Sunteți pe pagina 1din 102

Government of Andhra Pradesh

COMMON REFORMULATED BASIC


SCHEDULE OF RATES FOR THE
YEAR 2003-04 IN THE LIGHT OF
G.O.Ms.No.118 dt:09.11.2018

BOARD OF CHIEF ENGINEER


Index

S I. Description Page No.


No.
From To

1. Material Rates 1 16
2. Building Items, Sanitary & Water Supply Items 1 78
3. Public Health Items 1 7
Si. SS DESCRIPTION OF MATERIAL UNIT Basic rate
No. Item for SOR
No. 2003-04
Excluding
subsumed
taxes

1 2 3 4
Materials
(A) STONE AND ROAD MATERIALS

ROUGH STONE QUARRIED


INCLUDING WEDGING, BREAKING,
BURNING, SPLITTING AND
STACKING.
89 22.a For R.R Masonry Work (other than 1 cum 82.41
Granite, Dolomite and Trap)

90 b.i For SS Revetment work 225 mm 1 cum 43.52


91 b.ii For SS Revetment work 300 mm 1 cum 58.33
92 b.iii For SS Revetment work 450 mm 1 cum 69.44
93 c Jeddy Stone above 450 mm to 600 mm 1 cum 96.30

94 d i Laterite for revetment 225 mm 1 cum 60.19


95 d ii Laterite for revetment 300 mm 1 cum 69.44
96 d iii Granite for SS revetment 225 mm 1 cum 71.30
97 d iv Granite for SS revetment 300 mm 1 cum 83.33
Note:- Only when other granite is not available

98 e Laterite for masonry 1 cum 69.44


99 f Cyclopean stones above 0.2 cum 1 cum 128.70

100 g For R.R.Masonry works ( granite, 1 cum 95.37


dolamite and trap variety)
101 NOTE:- For items 22(a) to 22© and 22(g) 1 cum 51.00
add extra Rs /cum, wherever
quarrying is done by blasting

COURSED RUBBLE STONE


QUARRYING WEDGING, BREAKING,
BURNING AND SPLITTING FOR SS
FIRST SORT WORKS
102 23.a Granite, Dolamite and trap 1 cum 137.04
103 23.b For other varieties 1 cum 94.44

1
104 27 Granite stone slabs for culverts, lintels 1 cum 873.15
and copings (3 faces dressed coarsed
rubble masonry)

105 NOTE: - For items 23(a), 23(b) and 27 1 cum 51.00


add extra Rs. Per Cum, wherever
quarrying is done by blasting
106 28.a Bond stones ( 600 x 200 x 200 mm ) each 13.89
107 b Chainage stones and Centre line stones each 18.52
(750x150x150 mm)
Kilometers stones (1100 x 370 x 250 each deleted
mm)
5th Kilometers stones (1520 x 520 x 250 each deleted
mm)
Hectometers stones (900 x 200 x 200 each deleted
mm)
108 31 Demarcation Stones ( 900 x 150 x 150 each 28.70
mm)
109 32.a Guard Stones ( 1200 x 200 x 200 mm ) each 45.37

110 B Guide Stones ( 800 x 150 x150 mm ) each 28.70

111 C Carving letters and figures in stone up to each 2.87


100 mm size
112 D Carving letters and figures in stone above each 3.80
100 mm size
HARD BROKEN STONE OF GRANITE,
TRAP AND DOLERITE FREE FROM
DUST OBTAINED BY QUARRYING,
WEDGING, BREAKING, BURNING AND
SPLITTING
113 33 a - do - 6mm size (SS 5) 1 cum 210.19
114 b - do - 10mm size (SS 5) 1 cum 277.78
115 c - do - 12mm size (SS 5) 1 cum 333.33
116 d - do - 20mm size (SS 5) 1 cum 416.67
117 e - do - 25mm size (SS 5) 1 cum 416.67
118 f - do - 40mm size (SS 5) 1 cum 238.89
119 g - do - 50mm size (SS 5) 1 cum 165.74
120 h - do - 60mm size (SS 5) 1 cum 165.74
121 i - do - 65mm size (SS 5) 1 cum 165.74
122 j - do - 75mm size (SS 5) 1 cum 111.11
123 k - do - 75 to 100 mm size (SS 5) 1 cum 99.07
124 NOTE:- (1) Add extra Rs. 51.00 /- per 1 cum 51.00
cum for items 33 (a) to 33 (k) if the
metal is obtained by blasting
125 (2) Add 25% extra per cum if the metal 1 cum 25%
is obtained by machine crushing
excluding cost of blasting.

2
126 (3) Deduct Rs. 5.00 /- per cum if the 1 cum 5.00
metal or rubble is obtained from surface
stone and boulders.
127 (4) Add Rs. 11.00 /- per cum for Add 11.00
selection of stones and boulders from Deduct 5.00
excavated spoil dumps for items 33 a to
33 k, when this addition of Rs. 11.00 /-
per Cum is allowed, deduction of Rs. 5.00
/- per Cum mentioned under Note (3)
above should invariably be made.
SOFT BROKEN STONE SCREENED AND
FREE FROM DUST INCLUDING
STACKING
128 33.l - do - 40 mm size ( SS 5 ) 1 Cum 53.70
129 33.m - do - 50 mm size ( SS 5 ) 1 Cum 48.15
130 33.n - do - 60 mm size ( SS 5 ) 1 Cum 37.96
131 33.o - do - 65 mm size ( SS 5 ) 1 Cum 33.33
132 33.p - do - 75 mm size ( SS 5 ) 1 Cum 31.48
HARD BROKEN STONE OF GRANITE
TRAP DOLERITE AND DOLAMITE FREE
FROM DUST OBTAINED BY
QUARRYING WEDGING, BREAKING,
BURNING AND SPLITTING
(QUARTZITE AND BASALT WITH
AGGREGATE IMPACT OF LESS THAN
20)
133 33a -do- 5 to 7mm size (IRC & MORTH) 1 cum 210.19
134 b -do- 9.5 to 11.2mm size (IRC & MORTH) 1 cum 277.78
135 c -do- 12mm to 14 mm size ( IRC and 1 cum 333.33
MORTH )
136 d -do- 19 mm to 22 mm size ( IRC and 1 cum 416.67
MORTH )
137 e -do- 25 mm to 27 mm size ( IRC and 1 cum 416.67
MORTH )
138 f -do- 40 mm to 45 mm size ( IRC and 1 cum 238.89
MORTH )
139 g -do- 50 mm to 55 mm size ( IRC and 1 cum 165.74
MORTH )
140 h -do- 60 mm to 63 mm size ( IRC and 1 cum 165.74
MORTH )
141 i -do- 65 mm size ( IRC and MORTH ) 1 cum 165.74
142 j -do- 75 mm size ( IRC and MORTH ) 1 cum 111.11

143 l NOTE:- Add extra Rs.51.00 /- per cum 1 cum 51.00


for items 33 (a) to 33 (j) if the metal is
obtained by blasting
144 2 Add 25% extra per cum if the metal is 1 cum 25%
obtained by machine crushing excluding
cost of blasting.

3
145 3 Deduct Rs.5.00 /- per cum if the metal 1 cum 5.00
or rubble is obtained from surface stones
and boulders
146 4 Add Rs.11.00 /- per cum for selection of Add 11.00
stones and boulders from excavated soil
dumps for items 33 (a) to 33 (k), when
this addition of Rs.11.00 /- per cum
allowed deduction of Rs.5.00 /- per cum
mentioned under note (3) above should
invariably be made
HARD BROKEN STONE OTHER THAN
GRANITE SUCH AS QUARTZ, QUARTZ-
NAPA AND BASALT SCREENED AND
FREE FROM DUST INCLUDING
STACKING
147 33.q - do - 10 mm size (SS 5) 1 Cum 165.74
148 -do- 9.5 mm to 11.2 mm size ( IRC and 1 Cum 165.74
MORTH )
149 r - do - 12 mm size (SS 5) 1 Cum 155.56
150 -do- 12mm to 14 mm size ( IRC and 1 Cum 155.56
MORTH )
151 S - do - 20 mm size (SS 5) 1 Cum 125.93
152 -do- 19 mm to 22 mm size ( IRC and 1 Cum 125.93
MORTH )
153 T - do - 25 mm size (SS 5) 1 Cum 124.07
154 U - do - 40 mm size (SS 5) 1 Cum 73.15
155 -do- 40 mm to 45 mm size ( IRC and 1 Cum 73.15
MORTH )
156 V - do - 50 mm size (SS 5) 1 Cum 64.81
157 -do- 50 mm to 55 mm size ( IRC and 1 Cum 64.81
MORTH )
158 33.w - do - 65 mm size (SS 5) 1 Cum 61.11
159 -do- 60 mm to 65 mm size ( IRC and 1 Cum 61.11
MORTH )
160 X - do - 75 mm size (SS 5) 1 Cum 50.93
161 - do - 75 mm size ( IRC &MORTH) 1 Cum 50.93

162 Y - do - 75 to 100 mm size (SS 5) 1 Cum 39.81

163 - do - 75 to 100 mm ( IRC& MORTH) 1 Cum 39.81

OTHER ITEMS INCLUDING STACKING


164 33.z1 Laterite 40 to 75 mm ( ring) 1 Cum 46.30

165 z2 kankar, hard broken kankar 40 to 75 mm 1 Cum 36.11


( ring )

4
166 z3 Soling stone of 150 mm size of granite, 1 Cum 46.30
trap and Dolamite varieties.

167 NOTE:- (1) Add extra for items to 33(z3) 1 Cum 51.00
Rs 51.00 /- Per cum, wherever
quarrying is done by blasting. (2)
Wherever controlled blasting is resorted
to the Chief Engineer concerned shall
approve the observed data in support of
SS item No. 22 a to 22 c , 22g, 23a , 23b,
27, 33a to 33k and 33(z3).
168 z4 Soling stone of 150 mm size other than 1 Cum 32.41
granite variety
169 z5 Soling Stone laterite, Kankar 150mm, 1 Cum 19.44
surface stone
170 z6 Field picked metal unbroken 20 mm 1 Cum 27.78
size
171 z7 - do - 25 mm size 1 Cum 21.30
172 z8 - do - 40 mm size 1 Cum 23.15
173 z9 - do - 50 mm size 1 Cum 21.30
174 z10 - do - 60 mm size 1 Cum 16.67
175 z11 - do - 80 mm size 1 Cum 12.96
176 NOTE:- Add Rs.11.00 /- Per Cum for Add 11.00
selection of stone and boulders from
excavated spoil dumps for items 33 (Q)
TO 33 Z , when this addition of Rs. 11.00
/- per Cum is allowed, deduction of Rs.
5.00 /- per Cum should invariably be
made towards the metal or rubble if it is
obtained from surface stone and
boulders.
Deduct 5.00
177 34 Gravel including stacking 1 Cum 37.00
178 35 a Quarry rubbish 1 Cum 13.89
179 36.a Sand for mortar,ceiling coat including 1 cum 62.96
washing,screening etc.
180 b. Sand for filling and blindage 1 cum 25.00
181 37 Clay for puddle and masonry Items 38 (a) 1 Cum 18.00
to 39 (h) As per local prevailing rates
based on competitive quotations.

(C) LIME AND CEMENT


182 40 to As per local
41(c ) prevailing rates
based on
competitive
rates

5
183 42 Cement excluding cost of empty cement 1 MT 1724.14
bags

NOTE: (1) The rates is material at site


(No conveyance charges to be allowed)
2)As per the rates applicable to the
District. 3) Least of the (1) and (2 )
above may be allowed
184 42 a Labour for mixing cement mortar 1 Cum 18.00
185 b Mixing of cement mortar by machine 1 Cum 31.00

186 C Grinding lime mortar or Surkhi mortar 1 Cum 50.93

187 D Shell lime slaked and screened 1 Cum 505.56


188 E White cement 1 Kg 8.62
(D) MORTARS
189 43 to Items 43 to 45
45
(E) METAL AND IRON WORKS
190 Mild steel rods 6mm dia. 1 MT 16163.79
191 Mild steel flats 1 MT 16578.25
192 Mild Steel, Structural Steel, I.e., Angles, 1 MT 16578.25
Channels and I sections.
193 High Yield Strength Deformed Bars/TMT 1 MT 16992.71
bars
194 NOTE: (1) The rates are exclusive of
sales tax. 2)As per the rates applicable to
the District. 3) Least of the (1) and (2 )
above may allowed .
III RATES OF WORKS
(A) CLEARING SITE
195 1.a Clearing heavy Jungle 1 Sqm 1.00
196 b Clearing light Jungle 1 Sqm 1.00
197 c Clearing Scrub Jungle 1 Sqm 1.00
198 d Clearing Juliflora (Prosafis) jungle 1 Sqm 2.00
including up-rooting and removing of
Juliflora stumps.
199 2.a.1 Cutting and removing Palmyrah trees Each 18.00
including stacking of girth 30 to 100 cm.

200 a.2 - do - 100 to 200 cm. Each 31.00


201 2.b.1 Uprooting and removing Palmyrah stumps Each 22.00
including stacking of girth 30 to 100 cm.

202 b.2 - do - 100 to 200 cm. Each 34.00

6
203 2.c.1 Cutting and removing date trees including Each 13.00
stacking of girth 30 to 100 cm

204 c.2 - do - 100 to 200 cm Each 19.00


205 2.d.1 Uprooting and removing stumps of date Each 13.00
trees including stacking of girth 30 to 100
cm.
206 d.2 - do - 100 to 200 cm Each 18.00
207 2.e 1 Cutting and removing other kind of trees Each 18.00
including stacking of girth 30 to 100 cm

208 e.2 - do - 100 to 200 cm Each 28.00


209 e.3 - do - above 200 cm Each 47.00
210 2.f.1 Uprooting and removing stumps of other Each 13.00
kind of trees including stacking of girth 30
to 100 cm.
211 f.2 - do - 100 to 200 cm Each 19.00
212 f.3 - do - above 200 cm Each 26.00
213 3.a Uprooting and clearing prickly pear jungle 1 Sqm 1.00

214 b - do - under 2.5 meters height including 1 Sqm 1.50


burning and burrying as directed.
215 c - do - over 2.5 meters height including 1 Sqm 2.00
burning and burrying with an initital lead
of conveyance
216 4.a Removing of natchu, goobi, thooti etc., 1 Sqm 1.00
from drains, channels including clearance
if not more than 1 metre depth of water
with an initial lead of 10 metresand lift of
2 metres.
217 b.i Clearing alchi, tilla 1 Sq.m 2.00
218 b.ii Removal of Jammu 1 Sq.m 1.00
219 c.i Removal of imponea, cornea 1 Sq.m 2.00
220 c.ii Removal of water hyacinth upto 30 cm 1 Sqm 2.00
thick.
221 c.iii - do - more than 30 cm thick 1 Sq.m 2.50
222 d Removal of natchu, goobi, thooti etc., for 1 Sqm 0.50
every extra lead or lift over the initial lead
or lift.
(B) DISMANTLING
5 DISMANTLING, CLEARING AWAY
AND CAREFULLY STACKING
MATERIALS USEFUL FOR REUSE.
223 n.i Dry rough stone revetment for aprons 1 cum 23.00
and stacking within 40 metres

7
( C )QUARRYING AND BLASTING

224 6 Blasting and removing hard granite 1 cum Covered under


measured in solid earth work item

7 Drilling holes in hard granite or sheet


rock
a) Manually ( Hand)
225 i) 20 mm dia meter 1 RM 61.00
226 ii) 25 mm dia meter 1 RM 66.00
227 iii) 36 mm dia meter 1 RM 74.00
b) Pneumatic Compressor
228 i) 20 mm dia meter 1 RM 66.00
229 ii) 25 mm dia meter 1 RM 72.00
230 iii) 36 mm dia meter 1 RM 79.00
8 Grouting the holes with neat cement
slurry excluding cost of steel

231 i) 20 mm dia meter 1 RM 39.00


232 ii) 25 mm dia meter 1 RM 50.00
233 iii) 36 mm dia meter 1 RM 61.00
(D) EARTH WORK
234 NOTE:- 1. Standard Specification No.20-
A requires breaking clods, ramming and
sectioning of spoil bank etc.,
235 2. Standard Specification No.20-B does
not require that three items of work
detailed above, but does require neat
banking in accordance with the standard
specification.
236 3. A separate rate for these three items
of work will not be necessary where the
earth work is executed under the
standard specification No. 20-A.
EARTH WORK EXCAVATION AND
DEPOSITING ON BANK WITH AN
INITIAL LEAD OF 10 METRES AND AN
INITIAL LIFT OF 2 METRES IN CASE
OF HEAD LEAD ONLY.

237 8.a Sand or loose soils wet sand not under 1 cum 18.00
water, silt in canals, channels and drains
SS 20-A.
238 b - do - 20-B 1 cum 19.00

8
239 9.a Loamy and Clayey soils like black cotton 1 cum 30.00
soils, red earth and ordinary gravel SS
20-A.
240 b - do - 20-B 1 cum 27.00
241 10.b Slushy soil and silt clearance up to 0.60 1 cum 30.00
metres depth SS 20-B
242 11.b Clayey Soil in wet and slushy condition 1 cum 31.00
SS 20-B
243 12.a Hard Gravelly Soils SS 20-A 1 cum 31.00
244 b - do - SS 20-B 1 cum 29.00
245 13.a Mixture of gravel and soft disintegrated 1 cum 33.00
rock like shales ordinary gravel, stoney
earth and earth mixed with fair sized
boulders SS 20-A

246 b - do - 20-B 1 cum 30.00


247 14 Soft disintegrated rock ( removable by 1 cum 35.00
pick axes and crow bars)
248 15 Stone matrix 1 cum 36.00
249 16 Hard disintegrated rock or soft rock or 1 cum 47.00
conglomerate rock etc., removable by
pick axes and crow bars

250 17 Hard disintegrated rock or soft rock or 1 cum 63.00


conglomerate rock and Hard lime kankar
requiring partial blasting.
251 18.a.I Fissured and fractured rock and boulders 1 cum 108.00
up to 3 cum in size requiring blasting
including stacking
252 a.ii - do - Stacking is not done 1 cum 101.00
253 18.b.I Excavation of Nandyal Slabs more than 3 1 cum 130.00
cum in size requiring blasting including
stacking
254 b.ii - do - Stacking is not done 1 cum 125.00
255 19.a.I Hard rock and boulders more than 3 cum 1 cum 228.00
in size requiring blasting including
stacking
256 a.ii - do - Stacking is not done 1 cum 217.00
257 19.b Benching, chiseling, wedging and boring 1 cum 325.00
in rock in foundation grade levelling.

FOR ALL SOILS, SOFT


DISINTEGRATED ROCK AND STONE
MATRIX (ITEM N0s 8-b to 15 ABOVE )
258 20.a.I Extra for every additional 10 metres lead 1 cum 1.20
or part there of over the initial lead for
the first 3 extra leads

9
259 ii -do- from 4 th extra lead to 6 th extra 1 cum 1.80
lead
260 iii -do- from 7 th extra lead to 9 th extra 1 cum 2.60
lead
FOR HARD DISINTEGRATED ROCK
(ITEM 16 TO 17 ABOVE )
261 20bi (Extra for every additional 10 metres lead 1 cum 1.80
or part there of) over the initial lead for
the first 3 extra leads

262 ii Extra for every additional 10 mtrs. Lead 1 cum 3.20


or part there of from 4 th extra lead to 6
th extra lead
263 iii -do- from 7 th extra lead to 9 th extra 1 cum 4.30
lead
FOR FISSURED AND FRACTURED
HARD ROCK AND BOULDERS ETC.,
(ITEM 18 & 19 a ABOVE)
264 20.c.I (Extra for every additional 10 metres lead 1 cum 3.30
or part there of) over the initial lead for
the first 3 extra leads
265 ii Extra for every additional 10 mtrs. Lead 1 cum 5.30
or part there of from 4 th extra lead to 6
th extra lead
266 iii -do- from 7 th extra lead to 9 th extra 1 cum 6.10
lead
FOR ALL SOILS, SOFT
DISINTEGRATED ROCK AND STONE
MATRIX (ITEM N0s 8-b to 15 ABOVE )
267 21.a.I Extra for every additional 1 metre lift or 1 cum 1.20
part there of over the initial lift for the
first 3 extra lifts
268 ii Extra for every additional 1 mtrs. lift or 1 cum 1.90
part there of from 4 th extra lift to 6 th
extra lift
269 iii -do- from 7 th extra lift and above 1 cum 3.10
FOR HARD DISINTEGRATED ROCK
(ITEM 16 & 17 ABOVE )

270 21.b. I Extra for every additional 1 metres Lift or 1 cum 1.70
part there of over the initial lift for first 3
extra lifts
271 ii Extra for every additional 1 mtrs. lift or 1 cum 3.00
part there of from 4 th extra lift to 6 th
extra lift
272 21.b.iii -do- from 7 th extra lift and above 1 cum 4.30

10
FOR FISSURED AND FRACTURED,
HARD ROCK AND BOULDERS
ETC.,(ITEM 18 TO 19 a ABOVE ).

273 21.c.I Extra for every additional lift of 1 metre 1 cum 3.50
or part there of over the initial lift for the
first 3 extra lifts
274 ii Extra for every additional lift of 1metre or 1 cum 4.80
part there of over from 4th extra lift to 6
th extra lift
275 iii -do- from 7 th extra lift and above 1 cum 6.20

276 Note: The lift charges mentioned in SS


item Nos 21a,21 b, and 21c under (D)
Earth work are applicable to delifts also.

277 22.a Add to relevant SS 20-A rates for new 1 cum 2.00
tank bunds, closing breaches, road
formation and embankments for extra
watering and consolidation by stone roller
up to 1 tonne.
278 b - do - with stone roller 2 tonnes or cattle 1 cum 3.30
treading
279 c Add to relevant SS 20-A rates for new 1 cum 19.10
tank bunds, closing breaches, road
formation and embankments for extra
watering and consolidation of proctor's
density with 8 to 10 tonne power roller
including watering and conveyance of
water for initial lead of 1/2 Kilometer.
280 Note: The element of Hire charges is Rs
51.76 per 10 cum corresponding to the
hire charges of 8 to 10 Tonne power roller
fixed at Rs. 2200 /- per day of 8 hours.
The rate shall be increased when the
element of hire charges increases for item
No. 22 c above, if the roller is lent to the
contractor at a rate of Rs 275/- per hour
(i.e.,) Rs 2200 /- per day of 8 hours may
be effected.)
281 22.d Extra for every additional 1/2 km lead for 1 cum 2.10
water over the initial lead of 1/2 Km for
consolidation of banks .

282 23.a Benching old embankment slopes 0.45 x 1 RM 1.20


0.45 metres.
283 23.b Puddle wall work 1 cum 31.80

11
284 24 Turfing slopes including watering for 3 1 Sq.m 12.50
months with initial lead for conveyance of
water and grass for 1 hectometer.

285 25 Refilling with the excavated sand 1 cum 9.80


complying with the standard
specifications for filling foundations
286 26.a Refilling with the excavated soils ( other 1 cum 6.40
than sand) complying with the standard
specifications for filling foundations.

287 b Trimming of slopes of embankments and 1 cum 50% of earth


depositing the soils on the top of the work excavation
bank. of similar
classification

288 c Ploughing 1 Sq.m 0.30


(E) CONCRETE AND (G) STONE
MASONRY
289 SSI NOS 31a to 39 and SSI Nos. 60 to 87 Rates have to
be worked
based on
standard data
290 Note:
291 1. Add for vibrating concrete 1 cum 30.50
292 2. Add for machine mixing of concrete. 1 cum 30.00

293 3.Add where the power is available for 1 cum 19.90


operating the mixer, the rate is,
White Washing and Painting works

294 A White washing and colour banding for each 3.50


guard and guide stones including cost of
materials
295 B1 Screening sand and gravel 1 cum 3.50
296 B2 Screening chips and metal 1 cum 8.30
297 C Removing and refixing Hectometre or each 4.60
Demarcation stones
CENTERING CHARGES
298 L1 Centering charges for culvert slabs and 1 cum 661.00
other structures of 3 mts. span and
above
299 L2 Centering charges for bed blocks and 1 cum 541.00
culvert slabs and other structures of less
than 3 mts. span.
CENTERING CHARGES FOR MINOR
AND MAJOR BRIDGE WORKS

12
300 L3 For mass concrete piers, abutments and 1 cum 480.00
steining well curbs, well caps etc.,

301 L4 For RCC piers, abutments, wing wall, 1 cum 600.00


steining, well curbs, well caps etc.,

302 NOTE:- The rates under L3 and L 4 are


applicable to Roads and Buildings and
Irrigation structures up to 2 metres width
303 L5 For RCC deck slabs 1 cum 1141.00
304 L6 For RCC beams 1 cum 1441.00
305 L7 For RCC hand rails 1 cum 1561.00
306 L8 For CC pavements, wearing coats, 1 cum 114.00
approach, slabs, guide stone, J. M. stone
etc.,
n Laying and fixing RCC Hume pipes in
position including lifting, aligning
etc., complete with (fixing ) collars
for the following diametres of pipes
but excluding cost of materials ( NP2
Class )
307 n1 250 mm diameter 1 Rm 10.90
308 n2 300 mm diameter 1 Rm 14.80
309 n3 450 mm diameter 1 Rm 20.50
310 n4 600 mm diameter 1 Rm 33.10
311 n5 750 mm diameter 1 Rm 41.10
312 n6 800 mm diameter 1 Rm 49.10
313 n7 1000 mm diameter 1 Rm 54.80
314 n8 1220 mm diameter 1 Rm 69.60
315 Note:- For NP3 class 50% extra over the
rates of NP2. Class may be allowed.

(S ) ROAD WORK ITEMS


Picking old metalled surface to depth of
40 to 100 mm spreading old metal and
new metal sectioning including edge
bunds and subgrade rolling, spreading
metal including blindage of gravel
watering with an initial lead of
Hectometers and hand roller (1.5 to 2
Tonnes) Rolling etc., including
barricading, diversion of traffic and
wetting the new consolidation for a
fortnight complete.
( For a compact thickness )
1 (i ) HARD METAL
316 A 40 mm thickness 10 sqm 37.00

13
317 B 50 mm thickness 10 sqm 39.00
318 C 75 mm thickness 10 sqm 43.00
319 D 100 mm thickness 10 sqm 46.00
1 (ii ) (For compact thickness of soft metal)

320 A 50 mm thickness 10 sqm 29.00


321 B 75 mm thickness 10 sqm 33.00
322 C 100 mm thickness 10 sqm 37.00
323 2 Picking 5 to 100 mm old metalled surface 10 sqm 13.00
and sectioning
324 3 Picking gravelled surface 25 mm deep 10 sqm 3.50
and levelling and sectioning
325 4 Picking the existing B.T. surface and 10 sqm 13.50
removal of chips
326 5 Picking old metalled surface to a depth of
40 to 100 mm and spreading metal
including watering with an initial lead of 2
Hectometers and rolling with power
rollers watering and spreading gravel for
blindage and power roller rolling including
hire charges of power roller( 8 to 10 T )
barricading and diversion of traffic and
wetting the new consolidation for a
fortnight(for compacted thickness of )
HARD METAL
327 5 (a) 40 mm thickness 10 sqm 94.00
328 (b) 50 mm thickness 10 sqm 108.00
329 (c ) 75 mm thickness 10 sqm 120.00
330 (d ) 100 mm thickness 10 sqm 127.00
331 (e) 150 mm thick excluding hire charges 10 sqm 226.00

Spreading gravel watering with an


initial lead of 2 hectometers and
power roller ( 8 to 10 T ) rolling
excluding hire charges of power
roller and barricading etc., ( for a
compact thickness of )
332 6a 50 mm thickness 10 sqm 17.00
333 b 75 mm thickness 10 sqm 23.00
334 c 100 mm thickness 10 sqm 36.00
335 d 150 mm thickness 10 sqm 41.00
336 7a Blinding the road surface 6 mm thick 10 sqm 0.90
with gravel or sand available at site
after remaining loose stones
including watering.
337 b -do- without watering 10 sqm 0.80

14
338 8a Blinding the road surface 6 mm thick 10 sqm 2.00
with gravel or sand dug from road
site including watering.
339 b -do- without watering 10 sqm 1.50
340 Spreading gravel sand including
watering and roller rolling ( for
compacted thickness of )
341 9a -do- 6mm to 20 mm thick 1 cum 26.00
342 b -do- from 20 to 25 mm thick 1 cum 23.00
343 c -do- from 25 to 40 mm thick 1 cum 22.00
344 d -do- from 40 to 50 mm thick 1 cum 20.00
345 10 Picking 50 to 100 mm Old metalled 10 sqm 18.00
surface, spreading metal and blindage
watering tamping for patch repairs (
labour only )
346 11 Picking old metalled surface 50 to 100 10 sqm 9.10
mm deep spreading gravel watering and
tamping ( labour only )

347 12 Levelling ruts and tamping gravelled 10 sqm 2.30


roads
348 13 Levelling ruts and tamping metalled roads 10 sqm 3.50

349 14 Spreading gravel or sand including 10 cum 158.00


watering and rolling with hand roller
irrespective of thickness in layer
350 15(I) Carrying for water for WBM consolidation 10 sqm 2.30
metal and blindage of 40 to 150 mm
thickness for every one hectometer
beyond initial lead of 2 hectometers
BAILING OUT WATER CHARGES FOR
CD & CM WORKS (WHEREVER
REQUIRED)

351 I 14 For earth work excavation for foundations 1 cum 80.00


below low water level
352 I 15 For cement concrete for foundation below 1cum 80.00
low water level
353 n Labour charges for laying filters with 1 cum 32.00
coarse aggregate.
354 o Labour charges for laying filter with sand. 1 cum 15.00

15
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
IV . RATES OF MATERIALS
(A) BRICKS & TILE PRODUCTS
1 Bricks second class or ground moulded (Non-Modular 1000 1145
or traditional size) 23 x11x7 cm Nos
2 - do- modular size 19 x 9 x 9 cm 1000 1190
Nos
3 Bricks country (Non-modular tradditional size) 22 x111000 824
x 5 cm Nos
Fly ash lime solid blocks with compressive
strength of 100 kg/sq.cm
4 290 x225 x140 mm Each 6.4
5 290 x 200 x140 mm Each 5.5
6 290 x 122 x 140 mm Each 3.6
7 290 x 100 x 140 mm Each 3.1
8 225 x 100 x 60 mm Each 1.3
9 145 x 225 x 140 mm Each 3.6
10 145 x 200 x 140 mm Each 2.7
Fly ash lime solid blocks with compressive
strength of 50 kg/sq.cm
11 290 x225 x140 mm Each 5.5
12 290 x 200 x140 mm Each 4.6
13 290 x 122 x 140 mm Each 2.7
14 290 x 100 x 140 mm Each 2.3
15 225 x 100 x 60 mm Each 1.0
16 145 x 225 x 140 mm Each 2.7
17 145 x 200 x 140 mm Each 2.5
18 Cynder 1 Cum 191
CUDDAPAH/SHAHABAD STONES
19 Cuddapah/Shahabad slab 40 mm thick not less than 1 Sqm 70
0.457 M x 0.457 M
20 Cuddapah/Shahabad slab 50 mm thick not less than 1 Sqm 78
0.457 M x 0.457 M
Shahabad Stone slab of Tandur 25.4 mm thick
21 White 10 Sqm 522

Page # 1
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
22 Blue 10 Sqm 564

Shahabad Stone slab of Tandur 50.8 mm thick


23 White 10 Sqm 597

24 Blue 10 Sqm 680

Polished Shabad stone slab 25.4mm thick (0.457 x


0.457M)
25 White 10 Sqm 1015

26 Blue 10 Sqm 1285

27 Polished black cuddapah slabs 25.4 mm thick 10 Sqm 957


(0.457x 0.457M)
28 Bethamcherla Stone 25.4 mm thick (0.254M x0.254M) 10 Sqm 2507
white
29 Bethamcherla Stone 25.4 mm thick (0.254M x0.254M) 10 Sqm 2673
colour
30 High Polished Granite 18 to 20 mm thick up to 8'-00 1Sqm 1219
(2.43 M) other than black
31 High Polished Granite 16 to 18 mm thick up to 8'-00 1Sqm 1119
(2.43 M) other than black
32 High Polished Granite 18 to 20 mm thick up to 8'-00 1Sqm 1044
(2.43 M) black
33 High Polished Granite 16 to 18 mm thick up to 8'-00 1Sqm 945
(2.43 M) black
34 Rounding the edges of cuddapah Slabs and 1 Rm 25
Shahabad stone slabs & Marble slabs including
polishing the same.
35 Rounding the edges of Granite slabs including 1 Rm 75
polishing the same.
36 Flat nosing to Cuddapah slabs and Shahabad stone 1 Rm 3.0
slabs 40mm thick
37 Flat nosing to Cuddapah slabs and Shahabad stone 1 Rm 3.5
slabs 50mm thick

Page # 2
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
38 Flat nosing to Cuddapah slabs and Shahabad stone 1 Rm 4.4
slabs 60mm thick
39 Flat nosing to Cuddapah slabs and Shahabad stone 1 Rm 5.0
slabs 75mm thick
FLOORING SLABS/ TILES
40 Dongari Adanga marble slab polished 18 mm to 20 1 sqm 373
mm (average ) thick (size 0.457 M x 0.457 M)/ (0.6M x
0.6M)
41 Dongari Adanga marble slab polished 16 mm to 20 1 sqm 332
mm (average ) thick (size 0.457 M x 0.457 M)/ (0.6M x
0.6M)
42 Dongari Adanga marble slab polished 18 mm to 20 1 sqm 311
mm (average ) thick 0.305 M x 0.305 M
43 Dongari Adanga marble slab polished 16 mm to 20 1 sqm 269
mm (average ) thick 0.305 M x 0.305 M
44 Dongari Adanga marble slab polished 18 mm to 20 1 sqm 497
mm (average ) thick ( 0.610 M width of any length).

45 Dongari Adanga marble slab polished 16 mm to 20 1 sqm 456


mm (average ) thick ( 0.610 M width of any length)

46 Marble Tiles polished 8 mm thick 1 sqm 216


47 Cutting marble slabs upt o 50 mm thick by mechanical 1 RM 5.0
device.
48 Granite stone tiles 8 mm thick ( mirror polished of all 1 sqm 464
shades)
49 Chequrred Terrazo tiles of 22 mm thick ( Medium 1 sqm 145
shade) 0.254 M x 0.406 M
50 Chequrred Terrazo tiles of 22 mm thick (Dark shade) 1 sqm 133
0.254 M x 0.406 M
51 Chequrred Terrazo tiles of 30 mm thick ( Light 1 sqm 133
shade) 0.305 M x 0.305 M
52 Chequrred Terrazo tiles of 30 mm thick (Dark shade) 1 sqm 141
0.305 M x 0.305 M
53 Chequrred Terrazo tiles of 30 mm thick ( medium 1 sqm 124
shade) 0.305 M x 0.305 M

Page # 3
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
54 Decorated white background glazed tiles 200 mm x 1 sqm 305
152 mm
55 Decorated coloured background glazed tiles 200 mm 1 sqm 341
x 300 mm
56 Fantasy Glazed Tiles size 200mm x152 mm 1 sqm 322
57 White glazed Tiles of any size Ist quality 1 sqm 187
58 Glazed coloured Tiles of any size Ist Quality 1 sqm 220
59 Precast Terrazo Tiles 20 mm thick ( Medium shade) 1 sqm 157

60 Precast Terazo Tiles 20 mm thick (dark shade) 1 Sqm 153


61 Supply & Fixing precast Terrazo Tiles Marbleite in 1 Sqm 175
white & colour vains 20 mm thcik
62 a) Fixing charges only 1 Sqm 16.50
63 b) Polishing charges only 1 Sqm 22
64 c) Wax polishing charges only. 1 Sqm 13.50
65 Supply & Fixing precast Terrazo Tiles Marbleite in 1 Sqm 131
white tiles 20 mm thcik
66 a) Fixing charges only 1 Sqm 16.50
67 b) Polishing charges only 1 Sqm 22
68 c) Wax polishing charges only. 1 Sqm 13.50
69 Supply & fixing Terrazo tiles 20 mm thick grey tiles 1 Sqm 77
70 a) Fixing charges only 1 Sqm 16.50
71 b) Polishing charges only 1 Sqm 22
72 c) Wax polishing charges only. 1 Sqm 13.50
Supply & fixing of Crazy Marble flooring
73 Marble powder 1 Kg 1.6
74 Marble chips 1 Sqm 269
75 Mosaic chips 1 Sqm 1523
76 Grinding, Polishing, electricity charges 1 Sqm 64.50
77 Vitrified polished floor tiles (20" x 20") 508mm x 508 1 Sqm 625
mm (granada make or equivalent quality) 7.5 mm
thickness 1st quality
78 Vitrified polished floor tiles 24" x24" (609.6mm x 1 Sqm 892
609.6mm) 9.5 mm thickness 1st quality.

Page # 4
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
79 Providing Bisazza glass Tiles Group 1 series or 1 Sqm 1071
equivalent quality 20 x 20x4 mm thick to be aplied on
sponge finish using laucratic 290 thin set polymer
based adhesive.
(C ) TIMBER AND ROOFING MATERIALS
TEAK WOOD
80 Teak wood scantlings below 2 meters First class 1 cum 43103
81 Teak wood scantlings below 2 meters Second class 1 cum 34814

82 Teak wood scantlings above 2 meters First class 1 cum 44761


83 Teak wood scantlings above 2 meters Second class 1 cum 36472

84 Teak wood planks of all sizes First Class 1 cum 47248


85 Teak wood Planks of all sizes second class. 1 cum 38959
86 Burma Teak Wood Scantlings below 2 meters 1 cum 51393
87 Burma Teak wod Scantings above 2 meters 1 cum 53274
88 Burma Teak wood planks 0.150 M to 1 m 1 cum 64406
89 Assam Teak Wood frames 1 cum 19024
90 Assam Teak Wood Planks 1 cum 23210
91 Sal Wood Frames 1 cum 19024
92 Sal Wood Planks 1 cum 23210
93 Corrugalated Galvanized iron sheets (1 mm 1 Sqm 153
thickness)
94 Plain Galvanized Iron sheets 1 Sqm 100
95 Country Nails 1 Kg 17
96 Wire Nails 1 Kg 17
97 Labour charges for petty Iron work for truss straps 1 Kg 6.0
etc., wrought & plut up (lahour only)
98 labour for fabrication of reinforcement including 1 Kg 4.0
bending and placing at site in position including cost
of binding wire
Galvanized Steel Barbed wire
99 I.O.A. 12 Gauge 1 Kg 18
100 I.O.A. 14 Gauge 1 Kg 17

Page # 5
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
101 Supply & fixing of Rolling shutter made of 80 x 1.25 1 Sqm 1015
mm machine rolled laths (rate includes top cover
bearings, and locking arrangements etc. )
102 Supplying & fixing collapsable steel shutters with 1 Sqm 846
verticle, double channel of 20 x10x2 mm of 100 mm
center Bracers with flat iron 40x40x6 mm with 38 mm
dia steel plully with all fixtures and furniture as per
special spn. 1105
(D) DOOR FITTINGS
1) TOWR BOLTS AS PER IS 204
BRASS
103 100 mm Long Each 32
104 150 mm Long Each 48
105 200 mm Long Each 65
106 250 mm Long Each 80
107 300 mm Long Each 99
ALLUMINIUM
108 75 MM Long Each 22
109 100 mm Long Each 27
110 150 mm Long Each 32
111 200 mm Long Each 41
112 250 mm Long Each 48
113 300 mm Long Each 56
MILD STEEL (POWDER COATED)
114 100 mm Long Each 8.3
115 150 mm Long Each 12
116 200 mm Long Each 17
117 250 mm Long Each 24
118 300 mm Long Each 30
2) BUTT HINGES AS PER IS : 205
BRASS
119 75 MM Long Each 14
120 100 mm Long Each 45
121 125 mm Long Each 54
122 150 mm Long Each 71

Page # 6
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
ALLUMINIUM
123 75 MM Long Each 31
124 100 mm Long Each 38
125 125 mm Long Each 45
126 150 mm Long Each 45
MILD STEEL (POWDER COATED)
127 75 mm Long Each 4.1
128 100 mm Long Each 7.5
129 125 mm Long Each 11
130 150 mm Long Each 15
3) DOOR HANDLES AS PER IS:208
ALLUMINIUM
131 75 mm Long Each 21
132 100 mm Long Each 24
133 125 mm Long Each 36
134 150 mm Long Each 40
MILD STEEL (POWDER COATED)
135 125 mm Long Each 11
136 150 mm Long Each 16

Page # 7
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
ALDROPS AS PER IS:2681
BRASS
137 300 mm long Each 291
ALLUMINIUM
138 200 mm long Each 94
139 250 mm long Each 112
140 300 mm long Each 121
MILD STEEL (POWDER COATED)
141 200 mm long Each 37
142 250 mm long Each 49
143 300 mm long Each 58
5)FLAT LATCHES
BRASS
144 Door Stopers Each 58
145 Windows Stay Each 66
ALLUMINIUM
146 200 mm long Each 45
147 250 mm long Each 51
148 300 mm long Each 54
MILD STEEL (POWDER COATED)
149 250 mm long Each 18
150 300 mm long Each 23
151 Door Stopers Each 16
152 Supply & fixing droppery rods (25.4 mm) 1" x 21 G Rft 13
Powder coated with PVC rings
153 Supply & fixing droppery bracket - brass powder pair 148
coated
154 Brass Aldrop heavy duty 350 mm Each 560
155 Brass Aldrop heavy duty 450 mm Each 797
156 Alluminium Aldrop 350 mm ISI marked IS 204 Each 153
157 Alluminium Aldrop 450 mm ISI marked IS 204 Each 193
158 Delux window stay alluminium Each 41
159 Heavy duty alluminium Door stopper Each 17
160 Brass fancy handles 150 mm Each 99
161 Brass fancy handles 200 mm Each 134

Page # 8
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
162 Brass fancy handles 250 mm Each 242
163 Brass fancy handles 300 mm Each 309
164 Brass fancy handles 450 mm Each 483
165 Door closer automatic hyper brand IS 3564 Each 405
166 Double action brass plate floor spring Hyper brand IS Each 559
6315
167 Floor spring Ist Quality for Aluminium door Each 985
168 Heavy duty mortice lock 6/7 levers with PC or CP Each 250
handles complete set
169 Heavy duty mortice lock 6/7 levers with brass heavy Each 873
handles
170 Brass latch heavy 300 mm Each 183
171 Brass latch heavy 350 mm Each 211
172 Brass latch heavy 450 mm Each 278
173 Friction stay hinges for windows Each 37
174 Keyless lockset for toilet with CP or PC handles Each 108
(complete set)
175 Keyless lock set for toilet with brass handles Each 287

Page # 9
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
(E) MISCELLANEOUS ITEMS
176 Alluminium sheet 24 Gauge 1 Sqm 138
Alluminium strips
177 Alluminium Strip 40 mm wide and 2 mm thick 1 Kg. 96
178 Alluminium plain strip edging 38x12x3 mm Metre 31
179 Alluminium plain strip edging 57x12x3 mm Metre 44
180 Alluminium strips 10 mm 1 Kg. 87
181 Alluminium Strips 25 mm 1 Kg. 87
182 Alluminium Stips 38 mm wide and 1.6 mm thick. 1 Kg. 87
183 7.5mm thick Alluminium Grill (as approved by the 1 Sqm 510
department) 3.58 Kg/Sq.m.
184 Supply & fixing MS/CI grills of any design 1 Kg. 25
185 Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1" (25.4 mm 1 Sqm 407
) thick
186 Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1/2" (12.7 1 Sqm 233
mm ) thick
187 Expanded metal Jally 3/4" (19.05 mm ) size 1 Sqm 63
188 GI (M.S) fly proof wire mesth 16 x 20 guage 1 Sqm 85
189 SS fly proof mesh 1 Sqm 207
190 Chain link mesh 8 guage 2" x2" (50.8 mm x 50.8 mm) 1 Sqm 99

191 Chain link mesh 8 guage 3" x 3" (76.2 mm x 76.2 mm) 1 Sqm 67

192 Chain link mesh 8 guage 4"x4" (101.6 mm x 101.6 1 Sqm 57


mm)
193 Rabbit wire mesh (chicken mesh) 1 Sqm 6.6
194 Providing Tarfelting roof repairs 1 Sqm 89
195 Note :a) Duly applying one coat of bitumenous
196 b) Applying 1 coat of appropriate grade of hot
bitumen at 1.2 Kg/1Sqm of roof area
197 c)Fixing tarfelt (Manufactures to IS 1322/1972
specification)
198 d) Applying second coat of appropriate grade of
hot bitumen at 1.20 Kg/1Sqm of roof area
199 e)Spreading course aggregate (sand ) at 0.063
cum per 1 Sqm of surface area of roof.

Page # 10
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
WATER PROOFING & CONSTRUCTION
CHEMICALS AND EPOXIES
Any company make As per I.SI. Standards, First
Quality Rate (exfactory ) including all taxes

A) Concrete Admixtures and Plasticisers


Conflow SNP OR EQUIVALENT.
200 Pack size 1 Ltr Ltr 30
Conflow SNP 20 OR EQUIVALENT
201 Pack size 1 Ltr Ltr 37
Conflow SNPA OR EQUIVALENT.
202 Pack size 1 Ltr Ltr 49
B) Super Plasticisers
Conflow SNSI OR EQUIVALENT.
203 Pack size 1 Ltr Ltr 37
Conflow SNS2 OR EQUIVALENT.
204 Pack size 1 Ltr Ltr 37
Accelerating Plasticisers
Conflow SNA OR EQUIVALENT.
205 Pack size 1 Ltr Ltr 46
Retarding Plasticisers
Conflow SNR OR EQUIVALENT.
206 Pack size 1 Ltr Ltr 30
Air Entraining Agents
Conflow SNE OR EQUIVALENT.
207 Pack size 1 Ltr Ltr 30
Retarding super Plasticisers
Conflow SNS3 SPL OR EQUIVALENT
208 Pack size 1 Ltr Ltr 37
Conflow SNS3 OR EQUIVALENT
209 Pack size 1 Ltr Ltr 49
Mortar Plasticisers
Morflow SN1 OR EQUIVALENT
210 Pack size 1 Ltr Ltr 14
Integral Water Proofing compounds

Page # 11
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Conflow SNW1 OR EQUIVALENT
211 Pack size 1 Ltr Ltr 9.1
Conflow SNW2 OR EQUIVALENT
212 Pack size 25 Kg Kg 6.4
213 Pack size 750 Gms Pack 7.8
Block Admixtures
Conflow SNB OR EQUIVALENT
214 Pack size 1 Ltr Ltr 15
Sprayed Concrete Accelerators
Shotset SN1 OR EQUIVALENT
215 pack size 250 Kg. Kg 15
B) Concrete surface Treatments curing
compounds
CURAID SN1 OR EQUIVALENT
216 Pack size 1 Ltr Ltr 37
CURAID SN2 OR EQUIVALENT
217 Pack size 1 Ltr Ltr 39
Formwork & Mould Treatment
Shutterol SNU OR EQUIVALENT
218 Pack size 1 Ltr Ltr 37
Cleaning Agents
Uniklen SN1 OR EQUIVALENT
219 Pack size 1 Ltr Ltr 16
Uniklen SN2 OR EQUIVALENT
220 Pack size 1 Ltr Ltr 35
Uniklen SN3 OR EQUIVALENT
221 Pack size 1 Ltr Ltr 82
C)Free flow - Non shrink Grounts
Pre - Packed Cementitious Grouts
Expacrete SN 50 OR EQUIVALENT
222 Pack size 25 Ltr Kg 6.4
Expacrete SN 70 OR EQUIVALENT
223 Pack size 25 Ltr Kg 7.8
Expacrete SN 90 OR EQUIVALENT
224 Pack size 25 Ltr Kg 12

Page # 12
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Expacrete SN 2 OR EQUIVALENT
225 Pack size 250 gm pack 18
Epoxy Resin Grouts
Expacrete SNE 1 OR EQUIVALENT
226 Pack size 1 Kg Kg 392

Page # 13
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Expacrete SNE 3 OR EQUIVALENT
227 Pack size 15 Kg pack 1492
Polyster Resin Grouts
Anchrset SN1 OR EQUIVALENT
228 Pack size 1 Kg pack 93
Anchrset SN2 OR EQUIVALENT
229 Pack size 10 Kg pack 877
D) Industrial Flooring systems
Floor Hardeners
Flortop SNC OR EQUIVALENT
230 pack size 25 Kg Kg 15
Floor top SNS OR EQUIVALENT
231 Pack size 25 Kg. Kg 9.1
Expoxy Floor coating & protective coatings
Procoat SNF or Equivalent
232 Pack size 1 Kg Pack 310
Procoat SNS or Equivalent
233 Pack size 1 Kg Pack 257
Essenputty SNE or Equivalent
234 pack size 1 Kg Pack 157
Procoat SNZ or Equivalent
235 Pack size Ltr Pack 373
Procoat SNL or Equivalent
236 Pack size 2.5 Kg. Pack 541
Epoxy Self Levelling (Flooring system)
Flortop SNSL or Equivalent
237 Pack size 14 Kg Pack 2163
Flortop SNSL (SPL) or Equivalent
238 Pack size 14 Kg Pack 1649
Heavy Duty Epoxy Base (Flooring system)
Flortop SNM or Equivalent
239 Pack size 16 Kg Pack 877
Flortop SNFM or Equivalent
240 Pack size 16 Kg Pack 671
Epoxy resin primer

Page # 14
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Flortop SNP or Equivalent
241 Pack size 1 Kg Pack 373
Procoat SNC or Equivalent
242 pack size 3 Kg Pack 619
Procoat SNP or Equivalent
243 pack size 1 Kg Pack 362
Procoat SNP2 or Equivalent
244 pack size 3 Kg Pack 649
E) Repair Products
Repcrete SNC or Equivalent
245 Pack size 25 Kg Kg 9.1
Repcrete SNE1 or Equivalent
246 Pack size 16 kg Pack 1030
Reprecate SNW Primer or Equivalent
247 Pack size 1 Kg Pack 515
Reprecate SNW Mortor or Equivalent
248 Pack size 1 Kg Pack 145
Uniplug SN or Equivalent
249 pack size 5 Kg Kg 20
F) Water Proffing Systems
Aquacoat SNF or Equivalent
250 Pack size 15+5 Kg Pack 1134
Water Repellants
Aquarepel SN1 or Equivalent
251 Pack size 1 Ltr Ltr 35
G) Adhesive Tile Adhesives
Tilegrip SNU or Equivalent
252 Pack size 15 Kg Kg 12
Bonding Adhesives
Conbond SNA or Equivalent
253 Pack size 1 Ltr Ltr 157
Conbond SNE or Equivalent
254 Pack size 1 Kg Pack 429
255 Note: Literature for usage / application of above construction /water proofing materia
BITUMINOUS HOT SEALING COMPOUND

Page # 15
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
256 Grade 'A' I.S.I excluding 16 % Tax 1 Kg 13
257 Bitumen solution primer of aproved quality excluding 1 Kg 22
16 % tax
258 Tar Felt Type - 2 Grade - 1 1 sqm 39
GLASS
259 Plain Glass 4 mm thick 1 sqm 145
260 Plain Glass 5 mm thick 1 sqm 199
261 Tinted Glass 4 mm thick 1 sqm 274
262 Tinted Glass 5 mm thick 1 sqm 365
263 Pin headed Glass 4 mm thick 1 sqm 133
264 Ground Glass 4 mm thick 1 sqm 191
265 Ground Glass 5 mm thick 1 sqm 249
JALI (CEMENT CONCRETE)
266 25 mm thick 1 sqm 70
267 40 mm thick 1 sqm 91
268 50 mm thick 1 sqm 124
BRUSHES
269 Wire Brush Each 17
270 Soft Brush Each 75
DISTEMPERS
271 Dry Powder Distemper 1 Kg 15
272 Oil Bound Washable Distemper 1 Kg 38
POLISH
273 French Spirit Polish 1 Ltr 68
274 Wax Polish (Ready made) 1 Kg 136
275 Putty for steel work 1 Kg 10
276 Putty for wood work 1 Kg 21
277 Malamine Polish including cost & labour charges 1Sqm 207
PAINTS (CONFORMING TO I.S.I)
278 Alluminium paint Ist Grade 1 Ltr 136
279 Anti Corrosive bitumen paint (Black ) grade1 1 Ltr 207
280 Red Oxide Primer Paint Grade -1 1 Ltr 49
281 Red Oxide Primer Paint Grade - II 1 Ltr 38
282 Synthetic Enamel paints in all shades Grade - I 1 Ltr 94
283 Synthetic Enamel paints in all shades Grade - II 1 Ltr 68

Page # 16
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
284 Plastic Emulsion Paint Grade - I 1 Ltr 151
285 Water proof Cement paint of Superior Quality 1 Kg 20
286 White Lead 1 Kg 39
287 Marble Powder 1 Kg 10
288 Cement primer Grade -I 1 Kg 49
289 Cement primer Grade -II 1 Kg 38
290 Impervios Water Proofing compound 1 Kg 13
291 Fevicol/Wood adhesive compound 1 Kg 83
292 Wood Primer 1 Ltr 68
293 Oil bound Distemper Primer. 1 Ltr 38
294 Supplying and finishing (Altek or equivalent brand) to 1 Sqm 51
interior faces of new walls and ceiling of approved
colour as per manufacturers specification including
cost and conveyance of materials to site and labour
charges such as preparing the wall, applying primary
coat etc, complete for finished item of work.

295 Altek paint 25 Kg 218


296 Trump 1 Ltr 90
297 Snowcem or equivalent quality 25 Kg 602
298 Surya Cem or equivalent quality 25 Kg 113
BOARDS
Prelaminated particle Board
(One side choice colour and other side balancing
white lamination)
A EXTERIOR (GRADE-I)
299 9 mm thick 1 Sqm 459
300 12 mm thick 1 Sqm 507
301 18 mm thick 1 Sqm 611
302 25 mm thick 1 Sqm 660
B. REGULAR (GRADE -II)
303 9 mm thick 1 Sqm 396
304 12 mm thick 1 Sqm 438
305 18 mm thick 1 Sqm 497
306 25 mm thick 1 Sqm 584

Page # 17
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Prelaminated particle Board
(Both sides choice colour of same shade)
C. EXTERIOR (GRADE -I)
307 9 mm thick 1 Sqm 534
308 12 mm thick 1 Sqm 585
309 18 mm thick 1 Sqm 709
310 25 mm thick 1 Sqm 769
D. REGULAR (GRADE - II)
311 9 mm thick 1 Sqm 458
312 12 mm thick 1 Sqm 500
313 18 mm thick 1 Sqm 570
314 25 mm thick 1 Sqm 650

Page # 18
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Particle Board (Exterior Grade ) (Bhutan or
Equivalent)
A. Plain Particle Board
315 8 mm thick 1 Sqm 169
316 12 mm thick 1 Sqm 188
317 18 mm thick 1 Sqm 245
318 21.4 mm thick 1 Sqm 288
319 25 mm thick 1 Sqm 327
320 35 mm thick 1 Sqm 534
Melamine Faced prelaminated
B. Particle Board (Single Deco)
321 8 mm thick 1 Sqm 349
322 12 mm thick 1 Sqm 396
323 18 mm thick 1 Sqm 459
324 25 mm thick 1 Sqm 520
325 35 mm thick 1 Sqm 865
Melamine Faced prelaminated
C. Particle Board (Twin Deco)
326 8 mm thick 1 Sqm 402
327 12 mm thick 1 Sqm 459
328 18 mm thick 1 Sqm 531
329 25 mm thick 1 Sqm 588
330 35 mm thick 1 Sqm 1105
Particle Board (Interior Grade ) (Bhutan or
Equivalent)
A. Plain Particle Board
331 6 mm thick 1 Sqm 134
332 8 mm thick 1 Sqm 144
333 10 mm thick 1 Sqm 159
334 12 mm thick 1 Sqm 169
335 18 mm thick 1 Sqm 207
336 21.4 mm thick 1 Sqm 245
337 25 mm thick 1 Sqm 259
338 35 mm thick 1 Sqm 452
Melamine Faced Prelaminated

Page # 19
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
B. Particle Board (Singel Deco)
339 8 mm thick 1 Sqm 307
340 10 mm thick 1 Sqm 326
341 12 mm thick 1 Sqm 344
342 18 mm thick 1 Sqm 396
343 25 mm thick 1 Sqm 447
Melamine Faced prelaminated
C. Particle Board (Twin Deco)
344 8 mm thick 1 Sqm 351
345 10 mm thick 1 Sqm 384
346 12 mm thick 1 Sqm 398
347 18 mm thick 1 Sqm 456
348 25 mm thick 1 Sqm 501
NATURAL COLOUR INSULATING BOARD
349 12 mm thick 1 Sqm 130
350 18 mm thick 1 Sqm 192
351 25 mm thick 1 Sqm 245

Page # 20
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
WHITE FACE INSULATING BOARD
352 12 mm thick 1 Sqm 159
353 18 mm thick 1 Sqm 226
354 25 mm thick 1 Sqm 202
355 Extra for venered particle Board with commercial 1 Sqm 77
venerrring on both sides.
356 Venering on both sides with one side teak venered 1 Sqm 163
and other side commercial venered
357 Teak venering on both sides 1Sqm 255
358 Particle Board 12 mm thick (Three Layer) 1 Sqm 202
PANELS
Plain particle Board (PPB) (Interioir Grade)
359 9 mm thick 1 Sqm 166
360 12 mm thick 1Sqm 184
361 15 mm thick 1 Sqm 209
362 18 mm thick 1Sqm 231
363 21.4 mm thick 1 Sqm 262
364 25 mm thick 1Sqm 278
Plain particle Board (PPB) (Exterior Grade)
365 9 mm thick 1 Sqm 221
366 12 mm thick 1Sqm 239
367 15 mm thick 1 Sqm 286
368 18 mm thick 1Sqm 312
369 21.4 mm thick 1 Sqm 361
370 25 mm thick 1Sqm 390
Prelaminated particle Board (OSL) (Interior Grade)

371 9 mm thick 1 Sqm 339


372 12 mm thick 1Sqm 365
373 15 mm thick 1 Sqm 403
374 18 mm thick 1Sqm 428
375 21.4 mm thick 1 Sqm 459
376 25 mm thick 1Sqm 480
Prelaminated particle Board (OSL) (Exterior
Grade)

Page # 21
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
377 9 mm thick 1 Sqm 381
378 12 mm thick 1Sqm 428
379 15 mm thick 1 Sqm 458
380 18 mm thick 1Sqm 486
381 21.4 mm thick 1 Sqm 534
382 25 mm thick 1Sqm 565
Prelaminated particle Board (BSL) (Interior Grade
)
383 9 mm thick 1 Sqm 384
384 12 mm thick 1Sqm 417
385 15 mm thick 1 Sqm 444
386 18 mm thick 1Sqm 475
387 21.4 mm thick 1 Sqm 534
388 25 mm thick 1Sqm 597
Prelaminated particle Board (BSL) (Exterior
Grade)
389 9 mm thick 1 Sqm 426
390 12 mm thick 1Sqm 478
391 15 mm thick 1 Sqm 521
392 18 mm thick 1Sqm 574
393 21.4 mm thick 1 Sqm 599
394 25 mm thick 1Sqm 624
LAMINATED SHEETS (EQUIVALENT TO
DECOLAM)
Glossy Finish
395 1.00 mm thick 1 Sqm 196
396 1.50 mm thick 1Sqm 283
397 1.80 mm thick 1Sqm 310
Mat Finish
398 1.00 mm thick 1 Sqm 210
399 1.50 mm thick 1 Sqm 292
400 1.80 mm thick 1Sqm 315
MEDIUM FIBRE BOARD (EQUIVALENT TO
NUWUD)
401 6 mm thick 1 Sqm 201

Page # 22
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
402 8 mm thick 1Sqm 228
403 12 mm thick 1 Sqm 306
404 15 mm thick 1Sqm 388
405 18 mm thick 1 Sqm 434
406 25 mm thick 1Sqm 616
407 30 mm thick 1 Sqm 744
408 35 mm thick 1Sqm 812
PARTICLE BOARD CEILINGS
409 Gypsum Board 0.595 M x 0.595 M 12.5 mm thick of 1 Sqm 146
IS 2095 -1992`
410 False ceiling with 12.5 mm Gypsum Board IS 2095 - 1 Sqm 443
1982 using Gyp steel section including installation and
complete finish excluding painting.
411 Supply & fixing GVP board 0.595 x 0.595M 12.5mm 1 Sqm 502
thick tile using fine line grid system including
installation and complete finished excluding painting

Gypboard wall lining :


412 Supply & fixing of Gypboard wall lining using 9.5/12.5 1 Sqm 464
mm thick Gyp - board (cnforming to IS 2095-1982),
fixing to Gypsteel GI channels of perimeter channel
(20mm x30mm x27mm x0.55mm thick) and ceiling
channels of (51.5 mm x 26mm
x26mmx10.5mmx0.55mm thick) and fixing and
finishing using joint compound and paper
tapecomplete finish as per specification without
painting.
Gypboard plain false ceiling:

Page # 23
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
413 Supply and fixing of Gypboard plain false ceiling using 1 Sqm 510
12.5 mm thick Gypboard conforming to IS 2095 -
1982, fixing to Gypsteel GI channels frame work using
perimeter channel (20mm x30mmx27mmx0.55mm)
Intermediate channels (45mm x15mmx15mmx0.9mm)
and ceiling channels (51.5 mm x26mm x10.5mm x
0.55 mm thick) jointing and finishing using joint
compound and paper tape complete finish as per
specification without painting

Page # 24
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Gypboard (fine line) Grid suspended ceiling
Supply and fixing of Gypboard (conforming to IS
2095-1982 ) FALSE CEILING WITH FINE LINE
EXPOSED Grid suspended ceiling system using
pre-coated galvanized steel main "T" section
(24x38x0.35 mm thick x 3600 mm) Cross "T"
(24x38x0.35mm x 600mm)and wall angle of
(24x24x0.8 mm thick x 3050 mm) to form Grid size
600x 600 mm using MS Rods, "J" Bolts and
anchor fasterners etc as per specification & as
directed by dept, officers.
414 Using Plain Gypsum Board 9.5 mm laid on to the Grid !sqm 419

415 Using Plain Gypsum board 12.5 mm laid on to the 1 Sqm 453
Grid.
Gypboard metal stud partition single layer:-
416 Supply &fixing 75mm thick metal stud partition using 1 Sqm 700
12.5 mm thick Gypboard conforming to IS 2095-1982
screw fixed to either side to 48 mm studs of 0.55 mm
thick with the 50 mm floor and ceiling channel 0.55
mm and the joints duly finished with joint compound,
paper tape and two coats Dry wall top coat as per
specification.
417 Providing false ceiling with 15 mm thick Arm strong 1 Sqm 550
mineral fiber Board fine finished of size 600x 600mm
fixed over Aluminum frame using "T" Angles
38.1x25.4 mm (1 1/2" x1") size heavy duty weight
suspended from roof using 6mm dia MS Rod hooking
over roof replacement and outer attached to the "J"
Bolts fixed to the"T" angles including Cost
&conveyance of all materials and labour charges such
as cutting , fixing of standing of frame work exposing
roof making complete for finished item of work

Page # 25
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
418 Providing wooden paneling 12 mm thick Novapan 1 Sqm 945
one side laminated sheet fixed on wooden frame of
BT wood size 50.8 mm x 25.4 mm (2"x1") at distance
of 609.6mm (2'-0") intervals of both ways providing
3/4" x 1/2" (19.05 mm x 12.7 mm ) size BT wood
ornamental cover beeding and necessary screws,
fevical glue complete for finished item of work.

419 Supply , manufacturing , installing of library Rack of 1 Sqm 4044


19 mm thick ISI marked commercial ply All round
boxing verticals, Horizontal for depth of 609.6mm (2'-
0) and shelves with 3.5 mm thick teak veneer covered
with on exposed surface externally and internally and
each panels with 6mm thick ISI commercial ply with
3.5 mm thick teak veneer for glazed shutters teak
wood size 55 mm x 28mm with 5 mm thick glass fixed
with ornamental beeding and other ornamental
beading is covered as per drawing including brass
hinges, ornamental handles, ball catchters, buffers,
locking system etc, and all the commercial ply
exposed edges are to be covered with 6 mm thick
teak wood lipping. All the teak veneer and teak wood
and ornametnal beading is to coated with polishing
and a coat of melamine finish etc, complete for
finished item of work.

420 Thermocole 12 mm thick 1 Sqm 16


421 Thermocole 19 mm thick 1 Sqm 27

Page # 26
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Supply &fixing thermocole false ceiling 2' x 2'
(609.6 mm x 609.6 mm ) size with all necessary
fittings for finished item of work.
422 25 mm thick 1 Sqm 284
423 19 mm thick 1 Sqm 266
424 Plaster of paris 12 mm thick 1 Sqm 292
425 Plaster of Paris 10 mm thick 1 Sqm 244
426 Supply & fixing Plaster of paris false ceiling with all 1 Sqm 318
necessary fittings for finished item of work.
PLYWOOD ITEMS
427 Plywood 3 ply with teak ply on one face and 1 Sqm 288
commercial ply on another face 4mm thick
428 Plywood 5 ply with commercial ply on both faces 6 1 Sqm 255
mm thick
429 Plywood 5 ply with commercial ply on both faces 8 1 Sqm 260
mm thick
430 Plywood 5 ply with Teak ply on both faces 9 mm thick 1 Sqm 625

431 Plywood 5 ply with teak ply on one face and comercial 1 Sqm 374
ply on another face 6 mm thick
432 Plywood 5 ply with teak ply on one face and comercial 1 Sqm 479
ply on another face 9 mm thick
433 Plywood 9 ply with commercial ply on both faces 12 1 Sqm 297
mm thick.
434 Plywood 9 ply with commercial ply on both faces 15 1 Sqm 429
mm thick.
435 Plywood 9 ply with commercial ply on both faces 19 1 Sqm 492
mm thick.
436 Plywood 9 ply with teak ply on both faces 12 mm thick 1 Sqm 729

437 Plywood 9 ply with teak ply on one face and 1 Sqm 611
commerical ply on another face 13 mm thick
DOOR FRAMES

Page # 27
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
438 MS. Hallow door frames manufactured by cold roll 1 Rm 128
formed process steel sheet 1.25mm thick bright
CRCA confirming to IS 4351 - 1976 with Hinges tower
Bolts etc.
Flush door shutters, solid bond wood block board
type with teak ply on both faces
439 25 mm thick 1 sqm 693
440 30 mm thick 1 sqm 716
441 35 mm thick 1 sqm 771
Flush door shutters, solid bond wood block board
type with commercial ply on both faces
442 25 mm thick 1 sqm 352
443 30 mm thick 1 sqm 397
444 35 mm thick 1 sqm 435
445 40 mm thick 1 sqm 518
Flush door shutters, solid bond wood block board
type with teak venner on one face and commericla
ply on another face (liping)
446 20 mm thick 1 sqm 465
447 25 mm thick 1 sqm 518
448 30 mm thick 1 sqm 580
449 35 mm thick 1 sqm 622
450 40 mm thick 1 sqm 663

Page # 28
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Plain cement bonded particle boards conforming
to IS 14276 truly exterior grade (Bison panel or
equivalent)
451 6 mm thick 1 sqm 115
452 8 mm thick 1 sqm 142
453 10 mm thick 1 sqm 167
454 12 mm thick 1 sqm 193
455 16 mm thick 1 sqm 258
456 20 mm thick 1 sqm 309
457 25 mm thick 1 sqm 374
458 30 mm thick 1 sqm 437
459 40 mm thick 1 sqm 566
Prelaminated cement particle board truly exterior
board one side laminated (Bison Lam or
equivalent)
460 6 mm thick 1 sqm 308
461 8 mm thick 1 sqm 325
462 10 mm thick 1 sqm 342
463 12 mm thick 1 sqm 360
464 16 mm thick 1 sqm 400
Prelaminated cement particle board truly exterior
board both side laminated (Bison Lam or
equivalent)
465 6 mm thick 1 sqm 342
466 8 mm thick 1 sqm 360
467 10 mm thick 1 sqm 377
468 12 mm thick 1 sqm 395
469 16 mm thick 1 sqm 435
Cup board shutters using Bison Panel Plain
cement bonded particle Board

Page # 29
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
470 Supply & fixing of cup board shutters and frames 1 sqm 994
using 16 mm thick bison panel cement bonded board
and painted both sides with one coat of primer and
two coats of synthetic enamel paint of approved
shade and brand including fixing of furniture like
piano, hinges brass ball catches, aluminum tower
bolts, handles, nails, screws, godrej locks 6 Nos.
fevicol including cost and conveyaance of all materials
and labour charges and all incidental and operational
charges etc complete for finished item of work at site
for kitchen cup boards.

471 Supply & and fixing of false ceiling with pre - painted 1 Sqm 491
cold rolled "T" Sections of size 1 mm x 30 mm x 0.55
mm of grid size of 610 x 610 mm suspended by GI flat
(0.60) mm wire 14 gauge with necessary components
and with 8 mm thick bison panel (cement bonded
particle board) laid on the grid inclusive of necessary
hardware and labour etc, and one coat of primer
paint, two coats altek plaint one side, other side one
coat of primer.
472 Supply and fixing bison panel wall paneling (water 1 Sqm 787
proof) with frame work made of GI stud profiele of size
48 x 40 x 10 x0.6 mm thick placed at every 610 mm
C/C intervals fixed vertically in between floor and roof
"U" track of size 50 x 30 x 0.6 mm thick duly fixed with
self expansion screws and with 10 mm thick bison
planel claded around with self tapping self embedding
screws fixed at every 300 mm (centers) leaving 3
mm gap between two panels of width 2'-0" (609.6mm)
painting Altek smooth finish 2 coats of polymer
binding medium specially graded marble powder sand
other materials to give ideal surface over Altek primer
coat including cost and conveyance of all materials
and labour charges etc. complete

Page # 30
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
473 Supply and fixing duble skin bison planel partition with 1 Sqm 1261
frame work made of GI stud profiles of size 48 x 40 x
10 x 0.6 m thick placed at every 610 mm veritical and
intervals and 915 mm horizontal intervals duly fixed
with self expansion screws, the bison panel of 10 mm
thick in cladded in panels of width of 2'-0 " (609.6mm)
fixed both sides of plartition fixed with self tapping
self embedding screws fixed at every 300 mm centers
leaving 3 mm gap between two panels, the surface
smooth finish made of polymer binding medium
specifically graded marble powder, sand and other
materials to give ideal surfcae etc, over Altek primer
coat including cost and conveyance of all materials to
site and incidental labour charges etc.complete

474 Supply and fixing bison panel door shutter with 1 Sqm 931
alround style "U" size of 20 mm x 18 mm x 20 mm
made from 0.6 mm thick galvanized prepainted cold
rolled steel profiles with 16 mm thick bison panel with
necessary screws fixed at every 1'-0" (304.8mm)
interval 250 mm long aldrops 2 nos. MS nickel coated
250 m lng 1 No. MS tower bolts including cost and
conveyance of all materials at site and applying one
oat primer 2 coats of luppum and two coats of
synthetic enamel paint as per approved design for
finished item of work.

Page # 31
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
475 Providing and fixing frame made from 1 mm 1 Sqm 1481
galvanized SS prepainted cold roller steel profiles
with IS 277 with Zince of 120 gr/sqm primer coat of
epoxy primer of 7 microns thick finish paint ith
modifided polyester paint of thickness between 13-20
microns and back coat ith alkie polyester of 7-12
microns. Overall section size of 50 mm x 50 mm with
15 mm deep 28 mm wide rebate for shutter with
necessary corner brackets, stiffeners, hinges and
screws, expandable screws. Bison panel shutter
single door type with alround styles "U" size of 20 mm
x 18 mm x 20mm made from 0.6mm thick galvanized
prepainted cold rollerm, steel profiles with 16 mm thick
bison panel with necessary screws fixed every 1'-0"
(304.8mm) interval 250 mm long aldrops 2 nos MS
Nikel coat 250mm long 1 no MS tower bolt incluidng
cost and conveyance, One coat of primer 2 coats of
luppum and two coats of synthetic enamel paint as
per approved colour, labour charges etc

476 Supply and fixing of cup boars, box type using plain 1 Sqm 2115
16 mm bison board for box framing alround frame of
100 x 35 mm using double sheet 16mm thick one
plain and one prelaminated cement particle board.
The shutter consisting of 16 mm thick prelaminated
bison lam of aproved shade (manufactured as per the
instructions of Engineer incharge) inclusive of all
taxes, transport, door furniture, fixtures, powder
coated handles 4" (101.6 mm) aluminum tower bolt
4"(101.6mm) godrej locks 3/4 " x 3/4" piano hinges etc
complete finished item of work.

Page # 32
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3
4RF
477 Supply and fixing of door shutter made out of PVC 1 Sqm
867
Hollow extruded section (SINTEX MAKE 105
SECTION ) having dimensions of 78 mm x 28 mm
with wall thickness of 1.5 mm with necessary tapering
to house Bison Lam thickness of 12 mm . All the four
corners are jointed with PVC 'L' brackets of size 4" x
8" (101.6 x 203.2mm) and the PVC lipping is filled
with well seasoned country wood to hold hinges. The
hardware consists of 250mm long aldrop - 2 nos. 250
mm Handle - 1 no. ( all are of Aluminum ) The cost is
inclusive of all incidental, labour transportation
charges.
PRE- PAINTED STEEL, WINDOWS, VENTILATORS & DOOR FRAMES.

Page # 33
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
478 Supply and fixing of windows & top Hung and
fixed louvered ventilators made of pre - painted
steel (base steel as per IS 513 of -0.6 mm thick 'D"
quality, galvanized as per IS 277 with zinc of 120
GSM) primer coated with epoxy primer of 5-7
microns thick, finish painted with a polyester
paint of 12-16 microns thick and back coated with
5-7 microsn thick alkyd backer. Section for outer
frame should be 46 x 52 mm section for shutter
should be 46 x 46 mm section for mullion should
be 46 x 70 mm, and section for beading should be
18 x 25 mm and section for louvered ventilation
should be 33 x57mm Box section. The windows
should be panelled with 5mm thick plain float
glass & 4 mm pinhead glass for ventilators with
Ethy propylene Diamine monomer Gasket(EPDM).
The sections are to be cut to length mitre joined
with corner brocket centre mullions are to be fixed
using mullilon cap. Handle made of high grade
aluminium powder coated and nylon receiver.
Gaskets made of Ethyl propylene Diamine
monomer(EPDM). Corner brackets made of

CRCA with Zinc Phasphating. Mullion caps made


of glass linked nylon. The above frames should be
fixed to the concrete /masonry wall by means of
self expanidng screws. including 10 mm square
guard bars with 6" pitch and all taxes, complete
for finished item of work.
Windows
479 Single shutter 2'0 x 4'0 (609.6 x 1219.2 mm ) Outer 1 sqm 2294
frame section size of 46 x 52 mm shutter frame
section size of 46 x 46 mm

Page # 34
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
480 Double shutter 3'-0" x 4'-0" (914.4mm x 1219.2 mm) 1 Sqm 2294
outer frame sectionsize of 46 x 52 mm shuter frame
section size of 46 x 46 mm
481 Double shutter 3'-0" x 4'-0" (914.4mm x 1219.2 mm) 1 Sqm 2431
outer frame sectionsize of 46 x 52 mm shutter frame
section size of 46 x 46 mm Mullion section size of 46 x
70 mm
482 Double shutter 4'-0" x 4 '-0" (1219.2x12.19.2mm) 1 Sqm 2294
outer frame section size of 46 x 52 mm shutter frame
section size of 46 x 46 mm
483 Double shutter 4'-0" x 4 '-0" (1219.2x1219.2mm) 1 Sqm 2431
outer frame section size of 46 x 52 mm shutter frame
section size of 46 x 46 mm Mullion section size
of 46 x 70 mm
484 Double shutter 4'-6" x 4 '-6" (1371.6x1371.6mm) outer 1 Sqm 2168
frame section size of 46 x 52 mm shutter frame
section size of 46 x 46 mm Mullion section size
of 46 x 70 mm
485 Centre fixed both side openable shutter 5'-0" x 4'-0" 1 Sqm 2168
(1524x1219.2mm) outer frame section size of 46 x
52 mm shutter frame section size of 46 x 46 mm
Mullion section size of 46 x 70 mm fixed beading
section size of 18 x 25 mm
486 Centre fixed both side openable shutter 6'-0" x 4'-0" 1 Sqm 2168
(1828.8x1219.2mm) outer frame section size of 46 x
52 mm shutter frame section size of 46 x 46 mm
Mullion section size of 46 x 70 mm fixed beading
section size of 18 x 25 mm
487 Centre fixed both side openable shutter 6'-0" x 4'-6" 1 Sqm 2168
(1828.8x1371.6mm) outer frame section size of 46 x
52 mm shutter frame section size of 46 x 46 mm
Mullion section size of 46 x 70 mm fixed beading
section size of 18 x 25 mm
Ventilators :
488 Top Hung 2 '-0" x 2'-0" (609.6x609.6mm) outer frame 1 Sqm 2514
section size of 46mm x 52 mm shutter frame section
size of 46mm x 46 mm

Page # 35
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
489 Top Hung 4 '-0" x 2'-0" (1219.2x609.6mm) outer 1 Sqm 2514
frame section size of 46 x 52 m shutter frame section
size of 46 x 46 mm Mullion section size of 46 x 70 mm

490 Top Hung 4 '-0" x 3'-0" (1219.2x914.4mm) outer frame 1 Sqm 2514
section size of 46 x 52m m shutter frame section size
of 46 x 46 mm Mullion section size of 46 x 70 mm

491 Fixed louvers 2'-0" x 2'-0" (609.6x609.6mm)(Box 1 Sqm 1721


section) outer frame section size of 33 x 57 mm
492 Fixed louvers 4'-0" x 2'-0" (1219.2x609.6mm)(Box 1 Sqm 1721
section) outer frame section size of 33 x 57 mm
Mulliion section size of 33 x 57
493 Fixed louvers 4'-0" x 3'-0"(1219.2x914.4mm)(Box 1 Sqm 1721
section) outer frame section size of 33 x 57 mm
Mulliion section size of 33 x 57
Flymesh Shutters
Supply & fixing of Flymesh shtters of size 20 x 40
mm fly proof mesh with std. Spn (S.S.) flymesh
inclding cost and conveyance of all materials, all
taxes and labour charges etc. complete for
finished item of work.
494 Single shutter 2'-0" x 4'-0" (609.6x1219.2mm) shutter 1 Sqm 528
section size 20 x 40 mm
495 Double shutter 3'-0" x 4'-0" (914.4x1219.2mm) shutter 1 Sqm 528
section size 20 x 40 mm
496 Double shutter 4'-0" x 4'-0" (1219.2x1219.2mm) 1 Sqm 528
shutter section size 20 x 40 mm
Supply & fixing of Flymesh shutters of size 20 x
40 mm fly proof mesh with Netlon flymesh
inclding cost and conveyance of all materials, all
taxes and labour charges etc. complete for
finished item of work.
497 Single shutter 2'-0" x 4'-0" (609.6x1219.2mm) shutter 1 Sqm 455
section size 20 x 40 mm

Page # 36
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
498 Double shutter 3'-0" x 4'-0" (914.4x1219.2mm) shutter 1 Sqm 455
section size 20 x 40 mm
499 Double shutter 4'-0" x 4'-0" (1219.2x1219.2mm) 1 Sqm 455
shutter section size 20 x 40 mm
Door frames
Supply & fixing of Door frames made of all formed
sections of 1.25mm thick CRCA section, size
should be 50x60mm with 32mm rebate. The corner
of the frame should be welded. The frame should
be painted with one coat of primer and finished
painted with pure polyester paint. The frame
should be provided with approved quality butt
hinges of 3 Nos. including all taxes complete for
finished item of work.

500 Single shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer 1RM 115


frame section size of 50 x 60 mm
501 Double shutter 5'-0" x 7'-0" (1524x2133.6mm) outer 1 RM 115
frame section size of 50 x 60 mm
Supplying & fixing of Door frame made of roll
formed section of 1.25 mm thick CRCA section,
size should be 50 x 60 mm with 32 mm rebate.
The corner of the frame should be welded. The
frame should be painted with one coat of primer
and finished painted with pure plolyester paint.
The frame should be provided with approved
quality butt hinges of 3 Nos. including all taxes
complete for finished item of work.

502 Single shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer 1 RM 131


frame section size of 50 x 75 mm
503 Single shutter 5'-0" x 7'-0" (1524x2133.6mm) outer 1 RM 131
frame section size of 50 x 75 mm

Page # 37
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Curtain Glazing
Supply and fixing of curtain Glazing made of pre
painted steel (base steel as per IS 513 of 0.6 mm
thick D quality, galvanized as per IS 277 with
Zinc of 120 GSM) Primer coated with epoxy
primer of 5-7 microns thick, finish painted with a
polyester paint of 12- 16 microns thick and back
coated with 5-7 microns thick alkyad backer.
Section for outer frame should be 46 x 52 mm ,
section for mullion should be 46 x 70 mm and
section for beading should be 18 x 25 mm. The
Glazing should be panelled with 5 mm thick plain
float Glass with Ethyl Propylene diameine
Monomer (EPDM) Gaskets. The sections are to be
cut to length, mitre joined with corner bracket.
Cnetre mullions are to be fixed suing mullion cap.
Handle made of high grade alluminium powder
coated and nylon receiver. Gaskets made of Ethyl
propylence Diamine Monomer (EPDM) Corner
brackets made of CRCA with zinc phosphating.
Mullion caps made of Glass filled nylon. The
above frames should be fixed to the concrete /
masonry wall be means of self expanding screws.
Including all taxes & complete for finished item of
work.

504 Fixed Glazing 2'-0" x 2'-0" (609.6x609.6mm) grid 1 Sqm 2079


outer frames section size of 46 x 52 mm
Mullion section size of 46 x 70mm
Beading section size of 18 x 25 mm
505 Fixed Glazing 2'-0" x 3'-0" (609.6x914.4mm) grid outer 1 sqm 2079
frame section size of 46 x 52 mm
Mulllion section size of 46 x 70 mm
Beading section size of 18 x 25 mm

Page # 38
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
506 Fixed Glazing 3'-0" x 3'-0" (914.4x914.4mm) grid outer 1 sqm 1776
frame section size of 46 x 52 mm
Mulllion section size of 46 x 70 mm
Beading section size of 18 x 25 mm
507 Fixed Glazing 3'-0" x 4'-0" (914.4x1219.2mm) grid 1 sqm 1776
outer frame section size of 46 x 52 mm
Mulllion section size of 46 x 70 mm
Beading section size of 18 x 25 mm
ALLUMINIUM DOORS AND WINDOWS
508 Supplying alluminium Door frames with rectangular 1 Kg 146
box hollw section (including annodisation cost)
509 Supplying alluminium annodised openable sliding 1 Kg 146
window, Ventgilator (including annodisation cost)
510 A.C sheet Corrugated 6 mm thick 1 sqm 79
511 A.C sheet plain 4 m thick 1 sqm 73
512 A.C sheet plain 6 m thick 1 sqm 75
513 Sun Control film to the glazed windows partition 1 sqm 199
including labour charges.
514 Alluminium Venetian blinds horizontal 25.4 mm wide 1 sqm 483
with all accessories.
515 Alluminium Venetian blinds Verticle 100 mm wide with 1 sqm 821
all accessories.
516 S & F of marblex flooring with 2.0 mm thick in rolls. 1 sqm 275
517 S&F Vinyl Flooring with tiles 1.5 mm thick in rolls 1 sqm 275
RATES OF WORKS
A. DISMANTLING
Dismantling clearing away and carefully stacking
materials useful for reuse.
518 Brick or stone masonry in clay upto 3 M height 1 Cum 50
519 Brick or stone masonry in clay over 3 M height 1 Cum 60
520 Brick or stone masonry in lime motar or brick masonry 1 Cum 85
in cement mortar upto 3 M height
521 Brick in lime mortar wall up to 3 M height 1 Cum 50
522 Brick or stone masonry in lime motar or brick masonry 1 Cum 85
in cement mortar over 3 M height
523 Brick in lime mortar wall up to 3 M height 1 Cum 50

Page # 39
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
524 Stone masonry in cement mortar upto 3 M height 1 Cum 120
525 Stone masonry in cement mortar over 3 M height 1 Cum 145
526 Terracing work in roofs or floors 10 Sqm 60

527 Flat stones in roof or floors incluidng lifting 10 Sqm 50

528 pan tiled or mangalore tiled roof without roof timbers. 10 Sqm 45

529 Flat and pan tiles or Mangalore tiles over flat tiles 10 Sqm 50
without roof timbers
530 Old thatched roofing including tying materials into 10 Sqm 15
small bundles for reuse.
531 Wrought and framed timber in roofs or floors 1 Cum 75
532 Doors and windows including removal of frame, 1 sqm 25
hinges and fastening.
533 Old lime mortor plaster 10 Sqm 15

534 Old cement mortar plaster 10 Sqm 18

535 Dry rough stne revetment for aprons and stacking 1 Cum 20
within 40 M lead
536 Revetment for aprons and stacking grouted within 40 1 Cum 18
M lead
537 Lime concrete 1 Cum 80
538 Surki or cement concrete 1 Cum 125
539 Cuddapah slabs or shahabad stone slabs fooring on 10 Sqm 25
sand bed
540 reinforced cement conrete 1 Cum 735
541 Through scraping of old pllastered surface 10 Sqm 15

542 Washing of platered surface with soap, soda and 10 Sqm 5.0
water (or with soda lime cumbly and water)
543 clean removal of lime plaster from walls and raking 10 Sqm 16
out joints 20mm deep or from terraced roof and raking
out joints 100 mm deep
544 Clean removal of cement pllater from walls and raking 10 Sqm 17
out joint 200 mm deep

Page # 40
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Bailing out water for earth work excavation
/concrete for foundatin below water level.(For
building items only)
a) other than sandy soil
545 0.0 M to 1.0 M 1 cum 64
546 1.0 M to 2.0 M 1 cum 76
547 2.0 M to 3.0 M 1 cum 89
b) Sandy soil
548 0.0 M to 1.0 M 1 cum 102
549 1.0 M to 2.0 M 1 cum 158
550 2.0 M to 3.0 M 1 cum 191
(E) CONCRETE
551 a) Supply and placing of the ready (design ) standard 1 Cum 2300
mix concrete M 20 grade from standard suppliers
approved by the Department including cost and
conveyance pumping upto 5 floors
552 For each additional floor 1 Cum 30
(F) labour charges for wrought and put up
incluidng fixing in position frames, shutters for
doors, windows, ventilators etc.
553 Fully panelled doors external or internal 1 Sqm 330
554 Glazed and panelled doors 1 Sqm 318
555 Framed and planked doors 1 Sqm 311
556 Ledged, braced and planked doors 1 Sqm 267
557 Windows glazed 1 Sqm 318
558 Windows panelled 1 Sqm 419
559 Windows ledged, braced and planked 1 Sqm 267
560 Windows framed and planked 1 Sqm 254
561 Ventilators glazed, fixed with double frame with wire 1 Sqm 318
netting.
562 Swing ventilators glazed 1 Sqm 343
563 Weldmesh doors and windows 1 Sqm 267
564 G.I or .AC sheet door & windows 1 Sqm 134
(G) MISCELLANEOUS ITEMS
565 Preparing gabions with jungle wood Each 2.4

Page # 41
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
566 Planting plants Each 1.8
567 Pruning plants Each 1.8
568 Maintaining avenues including fencing, weeding, Each 4.2
milching, watering etc per plant.
569 - do - When scattered in hot weather with extra Each 4.8
conveyance from March to June
570 Hoisting or lowering of slab 1 cum 67
571 Dressing faces of granite stone (double line dressing) 1 Sqm 111

572 Dressing faces of other than granite stone(double line 1 Sqm 69


dressing)
(H) SCAFFOLDING
573 For superstructure in first floor over the rate of 1 cum 29
foundation and basement
574 For second floor over the rate of first floor 35
superstructure
575 For third floor over the rate of IInd floor 1 cum 47
superstructure
576 For each additional floor over third floor 1 cum 21
Scaffolding for plastering of walls and ceiling or
painting of roof timber or walls, where height is
more than 3 M
577 1st and 2nd floor 10 Sqm 32

578 2nd and 3rd floor 10 64


Sqm
579 3rd and 4th floor 10 Sqm 96

580 Extra for every additional floor over 4th floor 10 23


Sqm
Centering charges
581 centering charges for all RCC roof slabs upto 150 mm 10 Sqm 730
depth and upto 3.66 M of floor height

Page # 42
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
582 Centering charges for all RCC roof slabs upto 150 mm 10 200
depth & more than 3.66 M of floor height. Add for Sqm
each additional metre height or part there of over the
rate as in item above.
583 centering charges for all RCC roof slabs above 150 10 Sqm 1084
mm upto 300 mm depth and upto 3.66 M of floor
height
584 Centering charges for all RCC roof slabs above 150 10 296
mm and upto 300depth & more than 3.66 M of floor Sqm
height. Add for each additional metre height or part
there of over the rate as in item above.
Centering charges for all R.C.C roof slabs
projection upto 1.2 M only, at higher level without
having such slab projections at lower levels.

585 At 2nd floor level 10 Sqm 669

586 At 3rd floor level 10 699


Sqm
587 At 4th floor level 10 Sqm 730

588 Centering charges for all RCC waffle slabs incluidng 10 1114
ribs etc,(plain area) upto 3.66 M of floor height Sqm

589 Centering charges for all RCC waffle slabs including 10 Sqm 304
ribs etc. (plain area) & more than 3.66 M of floor
height. Add for each additional metre height or part
there of over the rate as in item above.
590 Centering charges for all R.C.C helical stair cases. 10 Sqm 1189

591 Centering charges for RCM facia/ railing 50 to 75 mm 1 Sqm 42


thickness
592 Centering charges for sunshade 0.6 M width 1 RM 31.50
593 Centering charges for sunshade 0.8 M width 1 RM 39
594 Centering charges for sunshade 1.00 M width 1 RM 44
595 Centering charges for T beams upto 3.66 M of floor 1 cum 813
height

Page # 43
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
596 Centering charges for T beams more than 3.66 M of 1 cum 222
floor height . Add for each additional metre height or
part there of over the rate as in item above

597 Centering charges for Rectangular beam, L beams, 1 cum 689


upto 3.66 M of floor height
598 Centering charges for Rectangular beams & L beams 1 cum 188
more than 3.66 M of floor height . Add for each
additional metre height or part there of over the rate
as in item above
599 Centering charges for columns, pedastals 1 cum 689
600 Centering charges for Templates, bed blocks and 1 cum 434
footings
601 Centering charges for arches upto 1.5 M span 1 cum 938
602 Centering charges for arches above 1.5 M span 1 cum 1001
603 Centering charges for lintels and plinth beams ( less 1 cum 561
than 3.0 span)
604 Centering charges for slabs above 300 mm depth 1 cum 651
605 Labour charges for 50 to 75 mm thick RCM Paradah 1 sqm 60
walls
606 Labour charges for fixing A.C sheets including cost of 1 sqm 344
J.Bots bitumen washers etc. with or without ridges.

(j) lift charges


For RCC items
607 Between 1 st and 2 nd floor 1 cum 37
608 Between 2nd and 3rd floor 1 cum 91
609 Between 3rd and 4th floor 1 cum 170
610 Between 4th and 5th floor 1 cum 267
611 Between 5th and 6 th floor 1 cum 291
612 between 6ht and 7 th floor 1 cum 364
613 Between 7th and 8 th floor 1 cum 424
614 Between 8th and 9 th floor 1 cum 473
615 Between 9th and 10th floor 1 cum 546
LIFT CHARGES FOR BRICK MASONRY & STONE
MASONRY

Page # 44
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
616 Between 1 st and 2 nd floor 1 cum 30.50
617 Between 2nd and 3rd floor 1 cum 43
618 Between 3rd and 4th floor 1 cum 55
619 Add extra for every additional floor above 4th floor 1 cum 18
Lift charges for impervious coat upto 26 mm thick
plastering with impermo compound or shahabad
stone flooring:
620 Between 1 st and 2nd floor 10 Sqm 15

621 Between 2nd and 3rd floor 10 27


Sqm
622 Between 3rd and 4th floor 10 Sqm 40

623 Add extra for every additional floor above 4th floor 10 14
Sqm
Lift charges for plastering
624 Between 1 st and 2 nd floor 10 Sqm 7.4

625 Between 2nd and 3rd floor 10 13


Sqm
626 Between 3rd and 4th floor 10 Sqm 19

627 Add extra for every additional floor above 4th floor 10 8.4
Sqm

(for Building items)


S.No Description of item Unit RATE for
SOR 2003-
04 excluding
subsumed
taxes

1 2 3 4

Page # 45
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
1 Supplying, laying, jointing and testing 101.6 mm SWG 1 RM 104
Ist class pipes with airtight cement joints in CM 1.5 : 1
prop. incluidng excavation of trenches and socket pits
in any soil (except rock requiring blasting) upto 1524
mm(5'0") depth and refilling with watering and
tamping.
2 Supplying, laying, jointing and testing 101.6 mm SWG 1 RM 81
Ist class pipes with airtight cement joints in CM 1:5:1
prop. incluidng excavation of trenches and socket pits
in any soil (except rock requiring blasting) upto 914.4
mm (3'0") depth and refilling with watering and
tamping.
3 a) Supplying & fixing SWG bends 101.6 mm Each 27
b) - do - labour charges only Each 11
4 Supplying & fixing 152.4 mm x 101.6 mm SWG gully Each 195
traps Ist class with C.I Grating & Constg. Brick
masonrary in CM 1 :6 prop. Intermediae chamber
and fitted with 304.8 mm x 288.6mm (12"x9")C.I
Frame and hinged cover
5 Supply of SWG pipe Ist class 4" dia (101.6mm) 1 RM 35
6 Supply of SWG pipe Ist class 6" dia (152.4mm) 1 RM 47
7 Supply of SWG pipe Ist class 8" dia (203.2mm) 1 RM 118
8 Supply of SWG pipe Ist class 10" dia (254mm) 1 RM 173
9 Constructing 914.4 mm (3'0") dia brick in CM 1:6 prop. Each 1824
Masonry inspection chamber upto 1524 mm (5'0")
depth including plastering with CM 1:3 prop. 12.7 mm
(1/2")thick both inside and outside and fitted with 508
mm (20") dia light weight 20 kg CI frame and cover.

10 Constructing 914.4 mm (3'0")dia brick in CM 1:6 prop. Each 1322


Masonry inspection chamber upto 914.4 mm (3'0")
depth including plastering with CM 1:3 prop. 12.7 mm
(1/2")thick both inside and outside and fitted with 508
mm (20") dia light weight 20 kg CI frame and cover.

11 Extra for provision of medium weight 40 Kg in place Each 269


of light weight cover.

Page # 46
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
12 Constructing 914.4 mm x 457.2 mm (3'0"x1'6") brick in Each 1409
CM 1:6 prop. Masonry Inspection chamber upto 914.4
mm (3'0") and fitted with light weight 914.4 mm x
457.2 mm (3'0"x1'6") C.I frame and cover of 40 Kg.

13 Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in Each 850


CM 1:6 prop. Masonry. Inspection chamber upto
914.4 mm (3'0") and fitted with light weight 457.2 mm
x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg.

14 a) Supplying & fixing 101.6 mm C.I Plug Bend Each 129


b) - do - labour charges only Each 30
15 a) Supplying & fixing 152.4mm dia CI plug bend Ist Each 291
quality
b) - do - labour charges only Each 39.70
16 a) Supplying & fixing 101.6mm dia CI Plain bend Ist Each 121
quality
b) - do - labour charges only Each 30
17 a)Making drainage connection in the existing Each 56
inspection including all repairs
b) - do - labour charges only Each 35
18 a)Supplying , laying, jointing and testing 152.4 mm 1 RM 139
SWG Ist class pipes with airtight cement joints in CM
1.5 : 1 prop. incluidng excavation of trenches and
socket pits in any soil (except rock requiring blasting)
upto 151.2 cm depth and refilling with watering and
tamping.
b) - do - labour charges only 1 RM 35
19 a)Supplying , laying, jointing and testing 152.4 mm 1 RM 34
CC bed 1 : 2 : 4 Prop: using 19.05 mm gauge
graded granite metal chips and cradling 101.6 mm
SWG pipe line all round to have 76.2 mm thick cover
over the sockets.
b) - do - labour charges only 1 RM 5.0

Page # 47
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
20 a)Supplying , laying, jointing and testing 152.4 mm 1 RM 62
CC bed 1:2:4 Prop: using 19.05 mm gauge graded
granite metal chips and cradling 152.4 mm SWG pipe
line all round to have 76.2 mm thick cover over the
sockets.
b) - do - labour charges only 1 RM 25
21 Supplying & Laying 101.6 mm SWG channels with 1 RM 38
cement mortor joints with suitable brick masonry for
fixing the channels in position
b) - do - labour charges only 1 RM 17
22 a) Supplying & Laying 152.4 mm SWG channels with 1 RM 69
cement mortor joints with suitable brick masonry for
fixing the channels in position
b) - do - labour charges only 1 RM 24
23 a) Supplying & fixing 101.6 mm C.I Soil pipes with 1 RM 206
cement caulked joints and painted black
b) - do - labour charges only 1 RM 68
24 a) Supplying and fixing 152.4 mm (6") CI soil pipe Ist 1 RM 364
quality with cement caulked joints and painted black (
single socket)
b) - do - labour charges only 1 RM 68
25 a) Supplying and fixing 76.2 mm (3") CI soil pipe Ist 1 RM 128
quality with cement caulked joints and painted black (
single socket)
b) - do - labour charges only 1 RM 67.50
26 a) Supplying and fixing 152.4 mm(6") CI soil pipe Ist 1 RM 385
quality with cement caulked joints and painted black (
Double socket)
b) - do - labour charges only 1 RM 67.50
27 a) Supplying and fixing 76.2 mm(3") CI soil pipe 1st 1 RM 144
quality with cement caulked joints and painted black (
Double socket)
b) - do - labour charges only 1 RM 67.50
28 a) Supplying & fixing 101.6 mm (4") CI soil single Each 169
junction with plug
b) - do - labour charges only Each 20

Page # 48
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
29 a) Supplying & fixig 152.4 mm (6") CI soil singel Each 291
junctin with plain
b) - do - labour charges only Each 39.70
30 a) Supplying & fixing 152.4 x 152.4 mm (6"x6") CI Each 331
single junction plug /door Ist quality
b) - do - labour charges only Each 23.80
31 a) S& F 101.6 mm (4") CI soil double junction with Each 184
plug
b) - do - labour charges only Each 30
32 a) S & F 101.6 x 76.2 mmm CI soil offsets (calcutta Each 114
make)
b) - do - labour charges only Each 15
33 a) Supplying & fixing 152.4 x 152.4 mm CI single Each 223
offset Ist quality
b) - do - labour charges only Each 23.80
34 a) Supplying & fixing 203.2 x 76.2 mm CI soil offsets Each 190
Ist quality
b) - do - labour charges only Each 23.80
35 a) Supplying & fixing 101.6 mm x 152.4 mm C.I soil Each 136
offsets (Calcutta make)
b) - do - labour charges only Each 18
36 a) Supplying & fixing 88.9 mm A.C cowls Each 30
b) - do - labour charges only Each 6.0
37 a) Supplying & fixing A.C Cowl 63.5 mm dia Each 22
b) - do - labour charges only Each 5.0
38 a) supplying & fixing 101.6 mm x 63.5 mm CI inverted Each 253
double junction (Calcutta/Nagpur make)
b) - do - labour charges only Each 26
39 a) S & F 76.2 mm CI Naharytrap (Calcutta/Nagpur Each 133
make)
b) - do - labour charges only Each 24
40 Removing and refixing W.C s Each 121
41 Removing and refixing wash hand basins of any size Each 95
with fittings complete
42 a) S & F 76.2 x 101.6 mm teak wood block complete Each 11

Page # 49
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
b) - do - labour charges only Each 4.0
43 a) S& F 76.2 mm C.I plug bends (Calcutta/Nagpur Each 85
make)
b) - do - labour charges only Each 12
44 a) S & F 76.2 mm CI plain beds (Calcutta/Nagpur Each 75
make)
b) - do - labour charges only Each 10
45 a) S&F 76.2 mm C.I single junction with Plug ( Each 115
Calcutta / Nagapur make)
b) - do - labour charges only Each 17
46 a) S&F 76.2 mm C.I double junction with Plug ( Each 161
Calcutta / Nagapur make)
b) - do - labour charges only Each 20
47 a) Supplying & fixing 76.2 mm x 76.2 mm CI offsets Each 88
(Calcutta/Nagpur make)
b) - do - labour charges only Each 3.0
48 a) Supplying & fixing 76.2 mm x 152.4 mm CI offsets Each 98
(Calcutta/Nagpur make)
b) - do - labour charges only Each 15
49 Supply & fixing 101.6 mm dia CI floor traps Ist quality Each 158

50 a)Boxing of Nahany traps in RCC floors Each 73


b) - do - labour charges only Each 40
51 Boxing of W.C Trap in R.C.C floor in Ist floor Labour Each 160
charges only
52 Cutting holes in C.C; basement & repairs Labour Each 45
charges only
53 Cuttinng holes in stone masonry & basement and Each 30
repairs Labour charges only
54 Cutting holes in Brick masonry & repairs Labour Each 20
charges only
55 Cutting holes in RCC slab floor & repairs Labour Each 30
charges only
56 a) S & F 584.2 mm long Indian pattern white glazed Each 400
W.C and trap
b) - do - labour charges only Each 110

Page # 50
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
57 a) S& F 584.2 mm long Orissa pan of parry Each 664
Neycer/H.S.W make with 'P' & 's' trap
b) - do - labour charges only Each 138
58 a) S & F porcelanin foot rest for I.W.C.(Rectangular Pair 95
pair)
b) - do - labour charges only Pair 25
59 a) S &F low down porcelain flushing tank Hindustan Each 946
Sanitary wae/ parry/ Neycer with internal components

b) - do - labour charges only Each 200


60 a)S & F European type Hindustan / Neycer or parry Each 473
W.C best Indian make white glazed (P trap)
b) - do - labour charges only Each 100
61 a) S & F European type Hindustan / Neycer or parry Each 556
W.C best Indian make white glazed with 'S' trap
b) - do - labour charges only Each 100
62 a) S& F best Indian make plastic seat and lid for Each 187
European water closets & Buffers as per IS 2548-
1963
b) - do - labour charges only Each 30
63 Supply, Installation and commissioning approved
make EWC(suit) CASCADE model P' or S' trap with
porcelin cistern fixed on EWC with all internal
parts of cistern vis. White seat cover of aproved
make with rubber buffer and cap 15 mm angle
stop cock 450 mm long PVC inter connection pipe
wall flanges all of approved make etc. complete
for finished item of work in all respects

a) white Each 3752


b) Extra for colour Each 1527
c) Extra for spl. Colour Each 3054
64 a) Supplying & Fixing 12.7 mm PVC connection with Each 43
brass union nut C.P coated
b) - do - labour charges only Each 10

Page # 51
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
65 a) S & F 12.7 mm NP stop cock Indian make 300 Each 78
grams
b) - do - labour charges only Each 12
66 a) S & F concealed stop cock 12.7 mm (1/2") Each 114
b) - do - labour charges only Each 13.80
67 a) S & F angle stop cock 12.7 mm dia first quality Each 82
b) - do - labour charges only Each 13.80
68 a) S&F 12.7 mm N.P bib tap Indian make 300 grams Each 78

b) - do - labour charges only Each 12


69 a) S&F 12.7mm N.P bib tap Indian make 250 grams Each 66

b) - do - labour charges only Each 10


70 a)S & F 31.75 mm brass plumber Union best Indian Each 22
first quality
b) - do - labour charges only Each 5.0
71 a) S & F 12.7 mm brass stop cock Indian make 400 Each 68
grams
b) - do - labour charges only Each 10
72 a) S & F 12.7 mm brass stop cock Indian make 300 Each 64
grams
b) - do - labour charges only Each 10
73 a) S & F 12.7 mm brass bib cock Indian make 400 Each 75
grams
b) - do - labour charges only Each 10
74 a) S & F 12.7 mm brass bib cock Indian make 300 Each 64
grams
b) - do - labour charges only Each 11
75 S & F CP long body bib cock fancy type delux 300 Each 132
grames dia 12.7 mm
76 S & F 12.7mm dia high neck piller cock Ist quality Each 211
Indian make 400 grams
77 a) S & F 12.7 mm .M.P couplings Each 16
b) - do - labour charges only Each 5.0
78 a) S & F 19.05 mm M.P couplings Each 17
b) - do - labour charges only Each 5.0

Page # 52
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
79 a) S& F MP coupling 25.4 mm dia Each 41
80 a) S & F PVC Rubber adopter for LLC and bend Each 8.8
b) - do - labour charges only Each 3.0
81 a) S& F 31.75 mm Brass union nuts Each 15
b) - do - labour charges only Each 3.0
82 a) S& F 38.1 mm Brass union nuts Each 16
b) - do - labour charges only Each 4.0
83 S& F GI union 12.7 mm Ist Quality Each 16
84 S& F GI union 19.05 mm Ist Quality Each 20
85 S& F GI union 25.4 mm Ist Quality Each 30
86 S& F GI union 31.75 mm Ist Quality Each 38
87 S& F GI union 38.1 mm Ist Quality Each 46
88 S& F GI union 50.8 mm Ist Quality Each 56
89 S& F GI connector 25.4 mm dia Each 34
90 S& F 12.7 m GI 'T' A class Ist quality Each 21
91 S& F 31.75 mm dia GI bend Ist quality Each 30
92 S & F 31.75 mm dia GI 'T' 1st Quality Each 30
93 a) Supplying & Fixing solder joints upto 50.8 mm dia Each 27

b) - do - labour charges only Each 10


94 a) Supplying & Fixing solution joints upto 50.8 dia Ist Each 5.3
quality.
b) - do - labour charges only Each 1.2
95 a)S & F 558.8 mm x 406.4 mm Indian make wash Each 480
hand basins (HSW/Parry/Earthenware) with 12.70 mm
double N.P 400 grams piller taps wast plug chain
complete with CI brackets including wooden block

b) - do - labour charges only Each 140


96 a) S& F pedestal (H.S.W / Parry/ Earthenware) Each 456
b) - do - labour charges only Each 50
97 a) S & F 31.75 mm C.P bottle trap (Heavy type) Each 128
b) - do - labour charges only Each 20
98 a) S & F 31.75 mm C.P TRAPS Each 128
b) - do - labour charges only Each 20

Page # 53
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
99 a) S & F 12.7 mm NP elbow action bib cock 600 gms Each 194

b) - do - labour charges only Each 17


100 a) S&F 12.7 m NP elbow action pillar cock 600 gms Each 162

b) - do - labour charges only Each 15


101 S&F 12.7 mm dia NP pillar cock Ist quality Each 79
102 S&F 12.7 mm dia NP push cock Ist quality Each 85
103 S&F 12.7 mm dia NP lift cock Ist quality Each 68
104 a)S & F 38.1 mm C.P waste coupling Each 40
b) - do - labour charges only Each 12
105 a) S & F 31.75 mm PVC bottle trap Each 56
b) - do - labour charges only Each 10
106 a) S& F 38.1 mm brass plumber union Each 29
b) - do - labour charges only Each 5.0
107 a) S & F white glazed flat back urinals with screws Each 300
complete Indian make (TWYFORT)(Parry/Neycer)
b) - do - labour charges only Each 55
108 a)S & F 19.05 mm NP stop cock Indian make with ISI Each 109
mark 400 grams
b) - do - labour charges only Each 10
109 Chiselling the stone masonry wall for fixing of wooden Each 15
blocks including finishing as directed by the
department
110 Chiselling the stone masonry wall and repairs as 1 Rm 70
directed by the department.
111 Chiselling the brick masonry wall and repairs as 1 Rm 15
directed by the department.
112 a) S & F NP telephonic shower spray set & valve Each 652
mixer with rest and all fittings complete (ARK/ESSCO
make)
b) - do - labour charges only Each 180
113 a) S & F NP shower spray fancy with NP Flexible pipe Each 217

b) - do - labour charges only Each 60


114 a) S & F NP cover for nahany trap Each 15

Page # 54
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
b) - do - labour charges only Each 8.0
115 a) Painting the flushing tank with white enamel paint Each 50
b) - do - labour charges only Each 28
116 S & F internal fittings for flush tank Each 256
117 Repairing and over hauling flushing tank Each 40
118 a) Supplying & Fixing NP chain rubber and plugh for Each 17
baisn
b) - do - labour charges only Each 3.0
119 a) S & F 609.6 x 457.2 x 254 mm Indian make white Each 1559
glazed sink on cantilever brackets with 2 NP
couplings, plug and chain complete
b) - do - labour charges only Each 150
120 a) S & F 762.00 x 457.2 x 228.6 mm Indian make Each 1849
white glazed sink on cantilever brackets with 2 NP
couplings, plug and chain complete
b) - do - labour charges only Each 150
121 a) S & F 609.6 x 457.2 x 254 mm RCC terrazo Each 266
finished sink (or constructed at site with 50.8mm
thick) brass plug and chain incluidng CI cantilever
brackets
b) - do - labour charges only Each 100
122 a) S & F 25.4 mm dia & 609.6 mm long aluminium Each 66
anodized towel rod with brackets and aluminium
screws
b) - do - labour charges only Each 20
123 a) S & F 19.04 mm dia & 609.6 mm long aluminium Each 59
anodized towel rod with brackets and aluminium
screws
b) - do - labour charges only Each 30
124 a) S & F 609.6 mm long 127 mm wide plate glass Each 83
shelf with superior quality aluminium railing complete
with aluminium screws
b) - do - labour charges only Each 25
125 a) S & F 609.6 mm long 127 mm wide plate glass Each 26
shelf only
b) - do - labour charges only Each 5.0

Page # 55
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
126 a) S & F NP soap dish heavy type with NP SCREWS Each 100

b) - do - labour charges only Each 5.5


127 a) S &F NP holder brackets with screws Each 22
b) - do - labour charges only Each 6.0
128 a) S & F liquid soap container NP metalic with NP Each 93
brackets and screws.
b) - do - labour charges only Each 10
129 a) Constructing R.C.C over head tank with partition 1 Lt 3.0
complete
b) - do - labour charges only 1 Lt 0.8
130 a) Constructing R.C.C over head tank with out 1 Lt 2.6
partition complete
b) - do - labour charges only 1 Lt 0.75
131 a) S & F 25.4 mm copper ball cock ith PVC ball Indian Each 161
make ISI mark
b) - do - labour charges only Each 20
132 a) S & F 19.05 mm copper ball cock ith PVC ball Each 132
Indian make ISI mark
b) - do - labour charges only Each 20
133 a)S & F 12.7 mm copper ball cock ith PVC ball Indian Each 86
make ISI mark
b) - do - labour charges only Each 20
134 a) S & F 25.4 mm GM peet valve Indian make heavy Each 177
type
b) - do - labour charges only Each 20
135 a) S & F 19.05 mm GM peet valve Indian make heavy Each 138
type
b) - do - labour charges only Each 20
136 a) S & F 12.7 mm GM peet valve Indian make heavy Each 107
type
b) - do - labour charges only Each 20
137 a) S & F 31.75 mm GM peet valve Indian make heavy Each 267
type Ist quality
138 a) S & F 38.1 mm GM peet valve Indian make heavy Each 416
type Ist quality

Page # 56
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
b) - do - labour charges only Each 30
139 a)S & F 50.8 mm dia GM peet valve Ist quality Each 537
b) - do - labour charges only Each 40
140 a)S & F 63.5 mm dia GM peet valve Ist quality Each 1010
b) - do - labour charges only Each 50
141 a)S & F 76.2 mm dia GM peet valve Ist quality Each 1478
b) - do - labour charges only Each 60
142 a) S& F 12.7 mm GI pipe 'A' class ISI mark with GI 1 RM 57
fittings including the cost of pipe & its fittings & labour
charges complete
b) - do - labour charges only 1 RM 18
143 a) S& F 19.05 mm GI pipe 'A' class ISI mark with GI 1 RM 61
fittings including the cost of pipe & its fittings & labour
charges complete
b) - do - labour charges only 1 RM 18
144 a) S& F 25.4 mm GI pipe 'A' class ISI mark with GI 1 RM 94
fittings including the cost of pipe & its fittings & labour
charges complete
b) - do - labour charges only 1 RM 18
145 a) S& F 38.1 mm GI pipe 'A' class ISI mark with GI 1 RM 128
fittings including the cost of pipe & its fittings & labour
charges complete
b) - do - labour charges only 1 RM 20
146 a) S& F 50.8 mm GI pipe 'A' class ISI mark with GI 1 RM 158
fittings including the cost of pipe & its fittings & labour
charges complete
b) - do - labour charges only 1 RM 30
147 a) S& F 12.7 mm GI pipe 'B' class ISI mark with GI 1 RM 66
fittings including the cost of pipe & its fittings & labour
charges complete
b) - do - labour charges only 1 RM 18
148 a) S& F 19.05 mm GI pipe 'B' class ISI mark with GI 1 RM 74
fittings including the cost of pipe & its fittings & labour
charges complete
b) - do - labour charges only 1 RM 18

Page # 57
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
149 a) S& F 25.4 mm GI pipe 'B' class ISI mark with GI 1 RM 107
fittings including the cost of pipe & its fittings & labour
charges complete
b) - do - labour charges only 1 RM 18
150 a) S& F 38.1 mm GI pipe 'B' class ISI mark with GI 1 RM 148
fittings including the cost of pipe & its fittings & labour
charges complete
b) - do - labour charges only 1 RM 20
151 a) S& F 50.8 mm GI pipe 'B' class ISI mark with GI 1 RM 192
fittings including the cost of pipe & its fittings & labour
charges complete
b) - do - labour charges only 1 RM 30
152 a) S& F 31.75 mm GI pipe 'B' class ISI mark with GI 1 RM 118
fittings including the cost & conveyance of all labour
charges complete
153 S & F 63.5 mm dia GI pipe 'B' class with GI fittings 1 RM 198
such as elbows tees couplings, nipples, plugs
including excavation for trenches and refilling the
trenches complete except for GI bends union and GI
connectors with checknut and socket Tata or Zenith
make.
154 a)S & F 12.7 mm holder bat clamps Each 5.5
b) - do - labour charges only Each 3.0
155 a)S & F 19.05 mm holder bat clamps Each 8.8
b) - do - labour charges only Each 3.0
156 a)S & F 25.4 mm holder bat clamps Each 10
b) - do - labour charges only Each 3.0
157 a)S & F 38.1 mm holder bat clamps Each 13
b) - do - labour charges only Each 4.0
158 a) Constructing Brick masonry chamber over the gully Each 157
trap or peet valve and fitted with 304.8 x 228.6 m size
CI frame and hinged cover.
b) - do - labour charges only Each 45
159 a)Constructing Brick mlasonry supprt for G.I pipe with Each 27
C.M 304.8 x 228.6 x228.6 mm size including
plastering and finishing etc. complete.

Page # 58
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
b) - do - labour charges only Each 10
160 a) S & F 12.7 x 152.0 mm NP shower rose heavy Each 64
b) - do - labour charges only Each 9.0
161 a) S & F 12.7 x 137.0 mm NP shower rose heavy Each 64
b) - do - labour charges only Each 10
162 a) S & F 12.7 x 101.6 mm NP shower rose heavy Each 56
b) - do - labour charges only Each 10
163 a) S & F 12.7 x 88.9 CP fancy shower Each 101
b) - do - labour charges only Each 10
164 a) Supplying & fixing 12.7 mm GI drain pipe with plug Each 18
for tanks (Mudvalve) including making a hole
b) - do - labour charges only Each 10
165 a) Supplying & fixing 19.05 mm GI drain pipe with plug Each 27
for tanks (Mud valve) including making a hole
b) - do - labour charges only Each 10
166 a) Supplying & fixing 25.4 mm GI drain pipe with plug Each 31
for tanks (Mud valve) including making a hole
b) - do - labour charges only Each 12
167 a) Taking branch water connection from the existing Each 61
25.4 mm GI pipe including cutting threading, etc,
complete with fitting,
b) - do - labour charges only Each 20
168 a) Taking branch water connection from the existing Each 36
19.05 mm GI pipe including cutting threading, etc,
complete with fitting,
b) - do - labour charges only Each 18
169 a) Taking branch water connection from the existing Each 27
12.7 mm GI pipe including cutting threading, etc,
complete with fitting,
b) - do - labour charges only Each 15
170 Supplying & fixing leather washers for 12.7 mm bib Each 0.8
tap and stop cock
171 Supplying & fixing leather washers for 19.05 mm bib Each 1.7
tap and stop cock
172 Supplying & Fixing 12.7 mm fibre washers 1.7
173 Supplying & Fixing 19.05 mm fibre washers 2.1

Page # 59
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
174 a) Supplying & fixing 304.8 x 228.6 mm CI frame & Each 52
cover over gully taps
b) - do - labour charges only Each 16
175 a) Supplying & fixing CI Nahany trap grating Each 9.1
b) - do - labour charges only Each 5.0
176 a) Supplying & fixing CI gully trap grating Each 22
b) - do - labour charges only Each 5.0
177 a) Supplying & fixing valves for brass ball cocks 25.4 Each 9.0
mm dia
b) - do - labour charges only Each 4.0
178 a) Supplying & fixing 12.7 m valve for bib tap or stop Each 8.0
cocks
b) - do - labour charges only Each 2.5
179 a) Supplying & fixing 19.05 m valve for bib tap or stop Each 13
cocks
b) - do - labour charges only Each 3.0
180 Removing 12.7 mm GI pipe and refixing the same Rm 26
181 Removing 19.05 mm GI pipe and refixing the same Rm 30

182 Removing 25.4 mm GI pipe and refixing the same Rm 44


183 Removing 38.1 mm GI pipe and refixing the same Rm 55
184 Removing 50.8 mm GI pipe and refixing the same Rm 65
185 Cleaning the W.C with acid and Vim powder Each 15
186 Cleaning the Urinal with acid and Vim power Each 15
187 Cleaning the wash basin with acid and Vim power Each 15
188 Cleaning the E.W.C with acid and Vim power Each 15
189 a) Supplying & fixing 914.4 x 457.2 mm CI man hole Each 355
frame and cover (light weight)
b) - do - labour charges only Each 40
190 a)Supplying & fixingg CI steps for septic tank. Each 22
b) - do - labour charges only Each 5.0
191 a) Supplying & fixing 50.8 cm dia man hole frame & Each 275
cover for 914.4 mm dia chamebr (Light weight)
b) - do - labour charges only Each 30

Page # 60
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
192 a) Supplying & fixing 50.8 cm dia man hole frame & Each 508
cover for 914.4 mm dia chamebr (Medium weight)

b) - do - labour charges only Each 65


193 a) Supplying & fixing 101.6 x 101.6 mm SWG Tee Each 39
b) - do - labour charges only Each 11
194 a) S & F SWG pipe 101.6 mm of Ist Class with 1 RM 39
cement joints
b) - do - labour charges only 1 RM 5.0
195 a) Supplying & Fixing SWG pipe 152.4 mm of Ist 1 RM 51
Class with cement joints
b) - do - labour charges only 1 RM 10
196 Constg. 50.8 mm thick RCM baffle wall with 2.267 Kg 1 Sqm 87
steel & rabbit wire mesh in CM 1:3 with fine rendering
in neat cement
197 a) Constg. 50.8 mm RCC partition wall 1 Sqm 103
b) - do - labour charges only 1 Sqm 20
198 a) S & F double layer of bamboo matting tarred on 10 Sqm 257
both sides.
b) - do - labour charges only 10 Sqm 50

199 Removing of 101.6 m or 76.2 mm CI pipe 1 RM 15


200 a) Supplying & fixing 76.2 mm W.I clamps Each 7.1
b) - do - labour charges only Each 3.0
201 Extra depth of inspection chamber of 914.4 mm 1 Rm 497
diameter excluding rock cutting.
202 Extra depth of inspection chamber of 914.4 x 1 Rm 497
457.2mm diameter excluding rock cutting.
203 a) Supplying & fixing NP coat hook Each 17
b) - do - labour charges only Each 5.0
204 Supplying & fixing small precast RCC water tanks 1 Lit 2.49
including cover over the roof of building
205 Labour charges for laying glazed tiles 1 Sqm 50

Page # 61
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
206 a) Providing & Placing on Terrace ( at all floor levels) 1 Lit 3.4
polyetheylene water storage tank with Double layer
approved brand & manufacture with cover and
suitable locking arrangement & making necessary
holes for inlet & outlets and over flow pipes but
without fittings & base support for tanks
b) - do - labour charges only 1 Lit 0.3
207 Supply of Plastic storage tank lid with hinges Each 37
208 Supply & Fixing 76.2 mm dia PVC elbow Ist quality Each 22
209 Supply & fixing 31.75 mm dia PVC flexible waste Each 13
pipe of 914.4 mm length of Ist quality
210 Supply & Fixing 38.1 mm dia PVC solid waste pipe Each 42
outlet
211 Supply & fixing Fancy PVC shelf including all fittings Each 102

212 a) Supplying and fixing TV shape mirror with plastic Each 218
frame size 609.6 mm x 457 .2 mm
b) - do - labour charges only Each 51.80
213 a) Supplying & fixing GI pipe plug of size 12.7 mm dia Each 2.2

b) - do - labour charges only Each 0.5


214 a) Supplying & fixing 19.06 mm dia GI plug Each 2.6
b) - do - labour charges only Each 0.5
215 a) Supplyng and fixing 38.1 mm dia of GI plug Each 10
b) - do - labour charges only Each 3.0
216 a) Supplying & fixing 50.8 mm dia of GI PLUG Each 22
b) - do - labour charges only Each 5.0
217 a) Supplying & fixing 76.2 mm dia of GI PLUG Each 30
b) - do - labour charges only Each 8.0
218 a) Supplyng & fixing 19.05 mm non return valve Each 145
b) - do - labour charges only Each 25
219 a) Supplying & fixing25.4 mm dia non return valve Each 193
b) - do - labour charges only Each 30
220 a) Supplying & fixing 38.1 m dia non return valve Each 344
b) - do - labour charges only Each 50
221 a) Supplying & fixing 50.8 mm dia non return valve Each 489

Page # 62
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
b) - do - labour charges only Each 50
222 a) Supplying & fixing C.P flange. Each 7.1
b) - do - labour charges only Each 3.0
223 a) Supplying & fixing stainless steel sink size 36" x 18 Each 2678
" (914.4x457.2mm) 1 mm thick with accessories
b) - do - labour charges only Each 150
224 a) Supplying & fixing stainless steel sink size 24" x18" Each 2222
x 8 " (609.6x457.2x203.2mm) 1 mm thick with
accessories
b) - do - labour charges only Each 150
225 a) Supplying & fixing stainless steel sink size 20" x18" Each 2015
x 8 " (508x457.2x203.2mm) 1 mm thick with
accessories
b) - do - labour charges only Each 150
226 Supplying & fixing 4 " x 24 " (101.6x609.6mm) white Each 193
glazed porcelain channel fixed in brick masonrywhite
cement pointing.
227 Supply & Fixing of steel surgical long elbow action Each 389
handle 12.7 mm dia bib cock indian make heavy type
including all materials
228 Supply & fixing 2 1/2" (63.5mm) dia Sluice valve ISI Each 2299
mark with 2 Nos. flanges, 8 nos, 3/4" dia nuts & bolts
and all necessary washers and packing materials etc.
complete
229 Supply & fixing porcelain P' trap Each 102
230 Supplying & fixing oval shape basin Each 998
white(520x410mm) parry or equalivalent
231 Supply & fixing RCC cover 22" dia with nominal Each 338
reinforcement 3 " thick and hooks for lifting
232 Supply & fixing cp spl. Grating with frame and cover Each 24
of Ist quality
233 Supply & fixing towel rod (CP) of 24" long and 3/4 " Each 157
dia
234 Supply & fixing of LLC handle set Ist quality Each 34
235 Supply & fixing 4" dia CP thimble pipe
a) 150 mm long Each 169

Page # 63
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
b) 220 mm long Each 254
c) 300 mm long Each 338
236 Supply & fixing CP long bend Each 137
237 Supply & fixing CP short bend Each 69
238 Supply & fixing of PVC low level system
parryware, slimline with internal components &
short bend.
a) 10 Ltrs capacity white Each 465
b) 10 ltrs capacity colour Each 516
c) 8 lts capacity tuffmate white & colour Each 313
239 Supplying & fixng bib cock with flange C.P jaquar Each 578
make queen series.
240 Supply & fixing bib cock cum health faucet with 1
m long flexible tube and wall hook of jaquar make
queen series
a ) Chrome plated Each 1646
b) Ivory gold Each 2834
241 Supply & fixing pillar cock jaquar make Queen
series
a ) Chrome plated Each 602
b) Ivory gold Each 1055
242 Supply & fixing Angular stop cokc with wall
flange jaquar make Queen series
a ) Chrome plated Each 556
b) Ivory gold Each 1030
243 Supply & fixing Waste coupling jaquar make
a ) Chrome plated Each 104
b) Ivory gold Each 114
244 Supply & fixng of Bottle trap jaquar make
a ) Chrome plated Each 388
b) Ivory gold Each 790
245 Supply & Fixing copper pipe 450 mm long with
nuts & washers Jaquar make
a ) Chrome plated Each 118
b) Ivory gold Each 209

Page # 64
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
246 Supplying and fixing wall mirror with provision for
ove head shower and 115 mm long bend pipe with
wall flange jaquar make queen series

a ) Chrome plated Each 1904


b) Ivory gold Each 3535
247 Supply & fixing overhead shower rose with
revolving joint and 150 mm long swivel shower
arem Jaquar make qureen sseries.
a) Chrome plated Each 745
b) Ivory Gold Each 1317
248 Supply and Fixing Wall Mixer with Telephonic shower Each 3478
arrangement with crutch and flexible pipe Jaquar
series Ivory gold colour for bath tub.
249 Suply & fixing Bath tub overflow set complete with Each 596
over flow cap, 450 mm Ball chain with rubber plug &
union bend with brass nut jaquar make, Ivory gold
colour.
250 Supply & fixing sink cock with regular swinging spout Each 834
with wall flange chromeplated Jaquar make Queen
series
251 Supply & fixing soap dish jaquar make queen
series:
a) Chrome plated Each 480
b) Ivory Gold Each 766
252 Supply & fixng of toilet paper holder Jaquar make
Queen series.
a) Chrome plated Each 390
b) Ivory Gold Each 618
253 Supply & Fixing of Towel ring Jaquar make Queen
series
a) Chrome plated Each 402
b) Ivory Gold Each 584
254 Supply & Fixing of towel coat hok Jaquar make
Queen series
a) Chrome plated Each 274

Page # 65
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
b) Ivory Gold Each 434
255 Supply & Fixing of Towel rod 24 " Jaquar make Queen Each 2107
series Ivory gold colour
256 Supply & Fixing of Tumbler holder Jaquar make Each 675
Queen series, Ivory gtold colour
257 Supply & fixing of Glass shelf 22" Jaquar make Queen Each 1293
series, Ivory gold colour
PRINCE/SUDHAKAR PVC/SWR PIPES & FITTINGS
(OR EQUIVALENT)
Prince/ Sudhakar make or equivalent quality PVC
/SWR pipes & fittings ( asper ISI standards)
4kg/cm2
258 75 mm dia 3 M Single Socket pipe Each 120
259 90 mm dia 3 M single socket pipe Each 190
260 110 mm dia 3 M Single socket pipe Each 227
261 75 mm dia 3 M Double socket pipe Each 135
262 90 mm dia 3 M Double socket pipe Each 216
263 110 mm dia 3 M Double socket pipe Each 263
264 75 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 84
265 90 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 130
266 110 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 161
267 75 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 89
268 90 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 137
269 110 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 168
270 75 mm dia 1219. mm (4'-0") Double Socket pipe Each 62
271 90 mm dia 1219. mm (4'-0") Double Socket pipe Each 95
272 110 mm dia 1219. mm (4'-0") Double Socket pipe Each 114
273 75 mm dia 914.4mm (3'-0") Double Socket pipe Each 52
274 90 mm dia 914.4mm (3'-0") Double Socket pipe Each 77
275 110 mm dia 914.4mm (3'-0") Double Socket pipe Each 98
276 75 mm dia 609.6mm (2'-0") Double Socket pipe Each 31
277 90 mm dia 609.6mm (2'-0") Double Socket pipe Each 53
278 110 mm dia 609.6mm (2'-0") Double Socket pipe Each 66
279 160 MM dia 3 M Double socket pipe Each 540

Page # 66
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
Prince/ Sudhakar make or equivalent quality PVC
/SWR pipes & fittings ( asper ISI standards)
6kg/cm2
280 75 mm dia 3 M Single Socket pipe Each 203
281 90 mm dia 3 M single socket pipe Each 326
282 110 mm dia 3 M Single socket pipe Each 388
283 75 mm dia 3 M Double socket pipe Each 221
284 90 mm dia 3 M Double socket pipe Each 352
285 110 mm dia 3 M Double socket pipe Each 429
286 75 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 133
287 90 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 207
288 110 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 246
289 75 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 142
290 90 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 215
291 110 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 266
292 75 mm dia 1219. mm (4'-0") Double Socket pipe Each 96
293 90 mm dia 1219. mm (4'-0") Double Socket pipe Each 149
294 110 mm dia 1219. mm (4'-0") Double Socket pipe Each 181
295 75 mm dia 914.4mm (3'-0") Double Socket pipe Each 83
296 90 mm dia 914.4mm (3'-0") Double Socket pipe Each 121
297 110 mm dia 914.4mm (3'-0") Double Socket pipe Each 147
298 75 mm dia 609.6mm (2'-0") Double Socket pipe Each 53
299 90 mm dia 609.6mm (2'-0") Double Socket pipe Each 83
300 110 mm dia 609.6mm (2'-0") Double Socket pipe Each 106
301 160 mm dia 3 M Double socket pipe Each 884
Prince/ Sudhakar make or equivalent quality U.V
resistant UPVC) SWR pipe fittings ( asper ISI
standards )
Plain Bend 87.5 degrees.
302 75 mm dia Each 23
303 90 mm dia Each 33
304 110 mm dia Each 39
Door Bend 87.5 degrees.
305 75 mm dia Each 31
306 90 mm dia Each 44

Page # 67
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
307 110 mm dia Each 50
45 degree Bend
308 75 mm dia Each 18
309 90 mm dia Each 26
310 110 mm dia Each 33
Cleaning Pipe
311 75 mm dia Each 31
312 90 mm dia Each 46
313 110 mm dia Each 55
Single Tee
314 75 mm dia Each 28
315 90 mm dia Each 42
316 110 mm dia Each 50
Single Tee (With Door)
317 75 mm dia Each 33
318 90 mm dia Each 50
319 110 mm dia Each 61
Doube Tee
320 75 mm dia Each 59
321 90 mm dia Each 86
322 110 mm dia Each 121
Doube Tee (With Door)
323 75 mm dia Each 93
324 90 mm dia Each 134
325 110 mm dia Each 138
Single ' Y'
326 75 mm dia Each 34
327 90 mm dia Each 56
328 110 mm dia Each 64

Single ' Y' (With Door)


329 75 mm dia Each 44
330 90 mm dia Each 69
331 110 mm dia Each 81
Double ' Y'

Page # 68
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
332 75 mm dia Each 48
333 90 mm dia Each 74
334 110 mm dia Each 84
Double ' Y' (With Door )
335 75 mm dia Each 62
36 90 mm dia Each 96
337 110 mm dia Each 108
Coupler
338 75 mm dia Each 17
339 90 mm dia Each 24
340 110 mm dia Each 27
Reducer
341 90 x 75 mm dia Each 28
342 110 x 75 mm dia Each 27
343 90 x 110 mm dia Each 37
Vent Cowl
344 63 mm dia Each 4.6
345 75 mm dia Each 6.1
346 90 mm dia Each 7.8
347 110 mm dia 8.5
Pipe Clip
348 40 mm dia Each 5.4
349 50 mm dia Each 6.0
350 63 mm dia Each 6.0
351 75 mm dia Each 6.8
352 90 mm dia Each 7.5
353 110 mm Each 8.4
354 160 mm dia Each 17
P Trap
355 P' Trap ( Small without Airvent ) 110 mm Each 89
356 P' Trap ( Small with Airvent ) 110 mm Each 97
357 P' Trap (Big with Airvent ) 110 mm Each 112
358 P' Trap ( Big without Airvent ) 110 mm Each 103
359 Floor Trap (Bell Mouth ) 110 mm Each 106
360 Bell Mouth Trap 7 " ( 177.8 mm) Each 155

Page # 69
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
361 4" (101.6 mm ) Nahani Trap ( Without Jali with inlet) Each 53
362 3" (76.2 mm ) Nahani Trap ( without Jali without inlet) Each 41

363 4" (101.6 mm ) Nahani Trap ( without inlet with out Each 50
Jali)
364 Mini Trap Each 25
365 3" (76.2 mm ) nahani Trap with Jali Each 48
366 4" (101.6 mm ) multi floor trap with jali Each 68
367 4" (101.6) multi floor trap with out jali Each 53
368 Round Jali Each 11
369 Square tile & jali Each 18
370 Pipe connector ( with LIP ring) Each 71
371 Pipe connector ( with out LIP ring) Each 55
Floor Traps
372 4" (101.6 mm ) Floor Trap Each 65
373 5" (127.mm ) floor Trap Each 70
Door cap
374 75 mm dia Each 27
375 90 mm dia Each 30
376 110 mm dia Each 34
Socket Plug
377 75 mm dia Each 25
378 90 mm dia Each 29
379 110 mm dia Each 30
Rubber Ring for socket
380 75 mm dia Each 3.6
381 90 mm dia Each 4.6
382 110 mm dia Each 5.4
Door Socket
383 75 mm dia Each 4.3
384 90 mm dia Each 5.4
385 110 mm dia Each 6.0
386 LIP ring 110 mm Each 32
Rubber Lubricant
387 100 Grams Each 14

Page # 70
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
388 250 Grams Each 30
389 500 Grams Each 55
390 1000 Grams Each 102
391 P' Trap with lip Ring Each 140
Solvent Cement
392 50 ml Each 7.0
393 100 ml Each 12
394 250 ml Each 28
395 500 ml Each 54
396 1000 ml Each 106
Internal Reducer.
397 110mm x 90 mm 42
398 160 mm x 110 mm 105
Prince / Sudhakar make or equivalent quality
P.V.C pipes ( as per I.S.I standards)
Pressure 2.5 Kg./ Sq. cm pipes
399 Pipe size 90 mm dia pressure 2.5 Kg/ Sq.cm Metre 27
400 Pipe size 110 mm dia pressure 2.5 Kg/ Sq.cm Metre 40
401 Pipe size 125 mm dia pressure 2.5 Kg/ Sq.cm Metre 52
402 Pipe size 140 mm dia pressure 2.5 Kg/ Sq.cm Metre 59
403 Pipe size 160 mm dia pressure 2.5 Kg/ Sq.cm Metre 85
404 Pipe size 180 mm dia pressure 2.5 Kg/ Sq.cm Metre 107
405 Pipe size 200 mm dia pressure 2.5 Kg/ Sq.cm Metre 137
406 Pipe size 225 mm dia pressure 2.5 Kg/ Sq.cm Metre 177
407 Pipe size 250 mm dia pressure 2.5 Kg/ Sq.cm Metre 213
408 Pipe size 280 mm dia pressure 2.5 Kg/ Sq.cm Metre 275
409 Pipe size 315 mm dia pressure 2.5 Kg/ Sq.cm Metre 346
Pressure 4 Kg/ sq.cm pipes
410 Pipe size 63 mm dia pressure 4 Kg/ sq.cm Metre 20
411 Pipe size 75 mm dia pressure 4 Kg/ sq.cm Metre 29
412 Pipe size 90 mm dia pressure 4 Kg/ sq.cm Metre 41
413 Pipe size 110 mm dia pressure 4 Kg/ sq.cm Metre 59
414 Pipe size 125 mm dia pressure 4 Kg/ sq.cm Metre 77
415 Pipe size 140 mm dia pressure 4 Kg/ sq.cm Metre 96
416 Pipe size 160 mm dia pressure 4 Kg/ sq.cm Metre 127

Page # 71
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
417 Pipe size 180 mm dia pressure 4 Kg/ sq.cm Metre 162
418 Pipe size 200 mm dia pressure 4 Kg/ sq.cm Metre 198
419 Pipe size 225 mm dia pressure 4 Kg/ sq.cm Metre 260
420 Pipe size 250 mm dia pressure 4 Kg/ sq.cm Metre 281
421 Pipe size 280 mm dia pressure 4 Kg/ sq.cm Metre 397
422 Pipe size 315 mm dia pressure 4 Kg/ sq.cm Metre 504
Pressure 6 Kg/ sq.cm pipes
423 Pipe size 40 mm dia pressure 6 Kg/Sq.cm Metre 13
424 Pipe size 50 mm dia pressure 6 Kg/Sq.cm Metre 19
425 Pipe size 63 mm dia pressure 6 Kg/Sq.cm Metre 29
426 Pipe size 75 mm dia pressure 6 Kg/Sq.cm Metre 40
427 Pipe size 90 mm dia pressure 6 Kg/Sq.cm Metre 58
428 Pipe size 110 mm dia pressure 6 Kg/Sq.cm Metre 84

429 Pipe size 125 mm dia pressure 6 Kg/Sq.cm Metre 105

430 Pipe size 140 mm dia pressure 6 Kg/Sq.cm Metre 138

431 Pipe size 160 mm dia pressure 6 Kg/Sq.cm Metre 179

432 Pipe size 180 mm dia pressure 6 Kg/Sq.cm Metre 232

433 Pipe size 200 mm dia pressure 6 Kg/Sq.cm Metre 280

434 Pipe size 225 mm dia pressure 6 Kg/Sq.cm Metre 375

435 Pipe size 250 mm dia pressure 6 Kg/Sq.cm Metre 464

436 Pipe size 280 mm dia pressure 6 Kg/Sq.cm Metre 585

437 Pipe size 315 mm dia pressure 6 Kg/Sq.cm Metre 734

CENTIFUGAL CAST IRON PIPES & FITTNGS AS


PER IS : 3989 - 1984
Note : Sales Tax and Excise duties extra
CI (spun) soils Waste & Ventilating pipe (3 M)

Page # 72
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
456 75 mm dia Each 522
457 100 mm dia Each 696
458 150 mm dia Each 1277
CI (spun) soils Waste & Ventilating pipe (3 M)
Double socket
459 75 mm dia Each 580
460 100 mm dia Each 783
9 feet (2743.2 mm ) pipes
461 75 mm dia Each 471
462 100 mm dia Each 627
8 feet (2438.4) mm ) pipes
463 75 mm dia Each 420
464 100 mm dia Each 560
6 feet (1828.8 mm ) pipes
465 75 mm dia Each 342
466 100 mm dia Each 447
6 feet (1828.8 mm ) pipes Double socket
467 75 mm dia Each 360
468 100 mm dia Each 447
Cut pipes (pieces) 1 foot (304.8 mm)
469 75 mm dia Each 81
470 100 mm dia Each 87
Cut pipes (pieces) 1'.6" (457.2 mm )
471 75 mm dia Each 110
472 100 mm dia Each 128
473 150 mm dia Each 243
Cut pipes (pieces ) 2 feet (609.6 mm)
474 75 mm dia Each 151
475 100 mm dia Each 168
476 150 mm dia Each 303
Cut pipes (pieces ) 3 feet (914.4 mm)
477 75 mm dia Each 191
478 100 mm dia Each 232
Cut pipes (pieces ) 4 feet (1219.2 mm)
479 75 mm dia Each 215

Page # 73
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
480 100 mm dia Each 302
Plain Bend
481 75 mm dia Each 69
482 100 mm dia Each 90
483 150 mm dia Each 197
Door Bend
484 75 mm dia Each 80
485 100 mm dia Each 104
486 150 mm dia Each 218
Plain Bend 45 degrees.
487 75 mm dia Each 70
488 100 mm dia Each 81
489 150 mm dia Each 174
Door Bend 45 degrees.
490 75 mm dia Each 79
491 100 mm dia Each 93
492 150 mm dia Each 183
493 Horn Bend Plain 101.6 x 50.8 mm (4" x 2") 100 Each 158
mm dia
494 Horn Bend door 101.6 x 50.8 mm (4" x 2") 100 Each 183
mm dia
Heel Rest Bend
495 75 mm dia Each 81
496 100 mm dia Each 104
497 150 mm dia Each 218
Single Branch Plain "T"
498 75 mm dia Each 103
499 100 mm dia Each 137
500 150 mm dia Each 284
Single Branch Door "T"
501 75 mm dia Each 116
502 100 mm dia Each 154
503 150 mm dia Each 308
Single Branch plain "Y"
504 75 mm dia Each 116

Page # 74
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
505 100 mm dia Each 157
506 150 mm dia Each 351
Single Branch Door "Y"
507 75 mm dia Each 128
508 100 mm dia Each 174
509 150 mm dia Each 371
Double Branch Plain "T"
510 75 mm dia Each 137
511 100 mm dia Each 186
Double Branch Door "T"
512 75 mm dia Each 154
513 100 mm dia Each 191
Double Branch Plain " Y"
514 75 mm dia Each 154
515 100 mm dia Each 206
Double Branch Door " Y"
516 75 mm dia Each 162
517 100 mm dia Each 224
Shoe bend
518 75 mm dia Each 67
519 100 mm dia Each 81
520 150 mm dia Each 174
Collar
521 75 mm dia Each 67
522 100 mm dia Each 81
523 150 mm dia Each 160
Cowel
524 75 mm dia Each 56
525 100 mm dia Each 65
526 150 mm dia Each 145
Offset 3" (76.2 mm ) projection
527 75 mm dia Each 79
528 100 mm dia Each 104
529 150 mm dia Each 210
Offset 6" (152.4mm ) projection

Page # 75
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
530 75 mm dia Each 88
531 100 mm dia Each 115
532 150 mm dia Each 238
Long Door Bend
533 75 mm dia Each 197
534 100 mm dia Each 212
Hand Hole pipe ( Inspection pipe)
535 75 mm dia Each 114
536 100 mm dia Each 154
537 150 mm dia Each 201
P Traps
538 75 mm dia Each 122
539 100 mm dia Each 168
540 4" x 3" (101.6 mm x 76.2mm ) P. Traps 100 mm dia Each 174

541 4" x 3" (101.6 mm x 76.2mm ) Vent Traps 100 mm dia Each 174

542 4" x 3" (101.6 mm x 76.2mm ) Reducer 75 mm dia Each 116


543 6" x 4" (152.4 mm x101.6 mm ) Reducer 75 mm dia Each 145

544 3" x 2" ( 76.2 mm x 50.8 mm ) plain T 75 mm dia Each 119


545 3" x 2" ( 76.2 mm x 50.8 mm ) Door T 75 mm dia Each 139
546 3" x 2" ( 76.2 mm x 50.8 mm ) Plain Y 75 mm dia Each 139
547 3" x 2" ( 76.2 mm x 50.8 mm ) Door Y 75 mm dia Each 139
548 4" x 3" (101.6 mm x 76.2mm ) Plain T 75 mm dia Each 139
549 4" x 3" (101.6 mm x 76.2mm ) Door T 75 mm dia Each 157
550 4" x 3" (101.6 mm x 76.2mm ) Plain Y 75 mm dia Each 157

551 4" x 3" (101.6 mm x 76.2mm ) Door Y 75 mm dia Each 174

552 6" x 4" (152.4 mm x101.6 mm ) Plain T 75 mm dia Each 261

553 6" x 4" (152.4 mm x101.6 mm ) Door T 75 mm dia Each 290

554 6" x 4" (152.4 mm x101.6 mm ) Plain Y 75 mm dia Each 302

Page # 76
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
555 6" x 4" (152.4 mm x101.6 mm ) Door Y 75 mm dia Each 325

Special Types of Long Fittings


Plain " T" 27 " (685.8 mm )
556 75 mm dia Each 342
557 100 mm dia Each 482
Door "T" 27" (685.8 mm )
558 75 mm dia Each 383
559 100mm dia Each 528
Plain " Y" 27" (685.8 mm)
560 75 mm dia Each 383
561 100mm dia Each 528
Door " Y" 27" (685.8 mm)
562 75 mm dia Each 427
563 100mm dia Each 580
Note : 1) All the items to be used on work are of first
quality & ISI and as approved by the Engineer
Incharge of the work.
2) Rates given above are
A) Rate for finished item of work
B) Labour charges only
3) RATES
Rates for all varieties of pipes, WC's wash hand
basins and othe items are based on market rates
plus sales Tax
4) LABOUR
Labour charges are increased based on proposals
and market rates
5) Coloured porcelain items:
50% extra may be allowed on basic cost of white
porcelain items excluding fittings

Page # 77
RF Buildings SOR 2003-04

BUILDING ITEMS
RATE for
2003-04
S.No Details Unit excluding
subsumed
taxes
1 2 3 4RF
6) SSR rates for Sanitary & water supply items are
purely for guidance for the officers for preparation of
estimates vide para 113 of APPWD code. Authority
who prepares the estimate is however responsible for
proper rates as envisaged in para 45 of APPWD
code.

Page # 78
1. S o R FOR R.C.C. PLAIN ENDED PIPES
Sl.
Description
No.
1 2
Manufacture, Supply and Delivery of R.C.C. Plain ended
1 pipes conforming to B.I.S 458/2003 , Ex-factory, Excluding
transportation, taxes & duties
Size Unit Revised SoR For 2003-04
NP - 3 Class NP - 4 Class
80 mm dia Meter
100 mm dia Meter
150 mm dia Meter
200 mm dia Meter
225 mm dia Meter
250 mm dia Meter
300 mm dia Meter
350 mm dia Meter 368 376
400 mm dia Meter 407 416
450 mm dia Meter 467 472
500 mm dia Meter 535 583
600 mm dia Meter 764 906
700 mm dia Meter 949 1215
800 mm dia Meter 1254 1583
900 mm dia Meter 1575 1976
1000 mm dia Meter 1960 2706
1100 mm dia Meter 2312 3138
1200 mm dia Meter 2724 3668
1400 mm dia Meter 3511 5064
1600 mm dia Meter 4558 6049
1800 mm dia Meter 6046 8113

The above rates of RCC Plain ended pipes are based on the following raw materials
Cost Cement. Rs.1724/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.16164/- per MT. (excluding all taxes and freight).
2. S o R FOR R.C.C. COLLARS
Sl.No
Description
.
1 2
Manufacture, Supply and Delivery of R.C.C. Collars
conforming to B.I.S. 458/2003 (rate per each collar) suitable
1
for R.C.C. Plain ended pipes including transportation but
excluding taxes & duties
Size Unit Revised SoR For 2003-04
NP - 3 Class NP - 4 Class
80 mm dia Each
100 mm dia Each
150 mm dia Each
200 mm dia Each
225 mm dia Each
250 mm dia Each
300 mm dia Each
350 mm dia Each 55.00 55.00
400 mm dia Each 62.00 62.00
450 mm dia Each 83.00 83.00
500 mm dia Each 98.00 98.00
600 mm dia Each 130.00 130.00
700 mm dia Each 173.00 173.00
800 mm dia Each 221.00 221.00
900 mm dia Each 258.00 258.00
1000 mm dia Each 323.00 323.00
1100 mm dia Each 408.00 408.00
1200 mm dia Each 512.00 512.00
1400 mm dia Each 648.00 648.00
1600 mm dia Each 830.00 830.00
1800 mm dia Each 1068.00 1068.00

The above rates of RCC Collars suitable to plain ended pipes are based on the
following raw materials cost.
Cost Cement. Rs.1724/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.16164/- per MT. (excluding all taxes and freight).
3. S o R FOR R.C.C. S/S PIPES (Non - Pressure)
Sl.
Description
No.
1 2
Manufacture, Supply and Delivery of R.C.C. Socket
and Spigot pipes conforming to B.I.S. 458/2003 at ex-
1
factory (rate per meter of effective length) Excluding
transportation, taxes & duties.
Size Unit Revised SoR For 2003-04
NP - 3 Class NP - 4 Class
80 mm dia Meter
100 mm dia Meter
150 mm dia Meter
200 mm dia Meter
225 mm dia Meter
250 mm dia Meter
300 mm dia Meter
350 mm dia Meter 556 567
400 mm dia Meter 617 628
450 mm dia Meter 681 686
500 mm dia Meter 778 846
600 mm dia Meter 1092 1113
700 mm dia Meter 1396 1625
800 mm dia Meter 1848 2120
900 mm dia Meter 2323 2670
1000 mm dia Meter 2616 3334
1100 mm dia Meter 3087 3851
1200 mm dia Meter 3644 4508
1400 mm dia Meter 4826 6393
1600 mm dia Meter 6267 7660
1800 mm dia Meter 8314 10279
The above rates of RCC S/S Non-Pressure pipes are based on the following raw
materials cost.
Cost Cement. Rs.1724/- per MT (excluding all taxes and freight).
Steel (M.S. Rods) - Rs.16164/- per MT. (excluding all taxes and freight).
8. S o R FOR A.C. PIPES
Sl.No Description
Manufacture, Supply of A.C. Pressure pipes (mazza process) as per BIS No:
1592/2003 as amended from time to time duly marked with BIS mark, including
cost of material, incidental handling, loading and packing charges but are
1
exclusive of transportation, unloading, stacking at departmental stores, and
excluding excise duty, VAT octroi and other govt. Levies. The pipes shall be
tested at factory premises confirming to is code 1592/2003.
Size Unit Revised SoR For 2003-04
Class - 15 Class - 20 Class - 25
80 mm dia Rate/Meter 71 76 96
100 mm dia Rate/Meter 93 117 146
125 mm dia Rate/Meter 122 152 191
150 mm dia Rate/Meter 173 215 269
200 mm dia Rate/Meter 288 365 463
250 mm dia Rate/Meter 365 468 587
300 mm dia Rate/Meter 512 661 842
350 mm dia Rate/Meter 626 813 1020
400 mm dia Rate/Meter 815 1061 1315
450 mm dia Rate/Meter 957 1266 1587
500 mm dia Rate/Meter 1189 1552 1950
600 mm dia Rate/Meter 1687 2197 2801
1. The above rates of AC Pipes are based on the Cement cost of Rs.1724/- per MT
(excluding all taxes and freight).
9. S o R FOR A.C. COUPLINGS

Sl.
Description
No.
1 2
Manufacture, Supply of A.C Couplings suitable to A.C. Pressure pipes
(mazza process) as per BIS: 1592/2003 excluding cost of rubber rings to suit
1 AC pressure pipes including cost of material, incidental handling, packing,
transportation and unloading at site transit risk, but excluding excise duty,
VAT and other govt. Levies and testing of joints as per IS Code.
Size Unit Revised SoR For 2003-04
0 Class - 15 Class - 20 Class – 25
80 mm dia Rate/Each 38 39 45
100 mm dia Rate/Each 49 50 61
125 mm dia Rate/Each 61 66 80
150 mm dia Rate/Each 70 87 108
200 mm dia Rate/Each 129 137 175
250 mm dia Rate/Each 150 188 240
300 mm dia Rate/Each 195 252 323
350 mm dia Rate/Each 254 329 422
400 mm dia Rate/Each 392 512 661
450 mm dia Rate/Each 470 620 800
500 mm dia Rate/Each 561 751 963
600 mm dia Rate/Each 640 836 1069

1. The above rates of AC Coupling are based on the Cement cost of Rs.1724/- per MT (Excluding all taxes and freight).
11. S o R FOR PRE-STRESSED (NON-CYLINDER) CONCRETE PIPES FOR THE YEAR 2003-04
Sl.No. Description
1 2
Manufacture, Supply, Delivery of Pre-stressed (Non-cylinder) concrete pipes conforming
to IS 784/2001 ex-factory excluding transportation, taxes & duties., for the following
1
Field/Site Test Pressures.(The manufacture shall design the pipes as per the IS Code 784-
2001)
Size Unit Revised SoR For 2003-04
Rs. Rs. Rs. Rs. Rs. Rs.
6 8 10 12 14 16
Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2
350 MM DIA Metre 1006 1006 1015 1022 1040 1078
400 MM DIA Metre 1081 1090 1098 1114 1132 1149
450 MM DIA Metre 1133 1141 1149 1174 1201 1228
Metre 1227 1234 1240 1265 1291 1328
500 MM DIA
600 MM DIA Metre 1410 1416 1431 1473 1518 1563
700 MM DIA Metre 1734 1738 1762 1802 1866 1910
800 MM DIA Metre 2047 2059 2110 2158 2239 2309
900 MM DIA Metre 2371 2380 2430 2524 2622 2759
1000 MM Metre 2779 2796 2873 2976 3151 3274
DIA
1100 MM Metre 3155 3190 3274 3446 3584 3736
DIA
1200 MM Metre 3485 3536 3647 3838 4181 4191
DIA

Note: a) The above rate of PSC pipes are based on the HT wire cost of Rs.21375/-MT (Excluding taxes).
and cement price of Rs.1724/- per MT (Excluding all taxes and freight)
13. S o R FOR BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES FOR THE YEAR 2003-04
Description
2
Bar Wrapped Steel Cylindrical (BWSC) pipes conforming to IS 15155 - 2002, ex-factory excluding transportation, taxes and
duties etc., for bar wrapped steel cylindrical pipes for the following Field/Site Test Pressures.(The manufacture shall design
the pipes as per the IS Code 784-2001)
Size Unit Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.
4 -12 14 16 18 20 22 24 26 28 30
Kg/cm 2 Kg/cm 2 Kg/cm 2 Kg/cm 2 Kg/cm 2 Kg/cm 2 Kg/cm 2 Kg/cm 2 Kg/cm 2 Kg/cm2
250 MM DIA Meter 952 952 952 952 952 952 951 947 952 990
300 MM DIA Meter 1,069 1,069 1,069 1,069 1,069 1,063 1,084 1,123 1,139 1,184
350 MM DIA Meter 1,317 1,317 1,317 1,315 1,307 1,298 1,325 1,365 1,398 1,441
400 MM DIA Meter 1,447 1,447 1,444 1,432 1,422 1,483 1,536 1,589 1,657 1,863
450 MM DIA Meter 1,572 1,570 1,556 1,561 1,627 1,693 1,754 1,826 1,894 2,051
500 MM DIA Meter 1,756 1,740 1,744 1,816 1,905 1,982 2,073 2,142 2,312 2,408
600 MM DIA Meter 2,307 2,288 2,299 2,418 2,534 2,643 2,758 2,881 2,055 3,178
700 MM DIA Meter 2,603 2,624 2,783 2,941 3,090 3,258 3,489 3,596 3774 3,991
800 MM DIA Meter 2,954 3,119 3,325 3,526 3,716 4,016 4,212 4,535 4,772 5,038
900 MM DIA Meter 3,645 3,720 3,979 4,228 4,482 4,742 5,194 5,460 5,748 6,110
1000 MM
Meter 4,102 4,385 4,669 4,964 5,279 5,835 6,188 6,801 7,040 7,523
DIA
Note: The above rates of BWSC pipes are based on the following raw materials' cost.
HR Plates - Rs.17241/- per MT (Excluding all taxes)
Wire rods - Rs.16744/- per MT (Excluding all taxes)
Cement Cost Rs.1724/-.per MT (Excluding all duties, taxes & freight)

S-ar putea să vă placă și