The document is a cost estimate summary from the Northern Central Luzon Management Office of the National Housing Authority for individual electrical and water service connections at the Balagtas Heights Resettlement Project in Brgy. Santol, Balagtas, Bulacan. It provides estimates from C.S. Garcia Construction and the NHA for the materials, labor, and fees required. The total estimated cost for individual power and water distribution is 9,100 pesos according to C.S. Garcia Construction and 9,050 pesos according to the NHA.
The document is a cost estimate summary from the Northern Central Luzon Management Office of the National Housing Authority for individual electrical and water service connections at the Balagtas Heights Resettlement Project in Brgy. Santol, Balagtas, Bulacan. It provides estimates from C.S. Garcia Construction and the NHA for the materials, labor, and fees required. The total estimated cost for individual power and water distribution is 9,100 pesos according to C.S. Garcia Construction and 9,050 pesos according to the NHA.
The document is a cost estimate summary from the Northern Central Luzon Management Office of the National Housing Authority for individual electrical and water service connections at the Balagtas Heights Resettlement Project in Brgy. Santol, Balagtas, Bulacan. It provides estimates from C.S. Garcia Construction and the NHA for the materials, labor, and fees required. The total estimated cost for individual power and water distribution is 9,100 pesos according to C.S. Garcia Construction and 9,050 pesos according to the NHA.
Summary of Cost Estimate for Individual Power and Water Service Connection
Project : Balagtas Heights Resettlement Project
Location : Brgy. Santol, Balagtas, Bulacan
C.S. GARCIA CONSTRUCTION NHA
PARTICULARS UNIT QTY. UNIT COST SUB-TOTAL QTY. UNIT COST SUB-TOTAL 1. ELECTRICAL SUPPLY A. Grounding System A.1. Materials TW Wire #8 m 4.5 53.00 238.50 4.5 35.30 158.85 Grounding Rod Clamp ⅝ pc 1 72.00 72.00 1 85.00 85.00 Grounding Rod pc 1 570.00 570.00 1 320.00 320.00 PVC Elbow ½" Ø pc 1 17.00 17.00 1 14.00 14.00 PVC Clamp pc 5 10.00 50.00 5 12.00 60.00 PVC Pipe ½" Ø lm. 4.5 90.00 405.00 4.5 90.00 405.00 Adaptor ½" Ø pc 3 20.00 60.00 3 14.00 42.00 Junction Box with Plate Cover set 1 42.00 42.00 1 35.00 35.00 Terminal Lug pc 1 75.00 75.00 1 75.00 75.00 Electrical Tape pc 1 30.00 30.00 1 25.00 25.00 Solvent Cement (100cc) can 1 65.00 65.00 1 70.00 70.00 Sub-Total: Materials 1,624.50 1,289.85 A.2. Installation of Grounding Pipe 500.00 500.00 B. Meralco Service Connection Fee/ Deposit 990.00 990.00 C. Permit Fees (Electrical/ Occupancy/ 769.00 769.00 Master Electrician Fee) with Individual Power Service Installation Total Electrical Distribution Cost 3,883.50 3,548.85 say 3,800.00 say 3,550.00 1. WATER SUPPLY A. Waterline to Individual Unit A.1. Materials (4 units) Saddle Clamp 3" pc 1 300.00 300.00 1 350.00 350.00 P.E. Hose 1"Ø lm. 1 43.00 43.00 1 43.00 43.00 P.E. Connector 1"Ø pc 2 76.00 152.00 2 80.00 160.00 G.I. Reducer 1"x¾"Ø pc 1 22.00 22.00 1 24.00 24.00 G.I. Nipple ¾"x3" Ø pc 4 20.00 80.00 4 18.00 72.00 G.I. Tee Reducer ¾"x½"Ø pc 3 24.00 72.00 3 32.00 96.00 G.I. Elbow Reducer ¾"x½"Ø pc 1 14.00 14.00 1 20.00 20.00 G.I. Nipple ½"x6" Ø pc 8 24.00 192.00 8 25.00 200.00 Ball Valve ½" pc 4 150.00 600.00 4 125.00 500.00 G.I. Straight Elbow ½" Ø pc 4 13.00 52.00 4 12.00 48.00 Water Meter pc 4 250.00 1,000.00 4 280.00 1,120.00 G.I. Elbow ½"Ø pc 8 13.00 104.00 8 12.00 96.00 P.E. Adaptor ½"Ø pc 8 50.00 400.00 8 50.00 400.00 Blue PVC Pipe ½"Ø lm. 40 30.00 1,200.00 40 30.00 1,200.00 Solvent Cement (100cc) pc 1 65.00 65.00 1 70.00 70.00 Teflon Tape pc 2 11.00 22.00 2 12.00 24.00 Materials Cost (4 units/cluster) 4,318.00 4,423.00 Sub-Total: Materials Cost/ Unit 1,079.50 1,105.75 A.2. Labor Cost Plumber 500.00 500.00 Laborer 300.00 400.00 A. Water Service Connection Fee 3,500.00 3,500.00 Total Water Distribution Cost 5,379.50 5,505.75 say 5,300.00 say 5,500.00 Total Power and Water Distribution Cost 9,263.00 9,054.60 9,100.00 9,050.00
Prepared by: Verified by: Conforme:
CESAR A. JONOS RAMON S. PARAGAS CRISANTO S. GARCIA
Supervising Engineer Manager Owner/ Manager Region III-A Region III-A C.S. Garcia Construction National Housing Authority Northern Central Luzon Management Office Summary of Cost Estimate for Individual Power and Water Service Connection
Project : Balagtas Heights Resettlement Project
Location : Brgy. Santol, Balagtas, Bulacan
C.S. GARCIA CONSTRUCTION NHA
PARTICULARS UNIT QTY. UNIT COST SUB-TOTAL QTY. UNIT COST SUB-TOTAL 1. ELECTRICAL SUPPLY A. Grounding System A.1. Materials TW Wire #8 m 4.5 53.00 238.50 4.5 35.30 158.85 Grounding Rod Clamp ⅝ pc 1 72.00 72.00 1 85.00 85.00 Grounding Rod pc 1 570.00 570.00 1 320.00 320.00 PVC Elbow ½" Ø pc 1 17.00 17.00 1 14.00 14.00 PVC Clamp pc 5 10.00 50.00 5 12.00 60.00 PVC Pipe ½" Ø lm. 4.5 30.00 135.00 4.5 30.00 135.00 Adaptor ½" Ø pc 3 20.00 60.00 3 14.00 42.00 Junction Box with Plate Cover set 1 42.00 42.00 1 37.00 37.00 Terminal Lug pc 1 75.00 75.00 1 75.00 75.00 Electrical Tape pc 1 30.00 30.00 1 25.00 25.00 Solvent Cement (100cc) can 1 65.00 65.00 1 70.00 70.00 Sub-Total: Materials 1,354.50 1,021.85 A.2. Installation of Grounding Pipe 350.00 500.00 B. Meralco Service Connection Fee/ Deposit 990.00 990.00 C. Permit Fees (Electrical/ Occupancy/ 769.00 769.00 Master Electrician Fee) with Individual Power Service Installation Total Electrical Distribution Cost 3,463.50 3,280.85 say 3,500.00 3,300.00 1. WATER SUPPLY A. Waterline to Individual Unit A.1. Materials (4 units) Saddle Clamp 2"x1" pc 1 300.00 300.00 1 340.00 340.00 P.E. Hose 1"Ø lm. 1 43.00 43.00 1 43.00 43.00 P.E. Connector 1"Ø pc 2 76.00 152.00 2 320.00 640.00 G.I. Reducer 1"x¾"Ø pc 1 22.00 22.00 1 30.00 30.00 G.I. Nipple ¾"x3" Ø pc 4 20.00 80.00 4 18.00 72.00 G.I. Tee Reducer ¾"x½"Ø pc 3 24.00 72.00 3 50.00 150.00 G.I. Elbow Reducer ¾"x½"Ø pc 1 14.00 14.00 1 35.00 35.00 G.I. Nipple ½"x6" Ø pc 8 24.00 192.00 8 23.00 184.00 Ball Valve ½" pc 4 150.00 600.00 4 240.00 960.00 G.I. Straight Elbow ½" Ø pc 4 13.00 52.00 4 13.00 52.00 Water Meter pc 4 250.00 1,000.00 4 280.00 1,120.00 G.I. Elbow ½"Ø pc 8 13.00 104.00 8 13.00 104.00 P.E. Adaptor ½"Ø pc 8 50.00 400.00 8 15.00 120.00 Blue PVC Pipe ½"Ø lm. 40 30.00 1,200.00 40 30.00 1,200.00 Solvent Cement (100cc) pc 1 65.00 65.00 1 70.00 70.00 Teflon Tape pc 2 11.00 22.00 2 12.00 24.00 Materials Cost (4 units/cluster) 4,318.00 5,144.00 Sub-Total: Materials Cost/ Unit 1,079.50 1,286.00 A.2. Labor Cost Plumber 500.00 500.00 Laborer 300.00 400.00 A. Water Service Connection Fee 3,500.00 3,500.00 Total Water Distribution Cost 5,379.50 5,686.00 say 5,400.00 5,700.00 Total Power and Water Distribution Cost Php 8,900.00 Php 9,000.00
Prepared by: Verified by: Conforme:
CESAR A. JONOS RAMON S. PARAGAS CRISANTO S. GARCIA
Supervising Engineer Manager Owner/ Manager Region III-A Region III-A C.S. Garcia Construction