.3.21 I310.10 (Grade C40) Type B1A (1000mm high x 200mm thick x 2370m long) nr 4
panel fixed behind columns.

3.3.22 I310.11 (Grade C40) Type B2 (1000mm high x 200mm thick x 2370m long) nr 130
panel fixed behind columns.

3.3.23 I310.12 (Grade C40) Type B2A (1000mm high x 200mm thick x 2370m long) nr 28
panel fixed behind columns.

3.3.24 I310.13 (Grade C40) Type B3 (1000mm high x 200mm thick x 2370m long) nr 23
panel fixed behind columns.

B3/73
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

3.3.25 I310.14 (Grade C40) Type B3A (1000mm high x 200mm thick x 2370m long) nr 31
panel fixed behind columns.

I400 FORMWORK
Rate for formwork shall be deemed to include the projections and
intrusions and any temporary staging required.

Sides
3.3.26 I412 F2: fair finish to columns m2 2,248
(i) Wall 1

3.3.27 I413 F2: fair finish to tied-beams and pile caps nr 767
(i) Wall 1

3.3.28 I414 F2: fair face finish to (insitu panel between bored-piles above gunite
panels or precast panels)
(i) Wall 1 m2 182
(ii) Wall 2 m2 102

3.3.29 I433.1 F2: fair face finish to (capping beam on top of wall).
(i) Wall 1 m2 506
(ii) Wall 2 m2 165

3.3.30 I433.2 F2: fair face finish to (handrail and posts on top of wall)
(i) Wall 1 m2 295
(ii) Wall 2 m2 124

3.3.31 I433.3 F2: fair face finish to (encasement of anchor head assembly)
(i) Wall 1 m2 892
(ii) Wall 2 m2 167

Carried Forward
SLOPE AT KM96.7
Bill No. 3.3 - CONCRETE WORK
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

B3/74
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

I500 REINFORCEMENT
Rate for reinforcement shall be deemed to include labou for cutting,
bending, and placing.

Mild Steel Bars


3.3.32 I512 Nominal diameter: 10mm
(i) Wall 1 t 9.5
(ii) Wall 2 t 1.6

3.3.33 I513 Nominal diameter: 12mm


(i) Wall 1 t 19

3.3.34 I519 Nominal diameter: 8mm


(i) Wall 1 t 1.2
(ii) Wall 2 t 0.5

High Tensile Bars


3.3.35 I522 Nominal diameter: 10mm
(i) Wall 1 t 1
(ii) Wall 2 t 0.7

3.3.36 I523 Nominal diameter: 12mm


(i) Wall 1 t 5.9
(ii) Wall 2 t 0.8

3.3.37 I524 Nominal diameter: 16mm


(i) Wall 1 t 31.9
(ii) Wall 2 t 2.8

3.3.38 I525 Nominal diameter: 20mm


(i) Wall 1 t 11

3.3.39 I526 Nominal diameter: 25mm


(i) Wall 1 t 63

3.3.40 I527 Nominal diameter: 32mm


(i) Wall 1 t 3.6
T=152 ton
Reinforcing Bars of Other Stated Material
3.3.41 I550.1 High tensile steel fabric - mesh A193 (A7), 3.02 kg/m2
(i) Wall 1 t 1,494
(ii) Wall 2 t 293

3.3.42 I550.3 High tensile steel fabric - mesh A393 (A10), 6.16 kg/m2
(i) Wall 1 t 3,737

B3/75
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

(ii) Wall 2 t 1,134

Carried Forward
SLOPE AT KM96.7
Bill No. 3.3 - CONCRETE WORK
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

I600 CONCRETE ANCILLARIES


Joints
Rate for joints shall be deemed to include formwork.

3.3.43 I611.1 Construction joint, (100mm deep) to ground slabs.


(i) Wall 1 m 373
(ii) Wall 2 m 155

3.3.44 I611.2 Construction joint, (600mm deep) to capping beam.


(i) Wall 1 m 26.6
(ii) Wall 2 m 12

3.3.45 I613 Expansion joints, (350mm deep) to handrail. Rate to include 25mm
thick resin bonded cork filler.
(i) Wall 1 m 3.8
(ii) Wall 2 m 2

I616.1 Dowels - plan, (R16mm diameter x 600mm long) galvanized steel bars
at (1000mm) vertical spacing to wall columns for temporary fixing of
precast concrete panels, inclusive of 50mm dia. PVC sleeve and mortar
all as specified.
(i) Wall 1 nr 1,050

3.3.46 I616.2 Dowels - (H.Y. Y16mm diameter x 900mm long) steel bars to wall
columns or bored piles to concrete encased anchor head, inclusive of
grouting all as specified.
(i) Wall 1 nr 2,760
(ii) Wall 2 nr 540.0

B3/76
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.4 - ROAD PAVEMENT AND ROAD FURNITURES
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

Q100 SUBGRADE PREPARATION


3.4.1 Q110.2 Earth material to receive road shoulder material. Rate to include m2 523
scarifying, levelling, and compaction of the top 300mm of the subgrade.

Q200 SUB-BASE
Sub-base shall be deemed to include chamfer.

3.4.2 Q220.2 Granular material with a (CBR value of more than 30, complying with m2 1,046
Type C) of Standard Specification for Road Works clause (4.1.2.2) in
(300mm) thick to road shoulders.

Q300 ROADBASE
Roadbase shall be deemed to include chamfer.

3.4.3 Q310 Removal of flexible surfaces. Rate to include scarifying the existing m2 2,440
roadbase before receiving the additional roadbase material.

B3/77
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

3.4.4 Q330.2 Crushed aggregates with a (CBR value of more than 80, complying with m2 1,464
Type II) of Standard Specification for Road Works clause (4.1.4.2) in
(250mm) thick to road shoulders.

3.4.5 Q580.2 Crushed aggregates with a (CBR value of more than 80, complying with m2
Type II) of Standard Specification for Road Works clause (4.1.4.2) in
maximum (100mm) thick. Approximately over 2436m2.

Q500 SURFACING
3.4.6 Q530 Tack coat to be applied at a rate of (0.5 litre per square metre) as per m2 2,443
Standard Specification for Road Works clauses (4.2.2)

3.4.7 Q540 Prime coat to be applied at a rate of (0.35 litres per square metre) as per m2 2,443
Standard Specification for Road Works clauses (4.2.1)

Asphaltic Concrete
3.4.8 Q561 Binder course - ACB28, (50mm) thick as per Standard Specification for m2 2,440
Road Works clauses (4.2.4)

3.4.9 Q562 Wearing course - ACW20, (50mm) thick as per Standard Specification m2 2,440
for Road Works clauses (4.2.4)

Carried Forward
SLOPE AT KM96.7
Bill No. 3.4 - ROAD PAVEMENT AND ROAD FURNITURES
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

Q800 ROAD FURNITURE


Pavement Marking

B3/78
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Pavement markings shall generally be hot-applied superimposed


reflectorised thermoplastic (with Class 'A' Solid Galss Beads to
BS6088) and in accordance with JKR Arahan Teknik (Jalan) 2D/85.

3.4.10 Q822.1 (100mm) wide continuous line (centre line) m 349

3.4.11 Q822.2 (150mm) wide continuous line (centre line) for no passing zone m 349

3.4.12 Q822.3 (150mm) wide continuous line (edge line) m 698

3.4.13 Q822.3 (200mm) wide intermittent (continuity) line with (1000mm) line and m 12
(1000mm) gap for rural area.

Traffic Barrier
3.4.14 Q843.1 (Single mounted corrugated steel beam) guardrail (with post at 2m m 340
spacing inclusive of delineators). Rate to include bolts, nuts, posts, and
other ancillary work.

3.4.15 Q844.1 Guardrail end (Wing Unit 'Type1'). Rate to include bolts, nuts, posts, nr 4
and other ancillary work.

3.4.16 Q844.2 Guardrail end (Anchorage Unit 'Type 2') terminal treatment). Rate to nr 4
include bolths, nuts, posts, and other ancillary work.

B3/79
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.5 - SUB SURFACE DRAINAGE
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

Drainage Layer Beneath New Fill / behind Retaining Wall


P300 SUBSURFACE DRAINS
Item for subsurface drains shall be deemed to include geotextiles fabric,
lining, and filter materials.

3.5.1 P320.1 Outlet drains; 100mm diameter PVC (Class D) subsoil pipe (weep hole)
with top half of pipe perforated, to subsoil trench behind each gunite
panel of retaining wall including fittings. Rate to include bends, filter
fabric, and filter material surround.
(i) wall 1 m
(ii) Wall 2 m 39

3.5.2 P320.2 Outlet drains; 100mm diameter PVC (Class D) subsoil pipe (weep hole)
with top half of pipe perforated, to drainage blanket behind csdcade
drain including fittings. Rate to include bends, filter fabric, and filter
material surround.
(i) wall 1 m
(ii) Wall 2 m 9

3.5.3 P320.3 Outlet drains; 200mm diameter PVC (Class D - minimum 10mm thick
wall) subsoil pipe with top half of pipe perforated, to drainage blanket
including fittings. Rate to include bends, filter fabric.
(i) wall 1 m 238

P300.0 FILLING
The following items for filling shall include compaction, and additional
filling necessitated by settlement or penetration into underlying material
as applicable.

Replacement
3.5.4 P334.0 Other stated material - granular material (37.5mm - 75mm clean
crushed aggregated) as per Specification to form drainage blanket
behing retaining gabion wall.
(i) wall 1 m3 1,248
(ii) Wall 2 m3

B3/80
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

P400.0 FILLING ANCILLARIES


3.5.5 P410 (Continuous UV-stabilized polypropylene filament, nonwoven)
geotextile with effective opening size 0.09mm (or open area,4%) as per
Specification.
(i) wall 1 m2 8,459
(ii) Wall 2 m2 105

Carried Forward
SLOPE AT KM96.7
Bill No. 3.5 - SUB SURFACE DRAINAGE
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

Horizontal Drain
Rate for horizontal drain shall be deemed to include drilling, filter
fabric, netting and perforated pipe.

(100mm) diameter horizontal drain hole with (75mm) diameter PVC


(Class D) perforated pipe as shown in Drawing No.
(SARG/JKR/SLP/KM96.70/WALL1/32) and
(SARG/JKR/SLP/KM96.70/WALL2/18)

3.5.6 G351 In earth, through each gunite panel of retaining wall at 1m vertical
intervals.
(i) Wall 1 m 876
(ii) Wall 2 m 2,112

B3/81
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.6 - METAL WORK (HANDRAILS)
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

L200 MISCELLANEOUS METAL WORK

Item for miscellaneous metalwork shall be deemed to include fixing to


other work, supply of fixing components, and drilling or cutting of other
work.

B3/82
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

(1000mm) high maintenance/inspectionhandrailalong cascade drain as


shown in Drawing No.
(SARG/JKR.SLP/KM96.70/WALL1/29) and
(SARG/JKR.SLP/KM96.70/WALL2/17)

3.6.1 L240.1 Galvanised steel handrail (min. 42.4mm diameter tubular section of m 380
min. 3.2mm thickness) and 200mm high with end posts at 1.5m apart, to
be embeded and anchored at least 300mm deep inside the concrete drain
wall as shown in the drawing.

B3/83
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.7 - BORED CAST INSITU PILES
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

H100 PLANT AND EQUIPMENT


3.7.1 H110 Provision of all necessary piling plant and equipment, transportation to Sum
the Site, handling, assembling, and removal off the Site after completion
of operation.

3.7.2 H120 Moving and handling of all piling plant and equipment within the Site nr 123
and from location tolocation as oftenf as is, and whenever necessary for
the execution of the whole piling operation.

3.7.3 H130 Temporary staging (for pliling work at temporary earthfill working Sum
platform along the road shoulder).

H200 PILES
Items for piling work shall be deemed to include piling records and
disposal of edcavated and srplus materials.

Bored Piles
Items for bored piles shall be deemed to include temporary casings,
stabilising agent, and enlarged bases.

(1200mm) diameter non-contiguous bored piles as working piles


3.7.4 H211.1 Boring in earth, up to (15m) for (17) nos of pile points.
(i) Wall 1 m 99
(ii) Wall 2 m 23

3.7.5 H211.2 Boring in earth, up to (20m) for (88) nos of pile points.
(i) Wall 1 m 721
(ii) Wall 2 m 218

3.7.6 H211.3 Boring in earth, up to (25m) for (11) nos of pile points.
(i) Wall 1 m
(ii) Wall 2 m 198

3.7.7 H211.3 Boring in earth, up to (30m) for (7) nos of pile points.
(i) Wall 1 m
(ii) Wall 2 m 151

B3/84
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Carried Forward
SLOPE AT KM96.7
Bill No. 3.7 - BORED CAST INSITU PILES
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

Bored Piles - (Con't/d…)


(1200mm) diameter non-contiguous bored piles as working piles
3.7.8 H212.2 Boring through rock, up to (10m) for (69) nos. of pile points. Rate to
include natural and artificial hard material.
(i) Wall 1 m 498
(ii) Wall 2 m 240

3.7.9 H214 High tensile reinforcement straight bars, nominal diameter not
exceeding 20mm. Rate to include supporting reinforcement.
(i) Wall 1 t 33
(ii) Wall 2 t 19

3.7.10 H215 High tensile reinforcement straight bars, nominal diameter exceeding
20mm. Rate to include supporting reinforcement.
(i) Wall 1 t 121
(ii) Wall 2 t 163

3.7.11 H216 High tensile reinforcement helical bars. Rate to include supporting
reinforcement.
(i) Wall 1 t 23
(ii) Wall 2 t 16

B3/85
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

3.7.12 H217.1 Concreted length with grade (C30/20), concrete slump of min. 175+/-
25mm and self compacting by Tremie Pipe method.
(i) Wall 1 m 1,317
(ii) Wall 2 m 808

3.7.13 H217.2 Concreted length with grade (C40/20), concrete slump of min. 175+/-
25mm and self compacting by Tremie Pipe method.
(i) Wall 1 m

3.7.14 H218 Cut-off piles. Rate to include preparing heads.


(i) Wall 1 nr 83
(ii) Wall 2 nr 40

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.8 - PRESTRESSED GROUND ANCHORS
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

G100 PLANT AND EQUIPMENT


3.8.1 G110 Provision of all necessary plant and equipment transportation to the Sum
Site, handling, assembling, and removal off the Site after completion of
operation
3.8.2 G120 Moving and handling all necessary plant and equipment within the Site Sum
and from location to location as often as is and whenever necessary for
the execution of whole operation.

G300 SLOPE STABILISATION

B3/86
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Ground Anchor
Rate for ground anchor shall be deemed to include prestressed tendons,
drilling, grouting, concreting, and all necessary formworks.

(Permanent Double Corrosion Protection Ground Anchor) as shown in


Drawing No.
(SARG/JKR/SLP/KM96.70/WALL1/26) &
(SARG/JKR/SLP/KM96.70/WALL2/14)
((700kN Working Design Load) Grade 270, 7-wire, Low Relaxation
Strands and minimum G30 cement grout.
3.8.3 G331.2 In soil, inclusive of highly fractured sedimentary rock, shale material,
total length upto (30m) for (17+3) nos. of anchors.
(i) Wall 1 m 482
(ii) Wall 2 m 90

3.8.4 G331.3 In soil, inclusive of highly fractured sedimentary rock, shale material,
total length upto (40m) for (117+115) nos. of anchors.
(i) Wall 1 m 4,209
(ii) Wall 2 m 4,064

3.8.5 G331.4 In soil, inclusive of highly fractured sedimentary rock, shale material,
total length upto (50m) for (24+8) nos. of anchors.
(i) Wall 1 m 1,013
(ii) Wall 2 m 328

Carried Forward
SLOPE AT KM96.7
Bill No. 3.8 - PRESTRESSED GROUND ANCHORS

B3/87
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

Ground Anchor - (Con't/d…)

(900kN Working Design Load) Grade 270, 7-Wire, Low Relaxation


strands and minimum G30 cement grout.

3.8.6 G331.3 In soil, inclusive of highly fractured sedimentary rock, shale materials,
total length upto (30m) for (29) nos. of anchors.
(i) Wall 1 m 856
(ii) Wall 2 m

3.8.7 G331.4 In soil, inclusive of highly fractured sedimentary rock, shale materials,
total length upto (40m) for (43) nos. of anchors.
(i) Wall 1 m 1,401
(ii) Wall 2 m

3.8.8 G339.1 Extra over for coring min. 150mm diameter through reinforced
concrete bored pile of 1200mm diameter, as required for the installation
of anchor.
(i) Wall 1 nr
(ii) Wall 2 nr 126

3.8.9 G339.5 (Suitability test) on ground anchor as per Specification for Slope
Remedial Work clause (9.7). Rate to include all necessary equipment,
Robust Load Cell to be permanently left in place at the tested anchor
and submission of procedure, records, and report.
(i) Wall 1 nr 15
(ii) Wall 2 nr 10

B3/88
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.9 - GROUTED STONE PITCHING, GABION AND RENO MATTRESS
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

G200 RETAINING STRUCTURES

Gabion
3.9.1 G211.1 (1.0m X 1.0m x 1.0m) rock-filled gabion with PVC coated wire gauge m3 82
size of (2.7mm) as per Specification and as shown in the drawings.
Rates for RC slabs and geotextiles shall be included.

3.9.2 G212 Rock-filled gabion mattress, (300mm) thick with PVC coated wire
gauge size of (2.2mm); and 260g per m2 zinc coating mesh size, 6cm x
8cm as per Specification and as shown in drawings.
(i) Wall 1 m2 18
(ii) Wall 2 m2 129

3.9.3 G213 (Continuous UV-stabilized polypropylene filament, nonwoven)


geotextile as drainage and separator with effective opening size 0.09mm
(or open area <4%) as per Specification.
(i) Wall 1 m2 18
(ii) Wall 2 m2 18

G400 SURFACE PROTECTION

3.9.4 G440 (250mm) thick stone pitching as per Specification. m2

B3/89
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.10 - GEOTECHNICAL INSTRUMENTATION
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

12.1 D100 MOBILISATION AND DEMOBILISATION


Rate shall be deemed to include provision of all plant and equipment,
transportation to the Site, including transfer between different locations
within the Site, handling, assembling and removal off the Site after
completion of operation.

3.10.1 D110 Mobilisation of Deep Boring of borehole to (1 no.) site Sum

D600 INSTRUMENTATION
Standpipe Piezometer, to Slope Stabilisation and Retaining
3.10.2 D610.1 structures
Standpipe Piezometer, up to (15m) depth as per Specification for Slope
Remedial Work clause (10.2.6) and as shown in the drawings. Rate to
include pre-boring and installation.

B3/90
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

(i) Wall 1 nr 2
(ii) Wall 2 nr 1

3.10.3 D619 Extra over for provision of up to 150mm dia., up to 200mm high
galvanised metal protective enclosure pipe. Rate to include locked
cover to the top part of the casing, raised mass concrete surround
flushed to top of casing, side drainage hole and galvanised metal
labelling plate fixed on the top, fixing bracets, bolts and etc., to prevent
vandalism.

(i) Wall 1 nr 2
(ii) Wall 2 nr 1

Inclinometer, to Slope Stabilisation and Retaining Structures


3.10.4 D620.2 Inclinometer, up to (30m) depth as per Specification for Slope Remedial
Work clause (10.2.2) and as shown in the drawings. Rate to include
installation (to be casted inside boredpile or reinforced concrete
column).
(i) Wall 1 nr 2
(ii) Wall 2 nr 2

Carried Forward
SLOPE AT KM96.7
Bill No. 3.10 - GEOTECHNICAL INSTRUMENTATION
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

B3/91
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Brought Forward

3.10.5 D629 Extra Over for provision of up to 150mm dia., up to 600mm high
galvanised metal protective enclosure casing. Rate to include locked
cover to the top part of the casing, raised mass concrete surround
flushed to top of casing, side drainage hole and galvanised metal
labelling plate fixed on the top, fixing brackets, bolts and etc., to
prevent vandalism.

(i) Wall 1 nr 2
(ii) Wall 2 nr 2

Load cells, to ground Anchors of Slope Stabilisation and Retaining


structures

3.10.6 G339.1 Provision of Load Cell in additional to the (16+10 nos. provided for the
Suitability tests) with at least 0.5% accuracy permanently installed to
ground anchor, for monitoring of anchor residual load with maximum
load capacities upto 200 tonnes. Rate to have deemed to include the
provision of the calibrated readout unit.

(i) Wall 1 nr 1
(ii) Wall 2 nr 1

3.10.7 G339.2 Extra Over for provision of up to 25mm diameter galvanised, weather-
proof metal conduit to the cable leads of load cell. Rate to include
fixing brackets and bolts etc. to the retaining structure.
(i) Wall 1 nr 192
(ii) Wall 2 nr 132

3.10.7 G339.3 Extra Over for provision of up to 150 square, 150mm high galvanised
metal protective enclosure junction box with locked cover to the heads
of the cable leads of load cell. Rate to have deemed to include
galvanised metal labelling plate, fixing brackets and bolts and etc., to
ensure the security of the junction box from vandalism.

(i) Wall 1 nr 16
(ii) Wall 2 nr 11

Instrument Monitoring and Processing of Monitoring Results

3.10.9 D660 Monitoring of instrument for all the above instrument (4 nr. Cycle 10
Inclinometers, 3 nr. Piezometer and 27 nr. Load cells) at the project
site by (Contractor's Engineer) as per Specification for Slope Remedial
Work clause (10.2.11). Rate to include preparation of monitoring report
to be submitted on a (regular) basis as directed by the SO/PD/Engineer.

Real Time Monitoring nr

B3/92
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.10 - GEOTECHNICAL INSTRUMENTATION
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

F100 EXCAVATION
Cut and Dispose, Excavation between Boredpiles, Vertical Face
Excavation in cut shall be deemed to include trimming and preparation
of excavated surface and transportation from source to place of fill or
disposal.
3.11.1 F139.1 Excavate in earth material in stages commencing from the outermost m3 504
edge line to vertical surface between the exposed boredpiles. This
operation is required for the Construction of the arched gunite concrete
wall panels.

G400 SURFACE PROTECTION


3.11.2 G410.2 (200mm) thick (G25) guniting to vertical face between bored-piles. m2 414
Rate for reinforcement shall be measured separately as shown in
Drawing NO.
(SARG/JKR/SLP/KM96.70/WALL2/13)

I500 REINFORCEMENT
Rate for reinforcement shall be deemed to include labour for cutting,
bending, and placing.

Mild Steel Bars


3.11.3 I512 Nominal diameter: 10mm t 3.1

High Tensile Bars


3.11.4 I522 Nominal diameter: 10mm t 3.8

3.11.5 I523 Nominal diameter: 12mm t 1.2

3.11.6 I524 Nominal diameter: 16mm t 1.2

B3/93
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.11 - GUNITING
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

C100 TRAFFIC MANAGEMENT PLAN


Traffic Management Team
3.12.1 C134 Traffic controller. (Flagmen - 2 persons) man-mth 18

C200 TEMPORARY ROAD FURNITURE


Items for temporary road furniture shall be deemed to include the
supply, installation, maintenance, and removal upon completion.

The supply of temporary road furniture shall be deemed to include base


preparation, cost of materials, fabrication, and fixing including posts,
struts, bolths and nuts, base, storage, and transportation.

Installation of temporary road furniture shall be deemed to include cost


for multiple shifting within the contractual boundaries and its vicinities
that is affected by the traffic management plan.

B3/94
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Temporary road furniture shall be deemed to include cost for the


inspection, immediate repair and replacement of any damaged, missing
or stolen items throughout the duration of the construction, and removal
upon completion.

Temporary Traffic Signs


Temporary Traffic Signs shall be in accordance with JKR Arahan
Teknik (Jalan) 2C/85.

3.12.2 C211.1 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 4


sheeting for (T.1 - 'ROAD WORKS' sign)

3.12.3 C211.2 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 4


sheeting for (T.12 - 'DANGER' sign - with 'AWAS')

3.12.4 C211.3 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 4


sheeting for (T.3 - 'STOP AND GO' - sign)

3.12.5 C211.4 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 2


sheeting for (T.8a - 'LENCONGAN' - with arrow sign)

3.12.6 C211.5 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 4


sheeting for (T.6 Advance Warning Sign - 'AWAS KERJA
PEMBINAAN DI HADAPAN 100m')

3.12.7 C211.6 Ditto - for (T.6 Advance Warning Sign - "AWAS KERJA PEMBINAAN nr 4
DI HADAPAN 200m')

3.12.8 C211.7 Ditto - for (T.6 Advance Warning Sign - "AWAS KERJA PEMBINAAN nr 4
DI HADAPAN 500m')

Carried Forward
SLOPE AT KM96.7
Bill No. 3.12 - TRAFFIC MANAGEMENT
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO
Brought Forward

Temporary Traffic Signs - (Con't/d…)

B3/95
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

3.12.9 C211.8 Portable non-illuminated Fluorescent Orange Prismatic retro-reflective nr 4


sheeting for (Warning Sign - T.11a- 'PEGAWAL BENDERA DI
HARAPAN…..m')

3.12.10 C211.10 Ditto - for (Warning Sign - T11d - 'JALAN SELORONG DI nr 4


HADAPAN…..m')

3.12.11 C211.15 Ditto - for (Warning Sign - T11M- 'PEMBINAAN TAMAT') nr 4

3.12.12 C211.16 Ditto - for (Warning Sign - T11P- 'AWAS KURANGKAN LAJU nr 4
40Km/J')

TRAFFIC MANAGEMENT & CONTROL

Barriers and Barricades

3.12.13 C221 Heavy duty water-or sand-filled PVC barrier of the (New Jersey) type. nr 30

3.12.14 C229 Drum in orange and black stripes (T.18) nr 6

Delineators
3.12.15 C231 (750mm) PVC Traffic cones with reflective bands. nr 25

B3/96
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

Total Carried to Grand Summary :


SLOPE AT KM96.7
Bill No. 3.13 - MAINTENANCE OF ROAD
(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

A340 Maintenance of Road


Affected section of existing road adjacent to the slope failures
throughout the duration of the construction period.

A341 Routine maintenance for existing road as per Specification, but not
necessary limited to those listed below:-

3.13.1 A341.1 Road Pavement month 18


i) Patching of potholes
ii) Sealing of surface cracks
iii) Reinstate edge deterioration of backfilled trenches

iv) Treatment to stripping of aggregate


v) Treatment for rutting
vi) Clear vegetation on paved surface
vii) Treatment to deterioration of concrete pavement

vii) Repair to concrete pavement joints

A342 Periodic maintenance of existing road as per Specification, but not


necessary limited to those listed below:-

3.13.2 A342.2 Existing Road Markings


i) Repaint roadline marking when faded or as directed by the SO. Sum

3.13.3 A342.3 Existing Roadside Drainages Cycle 6


i) Debris in lined drains
ii) Debris in unlined drains
iii) Debris in sumps
iv) Debris in culverts blocking grating

v) Non-structural repair to damaged drains and sumps


vi) Repair to misaligned unlined drains
vii) Reseat mis-seated covers

B3/97
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 2
DAN KM96.70, SABAH

viii) Non-structural repair to damaged covers

A343 Routine maintenance for temporary road diversion as per Specification. Sum 1

Total Carried to Grand Summary

B3/98
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

Performance Bond Sum * 5%*3%*(Contract+Maintenance Perio

3,000.00 3,900.00

Nil

8.00 322,712.00

15.00 31,845.00

15.00 161,625.00

B3/99
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

12.00 153,264.00

673,346.00

RATE AMOUNT
(RM) (RM)

15.00 3,585.00

15.00 2,010.00

15.00 6,435.00

Nil

B3/100
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

Nil

15.00 480.00

15.00 75.00

15.00 435.00

15.00 1,665.00

15.00 3,225.00

15.00 195.00

Nil

18,105.00

RATE AMOUNT
(RM) (RM)
18,105.00

15.00 720.00

B3/101
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

15.00 240.00

15.00 480.00

15.00 11,850.00

500.00 66,000.00

500.00 91,500.00

188,895.00

B3/102
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

RATE AMOUNT
(RM) (RM)
188,895.00

70.00 14,070.00

70.00 210,770.00

5,250.00 5,250.00

5,250.00 28,875.00

B3/103
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

5,250.00 5,250.00

453,110.00

RATE AMOUNT
(RM) (RM)
453,110.00

45.00 15,030.00

70.00 105,980.00

25.00 7,150.00

350.00 12,950.00

B3/104
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

600.00 3,000.00

2,000.00 12,000.00

3,500.00 7,000.00

5,000.00 15,000.00

631,220.00

RATE AMOUNT
(RM) (RM)
631,220.00

3,500.00 10,500.00

2,900.00 8,700.00

B3/105
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

5,000.00 10,000.00

6,250.00 12,500.00

120.00 4,440.00

180.00 3,420.00

680,780.00

B3/106
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

15.00 8,025.00
15.00 3,225.00

15.00 2,580.00

500.00 27,000.00
500.00 11,000.00

500.00 30,000.00
500.00 12,500.00

500.00 29,000.00

500.00 15,500.00
500.00 6,000.00

550.00 117,150.00

550.00 260,150.00

550.00 32,450.00

B3/107
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

550.00 111,650.00
550.00 46,200.00

712,430.00

RATE AMOUNT
(RM) (RM)
712,430.00

550.00 12,100.00
550.00 4,950.00

550.00 9,900.00
550.00 6,050.00

550.00 86,350.00
550.00 16,500.00

Nil

1,100.00 79,200.00

B3/108
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

1,100.00 37,400.00

1,100.00 8,800.00

1,250.00 2,500.00

1,250.00 12,500.00

1,100.00 201,300.00

1,189,980.00

RATE AMOUNT
(RM) (RM)
1,189,980.00

1,250.00 5,000.00

1,100.00 143,000.00

1,100.00 30,800.00

1,250.00 28,750.00

B3/109
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

1,250.00 38,750.00

65.00 146,120.00

65.00 49,855.00

65.00 11,830.00
65.00 6,630.00

65.00 32,890.00
65.00 10,725.00

65.00 19,175.00
65.00 8,060.00

65.00 57,980.00
65.00 10,855.00

1,790,400.00

RATE AMOUNT
(RM) (RM)
1,790,400.00

B3/110
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

5,250.00 49,875.00
5,250.00 8,400.00

5,250.00 99,750.00

5,250.00 6,300.00
5,250.00 2,625.00

5,250.00 5,250.00
5,250.00 3,675.00

5,250.00 30,975.00
5,250.00 4,200.00

5,250.00 167,475.00
5,250.00 14,700.00

5,250.00 57,750.00

5,250.00 330,750.00

5,250.00 18,900.00

25.00 37,350.00
25.00 7,325.00

70.00 261,590.00

B3/111
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

70.00 79,380.00

2,976,670.00

RATE AMOUNT
(RM) (RM)
2,976,670.00

10.00 3,730.00
100.00 15,500.00

50.00 1,330.00
50.00 600.00

100.00 380.00
100.00 200.00

20.00 21,000.00

20.00 55,200.00
20.00 10,800.00

B3/112
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

3,085,410.00

RATE AMOUNT
(RM) (RM)

10.00 5,230.00

60.00 62,760.00

10.00 24,400.00

B3/113
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

50.00 73,200.00

Nil

3.50 8,550.50

4.00 9,772.00

52.00 126,880.00

55.00 134,200.00

444,992.50

RATE AMOUNT
(RM) (RM)
444,992.50

B3/114
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

4.00 1,396.00

6.00 2,094.00

6.00 4,188.00

8.00 96.00

320.00 108,800.00

582.00 2,328.00

1,500.00 6,000.00

B3/115
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

569,894.50

RATE AMOUNT
(RM) (RM)

Nil
200.00 7,800.00

Nil
200.00 1,800.00

250.00 59,500.00

150.00 187,200.00
Nil

B3/116
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

12.00 101,508.00
12.00 1,260.00

359,068.00

RATE AMOUNT
(RM) (RM)
359,068.00

230.00 201,480.00
230.00 485,760.00

B3/117
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

1,046,308.00

RATE AMOUNT
(RM) (RM)

B3/118
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

150.00 57,000.00

B3/119
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

57,000.00

RATE AMOUNT
(RM) (RM)

60,000.00

150.00 18,450.00

40,000.00

520.00 51,480.00
520.00 11,960.00

540.00 389,340.00
540.00 117,720.00

Nil
560.00 110,880.00

Nil
600.00 90,600.00

B3/120
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

890,430.00

RATE AMOUNT
(RM) (RM)
890,430.00

1,300.00 647,400.00
1,300.00 312,000.00

5,250.00 173,250.00
5,250.00 99,750.00

5,250.00 635,250.00
5,250.00 855,750.00

5,250.00 120,750.00
5,250.00 84,000.00

B3/121
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

750.00 987,750.00
750.00 606,000.00

Nil

400.00 33,200.00
400.00 16,000.00

5,461,530.00

RATE AMOUNT
(RM) (RM)

20,000.00

20,000.00

B3/122
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

300.00 144,600.00
300.00 27,000.00

330.00 1,388,970.00
330.00 1,341,120.00

360.00 364,680.00
360.00 118,080.00

3,424,450.00

B3/123
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

RATE AMOUNT
(RM) (RM)
3,424,450.00

340.00 291,040.00
Nil

380.00 532,380.00
Nil

Nil
570.00 71,820.00

5,000.00 75,000.00
5,000.00 50,000.00

B3/124
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

4,444,690.00

RATE AMOUNT
(RM) (RM)

250.00 20,500.00

120.00 2,160.00
120.00 15,480.00

12.00 216.00
12.00 216.00

Nil

B3/125
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

38,572.00

RATE AMOUNT
(RM) (RM)

5,000.00

B3/126
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

3,500.00 7,000.00
3,500.00 3,500.00

150.00 300.00
150.00 150.00

6,000.00 12,000.00
6,000.00 12,000.00

39,950.00

RATE AMOUNT
(RM) (RM)

B3/127
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

39,950.00

250.00 500.00
250.00 500.00

7,000.00 7,000.00
7,000.00 7,000.00

750.00 144,000.00
750.00 99,000.00

250.00 4,000.00
250.00 2,750.00

4,500.00 45,000.00

Nil

B3/128
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

349,700.00

RATE AMOUNT
(RM) (RM)

20.00 10,080.00

400.00 165,600.00

5,250.00 16,275.00

5,250.00 19,950.00

5,250.00 6,300.00

5,250.00 6,300.00

B3/129
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

224,505.00

RATE AMOUNT
(RM) (RM)

2,000.00 36,000.00

B3/130
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

650.00 2,600.00

650.00 2,600.00

650.00 2,600.00

950.00 1,900.00

800.00 3,200.00

800.00 3,200.00

800.00 3,200.00

55,300.00

RATE AMOUNT
(RM) (RM)
55,300.00

B3/131
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

650.00 2,600.00

650.00 2,600.00

650.00 2,600.00

650.00 2,600.00

300.00 9,000.00

100.00 600.00

150.00 3,750.00

B3/132
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

79,050.00

RATE AMOUNT
(RM) (RM)

500.00 9,000.00

1,000.00

500.00 3,000.00

B3/133
LU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90
KM96.70, SABAH

5,000.00 5,000.00

18,000.00

B3/134
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN P
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Bill No. 4.1 - PROVISIONAL SUM


(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

4.10 A700 PROVISIONAL SUMS

4.1.1 A711 Allow a Provisional Sum for the compliance of EIA requirement & Sum
reporting

4.1.2 A712 Allow a Provisional Sum for the temporary / permanent relocation of Sum
the utilities services

PS1/135
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN P
PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

Bill No. 4.1 - PROVISIONAL SUM


(All Quantities are provisional Quantities)

CODE
ITEM DESCRIPTION UNIT QTY
NO

Total Carried to Grand Summary

PS1/136
OTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
M83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

100,000.00

250,000.00

PS1/137
OTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22)
M83.90 DAN KM96.70, SABAH

RATE AMOUNT
(RM) (RM)

350,000.00

PS1/138
PEMBAIKAN CERUN CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN
PERSEKUTUAN 22) PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

GRAND SUMMARY

AMOUNT
BILL NO. DESCRIPTION
(RM)

1 CONSTRUCTION PRELIMINARIES 1,016,020.00

2 SLOPE AT KM83.90
2.1 Clearing, Earthwork and Turfing 240,770.00
2.2 Surface Drainage (Include Culverts) 249,400.00
2.3 Concrete Works 723,350.00
2.4 Road Pavement and Road Furniture 141,440.00
2.5 Subsurface drainage 26,500.00
2.6 Metal Works (Boom Gate) 10,000.00
2.7 Micro Piles 411,250.00
2.8 Grouted Stone Pitching, Gabion and Reno Mattress 217,880.00
2.9 Geotechnical Instrumentation 5,000.00
2.10 Guniting 155,250.00
2.11 Traffic Management 41,850.00
2.12 Maintenance of Road 13,500.00

3 SLOPE AT KM96.7
3.1 Clearing, Earthwork and Turfing 673,346.00
3.2 Surface Drainage (Include Culverts) 680,780.00
3.3 Concrete Works 3,085,410.00
3.4 Road Pavement (Include Road Furniture 569,894.50
3.5 Subsurface drainage 1,046,308.00
3.6 Metal Works (Hand rail) 57,000.00
3.7 Bored Cast in Situ Piles 5,461,530.00
3.8 Prestressed Ground Anchors 4,444,690.00
3.9 Grouted Stone Pitching, Gabion and Reno Mattress 38,572.00
3.10 Geotechnical Instrumentation 349,700.00
3.11 Guniting 224,505.00
3.12 Traffic Management 79,050.00
3.13 Maintenance of Road 18,000.00

4 PROVISIONAL SUM 350,000.00

TOTAL AMOUNT CARRIED TO FORM OF TENDER : 20,330,995.50

Name of Contractor : ………………………………………………………………………………

Address : ………………………………………………………………………………

………………………………………………………………………………

Name of Signatory : ………………………………………………………………………………

Signature : …………………………………………..

SUM/139
Date : …………………………………………..

SUM/140
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH
FINANCIAL WORK PROGRAMME
ORIGINAL CONTRACT AMOUNT: RM21,550,855.23

CONTRACT SCHEDULE / ACTUAL OF WORK DONE 2017 2018 2019


BILL NO. BILL ITEM BILL VALUE (RM) DESCRIPTION
VALUE % (Overall Scheduled/Ac JULY AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEPT
% (Per Item)
Project) tual 12/7/2017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 9/12/2019
CONTRACTUAL REQUIREMENTS 252,544.00 100.00% 1.17% S 0.856% 0.316%
1.17% 100.00% 1.17% A 0.856% 0.316%
991,564.00 SO'S REQUIREMENT 281,450.00 90.61% 1.18% S 0.085% 0.085% 0.085% 0.070% 0.070% 0.070% 0.070% 0.070% 0.070% 0.070% 0.070% 0.070% 0.023% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031%
1.31% 90.61% 1.18% A 0.085% 0.085% 0.085% 0.070% 0.070% 0.070% 0.070% 0.070% 0.070% 0.070% 0.070% 0.070% 0.023% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031%
4.60% PROJECT REQUIREMENTS 208,070.00 84.85% 0.82% S 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.050% 0.050% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.091%
BILL NO. 1 GENERAL ITEM
0.97% 84.85% 0.82% A 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.050% 0.050% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018%
AUTHORITIES' REQUIREMENTS 119,700.00 85.05% 0.47% S 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.030% 0.030% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.052% 10000%
0.56% 85.05% 0.47% A 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.030% 0.030% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%
CONTRACTOR'S REQUIREMENTS 129,800.00 85.91% 0.52% S 0.045% 0.045% 0.045% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.030% 0.030% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.053%
0.60% 85.91% 0.52% A 0.045% 0.045% 0.045% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.031% 0.030% 0.030% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011% 0.011%
Clearing, Earthwork and Turfing 168,790.00 78.51% 0.61% S 0.223% 0.223% 0.084% 0.084% 0.084% 0.084%
0.78% 78.51% 0.61% A 0.223% 0.223% 0.084% 0.000% 0.084%
Surface Drainage (Include Culverts) 249,590.00 75.00% 0.87% S 0.000% 0.000% 0.193% 0.193% 0.193% 0.145% 0.145% 0.145% 0.145% 9000%
1.16% 62.50% 0.72% A 0.000% 0.000% 0.193% 0.193% 0.193% 0.000% 0.145%
Concrete Works 723,350.00 100.00% 3.36% S 0.000% 0.000% 0.000% 0.000% 0.671% 0.671% 0.201% 0.201% 0.201% 0.201% 0.201% 0.201% 0.201% 0.201% 0.201% 0.201%
3.36% 100.00% 3.36% A 0.000% 0.000% 0.000% 0.000% 0.671% 0.671% 0.201% 0.201% 0.604% 0.201% 0.201% 0.201% 0.201% 0.201%
Road Pavement and Road Furniture 141,440.00 33.52% 0.22% S 0.110% 0.110% 0.000% 0.000% 0.000% 0.145% 0.145% 0.145%
0.66% 33.52% 0.22% A 0.110% 0.110% 0.000% 0.000% 0.000%
Subsurface drainage 26,500.00 100.03% 0.12% S 0.000% 0.123% 8000%
2,254,400.00 0.12% 0.00% 0.00% A 0.000% 0.000% 0.000%
10.46% Metal Works (Boom Gate) 7,000.00 0.00% 0.00% S 0.032%
0.03% 0.00% 0.00% A
BILL NO. 2 SLOPE AT KM 83.90
Micro Piles 387,750.00 99.99% 1.80% S 0.420% 0.000% 0.000% 0.527% 0.530% 0.300% 0.022%
1.80% 99.99% 1.80% A 0.420% 0.000% 0.000% 0.527% 0.530% 0.300% 0.022%
Grouted Stone Pitching, Gabion and Reno Mattress 337,880.00 50.00% 0.78% S 0.523% 0.261% 0.261% 0.261% 0.261% 7000%
1.57% 71.81% 1.13% A 0.523% 0.000% 0.261% 0.081% 0.000% 0.261%
Geotechnical Instrumentation 1,500.00 0.00% 0.00% S 0.007%
0.01% 0.00% 0.00% A 0.000%
Guniting 155,250.00 33.33% 0.24% S 0.240% 0.240% 0.240%
0.72% 33.33% 0.24% A 0.000% 0.000% 0.240%
6000%
Traffic Management 41,850.00 87.47% 0.17% S 0.010% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.015%
0.19% 87.47% 0.17% A 0.010% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003%
Maintenance of Road 13,500.00 88.02% 0.06% S 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.005%
0.06% 88.02% 0.06% A 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001%
Clearing, Earthwork and Turfing 649,102.00 93.84% 2.83% S 0.210% 0.195% 0.195% 0.195% 0.195% 0.195% 0.195% 0.195% 0.200% 0.195% 0.195% 0.195% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046%
3.01% 92.30% 2.78% A 0.210% 0.195% 0.195% 0.195% 0.195% 0.195% 0.195% 0.195% 0.200% 0.195% 0.195% 0.195% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046%
5000%
Surface Drainage (Include Culverts) 680,768.00 31.50% 1.00% S 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.995% 0.900% 0.632% 0.632%
3.16% 31.50% 1.00% A 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.995%
Concrete Works 3,098,700.00 96.36% 13.85% S 0.000% 1.198% 1.550% 1.198% 2.400% 1.198% 2.000% 1.000% 2.000% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131%
14.38% 95.44% 13.72% A 0.000% 1.198% 1.550% 1.198% 2.400% 1.198% 2.000% 1.000% 2.000% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131% 0.131%
Road Pavement (Include Road Furniture 560,546.50 0.00% 0.00% S 1.200% 1.200% 0.201%
2.60% 7.69% 0.20% A 0.000% 0.000% 0.000% 0.000% 0.200% 4000%
Subsurface drainage 1,043,908.00 93.00% 4.50% S 0.000% 0.000% 0.000% 0.000% 0.000% 0.404% 2.000% 0.404% 0.339% 0.339% 0.680% 0.339% 0.339%
4.84% 79.74% 3.86% A 0.000% 0.000% 0.000% 0.000% 0.000% 0.404% 2.000% 0.404% 0.000% 0.339% 0.316% 0.400%
16,735,031.50 Metal Works (Hand rail) 57,000.00 0.00% 0.00% S 0.132% 0.132%
0.26% 0.00% 0.00% A 0.000% 0.000%
BILL NO.3 SLOPE AT KM 96.70 77.65% Bored Cast in Situ Piles 5,455,490.00 100.00% 25.31% S 1.440% 2.880% 4.880% 5.630% 4.600% 2.980% 0.500% 1.500% 0.200% 0.300% 0.404%
25.31% 100.00% 25.31% A 1.440% 2.880% 4.880% 5.630% 4.600% 2.980% 0.500% 1.500% 0.200% 0.300% 0.404% 0.000% 3000%
Prestressed Ground Anchors 4,479,690.00 95.48% 19.85% S 1.040% 1.040% 2.280% 0.100% 1.000% 3.900% 3.000% 2.500% 0.423% 0.423% 0.423% 0.423% 0.423% 0.423% 0.423% 0.423% 0.800% 0.800% 0.800% 0.140%
20.79% 83.70% 17.40% A 1.040% 1.040% 2.280% 0.100% 1.000% 3.900% 3.000% 2.500% 0.424% 0.423% 0.212% 0.409% 0.300% 0.300% 0.300% 0.000% 0.171%
Grouted Stone Pitching, Gabion and Reno Mattress 38,572.00 0.00% 0.00% S 0.179%
0.18% 0.00% 0.00% A 0.000%
Geotechnical Instrumentation 349,700.00 57.13% 0.93% S 0.300% 0.300% 0.327% 0.232% 0.232% 0.232%
1.62% 18.49% 0.30% A 0.300% 0.000% 2000%
Guniting 224,505.00 88.65% 0.92% S 0.000% 0.174% 0.300% 0.174% 0.079% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039%
1.04% 65.92% 0.69% A 0.000% 0.174% 0.300% 0.174% 0.000% 0.039%
Traffic Management 79,050.00 84.40% 0.31% S 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.000% 0.006% 0.006% 0.006% 0.032%
0.37% 84.40% 0.31% A 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006%
Maintenance of Road 18,000.00 85.88% 0.07% S 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.007%
1000%
0.08% 85.88% 0.07% A 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001%
BILL NO. 5 350,000.00 PROVISIONAL SUM 350,000.00 99.98% 1.62% S 0.271% 0.271% 0.271% 0.271% 0.400% 0.000% 0.130% 0.003% 0.003% 0.003% 0.001%
PROVISIONAL SUM
1.62% 1.62% 100.14% 1.63% A 0.271% 0.271% 0.271% 0.271% 0.400% 0.000% 0.130% 0.006% 0.003% 0.003% 0.001%
GST 1,219,859.73 GST 1,219,859.73 88.80% 5.03% S 0.077% 0.127% 0.254% 0.340% 0.514% 0.480% 0.480% 0.340% 0.250% 0.490% 0.420% 0.360% 0.078% 0.053% 0.053% 0.053% 0.058% 0.055% 0.076% 0.094% 0.153% 0.221% 0.198% 0.203% 0.185% 0.057%
5.66% 5.66% 87.30% 4.94% A 0.077% 0.127% 0.254% 0.340% 0.514% 0.480% 0.480% 0.340% 0.250% 0.490% 0.420% 0.360% 0.079% 0.053% 0.050% 0.030% 0.113% 0.100% 0.094% 0.070% 0.221%
21,550,855.23 0%
TOTAL ORIGINAL CONTRACT SUM
100.000%
MONTHLY FINANCIAL SCHEDULE PROGRESS 0.00% 1.357% 2.352% 4.342% 6.046% 9.079% 8.367% 8.499% 6.124% 4.302% 9.193% 7.170% 5.984% 1.384% 0.940% 0.940% 0.938% 1.020% 0.979% 1.338% 1.656% 2.700% 3.907% 3.498% 3.581% 3.265% 1.037%
CUMULATIVE FINANCIAL SCHEDULE PROGRESS 0.00% 1.357% 3.709% 8.052% 14.098% 23.176% 31.543% 40.042% 46.167% 50.469% 59.662% 66.832% 72.817% 74.201% 75.141% 76.081% 77.019% 78.040% 79.018% 80.356% 82.012% 84.712% 88.619% 92.117% 95.697% 98.962% 100.00%
MONTHLY FINANCIAL ACTUAL PROGRESS 0.00% 1.357% 2.352% 4.342% 6.046% 9.079% 8.367% 8.499% 6.124% 4.302% 9.193% 7.170% 5.984% 1.388% 0.940% 0.997% 0.900% 1.134% 0.941% 1.099% 1.210% 1.100% 2.153%
CUMULATIVE FINANCIAL ACTUAL PROGRESS 0.00% 1.357% 3.709% 8.052% 14.098% 23.176% 31.543% 40.042% 46.167% 50.469% 59.662% 66.832% 72.817% 74.204% 75.145% 76.142% 77.042% 78.177% 79.118% 80.217% 81.427% 82.527% 84.680%

ACTUAL/AGAINST SCHEDULED Prepared By: Checked By:


SCHEDULED PROGRESS ­ REV 00

ACTUAL PROGRESS

SCHEDULED ­ REV 01 _____________________________ _____________________________


ACTUAL ­ REV 01 KINABALU HANDAL SDN. BHD. SARG KONSULT

141
PEMBAIKAN CERUN-CERUN DI JALAN KOTA K
PHYSICAL WORK PROGRAMME
ORIGINAL CONTRACT AMOUNT: RM18,989,431.50

CONTRACT SCHEDULE / ACTUAL OF WORK DONE


BILL NO. BILL ITEM BILL VALUE (RM) DESCRIPTION
VALUE % (Overall Scheduled/Ac JULY
% (Per Item)
Project) tual 12/7/2017
Clearing, Earthwork and Turfing 168,790.00 83.94% 0.75% S
0.89% 78.58% 0.70% A
Surface Drainage (Include Culverts) 249,590.00 74.99% 0.99% S
1.31% 62.50% 0.82% A
Concrete Works 723,350.00 94.00% 3.58% S
3.81% 100.00% 3.81% A
Road Pavement and Road Furniture 141,440.00 33.56% 0.25% S
0.74% 33.56% 0.25% A
Subsurface drainage 26,500.00 100.32% 0.14% S
2,254,400.00 0.14% 0.00% 0.00% A
11.87% Metal Works (Boom Gate) 7,000.00 0.00% 0.00% S
0.04% 0.00% 0.00% A
BILL NO. 2 SLOPE AT KM 83.90
Micro Piles 387,750.00 100.00% 2.04% S
2.04% 100.00% 2.04% A
Grouted Stone Pitching, Gabion and Reno Mat 337,880.00 33.33% 0.59% S
1.78% 78.07% 1.39% A
Geotechnical Instrumentation 1,500.00 0.00% 0.00% S
0.01% 0.00% 0.00% A
Guniting 155,250.00 33.39% 0.27% S
0.82% 33.33% 0.27% A
Traffic Management 41,850.00 85.92% 0.19% S
0.22% 87.49% 0.19% A
Maintenance of Road 13,500.00 86.53% 0.06% S
0.07% 88.04% 0.06% A
Clearing, Earthwork and Turfing 649,102.00 92.01% 3.15% S
3.42% 91.55% 3.13% A
Surface Drainage (Include Culverts) 680,768.00 27.62% 0.99% S
3.58% 31.50% 1.13% A
Concrete Works 3,098,700.00 95.44% 15.57% S
16.32% 95.46% 15.58% A
Road Pavement (Include Road Furniture 560,546.50 0.00% 0.00% S
2.95% 7.69% 0.23% A
Subsurface drainage 1,043,908.00 92.52% 5.09% S
5.50% 76.21% 4.19% A
16,735,031.50 Metal Works (Hand rail) 57,000.00 0.00% 0.00% S
142
BILL NO.3 SLOPE AT KM 96.70
0.30% 0.00% 0.00% A
BILL NO.3 SLOPE AT KM 96.70 88.13% Bored Cast in Situ Piles 5,455,490.00 100.00% 28.73% S
28.73% 100.00% 28.73% A
Prestressed Ground Anchors 4,479,690.00 91.60% 21.61% S
23.59% 83.70% 19.75% A
Grouted Stone Pitching, Gabion and Reno Mat 38,572.00 0.00% 0.00% S
0.20% 0.00% 0.00% A
Geotechnical Instrumentation 349,700.00 52.13% 0.96% S
1.84% 18.49% 0.34% A
Guniting 224,505.00 88.61% 1.05% S
1.18% 65.92% 0.78% A
Traffic Management 79,050.00 84.40% 0.35% S
0.42% 84.41% 0.35% A
Maintenance of Road 18,000.00 84.12% 0.08% S
0.09% 85.89% 0.08% A
18,989,431.50
TOTAL ORIGINAL CONTRACT SUM
100.000%
MONTHLY PHYSICAL SCHEDULE PROGRESS 0.00%
CUMULATIVE PHYSICAL SCHEDULE PROGRESS 0.00%
MONTHLY PHYSICAL ACTUAL PROGRESS 0.00%
CUMULATIVEPHYSICAL ACTUAL PROGRESS 0.00%

ACTUAL/AGAINST SCHEDULED Prepared By:


SCHEDULED PROGRESS ­ REV 00

ACTUAL PROGRESS REV 00

SCHEDULED ­ REV 01 __________________________
ACTUAL ­ REV 01 KINABALU HANDAL SDN. BHD.

143
ALAN KOTA KINABALU-SANDAKAN (LALUAN PERSEKUTUAN 22) PAKEJ 2 DI KM83.90 DAN KM96.70, SABAH

2017 2018
AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC JAN FEB
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
0.25% 0.25% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.25% 0.25% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.000% 0.000%
0.00% 0.00% 0.00% 0.22% 0.22% 0.22% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.22% 0.22% 0.22% 0.00% 0.00% 0.00% 0.000% 0.000%
0.00% 0.00% 0.00% 0.76% 0.76% 0.00% 0.00% 0.00% 0.00% 0.000% 0.229% 0.229% 0.229% 0.229% 0.229% 0.229%
0.00% 0.00% 0.00% 0.76% 0.76% 0.00% 0.00% 0.00% 0.00% 0.229% 0.229% 0.686% 0.229% 0.229% 0.229% 0.229%
0.12% 0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.12% 0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.000% 0.000%
0.48% 0.00% 0.00% 0.00% 0.00% 0.60% 0.60% 0.34% 0.00% 0.00% 0.025%
0.48% 0.00% 0.00% 0.00% 0.00% 0.60% 0.60% 0.34% 0.00% 0.00% 0.025% 0.000%
0.00% 0.00% 0.00% 0.00% 0.59% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.59% 0.00% 0.00% 0.00% 0.00% 0.000% 0.296% 0.112% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.000% 0.000%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.000% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003%
0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.000% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001%
0.21% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.23% 0.22% 0.22% 0.22% 0.000% 0.055% 0.055% 0.055% 0.055% 0.055% 0.055%
0.21% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.22% 0.23% 0.22% 0.22% 0.22% 0.053% 0.055% 0.053% 0.053% 0.053% 0.053% 0.053%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.000% 0.000%
0.00% 0.00% 1.36% 1.76% 1.36% 2.72% 1.36% 2.27% 1.13% 2.27% 0.000% 0.149% 0.149% 0.149% 0.149% 0.149% 0.149%
0.00% 0.00% 1.36% 1.76% 1.36% 2.72% 1.36% 2.27% 1.13% 2.27% 0.149% 0.140% 0.000% 0.160% 0.149% 0.149% 0.149%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.46% 2.27% 0.46% 0.400%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.46% 2.27% 0.46% 0.000% 0.385%

144
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.000% 0.000%
1.64% 3.27% 5.54% 6.39% 5.22% 3.38% 0.57% 0.00% 1.70% 0.23% 0.34% 0.453%
1.64% 3.27% 5.54% 6.39% 5.22% 3.38% 0.57% 0.00% 1.70% 0.23% 0.34% 0.458% 0.000%
0.00% 0.00% 1.18% 1.18% 2.59% 0.11% 1.13% 4.43% 3.40% 2.84% 0.000% 0.480% 0.480% 0.480% 0.480% 0.480% 0.480%
0.00% 0.00% 1.18% 1.18% 2.59% 0.11% 1.13% 4.43% 3.40% 2.84% 0.481% 0.480% 0.240% 0.464% 0.340% 0.340% 0.340%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.20% 0.34% 0.20% 0.00% 0.00% 0.134% 0.045%
0.00% 0.00% 0.00% 0.00% 0.00% 0.20% 0.34% 0.20% 0.00% 0.00% 0.000% 0.000% 0.000%
0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.000% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007%
0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.03% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007%
0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.000% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002%
0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002%

0.21% 2.28% 4.40% 5.91% 9.20% 8.43% 8.58% 6.05% 3.93% 9.67% 7.31% 6.18% 0.48% 0.93% 0.93% 0.93% 0.93% 1.06% 1.37%
0.21% 2.49% 6.90% 12.80% 22.01% 30.44% 39.02% 45.07% 49.00% 58.67% 65.98% 72.16% 72.64% 73.56% 74.49% 75.41% 76.34% 77.40% 78.77%
0.21% 2.28% 4.40% 5.91% 9.20% 8.43% 8.58% 6.05% 3.93% 9.67% 7.31% 6.18% 1.41% 0.92% 0.99% 0.92% 1.08% 0.90% 1.17%
0.21% 2.49% 6.90% 12.80% 22.01% 30.44% 39.02% 45.07% 49.00% 58.67% 65.98% 72.16% 73.57% 74.48% 75.47% 76.39% 77.47% 78.37% 79.54%

_____________
SDN. BHD.

145
AH

2019
MAR APR MAY JUN JUL AUG SEPT
20 21 22 23 24 25 12/09/2019
0.143% 0.143%
10000%
0.000% 0.000% 0.095%
0.164% 0.164% 0.164% 0.164%
0.000% 0.000% 0.164%
0.229% 0.229% 0.229% 0.229%
0.229% 0.000% 0.000% 9000%
0.150% 0.180% 0.165%
0.000% 0.000% 0.000%
0.140%
0.000% 0.000% 0.000%
8000%
0.037%
0.000% 0.000% 0.000%

0.000% 0.000% 0.000%


0.000% 0.297% 0.297% 0.297% 0.297% 7000%
0.091% 0.000% 0.297%
0.008%
0.000% 0.000% 0.000%
0.273% 0.273% 0.273%
0.000% 0.000% 0.273% 6000%
0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.021%
0.003% 0.003% 0.003%
0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.006%
0.001% 0.001% 0.001%
5000%
0.055% 0.055% 0.055% 0.055% 0.055% 0.055% 0.109%
0.053% 0.053% 0.000%
0.990% 0.990% 0.880% 0.725%
0.000% 0.000% 1.129%
0.149% 0.149% 0.149% 0.149% 0.230% 0.230% 0.135% 4000%
0.149% 0.149% 0.149%
1.250% 1.250% 0.452%
0.000% 0.227% 0.000%
0.400% 0.700% 0.400% 0.411%
0.359% 0.260% 0.000% 3000%
0.150% 0.150%
146
4000%

3000%

0.000% 0.000% 0.000%

0.000% 0.000% 0.000% 2000%


0.480% 0.480% 0.900% 0.900% 0.900% 0.183%
0.000% 0.194% 0.000%
0.203%
0.000% 0.000% 0.000%
0.320% 0.320% 0.320% 0.320% 0.298% 0.263% 1000%
0.340% 0.000% 0.000%
0.045% 0.045% 0.045% 0.045% 0.045% 0.045%
0.045% 0.000% 0.000%
0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.043%
0%
0.007% 0.007% 0.000%
0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.007%
0.002% 0.002% 0.002%

1.69% 2.29% 3.68% 4.14% 4.58% 3.58% 1.27%


80.46% 82.75% 86.43% 90.57% 95.16% 98.73% 100.00%
1.28% 0.90% 2.11%
80.82% 81.71% 83.82%

Checked By:

_____________________________
SARG KONSULT

147
COMPONENT ACHIVEMENT / SUMMARY WORKDONE (MAY 2019)
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU - SANDAKAN (LALUAN PERSEKETUAN 22) PAKEJ 2 DI KM 83.90 & KM 96.70, RANAU SABAH

BILL
CONTRACT ACTUAL
BILL NO. BILL ITEM VALUE DESCRIPTION WEIGHTAGE SCHEDULE (%)
VALUE (RM) (%)
(RM)

Contractual's Requirement 252,544.00 1.17% 1.17% 1.17%


991,564.00 SO's Requirement 281,450.00 1.31% 1.18% 1.18%
General
Prelim 4.60% Project Requirement 208,070.00 0.97% 0.82% 0.82%
Items
Authorities's Requirement 119,700.00 0.56% 0.47% 0.47%
Contractor's Requirement 129,800.00 0.60% 0.52% 0.52%
2.1 Clearing, Earthwork and Turfing 168,790.00 0.78% 0.61% 0.61%
2.2 Surface Drainage (Include Culverts) 249,590.00 1.16% 0.87% 0.72%
2.3 Concrete Works 723,350.00 3.36% 3.36% 3.36%
2.4 2,254,400.00 Road Pavement and Road Furniture 141,440.00 0.66% 0.22% 0.22%
2.5 10.46% Subsurface drainage 26,500.00 0.12% 0.12% 0.00%
2.6 Metal Works (Boom Gate) 7,000.00 0.03% 0.00% 0.00%
KM 83.90
2.7 Micro Piles 387,750.00 1.80% 1.80% 1.80%
2.8 Grouted Stone Pitching, Gabion and Reno Mattress 337,880.00 1.57% 0.78% 1.13%
2.9 Geotechnical Instrumentation 1,500.00 0.01% 0.00% 0.00%
2.10 Guniting 155,250.00 0.72% 0.24% 0.24%
2.11 Traffic Management 41,850.00 0.19% 0.17% 0.17%
2.12 Maintenance of Road 13,500.00 0.06% 0.06% 0.06%
3.1 Clearing, Earthwork and Turfing 649,102.00 3.01% 2.83% 2.78%
3.2 Surface Drainage (Include Culverts) 680,768.00 3.16% 1.00% 1.00%
3.3 Concrete Works 3,098,700.00 14.38% 13.85% 13.72%
3.4 Road Pavement (Include Road Furniture) 560,546.50 2.60% 0.00% 0.20%
3.5 16,735,031.50 Subsurface drainage 1,043,908.00 4.84% 4.50% 3.86%
3.6 77.65% Metal Works (Hand rail) 57,000.00 0.26% 0.00% 0.00%
3.7 KM 96.7 Bored Cast in Situ Piles 5,455,490.00 25.31% 25.31% 25.31%
3.8 Prestressed Ground Anchors 4,479,690.00 20.79% 19.85% 17.40%
3.9 Grouted Stone Pitching, Gabion and Reno Mattress 38,572.00 0.18% 0.00% 0.00%
3.10 Geotechnical Instrumentation 349,700.00 1.62% 0.93% 0.30%
3.11 Guniting 224,505.00 1.04% 0.92% 0.69%
3.12 Traffic Management 79,050.00 0.37% 0.07% 0.31%
3.13 Maintenance of Road 18,000.00 0.08% 0.07% 0.07%
350,000.00
4 PS PROVISIONAL SUM 350,000.00 1.62% 1.62% 1.63%
1.62%
1,219,859.73
GST GST 1,219,859.73 5.66% 5.03% 4.94%
5.66%
COMPONENT ACHIVEMENT / SUMMARY WORKDONE (MAY 2019)
PEMBAIKAN CERUN-CERUN DI JALAN KOTA KINABALU - SANDAKAN (LALUAN PERSEKETUAN 22) PAKEJ 2 DI KM 83.90 & KM 96.70, RANAU SABAH

FINANCIAL PROGRESS

DELAY/AHEAD
SCHEDULE (%) ACTUAL (%)
(%)
CUMULATIVE PROGRESS
88.619% 84.680% -3.94%

PHYSICAL PROGRESS

DELAY/AHEAD
SCHEDULE (%) ACTUAL (%)
(%)
CUMULATIVE PROGRESS
86.434% 83.824% -2.61%

*Based on Revised Work Programme No.01


ENT / SUMMARY WORKDONE (MAY 2019)
AN (LALUAN PERSEKETUAN 22) PAKEJ 2 DI KM 83.90 & KM 96.70, RANAU SABAH

AHEAD /
DELAY (%)

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
-0.14%
0.00%
0.00%
-0.12%
0.00%
0.00%
0.34%
0.00%
0.00%
0.00%
0.00%
-0.05%
0.00%
-0.13%
0.20%
-0.64%
0.00%
0.00%
-2.45%
0.00%
-0.63%
-0.24%
0.24%
0.00%
0.00%

-0.08%
ENT / SUMMARY WORKDONE (MAY 2019)