EARTH WORK

No. Item Description Quantity Unit

A EARTHWORK & WALL FENCE


I EMBANKMENT WORK, FOUNDATION & WALL FENCE (2m High)
1 Embankment work 5202.18 Cu.m
2 Continues Footing (1:5) 388.58 Cu.m
3 Reinforcement concrete of Ground Beam 15x20 cm K300 (1:2:3) 11.50 Cu.m
4 Reinforcement Concrete of column 20x20 cm K300 (1:2:3) 12.82 Cu.m
5 Masonry Brick wall (1:5) 719.74 Sq.m
6 Reinforcement concrete of upper beam 15x20 cm K300 (1:2:3) 11.50 Cu.m
7 Plastering & Rendering works thickness 15 mm 1013.31 Sq.m
8 Painting works for wall fence 1013.31 Sq.m
9 Steel and Painting works for fence 1.00 LS
Sub Total
GRAND TOTAL

1
QUANTITY (BOQ)
IL STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount (US


$) $)

$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ -
$ -

2
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

B FUEL STATION
I PREPARATION WORK
1 Mobilization & Demobilization 1.00
2 Temporary site office (Direksi Keet) 1.00
3 Temporary Electricity & water supply during construction 1.00
4 New Installation and/or power upgrading (40KVA) 1.00
5 Temporary fence 1.00
6 Safety Facilities 1.00
7 Site Security Staff 1.00
Sub Total I

II UNDERGROUND TANK & PIPING WORK


1 Ground Excavation for Underground tank 329.70
2 Backfilling work 82.43
3 Mortar Ground Leveling 4.80

3
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

4 Stone Masonry (1:5) 169.08


5 Reinforcement concrete for ground slab, K300 grade and 20 cm thickness 12.75
6 Reinforcement Concrete for upper slab, K300 grade and 10 cm Thickness (wire mesh) 14.92
7 Reinforcement concrete for upper beam of tank, K300 B1 25/35 cm 4.10
8 Reinforcement concrete for supporting beam of tank, K300 B2 25/35 cm 6.56
9 Reinforcement concrete for Column of tank, K300 K1 25/35 4.20
10 Cathodes Protection for undergraound storage tank 15 KL 3.00
11 Unloading and undergraund Tank installation 3.00
12 Backfilling work for underground tanks 82.60
13 Monitoring Well 10" 3.00
14 Manitoring well 18" 3.00
15 Supporting Equipment
a. Seal tape 225.00
b. Gasket Treebon 145.00
c. Sealent dow corning (Netral) Silicon 25.00
d. Fiber 5.00

4
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

e. Resin 7.50
f. Catalyst 1.00
g. Acceton 15.00
16 Loading and Unloading of fuels Equipment and Accessories
a. Hose lossing Dim.4" 1.00
b. Allumunium Tight fill elbow 4" 1.00
c. Gravity Coupler 4"x4" 1.00
d. Vapuor Hose 3" + Chamlock 4"(code.633) 1.00
e. Elbow vapuor recovery dual point 1.00
17 Piping & Fittings
a. Flexible Pipe 4" 120.00
b. Flexible Pipe 2" 120.00
c. Electrofusion Welding Socket 4" 15.00
d. Electrofusion Elbow 2" 35.00
e. Termination 2" 30.00
f. Termination 4" 10.00

5
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

g. Elbow 4" 15.00


h. Mag VFC, variable controller 1.00
18 ATG ( automatic Tank Gauging ) including Installation
a. Probe acuracy 0,1 mm 3.00
b. Consol Controller cw display range 0-6 Node 1.00
c. Modification of manhole for Probe ATG Installation 3.00
19 Hidrostatic test 2,5 Psi
a. Tank 15 KL Gasoil 2.00
b. Tank 15 KL Benzene 1.00
20 Tank Calibration
a. Tank 15 KL Gasoil 2.00
b. Tank 15 KL Benzene 1.00
21 Grounding fuel tank Box 40x40x40cm 3.00
21 Galvanized Pipe ø 2" for Tank Vent 30.00
22 Equipment Accessories for Discharge Point
a. Galvanized pipe 4" 15 cm 5.00

6
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

b. Galvanized pipe 4" 10 cm 8.00


c. Galvanized pipe 4" 10 cm 3.00
d. Reducer 4"x2" for vapor 3.00
e. 5GL Contaimant Gade Lw Raintight 10.00
f. Side seal Adaptor 3.00
g. Strainer 3.00
h. Fill cap 3.00
i. Assy VR Adaptor 1.00
j. Vapour Cap 4" Assy Alumunium 1.00

Sub Total II

III CANOPY WORKS


1 Excavation for Foot Plate Foundation 200x200x200 cm 21.65
2 Mortar Ground Leveling 1.14
3 Foot Plate Foundation K300 (Plate Thickness=30 cm) 4.80

7
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

4 Connecting Beam 30x50 cm 3.39


5 Reinforcement concrete Column K300 (40x40 cm) 1.00
6 Concrete work for composite structure 1.62
7 Supply & Installation of INP steel for Column 320X131X11.5X17.3X6.9mm 20.00
8 Supply & Installation of INP Steel for Beam 200X90X7.5X11.3X4.5mm 67.40
9 Supply & Installation of Truss structure RHS 50x50mm 126.00
10 Supply & Installation of purlin RHS 50X50mm 216.70
11 Supply & Installation of Zincalume Colorbond 0.42 mm 275.80
12 Supply & Installation of Fascia (Lisplank) Zincalume Colorbond 0.42 mm 67.40
13 Roof Accessories (Trekstang, anchor bolt, stiffener, etc) 1.00
14 Backfilling work 5.41
15 Concrete slab for Canopy Area, t=10 cm 25.73
16 Permanent Pump Island (car) 1.00
17 Permanent Pump island (Motorcycle) 1.00
18 Polyethylene Dispensing Sump 2.00
19 Emergency Shut-Off Combo 1,5" 4.00

8
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

20 Dinabolt 10cm 4.00


21 Entryboots 2" 12.00
22 Entry Boots for cable 24.00
23 Hardener Concrete floor with Light Grey color 275.80
24 Island red guard 2.00
25 Floor tiles of 20x20 cm for pump Island area (car) 1.00
26 Floor tiles of 20x20 cm for pump Island area (Motorbike) 1.00
27 Refilling Boundary marking works (Car) 1.00
28 Refilling Boundary marking works (Motorbike) 1.00
29 Unloading Boundary marking works for Fuel Tanker 1.00
30 Painting works of Steel Column with Epoxi white Color of fin Poly Urethene standard 4.00
31 Canopy Ceiling Works
a. Flat 275.80
b. Vehicles Reflector 2.00
c Motorbike Reflector 4.00
32 Signage & Fascia

9
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

a. Logo + TIMOR GAP Brand 1.00


b. Lisplank Back Light 12.00
c. Suplement to the white Lisplank 7.00
d. Lisplank without lamp & acrylic 44.40
e. Car Sign Product double column 1.00
f. Product sign motors double column 1.00
g. Flashing Lisplank 60.00
h. Media advertise in Dispenser 2.00
i. Warning Sticker 25 cm x 45 cm 4.00
33 Lighting of Canopy and Lisplank Area
a. Lighting Installation 41.00
b. Asymmetrical Fluorescent Light T5 HO 1x80W 865 C1 - under canopy 9.00
c. Symmetrical Fluorescent Light-T5 HO 1x54W 865 C2&C3 above dispenser 10.00
d. T - Bar under Canopy 5.00
e. Osram Backlight 29 10V 38W RED 18.00
f. Osram Backlight 29 10V 38W WHITE 12.00

10
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

g. LED Lamp for Lisplank 3.00


h. Signage Back Light T5 - HE 1x W 865 C-4 lamp in dispenser (lamp for lisplank) 9.00
34 Grounding Dispensing Sump 2.00
35 Grounding Steel Frame for Canopy 1.00
36 Grounding connection with BC cable of 35mm2 50.00
37 PVC pipe Accessories and horizontal PVC pipe to flat gutter 1.00

Sub Total III

IV SUPPORTING BUILDING FOR FUEL STATION & GASOIL STORAGE


1 Structural Works
a. Excavation Works 87.54
b. Continuous Footing 1:5 62.04
c. Backfilling 21.89
d. Soil Embankment 72.00
e. Reinforcement Concrete of Ground Beam (15x20 cm) K225 3.83

11
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

f. Reinforcement Concrete of Column (15x15 cm) K225 2.70


h Floor Concrete Slab 1:3:5 12.00
i. Reinforcement Concrete of Upper Beam (15x20 cm) K225 4.08
j. Concrete gutter and canopyt=10 cm, K300 1.20
k. Waterproofing for canopy and concrete gutter 12.00
l Roof Structure
- Beam WF 150x75x5x7 533.12
- Purlin CNP 125x50x20 (3,2) 835.36
m Installation of Zincalume Colorbond 0.42 mm 228.00
n Roof Drain pipe & accessories 1.00
Construction of Security Post 1.00
Septick Tank Work
a. Excavation Works 6.81
b. Mortar Ground Leveling, t = 5 cm 0.08
c. Reinforcement Concrete, t = 5 cm 0.10

12
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

d. Masonry Brick wall (1:4) 20.00


e. Piping & Absortion Material 1.00
Sub Total Structural Works

2 Finishing Works
a. Brick wall & Plestering works
1 Masonry Brick Wall 1:4 247.00
2 Plestering & Rendering works 1:3 (Toilet) 45.00
3 Plestering & Rendering works 1:5 (Building) 220.69
b - Frame including Door & Window from Aluminium
1 Double door Frame Less glass tempered t.10mm uk.2,10x2x80 (PJ1) 5.00
2 Single door Frame tempered t.10mm 2,10x80 (P1) 4.00
3 Glass window Frame 64.36
4 Window type J1 5.00
6 Window type BV1 1.00

13
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

7 Door type P1 4.00


- Frame including Door & Window from Steel
1 Door type P3 2.00
- Frame including door from PVC for Toilet
1 Doortype P2 2.00
c Ceiling Works
1 Gypsum Board 9 mm 180.00
2 Ceiling Lis 117.00
d Floor woorks
- Installation Homogenous Tile
1 Floor 40x40 cm (polished) 173.25
2 Floor 30x30 cm (polished) 70.40
- Tile Installation
1 Floor 20x20 cm (non slip) 7.50
2 Wall 20x25 cm (polished) 56.00

14
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

3 Plint Homogenous Tile t. 10cm 175.00


e Painting Works
1 Internal Wall 307.23
2 External Wall 224.15
3 Ceiling 180.00
g. Sanitary & Pantry works
1 Clean out stainles steel 2.00
2 Floor Drain TX1BV1 2.00
3 Installation of wall t T23 B13V7N 2.00
4 Installationof Washtafel L529V1 1.00
5 Closet Cw420j 2.00
6 Jet Washer TX.403 SMCR 2.00
7 Mirror 1.00
Sub Total for Finishing Works

15
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

Sub Total IV

V AC, ELECTRICAL & GENSET WORK


1 AC & Ventilation of Mechanical Work
a AC Split 9.000 BTU/HR (1 PK) 3.00
b Fan wall : 200 CFM/1450RPM/0,2 KW 2.00
c Ceiling Fan /100 cfm/500 rpm/0,075 KW 2.00
Sub Total AC & Ventilation work

2 PANEL & CABLE WORKS


a Main Panel of Low Voltage 1.00
b Outside Lighting Panel 1.00
c Panel PP-FUEL 1.00
d Panel PP-PUMP 1.00
e Office Lighting Panel (PP-Office) 1.00

16
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

f Stabilizer 40 kva 1.00


g Distribution Cable NYY 1x4x50 mm²
i. From kWH-Meter EDTL to main Panel, NYY 1x4x50 mm² 30.00
ii. From Genset to PKG-1, NYY 1x4x50 mm² 15.00
iii From PKG-1 main panel, 22.50
h To PP-PL, 22.50
i To PP-FUEL, 22.50
j To PP-PUMP, 22.50
k To PP-OFFICE NYY 4x16 mm2 22.50
l. To PP-SUPPORTING NYY 4x16 mm2 22.50
m To the cell of lighting on canopy area: NYY 3 x 2,5 mm² 250.00
n Ke PJU, NYFGbY 4 x 2,5 mm² (untuk 1 group) 200.00
o To Signed Information cable Type NYFGbY 3x2,5 mm² 300.00
p From PP-FUEL NYRGbY 4 x 4 mm²
- To Fuel Pump-1, NYFGbY 4 x 4 mm² 25.00
- To Fuel Pump-2, NYFGbY 4 x 4 mm² 29.00

17
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

- To Fuel Pump-3, NYFGbY 4 x 4 mm² 33.00


- To Fuel Pump-4, NYFGbY 4 x 4 mm² 37.00
- To Fuel Pump-5, NYFGbY 4 x 4 mm² 41.00
- To Fuel Pump-6, NYFGbY 4 x 4 mm² 45.00
- To Dispensing Pump-01, NYFGbY 4 x 4 mm² 61.00
- ke Dispensing Pump-02, NYFGbY 4 x 4 mm² 0.00
- To Dispensing Pump-02, NYFGbY 4 x 4 mm² 66.00
- To Dispensing Pump-03, NYFGbY 4 x 4 mm² 74.00
- To Dispensing Pump-04, NYFGbY 4 x 4 mm² 85.00
q Installation of Lighting for access road 11.00
r Installation of single pole Lamp, double pole,engtrance & Exit Signage 6.00

Sub Total of Panel & Cable Works

3 LIGHTNINGROD WORK
a. Unit Air terminal, Electro Static System Radius = 68 Meter 1.00

18
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

b. Terminations Kits 1.00


c. Fiber Support Mast 1.00
d. Down Conductor Coaxial High Voltage Shelded cable 50.00
e. Grounding works 1.00
f. Supporting Material 1.00
g. Installation Fee 1.00
h. GIP Pole including base plate 1.00
i. TESTING & COMMISSIONING 1.00
Sub Total of Lightningrod works

4 GENSET WORK
a. Diesel Generating Set silent type cap 30 KVA 1.00
b. Reinforcement concrete for GENSET foundation, K300 0.90
c. Grounding Genset c/w Cooper rod, galvanized pipe 1", cable BC 50 mm 1.00
d. Exhaust/muffler works Including flexible connection,black steel Pipe to the box trap 3.00
e. Installation of ducting Intake fan by using BJLS 50 of 2 m length 1.00

19
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

f. Supply & Install of cable trey with 30 cm length 15.00


g. Testing & commisioning 1.00
Sub Total of GENSET work

5 POS (Point of Sale) SYSTEM


a. POS Software 1.00
b. Communication Cable From Dispenser to POS System 4.00
c. printer c/w RFID Reader 4.00
d. Hardware PC + Printer l (Industrial Std) 1.00
e. RFID card untuk kartu langanan
f. RFID Writer
e. GSM Modem u/ SMS 1.00
f. Commisioning 1.00
Sub Total PoS (Point of Sale) System

20
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

Sub Total V

VI DRAINAGE & PAVING WORKS


1 Reiforcement concrete K.300 t= 10 cm discharge point area
a Reinforcement concrete for Filling Point t = 10 cm 4.40
b Paving work t= 8 cm, K 400 (Fuel station Area) 1445.08
2 Floor Hardener on discharge point area 235.52
3 Thermoplastic road marking 1.00
4 Sparing cable for power, low voltage & data from PVC AW pipe 247.00
5 Ground Excavation (Rainfall & oil catcher channel) 38.89
6 Channel for rainfall from pipe culvert Ø 30 cm 214.59
7 Channel for oil catcher from PVC Ø100 155.81
8 Concrete Gutter under canopy 3.37
9 Steel works for upper concrete gutter at canopy area (40 cm width of elbow+Hollow steel combination) 20.22
10 Ground excavation (Decker & open channel) 30.40
11 Stone masonry 1:5 23.02

21
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

12 Reinforcement concrete slab for decker, t = 20 cm, w = 200 cm 3.84


13 Cast Concrete for upper part of stone masonry 3.66
14 Box Control & concrete covering 19.00
15 Concrete for landscape boundary (K350) 13.88
16 Landscape 1.00
17 Fresh water system
a. Sentrifugal transfer pump: 100 Liter/1'; head 15 m ; 1,1 HP 1.00
b Sentrifugal Presure pump : 75 Liter/1'; head 15 m ; 0,5 HP 1.00
c Roof Tank viber Capacity. 0,5 m3 2.00
d Ground water tank Silinder Horizontal & steel frame tower (Fiber Glass) 5 m3 1.00
e. PVC pipe Installation (AW/10 kg/cm2)
Pipe Diameter : 50 ( Header ) 5.00
40 mm 15.00
32 mm 40.00
25 mm 160.00
20 mm 20.00

22
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

15 mm 20.00
Bal Valve : 32 mm 8.00
Gate Valve : 32 mm 1.00
Sub Total VI

VII FIRE PROTECTION & SIGNAGE FACILITIES


1 Fire Protection Ficilities
a Fire Extinguisher box 2.00
b Fire Extinguisher ABC (Dry Chemical Powder 68 kg) 2.00
c Fire Extinguisher at the canopy Area (Dry Powder 9 Kg) 4.00
d CO2 capacity 5 Kg 2.00
e Installation of Oil Catcher and PE Materials 1.00
f Absortion well including inspection cap 8.00
g Observation well & manhole cover 3.00
h Observation well & manhole cover 5.00
2 Entrance & Exit Signage 2.00

23
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
FUEL STATION

No. Item Description Quantity

3 No Smoking Signage 1.00


4 Fuel unloading signage 1.00
5 Flag pole 1.00
6 Advertisement pole 6.00
Sub Total VII

GRAND TOTAL (I+II+III+IV+V+VI+VII)

24
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

LS $ - $ -
LS $ - $ -
LS $ - $ -
LS $ - $ -
LS $ - $ -
LS $ - $ -
LS $ - $ -
$ -

Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -

25
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
unit $ - $ -
unit $ - $ -
Cu.m $ - $ -
pcs $ - $ -
pcs $ - $ -

pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
Kg $ - $ -

26
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Kg $ - $ -
ltr $ - $ -
ltr $ - $ -

pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -

m' $ - $ -
m' $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -

27
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

pcs $ - $ -
pcs $ - $ -

Unit $ - $ -
Unit $ - $ -
Unit $ - $ -

Unit $ - $ -
Unit $ - $ -

Unit $ - $ -
Unit $ - $ -
Point $ - $ -
m $ - $ -

pcs $ - $ -

28
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -
pcs $ - $ -

$ -

Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -

29
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
Sq.m $ - $ -
m' $ - $ -
LS $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -

30
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Sq.m $ - $ -
unit $ - $ -
unit $ - $ -
unit $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
unit $ - $ -

Sq.m $ - $ -
Unit $ - $ -
Unit $ - $ -

31
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Unit $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
Unit $ - $ -
Unit $ - $ -
m' $ - $ -
Unit $ - $ -
Unit $ - $ -

Point $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
m' $ - $ -
m' $ - $ -

32
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

m' $ - $ -
Pcs $ - $ -
Unit $ - $ -
Unit $ - $ -
m' $ - $ -
Ls $ - $ -

$ -

Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -

33
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Sq.m $ - $ -

kg $ - $ -
kg $ - $ -
Sq.m $ - $ -
Ls $ - $ -
Ls $ - $ -

Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -

34
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Sq.m $ - $ -
Ls $ - $ -
$ -

Sq.m $ - $ -
Sq.m $ - $ -
Sq.m $ - $ -

Unit $ - $ -
Unit $ - $ -
Sq.m $ - $ -
Unit $ - $ -
Unit $ - $ -

35
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Unit $ - $ -

Unit $ - $ -

Unit $ - $ -

Sq.m $ - $ -
m' $ - $ -

Sq.m $ - $ -
Sq.m $ - $ -

Sq.m $ - $ -
Sq.m $ - $ -

36
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

m' $ - $ -

Sq.m $ - $ -
Sq.m $ - $ -
Sq.m $ - $ -

Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
Pcs $ - $ -
$ -

37
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

$ -

Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
$ -

Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -

38
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Unit $ - $ -

m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -

m' $ - $ -
m' $ - $ -

39
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
Point $ - $ -
Unit $ - $ -

$ -

Unit $ - $ -

40
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Set $ - $ -
Bar $ - $ -
m' $ - $ -
Unit $ - $ -
Lot $ - $ -
Ls $ - $ -
Lot $ - $ -
Ls $ - $ -
$ -

Unit $ - $ -
Cu.m $ - $ -
Lot $ - $ -
m' $ - $ -
Ls $ - $ -

41
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

m' $ - $ -
Ls $ - $ -
$ -

Unit $ - $ -
Point $ - $ -
Unit $ - $ -
Unit $ - $ -
lbr $ - $ -
Unit $ - $ -
Unit $ - $ -
Ls $ - $ -
$ -

42
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

$ -

Cu.m $ - $ -
Sq.m $ - $ -
Sq.m $ - $ -
Ls $ - $ -
m' $ - $ -
Cu.m $ - $ -
m' $ - $ -
m' $ - $ -
Cu.m $ - $ -
Sq.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -

43
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Cu.m $ - $ -
Cu.m $ - $ -
Pcs $ - $ -
Cu.m $ - $ -
Ls $ - $ -

Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Ls $ - $ -

m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -

44
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

m' $ - $ -
Pcs $ - $ -
Pcs $ - $ -
$ -

Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Ls $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -

45
UANTITY (BOQ)
STORAGE PROJECT IN TIMOR LESTE

Unit Price (US Total Amount


Unit
$) (US $)

Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
Unit $ - $ -
$ -

+III+IV+V+VI+VII) $ -

46
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
GASOIL STORAGE

No. Item Description Quantity

C GASOIL STORAGE
I CANOPY WORK
1 Excavation work for Foot plate 200x200x200 cm 8.70
2 Mortar Ground Leveling 0.44
3 Foot Plate Foundation K300 (Plate Thickness=30 cm) 2.40
4 Connecting Beam 30x50 cm 0.42
5 Reinforcement concrete Column K300 (40x40 cm) 0.54
6 Concrete work for composite structure 0.81
7 Supply & Installation of INP steel for Column 320X131X11.5X17.3X6.9mm 10.00
8 Supply & Installation of INP Steel for Beam 200X90X7.5X11.3X4.5mm 36.40
9 Supply & Installation of Truss structure RHS 50x50mm 84.00
10 Supply & Installation of purlin RHS 50X50mm 123.20
11 Supply & Installation of Zincalume Colorbond 0.42 mm 156.80
12 Supply & Installation of Fascia (Lisplank) Zincalume Colorbond 0.42 mm 50.40
13 Roof Accessories (Trekstang, anchor bolt, stiffener, etc) 1.00
14 Backfilling work 2.18

47
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
GASOIL STORAGE

No. Item Description Quantity

15 Concrete slab for Canopy Area, t=10 cm 15.68


Sub Total I

48
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
GASOIL STORAGE

No. Item Description Quantity

II TANK & PIPING WORK


a. Tank
1 Mortar Ground Leveling 4.80
2 Reinforcement Concrete K300 t= 15 cm 9.34
3 Installation of ISO TANK,Piping & Accessories 2.00
b. Diamond Wire mesh work for ISO tank fence
1 Excavation for foot plate (Pondasi Umpak) 0.77
2 Stone Masonry 1:5 0.32
3 Fabrication and Instalation Galvanize Pipe diameter 2" 36.80
4 Fabrication & Installation diamond wire mesh (Harmonika) 3mm*2m + Accessories 39.00
5 Fence gate of Harmonika diamond wire mesh (Piping + Accssesories for ISO TANK) 1.00
Sub Total II
III ELECTRICAL WORK
1 Supply & Installation of Electrical Work 1.00
Sub Total III
IV DRAINAGE & PAVING WORKS
1 Paving works K400 1903.94

49
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMOR LESTE
GASOIL STORAGE

No. Item Description Quantity

2 Drainage for rainfall by pipe culvert Ø 30 cm 126.50


3 Drainage for oil catcher pvc pipe Ø100 169.00
4 Concrete Gutter under canopy 2.52
5 Steel works for upper concrete gutter at canopy area (40 cm width of elbow+Hollow steel combination) 15.12
Steel works for upper concrete gutter at entrance & exit area (40 cm width of elbow+Hollow steel
6 7.20
combination)
7 Excavation of drainage for main gate (129.34 + 200 meter) 526.94
8 Stone Masonry 1:5 247.01
9 Plestering & Rendering 1:4 658.68
10 Concrete work 1:3:5 for upper part of drainage 8.23
Sub Total IV

GRAND TOTAL

50
OF QUANTITY (BOQ)
ASOIL STORAGE PROJECT IN TIMOR LESTE

Unit Price (US


Unit Total Amount (US $)
$)

Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
m' $ - $ -
Sq.m $ - $ -
m' $ - $ -
Ls $ - $ -
Cu.m $ - $ -

51
OF QUANTITY (BOQ)
ASOIL STORAGE PROJECT IN TIMOR LESTE

Unit Price (US


Unit Total Amount (US $)
$)

Cu.m $ - $ -
$ -

52
OF QUANTITY (BOQ)
ASOIL STORAGE PROJECT IN TIMOR LESTE

Unit Price (US


Unit Total Amount (US $)
$)

Cu.m $ - $ -
Cu.m $ - $ -
Pcs $ - $ -

Cu.m $ - $ -
Cu.m $ - $ -
m' $ - $ -
m' $ - $ -
Ls $ - $ -
$ -

Ls $ - $ -
$ -

Sq.m $ - $ -

53
OF QUANTITY (BOQ)
ASOIL STORAGE PROJECT IN TIMOR LESTE

Unit Price (US


Unit Total Amount (US $)
$)

m' $ - $ -
m' $ - $ -
Cu.m $ - $ -
Sq.m $ - $ -

Sq.m $ - $ -
Cu.m $ - $ -
Cu.m $ - $ -
Sq.m $ - $ -
Cu.m $ - $ -
$ -

ND TOTAL $ -

54
BILL OF QUANTITY (BOQ)
SUAI FUEL STATION AND GASOIL STORAGE PROJECT IN TIMO

SUMMARY

NO ITEM DESCRIPTION

A EARTHWORK & WALL FENCE

I EMBANKMENT WORK, FOUNDATION & WALL FENCE (2m High)

B FUEL STATION

I PREPARATION WORK

II UNDERGROUND TANK & PIPING WORK

III CANOPY WORKS

IV SUPPORTING BUILDING FOR FUEL STATION & GASOIL STORAGE

V AC, ELECTRICAL & GENSET WORK

VI DRAINAGE & PAVING WORKS

VII FIRE PROTECTION & SIGNAGE FACILITIES

C GASOIL STORAGE
I CANOPY WORK

II TANK & PIPING WORK

III ELECTRICAL WORK

IV DRAINAGE & PAVING WORKS

INCLUDING TAX

GRAND TOTAL (A+B+C)


OF QUANTITY (BOQ)
GASOIL STORAGE PROJECT IN TIMOR LESTE

SUMMARY

DESCRIPTION AMOUNT (US $)

$ -

WALL FENCE (2m High) $ -

$ -

$ -

$ -

$ -

ON & GASOIL STORAGE $ -

$ -

$ -

S $ -

$ -
$ -

$ -

$ -

$ -

DING TAX

TAL (A+B+C) $ -

S-ar putea să vă placă și