Sunteți pe pagina 1din 3

APPENDIX A

E S T I M AT E D E L E C T R I C A L D E M A N D
F RO M N E W D E V E LO P M E N T P RO J E C T S

City of Pasadena
Water & Power Department
Electric Distribution System Master Plan
PWP Electric System Master Plan
Appendix A
Estimated Electrical Demand From New Development Projects
Estimated
ID Demand
No. Substation Circuit Project Name Address (kVA) Description Status
1 Chester Lake Crown City Office Development 203 N. Lake Avenue 2000 230,000 sq ft, 6-story office building Under construction
2 Chester Union Archstone Pasadena 720 E. Colorado Boulevard 400 Residential apartments — 5-story mixed-use over parking, 8,000 sq ft commercial, 120 units Retail and residential leasing
underway
3 Chester Union Unknown 25 S. Oak Knoll Avenue Not provided
4 Chester Union The Fountains at Pasadena 775 E. Union 400 4-story, 98-unit senior housing project plus 78 parking spaces Construction complete
5 Chester Union Granada Court Development 77 N. Oak Knoll Ave. 150 Mill Creek Properties (29-unit apartments) Planning
6 Del Mar Arbor Del Mar Joint Development 240 S. Raymond Avenue 2000 Not provided
7 Del Mar Dayton Ambassador College 300 W. Green Street 4000 1,431 residential units Planning
8 Del Mar Dayton Pasadena Palace 159 W. Green Street 200 5-story mixed-use development with 38 apartment units and 8,200 sq ft retail Under construction
9 Del Mar Dayton Roosevelt School 315 N. Pasadena Avenue 400 Under construction
10 Del Mar Vernon Stats on Green 170 S. Raymond Avenue 1000 Stats on Green Planning
11 Del Mar Vernon Messina Mixed-Use Projects 65 W. Dayton Street 200 4-story mixed-use development with 42 apartment units and 12,700 sq ft office/retail Under construction
12 Del Mar Vernon Green Delacey Mixed-Use 100-120 W Green Street 300 4-story mixed-use project with 61 residential units and 8,878 sq ft commercial Planning
13 Del Mar Vernon Delacey Flats 250 S. Delacey Street 200 6-story mixed-use project with 34 condominiums and 8,594 sq ft commercial Planning
14 Del Mar Vernon One East Union 1 East Union 500 Office building Planning
15 Del Mar Vernon Pasadena Market Place 55 S. Fair Oaks Avenue 800 Planning
16 Eastern Foothill Space Bank Expansion 3202 Foothill Boulevard 2000 Planning
17 Eastern Foothill Foothill Retail 3455 E. Foothill Boulevard 100 Retail Under construction
18 Glenarm Marengo Euclid Condos 233 S. Euclid Avenue 300 82-unit condos Planning
19 Glenarm Plaza The Montana 301 E. Colorado Boulevard 1000 The Montana Planning
20 Oak Knoll Alpine Glenarm Townhouses 270 E. Glenarm Street 150 15 townhouse units Under construction
21 Oak Knoll California San Pasqual Residential 947 E. California Boulevard 300 4-story, 72-unit residential development Planning
22 Oak Knoll California San Pasqual - Unknown 950 San Pasqual Street 300 Estimated Planning
23 Oak Knoll Hudson Pasadena Collection 175 S. Lake Avenue 1500 Champion Office Building — 5-story, 115,000 sq ft office with 485 parking spaces Under construction
24 Oak Knoll Hudson Pasadena Collection Luxury Apts. 160 S. Hudson Avenue 434 Champion Residential — 4-story, 72 residential units and 2,045 sq ft retail Under construction
25 Oak Knoll Hudson Art Center 950 S. Raymond Avenue 1200 Under construction
26 Oak Knoll Hudson Lofts at South Lake 840 E. Green Street 700 Mixed-use project (103 residential units and commercial space) Under construction
27 Oak Knoll Mentor Trio Mixed-Use development 621 E. Colorado Boulevard 2000 304 residential units, 882 parking spaces, 14,602 sq ft retail Under construction
28 Oak Knoll Mentor Plaza las Fuentes II 385 E. Colorado Boulevard 2400 255,000 sq ft, 5-Story office building Construction complete
29 Santa Anita Altadena Artisan Square 435 N. Altadena Avenue 200 52-unit condominium development Under construction
30 Santa Anita Halstead Stuart Pharmaceutical 3360 E. Foothill Boulevard 1000 Pinnacle at Sierra Madre Villa — 350,000 sq ft office R&D and construction of 4-level residential building Planning
with 188 apartment units
31 Santa Anita Hill Craig Townhouses 38 S. Craig Avenue 50 5 townhouse units Under construction
32 Santa Anita Maple Foothill Storage 2181 E. Foothill Boulevard 100 Self-storage Planning
33 Santa Anita Vinedo San Gabriel Commercial 150 S. San Gabriel 500 Commercial building Under construction
34 Villa Belmont Fair Oaks - Belmont 730-790 N. Fair Oaks Avenue 400 Planning
35 Villa Belmont Rosewood Court Housing 1880 N. Fair Oaks Avenue 100 65-unit apartment Leasing underway
36 Villa Carson Fair Oaks Executive Suites 408 N. Fair Oaks Avenue 100 3-story office building of 16,103 sq ft Planning
37 Villa Carson Bryant Office Bldg. 751 N. Fair Oaks Avenue 100 3-story office building of 14,371 sq ft Planning
38 Villa Carson Heritage Square 760 N. Fair Oaks Avenue 200 Multi-family affordable senior residential — 106 units/4,000 sq ft commercial Planning
39 Villa Carson Orange Grove Apartments 270 E. Orange Grove Boulevard 100 37-unit apartment Planning
40 Villa Carson Renaissance Court 466 E. Orange Grove Boulevard 100 3-story mixed-use project with 31 residential units and 24,704 sq ft commercial Planning
41 Villa Parsons Boston Building Rehab and Addition 35 N. Raymond Ave. 150 4-story mixed-use project with 38 residential units and 13,845 sq ft commercial Under construction
42 Villa Villa Oak Knoll Villa 130 N. Oak Knoll Ave. 200 Under construction
43 Villa Villa Madison Apartments 280 N. Madison Avenue 150 48-unit apartment Under construction
44 Villa Villa Walnut Place Apartments 712 E. Walnut Street 150 28-unit apartment Under construction
Page 1 of 2
PWP Electric System Master Plan
Appendix A
Estimated Electrical Demand From New Development Projects
Estimated
ID Demand
No. Substation Circuit Project Name Address (kVA) Description Status
45 Villa Villa Oak Knoll Condominiums 128 N. Oak Knoll Ave. 318 4-story, 53-unit condominium project Under construction
46 TBD TBD Fuller Seminary Student Housing 255 N. Madison Avenue 960 4-story, 160-unit student housing complex; 4 buildings over subterranean parking Planning
47 TBD TBD Colorado-Catalina Business Financial Center 1010 E. Colorado Boulevard 91 2-story, 18,236 sq ft commercial office building Redevelopment project -
Pending
48 TBD TBD Vista del Arroya 3 South Grand Avenue 96 Converting 8 bungalows on site to 16 residential units and new construction of 29 condominium units in Planning
three new buildings of 47,562 sq ft
49 TBD TBD Pasadena Physicians LLC 620 S. Raymond Avenue 225 Converting 2 single-story warehouses with 12,204 sq ft into a new 5-story, 45,076 sq ft medical office Planning
building with 3 levels of parking and two levels of office space
50 TBD TBD Gardens on the Hill 315 N. Hill Avenue 204 Converting a single-family residential unit to a mixed-use development with 34 apartments in a 4-story Planning
building
51 TBD TBD Fair Oaks Summit 1703 N. Fair Oaks Avenue 150 Converting 3 existing buildings totaling 3,200 sq ft to 25 townhouse condominiums with 61,050 sq ft No approvals

52 TBD TBD Fair Oaks Terrace 1424 N. Fair Oaks Boulevard 720 Converting existing buildings totaling 1,178 sq ft to 12 townhouse condominiums with 27,976 sq ft No approvals

53 TBD TBD Lincoln-Montana Commercial Development 2051-2059 Lincoln Avenue 81 15,000 sq ft commercial development with 2 office buildings at 12,000 sq ft and 2 retail buildings at Completed. Leasing currently
3,000 sq ft underway
54 TBD TBD Orange Grove Gardens 252 E. Orange Grove Boulevard 228 3-story apartment development with 38 residential units in 3 buildings Planning
55 TBD TBD Washington Theatre 841 E. Washington Boulevard 500 Reuse of historic cinema building into a mixed-use development Sale pending
56 TBD TBD Central Park Market at Del Mar Station 252 S. Raymond Avenue 2159 Construction of 4 new buildings totaling 484,458 sq ft, including 347 residential units and 11,000 retail Under construction
use
57 TBD TBD Montana Residential Project 325 E. Colorado Boulevard 366 The Montana Phase I and II (6-story, 36-unit and 5-story, 25-unit condominium project) Planning
58 TBD TBD Marengo Condominiums 215 S. Marengo Avenue 228 Converting 6-unit apartment building into 38 condominium studio units Planning
59 TBD TBD Archstone Pasadena 25 S. Oak Knoll Avenue 970 5-story mixed-use development with retail space and 120 residential units Retail and residential leasing
underway
60 TBD TBD Lake-Walnut Mixed-use Development 220 N. Lake Avenue 674 6-story building with 94 condominium units, 9,200 sq ft retail and 9,200 sq ft office space (180,382 sq ft Planning
total)
61 TBD TBD Playhouse Condominiums 50 S. Madison Avenue 1126 Mixed-use development with 146 residential units and retail Planning
62 TBD TBD Union Village 62-100 N. El Malino Avenue 874 Two-phase mixed-use project with new 104-unit apartment complex and retail spaces Planning
63 TBD TBD Unknown 686-700 E. Union Street 250 Unknown
64 TBD TBD Walnut/Hudson Mixed-Use Project 233 N. Hudson Avenue 382 Mixed-use development with 22 apartments and retail space Planning
65 TBD TBD Milan Lofts 310 S. Arroyo Parkway 658 68-unit condominium development with retail spaces Pending
66 TBD TBD Hillside Homes for Children 940 Avenue 64 250 Unknown Application made
67 TBD TBD Mayfield Senior School 500 Bellefontaine Street 250 Unknown Application made
68 TBD TBD Polytechnic School 1030 E. California Boulevard 250 Unknown Application made
69 TBD TBD Huntington Memorial Hospital 100 W. California Boulevard 250 Huntington Memorial Hospital — phase III (hospital expansion) Planning
70 TBD TBD Plaza of the Americas 350 N. Los Robles 5664 1,180,000 sq ft multi-use project to be built over 210 ROW Application made
71 TBD TBD Raymond Theater 129 N. Raymond Avenue 198 Addition of new building (39,600 sq ft) Planning
72 TBD TBD Rose Court 1000 Rose Avenue 312 3-story, 52-unit townhouses On hold
73 TBD TBD PSP_Kinneloa 140 S. Kinneloa Avenue 51 51,190 sq ft self-storage Application made
74 TBD TBD Royal Laundry Residential Units 443 S. Raymond Avenue 288 Conversion of office building to 48 residential units Application made
75 TBD TBD PSP_Sierra Madre 3111 E. Sierra Madre Boulevard 216 216,451 sq ft self-storage facility Application made
76 TBD TBD Annandale Canyon Estates Weirfield Drive 288 24 single-family homes Planning
77 TBD TBD William Carrey International University 1610 Elizabeth Street 250 Unknown Application made
78 TBD TBD Stor-Box Self Storage 2233 E. Foothill Boulevard 100 Unknown Planning
79 TBD TBD Pasadena Conference Center Expansion 300 E. Green Street 1082 Construction of new 55,653 sq ft ballroom and 160,768 sq ft of exhibit hall Planning
Total Estimated Demand from Known Development Projects (kVA) 46,845
Page 2 of 2

S-ar putea să vă placă și