GENERAL CONDITIONS:
I. SCOPE OF WORK
The work to be undertaken in this contract shall include:
a. Furnishing of all necessary materials, labor and equipment required in the
construction.
b. Complete construction in accordance with the plan and specification submitted
herewith.
c. All works took be done shall be of the highest quality of workmanship and to the
fullest intent of the plan and specification unless otherwise specified by the
Engineer.
III. LOCATION
a. The proper structure is to be created.
b. The structure shall be staked out and grade established by the Engineer or his
authorized representative.
c. All materials shall be stored within our near sure work and shall be conducted in
such a manner as to preserve all works by the Engineer.
IV. EXCAVATION
a. All excavation required for foundation indicated on the site drawing shall be done by
the contractor by his expense.
b. Excavation shall be done in accordance from the bottom of the excavation before
setting up the footing and no footing shall be rest on fill.
c. All fills shall be placed 1 layer not exceeding 150mm thickness, each layer is to be
compacted by wetting, tamping and rolling.
d. After forms have been removed from footings, the materials from excavation shall
be used for backfilling. Materials not used shall be placed on an immediate premise
as directed by the Engineer provided the contractor shall not require moving such
materials more than 50 meters.
VI. FRAMING
a. All framing shall be mortised and tenoned and fitted together with closed tight joints
in approved manner. No joint on the purlins will be allowed between bearings. Ask
openings shall have frames or dimensions shown on the drawings.
VII. HARDWARE
a. Hardware to be used in this building shall be approved typed depending upon the
owner's request with the approval of the Engineer with respect to the adaptability
and availability on the market.
VII. PAINTING
a. All painting materials shall have first grade quality and shall meet the requirements
of the Government Standard Specifications and shall be approved and delivered in
original container. No ready mixed paint shall be allowed.
b. No painting shall be done in wet weather. All works shall be done in first class
workmanship. No succeeding costs shall be done it applied unless the preceding
costs have been inspected and accepted by the Engineer.
IX. MISCELLANEOUS
a. Any work in connection with these specifications, which are not specified herewith
but necessary to have and desired by the owner with the approval of the Engineer
shall be done in the best and approved manner in accordance with the standard
practice and based on reasonable interpretation of the plan.