National Electric Power Company (NEPCO)

Substation Division
Protection and Metering Department
Maintenance Section
Differential Relay
1. General
Site: Circuit: Phase(s):
Type / Model No. Serial No.:
Rating Current: (A) Rating Voltage: (V) Rating Freq.: (HZ)
2. Mechanical Inspection & Tap Continuity Check:……………………………..

3.1 Electro-mechanical & Electronic relays (GEC, REYROLLE, AND BBC)


Setting: (GEC- DTH b%=………. ), (BBC g=….….. ,V=….…. ),(GEC-MBCH ,IS=…….. ).
Calculated Operating Measured Operating Current (A)
Bias Current (A)
Current (A) * ** *** R Y B
0.0

*GEC and ReyRolle Relays, (at bias 2.0 A, Id=2× b/ 1-0.5× b)


**B.B.C Relay (at bias 0 A: Id= g × IN × 100%), (at bias 2.0 A: Id = IN × g + (IB-0.5 × IN) ×V )
***GEC MBCH (at bias = 1.6A: Id = (1.15 × IB) – 0.9 +( 1.13 × IS) )

3.2 Numerical Relays (SPAD 3A1J6, SPAD 346C, KBCH):


(Basic setting IP= :………… %.) note: Vector group Setting to be Y-Y during test
Calculated Operating Measured Operating Current (A)
Bias Current (A)
Current (A) R Y B
Curve 1 Ib= 0.0
Curve 2 Ib=
Curve 3 Ib=
4. Timing Test
Measured Operating Time (ms)
Test Values (A) (All Types of Relays)
R Y B
I bias = 0 A I diff= 1.0 A
5. Operation Test
Alarm contact : Flag (LED) :
Trip Contact : Trip Lever :
Shorting Bridge :
********** For numerical relays: Tests results stored in Test set are attached
6. Remarks:
Foreman Name Eng. Name
Foreman Sign. Eng. Sign.
Date Date

Form #: QP17/01/F02 Page 1 of 1 Issue/Rev.: 1/b